Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3767765B2 - Condensate treatment method and condensate treatment apparatus - Google Patents
[go: Go Back, main page]

JP3767765B2 - Condensate treatment method and condensate treatment apparatus - Google Patents

Condensate treatment method and condensate treatment apparatus Download PDF

Info

Publication number
JP3767765B2
JP3767765B2 JP31440397A JP31440397A JP3767765B2 JP 3767765 B2 JP3767765 B2 JP 3767765B2 JP 31440397 A JP31440397 A JP 31440397A JP 31440397 A JP31440397 A JP 31440397A JP 3767765 B2 JP3767765 B2 JP 3767765B2
Authority
JP
Japan
Prior art keywords
condensate
filter
precoat
filtration
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31440397A
Other languages
Japanese (ja)
Other versions
JPH11128629A (en
Inventor
悟 津田
伸一 大橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Organo Corp
Original Assignee
Organo Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Organo Corp filed Critical Organo Corp
Priority to JP31440397A priority Critical patent/JP3767765B2/en
Publication of JPH11128629A publication Critical patent/JPH11128629A/en
Application granted granted Critical
Publication of JP3767765B2 publication Critical patent/JP3767765B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Filtration Of Liquid (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、原子力発電所や火力発電所等の発電プラントの復水処理方法及び復水処理装置に関し、更に詳しくは、復水前置濾過装置に用いられたフィルタエレメントの寿命を延長すると共に逆洗毎の廃棄物の低減を実現できる復水処理方法及び復水処理装置に関する。
【0002】
【従来の技術】
従来から原子力発電所や火力発電所等の発電所では、原子力や火力を利用して蒸気を作り、この蒸気で発電タービンを駆動して発電するようにしている。例えば、沸騰水型原子力発電所(BWR)では、図8に示すように、原子炉111で発生した水蒸気を高圧タービン112、低圧タービン113の順に送り、各タービン112、 1 13で発電機を回転させている。そして、タービンを回転させた後の蒸気を復水器114で冷却して復水とし、復水を復水前置濾過装置115、復水脱塩装置116の順に送り、原子炉等の機器類や配管等の配管材料から発生した酸化鉄微粒子等の金属クラッドを復水前置濾過装置115で除去し、次いでFeイオン、Cuイオン等の種々のイオン成分を復水脱塩装置116で除去した後、復水を原子炉111へ送るようにしている。また、原子炉111へ復水を供給する前に、高圧タービン112及び低圧タービン113それぞれの水蒸気の一部を低圧ヒータ117及び高圧ヒータ118へ供給し、復水を加熱している。尚、図8において、破線で示す119Aは蒸気配管、実線で示す119Bは復水配管、120A、120B、120Cはいずれも給水ポンプである。
【0003】
上記復水前置濾過装置115は互いに並列配置された複数塔(例えば、5〜12塔)の濾過塔を備え、これらの濾過塔に対して復水を同時に通水して濾過処理を行うようにしている。各復水濾過塔には、例えば濾材の表面に粉末イオン交換樹脂等の濾過助材をプリコートしたプリコート型フィルタエレメントや、中空糸膜フィルタを多数本束ねた中空糸膜型フィルタエレメントが用いられている。前者のプリコート型復水濾過塔の場合には、復水中の酸化鉄微粒子等の金属クラッドと不純物イオンの一部を除去する濾過脱塩処理を行っているが、処理時間が経過するに連れてフィルタの差圧が上昇したり、粉末イオン交換樹脂の脱塩機能が低下するため、このような現象が現れた時点で復水濾過塔を逆洗再生している。この逆洗再生操作は一塔あたり通常一年間に4〜10回程度行われている。特に沸騰水型原子力発電プラント(以下、「BWR」と称す。)の場合には逆洗再生操作の度毎に放射性物質で汚染された使用済みの粉末イオン交換樹脂が放射性廃棄物として発生する。これに対し、後者の中空糸膜型復水濾過塔の場合には濾過助材を必要としないため、プリコート型復水濾過塔の逆洗再生時に発生する使用済み粉末イオン交換樹脂のような放射性廃棄物が発生しないため、近年建設されたBWRには中空糸膜型復水濾過塔が採用されている。
【0004】
しかし、依然として既設のBWRの復水前置濾過装置115の殆どにはプリコート型復水濾過塔が用いられているため、逆洗の度毎に発生する放射性廃棄物(粉末イオン交換樹脂等の濾過助材)の低減が大きな課題になっており、その改善が求められている。そこで、逆洗可能なノンプリコート型フィルタエレメントを既設のプリコート型復水濾過塔と互換性を持たせることができれば放射性廃棄物の発生量を低減することができる。
【0005】
【発明が解決しようとする課題】
しかしながら、仮にノンプリコート型フィルタエレメント(例えば、プリーツフィルタ)をプリコート型フィルタエレメントと互換性を持たせて切り換えたとしても、例えば発電プラントの定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間に金属クラッドやTOC成分がプリーツフィルタの濾過面に目詰まりして急激な差圧上昇を招き、逆洗性が低下してフィルタの寿命に悪影響を及ぼすという課題があった。即ち、発電プラントの通常運転時には復水中の金属クラッドの濃度やTOCの濃度はいずれも20ppb程度の低いオーダーであるが、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間では最大1000ppb程度の金属クラッドや数100ppb程度のTOC成分が含まれた復水を処理している。そして、この定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間に発生する金属クラッドは例えば次の定期点検までの約一年間のプラント運転サイクル中に発生する金属クラッド量の約30%程度にも達し、この大量の金属クラッドがクリーンアップ運転期間の約一週間前後の間に集中し、この間に急激に差圧が上昇し、逆洗性が低下し、フィルタエレメントの寿命を短くするという課題があった。尚、定常運転とは、発電プラントの本来の発電出力に達した状態での運転のことを意味し、以下の説明でも同様のことを意味する。
【0006】
本発明は、上記課題を解決するためになされたもので、復水前置濾過装置にノンプリコート型フィルタエレメントを適用すると共にその急激な差圧上昇を防止して寿命を延長することができ、もって放射性廃棄物の発生量を格段に低減することができる復水処理方法及び復水処理装置を提供することを目的としている。
【0007】
【課題を解決するための手段】
本発明の請求項1に記載の復水処理装置は、復水器の後段に配置された復水前置濾過装置と、この復水前置濾過装置の後段に配置された復水脱塩装置とを備えた腹水処理装置において、上記復水前置濾過装置は、粉末イオン交換樹脂がプリコートされたプリコート型フィルタエレメントを有する単塔または複数塔配置されている第1の濾過塔と、この第1の濾過塔と並列に複数塔配置され且つ粉末イオン交換樹脂がプリコートされていないノンプリコート型プリーツフィルタエレメントを有する第2の濾過塔とを備えたことを特徴とするものである。
【0008】
また、本発明の請求項2に記載の復水処理方法は、復水器からの復水を復水前置濾過装置を用いて濾過処理した後、上記復水前置濾過装置からの復水を復水脱塩装置を用いて脱塩処理する腹水処理方法において、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間は上記復水前置濾過装置を構成する互いに並列配置された粉末イオン交換樹脂をプリコートしたプリコート型フィルタエレメントを有する第1の濾過塔及びノンプリコート型プリーツフィルタエレメントを有する第2の濾過塔のうち、第1の濾過塔のプリコート型フィルタエレメントのみに通水することを特徴とするものである。
【0009】
【発明の実施の形態】
以下、図1〜図7に示す実施形態に基づいて従来と同一または相当部分には同一符号を附して本発明の特徴を中心に説明する。尚、各図中、図1は本発明の復水処理装置の一実施形態を示す図で、(a)は発電所プラントの概要を示す構成図、(b)は復水前置濾過装置の濾過塔の配置例を示す構成図、図2は図1において復水前置濾過装置を構成する濾過塔を示す構成断面図、図3は第1の濾過塔に適用にされるプリコート型プリーツフィルタの一例を示す図で、(a)はその斜視図、(b)はその横方向の断面を示す模式図、(c)はそのプリコート層支持体を拡大して示す正面図、図4は図3に示すプリコート型プリーツフィルタを図2に示す濾過塔に取り付けた状態を示す図で、(a)はその断面図、(b)はシールアダプタを分解して示す斜視図、図5は図3に示すプリコート型プリーツフィルタとは別のタイプのプリコート型プリーツフィルタを段階的に分解して示す斜視図、図6は第2の濾過塔に適用されるノンプリコート型フィルタの一例を示す分解斜視図、図7は図1に示す復水処理装置とノンプリコート型プリーツフィルタを用いた時の各フィルタの運転期間と鉄クラッドの負荷量との関係を示すグラフである。
【0010】
本実施形態の発電プラントは、図1の(a)に示すように、原子炉1、高圧タービン2、低圧タービン3、復水器4、復水前置濾過装置5、復水脱塩装置6、低圧ヒータ7及び高圧ヒータ8を備え、基本的には復水前置濾過装置5を除き従来の発電プラントと同様に構成されている。そして、復水処理装置は復水前置濾過装置5及び復水脱塩装置6によって構成され、復水を濾過、脱塩処理するようにしてある。尚、図1の(a)において、9Aは蒸気配管、9Bは復水配管であり、9Cは復水脱塩装置出口の復水配管9Bから分岐して復水器へ連結されている循環配管である。また、10A、10B、10Cはそれぞれポンプを示す。
【0011】
ところで、本実施形態では復水前置濾過装置5は、例えば図1の(b)に示すように、2塔の第1の濾過塔5A(同図では白抜きの塔)と、3塔の第2の濾過塔5B(同図では斜線を引いた塔)と、バイパスバルブ5Cを備えている。そして、第1、第2の濾過塔5A、5Bはフィルタエレメントの種類を異にする以外は同一構成を有している。第1の濾過塔5Aは粉末イオン交換樹脂がプリコートされたプリコート型プリーツフィルタF1を複数本有し、第2濾過塔5Bは粉末イオン交換樹脂がプリコートされていないノンプリコート型プリーツフィルタF2を複数有している。そして、復水前置濾過装置5、復水脱塩装置6及び復水器4は復水配管9B及び循環配管9Cを介して連結され、例えば定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間には復水はこの循環配管9Cを介して復水器4、復水前置濾過装置5及び復水脱塩装置6間の循環路を循環し、定期点検時に復水器4内で発生した酸化鉄等の金属クラッドが循環路を循環する間に除去するようにしてある。従って、図1では2塔の第1の濾過塔5Aと3塔の第2濾過塔5Bが図示してあるが、実際には第1の濾過塔5Aは、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間で、金属クラッドを除去し、定常運転時の金属クラッド濃度まで低減できるだけの処理能力を有する塔数が必要であり、この塔数は発電プラントの構成機器やその規模によって適宜設定することができる。
【0012】
次に、第1、第2の濾過塔5A、5Bについて図2を参照しながら説明する。第1の濾過塔5Aは、図2に示すように、塔本体51と、この塔本体51を上室52と下室53に分割する隔壁(以下、「チューブシート」と称す。)54と、このチューブシート54に所定間隔を空けて多数本(例えば数10〜数100本)立設され且つ上室52と下室53を連通する連通管(以下、「チューブ」と称す。)55と、これらのチューブ55の上端にそれぞれ押圧固定機構(図示せず)を介して立設されたプリーツ型フィルタF1(F2)とを備えている。また、チューブシート54の中央には復水が流入する流入管51Aが取り付けられ、この流入管51Aは塔本体51の底部を貫通し、復水配管に接続されている。そして、流入管51Aの出口上方には、流入管51Aと対向するバッフルプレート56及びバッフルプレート56から垂直に立ち上がるドラフトチューブ56Aが配置され、このバッフルプレート56及びドラフトチューブ56Aを介して流入水が上室52の上下から全体へ均等に分散するようにしてある。また、塔本体51の底部には処理水が流出する流出管51Bが取り付けられ、この流出管51Bは復水脱塩装置6(図1参照)へ通じる復水配管9Bに接続されている。尚、図2において、51Cは溢流管で、塔本体51内を満水にする時にそのバルブ51Dを開放しておく。
【0013】
上記プリコート型プリーツフィルタエレメントF1は、例えば図3の(a)、(b)示すように、濾過膜11を一定の折幅を持って折り込んでプリーツ状に形成された円筒形の濾過体12と、この濾過体12を内周面で支持する円筒形の支持筒13と、濾過体12の外周面を被覆し且つ粉末イオン交換樹脂をプリコート層Lとして支持する円筒形のプリコート支持体14と、これらの両端を円筒形に保持した状態で固定する一対のエンドプレート15とを有し、濾過体12とプリコート層Lとで二重濾過構造が構成されている。従って、このプリコート型プリーツフィルタエレメントF1は従来の保護体に代えてプリコート層支持体14を有する以外は従来公知のプリーツフィルタと同様に構成されている。
【0014】
上記プリコート層支持体14は、図3の(c)に示すように、全面に均等に配置形成された多数の矩形状の開口14Aを有し、且つこの開口14Aはプリコート時の粉末イオン交換樹脂の通過を阻止する大きさに形成されている。各開口14Aは、例えば最大限3mmの目開きで形成されている。ここで云う目開きとは、開口14Aを通過可能な粒体の粒径の寸法に即した寸法を意味している。例えば目開き1mmの場合には、粒径が1mmの粒子あるいは微粒子の凝集体(以下、「フロック」と称す。)であれば、その殆どの粒子またはフロックを遮断して通過させない大きさの開口を意味している。従って、本発明では、開口14Aの目開きが3mmを越えると、プリコート時に粉末イオン交換樹脂(より正確にはプリコート時の粉末イオン交換樹脂のフロック)の殆どが開口14Aを通過し、濾過体12の折り返し部に詰まり、詰まった粉末イオン交換樹脂が逆洗操作時に濾過体12とプリコート層支持体14間に残留し、その後の濾過機能を低下させる虞がある。尚、本実施形態では目開きが例えば3mmの開口14Aとして形成され、この程度の目開きであれば、プリコート時の粉末イオン交換樹脂のフロックの通過を実質的に阻止することができる。
【0015】
上述したように上記プリコート型プリーツフィルタF1は濾過構造が濾過体12とプリコート層Lの二重構造になっているため、濾過体12は主として金属クラッドのうち粒径が比較的大きな粒子の濾過機能を有し、プリコート層Lは種々のイオン成分の脱塩機能を有すると共に比較的粒径の小さな微粒子の濾過機能を有し、濾過体12の金属クラッドによる目詰まりを防止している。従って、プリコート層Lの金属クラッドの濾過機能を低くしても濾過体12で目詰まりを生じるような微粒子をプリコート層Lで捕捉して濾過体12の目詰まりを抑制し、しかもその層厚を従来のプリコート型フィルタよりも格段に薄くすることができ、粉末イオン交換樹脂の使用量を格段に削減することができる。
【0016】
次いで、上記チューブ55に対する上記プリコート型プリーツフィルタF1の取付構造について図4の(a)、(b)を参照しながら説明する。上記プリコート型プリーツフィルタF1は、図4の(a)に示す押圧固定機構及び図4の(b)に示すシールアダプタを介して従来のプリコート型フィルタエレメントと互換性を持って交換することができ、従来の濾過塔の構造を改造することなくそのまま取り付けることができるようにしてある。
【0017】
即ち、上記プリコート型プリーツフィルタF1は濾過膜11がプリーツ状に折り込まれて円筒形の濾過体12として形成されているため、従来のプリコート型糸巻きフィルタエレメントと比較して外径が大きく、このままでは図4の(a)に示すチューブ55上端の取付用アダプタ58に取り付けることができない。そこで、塔本体51の基本的構造を改造することなくそのまま取り付けるために、プリコート型プリーツフィルタF1と取付用アダプタ58とのインターフェース部材として図4の(b)に示すシールアダプタ59が設けられている。このシールアダプタ59は、同図に示すように、取付用アダプタ58に嵌合するリング状のアダプタ本体591と、このアダプタ本体591の取付用アダプタ側の面に装着されるシール部材592とを有している。アダプタ本体591の下面にはやや深い凹陥部(図示せず)が形成され、この凹陥部に嵌まり込んだシール部材592を介して取付用アダプタ58のリング状突起58Aと圧接するようにしてある。アダプタ本体591の上面にはやや浅い凹陥部591Aが形成され、周囲のリング状突起591Bでプリコート型プリーツフィルタF1の下面と圧接するようにしてある。上記シールアダプタ59はプリコート型プリーツフィルタF1から独立した部材として形成されているが、シールアダプタはプリーツ型フィルタと一体型に形成したものであっても良い。例えばプリコート型プリーツフィルタF1のエンドプレート15とシールアダプタ59とを樹脂成形により一体化することでシールアダプタ59を一体化したプリコート型プリーツフィルタF1を実現することができる。
【0018】
また、図4の(a)に示す押圧固定機構60は従来のものと同様に構成されている。即ち、この押圧固定機構60は、図4の(a)に示すように、プリコート型プリーツフィルタF1の軸芯に従って貫通するガイドロッド61と、このガイドロッド61の上部に取り付けられた第1受け部材62と、この第1受け部材62とプリコート型プリーツフィルタF1上端に配置された第2受け部材63間に介装されたバネ部材64と、このバネ部材64を蓄勢した状態でガイドロッド61の下端を取付用アダプタ58に係止してプリコート型プリーツフィルタF1を取付用アダプタ58に押圧固定するロックピン66とを有している。取付用アダプタ58はガイドロッド61の下端部が通る大きさの貫通孔を有し、この貫通孔にはロックピン66が通る切欠部(図示せず)が形成されている。そして、プリコート型プリーツフィルタF1の下面と取付用アダプタ58の間には上述のシールアダプタ59が介装されている。また、第2受け部材63とプリコート型プリーツフィルタF1の上面間にはガスケット67が介装されている。また、ガイドロッド61は、ロッド本体61Aと、このロッド本体61Aの上端で螺合する細長形状のナット部材61Bとからなり、ナット部材61Bの下端面で第1受け部材62が係止するようにしてある。
【0019】
従って、プリコート型プリーツフィルタF1を取付用アダプタ58に取り付ける時には、まず、ガイドロッド61のロッド本体61Aにシールアダプタ59を通した後、プリコート型プリーツフィルタF1を通す。次いで、ガスケット67、第2受け部材63、ガスケット(図示せず)、バネ部材64、第1受け部材62をこの順序でロッド本体61Aを通し、ロッド本体61Aとナット部材61Bとを連結し、これらの部材を一体化する。そして、プリコート型プリーツフィルタF1を取付用アダプタ58に取り付ける時には、ロックピン66を取付用アダプタ58の貫通孔の切欠部に合わせた後、バネ部材64のバネ力に抗してガイドロッド61を押し込み、ロックピン66が切欠部を通った後、ガイドロッド61を回転させてロックピン66を切欠部からずらすと、ロックピン66を介してプリコート型プリーツフィルタF1が取付用アダプタ58に連結される。
【0020】
そして、上記プリコート型プリーツフィルタF1のプリコート層支持体14に粉末イオン交換樹脂のプリコート層Lを形成するためには、図示しない調整槽内で粉末イオン交換樹脂に純水を加えて調整されたスラリーを調整槽から流入管51Aを経由して塔本体51の上室52内へ供給する。このようにして調整槽からスラリーを供給すると、同伴水がプリコート型プリーツフィルタF1の外側から内側へ透過する間にプリコート層支持体14に粉末イオン交換樹脂が堆積してプリコート層Lが形成され、同伴水はプリコート型プリーツフィルタF1内へ透過し、チューブ55を経由して下室53に達し、流出管51Bから排出される。
また、逆洗する時にはスラリーとは逆向きに逆洗用水及び/または圧力空気を供給し、プリコート層支持体14からプリコート層Lを除去する。
【0021】
また、プリコート型プリーツフィルタF1’としては図5に示すように表面に糸を巻き付けたものであっても良い。このプリコート型プリーツフィルタF1’は、プリコート層支持体14Cを異にする以外は上記プリコート型プリーツフィルタF1に準じて構成されている。この場合のプリコート層支持体14Cは、図5に示すように、濾過体12を被覆する円筒形の第2支持体141と、第2支持体141に糸が巻き付けられて形成された糸層142とから構成され、糸層142でプリコート用の粉末イオン交換樹脂が捕捉されてプリコート層を形成するようになっている。また、第2支持体141には水の通路となる開口141Aが全面に均等に分散させて形成されている。糸層142を形成する糸としては、例えば従来公知のナイロン、アクリル、ポリエステル、ポリアミド等の合成繊維が用いられる。また、濾過膜11は、上述したプリコート型プリーツフィルタF1と同様であり、例えば濾過機能を有する例えばポリプロピレン製の不織布11Aと、この不織布11Aの内面を被覆するサポートネット11Bと、不織布11Aの外面を被覆するスパンボンド11Cとで構成されている。サポートネット11Bは、濾過体12としての形態を保持する機能を有し、スパンボンド11Cは不織布11Aの表面を保護する機能を有している。
【0022】
一方、ノンプリコート型プリーツフィルタF2は、例えば図6に示すように、濾過膜11を一定の折幅を持って折り込んでプリーツ状に形成された円筒形の濾過体12と、この濾過体12を内周面で支持する円筒形の支持体13と、濾過体12の外周面を被覆する円筒形の保護体14Bと、これらの両端を円筒形状に保持した状態で固定する一対のエンドプレート15とを有し、従来公知のものを使用することができる。そして、支持体13の周面には濾過体12で濾過された濾過水を支持体13の内側空間に集水するための多数の小径開口が分散して形成されており、また、保護体14Bは例えば目開きが10〜30mm程度のネット状に形成されている。尚、図6において、図5と同一符号は同一部分を示している。
【0023】
次に、上記復水前置濾過装置5を備えた本実施形態の復水処理装置を用いた本発明の復水処理方法の一実施形態について説明する。本実施形態の復水処理方法の場合には、例えば発電プラントを定期点検した後、発電プラントを定常運転に至るまでの期間に特有の処理を行う。例えばまず、図1に白抜きで示す塔の第1の濾過塔5Aのバルブ即ち、図2に示す第1の濾過塔5Aの溢流管51Cのバルブ51Dを開放した状態で補給水を供給し、塔本体51内を満水にする。次いで、溢流管51Cのバルブ51Dを閉じ、粉末イオン交換樹脂のスラリーを流入管51Aから上室52内へ供給する間に、スラリーが上室52内で全体に分散すると共に同伴水が各プリコート型プリーツフィルタF1を外側から内側へ透過し、各プリコート型プリーツフィルタF1のプリコート層支持体14表面に粉末イオン交換樹脂がプリコート層L(図3の(b)参照)としてを形成される。このプリコート操作を他の第1の濾過塔5Aについても並行して行う。また、他のノンプリコート型プリーツフィルタF2を有する第2の濾過塔5B内も定常運転に入る前に補給水を満たし、定常運転に備える。
【0024】
しかる後、発電プラントのクリーンアップ運転を行う。まず発電プラントの起動時に補給水を復水器4内へ供給し、ポンプ10Aによって復水器4内の補給水を復水前置濾過装置5の第1の濾過塔5A内にのみ導入し、塔本体51内のプリコート型プリーツフィルタF1に対して通水し、第2の濾過塔5B内には補給水を導入しない。補給水は第1の濾過塔5Aで金属クラッドやTOC成分が除去されると共に種々のイオン成分の一部が除去された後、更に復水脱塩装置6において種々のイオン成分が除去される。その後、この処理水は全て循環配管9Cを介して復水器4内へ戻り、循環を繰り返す間に復水器4内の金属クラッド及びTOC成分等の不純物の殆どが第1の濾過塔5A内のプリコート型プリーツフィルタF1によって除去される。
【0025】
復水器4内で定期点検時に発生した不純物を除去した後、他のポンプ10B、10Cをも駆動させ、循環配管9Cのバルブ(図示せず)を閉じ、復水配管9Bを経由して発電プラントに復水を供給する。そして、上記の系内で補給水が循環する間に系内の金属クラッド、TOC成分及び種々のイオン成分の殆どが復水処理装置の第1の濾過塔5A及び復水脱塩装置6において除去され、不純物の濃度が定常運転時の不純物濃度まで低減される。従って、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間は、復水中に大量の金属クラッドやTOC成分が含まれていても、これらは第1の濾過塔5A内の各プリコート型プリーツフィルタF1の表面に形成された粉末イオン交換樹脂のプリコート層によって確実に捕捉、除去されるため、濾過膜11に直接付着して濾過膜11で目詰まりが生じる虞がない。しかも、濾過膜11がプリーツ型の場合濾過容量が大きく、差圧上昇が緩やかであるため、金属クラッド等を効率良く除去することができ、クリーンアップ運転期間を短縮することができる。そして、クリーンアップ運転が終わる段階では、復水中に含まれる金属クラッドは急激に低下してプラントの定常運転時と変わらない極めて低い濃度(約20ppb程度)に達しているため、その後の定常運転では濾過膜11に対する負荷が格段に低下する。
【0026】
その後、クリーンアップ運転を定常運転に切り換え、この時点で第2の濾過塔5Bにも復水を通水し、復水前置濾過装置5の第1、第2の濾過塔5A、5Bに対して同時に通水し、復水前置濾過装置5を定常運転状態に持って行く。この時点では上述したように復水中に含まれる金属クラッドの濃度が極め低いため、その後の第2濾過塔5Bの各ノンプリコート型プリーツフィルタF2の負荷が急激に増加する虞がなく、ノンプリコート型フィルタF2の寿命を延長することができる。
【0027】
本実施形態の復水処理装置を用いて上述のように本発明の復水処理方法を実施した場合と、従来の復水処理装置を用いて復水処理方法を実施した場合のフィルタの運転期間と金属クラッドの負荷量との関係を示したグラフが図7である。このグラフからも明らかなように、本発明の復水処理方法と従来の復水処理方法では定常運転時の金属クラッドの各フィルタに対する負荷量は殆ど変わりないが、従来の復水処理方法の場合にはクリーンアップ運転期間中にプリーツフィルタに対する金属クラッドの負荷量が急激に増加し、3年でプリーツフィルタが寿命に達することが判る。これに対して本実施形態の復水処理方法の場合にはクリーンアップ運転期間中でも各プリーツフィルタF1、F2に対する金属クラッドの負荷量が殆ど増加せず、従来の方法と比較してフィルタの寿命が延びることが判る。
【0028】
以上説明したように本実施形態によれば、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間は、復水前置濾過装置5を構成する互いに並列配置されたプリコート型プリーツフィルタF1を有する第1の濾過塔5A及びノンプリコート型プリーツフィルタF2を有する第2の濾過塔5Bのうち、第1の濾過塔5Aのプリコート型フィルタF1のみに通水するようにしたため、定期点検後のクリーンアップ運転期間にプラント停止時に発生した材料腐食等による金属クラッドやTOC成分の殆どをプリコート型プリーツフィルタF1のプリコート層(粉末イオン交換樹脂)により除去することができ、定常運転に入った時点で第2の濾過塔5Bに通水してもそのノンプリコート型プリーツフィルタF2への負荷は極めて小さく、復水前置濾過装置5の寿命を延長することができる。しかも、プリコート型プリーツフィルタF1は、数年に一度逆洗するだけで済み、逆洗用水の使用水量を格段に低減することができると共に放射性廃棄物(使用済みの粉末イオン交換樹脂)の発生量を格段に低減することができる。
【0029】
尚、本発明は上記実施形態に何等制限されるものではなく、第1の濾過塔5Aに用いられるプリコート型フィルタエレメントは、プリーツ型フィルタに限らず従来のプリコート型フィルタエレメントを用いることもできる。
【0030】
【発明の効果】
本発明の請求項1及び請求項2に記載の発明によれば、復水前置濾過装置にノンプリコート型フィルタエレメントを適用すると共にその急激な差圧上昇を防止して寿命を延長することができ、もって放射性廃棄物の発生量を格段に低減することができる復水処理方法及び復水処理装置を提供することができる。
【図面の簡単な説明】
【図1】本発明の復水処理装置の一実施形態を示す図で、(a)は発電所プラントの概要を示す構成図、(b)は復水前置濾過装置の濾過塔の配置例を示す構成図である。
【図2】図1の復水前置濾過装置を構成する濾過塔を示す構成断面図である。
【図3】図2に示す濾過塔に適用にされたプリコート型プリーツフィルタの一例を示す図で、(a)はその斜視図、(b)はその横方向の断面を示す模式図、(c)はそのプリコート層支持体を拡大して示す正面図である。
【図4】図3に示すプリコート型プリーツフィルタを図2に示す濾過塔に取り付けた状態を示す図で、(a)はその断面図、(b)はシールアダプタを分解して示す斜視図である。
【図5】図3に示すプリコート型プリーツフィルタとは別のタイプのプリコート型プリーツフィルタを段階的に分解して示す斜視図である。
【図6】ノンプリコート型フィルタの一例を示す分解斜視図である。
【図7】図1に示す復水処理装置とノンプリコート型プリーツフィルタを用いた時の各フィルタの使用期間と鉄クラッドの負荷量との関係を示すグラフである。
【図8】従来の発電プラントの一例を示す構成図である。
【符号の説明】
4 復水器
5 復水前置濾過装置
5A 第1の濾過塔
5B 第2の濾過塔
6 復水脱塩装置
F1 プリコート型プリーツフィルタ
F2 ノンプリコート型プリーツフィルタ
11 濾過膜
12 濾過体
13 コア(支持体)
14 プリコート層支持体
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a condensate treatment method and a condensate treatment device for a power plant such as a nuclear power plant or a thermal power plant. More specifically, the present invention extends the life of a filter element used in a condensate pre-filtration device and reverses it. The present invention relates to a condensate treatment method and a condensate treatment apparatus that can realize reduction of waste for each wash.
[0002]
[Prior art]
Conventionally, in power plants such as nuclear power plants and thermal power plants, steam is generated using nuclear power or thermal power, and a power generation turbine is driven by this steam to generate power. For example, in a boiling water nuclear power plant (BWR), as shown in FIG.111Steam generated in the high pressure turbine112Low pressure turbine113In order of each turbine112, 1 13The generator is rotating at. And the steam after rotating the turbine114Cooled with condensate, and the condensate pre-filtration device115Condensate demineralizer116In this order, metal cladding such as iron oxide fine particles generated from equipment such as nuclear reactors and piping materials such as piping is pre-filtered for condensate115And then removes various ion components such as Fe ions and Cu ions from the condensate demineralizer116The condensate is removed by111To send to. Also nuclear reactor111Before supplying the condensate to the high pressure turbine112And low pressure turbine113A part of each steam is a low pressure heater117And high-pressure heater118The condensate is being heated. In addition, in FIG. 8, it shows with a broken line119AIndicates steam piping, solid line119BIs condensate piping,120A, 120B, 120CAre all feed pumps.
[0003]
Condensate pre-filtration device115Includes a plurality of filtration towers (for example, 5 to 12 towers) arranged in parallel with each other, and condensate is simultaneously passed through these filtration towers for filtration. In each condensate filtration tower, for example, a precoat filter element in which a filter aid such as a powder ion exchange resin is precoated on the surface of the filter medium, or a hollow fiber membrane filter element in which a large number of hollow fiber membrane filters are bundled is used. Yes. In the case of the former precoat-type condensate filtration tower, filtration desalination treatment is performed to remove a part of the metal clad and impurity ions such as iron oxide fine particles in the condensate, but as the treatment time elapses. Since the differential pressure of the filter increases and the desalting function of the powder ion exchange resin decreases, the condensate filtration tower is backwashed and regenerated when such a phenomenon appears. This backwashing regeneration operation is usually performed about 4 to 10 times per tower per year. In particular, in the case of a boiling water nuclear power plant (hereinafter referred to as “BWR”), used powder ion exchange resin contaminated with radioactive substances is generated as radioactive waste every time the backwashing regeneration operation is performed. On the other hand, in the case of the latter hollow fiber membrane type condensate filtration tower, no filter aid is required, so that radioactive materials such as used powder ion exchange resin generated during backwash regeneration of the precoat type condensate filtration tower are used. Since no waste is generated, hollow fiber membrane type condensate filtration towers are adopted for BWRs constructed in recent years.
[0004]
However, the existing BWR condensate front filtration device still115Since most of them use pre-coated condensate filtration towers, the reduction of radioactive waste (filter aids such as powder ion exchange resin) generated every time backwashing is a major issue. There is a need for improvement. Therefore, if the non-precoat type filter element that can be backwashed can be made compatible with the existing precoat type condensate filtration tower, the amount of radioactive waste generated can be reduced.
[0005]
[Problems to be solved by the invention]
However, even if a non-precoated filter element (for example, a pleated filter) is switched to be compatible with a precoated filter element, for example, until a steady operation is performed after a cleanup operation period after a periodic inspection of a power plant. During this period, the metal clad or TOC component clogs the filtration surface of the pleated filter, causing a sudden increase in the differential pressure, resulting in a problem that the backwashing property is lowered and adversely affects the filter life. That is, during normal operation of the power plant, the metal clad concentration and TOC concentration in the condensate are both on the order of as low as 20 ppb, but the maximum is the period from the cleanup operation period after regular inspection to the steady operation. Condensate containing about 1000 ppb metal clad and about several hundred ppb TOC component is treated. The metal clad generated in the period from the cleanup operation period after the periodic inspection to the steady operation is, for example, about 30 of the metal clad amount generated in the plant operation cycle for about one year until the next periodic inspection. This large amount of metal clad concentrates for about one week during the cleanup operation period, during which the differential pressure increases rapidly, the backwashing performance decreases, and the filter element life is shortened. There was a problem to do. The steady operation means an operation in a state where the original power generation output of the power plant is reached, and the same is true in the following description.
[0006]
The present invention was made in order to solve the above-mentioned problem, and can apply a non-precoat type filter element to the condensate pre-filter device and prevent its rapid differential pressure increase and extend the life, Accordingly, an object of the present invention is to provide a condensate treatment method and a condensate treatment apparatus that can significantly reduce the amount of radioactive waste generated.
[0007]
[Means for Solving the Problems]
  The condensate treatment apparatus according to claim 1 of the present invention includes a condensate pre-filter device disposed at a subsequent stage of the condenser, and a condensate demineralizer disposed at a subsequent stage of the condensate pre-filter apparatus. In the ascites treatment apparatus comprising:Powder ion exchange resinA first filtration tower having a precoat filter element precoated with a single column or a plurality of towers, a plurality of towers arranged in parallel with the first filtration tower, andPowder ion exchange resinAnd a second filtration tower having a non-precoated pleated filter element that is not precoated.
[0008]
  In the condensate treatment method according to claim 2 of the present invention, the condensate from the condenser is filtered after the condensate from the condenser is filtered using the condensate pre-filter. In the ascites treatment method using the condensate demineralizer, the period from the cleanup operation period after the regular inspection to the steady operation is arranged in parallel with each other constituting the condensate pre-filter device. ThePre-coated with powder ion exchange resinOf the first filter tower having the precoat filter element and the second filter tower having the non-precoat type pleated filter element, water is passed through only the precoat filter element of the first filter tower. is there.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, based on the embodiment shown in FIG. 1 to FIG. In each figure, FIG. 1 is a diagram showing an embodiment of the condensate treatment apparatus of the present invention, (a) is a block diagram showing an outline of a power plant, and (b) is a condensate pre-filtration apparatus. FIG. 2 is a structural diagram showing an example of the arrangement of the filtration tower, FIG. 2 is a structural sectional view showing the filtration tower constituting the condensate pre-filtration device in FIG. 1, and FIG. 3 is a precoat pleated filter applied to the first filtration tower. FIG. 4A is a perspective view, FIG. 4B is a schematic view showing a cross section in the lateral direction, FIG. 4C is a front view showing an enlarged precoat layer support, and FIG. 3 is a view showing a state where the precoat type pleated filter shown in FIG. 3 is attached to the filtration tower shown in FIG. 2, wherein (a) is a sectional view thereof, (b) is an exploded perspective view of the seal adapter, and FIG. Step by step a different type of pre-coated pleated filter from the pre-coated pleated filter shown in FIG. 6 is an exploded perspective view showing an example of a non-precoat type filter applied to the second filtration tower, and FIG. 7 is a diagram using the condensate treatment apparatus and the non-precoat type pleated filter shown in FIG. It is a graph which shows the relationship between the driving | running period of each filter at the time and the load amount of an iron clad.
[0010]
As shown in FIG. 1A, the power plant according to the present embodiment includes a nuclear reactor 1, a high-pressure turbine 2, a low-pressure turbine 3, a condenser 4, a condensate pre-filter device 5, and a condensate demineralizer 6. The low-pressure heater 7 and the high-pressure heater 8 are provided, and are basically configured in the same manner as a conventional power plant except for the condensate pre-filter unit 5. The condensate treatment device is constituted by a condensate pre-filter device 5 and a condensate demineralizer 6, and the condensate is filtered and desalted. In FIG. 1 (a), 9A is a steam pipe, 9B is a condensate pipe, and 9C is a condensate demineralizer.PlacementThis is a circulation pipe branched from the condensate pipe 9B at the mouth and connected to the condenser. Reference numerals 10A, 10B, and 10C denote pumps, respectively.
[0011]
  By the way, in this embodiment, the condensate pre-filtration device 5 includes, for example, two first filtration towers 5A (in the figure, white towers) and three towers as shown in FIG. Second filtration tower 5B (in the figure, the hatched tower) and bypass valve 5CWhenIt has. The first and second filtration towers 5A and 5B have the same configuration except that the types of filter elements are different. First filter tower 5APowderIon exchange treeFatA plurality of pre-coated pre-coated pleated filters F1,ofFilter tower 5BPowder ion exchange resinMultiple non-precoated pleated filters F2 that are not precoatedBookHave. And the condensate pre-filtration apparatus 5, the condensate desalination apparatus 6, and the condenser 4 are connected via the condensate piping 9B and the circulation piping 9C, for example, after a clean-up operation period after a periodic check, it becomes a steady operation. During this period, the condensate circulates in the circulation path between the condenser 4, the condensate pre-filter unit 5 and the condensate demineralizer 6 through the circulation pipe 9 </ b> C. The metal clad such as iron oxide generated inside is removed while circulating in the circulation path. Accordingly, in FIG. 1, two first filtration towers 5A and three second towersofAlthough the filtration tower 5B is illustrated, in practice, the first filtration tower 5A removes the metal clad during the period from the cleanup operation period after the regular inspection to the steady operation, and during the steady operation. The number of towers having a processing capacity that can be reduced to the metal clad concentration is required, and the number of towers can be appropriately set depending on the components of the power plant and the scale thereof.
[0012]
Next, the first and second filtration towers 5A and 5B will be described with reference to FIG. As shown in FIG. 2, the first filtration tower 5 </ b> A includes a tower main body 51, a partition wall (hereinafter referred to as “tube sheet”) 54 that divides the tower main body 51 into an upper chamber 52 and a lower chamber 53, A communication pipe (hereinafter referred to as “tube”) 55 that is provided in a large number (for example, several tens to several hundreds) on the tube sheet 54 with a predetermined interval and communicates with the upper chamber 52 and the lower chamber 53. A pleated filter F1 (F2) is provided at the upper end of each of the tubes 55 through a pressing and fixing mechanism (not shown). An inflow pipe 51A through which condensate flows is attached to the center of the tube sheet 54, and the inflow pipe 51A passes through the bottom of the tower body 51 and is connected to the condensate pipe. Above the outlet of the inflow pipe 51A, a baffle plate 56 facing the inflow pipe 51A and a draft tube 56A rising vertically from the baffle plate 56 are arranged, and the inflow water flows upward through the baffle plate 56 and the draft tube 56A. The chamber 52 is uniformly distributed from the top and bottom of the chamber 52. An outflow pipe 51B through which treated water flows out is attached to the bottom of the tower body 51, and this outflow pipe 51B is connected to a condensate pipe 9B that leads to the condensate demineralizer 6 (see FIG. 1). In FIG. 2, 51C is an overflow pipe, and the valve 51D is opened when the tower body 51 is filled with water.
[0013]
  The precoat pleated filter element F1 is, for example, shown in FIGS. 3 (a) and 3 (b).InAs shown, a cylindrical filter body 12 formed in a pleat shape by folding the filter membrane 11 with a certain folding width, and a cylindrical support cylinder 13 for supporting the filter body 12 on the inner peripheral surface, Covering the outer peripheral surface of the filter body 12 andPowder ion exchange resinIs provided as a precoat layer L, and a pair of end plates 15 that are fixed in a state where both ends thereof are held in a cylindrical shape. The filter body 12 and the precoat layer L are double-layered. A filtration structure is constructed. Therefore, this precoat type pleat filter element F1 is configured in the same manner as a conventionally known pleat filter except that it has a precoat layer support 14 instead of a conventional protective body.
[0014]
As shown in FIG. 3 (c), the precoat layer support 14 has a large number of rectangular openings 14A arranged uniformly on the entire surface, and the openings 14A are powder ion exchange resins at the time of precoat. It is formed in the size which prevents passage of. Each opening 14A is formed with, for example, a maximum opening of 3 mm. The term “aperture” as used herein means a size corresponding to the size of the particle size of the particles that can pass through the opening 14A. For example, in the case of an opening of 1 mm, if the particle diameter is 1 mm or an aggregate of fine particles (hereinafter referred to as “floc”), an opening having a size that blocks most of the particles or floc so as not to pass therethrough. Means. Therefore, in the present invention, if the opening of the opening 14A exceeds 3 mm, most of the powder ion exchange resin (more precisely, the flocs of the powder ion exchange resin at the time of precoating) pass through the opening 14A, and the filter 12 There is a possibility that the powder ion-exchange resin clogged in the folded portion may remain between the filter body 12 and the precoat layer support 14 during the backwashing operation, and the subsequent filtration function may be deteriorated. In this embodiment, the opening is formed as an opening 14A having a size of 3 mm, for example, and if this degree of opening is used, the passage of flocs of the powder ion exchange resin during pre-coating can be substantially prevented.
[0015]
As described above, since the precoat pleated filter F1 has a double structure of the filter body 12 and the precoat layer L, the filter body 12 mainly has a function of filtering particles having a relatively large particle diameter in the metal cladding. The precoat layer L has a desalting function of various ionic components and a filtering function of fine particles having a relatively small particle size, thereby preventing clogging of the filter body 12 due to the metal cladding. Therefore, even if the filtration function of the metal clad of the precoat layer L is lowered, the fine particles that cause clogging in the filter body 12 are captured by the precoat layer L, and clogging of the filter body 12 is suppressed, and the layer thickness is reduced. It can be made much thinner than conventional precoat filters, and the amount of powder ion exchange resin used can be significantly reduced.
[0016]
Next, the attachment structure of the precoat pleated filter F1 to the tube 55 will be described with reference to FIGS. 4 (a) and 4 (b). The precoat type pleated filter F1 can be exchanged with a conventional precoat type filter element through a pressing and fixing mechanism shown in FIG. 4 (a) and a seal adapter shown in FIG. 4 (b). The conventional filter tower can be mounted as it is without modifying the structure.
[0017]
That is, the precoat type pleated filter F1 is formed as a cylindrical filter body 12 with the filter membrane 11 folded into a pleat shape, and therefore has a larger outer diameter than a conventional precoat type spool filter element. It cannot be attached to the attachment adapter 58 at the upper end of the tube 55 shown in FIG. Therefore, in order to attach the basic structure of the tower main body 51 without modification, a seal adapter 59 shown in FIG. 4B is provided as an interface member between the precoat pleated filter F1 and the mounting adapter 58. . As shown in the figure, the seal adapter 59 has a ring-shaped adapter main body 591 that fits into the mounting adapter 58 and a seal member 592 that is mounted on the surface of the adapter main body 591 on the mounting adapter side. is doing. A slightly deep recess (not shown) is formed on the lower surface of the adapter main body 591, and is brought into pressure contact with the ring-shaped protrusion 58 </ b> A of the mounting adapter 58 through a seal member 592 fitted in the recess. . A slightly shallow recessed portion 591A is formed on the upper surface of the adapter main body 591 so that the peripheral ring-shaped protrusion 591B is in pressure contact with the lower surface of the precoat pleated filter F1. The seal adapter 59 is formed as a member independent of the precoat pleated filter F1, but the seal adapter may be formed integrally with the pleated filter. For example, the precoat pleated filter F1 in which the seal adapter 59 is integrated can be realized by integrating the end plate 15 and the seal adapter 59 of the precoat pleated filter F1 by resin molding.
[0018]
Moreover, the press fixing mechanism 60 shown to (a) of FIG. 4 is comprised similarly to the conventional one. That is, as shown in FIG. 4A, the pressing and fixing mechanism 60 includes a guide rod 61 that passes through the axis of the precoat pleated filter F1, and a first receiving member that is attached to the upper portion of the guide rod 61. 62, a spring member 64 interposed between the first receiving member 62 and the second receiving member 63 disposed at the upper end of the precoat pleated filter F1, and the guide rod 61 in a state where the spring member 64 is energized. A lock pin 66 is provided that locks the lower end to the mounting adapter 58 and presses and fixes the precoat pleated filter F1 to the mounting adapter 58. The mounting adapter 58 has a through-hole having a size through which the lower end of the guide rod 61 passes, and a notch (not shown) through which the lock pin 66 passes is formed in this through-hole. The above-described seal adapter 59 is interposed between the lower surface of the precoat pleated filter F1 and the mounting adapter 58. A gasket 67 is interposed between the upper surfaces of the second receiving member 63 and the precoat pleated filter F1. The guide rod 61 includes a rod main body 61A and an elongated nut member 61B that is screwed at the upper end of the rod main body 61A. The first receiving member 62 is engaged with the lower end surface of the nut member 61B. It is.
[0019]
Accordingly, when the precoat pleated filter F1 is attached to the attachment adapter 58, first, the seal adapter 59 is passed through the rod body 61A of the guide rod 61, and then the precoat pleat filter F1 is passed. Next, the gasket 67, the second receiving member 63, the gasket (not shown), the spring member 64, and the first receiving member 62 are passed through the rod body 61A in this order, and the rod body 61A and the nut member 61B are connected. The members are integrated. When the precoat pleated filter F1 is attached to the mounting adapter 58, the guide pin 61 is pushed in against the spring force of the spring member 64 after the lock pin 66 is aligned with the notch of the through hole of the mounting adapter 58. After the lock pin 66 passes through the notch, when the guide rod 61 is rotated and the lock pin 66 is shifted from the notch, the precoat pleated filter F 1 is connected to the mounting adapter 58 via the lock pin 66.
[0020]
In order to form the precoat layer L of the powder ion exchange resin on the precoat layer support 14 of the precoat pleated filter F1, a slurry prepared by adding pure water to the powder ion exchange resin in an adjustment tank (not shown) Is supplied from the adjustment tank into the upper chamber 52 of the tower body 51 through the inflow pipe 51A. When the slurry is supplied from the adjustment tank in this way, the powder ion exchange resin is deposited on the precoat layer support 14 while the entrained water permeates from the outside to the inside of the precoat pleated filter F1, and the precoat layer L is formed. The accompanying water permeates into the precoat pleated filter F1, reaches the lower chamber 53 via the tube 55, and is discharged from the outflow pipe 51B.
Further, when backwashing is performed, water for backwashing and / or pressurized air is supplied in a direction opposite to that of the slurry, and the precoat layer L is removed from the precoat layer support 14.
[0021]
Further, the precoat pleated filter F1 'may be one in which a thread is wound around the surface as shown in FIG. This precoat pleated filter F1 'is a precoat layer support.14CExcept for the difference, the precoat type pleated filter F1 is used. Precoat layer support in this case14C5 is composed of a cylindrical second support 141 that covers the filter body 12, and a thread layer 142 formed by winding a thread around the second support 141. Thus, the powder ion exchange resin for pre-coating is captured and a pre-coating layer is formed. In addition, the second support 141 is formed with openings 141 </ b> A serving as water passages that are evenly distributed over the entire surface. As the yarn forming the yarn layer 142, for example, conventionally known synthetic fibers such as nylon, acrylic, polyester, and polyamide are used. Moreover, the filtration membrane 11 is the same as the precoat type pleated filter F1 described above. For example, a nonwoven fabric 11A made of, for example, polypropylene having a filtration function, a support net 11B covering the inner surface of the nonwoven fabric 11A, and the outer surface of the nonwoven fabric 11A It is comprised with the spunbond 11C to coat | cover. The support net 11B has a function of maintaining the form as the filter body 12, and the spunbond 11C has a function of protecting the surface of the nonwoven fabric 11A.
[0022]
On the other hand, as shown in FIG. 6, for example, the non-precoat type pleated filter F2 includes a cylindrical filter body 12 formed in a pleat shape by folding the filter membrane 11 with a certain folding width, and the filter body 12 includes A cylindrical support 13 supported by the inner peripheral surface, a cylindrical protector 14B that covers the outer peripheral surface of the filter body 12, and a pair of end plates 15 that are fixed in a state in which both ends thereof are held in a cylindrical shape; Conventionally known ones can be used. A large number of small-diameter openings for collecting filtered water filtered by the filter body 12 in the inner space of the support body 13 are formed on the peripheral surface of the support body 13 in a dispersed manner, and the protection body 14B. Is formed in a net shape having an opening of about 10 to 30 mm, for example. In FIG. 6, the same reference numerals as those in FIG. 5 denote the same parts.
[0023]
Next, an embodiment of the condensate treatment method of the present invention using the condensate treatment apparatus of the present embodiment provided with the condensate pre-filtration device 5 will be described. In the case of the condensate treatment method of the present embodiment, for example, after a periodic check of the power plant, a process peculiar to a period until the power plant reaches a steady operation is performed. For example, first, it is shown in white in FIG.3Make-up water is supplied with the valve of the first filtration tower 5A of the tower, that is, the valve 51D of the overflow pipe 51C of the first filtration tower 5A shown in FIG. Next, while the valve 51D of the overflow pipe 51C is closed and the slurry of the powder ion exchange resin is supplied from the inflow pipe 51A into the upper chamber 52, the slurry is dispersed throughout the upper chamber 52 and entrained water is precoated. Through the mold pleat filter F1, the powder ion exchange resin is formed as a precoat layer L (see FIG. 3B) on the surface of the precoat layer support 14 of each precoat type pleat filter F1. This pre-coating operation is also performed on the other first filtration tower 5A in parallel. In addition, the second filtration tower 5B having another non-precoat type pleated filter F2 is also filled with make-up water before entering the steady operation, and is prepared for the steady operation.
[0024]
After that, the power plant is cleaned up. First, makeup water is supplied into the condenser 4 when the power plant is started, and the makeup water in the condenser 4 is introduced only into the first filtration tower 5A of the condensate pre-filter 5 by the pump 10A. Water is passed through the precoat pleated filter F1 in the tower body 51, and no makeup water is introduced into the second filtration tower 5B. In the makeup water, after removing the metal clad and the TOC component in the first filtration tower 5A and removing some of the various ion components, the condensate demineralizer 6 further removes various ion components. Thereafter, all of this treated water returns to the condenser 4 through the circulation pipe 9C, and most of impurities such as the metal clad and the TOC component in the condenser 4 are contained in the first filtration tower 5A while repeating the circulation. Are removed by the precoat type pleated filter F1.
[0025]
  After removing impurities generated during periodic inspection in the condenser 4, the other pumps 10B and 10C are also driven, the valve (not shown) of the circulation pipe 9C is closed, and power is generated via the condensate pipe 9B. Supply condensate to the plant. And while makeup water circulates in the above system, most of the metal clad, TOC component and various ion components in the system are removed in the first filtration tower 5A and the condensate demineralizer 6 of the condensate treatment apparatus. Thus, the impurity concentration is reduced to the impurity concentration during steady operation. Therefore, during the period from the cleanup operation period after the periodic inspection to the steady operation, even if a large amount of metal cladding and TOC components are contained in the condensate, these are precoated in the first filtration tower 5A. Powder ion exchange resin precoat layer formed on the surface of the mold pleat filter F1LSince it is reliably captured and removed by the filter membrane, it adheres directly to the filter membrane 11 and is filtered.11There is no risk of clogging. Moreover, when the filtration membrane 11 is a pleated type,Since the filtration capacity is large and the differential pressure rises slowly, the metal cladding and the like can be removed efficiently, and the cleanup operation period can be shortened. At the end of the clean-up operation, the metal clad contained in the condensate drops rapidly and reaches a very low concentration (about 20 ppb) that is the same as that in the normal operation of the plant. The load on the filtration membrane 11 is significantly reduced.
[0026]
Thereafter, the clean-up operation is switched to the steady operation, and at this time, the condensate is also passed through the second filtration tower 5B, and the first and second filtration towers 5A and 5B of the condensate pre-filtration device 5 are passed through. At the same time, the condensate prefiltration device 5 is brought into a steady operation state. At this time, since the concentration of the metal clad contained in the condensate is extremely low as described above, there is no possibility that the load of each non-precoated pleated filter F2 of the second filtration tower 5B thereafter increases rapidly, and the non-precoated type The lifetime of the filter F2 can be extended.
[0027]
The operation period of the filter when the condensate treatment method of the present invention is implemented as described above using the condensate treatment device of the present embodiment and when the condensate treatment method is implemented using the conventional condensate treatment device FIG. 7 is a graph showing the relationship between the load on the metal clad and the load. As is clear from this graph, the load amount on each filter of the metal clad during steady operation is almost the same between the condensate treatment method of the present invention and the conventional condensate treatment method, but in the case of the conventional condensate treatment method, Shows that the load of the metal clad on the pleated filter suddenly increases during the cleanup operation, and the pleated filter reaches the end of its life in 3 years. In contrast, in the case of the condensate treatment method of the present embodiment, the load of the metal clad on each of the pleated filters F1, F2 hardly increases even during the cleanup operation period, and the filter life is longer than that of the conventional method. It can be seen that it extends.
[0028]
As described above, according to the present embodiment, the period from the cleanup operation period after the regular inspection to the steady operation is the precoat type pleated filter arranged in parallel with each other that constitutes the condensate pre-filter unit 5. Since the first filtration tower 5A having F1 and the second filtration tower 5B having the non-precoat type pleated filter F2 are passed through only the precoat type filter F1 of the first filtration tower 5A, after periodic inspection Most of the metal clad and TOC components caused by material corrosion, etc. that occurred when the plant was shut down during the cleanup operation period can be removed by the precoat layer (powder ion exchange resin) of the precoat pleated filter F1, and when the steady operation is started Thus, even if water is passed through the second filtration tower 5B, the load on the non-precoated pleated filter F2 is extremely small. , It is possible to extend the life of the condensate before 置濾 over device 5. In addition, the precoat pleated filter F1 only needs to be backwashed once every few years, and can significantly reduce the amount of water used for backwashing and the amount of radioactive waste (used powder ion exchange resin) generated. Can be significantly reduced.
[0029]
In addition, this invention is not restrict | limited at all to the said embodiment, The precoat type filter element used for 5 A of 1st filtration towers can use not only a pleat type filter but the conventional precoat type filter element.
[0030]
【The invention's effect】
According to the first and second aspects of the present invention, it is possible to extend the life by applying a non-precoat type filter element to the condensate pre-filter device and preventing a sudden increase in the differential pressure. Therefore, it is possible to provide a condensate treatment method and a condensate treatment apparatus that can significantly reduce the amount of radioactive waste generated.
[Brief description of the drawings]
1A and 1B are diagrams showing an embodiment of a condensate treatment apparatus according to the present invention, in which FIG. 1A is a configuration diagram showing an outline of a power plant, and FIG. 1B is an arrangement example of filtration towers of a condensate pre-filtration apparatus. FIG.
FIG. 2Condensate pre-filtration equipmentIt is a structure sectional view showing the filtration tower which constitutes.
3A and 3B are diagrams showing an example of a precoat pleated filter applied to the filtration tower shown in FIG. 2, wherein FIG. 3A is a perspective view thereof, FIG. 3B is a schematic view showing a cross section in the lateral direction, and FIG. ) Is an enlarged front view showing the precoat layer support.
4 is a view showing a state in which the precoat pleated filter shown in FIG. 3 is attached to the filtration tower shown in FIG. 2, wherein (a) is a sectional view thereof, and (b) is an exploded perspective view showing a seal adapter. is there.
FIG. 5 is a perspective view showing a precoat type pleat filter of a type different from the precoat type pleat filter shown in FIG.
FIG. 6 is an exploded perspective view showing an example of a non-precoat type filter.
7 is a graph showing the relationship between the period of use of each filter and the load of iron clad when the condensate treatment apparatus shown in FIG. 1 and the non-precoat type pleated filter are used.
FIG. 8 is a configuration diagram showing an example of a conventional power plant.
[Explanation of symbols]
4 condenser
5 Condensate pre-filter
5A First filter tower
5B Second filter tower
6 Condensate demineralizer
F1 Pre-coated pleated filter
F2 Non-precoat pleated filter
11 Filtration membrane
12 Filter body
13 Core (support)
14 Precoat layer support

Claims (2)

復水器の後段に配置された復水前置濾過装置と、この復水前置濾過装置の後段に配置された復水脱塩装置とを備えた腹水処理装置において、上記復水前置濾過装置は、粉末イオン交換樹脂がプリコートされたプリコート型フィルタエレメントを有する単塔または複数塔配置されている第1の濾過塔と、この第1の濾過塔と並列に複数塔配置され且つ粉末イオン交換樹脂がプリコートされていないノンプリコート型プリーツフィルタエレメントを有する第2の濾過塔とを備えたことを特徴とする復水処理装置。In the ascites treatment apparatus comprising a condensate pre-filtration device disposed downstream of the condenser and a condensate demineralization device disposed downstream of the condensate pre-filtration device, the condensate pre-filtration The apparatus includes a first filter tower having a single tower or a plurality of towers having a precoat filter element pre-coated with a powder ion exchange resin, and a plurality of towers arranged in parallel with the first filter tower and powder ion exchange. A condensate treatment apparatus comprising: a second filtration tower having a non-precoat type pleated filter element that is not precoated with resin . 復水器からの復水を復水前置濾過装置を用いて濾過処理した後、上記復水前置濾過装置からの復水を復水脱塩装置を用いて脱塩処理する腹水処理方法において、定期点検後のクリーンアップ運転期間を経て定常運転に至るまでの期間は上記復水前置濾過装置を構成する互いに並列配置された粉末イオン交換樹脂がプリコートされたプリコート型フィルタエレメントを有する第1の濾過塔及びノンプリコート型プリーツフィルタエレメントを有する第2の濾過塔のうち、第1の濾過塔のプリコート型フィルタエレメントのみに通水することを特徴とする復水処理方法。In an ascites treatment method, the condensate from the condenser is filtered using a condensate pre-filtration device, and then the condensate from the condensate pre-filtration device is desalted using a condensate demineralizer. The first period having a pre-coated filter element pre- coated with powder ion exchange resins arranged in parallel and constituting the above-mentioned condensate pre-filtering device during a period from a cleanup operation period after regular inspection to a steady operation. A condensate treatment method characterized by passing water through only the precoat filter element of the first filter tower among the second filter tower having the filter tower and the non-precoat pleated filter element.
JP31440397A 1997-10-29 1997-10-29 Condensate treatment method and condensate treatment apparatus Expired - Fee Related JP3767765B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31440397A JP3767765B2 (en) 1997-10-29 1997-10-29 Condensate treatment method and condensate treatment apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31440397A JP3767765B2 (en) 1997-10-29 1997-10-29 Condensate treatment method and condensate treatment apparatus

Publications (2)

Publication Number Publication Date
JPH11128629A JPH11128629A (en) 1999-05-18
JP3767765B2 true JP3767765B2 (en) 2006-04-19

Family

ID=18052939

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31440397A Expired - Fee Related JP3767765B2 (en) 1997-10-29 1997-10-29 Condensate treatment method and condensate treatment apparatus

Country Status (1)

Country Link
JP (1) JP3767765B2 (en)

Also Published As

Publication number Publication date
JPH11128629A (en) 1999-05-18

Similar Documents

Publication Publication Date Title
US5468397A (en) Gas backwash of pleated filters
EP0876198B1 (en) Method and device for removing iron from aqueous liquids
JP2000051669A (en) Hollow fiber membrane module with lower cap
US4904380A (en) Precoat filter assembly
CA1120867A (en) Two layer wound-on-core medium filter element
JP3767765B2 (en) Condensate treatment method and condensate treatment apparatus
JPH1199307A (en) Pleat type filter
JPH09187605A (en) Pleat cartridge filter and fitter for power plant condensate system using the same
JP4523112B2 (en) Condensate filtration device
JP2000033210A (en) Operation of condensate water filtration apparatus of power plant
GB2214447A (en) Filter element
JPH0353999B2 (en)
JPH1199311A (en) Method for operating condensate filtration column
JPS63315109A (en) Ion exchangeable filter
JP4272779B2 (en) Cartridge type filtration device used in condensate system of power plant and operation method of condensate filtration using the same
JPH0747242A (en) Non-auxiliary filter
JPH0611384B2 (en) Filtration tower using hollow fiber module
JPS60206405A (en) Hollow yarn membrane filter apparatus
JPS63274405A (en) Reverse washing treatment method of hollow fiber membrane filter apparatus
JPS60142295A (en) Filter
JPS58183980A (en) “Filtration” element of “filtration” demineralizer
JPH0824823B2 (en) Hollow fiber module
DE102023001704A1 (en) filter device
JPH09308881A (en) Condensate demineralizer cleaning method
JPH09206567A (en) Method for filtering heater drain in power plant and device therefor

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050927

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060126

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110210

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120210

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120210

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130210

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140210

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees