Clinker hopper equipment and its operation method Download PDFInfo
- Publication number
- JP3759764B2 JP3759764B2 JP02547595A JP2547595A JP3759764B2 JP 3759764 B2 JP3759764 B2 JP 3759764B2 JP 02547595 A JP02547595 A JP 02547595A JP 2547595 A JP2547595 A JP 2547595A JP 3759764 B2 JP3759764 B2 JP 3759764B2
- Authority
- JP
- Japan
- Prior art keywords
- clinker
- water
- hopper
- crusher
- clinker hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 114
- 239000000498 cooling water Substances 0.000 claims description 13
- 239000003245 coal Substances 0.000 claims description 7
- 238000007599 discharging Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000004380 ashing Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011819 refractory material Substances 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Landscapes
- Gasification And Melting Of Waste (AREA)
Description
【0001】
【産業上の利用分野】
本発明は微粉炭焚ボイラ用クリンカホッパに係り、特にクリンカホッパからのオーバーフロー水に含まれる浮灰を処理するのに好適なクリンカホッパ設備とその運転方法に関する。
【0002】
【従来の技術】
従来の微粉炭焚ボイラ用クリンカホッパからのオーバーフロー水に含まれる浮灰を処理する系統図を図2に示す。ボイラ火炉1の底部には複数のクリンカホッパ2が設けられている。図2に示す例では2つのクリンカホッパ2が設けられていて、各クリンカホッパ2には冷却水供給系統とクリンカ灰排出系統が接続している。また、ボイラ火炉1の下端部にはボイラ火炉水冷壁下部管寄管3およびシールプレート4が設けられ、該シールプレート4はクリンカホッパ2との境界に設けられたシールプレートトラフ5内の水面下に達するように配置されている。また、クリンカホッパ2内壁面には耐火材6が張られている。
【0003】
ボイラ火炉1から落下したクリンカ灰はクリンカホッパ2内の水により冷却され、一定時間(通常8時間)貯蔵された後、1ホッパずつクリンカホッパ2の底部に設けられたアッシュゲート11から排出され、アッシュゲートエンクロージャ12に送られる。アッシュゲートエンクロージャ12では、クリンカ灰はその底部に設けられたクラッシャ13により配管輸送に適した、通常25mm×25mm以下の大きさに粉砕され、水と一緒にエジェクタ14により脱水槽または灰捨池18までスラリ輸送される。このとき、エジェクタ高圧水入口弁16とエジェクタ出口弁17を全開とし、エジェクタ高圧水入口弁16の上流側の配管に接続した高圧水ポンプ15を起動することで、エンクロージャ12内の灰およびホッパ水はエジェクタ14によって送り出されて灰捨池18まで搬送される。
【0004】
クリンカホッパ2内部の水温は常時ボイラ火炉1からの輻射熱および落下したクリンカ灰によって持ち込まれる熱によって上昇するため、常時低圧水ポンプ22から冷却水が供給される。この冷却水はボイラ火炉1とクリンカホッパ2とを接合し、外気との遮断を目的としたシールトラフ5にまず供給され、次いでクリンカホッパ2の内部へオーバーフローするようになっている。クリンカホッパ2内を冷却した水は、クリンカホッパ2の壁面に設けられたオーバーフロー口7によりクリンカホッパ2外へ排出される。
【0005】
図3には図2のオーバーフロー口7の断面構造の拡大図を示す。クリンカホッパ2からの浮灰28の流出を防止するための堰26がオーバーフロー口7に取付けられているが、完全に浮灰28の流出を防止することは不可能であり、クリンカホッパケーシング29のフランジ27部分からオーバーフロー水は若干の浮灰28を伴って、オーバーフロー管8によりシールボックス9に排出される。
【0006】
シールボックス9は、クリンカホッパ2からの灰出し時、クリンカホッパ2内の貯水のレベルが下がり、ボイラ火炉1と外気とのシールが切れるのを防止する機能を有するものであり、常時オーバーフロー管8の先端はシールボックス9内の貯水により水封される構造である。シールボックス9内に導入されたオーバーフロー水は、さらにオーバーフロー水ピット21に排出され、さらにオーバーフロー水は排水ポンプ19により貯水槽または灰捨池20に排出される。
【0007】
【発明が解決しようとする課題】
上記従来技術は、クリンカホッパ2からのオーバーフロー水に含まれる浮灰28の量、大きさについて配慮がされておらず、ボイラの燃料炭種によっては、例えば、10cm×10cm程度の大きな浮灰28が多量にオーバーフロー水中に含まれ、オーバーフロー水排水ポンプ19によって搬送できないため、オーバーフロー水ピット21中に浮灰28が多量に堆積し、ボイラの運転が継続できなくなる問題があった。
【0008】
この問題の対策の一例として図4に示すようにシールボックス9の出口に25mm目開き程度のスクリーン30を設置した例はあるが、シールボックス9の容量が小さいため、頻繁にスクリーン30上の浮灰28を人力で除去作業を行う必要がある。
【0009】
本発明の目的は、クリンカホッパからのオーバーフロー水に多量に大きな浮灰が含まれていても、設備、機器を大幅に追加設置しないで、オーバーフロー水排水を系外に排出することである。また、本発明の目的はクリンカホッパからのオーバーフロー水に多量に大きな浮灰が含まれていても、この浮灰をポンプで搬送可能な大きさ以下に連続的に粉砕することにある。さらに、本発明の目的は、クリンカホッパからのオーバーフロー水に含まれる多量の大きな浮灰を、ポンプで搬送可能な大きさ以下に連続的に粉砕し、ボイラの安定連続運転を可能にすることにある。また、本発明の目的は、ボイラの連続運転中でもクリンカホッパ設備の点検、修理を可能にすることである。
【0010】
【課題を解決するための手段】
本発明の上記目的は、次の構成によって達成される。すなわち、微粉炭焚ボイラのボイラ火炉下に設置され、ボイラ火炉から落下するクリンカを冷却水により冷却し、一時貯蔵するクリンカホッパにおいて、前記クリンカホッパは複数のクリンカホッパから構成され、それぞれのクリンカホッパ出口に設置されたクラッシャと、それぞれのクリンカホッパに導入される冷却水のオーバーフローした水を前記クラッシャに導入する流路と、該流路に設けた、前記オーバーフローした水を導入するクラッシャを選択できる選択手段とを備えたクリンカホッパ設備である。
【0011】
更に、前記クラッシャに導入された水を排出する排出系への第一流路と、該第一流路に接続する排出系とは別の排出系へクラッシャに導入された水を排出する第二流路と、前記クラッシャに導入された前記オーバーフロー水を前記第一流路に導入し、前記クリンカホッパの出口から前記クラッシャに導入された水を前記第二流路に導入するように、前記第一流路と第二流路にそれぞれ設けた流路選択手段とを備えた請求項1記載のクリンカホッパ設備である。
【0013】
本発明の上記目的は、次の構成によっても達成される。すなわち、微粉炭焚ボイラのボイラ火炉下に設置し、ボイラ火炉から落下するクリンカを冷却水により冷却して一時貯蔵し、それぞれの出口にクラッシャを有する複数のクリンカホッパを設けたクリンカホッパ設備の運転方法であって、それぞれのクリンカホッパに導入される冷却水の中でクリンカホッパからオーバーフローする水を導入するクラッシャを選択し、該選択したクラッシャに前記オーバーフローする水を導入して、該オーバーフローした水に含まれる大きな浮灰をポンプにより搬送可能な大きさ以下に粉砕し、その後オーバーフロー水と送り出すクリンカホッパ設備の運転方法である。
【0014】
また、各クリンカホッパを一つずつ順次使用し、クリンカホッパ内のクリンカを当該クリンカホッパの出口に設置されているクラッシャに排出し、その後クリンカホッパからのオーバーフロー水を前記クリンカが排出されたクラッシャに導入する工程を、すべてのクリンカホッパで順次繰り返す請求項3記載のクリンカホッパ設備の運転方法などを採用することができる。
【0015】
【作用】
クリンカホッパに導入される冷却水がクリンカホッパからオーバーフローする水をクリンカホッパ出口に設置されたクラッシャに導入する流路として、例えばクリンカホッパに設けられたオーバーフロー口と下部にクラッシャを備えたアッシュゲートエンクロージャとを結ぶオーバーフロー水の流路を用いる。この場合には、オーバーフロー水中に含まれる浮灰は、アッシュゲートエンクロージャに設置されたクラッシャに流れ込み、大きな浮灰はクラッシャにより概ね25mm×25mm以下に粉砕され、一旦オーバーフロー水の貯槽に蓄えられる。しかし、浮灰はクラッシャにより、十分小さく粉砕されているので、オーバーフロー水の貯槽内のオーバーフロー水は排水ポンプなどで搬送が可能な大きさ(通常30mm×30mm以下)であり、前記オーバーフロー水の貯槽の底ざらいをする必要がない。
【0016】
また、ボイラ火炉に複数のクリンカホッパを設け、各クリンカホッパを一つずつ順次使用し、クリンカホッパ内のクリンカを当該クリンカホッパ出口に設置されているクラッシャに排出し、その後クリンカホッパからのオーバーフロー水を前記クリンカが排出されたクラッシャに導入する工程を、すべてのクリンカホッパで順次繰り返す運転方法を用いると、使用していないクラッシャの点検・修理時においても、ボイラを停止することなく運用する事が可能である。
【0017】
【実施例】
本発明の一実施例を図面とともに説明する。
図1に示す本実施例では、図2に示す従来技術と同一機能を奏する部材は同一番号を使用してその説明は省略する場合がある。
図1に示す本実施例は図2に示す装置にシールボックス9からのオーバーフロー水をアッシュゲートエンクロージャ12に供給する配管32と、クラッシャ13からのオーバーフロー水をオーバーフロー水ピット21に排出する配管33と、該配管32、33のオーバーフロー水弁23、25をそれぞれ追加し、さらに、クラッシャ13とエジェクタ14を結ぶ配管にエジェクタ入口弁24を設けたものである。
【0018】
ボイラ火炉1から落下したクリンカ灰はクリンカホッパ2内の水により冷却され、一定時間貯蔵される。また、クリンカホッパ2にはボイラ火炉1からの輻射熱および落下したクリンカ灰により持ち込まれる熱によるホッパ水の温度上昇防止と、シールトラフ5内の封水の補給の目的から常時低圧水ポンプ22より冷却水がシールトラフ5を経由して供給される。クリンカホッパ2内に供給された冷却水は連続的にオーバーフロー口7よりシールボックス9を経由して、二つあるうちの片側のアッシュゲートエンクロージャ12に導入される。二つのアッシュゲートエンクロージャ12の内のいずれを選択するかは、オーバーフロー水弁23にて行い、オーバーフロー水を受け入れる側のクラッシャ13は連続運転しており、オーバーフロー水に含まれる大きな浮灰28(図3参照)は、このクラッシャ13により概ね25mm×25mm以下に粉砕され、オーバーフロー水と一緒にオーバーフロー水弁25を経由してオーバーフロー水ピット21に排出される。さらにオーバーフロー水ピット21に排出されたオーバーフロー水と25mm×25mm以下に粉砕された浮灰は、オーバーフロー水排水ポンプ19により貯水槽または灰捨池20に排出される。
【0019】
一方、一定時間クリンカホッパ2内に貯蔵されたクリンカは、一つのホッパずつ順次灰出し運転が行われる。以下に本発明であるクリンカホッパ2の灰出し運転の手順例を示す。
(1)2つのクリンカホッパ2の内のいずれか一つ、灰出し運転を行うクリンカホッパ2を選択する。まず、灰出し運転を行うクリンカホッパ2は、オーバーフロー水を受け入れていない方のアッシュゲートエンクロージャ12側のものとする。
(2)灰出し運転が選択された側のアッシュゲートエンクロージャ12に設けられたクラッシャ13および高圧水ポンプ15を起動し、さらにエジェクタ出口弁17を全開とする。
(3)当該灰出し運転中のクリンカホッパ2側のエジェクタ高圧水入口弁16を全開とし、さらにエジェクタ入口弁24を全開とし、アッシュゲート11を全開とする。こうすることにより、エンクロージャ12を経て灰およびホッパ水はエジェクタ14によって送り出されて灰捨池18まで搬送される。
(4)クリンカホッパ2内の水位が低下し、内部のクリンカの排出が完了したら、当該ホッパ2のアッシュゲート11を全閉とする。さらに当該ホッパ2のエジェクタ高圧水入口弁16を全閉とし、エジェクタ出口弁17を全閉とする。これにより、灰およびホッパ水のエジェクタ14からの送出は停止される。
【0020】
なお、上記(1)〜(4)の工程により、一方のクリンカホッパ2中の灰処理を行った後、次の(5)〜(9)の工程で当該クリンカホッパ2内にオーバーフロー水を受け入れる。このとき、オーバーフロー水中の浮灰28を処理することができる。
(5)当該ホッパ2側のオーバーフロー水弁25およびオーバーフロー水弁23を全開とし、さらにエジェクタ入口弁24を全閉とする。これにより、大きな浮灰28を含むオーバーフロー水はアッシュゲートエンクロージャ12の中に導かれる。
(6)次に、オーバーフロー水を受け入れ中のアッシュゲートエンクロージャ12側のオーバーフロー水弁23およびオーバーフロー水弁25を全閉として、さらにエジェクタ入口弁24を全開とする。
(7)次いで、上記オーバーフロー水を受け入れていたアッシュゲートエンクロージャ12側のホッパ2の灰出し運転を選択し、上記と同様の灰出し運転を行う。
(8)当該ホッパ2のクリンカの排出が完了したら、当該ホッパ2のアッシュゲート11を全閉とし、さらに当該ホッパ2のエジェクタ高圧水入口弁16、エジェクタ出口弁17およびエジェクタ入口弁24を全閉とし、クラッシャ13を停止する。
(9)さらに高圧水ポンプ15を停止し、クリンカホッパ2からの灰出し運転を完了する。
【0021】
以上に示したような運転により、クリンカホッパ2のオーバーフロー口7から、オーバーフロー水と一緒に排出された浮灰28は、シールボックス9を経由してアッシュゲートエンクロージャ12内に導入される。アッシュゲートエンクロージャ12内に導入された浮灰28を含むオーバーフロー水は、アッシュゲートエンクロージャ12の底部に設置されたクラッシャ13に流れ込み、大きな浮灰28はクラッシャ13により概ね25mm×25mm以下に粉砕され、オーバーフロー水弁25を通って、オーバーフロー水ピット21に排出される。それによって、浮灰28はオーバーフロー水排水ポンプ19にて搬送可能な大きさ以下に全て粉砕されるため、オーバーフロー水ピット21内に残留することなく、オーバーフロー水排水ポンプ19により貯水槽または灰捨池20へ排出されるので、ボイラを停止して、オーバーフロー水ピット21内の底ざらいをする必要がない。
【0022】
本実施例によれば、クリンカホッパ2からの灰出し運転中にのみ使用していたクラッシャ13をクリンカホッパ2からのオーバーフロー水に含まれる大きな浮灰28の粉砕にも利用でき、オーバーフロー水ピット21内に残留する浮灰28を無くすことが可能となる。また、2台のクラッシャ13を交互に使用することができるため、万一のクラッシャ13の点検・修理時においても、ボイラを停止することなく運用する事が可能である。
【0023】
【発明の効果】
本発明によれば、クリンカホッパからのオーバーフロー水に含まれる大きな浮灰を設備、機器の大幅な追設をする必要がなく連続的に、ポンプで輸送可能な大きさまで粉砕処理し、オーバーフロー水排水ポンプで系外に排出できるので、ボイラを停止してオーバーフロー水ピットの清掃を行う必要がなくなり、ボイラの安定連続運転の確保および省力化が可能となる。
【図面の簡単な説明】
【図1】 本発明の一実施例のクリンカホッパ装置の系統図である。
【図2】 従来のクリンカホッパ装置の系統図である。
【図3】 クリンカホッパのオーバーフロー口の詳細断面構造図である。
【図4】 従来技術のシールボックスの断面図である。
【符号の説明】
1…ボイラ火炉、2…クリンカホッパ、7…オーバーフロー口、
9…シールボックス、11…アッシュゲート、
12…アッシュゲートエンクロージャ、13…クラッシャ、
14…エジェクタ、15…高圧水ポンプ、16…高圧水入口弁、
17…エジェクタ出口弁、18、20…貯水槽または灰捨池、
19…オーバーフロー水排水ポンプ、21…オーバーフロー水ピット、
23、25…オーバーフロー水弁、24…エジェクタ入口弁、28…浮灰、
32、33…配管[0001]
[Industrial application fields]
The present invention relates to a clinker hopper for a pulverized coal fired boiler, and more particularly to a clinker hopper facility suitable for treating floating ash contained in overflow water from the clinker hopper and an operation method thereof.
[0002]
[Prior art]
FIG. 2 shows a system diagram for treating floating ash contained in overflow water from a clinker hopper for a conventional pulverized coal fired boiler. A plurality of
[0003]
The clinker ash dropped from the
[0004]
Since the water temperature inside the
[0005]
FIG. 3 shows an enlarged view of the cross-sectional structure of the
[0006]
The
[0007]
[Problems to be solved by the invention]
In the above prior art, no consideration is given to the amount and size of the floating
[0008]
As an example of countermeasures against this problem, there is an example in which a
[0009]
An object of the present invention is to discharge overflow water drainage from the system without greatly installing additional equipment and equipment even if the overflow water from the clinker hopper contains a large amount of large floating ash. Another object of the present invention is to continuously pulverize the floating ash to a size that can be transported by a pump even if the overflow water from the clinker hopper contains a large amount of large floating ash. Furthermore, an object of the present invention is to continuously pulverize a large amount of large floating ash contained in overflow water from a clinker hopper to a size that can be transported by a pump, thereby enabling stable continuous operation of the boiler. is there. Another object of the present invention is to enable inspection and repair of clinker hopper equipment even during continuous operation of the boiler.
[0010]
[Means for Solving the Problems]
The above object of the present invention is achieved by the following configuration. That is, in a clinker hopper that is installed under a boiler furnace of a pulverized coal fired boiler, cools clinker falling from the boiler furnace with cooling water, and temporarily stores the clinker hopper, the clinker hopper includes a plurality of clinker hoppers. can select a crusher installed in the outlet, the flow path of the overflow water of the cooling water is introduced into the crusher to be introduced into each of the clinker hopper, provided in the flow path, the crusher of introducing the overflow water A clinker hopper facility provided with a selection means .
[0011]
Furthermore, a first flow path to a discharge system for discharging water introduced into the crusher and a second flow path for discharging water introduced into the crusher to a discharge system different from the discharge system connected to the first flow path And the first flow path so that the overflow water introduced into the crusher is introduced into the first flow path, and the water introduced into the crusher from the outlet of the clinker hopper is introduced into the second flow path. The clinker hopper facility according to
[0013]
The above object of the present invention can also be achieved by the following configuration. That is, the operation of the clinker hopper facility that is installed under the boiler furnace of the pulverized coal fired boiler, the clinker falling from the boiler furnace is cooled and temporarily stored with cooling water , and a plurality of clinker hoppers each having a crusher are provided at each outlet. a method to select a crusher for introducing water overflowed from the clinker hopper in a cooling water introduced into each of the clinker hopper, by introducing water to the overflow to the crusher was the selected and the overflow water Is a method of operating a clinker hopper facility that pulverizes large floating ash contained in the water to a size that can be conveyed by a pump, and then sends out overflow water.
[0014]
In addition, each clinker hopper is used one by one, and the clinker in the clinker hopper is discharged to a crusher installed at the outlet of the clinker hopper, and then the overflow water from the clinker hopper is discharged to the crusher from which the clinker is discharged. The operation method of the clinker hopper facility according to
[0015]
[Action]
For example, an ash gate enclosure having an overflow port provided in the clinker hopper and a crusher in the lower part as a flow path for introducing water into which the cooling water introduced into the clinker hopper overflows from the clinker hopper. The flow path of overflow water connecting In this case, the floating ash contained in the overflow water flows into the crusher installed in the ash gate enclosure, and the large floating ash is pulverized to approximately 25 mm × 25 mm or less by the crusher and temporarily stored in the overflow water storage tank. However, since the floating ash is pulverized sufficiently small by the crusher, the overflow water in the overflow water storage tank is of a size that can be transported by a drain pump or the like (usually 30 mm × 30 mm or less). You don't have to worry about the bottom.
[0016]
Also, a plurality of clinker hoppers are provided in the boiler furnace, and each clinker hopper is used one by one, and the clinker in the clinker hopper is discharged to a crusher installed at the clinker hopper outlet, and then overflow water from the clinker hopper If the operation method of repeatedly introducing the clinker into the crusher from which the clinker is discharged is used in an orderly manner in all clinker hoppers, it is possible to operate the boiler without stopping it even when checking and repairing crushers that are not in use. Is possible.
[0017]
【Example】
An embodiment of the present invention will be described with reference to the drawings.
In the present embodiment shown in FIG. 1, members having the same functions as those of the prior art shown in FIG.
The present embodiment shown in FIG. 1 has a
[0018]
The clinker ash dropped from the
[0019]
On the other hand, the clinker stored in the
(1) Select one of the two
(2) The
(3) The ejector high pressure water inlet valve 16 on the
(4) When the water level in the
[0020]
In addition, after the ash treatment in one
(5) The overflow water valve 25 and the
(6) Next, the
(7) Next, the ash removal operation of the
(8) When discharging of the clinker of the
(9) Further, the high
[0021]
By the operation as described above, the floating
[0022]
According to the present embodiment, the
[0023]
【The invention's effect】
According to the present invention, the large floating ash contained in the overflow water from the clinker hopper is continuously pulverized to a size that can be transported by a pump without the need for significant additional installation of equipment and equipment, and overflow water drainage Since it can be discharged out of the system by the pump, it is not necessary to stop the boiler and clean the overflow water pit, and it is possible to ensure stable continuous operation of the boiler and save labor.
[Brief description of the drawings]
FIG. 1 is a system diagram of a clinker hopper device according to an embodiment of the present invention.
FIG. 2 is a system diagram of a conventional clinker hopper device.
FIG. 3 is a detailed cross-sectional structure diagram of an overflow port of a clinker hopper.
FIG. 4 is a cross-sectional view of a prior art seal box.
[Explanation of symbols]
1 ... Boiler furnace, 2 ... Clinker hopper, 7 ... Overflow port,
9 ... seal box, 11 ... ash gate,
12 ... Ashgate enclosure, 13 ... Crusher,
14 ... ejector, 15 ... high pressure water pump, 16 ... high pressure water inlet valve,
17 ... Ejector outlet valve, 18, 20 ... Water tank or ash pond,
19 ... overflow water drain pump, 21 ... overflow water pit,
23, 25 ... Overflow water valve, 24 ... Ejector inlet valve, 28 ... Floating ash,
32, 33 ... Piping
Claims (4)
前記クリンカホッパは複数のクリンカホッパから構成され、
それぞれのクリンカホッパの出口に設置されたクラッシャと、
それぞれのクリンカホッパに導入される冷却水のオーバーフローした水を前記クラッシャに導入する流路と、
該流路に設けた、前記オーバーフローした水を導入するクラッシャを選択できる選択手段と
を備えたことを特徴とするクリンカホッパ設備。In a clinker hopper that is installed under the boiler furnace of a pulverized coal fired boiler, cools the clinker falling from the boiler furnace with cooling water, and temporarily stores it,
The clinker hopper is composed of a plurality of clinker hoppers ,
Crushers installed at the exit of each clinker hopper ,
Water overflowing cooling water introduced into each of the clinker hopper and the flow path for introducing to the crusher,
Provided the flow path, clinker hopper equipment, characterized in that it comprises a a <br/> selection means for selecting a crusher of introducing the overflow water.
該第一流路に接続する排出系とは別の排出系へクラッシャに導入された水を排出する第二流路と、
前記クラッシャに導入された前記オーバーフロー水を前記第一流路に導入し、前記クリンカホッパの出口から前記クラッシャに導入された水を前記第二流路に導入するように、前記第一流路と第二流路にそれぞれ設けた流路選択手段と
を備えたことを特徴とする請求項1記載のクリンカホッパ設備。 Furthermore, a first flow path to a discharge system for discharging water introduced into the crusher,
A second flow path for discharging water introduced into the crusher to a discharge system different from the discharge system connected to the first flow path;
The first flow path and the second flow path are introduced so that the overflow water introduced into the crusher is introduced into the first flow path, and the water introduced into the crusher from the outlet of the clinker hopper is introduced into the second flow path. A flow path selection means provided in each flow path;
The clinker hopper facility according to claim 1, further comprising:
それぞれのクリンカホッパに導入される冷却水の中でクリンカホッパからオーバーフローする水を導入するクラッシャを選択し、
該選択したクラッシャに前記オーバーフローする水を導入して、
該オーバーフローした水に含まれる大きな浮灰をポンプにより搬送可能な大きさ以下に粉砕し、
その後オーバーフロー水と送り出すことを特徴とするクリンカホッパ設備の運転方法。Installed in boiler furnace of a pulverized coal fired boiler, a clinker dropping from the boiler furnace and stored temporarily cooled by the cooling water, in clinker hopper equipment operation method in which a plurality of clinker hopper having a crusher to respective outlets There ,
Select the crusher for introducing water overflowed from the clinker hopper in a cooling water introduced into each of the clinker hopper,
Introducing the overflowing water into the selected crusher ;
Large浮灰contained in water that has the overflow ground to below the size that can be conveyed is by a pump,
A method of operating the clinker hopper facility, characterized in that the overflow water is then discharged.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02547595A JP3759764B2 (en) | 1995-02-14 | 1995-02-14 | Clinker hopper equipment and its operation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02547595A JP3759764B2 (en) | 1995-02-14 | 1995-02-14 | Clinker hopper equipment and its operation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08219434A JPH08219434A (en) | 1996-08-30 |
| JP3759764B2 true JP3759764B2 (en) | 2006-03-29 |
Family
ID=12167074
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP02547595A Expired - Fee Related JP3759764B2 (en) | 1995-02-14 | 1995-02-14 | Clinker hopper equipment and its operation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3759764B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018087920A1 (en) * | 2016-11-14 | 2018-05-17 | 中国電力株式会社 | Maintenance system for ash treatment waterway |
-
1995
- 1995-02-14 JP JP02547595A patent/JP3759764B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08219434A (en) | 1996-08-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100905562B1 (en) | Coke Drum Discharge System | |
| US1957583A (en) | Combustion apparatus | |
| JP3759764B2 (en) | Clinker hopper equipment and its operation method | |
| KR100324856B1 (en) | Slag treatment system | |
| US2344347A (en) | Material handling apparatus | |
| US1894267A (en) | Ash handling apparatus | |
| JP2020081917A (en) | Scum conveyance device | |
| KR850000354B1 (en) | Ash handling system with submerged scraper | |
| RU2508392C2 (en) | Slime dumping from reactor for production of synthesis gas | |
| CN109746086A (en) | Effluent treatment unit, crushing system and discharge substance treating method | |
| JP2003194324A (en) | Stream type device and method for discharging clinker ash | |
| KR101926240B1 (en) | Blowdown system | |
| KR102156855B1 (en) | Device for preventing slag reverse flow of tuyere | |
| US2852313A (en) | Apparatus and method for removing refuse | |
| JP6269898B1 (en) | Ash treatment channel maintenance system | |
| CN106458747B (en) | Water granulated slag manufacturing device and water granulated slag manufacturing method | |
| KR102332489B1 (en) | Ash handing apparatus of flay ash and method thereof | |
| KR102203622B1 (en) | Sludge conveying system | |
| KR20060109619A (en) | Evaporation High Concentration Wastewater Treatment System and Method | |
| CN216712130U (en) | Steel slag stewing system | |
| CN208250246U (en) | The slag-draining device of gasification furnace radiation waste pot | |
| US11828459B2 (en) | Cleaning of a recovery boiler | |
| US1912336A (en) | Furnace ash grinder and remover | |
| SU554288A1 (en) | Granulation plant | |
| KR0116245Y1 (en) | Coke Oven Gas Distributor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050628 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050816 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20051013 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060104 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060105 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090113 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100113 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100113 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110113 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120113 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |