Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3759764B2 - Clinker hopper equipment and its operation method - Google Patents
[go: Go Back, main page]

JP3759764B2 - Clinker hopper equipment and its operation method - Google Patents

Clinker hopper equipment and its operation method Download PDF

Info

Publication number
JP3759764B2
JP3759764B2 JP02547595A JP2547595A JP3759764B2 JP 3759764 B2 JP3759764 B2 JP 3759764B2 JP 02547595 A JP02547595 A JP 02547595A JP 2547595 A JP2547595 A JP 2547595A JP 3759764 B2 JP3759764 B2 JP 3759764B2
Authority
JP
Japan
Prior art keywords
clinker
water
hopper
crusher
clinker hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP02547595A
Other languages
Japanese (ja)
Other versions
JPH08219434A (en
Inventor
敬 川野
義人 川本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Babcock Hitachi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock Hitachi KK filed Critical Babcock Hitachi KK
Priority to JP02547595A priority Critical patent/JP3759764B2/en
Publication of JPH08219434A publication Critical patent/JPH08219434A/en
Application granted granted Critical
Publication of JP3759764B2 publication Critical patent/JP3759764B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Gasification And Melting Of Waste (AREA)

Description

【0001】
【産業上の利用分野】
本発明は微粉炭焚ボイラ用クリンカホッパに係り、特にクリンカホッパからのオーバーフロー水に含まれる浮灰を処理するのに好適なクリンカホッパ設備とその運転方法に関する。
【0002】
【従来の技術】
従来の微粉炭焚ボイラ用クリンカホッパからのオーバーフロー水に含まれる浮灰を処理する系統図を図2に示す。ボイラ火炉1の底部には複数のクリンカホッパ2が設けられている。図2に示す例では2つのクリンカホッパ2が設けられていて、各クリンカホッパ2には冷却水供給系統とクリンカ灰排出系統が接続している。また、ボイラ火炉1の下端部にはボイラ火炉水冷壁下部管寄管3およびシールプレート4が設けられ、該シールプレート4はクリンカホッパ2との境界に設けられたシールプレートトラフ5内の水面下に達するように配置されている。また、クリンカホッパ2内壁面には耐火材6が張られている。
【0003】
ボイラ火炉1から落下したクリンカ灰はクリンカホッパ2内の水により冷却され、一定時間(通常8時間)貯蔵された後、1ホッパずつクリンカホッパ2の底部に設けられたアッシュゲート11から排出され、アッシュゲートエンクロージャ12に送られる。アッシュゲートエンクロージャ12では、クリンカ灰はその底部に設けられたクラッシャ13により配管輸送に適した、通常25mm×25mm以下の大きさに粉砕され、水と一緒にエジェクタ14により脱水槽または灰捨池18までスラリ輸送される。このとき、エジェクタ高圧水入口弁16とエジェクタ出口弁17を全開とし、エジェクタ高圧水入口弁16の上流側の配管に接続した高圧水ポンプ15を起動することで、エンクロージャ12内の灰およびホッパ水はエジェクタ14によって送り出されて灰捨池18まで搬送される。
【0004】
クリンカホッパ2内部の水温は常時ボイラ火炉1からの輻射熱および落下したクリンカ灰によって持ち込まれる熱によって上昇するため、常時低圧水ポンプ22から冷却水が供給される。この冷却水はボイラ火炉1とクリンカホッパ2とを接合し、外気との遮断を目的としたシールトラフ5にまず供給され、次いでクリンカホッパ2の内部へオーバーフローするようになっている。クリンカホッパ2内を冷却した水は、クリンカホッパ2の壁面に設けられたオーバーフロー口7によりクリンカホッパ2外へ排出される。
【0005】
図3には図2のオーバーフロー口7の断面構造の拡大図を示す。クリンカホッパ2からの浮灰28の流出を防止するための堰26がオーバーフロー口7に取付けられているが、完全に浮灰28の流出を防止することは不可能であり、クリンカホッパケーシング29のフランジ27部分からオーバーフロー水は若干の浮灰28を伴って、オーバーフロー管8によりシールボックス9に排出される。
【0006】
シールボックス9は、クリンカホッパ2からの灰出し時、クリンカホッパ2内の貯水のレベルが下がり、ボイラ火炉1と外気とのシールが切れるのを防止する機能を有するものであり、常時オーバーフロー管8の先端はシールボックス9内の貯水により水封される構造である。シールボックス9内に導入されたオーバーフロー水は、さらにオーバーフロー水ピット21に排出され、さらにオーバーフロー水は排水ポンプ19により貯水槽または灰捨池20に排出される。
【0007】
【発明が解決しようとする課題】
上記従来技術は、クリンカホッパ2からのオーバーフロー水に含まれる浮灰28の量、大きさについて配慮がされておらず、ボイラの燃料炭種によっては、例えば、10cm×10cm程度の大きな浮灰28が多量にオーバーフロー水中に含まれ、オーバーフロー水排水ポンプ19によって搬送できないため、オーバーフロー水ピット21中に浮灰28が多量に堆積し、ボイラの運転が継続できなくなる問題があった。
【0008】
この問題の対策の一例として図4に示すようにシールボックス9の出口に25mm目開き程度のスクリーン30を設置した例はあるが、シールボックス9の容量が小さいため、頻繁にスクリーン30上の浮灰28を人力で除去作業を行う必要がある。
【0009】
本発明の目的は、クリンカホッパからのオーバーフロー水に多量に大きな浮灰が含まれていても、設備、機器を大幅に追加設置しないで、オーバーフロー水排水を系外に排出することである。また、本発明の目的はクリンカホッパからのオーバーフロー水に多量に大きな浮灰が含まれていても、この浮灰をポンプで搬送可能な大きさ以下に連続的に粉砕することにある。さらに、本発明の目的は、クリンカホッパからのオーバーフロー水に含まれる多量の大きな浮灰を、ポンプで搬送可能な大きさ以下に連続的に粉砕し、ボイラの安定連続運転を可能にすることにある。また、本発明の目的は、ボイラの連続運転中でもクリンカホッパ設備の点検、修理を可能にすることである。
【0010】
【課題を解決するための手段】
本発明の上記目的は、次の構成によって達成される。すなわち、微粉炭焚ボイラのボイラ火炉下に設置され、ボイラ火炉から落下するクリンカを冷却水により冷却し、一時貯蔵するクリンカホッパにおいて、前記クリンカホッパは複数のクリンカホッパから構成されそれぞれのクリンカホッパ出口に設置されたクラッシャと、それぞれのクリンカホッパに導入される冷却水オーバーフローした水を前記クラッシャに導入する流路該流路に設けた、前記オーバーフローした水を導入するクラッシャを選択できる選択手段と備えたクリンカホッパ設備である。
【0011】
更に、前記クラッシャに導入された水を排出する排出系への第一流路と、該第一流路に接続する排出系とは別の排出系へクラッシャに導入された水を排出する第二流路と、前記クラッシャに導入された前記オーバーフロー水を前記第一流路に導入し、前記クリンカホッパの出口から前記クラッシャに導入された水を前記第二流路に導入するように、前記第一流路と第二流路にそれぞれ設けた流路選択手段とを備えた請求項1記載のクリンカホッパ設備である
【0013】
本発明の上記目的は、次の構成によっても達成される。すなわち、微粉炭焚ボイラのボイラ火炉下に設置し、ボイラ火炉から落下するクリンカを冷却水により冷却し一時貯蔵し、それぞれの出口にクラッシャを有する複数のクリンカホッパを設けたクリンカホッパ設備の運転方法であってそれぞれのクリンカホッパに導入される冷却水の中でクリンカホッパからオーバーフローする水を導入するクラッシャを選択し、該選択したクラッシャに前記オーバーフローする水を導入して、オーバーフローした水に含まれる大きな浮灰をポンプにより搬送可能な大きさ以下に粉砕し、その後オーバーフロー水と送り出すクリンカホッパ設備の運転方法である。
【0014】
また、各クリンカホッパを一つずつ順次使用し、クリンカホッパ内のクリンカを当該クリンカホッパ出口に設置されているクラッシャに排出し、その後クリンカホッパからのオーバーフロー水を前記クリンカが排出されたクラッシャに導入する工程を、すべてのクリンカホッパで順次繰り返す請求項3記載のクリンカホッパ設備の運転方法などを採用することができる。
【0015】
【作用】
クリンカホッパに導入される冷却水がクリンカホッパからオーバーフローする水をクリンカホッパ出口に設置されたクラッシャに導入する流路として、例えばクリンカホッパに設けられたオーバーフロー口と下部にクラッシャを備えたアッシュゲートエンクロージャとを結ぶオーバーフロー水の流路を用いる。この場合には、オーバーフロー水中に含まれる浮灰は、アッシュゲートエンクロージャに設置されたクラッシャに流れ込み、大きな浮灰はクラッシャにより概ね25mm×25mm以下に粉砕され、一旦オーバーフロー水の貯槽に蓄えられる。しかし、浮灰はクラッシャにより、十分小さく粉砕されているので、オーバーフロー水の貯槽内のオーバーフロー水は排水ポンプなどで搬送が可能な大きさ(通常30mm×30mm以下)であり、前記オーバーフロー水の貯槽の底ざらいをする必要がない。
【0016】
また、ボイラ火炉に複数のクリンカホッパを設け、各クリンカホッパを一つずつ順次使用し、クリンカホッパ内のクリンカを当該クリンカホッパ出口に設置されているクラッシャに排出し、その後クリンカホッパからのオーバーフロー水を前記クリンカが排出されたクラッシャに導入する工程を、すべてのクリンカホッパで順次繰り返す運転方法を用いると、使用していないクラッシャの点検・修理時においても、ボイラを停止することなく運用する事が可能である。
【0017】
【実施例】
本発明の一実施例を図面とともに説明する。
図1に示す本実施例では、図2に示す従来技術と同一機能を奏する部材は同一番号を使用してその説明は省略する場合がある。
図1に示す本実施例は図2に示す装置にシールボックス9からのオーバーフロー水をアッシュゲートエンクロージャ12に供給する配管32と、クラッシャ13からのオーバーフロー水をオーバーフロー水ピット21に排出する配管33と、該配管32、33のオーバーフロー水弁23、25をそれぞれ追加し、さらに、クラッシャ13とエジェクタ14を結ぶ配管にエジェクタ入口弁24を設けたものである。
【0018】
ボイラ火炉1から落下したクリンカ灰はクリンカホッパ2内の水により冷却され、一定時間貯蔵される。また、クリンカホッパ2にはボイラ火炉1からの輻射熱および落下したクリンカ灰により持ち込まれる熱によるホッパ水の温度上昇防止と、シールトラフ5内の封水の補給の目的から常時低圧水ポンプ22より冷却水がシールトラフ5を経由して供給される。クリンカホッパ2内に供給された冷却水は連続的にオーバーフロー口7よりシールボックス9を経由して、二つあるうちの片側のアッシュゲートエンクロージャ12に導入される。二つのアッシュゲートエンクロージャ12の内のいずれを選択するかは、オーバーフロー水弁23にて行い、オーバーフロー水を受け入れる側のクラッシャ13は連続運転しており、オーバーフロー水に含まれる大きな浮灰28(図3参照)は、このクラッシャ13により概ね25mm×25mm以下に粉砕され、オーバーフロー水と一緒にオーバーフロー水弁25を経由してオーバーフロー水ピット21に排出される。さらにオーバーフロー水ピット21に排出されたオーバーフロー水と25mm×25mm以下に粉砕された浮灰は、オーバーフロー水排水ポンプ19により貯水槽または灰捨池20に排出される。
【0019】
一方、一定時間クリンカホッパ2内に貯蔵されたクリンカは、一つのホッパずつ順次灰出し運転が行われる。以下に本発明であるクリンカホッパ2の灰出し運転の手順例を示す。
(1)2つのクリンカホッパ2の内のいずれか一つ、灰出し運転を行うクリンカホッパ2を選択する。まず、灰出し運転を行うクリンカホッパ2は、オーバーフロー水を受け入れていない方のアッシュゲートエンクロージャ12側のものとする。
(2)灰出し運転が選択された側のアッシュゲートエンクロージャ12に設けられたクラッシャ13および高圧水ポンプ15を起動し、さらにエジェクタ出口弁17を全開とする。
(3)当該灰出し運転中のクリンカホッパ2側のエジェクタ高圧水入口弁16を全開とし、さらにエジェクタ入口弁24を全開とし、アッシュゲート11を全開とする。こうすることにより、エンクロージャ12を経て灰およびホッパ水はエジェクタ14によって送り出されて灰捨池18まで搬送される。
(4)クリンカホッパ2内の水位が低下し、内部のクリンカの排出が完了したら、当該ホッパ2のアッシュゲート11を全閉とする。さらに当該ホッパ2のエジェクタ高圧水入口弁16を全閉とし、エジェクタ出口弁17を全閉とする。これにより、灰およびホッパ水のエジェクタ14からの送出は停止される。
【0020】
なお、上記(1)〜(4)の工程により、一方のクリンカホッパ2中の灰処理を行った後、次の(5)〜(9)の工程で当該クリンカホッパ2内にオーバーフロー水を受け入れる。このとき、オーバーフロー水中の浮灰28を処理することができる。
(5)当該ホッパ2側のオーバーフロー水弁25およびオーバーフロー水弁23を全開とし、さらにエジェクタ入口弁24を全閉とする。これにより、大きな浮灰28を含むオーバーフロー水はアッシュゲートエンクロージャ12の中に導かれる。
(6)次に、オーバーフロー水を受け入れ中のアッシュゲートエンクロージャ12側のオーバーフロー水弁23およびオーバーフロー水弁25を全閉として、さらにエジェクタ入口弁24を全開とする。
(7)次いで、上記オーバーフロー水を受け入れていたアッシュゲートエンクロージャ12側のホッパ2の灰出し運転を選択し、上記と同様の灰出し運転を行う。
(8)当該ホッパ2のクリンカの排出が完了したら、当該ホッパ2のアッシュゲート11を全閉とし、さらに当該ホッパ2のエジェクタ高圧水入口弁16、エジェクタ出口弁17およびエジェクタ入口弁24を全閉とし、クラッシャ13を停止する。
(9)さらに高圧水ポンプ15を停止し、クリンカホッパ2からの灰出し運転を完了する。
【0021】
以上に示したような運転により、クリンカホッパ2のオーバーフロー口7から、オーバーフロー水と一緒に排出された浮灰28は、シールボックス9を経由してアッシュゲートエンクロージャ12内に導入される。アッシュゲートエンクロージャ12内に導入された浮灰28を含むオーバーフロー水は、アッシュゲートエンクロージャ12の底部に設置されたクラッシャ13に流れ込み、大きな浮灰28はクラッシャ13により概ね25mm×25mm以下に粉砕され、オーバーフロー水弁25を通って、オーバーフロー水ピット21に排出される。それによって、浮灰28はオーバーフロー水排水ポンプ19にて搬送可能な大きさ以下に全て粉砕されるため、オーバーフロー水ピット21内に残留することなく、オーバーフロー水排水ポンプ19により貯水槽または灰捨池20へ排出されるので、ボイラを停止して、オーバーフロー水ピット21内の底ざらいをする必要がない。
【0022】
本実施例によれば、クリンカホッパ2からの灰出し運転中にのみ使用していたクラッシャ13をクリンカホッパ2からのオーバーフロー水に含まれる大きな浮灰28の粉砕にも利用でき、オーバーフロー水ピット21内に残留する浮灰28を無くすことが可能となる。また、2台のクラッシャ13を交互に使用することができるため、万一のクラッシャ13の点検・修理時においても、ボイラを停止することなく運用する事が可能である。
【0023】
【発明の効果】
本発明によれば、クリンカホッパからのオーバーフロー水に含まれる大きな浮灰を設備、機器の大幅な追設をする必要がなく連続的に、ポンプで輸送可能な大きさまで粉砕処理し、オーバーフロー水排水ポンプで系外に排出できるので、ボイラを停止してオーバーフロー水ピットの清掃を行う必要がなくなり、ボイラの安定連続運転の確保および省力化が可能となる。
【図面の簡単な説明】
【図1】 本発明の一実施例のクリンカホッパ装置の系統図である。
【図2】 従来のクリンカホッパ装置の系統図である。
【図3】 クリンカホッパのオーバーフロー口の詳細断面構造図である。
【図4】 従来技術のシールボックスの断面図である。
【符号の説明】
1…ボイラ火炉、2…クリンカホッパ、7…オーバーフロー口、
9…シールボックス、11…アッシュゲート、
12…アッシュゲートエンクロージャ、13…クラッシャ、
14…エジェクタ、15…高圧水ポンプ、16…高圧水入口弁、
17…エジェクタ出口弁、18、20…貯水槽または灰捨池、
19…オーバーフロー水排水ポンプ、21…オーバーフロー水ピット、
23、25…オーバーフロー水弁、24…エジェクタ入口弁、28…浮灰、
32、33…配管
[0001]
[Industrial application fields]
The present invention relates to a clinker hopper for a pulverized coal fired boiler, and more particularly to a clinker hopper facility suitable for treating floating ash contained in overflow water from the clinker hopper and an operation method thereof.
[0002]
[Prior art]
FIG. 2 shows a system diagram for treating floating ash contained in overflow water from a clinker hopper for a conventional pulverized coal fired boiler. A plurality of clinker hoppers 2 are provided at the bottom of the boiler furnace 1. In the example shown in FIG. 2, two clinker hoppers 2 are provided, and a cooling water supply system and a clinker ash discharge system are connected to each clinker hopper 2. Also, a boiler furnace water cooling wall lower pipe header 3 and a seal plate 4 are provided at the lower end of the boiler furnace 1, and the seal plate 4 is below the water surface in the seal plate trough 5 provided at the boundary with the clinker hopper 2. Is arranged to reach. A refractory material 6 is stretched on the inner wall surface of the clinker hopper 2.
[0003]
The clinker ash dropped from the boiler furnace 1 is cooled by the water in the clinker hopper 2 and stored for a certain time (usually 8 hours), and then discharged from the ash gate 11 provided at the bottom of the clinker hopper 2 one by one. It is sent to the ash gate enclosure 12. In the ash gate enclosure 12, the clinker ash is crushed into a size of 25 mm × 25 mm or less, which is suitable for pipe transportation, by a crusher 13 provided at the bottom of the ash gate enclosure 12. It is transported to slurry. At this time, the ejector high-pressure water inlet valve 16 and the ejector outlet valve 17 are fully opened, and the high-pressure water pump 15 connected to the pipe upstream of the ejector high-pressure water inlet valve 16 is started, so that the ash and hopper water in the enclosure 12 are Is delivered by the ejector 14 and conveyed to the ash basin 18.
[0004]
Since the water temperature inside the clinker hopper 2 is constantly raised by the radiant heat from the boiler furnace 1 and the heat brought in by the clinker ash that has fallen, the cooling water is always supplied from the low-pressure water pump 22. This cooling water joins the boiler furnace 1 and the clinker hopper 2, and is first supplied to a seal trough 5 for the purpose of blocking external air, and then overflows into the clinker hopper 2. The water cooled in the clinker hopper 2 is discharged out of the clinker hopper 2 through the overflow port 7 provided on the wall surface of the clinker hopper 2.
[0005]
FIG. 3 shows an enlarged view of the cross-sectional structure of the overflow port 7 of FIG. Although the weir 26 for preventing the floating ash 28 from flowing out of the clinker hopper 2 is attached to the overflow port 7, it is impossible to completely prevent the floating ash 28 from flowing out. Overflow water is discharged from the flange 27 portion to the seal box 9 through the overflow pipe 8 together with some floating ash 28.
[0006]
The seal box 9 has a function of preventing the level of water stored in the clinker hopper 2 from being lowered when the ash is discharged from the clinker hopper 2, and the seal between the boiler furnace 1 and the outside air is not broken. The tip of is sealed with water stored in the seal box 9. The overflow water introduced into the seal box 9 is further discharged to the overflow water pit 21, and the overflow water is further discharged to the water storage tank or ash basin 20 by the drain pump 19.
[0007]
[Problems to be solved by the invention]
In the above prior art, no consideration is given to the amount and size of the floating ash 28 contained in the overflow water from the clinker hopper 2, and depending on the fuel coal type of the boiler, for example, a large floating ash 28 of about 10 cm × 10 cm. Is contained in the overflow water in a large amount and cannot be conveyed by the overflow water drain pump 19, so that a large amount of floating ash 28 accumulates in the overflow water pit 21, which makes it impossible to continue the operation of the boiler.
[0008]
As an example of countermeasures against this problem, there is an example in which a screen 30 having an opening of about 25 mm is installed at the outlet of the seal box 9 as shown in FIG. It is necessary to remove the ash 28 manually.
[0009]
An object of the present invention is to discharge overflow water drainage from the system without greatly installing additional equipment and equipment even if the overflow water from the clinker hopper contains a large amount of large floating ash. Another object of the present invention is to continuously pulverize the floating ash to a size that can be transported by a pump even if the overflow water from the clinker hopper contains a large amount of large floating ash. Furthermore, an object of the present invention is to continuously pulverize a large amount of large floating ash contained in overflow water from a clinker hopper to a size that can be transported by a pump, thereby enabling stable continuous operation of the boiler. is there. Another object of the present invention is to enable inspection and repair of clinker hopper equipment even during continuous operation of the boiler.
[0010]
[Means for Solving the Problems]
The above object of the present invention is achieved by the following configuration. That is, in a clinker hopper that is installed under a boiler furnace of a pulverized coal fired boiler, cools clinker falling from the boiler furnace with cooling water, and temporarily stores the clinker hopper, the clinker hopper includes a plurality of clinker hoppers. can select a crusher installed in the outlet, the flow path of the overflow water of the cooling water is introduced into the crusher to be introduced into each of the clinker hopper, provided in the flow path, the crusher of introducing the overflow water A clinker hopper facility provided with a selection means .
[0011]
Furthermore, a first flow path to a discharge system for discharging water introduced into the crusher and a second flow path for discharging water introduced into the crusher to a discharge system different from the discharge system connected to the first flow path And the first flow path so that the overflow water introduced into the crusher is introduced into the first flow path, and the water introduced into the crusher from the outlet of the clinker hopper is introduced into the second flow path. The clinker hopper facility according to claim 1, further comprising flow path selection means provided in each of the second flow paths .
[0013]
The above object of the present invention can also be achieved by the following configuration. That is, the operation of the clinker hopper facility that is installed under the boiler furnace of the pulverized coal fired boiler, the clinker falling from the boiler furnace is cooled and temporarily stored with cooling water , and a plurality of clinker hoppers each having a crusher are provided at each outlet. a method to select a crusher for introducing water overflowed from the clinker hopper in a cooling water introduced into each of the clinker hopper, by introducing water to the overflow to the crusher was the selected and the overflow water Is a method of operating a clinker hopper facility that pulverizes large floating ash contained in the water to a size that can be conveyed by a pump, and then sends out overflow water.
[0014]
In addition, each clinker hopper is used one by one, and the clinker in the clinker hopper is discharged to a crusher installed at the outlet of the clinker hopper, and then the overflow water from the clinker hopper is discharged to the crusher from which the clinker is discharged. The operation method of the clinker hopper facility according to claim 3 , wherein the introducing step is sequentially repeated in all clinker hoppers.
[0015]
[Action]
For example, an ash gate enclosure having an overflow port provided in the clinker hopper and a crusher in the lower part as a flow path for introducing water into which the cooling water introduced into the clinker hopper overflows from the clinker hopper. The flow path of overflow water connecting In this case, the floating ash contained in the overflow water flows into the crusher installed in the ash gate enclosure, and the large floating ash is pulverized to approximately 25 mm × 25 mm or less by the crusher and temporarily stored in the overflow water storage tank. However, since the floating ash is pulverized sufficiently small by the crusher, the overflow water in the overflow water storage tank is of a size that can be transported by a drain pump or the like (usually 30 mm × 30 mm or less). You don't have to worry about the bottom.
[0016]
Also, a plurality of clinker hoppers are provided in the boiler furnace, and each clinker hopper is used one by one, and the clinker in the clinker hopper is discharged to a crusher installed at the clinker hopper outlet, and then overflow water from the clinker hopper If the operation method of repeatedly introducing the clinker into the crusher from which the clinker is discharged is used in an orderly manner in all clinker hoppers, it is possible to operate the boiler without stopping it even when checking and repairing crushers that are not in use. Is possible.
[0017]
【Example】
An embodiment of the present invention will be described with reference to the drawings.
In the present embodiment shown in FIG. 1, members having the same functions as those of the prior art shown in FIG.
The present embodiment shown in FIG. 1 has a pipe 32 for supplying overflow water from the seal box 9 to the ash gate enclosure 12 and a pipe 33 for discharging overflow water from the crusher 13 to the overflow water pit 21 in the apparatus shown in FIG. The overflow water valves 23 and 25 of the pipes 32 and 33 are added, respectively, and the ejector inlet valve 24 is provided in the pipe connecting the crusher 13 and the ejector 14.
[0018]
The clinker ash dropped from the boiler furnace 1 is cooled by the water in the clinker hopper 2 and stored for a certain time. The clinker hopper 2 is always cooled by the low pressure water pump 22 for the purpose of preventing the hopper water temperature from rising due to the radiant heat from the boiler furnace 1 and the heat brought in by the clinker ash that has fallen, and refilling the sealed water in the seal trough 5. Water is supplied via the seal trough 5. The cooling water supplied into the clinker hopper 2 is continuously introduced from the overflow port 7 through the seal box 9 into one of the two ash gate enclosures 12. Which one of the two ash gate enclosures 12 is selected is determined by the overflow water valve 23, and the crusher 13 on the side receiving the overflow water is continuously operated, and a large floating ash 28 (see FIG. 3) is crushed to approximately 25 mm × 25 mm or less by the crusher 13 and discharged to the overflow water pit 21 through the overflow water valve 25 together with the overflow water. Further, the overflow water discharged to the overflow water pit 21 and the floating ash crushed to 25 mm × 25 mm or less are discharged to the water storage tank or the ash basin 20 by the overflow water drain pump 19.
[0019]
On the other hand, the clinker stored in the clinker hopper 2 for a certain period of time is sequentially ashed out one by one. Below, the example of a procedure of the ash extraction operation | movement of the clinker hopper 2 which is this invention is shown.
(1) Select one of the two clinker hoppers 2 to perform the ash removal operation. First, the clinker hopper 2 that performs the ash removal operation is assumed to be on the ash gate enclosure 12 side that does not accept overflow water.
(2) The crusher 13 and the high-pressure water pump 15 provided in the ash gate enclosure 12 on the side where the ash removal operation is selected are started, and the ejector outlet valve 17 is fully opened.
(3) The ejector high pressure water inlet valve 16 on the clinker hopper 2 side during the ashing operation is fully opened, the ejector inlet valve 24 is fully opened, and the ash gate 11 is fully opened. By doing so, the ash and the hopper water are sent out by the ejector 14 through the enclosure 12 and conveyed to the ash disposal basin 18.
(4) When the water level in the clinker hopper 2 decreases and the discharge of the clinker inside is completed, the ash gate 11 of the hopper 2 is fully closed. Further, the ejector high-pressure water inlet valve 16 of the hopper 2 is fully closed, and the ejector outlet valve 17 is fully closed. Thereby, the delivery of ash and hopper water from the ejector 14 is stopped.
[0020]
In addition, after the ash treatment in one clinker hopper 2 is performed by the steps (1) to (4), overflow water is received in the clinker hopper 2 in the following steps (5) to (9). . At this time, the floating ash 28 in the overflow water can be treated.
(5) The overflow water valve 25 and the overflow water valve 23 on the hopper 2 side are fully opened, and the ejector inlet valve 24 is fully closed. Thereby, the overflow water including the large floating ash 28 is guided into the ash gate enclosure 12.
(6) Next, the overflow water valve 23 and the overflow water valve 25 on the ash gate enclosure 12 side receiving the overflow water are fully closed, and the ejector inlet valve 24 is fully opened.
(7) Next, the ash removal operation of the hopper 2 on the ash gate enclosure 12 side that has received the overflow water is selected, and the ash removal operation similar to the above is performed.
(8) When discharging of the clinker of the hopper 2 is completed, the ash gate 11 of the hopper 2 is fully closed, and the ejector high-pressure water inlet valve 16, the ejector outlet valve 17 and the ejector inlet valve 24 of the hopper 2 are fully closed. And the crusher 13 is stopped.
(9) Further, the high pressure water pump 15 is stopped, and the ash removal operation from the clinker hopper 2 is completed.
[0021]
By the operation as described above, the floating ash 28 discharged together with the overflow water from the overflow port 7 of the clinker hopper 2 is introduced into the ash gate enclosure 12 through the seal box 9. The overflow water containing the floating ash 28 introduced into the ash gate enclosure 12 flows into the crusher 13 installed at the bottom of the ash gate enclosure 12, and the large ash 28 is pulverized to approximately 25 mm × 25 mm or less by the crusher 13, The water is discharged to the overflow water pit 21 through the overflow water valve 25. As a result, the floating ash 28 is all crushed to a size that can be conveyed by the overflow water drain pump 19, so that it does not remain in the overflow water pit 21, and the water tank or ash pond is retained by the overflow water drain pump 19. Therefore, it is not necessary to stop the boiler and clean the bottom of the overflow water pit 21.
[0022]
According to the present embodiment, the crusher 13 used only during the ash removal operation from the clinker hopper 2 can be used for crushing the large floating ash 28 contained in the overflow water from the clinker hopper 2, and the overflow water pit 21. It becomes possible to eliminate the floating ash 28 remaining inside. In addition, since the two crushers 13 can be used alternately, even when the crusher 13 is inspected and repaired, it can be operated without stopping the boiler.
[0023]
【The invention's effect】
According to the present invention, the large floating ash contained in the overflow water from the clinker hopper is continuously pulverized to a size that can be transported by a pump without the need for significant additional installation of equipment and equipment, and overflow water drainage Since it can be discharged out of the system by the pump, it is not necessary to stop the boiler and clean the overflow water pit, and it is possible to ensure stable continuous operation of the boiler and save labor.
[Brief description of the drawings]
FIG. 1 is a system diagram of a clinker hopper device according to an embodiment of the present invention.
FIG. 2 is a system diagram of a conventional clinker hopper device.
FIG. 3 is a detailed cross-sectional structure diagram of an overflow port of a clinker hopper.
FIG. 4 is a cross-sectional view of a prior art seal box.
[Explanation of symbols]
1 ... Boiler furnace, 2 ... Clinker hopper, 7 ... Overflow port,
9 ... seal box, 11 ... ash gate,
12 ... Ashgate enclosure, 13 ... Crusher,
14 ... ejector, 15 ... high pressure water pump, 16 ... high pressure water inlet valve,
17 ... Ejector outlet valve, 18, 20 ... Water tank or ash pond,
19 ... overflow water drain pump, 21 ... overflow water pit,
23, 25 ... Overflow water valve, 24 ... Ejector inlet valve, 28 ... Floating ash,
32, 33 ... Piping

Claims (4)

微粉炭焚ボイラのボイラ火炉下に設置され、ボイラ火炉から落下するクリンカを冷却水により冷却し、一時貯蔵するクリンカホッパにおいて、
前記クリンカホッパは複数のクリンカホッパから構成され
それぞれのクリンカホッパの出口に設置されたクラッシャと
それぞれのクリンカホッパに導入される冷却水オーバーフローした水を前記クラッシャに導入する流路
該流路に設けた、前記オーバーフローした水を導入するクラッシャを選択できる選択手段と
備えたことを特徴とするクリンカホッパ設備。
In a clinker hopper that is installed under the boiler furnace of a pulverized coal fired boiler, cools the clinker falling from the boiler furnace with cooling water, and temporarily stores it,
The clinker hopper is composed of a plurality of clinker hoppers ,
Crushers installed at the exit of each clinker hopper ,
Water overflowing cooling water introduced into each of the clinker hopper and the flow path for introducing to the crusher,
Provided the flow path, clinker hopper equipment, characterized in that it comprises a a <br/> selection means for selecting a crusher of introducing the overflow water.
更に、前記クラッシャに導入された水を排出する排出系への第一流路と、
該第一流路に接続する排出系とは別の排出系へクラッシャに導入された水を排出する第二流路と、
前記クラッシャに導入された前記オーバーフロー水を前記第一流路に導入し、前記クリンカホッパの出口から前記クラッシャに導入された水を前記第二流路に導入するように、前記第一流路と第二流路にそれぞれ設けた流路選択手段と
を備えたことを特徴とする請求項1記載のクリンカホッパ設備
Furthermore, a first flow path to a discharge system for discharging water introduced into the crusher,
A second flow path for discharging water introduced into the crusher to a discharge system different from the discharge system connected to the first flow path;
The first flow path and the second flow path are introduced so that the overflow water introduced into the crusher is introduced into the first flow path, and the water introduced into the crusher from the outlet of the clinker hopper is introduced into the second flow path. A flow path selection means provided in each flow path;
The clinker hopper facility according to claim 1, further comprising:
微粉炭焚ボイラのボイラ火炉下に設置し、ボイラ火炉から落下するクリンカを冷却水により冷却し一時貯蔵し、それぞれの出口にクラッシャを有する複数のクリンカホッパを設けたクリンカホッパ設備の運転方法であって
それぞれのクリンカホッパに導入される冷却水の中でクリンカホッパからオーバーフローする水を導入するクラッシャを選択し、
該選択したクラッシャに前記オーバーフローする水を導入して、
オーバーフローした水に含まれる大きな浮灰をポンプにより搬送可能な大きさ以下に粉砕し、
その後オーバーフロー水と送り出すことを特徴とするクリンカホッパ設備の運転方法。
Installed in boiler furnace of a pulverized coal fired boiler, a clinker dropping from the boiler furnace and stored temporarily cooled by the cooling water, in clinker hopper equipment operation method in which a plurality of clinker hopper having a crusher to respective outlets There ,
Select the crusher for introducing water overflowed from the clinker hopper in a cooling water introduced into each of the clinker hopper,
Introducing the overflowing water into the selected crusher ;
Large浮灰contained in water that has the overflow ground to below the size that can be conveyed is by a pump,
A method of operating the clinker hopper facility, characterized in that the overflow water is then discharged.
各クリンカホッパを一つずつ順次使用し、クリンカホッパ内のクリンカを当該クリンカホッパ出口に設置されているクラッシャに排出し、その後クリンカホッパからのオーバーフロー水を前記クリンカが排出されたクラッシャに導入する工程を、すべてのクリンカホッパで順次繰り返すことを特徴とする請求項記載のクリンカホッパ設備の運転方法。Each clinker hopper is used one by one in sequence, the clinker in the clinker hopper is discharged to a crusher installed at the outlet of the clinker hopper, and then the overflow water from the clinker hopper is introduced into the crusher from which the clinker is discharged. 4. The method of operating a clinker hopper facility according to claim 3 , wherein the process is sequentially repeated in all clinker hoppers.
JP02547595A 1995-02-14 1995-02-14 Clinker hopper equipment and its operation method Expired - Fee Related JP3759764B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02547595A JP3759764B2 (en) 1995-02-14 1995-02-14 Clinker hopper equipment and its operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02547595A JP3759764B2 (en) 1995-02-14 1995-02-14 Clinker hopper equipment and its operation method

Publications (2)

Publication Number Publication Date
JPH08219434A JPH08219434A (en) 1996-08-30
JP3759764B2 true JP3759764B2 (en) 2006-03-29

Family

ID=12167074

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02547595A Expired - Fee Related JP3759764B2 (en) 1995-02-14 1995-02-14 Clinker hopper equipment and its operation method

Country Status (1)

Country Link
JP (1) JP3759764B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018087920A1 (en) * 2016-11-14 2018-05-17 中国電力株式会社 Maintenance system for ash treatment waterway

Also Published As

Publication number Publication date
JPH08219434A (en) 1996-08-30

Similar Documents

Publication Publication Date Title
KR100905562B1 (en) Coke Drum Discharge System
US1957583A (en) Combustion apparatus
JP3759764B2 (en) Clinker hopper equipment and its operation method
KR100324856B1 (en) Slag treatment system
US2344347A (en) Material handling apparatus
US1894267A (en) Ash handling apparatus
JP2020081917A (en) Scum conveyance device
KR850000354B1 (en) Ash handling system with submerged scraper
RU2508392C2 (en) Slime dumping from reactor for production of synthesis gas
CN109746086A (en) Effluent treatment unit, crushing system and discharge substance treating method
JP2003194324A (en) Stream type device and method for discharging clinker ash
KR101926240B1 (en) Blowdown system
KR102156855B1 (en) Device for preventing slag reverse flow of tuyere
US2852313A (en) Apparatus and method for removing refuse
JP6269898B1 (en) Ash treatment channel maintenance system
CN106458747B (en) Water granulated slag manufacturing device and water granulated slag manufacturing method
KR102332489B1 (en) Ash handing apparatus of flay ash and method thereof
KR102203622B1 (en) Sludge conveying system
KR20060109619A (en) Evaporation High Concentration Wastewater Treatment System and Method
CN216712130U (en) Steel slag stewing system
CN208250246U (en) The slag-draining device of gasification furnace radiation waste pot
US11828459B2 (en) Cleaning of a recovery boiler
US1912336A (en) Furnace ash grinder and remover
SU554288A1 (en) Granulation plant
KR0116245Y1 (en) Coke Oven Gas Distributor

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050628

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050816

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051013

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060105

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090113

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100113

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100113

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110113

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120113

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees