JP3761282B2
JP3761282B2 JP10751497A JP10751497A JP3761282B2 JP 3761282 B2 JP3761282 B2 JP 3761282B2 JP 10751497 A JP10751497 A JP 10751497A JP 10751497 A JP10751497 A JP 10751497A JP 3761282 B2 JP3761282 B2 JP 3761282B2
Authority
JP
Japan
Prior art keywords
floor
hardware
bolt
building
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP10751497A
Other languages
Japanese (ja)
Other versions
JPH10299104A (en
Inventor
賢範 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP10751497A priority Critical patent/JP3761282B2/en
Publication of JPH10299104A publication Critical patent/JPH10299104A/en
Application granted granted Critical
Publication of JP3761282B2 publication Critical patent/JP3761282B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、建物の据付構造、建物ユニット及びユニット建物並びに床金物に関する。
【0002】
【従来の技術】
従来、床パネルの上部に壁パネルを立設してなる建物ユニットが用いられている。この建物ユニットを基礎の上に据付けるに際しては、特公平5−38102号公報に記載の如く、基礎に植設してあるアンカーボルトを床パネルの土台(下枠)に貫通し、該土台に緊結することとしている。
【0003】
【発明が解決しようする課題】
しかしながら、従来技術では、建物ユニットと基礎との接合構造が、基礎側のアンカーボルトを床パネルの土台に緊結することのみにより構成されているから、接合強度の向上に限界がある。
【0004】
本発明の課題は、建物ユニット等の建物と基礎との接合強度を向上することにある。
【0005】
【課題を解決するための手段】
請求項1に記載の本発明は、床構造体の上部に壁パネル又は柱を立設してなる建物の据付構造において、床構造体の下部に第一の床金物が格納され、床構造体の構造材の上面にボルト付き座金の座金部を添設し、該座金部から下方に延在されたボルト部を前記第一の床金物に緊結し、床構造体の下部に第二の床金物が格納され、壁パネル又は柱の垂直面に引き寄せ金物が取り付けられ、該引き寄せ金物を前記第二の床金物にボルトにより緊結して床構造体の上部にパネル又は柱が立設され、基礎に植設してあるアンカーボルトを、前記第一の床金物と第二の床金物のうち少なくとも第一の床金物に緊結してなるようにしたものである。
【0006】
請求項2に記載の本発明は、床構造体の上部に壁パネル又は柱を立設してなる建物ユニットにおいて、床構造体の下部に、第一の床金物が格納され、床構造体の構造材の上面にボルト付き座金の座金部を添設し、該座金部から下方に延在されたボルト部を前記第一の床金物に緊結してなり、床構造体の下部に第二の床金物が格納され、壁パネル又は柱の垂直面に引き寄せ金物が取り付けられ、該引き寄せ金物をボルトにより前記第二の床金物に緊結して床構造体の上部にパネル又は柱を立設してなり、前記第一の床金物と第二の床金物とを、基礎に植設してあるアンカーボルトを緊結可能に形成したものである。
【0007】
請求項3に記載の本発明は、請求項2に記載の建物ユニットを基礎に据付けてなるユニット建物であって、基礎に植設してあるアンカーボルトが、前記第一の床金物と第二の床金物のうち少なくとも第一の床金物に緊結されてなるようにしたものである。
【0008】
請求項4に記載の本発明は、請求項3に記載のユニット建物に用いられる第一の床金物及び第二の床金物であって、建物ユニットの床構造体の内部に格納され、該建物ユニットの床構造体の構造材の上面に添設されたボルト付き座金のボルト部のための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを備えてなることを特徴とする第一の床金物と、該建物ユニットの床構造体の上部に立設される壁パネル又は柱を固定するボルトのための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを備 えてなることを特徴とする第二の床金物とを備えてなるようにしたものである。
【0009】
請求項1に記載の本発明によれば下記(1)の作用がある。
(1)建物を基礎に据付けるに際し、基礎側のアンカーボルトが床構造体に格納してある第一の床金物に緊結される。そして、第一の床金物は、床構造体の構造材の上面に添設されたボルト付き座金のボルト部に緊結され、床構造体の全体と強固に一体化されている。従って、アンカーボルトは、単に床構造体に接合されるものでなく、ボルト付き座金と緊結されて床構造体の全体と強固に一体化されている第一の床金物と緊結されるものであり、建物と基礎との接合強度を向上できる。また壁パネル及び柱を床構造体の上部に立設するに際し、壁パネル及び柱に取り付けられた引き寄せ金物が床構造体に格納してある第二の床金物に緊結される。そして、第二の床金物は、床構造体の構造材を挿通するボルトによって床構造体を抱きかかえる如く引き寄せ金物に緊結され、床構造体の全体と強固に一体化されている。従って、壁パネル及び柱は、単に床構造体に接合されるものでなく、第二の床金物と緊結されて床構造体の全体と強固に緊結されるものであり、床構造体と壁パネル及び柱との接合強度を向上できる。さらに第二の床金物は、第一の床金物と同様に基礎側のアンカーボルト部に緊結することができる。従って、壁パネル及び柱を立設する 直下においてもアンカーボルトにより基礎と床構造体を緊結することができ、アンカーボルトの位置を壁パネル及び柱の位置とは無関係に設定することができる。
【0010】
請求項2、3に記載の本発明によれば下記(2)の作用がある。
(2)建物ユニットを基礎に据付けるに際し、基礎側のアンカーボルトが床構造体に格納してある第一の床金物に緊結される。そして、第一の床金物は、床構造体の構造材の上面に添設されたボルト付き座金のボルト部に緊結され、床構造体の全体と強固に一体化されている。従って、アンカーボルトは、単に床構造体に接合されるものでなく、ボルト付き座金と緊結されて床構造体の全体と強固に一体化されている第一の床金物と緊結されるものであり、建物ユニットと基礎との接合強度を向上できる。また壁パネル及び柱を床構造体の上部に立設するに際し、壁パネル及び柱に取り付けられた引き寄せ金物が床構造体に格納してある第二の床金物に緊結される。そして、第二の床金物は、床構造体の構造材を挿通するボルトによって床構造体を抱きかかえる如く引き寄せ金物に緊結され、床構造体の全体と強固に一体化されている。従って、壁パネル及び柱は、単に床構造体に接合されるものでなく、第二の床金物と緊結されて床構造体の全体と強固に緊結されるものであり、床構造体と壁パネル及び柱との接合強度を向上できる。さらに第二の床金物は、第一の床金物と同様に基礎側のアンカーボルト部に緊結することができる。従って、壁パネル及び柱を立設する直下においてもアンカーボルトにより基礎と床構造体を緊結することができ、アンカーボルトの位置を壁パネル及び柱の位置とは無関係に設定することができる。
【0011】
請求項に記載の本発明によれば下記(3)の作用がある。
(3)第一の床金物に、建物ユニットの床構造体の構造材の上面に添設されたボルト付き座金のボルト部のための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを併せ備えるようにした。従って、床構造体に格納されている第一の床金物を用いることにより、建物ユニットと基礎との接合強度を向上できる。また第二の床金物に、該建物ユニットの床構造体の上部に立設される壁パネル又は柱を固定するボルトのための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを併せ備えるようにした。従って、床構造体に格納されている第二の床金物を用いることにより、建物ユニットと基礎との接合強度及び床構造体と壁パネル及び柱との接合強度を向上できるとともに、アンカーボルトの位置を任意に設定することができる。
【0012】
【発明の実施の形態】
図1は建物ユニットと基礎との接合構造を示す模式図、図2は図1のII-II 線に沿う矢視図、図3は図1のIII-III 線に沿う矢視図、図4は第二の床金物を示す模式図、図5は引き寄せ金物を示す模式図、図6は第一の床金物を示す模式図、図7はボルト付き座金を示す模式図、図8はユニット建物と基礎との接合構造を示す模式図である。
【0013】
(建物ユニット)(図1〜図7)
建物ユニット10は、図1〜図3に示す如く、床構造体としての床パネル11の上部に壁パネル21を立設して構成される。
【0014】
床パネル11は、図1〜図3に示す如く、根太12と端根太13とを釘打ち及び/又は接着剤により接合した床枠組の下面に下枠14を釘打ち及び/又は接着剤により取着され、該床枠組の上面に床面材15を釘打ち及び/又は接着剤により取着されて構成される。
【0015】
壁パネル21は、図1〜図3に示す如く、下枠22と縦枠23と上枠24(不図示)とを釘打ち及び/又は接着剤により接合した壁枠組の両面に外壁面材25、内壁面材26を釘打ち及び/又は接着剤により取着されて構成される。
【0016】
そして、床パネル11と壁パネル21は、第二の床金物31と引き寄せ金物41とを用いて接合される。
【0017】
第二の床金物31は、図4に示す如く、2枚の側板32、32の上端部間に上支持部33を溶接され、下端部間に下支持部34を溶接されている。上支持部33にはボルト孔33Aが、下支持部34にはボルト孔34Aが設けられる。上支持部33の下面には裏ナット35が溶接されている。両側板32、32の前端部には止め板36が溶接されている。第二の床金物31は、床パネル11における根太12の下端側に設けた切欠部12Aに嵌め込まれ、両止め板36、36を切欠部12Aの両側の根太表面に当てられてこの止め板36、36を根太12に釘打ちされることにより仮止めされる。切欠部12Aに嵌め込まれた第二の床金物31の下面は、床パネル11の下枠14(土台)の下面と面一をなすようになっている。
【0018】
引き寄せ金物41は、図5に示す如く、壁パネル21の縦枠23の側面に添設される平板42と、平板42に溶接される支持板43と、支持板43を補強する補強板44とを有する。平板42にはボルト孔42Aが、支持板43にはボルト孔43Aが設けられる。
【0019】
従って、床パネル11と壁パネル21は、第二の床金物31と引き寄せ金物41を用いて以下の如くにより接合される。
(イ)床パネル11の根太12に設けた切欠部12Aに第二の床金物31を嵌め込み格納し、止め板36を根太12に釘打ちすることにて第二の床金物31を仮止めする。
【0020】
(ロ)壁パネル21の縦枠23の側面に引き寄せ金物41の平板42をボルト45により固定する。ボルト45は縦枠23に設けられているボルト挿通孔を外面側から挿通され、座金頭45Aを縦枠23に釘打ちされて回り止めされ、平板42のボルト孔42Aを貫通してナット45Bで固定される。
【0021】
(ハ)第二の床金物31の上支持部33と引き寄せ金物41の支持板43とをボルト38により緊結する。ボルト38は、第二の床金物31の裏ナット35に螺着された状態で、第二の床金物31のボルト孔33A、床パネル11の根太12、床面材15に設けたボルト挿通孔12B、15A、壁パネル21の下枠22に設けたボルト挿通孔22A、引き寄せ金物41の支持板43のボルト孔43Aを挿通され、その挿通端にナット38Aを螺着される。
【0022】
尚、ユニット建物10において、引き寄せ金物41は壁内、即ち壁パネル21の壁面材25、26に挟まれる縦枠23の側面に固定されるようになっている。そして、ユニット建物10にあっては、工場生産段階で、上記(イ)(ハ)により床パネル11と壁パネル21とを接合した後、内壁面材26を取着完了することとしている。
【0023】
従って、建物ユニット10によれば、以下の作用がある。建物ユニット10において、床パネル11の上部に壁パネル21を立設するに際し、床パネル11に格納した第二の床金物31に固定したボルト38と、壁パネル21の縦枠23の側面に固定した引き寄せ金物41とを緊結することとした。従って、第二の床金物31は、床パネル11を抱きかかえる如くにして壁パネル21の縦枠23に固定した引き寄せ金物41に緊結され、床パネル11と壁パネル21との接合強度を向上できる。
【0024】
また、床パネル11には、建物ユニット10を基礎1に据付けるための第一の床金物31Aとボルト付き座金51とが設けられている。
【0025】
第一の床金物31Aは、図6に示す如く、前述した第二の床金物31から、裏ナット35、止め板36を撤去したものである。即ち、第一の床金物31Aは、2枚の側板32、32の上端部間に上支持部33を溶接され、下端部間に下支持部34を溶接されている。上支持部33にはボルト孔33Aが、下支持部34にはボルト孔34Aが設けられる。第一の床金物31Aは、床パネル11における根太12の下端側に設けた切欠部12Cに嵌め込まれ、切欠部12Cに嵌め込まれた第一の床金物31Aの下面は、床パネル11の下枠14(土台)の下面と面一をなすようになっている。
【0026】
ボルト付き座金51は、図7に示す如く、座金部52にボルト部53を溶接して構成される。54はナットである。
【0027】
即ち、図1、図3に示す如く、床パネル11の根太12の上面に切欠部12Dを設けるとともに、この切欠部12Dから前述の第一の床金物31Aを嵌め込むための切欠部12Cにまで貫通するボルト挿通孔12Eを設ける。そして、ボルト付き座金51のボルト部53をボルト挿通孔12Cに挿通し、座金部52を切欠部12Dに嵌め込み、座金部52を根太12の上面に釘打ちして仮止めしておく。そして、床パネル11の根太12の下端側に設けた切欠部12Cに第一の床金物31Aを嵌め込み、第一の床金物31Aの上支持部33のボルト孔33Aを上記ボルト付き座金51のボルト部53に嵌め、該ボルト部53の先端部にナット54を螺着することにて、第一の床金物31Aとボルト付き座金51とを結合し、それらの第一の床金物31Aとボルト付き座金51を床パネル11の根太12に一体化する。第一の床金物31Aの下支持部34は基礎1のアンカーボルト2との緊結部として用いられるものとなる。
【0028】
(建物ユニットと基礎との接合構造)(図1〜図3、図8)
図1〜図3のユニット建物100は、上述の建物ユニット10を基礎1の上に据付けて構築される。このとき、基礎1は建物ユニット10の壁パネル21における縦枠23の位置と無関係な位置を、アンカーボルト2の標準位置として定めたものであり、本実施形態では、縦枠23に固定した引き寄せ金物41とボルト38で緊結された第二の床金物31がアンカーボルト2の位置から外れたものとなっている。このため、本実施形態の建物ユニット10では、床パネル11におけるアンカーボルト2に対応する位置に上述の第一の床金物31A、ボルト付き座金51を設け、この第一の床金物31Aの下支持部34にアンカーボルト2を緊結したものである。アンカーボルト2は、第一の床金物31Aの下支持部34のボルト孔34Aを通って座金3、ナット4にて締結される。
【0029】
尚、建物ユニット10における壁パネル21の縦枠23に固定した引き寄せ金物41とボルト38で緊結された第二の床金物31が、基礎1におけるアンカーボルト2の標準位置に対応するものであれば、この第二の床金物31の下支持部34にアンカーボルト2を緊結できる(図8)。
【0030】
従って、ユニット建物100によれば以下の作用がある。
(A)建物ユニット10を基礎1に据付けるに際し、基礎1側のアンカーボルト2が床パネル11に格納してある第一の床金物31Aに緊結される。そして、第一の床金物31Aは、床パネル11の根太12の上面に添設されたボルト付き座金51のボルト部53に緊結され、床パネル11の全体と強固に一体化される。従って、アンカーボルト2は、単に床パネル11に接合されるものでなく、ボルト付き座金51と緊結されて床パネル11の全体と強固に一体化されている第一の床金物31Aと緊結されるものであり、建物ユニット10と基礎1との接合強度を向上できる。
(B)壁パネル21を床パネル11の上部に立設するに際し、壁パネル21に取り付けられた引き寄せ金物41が床パネル11に格納してある第二の床金物31に緊結される。そして、第二の床金物31は、床パネル11の根太12を挿通するボルト38によって床パネル11を抱きかかえる如く引き寄せ金物41に緊結され、床パネル11の全体と強固 に一体化されている。従って、壁パネル21は、単に床パネル11に接合されるものでなく、第二の床金物31と緊結されて床パネル11の全体と強固に緊結されるものであり、床パネル11と壁パネル21との接合強度を向上できる。
【0031】
(C)第一の床金物31Aは、建物ユニット10の床パネル11の根太12の上面に添設されたボルト付き座金51のボルト部53のための上支持部33と、基礎1に植設してあるアンカーボルト2のための下支持部34とを併せ備えるようにした。従って、床パネル11に格納されている第一の床金物31Aを用いることにより、建物ユニット10と基礎1との接合強度を向上できる。
(D)第二の床金物31は、建物ユニット10の床パネル11の上部に立設される壁パネル21を固定するボルト38のための上支持部33と、基礎1に植設してあるアンカーボルト2のための下支持部34とを併せ備えるようにした。従って、床パネル11に格納されている第二の床金物31を用いることにより、建物ユニット10と基礎1との接合強度及び床パネル11と壁パネル21との接合強度を向上できるとともに、アンカーボルト2の位置を任意に設定することができる。
【0032】
以上、本発明の実施の形態を図面により詳述したが、本発明の具体的な構成はこの実施の形態に限られるものではなく、本発明の要旨を逸脱しない範囲の設計の変更等があっても本発明に含まれる。例えば、本発明の床金物とボルト付き座金とを用いる建物の接合構造は、床構造体を床梁とするもの、床構造体の上部に柱を立設するものにも適用できる。また、本発明の建物の接合構造は、ユニット建物に限らず、広く一般の建物にも適用できる。
【0033】
【発明の効果】
以上のように本発明によれば、建物ユニット等の建物と基礎との接合強度を向上することができる。
【図面の簡単な説明】
【図1】図1は建物ユニットと基礎との接合構造を示す模式図である。
【図2】図2は図1のII-II 線に沿う矢視図である。
【図3】図3は図1のIII-III 線に沿う矢視図である。
【図4】図4は第二の床金物を示す模式図である。
【図5】図5は引き寄せ金物を示す模式図である。
【図6】図6は第一の床金物を示す模式図である。
【図7】図7はボルト付き座金を示す模式図である。
【図8】図8はユニット建物と基礎との接合構造を示す模式図である。
【符号の説明】
1 基礎
2 アンカーボルト
10 建物ユニット
11 床パネル
21 壁パネル
23 縦枠
31 第二の床金物
31A 第一の床金物
33 上支持部
34 下支持部
51 ボルト付き座金
52 座金部
53 ボルト部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building installation structure, a building unit, a unit building, and a floor hardware.
[0002]
[Prior art]
Conventionally, a building unit is used in which a wall panel is erected on an upper part of a floor panel. When installing this building unit on the foundation, as described in Japanese Examined Patent Publication No. 5-38102, anchor bolts installed in the foundation are passed through the foundation (lower frame) of the floor panel, We are going to be tight.
[0003]
[Problems to be solved by the invention]
However, in the prior art, since the joint structure between the building unit and the foundation is configured only by fastening the anchor bolt on the foundation side to the base of the floor panel, there is a limit in improving the joint strength.
[0004]
The subject of this invention is improving the joining strength of buildings, such as a building unit, and a foundation.
[0005]
[Means for Solving the Problems]
According to the first aspect of the present invention, in the installation structure of a building in which a wall panel or a column is erected on the upper part of the floor structure, the first floor hardware is stored in the lower part of the floor structure, and the floor structure and additionally provided a washer of the bolt with washers on the top surface of the structural material, and Tightened the bolt portion which extends downwardly from said seat gold section to the first bed hardware, second bed in the lower portion of the floor structure The hardware is stored, the attracting hardware is attached to the vertical surface of the wall panel or pillar, the panel or pillar is erected on the upper part of the floor structure by fastening the attracting hardware to the second floor hardware with a bolt, the anchor bolts are implanted in, in which as formed by Tightened at least first bed hardware of the first bed hardware and second bed hardware.
[0006]
The present invention according to claim 2 is a building unit in which a wall panel or a column is erected on the upper part of the floor structure, wherein the first floor hardware is stored in the lower part of the floor structure, the washer of the bolt with washers on the top surface of the structural material is additionally provided, it was Tightened the bolt portion which extends downwardly from said seat gold section to the first bed hardware, lower the second floor structure bed hardware is stored, hardware attached attracted to the vertical plane of the wall panel or column, the drawn hardware to be Tightened on the second floor hardware by bolts erected top to wall panels or pillars of the floor structure Thus, the first floor hardware and the second floor hardware are formed so that the anchor bolts planted on the foundation can be fastened together .
[0007]
The present invention of claim 3 is a unit building comprising mounted on foundation building unit according to claim 2, the anchor bolts are planted in foundation, the first bed hardware and the second The floor hardware is tightly coupled to at least the first floor hardware.
[0008]
The present invention described in claim 4 is a first floor hardware and a second floor hardware used in the unit building according to claim 3, and is housed inside the floor structure of the building unit. an upper support for the bolt portion of the upper surface is additionally provided a bolt with washers structural member of the floor structure of the unit, by comprising a lower support for the anchor bolt that is planted in the underlying A first floor hardware characterized by: an upper support for fixing a wall panel or pillar standing on the top of the floor structure of the building unit; and an anchor bolt planted on the foundation it is obtained by the so and a second bed hardware characterized by comprising Bei Ete and a lower support for the.
[0009]
According to the first aspect of the present invention, the following effect (1) is obtained.
(1) When installing the building on the foundation, the anchor bolt on the foundation side is fastened to the first floor hardware stored in the floor structure. The first floor hardware is tightly coupled to the bolt portion of the washer with the bolt attached to the upper surface of the structural material of the floor structure, and is firmly integrated with the entire floor structure. Therefore, the anchor bolt is not simply joined to the floor structure, but is fastened to the first floor hardware that is tightly coupled with the bolted washer and firmly integrated with the entire floor structure. The joint strength between the building and the foundation can be improved. Further, when the wall panel and the pillar are erected on the upper portion of the floor structure, the attracting hardware attached to the wall panel and the pillar is fastened to the second floor hardware stored in the floor structure. The second floor hardware is tightly coupled to the attracting hardware so as to hold the floor structure with bolts that pass through the structural material of the floor structure, and is firmly integrated with the entire floor structure. Therefore, the wall panel and the pillar are not simply joined to the floor structure, but are tightly joined to the whole floor structure by being fastened to the second floor hardware. And the joint strength with the pillar can be improved. Furthermore, the second floor hardware can be fastened to the anchor bolt portion on the base side in the same manner as the first floor hardware. Therefore, the foundation and the floor structure can be tightly coupled by the anchor bolt even immediately below the wall panel and the column, and the position of the anchor bolt can be set regardless of the position of the wall panel and the column.
[0010]
According to the second and third aspects of the present invention, the following effect (2) is obtained.
(2) When the building unit is installed on the foundation, the anchor bolt on the foundation side is tightly connected to the first floor hardware stored in the floor structure. The first floor hardware is tightly coupled to the bolt portion of the washer with the bolt attached to the upper surface of the structural material of the floor structure, and is firmly integrated with the entire floor structure. Therefore, the anchor bolt is not simply joined to the floor structure, but is fastened to the first floor hardware that is tightly coupled with the bolted washer and firmly integrated with the entire floor structure. The joint strength between the building unit and the foundation can be improved. Further, when the wall panel and the pillar are erected on the upper portion of the floor structure, the attracting hardware attached to the wall panel and the pillar is fastened to the second floor hardware stored in the floor structure. The second floor hardware is tightly coupled to the attracting hardware so as to hold the floor structure with bolts that pass through the structural material of the floor structure, and is firmly integrated with the entire floor structure. Therefore, the wall panel and the pillar are not simply joined to the floor structure, but are tightly joined to the whole floor structure by being fastened to the second floor hardware. And the joint strength with the pillar can be improved. Furthermore, the second floor hardware can be fastened to the anchor bolt portion on the base side in the same manner as the first floor hardware. Therefore, the foundation and the floor structure can be tightly coupled by the anchor bolt even immediately below the wall panel and the column, and the position of the anchor bolt can be set regardless of the position of the wall panel and the column.
[0011]
According to the fourth aspect of the present invention, the following effect (3) is obtained.
(3) An upper support portion for the bolt portion of the washer with the bolt attached to the upper surface of the structural material of the floor structure of the building unit on the first floor hardware, and anchor bolts embedded in the foundation And a lower support portion. Therefore, the joint strength between the building unit and the foundation can be improved by using the first floor hardware stored in the floor structure. In addition, an upper support for a bolt for fixing a wall panel or a pillar standing on the upper part of the floor structure of the building unit, and an anchor bolt installed on the foundation are mounted on the second floor hardware. A lower support part is also provided. Therefore, by using the second floor hardware stored in the floor structure, the joint strength between the building unit and the foundation and the joint strength between the floor structure, the wall panel, and the column can be improved, and the position of the anchor bolt Can be set arbitrarily.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
1 is a schematic diagram showing a joint structure between a building unit and a foundation, FIG. 2 is an arrow view taken along line II-II in FIG. 1, FIG. 3 is an arrow view taken along line III-III in FIG. Is a schematic diagram showing the second floor hardware, FIG. 5 is a schematic diagram showing the attracting hardware, FIG. 6 is a schematic diagram showing the first floor hardware, FIG. 7 is a schematic diagram showing a washer with a bolt, and FIG. 8 is a unit building. It is a schematic diagram which shows the joining structure of a foundation.
[0013]
(Building unit) (Figs. 1-7)
As shown in FIGS. 1 to 3, the building unit 10 is configured by standing a wall panel 21 on an upper part of a floor panel 11 as a floor structure.
[0014]
As shown in FIGS. 1 to 3, the floor panel 11 has a lower frame 14 attached to the lower surface of the floor frame assembly in which the joists 12 and the end joists 13 are joined with nails and / or an adhesive. The floor material 15 is attached to the upper surface of the floor frame by nailing and / or adhesive.
[0015]
As shown in FIGS. 1 to 3, the wall panel 21 has an outer wall material 25 on both sides of a wall frame assembly in which a lower frame 22, a vertical frame 23, and an upper frame 24 (not shown) are joined by nailing and / or adhesive. The inner wall surface material 26 is constructed by nailing and / or attaching with an adhesive.
[0016]
The floor panel 11 and the wall panel 21 are joined using the second floor hardware 31 and the drawing hardware 41.
[0017]
As shown in FIG. 4, the second floor hardware 31 has an upper support portion 33 welded between the upper end portions of the two side plates 32, 32 and a lower support portion 34 welded between the lower end portions. The upper support portion 33 is provided with a bolt hole 33A, and the lower support portion 34 is provided with a bolt hole 34A. A back nut 35 is welded to the lower surface of the upper support portion 33. A stop plate 36 is welded to the front end portions of the side plates 32, 32. The second floor hardware 31 is fitted into a notch 12A provided on the lower end side of the joist 12 in the floor panel 11, and both stop plates 36, 36 are applied to the joists on both sides of the notch 12A. , 36 are nailed to the joist 12 to be temporarily fixed. The lower surface of the second floor metal fitting 31 fitted in the notch 12A is flush with the lower surface of the lower frame 14 (base) of the floor panel 11.
[0018]
As shown in FIG. 5, the attracting metal 41 includes a flat plate 42 attached to the side surface of the vertical frame 23 of the wall panel 21, a support plate 43 welded to the flat plate 42, and a reinforcing plate 44 that reinforces the support plate 43. Have The flat plate 42 is provided with a bolt hole 42A, and the support plate 43 is provided with a bolt hole 43A.
[0019]
Therefore, the floor panel 11 and the wall panel 21 are joined as follows using the second floor hardware 31 and the attracting hardware 41.
(B) storing fit the second bed hardware 31 into the notch 12A provided in the joist 12 of the floor panel 11, temporarily fixed to a second floor fittings 31 at that nailing the stop plate 36 to the joist 12 .
[0020]
(B) The flat plate 42 of the drawing hardware 41 is fixed to the side surface of the vertical frame 23 of the wall panel 21 with bolts 45. The bolt 45 is inserted through a bolt insertion hole provided in the vertical frame 23 from the outer surface side, and the washer head 45A is nailed by the vertical frame 23 to be prevented from rotating, and passes through the bolt hole 42A of the flat plate 42 with a nut 45B. Fixed.
[0021]
(C) The upper support portion 33 of the second floor hardware 31 and the support plate 43 of the attracting hardware 41 are fastened with bolts 38. Bolt 38 is in a state of being screwed behind the nut 35 of the second bed hardware 31, the bolt holes 33A of the second bed fittings 31, joists 12 of the floor panel 11, bolt insertion holes provided in the floor member 15 12B, 15A, a bolt insertion hole 22A provided in the lower frame 22 of the wall panel 21, and a bolt hole 43A of the support plate 43 of the attracting member 41 are inserted, and a nut 38A is screwed to the insertion end.
[0022]
In the unit building 10, the attracting metal 41 is fixed inside the wall, that is, on the side surface of the vertical frame 23 sandwiched between the wall surface materials 25 and 26 of the wall panel 21. And in the unit building 10, after joining the floor panel 11 and the wall panel 21 by said (b) - (c) in the factory production stage, it is supposed that the attachment of the inner wall surface material 26 will be completed.
[0023]
Therefore, the building unit 10 has the following effects. In the building unit 10, when the wall panel 21 is erected on the upper portion of the floor panel 11, the bolt 38 fixed to the second floor hardware 31 stored in the floor panel 11 and the side of the vertical frame 23 of the wall panel 21 are fixed. It was decided to tie up the attracted hardware 41. Therefore, the second floor hardware 31 is fastened to the attracting hardware 41 fixed to the vertical frame 23 of the wall panel 21 so as to hold the floor panel 11, and the bonding strength between the floor panel 11 and the wall panel 21 can be improved. .
[0024]
Further, the floor panel 11 is provided with a first floor hardware 31 </ b> A and a washer 51 with a bolt for installing the building unit 10 on the foundation 1.
[0025]
As shown in FIG. 6, the first floor hardware 31 </ b> A is obtained by removing the back nut 35 and the stop plate 36 from the second floor hardware 31 described above. That is, in the first floor hardware 31A, the upper support 33 is welded between the upper ends of the two side plates 32, 32, and the lower support 34 is welded between the lower ends. The upper support portion 33 is provided with a bolt hole 33A, and the lower support portion 34 is provided with a bolt hole 34A. The first floor hardware 31A is fitted into a notch 12C provided on the lower end side of the joist 12 in the floor panel 11, and the lower surface of the first floor hardware 31A fitted into the notch 12C is a lower frame of the floor panel 11. 14 (base) is flush with the lower surface.
[0026]
As shown in FIG. 7, the washer 51 with a bolt is configured by welding a bolt part 53 to a washer part 52. 54 is a nut.
[0027]
That is, as shown in FIGS. 1 and 3, a notch 12D is provided on the upper surface of the joist 12 of the floor panel 11, and from the notch 12D to the notch 12C for fitting the first floor hardware 31A. A penetrating bolt insertion hole 12E is provided. Then, the bolt part 53 of the washer 51 with bolt is inserted into the bolt insertion hole 12C, the washer part 52 is fitted into the notch part 12D, and the washer part 52 is nailed to the upper surface of the joist 12 and temporarily fixed. Then, the first floor bracket 31A is fitted into a notch 12C provided on the lower end side of the joist 12 of the floor panel 11, and the bolt hole 33A of the upper support portion 33 of the first floor bracket 31A is inserted into the bolt of the washer 51 with bolt. The first floor hardware 31A and the bolted washer 51 are coupled to each other by fitting into the section 53 and screwing the nut 54 to the tip of the bolt section 53, and the first floor hardware 31A and the bolt are attached. The washer 51 is integrated with the joist 12 of the floor panel 11. The lower support portion 34 of the first floor hardware 31A is used as a fastening portion with the anchor bolt 2 of the foundation 1.
[0028]
(Bonding structure of building unit and foundation) (FIGS. 1 to 3, FIG. 8)
The unit building 100 shown in FIGS. 1 to 3 is constructed by installing the building unit 10 described above on the foundation 1. At this time, the foundation 1 defines a position irrelevant to the position of the vertical frame 23 on the wall panel 21 of the building unit 10 as a standard position of the anchor bolt 2. In this embodiment, the drawing is fixed to the vertical frame 23. The second floor hardware 31 tightly coupled with the hardware 41 and the bolt 38 is deviated from the position of the anchor bolt 2. For this reason, in the building unit 10 of the present embodiment, the first floor hardware 31A and the bolted washer 51 are provided at a position corresponding to the anchor bolt 2 in the floor panel 11, and the lower support of the first floor hardware 31A is provided. The anchor bolt 2 is tightly coupled to the portion 34. The anchor bolt 2 is fastened by the washer 3 and the nut 4 through the bolt hole 34A of the lower support portion 34 of the first floor hardware 31A.
[0029]
In addition, if the 2nd floor metal fitting 31 fastened with the drawing metal 41 fixed to the vertical frame 23 of the wall panel 21 in the building unit 10 and the bolt 38 corresponds to the standard position of the anchor bolt 2 in the foundation 1. The anchor bolt 2 can be fastened to the lower support portion 34 of the second floor hardware 31 (FIG. 8).
[0030]
Therefore, the unit building 100 has the following effects.
(A) When the building unit 10 is installed on the foundation 1, the anchor bolt 2 on the foundation 1 side is fastened to the first floor hardware 31 </ b> A stored in the floor panel 11. The first floor hardware 31 </ b> A is tightly coupled to the bolt portion 53 of the washer 51 with bolt attached to the upper surface of the joist 12 of the floor panel 11, and is firmly integrated with the entire floor panel 11. Accordingly, the anchor bolt 2 is not simply joined to the floor panel 11 but is fastened to the first floor fitting 31A that is tightly joined to the entire floor panel 11 by being fastened to the bolted washer 51. Therefore, the joint strength between the building unit 10 and the foundation 1 can be improved.
(B) When the wall panel 21 is erected on the top of the floor panel 11, the attracting metal 41 attached to the wall panel 21 is fastened to the second floor metal 31 stored in the floor panel 11. The second floor hardware 31 is fastened to the attracting hardware 41 so as to hold the floor panel 11 by bolts 38 that pass through the joists 12 of the floor panel 11, and is firmly integrated with the entire floor panel 11 . Therefore, the wall panel 21 is not simply joined to the floor panel 11 but is tightly joined to the entire floor panel 11 by being fastened to the second floor hardware 31. The bonding strength with 21 can be improved.
[0031]
(C) The first floor hardware 31 </ b> A is planted on the foundation 1 and the upper support portion 33 for the bolt portion 53 of the bolt washer 51 attached to the upper surface of the joist 12 of the floor panel 11 of the building unit 10. The lower support portion 34 for the anchor bolt 2 is also provided. Therefore, the joint strength between the building unit 10 and the foundation 1 can be improved by using the first floor hardware 31 </ b> A stored in the floor panel 11.
(D) The second floor hardware 31 is planted on the foundation 1 and the upper support 33 for the bolt 38 for fixing the wall panel 21 standing on the top of the floor panel 11 of the building unit 10. A lower support portion 34 for the anchor bolt 2 is also provided. Therefore, by using the second floor hardware 31 stored in the floor panel 11, the joint strength between the building unit 10 and the foundation 1 and the joint strength between the floor panel 11 and the wall panel 21 can be improved, and the anchor bolt The position of 2 can be arbitrarily set.
[0032]
Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration of the present invention is not limited to this embodiment, and there are design changes and the like without departing from the gist of the present invention. Is included in the present invention. For example, the joint structure of a building using the floor hardware and the bolted washer according to the present invention can be applied to a structure in which the floor structure is a floor beam, and a structure in which a column is erected on the floor structure. Moreover, the joint structure of a building according to the present invention is not limited to a unit building and can be widely applied to general buildings.
[0033]
【The invention's effect】
As described above, according to the present invention, the bonding strength between a building such as a building unit and the foundation can be improved.
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing a joint structure between a building unit and a foundation.
FIG. 2 is a view taken along the line II-II in FIG.
FIG. 3 is a view taken along the line III-III in FIG.
FIG. 4 is a schematic view showing a second floor hardware.
FIG. 5 is a schematic view showing an attracting metal object.
FIG. 6 is a schematic view showing a first floor hardware.
FIG. 7 is a schematic view showing a washer with a bolt.
FIG. 8 is a schematic diagram showing a joint structure between a unit building and a foundation.
[Explanation of symbols]
1 Foundation 2 Anchor Bolt 10 Building Unit 11 Floor Panel 21 Wall Panel 23 Vertical Frame
31 Second floor hardware 31A First floor fitting 33 Upper support 34 Lower support 51 Bolt washer 52 Washer 53 Bolt

Claims (4)

床構造体の上部に壁パネル又は柱を立設してなる建物の据付構造において、
床構造体の下部に第一の床金物が格納され、
床構造体の構造材の上面にボルト付き座金の座金部を添設し、該座金部から下方に延在されたボルト部を前記第一の床金物に緊結し、
床構造体の下部に第二の床金物が格納され、
壁パネル又は柱の垂直面に引き寄せ金物が取り付けられ、該引き寄せ金物を前記第二の床金物にボルトにより緊結して床構造体の上部にパネル又は柱が立設され、
基礎に植設してあるアンカーボルトを、前記第一の床金物と第二の床金物のうち少なくとも第一の床金物に緊結してなることを特徴とする建物の据付構造。
In a building installation structure in which wall panels or pillars are erected on the top of the floor structure,
The first floor hardware is stored at the bottom of the floor structure,
The washer of the bolt with washers on the top surface of the structural member of the floor structure and additionally provided, and Tightened the bolt portion which extends downwardly from said seat gold section to the first bed hardware,
The second floor hardware is stored at the bottom of the floor structure,
Attached hardware attracted to the vertical plane of the wall panel or column, the attracted top panel or pillar of hardware to be Tightened by bolts to the second bed hardware floor structure is erected,
An installation structure for a building , wherein an anchor bolt planted on a foundation is tightly coupled to at least a first floor hardware among the first floor hardware and the second floor hardware.
床構造体の上部に壁パネル又は柱を立設してなる建物ユニットにおいて、
床構造体の下部に、第一の床金物が格納され、
床構造体の構造材の上面にボルト付き座金の座金部を添設し、該座金部から下方に延在されたボルト部を前記第一の床金物に緊結してなり
構造体の下部に第二の床金物が格納され、
壁パネル又は柱の垂直面に引き寄せ金物が取り付けられ、該引き寄せ金物をボルトにより前記第二の床金物に緊結して床構造体の上部にパネル又は柱を立設してなり、
前記第一の床金物と第二の床金物とを、基礎に植設してあるアンカーボルトを緊結可能に形成したことを特徴とする建物ユニット。
In a building unit in which a wall panel or a pillar is erected on the upper part of the floor structure,
The first floor hardware is stored at the bottom of the floor structure,
The washer of the bolt with washers on the top surface of the structural member of the floor structure and additionally provided, it was Tightened the bolt portion which extends downwardly from said seat gold section to the first bed hardware,
The second floor hardware is stored at the bottom of the floor structure,
Attached hardware attracted to the vertical plane of the wall panel or column, will be to Tightened the drawn hardware on the second floor hardware by bolts erected top to wall panels or pillars of the floor structure,
A building unit characterized in that the first floor hardware and the second floor hardware are formed so that anchor bolts planted on a foundation can be fastened together .
請求項2に記載の建物ユニットを基礎に据付けてなるユニット建物であって、
基礎に植設してあるアンカーボルトが、前記第一の床金物と第二の床金物のうち少なくとも第一の床金物に緊結されてなることを特徴とするユニット建物。
A unit building installed on the basis of the building unit according to claim 2,
A unit building , wherein an anchor bolt planted on a foundation is tightly coupled to at least a first floor hardware among the first floor hardware and the second floor hardware.
請求項3に記載のユニット建物に用いられる第一の床金物及び第二の床金物であって、
建物ユニットの床構造体の内部に格納され、該建物ユニットの床構造体の構造材の上面に添設されたボルト付き座金のボルト部のための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを備えてなることを特徴とする第一の床金物と、
該建物ユニットの床構造体の上部に立設される壁パネル又は柱を固定するボルトのための上支持部と、基礎に植設してあるアンカーボルトのための下支持部とを備えてなることを特徴とする第二の床金物。
A first floor hardware and a second floor hardware used in the unit building according to claim 3,
It is housed inside the floor structure of the building unit, and is embedded in the foundation for the bolt part of the washer with bolt attached to the upper surface of the structural material of the floor structure of the building unit. A first floor hardware comprising a lower support for an anchor bolt; and
An upper support portion for a bolt for fixing a wall panel or a column erected on the upper part of the floor structure of the building unit, and a lower support portion for an anchor bolt installed in the foundation. Second floor hardware characterized by that.
JP10751497A 1997-04-24 1997-04-24 Building installation structure, building unit and unit building, and floor hardware Expired - Lifetime JP3761282B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10751497A JP3761282B2 (en) 1997-04-24 1997-04-24 Building installation structure, building unit and unit building, and floor hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10751497A JP3761282B2 (en) 1997-04-24 1997-04-24 Building installation structure, building unit and unit building, and floor hardware

Publications (2)

Publication Number Publication Date
JPH10299104A JPH10299104A (en) 1998-11-10
JP3761282B2 true JP3761282B2 (en) 2006-03-29

Family

ID=14461141

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10751497A Expired - Lifetime JP3761282B2 (en) 1997-04-24 1997-04-24 Building installation structure, building unit and unit building, and floor hardware

Country Status (1)

Country Link
JP (1) JP3761282B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5924977A (en) * 1993-02-26 1999-07-20 Olympus Optical Co., Ltd. Endoscope system including endoscope and disposable protection cover

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4950651U (en) * 1972-08-09 1974-05-04
JPS5436916U (en) * 1977-08-19 1979-03-10
JP2612658B2 (en) * 1992-01-27 1997-05-21 ミサワホーム株式会社 Panel structure connection structure
JP3022169U (en) * 1995-08-30 1996-03-22 正弘 安斎 Joining hardware for wooden construction
JPH09100576A (en) * 1995-10-06 1997-04-15 Seiichi Kosaka Method for joining end section of column for wooden framework technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5924977A (en) * 1993-02-26 1999-07-20 Olympus Optical Co., Ltd. Endoscope system including endoscope and disposable protection cover

Also Published As

Publication number Publication date
JPH10299104A (en) 1998-11-10

Similar Documents

Publication Publication Date Title
JP3761282B2 (en) Building installation structure, building unit and unit building, and floor hardware
JPH10280553A (en) Building joint structures, building units and unit buildings
JP4169873B2 (en) Wall with interior base material
JP3766940B2 (en) Seismic reinforcement method for existing buildings
JP3860655B2 (en) Building connection structure
JP3246862U (en) Building reinforcement fittings
JPH10292482A (en) Building installation structure, building units and unit buildings and floor hardware
JP4654674B2 (en) How to install seismic reinforcement brackets for wooden buildings
JP3822737B2 (en) Veranda wall mounting structure
JP2004218236A (en) Earthquake-resistant repair method for existing wooden building
JP2006132202A (en) Joint structure of wooden frame members
JP4072274B2 (en) Building unit
JP4756927B2 (en) Roof panel connecting hardware and roof panel connecting method
JP3014980B2 (en) Wall panels
JP2003328435A (en) Joint structures and unit buildings in wooden buildings
JPH0513791Y2 (en)
JPH11166276A (en) Bearing wall structure
JP2001073561A (en) Seismic reinforcement structure of existing buildings
JP3685843B2 (en) Floor panel / outer wall panel fixing structure
JPH044084Y2 (en)
JP2001303682A (en) Shaped steel joint structure and ceiling panel
JP2538660Y2 (en) Joiner frames for partition walls
JP2001336219A (en) Brace attaching structure
JPH08338070A (en) Reinforcing hardware for wooden building
JP2001098647A (en) Unit building upper and lower floor joint structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040120

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050421

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050427

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050606

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050914

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051007

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20051116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060110

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100120

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100120

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110120

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110120

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120120

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130120

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140120

Year of fee payment: 8

EXPY Cancellation because of completion of term