JP3774615B2 - Test run control method for hot water heater - Google Patents
Test run control method for hot water heater Download PDFInfo
- Publication number
- JP3774615B2 JP3774615B2 JP2000135140A JP2000135140A JP3774615B2 JP 3774615 B2 JP3774615 B2 JP 3774615B2 JP 2000135140 A JP2000135140 A JP 2000135140A JP 2000135140 A JP2000135140 A JP 2000135140A JP 3774615 B2 JP3774615 B2 JP 3774615B2
- Authority
- JP
- Japan
- Prior art keywords
- hot water
- thermal valve
- value
- heating
- open
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
- Air Conditioning Control Device (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、温水暖房装置の試運転時の試運転制御のために用いられる温水暖房装置の試運転制御方法に関し、特に、端末放熱器に対する温水の循環供給を開閉切換えするための熱動弁が正常に開変換作動するか否かをチェックするものに係る。
【0002】
【従来の技術】
従来より、温水暖房装置としては、燃焼バーナにより加熱される熱交換器や貯湯タンク内の水を循環させる循環ポンプが配設された暖房回路を備えた熱源機と、この熱源機外の各室に設置された複数の端末放熱器(例えば床暖房器や浴室暖房機)とからなるものが一般に知られている。このものでは、上記複数の端末放熱器が上記暖房回路に対し熱動弁及び循環配管を介して並列に接続され、所望の熱動弁を開作動させることで上記熱交換器により加熱された温水が対応する端末放熱器に対し個別に循環供給されるようになっている。
【0003】
そして、上記の温水暖房装置については、熱源機及び各端末放熱器をそれぞれ設置し、その熱源機と各端末放熱器との間に循環配管等の配管工事を行った後、使用(通常の暖房運転)に供される前に、水張りを行い正常に機能するか否かの試運転が一般に行われている。すなわち、上記各熱動弁が正常に開閉作動するか否か、循環配管が正常に配管されているか否か、各端末放熱器に対し所定温度の温水が供給されて端末放熱器による暖房が正常に行われるか否か等のチェックが試運転として行われている。
【0004】
特に、上記熱動弁はコントローラからの開作動指令を受けてヒータ加熱が行われ、この加熱を受けて開変換作動する構造となっているため、上記開作動指令の出力により正常に開変換作動をするか否かのチェックが試運転においては重要となる。
【0005】
熱動弁についての上記チェックは、通常、循環ポンプと端末放熱器との間で循環される往き側温水と、戻り側温水との両温度間の温度差の変動を監視することにより行われている。すなわち、燃焼バーナを燃焼作動させて熱交換器で所定温度に加熱した温水を循環ポンプの作動により暖房回路内で循環させ、この状態でチェック対象の熱動弁に開作動指令を出力する。その熱動弁が正常に開変換作動していけば、加熱されて高温の往き側温水が上記暖房回路から循環配管を通して端末放熱器に供給され、この端末放熱器で放熱されて低温となった戻り側温水が上記循環ポンプに戻されることになる。従って、上記熱動弁への開作動指令の出力前における往き側温水と戻り側温水との温度検出値間の温度差が上記端末放熱器での放熱等により増大変動することになる。そこで、上記温度差が増大した状態で安定したことを検出することにより、熱動弁が正常に開変換作動して開状態になったことを検出するようにされている。
【0006】
【発明が解決しようとする課題】
ところが、上記熱動弁についての従来の開変換作動チェックでは極めて長時間を要し、試運転に要する全所要時間の長大化を招くという問題がある。
【0007】
すなわち、上記従来の開変換作動チェックでは、温水が端末放熱器に供給されてから放熱が徐々に進行するため、熱動弁がたとえ正常に開変換作動していたとしても上記温度差は徐々にしか増大しない上にこの増大が比較的長時間にわたり進行することになる。しかも、上記熱動弁が実際には既に全開状態になっていたとしても、上記の放熱は安定状態にならずにその後しばらくは継続するため、往き側及び戻り側の両温水温度を検出して温度差を監視していても、その温度差は熱動弁が全開状態に到達した以降もしばらくは増大することになる。このため、上記温度差が安定状態になるまでには実際の熱動弁動作以上の時間が経過することになり、上記の安定状態に至ったことの判定のために所定の判定時間の経過を見込む必要がある。以上の結果、開変換作動チェックの結果を得るためには、熱動弁の実際の開変換動作に要する時間以上の長い待機時間(例えば12分間)を必要とするという不都合がある。
【0008】
しかも、従来は一つの熱動弁について開変換作動チェックをした後、引き続いて閉作動指令を出力して閉変換作動チェックを行い、次に、他の熱動弁について上記と同様に開と閉との両変換作動チェックを行うというように熱動弁1つ毎に個別に開・閉の両変換作動チェックが順に行われている。閉変換作動チェックに要する待機時間は開変換作動チェックと比較すれば若干短い(例えば10分間)ものの、開・閉の双方で二重の待機時間を必要としている。
【0009】
特に、温水暖房装置においては、通常は、複数もしくは多数(例えば4〜10)の端末放熱器を熱源機に対し接続する場合が多く、その端末放熱器と同数の熱動弁について逐一チェックする必要があるために、試運転全体の所要時間が極めて長いものとなっている。
【0010】
本発明は、このような事情に鑑みてなされたものであり、その目的とするところは、温水暖房装置の試運転の中でも特に長い時間を要する熱動弁の開変換作動チェックのための試運転時間を可及的に短縮化し得る温水暖房装置の試運転制御方法を提供することにある。
【0011】
【課題を解決するための手段】
上記目的を達成するために、本発明は、少なくとも加熱部及び循環ポンプが配設された暖房回路を有する熱源機と、この熱源機外に設置されて個別の熱動弁及び循環配管により上記暖房回路と接続された少なくとも1の端末放熱器とを備え、上記熱動弁の開状態への変換によって上記暖房回路から加熱された温水が上記循環配管を通して上記端末放熱器に対し循環供給されるように構成された温水暖房装置について、通常運転を行う前に上記熱動弁が正常に開変換作動するか否かをチェックする温水暖房装置の試運転制御方法を対象にして以下の特定事項を有するものである。すなわち、上記循環ポンプとして直流電動機により駆動されその回転数の変更により吐出流量が可変とされる流量可変型のポンプを用いて上記温水暖房装置を設置し、次に、上記熱源機及び循環配管に水張りした状態で、試運転制御を行うコントローラにより上記直流電動機をその回転数が一定回転数を持続するように作動制御する一方、上記熱動弁に対し開作動指令を出力する。以後、上記直流電動機の作動制御中に印加される電圧値もしくは電流値又は上記暖房回路内の循環流量値もしくは配管圧力値の内の少なくともいずれか1の値を監視対象値としてその監視対象値の変動を監視し、その監視対象値に所定の変動が発生することにより上記熱動弁の開変換作動が正常に行われることを検出するようにすることを主特定事項とするものである。
【0012】
ここで、上記の「加熱部」としては、燃焼バーナとこの燃焼バーナの燃焼熱により加熱される熱交換器との組み合わせ、あるいは、電気ヒータ等を用いるものである。
【0013】
上記の主特定事項を有するものであれば、開作動指令に基づき熱動弁が正常に開変換作動をするか否かの開変換作動チェックに要する時間を短縮することが可能になり、温水暖房装置の試運転に要する全体時間の大幅な短縮化を図ることが可能になる。すなわち、熱動弁は開作動指令を受けると正常であればヒータによる加熱が開始され当初は加熱遅れにより全閉からごく僅かずつしか開作動しないものの、加熱が十分になると急激に開度が増大して全開に近づくことになる。その開度の急増大により熱源機の暖房回路から循環配管に循環供給される水の循環流量値も急増大することになる。この結果、循環配管の配管長や端末放熱器の存在に基づく抵抗を新たに受けて配管圧力値も急変動したり、あるいは、これらの変動の影響を受ける循環ポンプの直流電動機を一定回転数に維持するための作動制御上、印加電圧値が変動したり、その印加電圧値の変更に伴い電流値の変動が生じたりすることになる。従って、電流値、電圧値、配管圧力値及び循環流量値のいずれか一つの値を監視対象として監視し、その監視対象値が上記開度の急増大に対応する所定の変動が生じたことを検出することにより、熱動弁が正常に開変換作動したことを確実かつ早期に検出することが可能になる。
【0014】
以上により、従来技術では熱動弁が完全に全開状態になった後に温水の往き側と戻り側との両温水の温度差が安定状態になるのを待ってからでないと正常に開変換作動しているとの判定を行い得なかったのに比べ、全開状態になるまで待たずに正常に開変換作動しているとの判定が行い得る点で、開変換作動チェックに要する時間の短縮化が図られる。特に、熱動弁が複数もしくは多数設置されている温水暖房装置の場合には、大幅な時間の短縮化を得ることが可能になる。なお、熱動弁の開変換作動が正常に行われていることを検出した場合には、例えばコントローラに接続させたリモコン等の報知手段により正常である旨を表示させたり音声報知させたりする報知を作業者に行うようにすればよい。
【0015】
しかも、温度変動に依存することなく開変換作動チェックが行い得るため、上記発明の場合には従来技術では必要であった加熱部での加熱作動を不要にして、管路内に水張りした水の状態のままで熱動弁の開変換作動チェックを行うことが可能となる。これにより、試運転制御の簡略化が図られる。
【0016】
上記の主特定事項に対し、熱動弁への開作動指令の出力と同時にタイマーをスタートさせ、監視対象値に所定の変動が発生した後、その監視対象値が安定状態に至るまでのタイマー値を検出し、その検出タイマー値をコントローラに対し上記熱動弁の開作動開始から全開状態までの開変換作動に要する基準開時間値として記憶設定するようにする。この場合には、試運転後の通常暖房運転において、開変換作動に要する時間を検出することにより、その検出時間値と、上記基準開時間値との対比により故障発生等の異常を検出することが可能になる。
【0017】
また、上記の主特定事項に対し、端末放熱器と、この各端末放熱器に温水を個別に循環させる循環配管と、上記端末放熱器に対し上記循環配管を通しての温水の供給を開閉切換する熱動弁との組み合わせからなる端末系統を2以上備えた温水暖房装置を対象とする場合には、以下の特定事項をさらに付加することにより、熱動弁の開変換作動チェックに要する試運転時間のより一層かつ大幅な短縮化が図られることになる。すなわち、まず、任意の1の端末系統の熱動弁をチェック対象にして、このチェック対象熱動弁に開作動指令を出力し、監視対象値の変動発生によりそのチェック対象熱動弁の開変換作動が正常に行われることを検出する開変換作動チェックを行い、以後、全数の熱動弁についての開変換作動チェックが完了するまでチェック対象熱動弁を任意の新たな熱動弁に変更して開変換作動チェックを順次繰り返すようにし、上記チェック対象熱動弁の変更の際、今回のチェック対象熱動弁についての正常開変換作動の検出と同時に、上記今回のチェック対象熱動弁を開状態にしたまま次回のチェック対象熱動弁に対し開作動指令を出力するようにすればよい。
【0018】
この場合には、今回のチェック対象熱動弁が全開状態になる前の段階で次回のチェック対象熱動弁についての開作動を開始させることが可能となり、全開状態になった後にさらに一定の判定時間の経過を待つ従来技術と比べ、大幅な時間短縮化が図られる。このように次回のチェック対象熱動弁に開作動指令を出力したとしても、上述の如く出力後の初期段階では熱動弁の加熱遅れに起因して直ぐには開かれず、その結果、循環流量等への影響もない一方、次回のチェック対象熱動弁の開度が急増大する頃には前回のチェック対象熱動弁は既に全開状態となってそれ以上循環流量値等への変動は生じないため、その前回のチェック対象熱動弁を開いたままでも今回のチェック対象熱動弁についての開変換作動チェックが確実に行い得る。
【0019】
さらに、上記の複数の端末系統を対象とする場合において、全熱動弁についての開変換作動チェックを完了した後、その全熱動弁に対し閉作動指令を一斉に出力するようにしてもよい。
【0020】
なお、上記発明における監視対象値の監視において、循環流量値もしくは配管圧力値を監視対象とする場合には、例えば流量検出手段もしくは圧力検出手段を暖房回路に配設して検出してもよいが、これに限らず、熱源機が給湯回路、風呂注湯回路もしくは風呂追い焚き回路等を併有するものであれば、それらの暖房回路以外の他の回路に既設置の流量検出手段もしくは圧力検出手段を試運転時にのみ一時的に有効利用するようにしてもよい。
【0021】
【発明の効果】
以上、説明したように、請求項1〜請求項4のいずれかに係る温水暖房装置の試運転制御方法によれば、熱動弁が正常に開変換作動したことを確実かつ早期に検出することができ、温水暖房装置の試運転の中でも特に長い時間を要する熱動弁の開変換作動チェックのための試運転時間を可及的かつ大幅に短縮することができるようになる。特に、熱動弁が複数もしくは多数設置されている温水暖房装置の場合には、極めて大きな時間短縮を得ることができるようになる。
【0022】
特に、請求項1によれば、試運転時において熱動弁の開作動指令の出力から全開状態に至るまでの時間を基準開時間値として予め記憶設定しておくことにより、通常暖房運転時における熱動弁の異常発生の検出を容易に行うことができるようになる。
【0023】
さらに、請求項2によれば、複数の熱動弁を対象とする場合に、次回のチェック対象熱動弁に開作動指令を出力する前に今回のチェック対象熱動弁の閉作動を待つ必要がない分、試運転時間の大幅な短縮化を図ることができる。
【0024】
【発明の実施の形態】
以下、本発明の実施形態を図面に基づいて説明する。
【0025】
図1は、本発明の実施形態が適用される複合熱源機の例を示す。この複合熱源機20は、給湯、暖房及び風呂追い焚きの各機能を有するものである。同図において、21は給湯回路、22は暖房回路、23は追い焚き回路、24はこれらの各回路の動作や試運転を制御するコントローラである。本複合熱源機20は、風呂追い焚き時には暖房回路22の湯水と、追い焚き回路23の湯水との間で熱交換を行うことにより追い焚き回路23の湯水を温度上昇させて追い焚きを行うタイプのものである。以下、上記複合熱源機20の各主要構成要素21,22,23,24について説明する。
【0026】
(給湯回路21)
上記給湯回路21は、給湯用燃焼室31を形成する給湯用ケーシング(缶体)32と、このケーシング32内の燃焼室31の上部に配設された給湯用熱交換器33と、この熱交換器33の下方に配設された給湯用バーナ34と、このバーナ34に燃料ガスを供給する給湯用燃料供給系35と、上記バーナ34に対し燃焼用空気を供給する送風ファン36と、上記給湯用熱交換器33にそれぞれ接続された給湯用入水管37及び給湯用出湯管38とを備えている。
【0027】
上記給湯用燃料供給系35は、後述の暖房用燃料供給系55と共通の開閉用電磁弁39の下流側と上記給湯用バーナ34とを接続する給湯用ガス管40と、この給湯用ガス管40に介装されて上記バーナ34への燃料ガス供給量を変更調整する給湯用電磁比例弁41とを備えている。
【0028】
そして、上記入水管37を通して給湯用熱交換器33に供給された水道水などの水は、その給湯用熱交換器33を通過する間に給湯用バーナ34の火炎により加熱され、上記出湯管38を通して台所等のカラン44や上記追い焚き回路23などの所定の給湯箇所に給湯されるようになっている。上記給湯用入水管37には、給湯用熱交換器33への入水流量を検出する水量センサ45と、入水サーミスタ46とが設置されており、また、給湯用出湯管38には出湯サーミスタ47が設置されている。
【0029】
(暖房回路22)
上記暖房回路22は、暖房用燃焼室51を形成する暖房用ケーシング(缶体)52と、加熱部を構成する暖房用熱交換器53及び暖房用バーナ54と、このバーナ54に上記と同じ燃料ガスを供給する暖房用燃料供給系55と、上記バーナ54に対し燃焼用空気を供給する暖房用送風ファン56と、上記暖房用熱交換器53を通る暖房用循環流路57とを備えている。
【0030】
上記暖房用燃料供給系55は、上記共通の開閉用電磁弁39の下流側と上記暖房用バーナ54とを接続する暖房用ガス管60と、この暖房用ガス管60に介装されて上記バーナ54への燃料ガス供給量を変更調整する暖房用電磁比例弁61とを備えている。
【0031】
上記暖房用循環流路57は、途中に介装された貯湯タンクとしての膨張タンク64と、この膨張タンク64から上記暖房用熱交換器53に至る暖房用入水管65と、その暖房用熱交換器53から上記膨張タンク64に至る暖房用出湯管66とを備えている。上記膨張タンク64には給湯用入水管37から分岐して注水栓及び補給水電磁弁を介装した暖房用注水管68の下流端が接続されており、膨張タンク64への注水と、膨張タンク64内の水位が低下したときの水の補給とが高水位スイッチ641(図2参照)及び低水位スイッチ642(図2参照)からの検出信号に基づき行われるようになっている。また、上記暖房用入水管65には、膨張タンク64内の温水を暖房用循環流路57等を介して循環させる暖房用循環ポンプ67が設置されており、上記暖房用出湯管66はその途中において後述の追い焚き用熱交換器81を通るように配設されている。
【0032】
上記暖房用循環ポンプ67は、DC(直流)モータを駆動用電動機とするDCポンプにより構成され、PWM(Pulse Width Modulation)制御による印加電圧指令値の変更制御によりポンプ羽根(インベラ)の回転数の変更制御が行い得るようになっている。そして、上記回転数の変更制御により吐出流量能力が変更されるようになっている。また、上記の回転数を検出する回転数検出手段と、上記印加電圧指令により印加された電圧下で流れる電流値を検出する電流値検出手段とが配設され、それぞれ検出値をコントローラ24に出力するようになっている。
【0033】
上記暖房用入水管65の中間位置には低温用暖房配管69の上流端が分岐接続され、この低温用暖房配管69の下流端には端末開閉弁として複数(図例では6つ)の熱動弁721〜726(図2参照)を有する6Pヘッダ72が接続されている。そして、図2に示すように上記6Pヘッダ72の各熱動弁721〜726に対し複数の低温用端末放熱器A1〜A4に向かう循環配管11〜14の上流端が個別に接続されて上記低温用暖房配管69からの低温水が各端末放熱器A1〜A4に対し並列に分流されるようになっている。なお、上記各低温用端末放熱器A1〜A4は、建物の各部屋に設置された床暖房用の放熱パネルや放熱チューブ等により構成され、通常の暖房運転に際しては比較的低温(例えば60℃)の温水が循環供給されるようになっている。また、図2の例では4つの熱動弁721〜724に対し上記の4つの端末放熱器A1〜A4が個別に接続され、他の2つの熱動弁725,726は未接続状態とされた場合を示している。
【0034】
上記暖房用出湯管66には上記暖房用熱交換器53と追い焚き用熱交換器81との中間位置で高温用暖房配管70の上流端が分岐接続され、この高温用暖房配管70の下流側には下流接続端701が設けられている。そして、この下流接続端701には、1もしくは2以上(図2では2つの例を示す)の高温用端末放熱器A5,A6へ向かう循環配管15の上流端側が接続されるようになっている。上記循環配管15はその途中位置で二つの分岐循環配管15a,15bに分岐され、それぞれ熱動弁により構成された熱動弁151,152を介して上記各高温用端末放熱器A5,A6を通るようになっている。なお、この高温用端末放熱器A5,A6は、例えば浴室乾燥機や室内暖房機等により構成され、通常の暖房運転に際しては比較的高温(例えば80℃)の温水が循環供給されるようになっている。
【0035】
上記下流接続端701の手前位置の高温用暖房配管70から暖房用バイパス管75の上流端が分岐接続されており、この暖房用バイパス管75の下流端は膨張タンク64手前の暖房戻り管71に合流するように接続されている。この暖房戻り管71の上流側接続端711には上記の低温用及び高温用の各端末放熱器A1〜A6を通過した循環配管11〜14,15a,15bの各下流端が接続されるようになっており、上記暖房戻り管71の下流端は上記暖房用出湯管66に対し膨張タンク64手前位置で合流接続されている。
【0036】
上記の各端末放熱器A1〜A6には端末コントローラ241〜246が個別に配設され、この各端末コントローラ241〜246は熱源機20側のコントローラ24との間で無線もしくは有線により双方向通信が可能になっている。これにより、試運転に際しては上記各端末コントローラ241〜246から熱源機側コントローラ24に対し各端末放熱器A1〜A6の状況を出力したり、各熱動弁721〜724,151,152の開閉作動指令を上記各端末コントローラ241〜246からでも熱源機側コントローラ24からでも出力し得るようになっている。
【0037】
上記の熱源機20外にそれぞれ並列に設置された端末は、熱動弁721と循環配管11と端末放熱器A1とで一つの端末系統1を構成し、熱動弁722と循環配管12と端末放熱器A2とで同じく一つの端末系統2を構成するというように、各熱動弁723,724,151,152と各循環配管13,14,15及び15a,15及び15bと各端末放熱器A3〜A6との各組み合わせによりそれぞれ一つの端末系統3〜6を構成することになる。
【0038】
図1に戻り、上記暖房用熱交換器53から高温用暖房配管70の上流端との分岐までの間の暖房用出湯管66には上記熱交換器53からの往き側温水の出湯温度を検出する往き側サーミスタ73が設置され、また、暖房戻り管71には戻り側温水の温度を検出する戻り側サーミスタ74が設置されている。
【0039】
また、上記暖房用出湯管66の追い焚き用熱交換器81よりも下流位置には風呂用熱動弁76が介装されており、この熱動弁76が閉じることにより暖房用出湯管66の温水は上記高温用暖房配管70のみに流れ、熱動弁151,152の一方もしくは双方が開いていれば循環配管15に、双方が閉じていれば暖房用バイパス管75にそれぞれ流れて循環することになる。
【0040】
(追い焚き回路23)
追い焚き回路23は、上記追い焚き用熱交換器81と、この熱交換器81を通る追い焚き用循環流路82と、この循環流路82を通して温水を循環させる追い焚き用循環ポンプ83と、給湯用出湯管38から分岐して上記循環流路82にお湯を注湯する注湯管84とを備えている。
【0041】
上記追い焚き用循環流路82は、図示省略の浴槽から追い焚き用熱交換器81に至る風呂戻り管85と、その追い焚き用熱交換器81から上記浴槽に至る風呂往き管86とにより構成されている。上記風呂戻り管85には、上記循環ポンプ83が設置されている一方、上記注湯管84の下流端が接続されている。この注湯管84にはこの注湯管84を流れる流量を検出する湯量センサ87及び電磁開閉弁88等が設置されている。加えて、上記風呂戻り管85には上記浴槽内の水位を検出するための圧力センサ89が配設されている。
【0042】
(コントローラ24)
コントローラ24は、報知手段を構成するリモコン240からユーザもしくは試運転作業者の入力操作に基づく各種操作指令を受けて上記の各熱交換回路21,22,23の運転を制御するものであり、マイクロコンピュータやメモリ等を含んで構成されたものである。上記コントローラ24は、上記各回路21,22,23に対応して給湯制御手段、風呂追い焚き制御手段及び暖房制御手段等の通常運転を制御する部分と、記憶手段と、上記各回路21,22,23及び暖房回路22に接続される各端末放熱器A1〜A6等の各試運転を制御する試運転制御手段とを備えている。
【0043】
(試運転制御)
以上の構成を前提として、暖房回路22の循環ポンプ67の吐出側の管路に対し管路内の圧力を検出する圧力検出手段としての圧力センサ7(図2参照)を試運転制御用にのみ用いるために配設した場合の試運転制御を以下に説明する。なお、以下の説明では暖房回路22及び各端末系統1〜6からなる温水暖房系についての試運転制御について説明する。
【0044】
本試運転制御は、熱源機20の設置、各室への端末放熱器A1〜A6の設置、及び、各循環配管11〜15の配管・接続の各種工事や配線工事等が完了した後に行われる。この状態では全熱動弁721〜726,151,152及び風呂用熱動弁76等は全て閉状態とされている。また、コントローラ24の記憶手段には循環ポンプ67についての所定のポンプ特性テーブルが予め記憶設定されている。
【0045】
本試運転制御は、例えばリモコン240に配設された自動試運転スイッチをON操作することにより開始され、図3に示すように、水張り処理SUB1を行った後に循環ポンプ67についてのポンプ特性値補正処理SUB2を行う。次に、チェックを行う端末放熱器Aj、すなわち、端末系統を選択する(ステップS1)。この選択は、6つの端末系統1〜6の内から任意の端末系統を1つずつ選択して、新規選択端末系統の熱動弁の開変換作動が正常に行われているか否かをチェックする開チェック処理SUB3、圧損チェック処理SUB4及び新規選択端末系統の正常運転チェック処理SUB5を行った後に、6つの端末系統1〜6の全てが選択されるまで端末系統を1つずつ増加選択して上記各処理SUB3〜5を繰り返すようにする(ステップS2で「NO」の場合参照)。そして、全端末系統1〜6についての各処理SUB3〜5が終了すれば(ステップS2でj=jmax=6;「YES」の場合)、それまでに開状態とされた全熱動弁721〜724,151,152を一斉かつ同時に閉作動し(ステップS3)、これら全熱動弁721〜724,151,152の閉チェック処理SUB6と、各端末系統1〜6の圧損ばらつきチェック処理SUB7とを行って試運転制御を終了する。以下、上記各処理を詳細に説明する。なお、上記自動試運転スイッチのON操作により、設置されている各端末コントローラ241〜246からの出力信号を受けて現に接続されている端末放熱器数、どの熱動弁に接続されているか、及び、正常通信可能か否か等の確認が行われる。
【0046】
水張り処理SUB1では、暖房用注水管68を通して膨張タンク64に注水した後、低温用の熱動弁721〜724及び高温用の熱動弁151,152の全てを開作動させる。次いで、循環ポンプ67を作動させて熱源機20側や熱源機20外の端末放熱器A1〜A6側の全てに水張りを行い、水張り完了後、上記の全ての熱動弁721〜724,151,152を閉作動させて再び閉状態にする。
【0047】
ポンプ特性値補正処理SUB2では、上記の全ての熱動弁721〜724,151,152を閉状態のまま循環ポンプ67の作動を継続することにより水の流れを熱源機20の暖房回路22内でのみの循環状態にする。すなわち、循環ポンプ67により膨張タンク64からの水が吸い込まれて吐出され、吐出された水が入水管65、熱交換器53、高温用暖房配管70、バイパス管75及び戻り管71を経て上記膨張タンク64に戻されるというような内循環状態にする。なお、上記バイパス管75は熱源機20側に予め組み込まれたものであるため、その配管仕様や所定のポンプ出力に対する流量(バイパス流量)も予め試験等を行うことにより既知のものである。
【0048】
上記の内循環状態で、循環ポンプ67に所定の印加電圧指令値を出力して予め記憶設定されているポンプ特性テーブル(図4の一点鎖線参照)に対応するポンプ仕事量(ポンプ能力)で作動させる。次に、この作動状態において、回転数検出手段による循環ポンプ67の回転数検出値と電流値検出手段による電流検出値とを検出し、これら回転数検出値及び電流検出値により規定されるポンプ仕事量に合致するよう上記ポンプ特性テーブルを補正する。この補正は差分だけオフセットするか、差分を解消し得る比率を乗じることにより行う。この補正処理SUB2は記憶設定されているポンプ特性テーブルが複数のポンプ仕事量に対応した複数のものであれば、その複数のポンプ仕事量に対応して複数回行えばよい。以後、補正後のポンプ特性テーブル(図4の実線参照)を用いる。以上の補正処理SUB2により、循環ポンプ67の製作誤差等に起因するばらつき等が予め補正される。
【0049】
新規選択端末の熱動弁開チェック処理SUB3では、図5に示すように、循環ポンプ67の回転数を一定回転数で持続させる一定回転数持続制御(ステップS11)を行う一方、新規選択されたチェック対象熱動弁である熱動弁(例えば721)に開作動指令を出力して開作動を開始させこれと同時にタイマーをスタートさせる(ステップS12)。
【0050】
その開作動された熱動弁721が正常であれば、図6に示すように当初は加熱遅れにより全閉からごく僅かずつしか開作動しないものの、加熱が十分になると急激に開度が増大して全開に近づくことになる。その開度の急増大により低温用暖房配管69から循環配管11に循環供給される水の流量も急増大することになる。この結果、循環配管11の配管長や端末放熱器A1の存在に基づく抵抗を新たに受けて圧力センサ7での圧力検出値も急変動したり、あるいは、これらの変動の影響を受ける循環ポンプ67を一定回転数に維持する上で印加電圧値の変更させたり、その印加電圧値の変更に伴い電流値の変動が生じたりすることになる。
【0051】
そこで、電流値、電圧値、圧力値及び流量値のいずれか一つの値(例えば圧力センサ7による圧力検出値)を監視対象値として検出・監視し、その検出値が上記開度の急増大に対応する所定の変動が生じたか否かを上記タイマーによる判定時間が経過するまで判定し(ステップS13,S14)、変動が生じれば正常に開作動していると判定してリモコン240の例えば液晶表示部に対し「開チェックOK」と表示する(ステップS13,S15)。次いで、上記の変動後の監視対象値がそれ以上変動することなく安定すれば、その安定時点のタイマー値を基準開時間値として記憶手段に記憶設定する(ステップS16,S17)。もしも、所定の判定時間が経過しても変動が生じなければ、熱動弁721の開作動に異常があると判定して上記液晶表示部に対し「熱動弁開エラー」と表示させ(ステップS14,S18)、その熱動弁721に念のため閉作動信号を出力した後にステップS2にジャンプさせる(ステップS19,S20)。なお、図示を省略しているが、上記ステップS15で「開チェックOK」の表示を行った場合には、次の処理(圧損チェック処理SUB4等)をステップS16及びS17よりも先に開始させて順次ステップS1での新規端末の追加選択を進行させる一方、ステップS16及びS17の基準開時間値の検出及び記憶設定を並行処理するようになっている。
【0052】
以上の開チェック処理SUB3により、従来技術では開作動させた熱動弁が完全に全開状態になって加熱した温水の往き側と戻り側との温度差が安定状態になるのを待ってからでないと正常開作動との判定を行い得なかったのに比べ、全開状態になるまで待たずに正常開作動との判定が行い得る点で開チェックに要する時間の短縮化を図ることができる。特に、熱動弁数が複数もしくは多数設置されている場合には、大幅な時間の短縮化を得ることができる。この結果、図6に示す如く今回の熱動弁が全開状態になる前の段階で次回の熱動弁についての開作動を開始させることができることになる上に、今回の熱動弁が全開状態になる直前位から次の処理(例えば圧損チェック処理SUB4)を開始させて行い得ることになる。これにより、試運転に要する全体時間の大幅な時間短縮化が得られることになる。
【0053】
圧損チェック処理SUB4では、図7に示すように、まず、循環ポンプ67(図7では「暖房ポンプ」と表示)の回転数を初期設定回転数(例えば2000rpm)から所定の回転数増分(例えば100rpm)ずつ段階的に増速させていく(ステップS21)。この回転数の増速段階毎に、その時の圧力値Pと流量値Qとの関係(P−Q関係)を順に取得してコントローラ24の記憶手段に記憶保持する(ステップS22)。この際、上記圧力値Pは圧力センサ7から直接検出する一方、上記流量値Qはその時の制御回転数と電流検出値とから演算により求めるなどにより取得すればよい。次に、今回の循環供給対象の端末系統(例えば端末系統1;端末放熱器A1)についての圧損曲線の演算及び演算された圧損曲線の記憶手段への記憶保持を行う(ステップS23)。すなわち、上記ステップS22で取得したPとQとの各値の集合に基づいて両値についての関係式を高次近似式により求め、これを上記端末系統1(A1)についての圧損曲線(圧損特性データ)として記憶手段に記憶する。具体的に示すと上記ステップS22で取得したPとQの両値の組み合わせを図8に示すように圧力P及び機外流量Qの直交座標に順にプロットした場合(同図の黒丸参照)にそれらを順に結ぶ近似曲線により上記圧損曲線が得られることになる。
【0054】
そして、ステップS1で上記端末系統1(A1)が選択された場合、この端末系統1についてSUB3〜5が行われ、ステップS2を経て再度ステップS1に戻った場合に、次回に開作動させて水を循環供給させる端末系統が選択されることになる。ここで、次回のものとして端末系統6(A6)が選択されたとすると、SUB3を経て熱動弁721及び152が共に開かれた状態でSUB4の圧損チェック処理が上記と同様に行われることになる。この場合には図9に示すように前回の端末系統1(A1)単独での圧損曲線に加え、2つの端末系統1,6(A1,A6)の合成された圧損曲線が得られ、この2つの端末系統1,6(A1,A6)の組み合わせについての圧損曲線が記憶保持されることになる。このようにして3つの端末系統、4つの端末系統というように複数の端末系統を組み合わせた場合の圧損曲線が順次得られて記憶保持されることになる。
【0055】
その際に、今回得た圧損曲線と、前回得た圧損曲線との対比演算により新たに選択された端末系統の単独の場合の圧損曲線を順次取得して記憶保持していく(ステップS24)。例えば、上記の2つの端末系統1,6(A1,A6)の合成された圧損曲線が得られたら、この合成圧損曲線と前回得た端末系統1(A1)単独の圧損曲線との差分をプロットすることにより、今回新たに選択された端末系統6(A6)単独の場合の圧損曲線(図9に点線で示す曲線)が得られることになる。これにより、全端末系統1〜6(A1〜A6)についてそれぞれ単独で水が循環供給された場合の圧損曲線が得られることになる。また、これと同様の方法により圧損曲線を取得していない任意の2以上の端末系統の組み合わせの場合の圧損曲線も得られることになり、以上の各圧損曲線が記憶手段に記憶保持された状態となる。
【0056】
図10は上記のステップS24の処理により6つの端末系統1〜6(A1〜A6)についてそれぞれ単独使用時での6本の圧損曲線を得た例を示している。同図において実線で示す4本の曲線が端末系統1〜4(A1〜A4)の各単独使用時の圧損曲線であり、点線で示す2本の曲線が端末系統5,6(A5,A6)の各単独使用時の圧損曲線である。
【0057】
新規選択の端末系統の正常運転チェック処理SUB5は、暖房用バーナ54を燃焼作動させて所定温度まで加熱した温水を端末系統に循環供給させてその端末系統の端末放熱器が正常暖房するか否かのチェックを行うものであり、従来より周知の方法が採用される。すなわち、各端末コントローラ241〜246により各端末放熱器A1〜A6が所定温度まで上昇するか否かを検出してコントローラ24に出力したり、あるいは、往き側サーミスタ73と戻り側サーミスタ74との各温度検出値の差に基づいて判定したりすればよい。
【0058】
そして、全端末系統1〜6の全熱動弁721〜724,151,152の一斉閉作動開始(ステップS3)の後の熱動弁の閉チェック処理SUB6では、図11に示すように、上記閉作動開始からスタートさせたタイマーにより、予め設定した閉作動時間(正常ならば全閉状態になるまでの所要時間)の経過を待った上で(ステップS31)、上記と同様にしてその時の回転数検出値と電流検出値とに基づき演算により取得した現実の循環流量値は既知のバイパス流量値よりも多いか否かの判定を行う(ステップS32)。現実に循環している流量値が上記バイパス流量値であれば、循環している水は全てバイパス管75を通って循環しており全ての熱動弁721〜724,151,152は全閉状態となっていると判定してリモコン240の液晶表示部に「閉チェックOK」との表示を行う(ステップS33)。
【0059】
逆に現実に循環している流量値が上記バイパス流量値よりも多ければ、いずれかの熱動弁が全閉とはならない異常が発生しているものと判定して、その特定を行う(ステップS34)。すなわち、その時の流量値と圧力センサ7により検出した圧力値との組み合わせに合致する圧損曲線を上記圧損チェック処理SUB4で記憶保持した各種の圧損曲線から割り出す。この割り出した圧損曲線が単独使用時の圧損曲線であればその端末系統の熱動弁が全閉とはならずにまだ開いていることが特定され、上記割り出した圧損曲線が2以上の端末系統の組み合わせ使用時の圧損曲線であればその組み合わせに係る2以上の端末系統の各熱動弁が全閉とはならずにまだ開いていることが特定されることになる。
【0060】
そして、上記で特定された熱動弁及びこれらが閉異常(閉エラー)であることをリモコン240の液晶表示部に表示して作業者に報知する(ステップS35)。
【0061】
最後に、各端末系統1〜6の圧損ばらつきチェック処理SUB7では、図12に示すように、上記圧損チェック処理SUB4で記憶手段に記憶保持された各種の圧損曲線の内から最大圧損曲線Wmaxと、最小圧損曲線Wminとを抽出し(ステップS41)、Wminに対するWmaxの比率(ばらつき度合;Wmax/Wmin)が限度値α(例えばα=1.6)よりも大きいか否かの判定を行う(ステップS42)。ばらつき度合が限度値αよりも小さければ、許容限度内であるとしてリモコン240の液晶表示部に対し「圧損ばらつきチェックOK」と表示し(ステップS43)、上記ばらつき度合が限度値αよりも大きければ上記液晶表示部に対し圧損ばらつきが発生していること、上記Wmax及びWminに該当する特定端末系統、及び、発生しているばらつき度合の数値をそれぞれ表示する(ステップS44)。この場合には、従来は熟練した作業者の勘でしか知り得なかった圧損ばらつきの発生及びどの端末系統に圧損ばらつきが発生しているかを容易かつ確実に作業者に報知することができ、その対策作業を迅速かつ容易に実施することができるようになる。この結果、大きな圧損ばらつきの発生により圧損の最大及び最小の二つの端末系統を通常運転において同時使用した場合に一方の端末系統での暖房が行い得ないといった事態の発生を確実に回避し得ることになる。なお、対策としては例えば各配管に配設されたボールバルブによる調整等が挙げられる。
【0062】
以上の試運転制御が終了すれば、暖房制御手段により通常使用時における暖房運転制御が行われる。この場合、各端末コントローラ241〜246又はリモコン240を用いてユーザーが端末放熱器A1〜A6の内から使用したい1又は2以上の端末放熱器の暖房作動スイッチをON操作することにより制御が開始される。この制御開始により、上記のON操作された端末系統の熱動弁の開作動、循環ポンプ67の作動及びバーナ54の燃焼作動が開始されることになる。その際、上記循環ポンプ67の作動制御の基準として記憶手段に記憶された圧損曲線が用いられることになる。すなわち、上記ON操作された端末系統の圧損曲線に基づいてその圧損に対応した循環流量となるように上記循環ポンプ67への印加電圧指令が上記暖房制御手段から出力され、その印加電圧指令に基づく回転数制御が行われることになる。これにより、暖房運転される端末系統が有する圧損特性に合致した流量の温水が循環供給され、確実な暖房運転と共に循環ポンプ67の駆動エネルギーについての省エネルギー化が図られることになる。
【0063】
より具体的な一例を示すと、例えば図10において圧損が5.00×9.8kPaとなる流量値を6つの圧損曲線から割り出し、その流量値をそれぞれ対応する端末系統への循環供給時の循環ポンプ67の作動制御基準とするようにすればよい。
【0064】
<他の実施形態>
なお、本発明は上記実施形態に限定されるものではなく、その他種々の実施形態を包含するものである。すなわち、上記実施形態では、循環ポンプ67の吐出側の管路に圧力検出手段としての圧力センサ7を配設して配管内圧力を直接検出し、循環流量値を間接的に得るようにしているが、逆に、流量検出手段としての流量センサを試運転時用として設けて循環流量値を直接検出し、圧力値を間接的に得るようにしてもよい。この場合には、図13に示すように、戻り管71に流量センサ8を設けたり、あるいは、循環ポンプ67の吐出側(往き側)の管路に流量センサ8を設けるようにすればよい。
【0065】
また、上記の圧力センサ7あるいは流量センサ8を試運転時用にのみ設けることを省略して給湯回路21(図1参照)や追い焚き回路23に既設されているセンサを試運転時にのみ有効利用するようにしてもよい。例えば、戻り管71の途中から給湯用入水管37の水量センサ45を通るように迂回するバイパス管を上記戻り管71と給湯用入水管37との間に着脱可能に接続するようにし、上記水量センサ45を圧損特性データの取得時及び監視対象値検出用の流量検出手段として有効利用する。上記バイパス管は試運転時にのみ使用し、試運転終了後は取り外すようにすればよい。上記と同様のバイパス管を用いることにより注湯管84の湯量センサ87を圧損特性データの取得時及び監視対象値検出用の流量検出手段として有効利用するようにしてもよい。また、追い焚き回路23の浴槽内水位を検出するための圧力センサ89に対し高温用もしくは低温用の暖房配管70もしくは69と連通させる連通管を接続しておき、例えば三方切換弁の切換操作により試運転時には上記暖房配管70,69に連通させてその配管圧力を検出する圧力検出手段として用いるようにし、通常運転時には風呂戻り管85と連通させて浴槽内水位を検出する水位検出センサとして用いるようにしてもよい。
【0066】
あるいは、暖房回路22には試運転時用の圧力検出手段及び流量検出手段のいずれをも配設しないで、コントローラ24に予め記憶設定したポンプ特性テーブルもしくはポンプ特性補正処理SUB2(図3参照)により補正されたポンプ特性テーブルを用いて圧損曲線の取得を行うようにしてもよい。
【図面の簡単な説明】
【図1】 本発明の実施形態を適用する複合熱源機を示す全体模式図である。
【図2】 暖房回路部分の熱源機と熱源機外の端末放熱器とを示す模式図である。
【図3】 試運転制御の全体フローチャートである。
【図4】 ポンプ特性テーブルの補正を説明するための圧力−流量関係図である。
【図5】 熱動弁の開チェック処理のサブルーチンを示すフローチャートである。
【図6】 熱動弁の開特性を示す時間−通過流量関係図である。
【図7】 圧損チェック処理のサブルーチンを示すフローチャートである。
【図8】 一つの端末系統の単独使用時の圧損曲線の取得方法を説明するための圧力−流量関係図である。
【図9】 単独及び二つの端末系統の各圧損曲線と、これらから未知の端末系統単独使用時の圧損曲線の取得方法を説明するための圧力−流量関係図である。
【図10】 6つの端末系統の各単独使用時の圧損曲線の例を示す圧力(圧損)−流量関係図である。
【図11】 熱動弁の閉チェック処理のサブルーチンを示すフローチャートである。
【図12】 圧損ばらつきチェック処理のサブルーチンを示すフローチャートである。
【図13】 他の実施形態を適用する暖房回路を示す図2相当図である。
【符号の説明】
A1〜A6 端末放熱器
1〜6 端末系統
7 圧力センサ
8 流量センサ
11〜15、15a、15b 循環配管
20 熱源機
22 暖房回路
24 コントローラ
53 暖房用熱交換器(加熱部)
54 暖房用バーナ(加熱部)
67 暖房用循環ポンプ(流量可変型のポンプ)
151,152 熱動弁
240 リモコン(報知手段)
721〜724 熱動弁[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a test operation control method for a hot water heater used for trial operation control during a trial operation of the hot water heater, and in particular, a thermal valve for switching on and off the circulation supply of hot water to a terminal radiator is normally opened. This relates to checking whether or not the conversion operation is performed.
[0002]
[Prior art]
Conventionally, as a hot water heating device, a heat source device provided with a heating circuit provided with a heat exchanger heated by a combustion burner and a circulation pump for circulating water in a hot water storage tank, and each room outside the heat source device What consists of several terminal radiators (for example, a floor heater and a bathroom heater) installed in is generally known. In this, the plurality of terminal radiators are connected in parallel to the heating circuit via a thermal valve and a circulation pipe, and the hot water heated by the heat exchanger by opening a desired thermal valve is opened. Are individually circulated to the corresponding terminal radiator.
[0003]
And about said hot water heating apparatus, after installing a heat source machine and each terminal radiator, and performing piping construction, such as circulation piping, between the heat source machine and each terminal radiator, it is used (normal heating Before being used for operation, a test run is generally performed to determine whether or not it functions normally by filling it with water. That is, whether or not each of the thermal valves normally opens and closes, whether or not the circulation piping is normally connected, whether or not the terminal radiator is supplied with warm water at a predetermined temperature and heating by the terminal radiator is normal Whether or not to be performed is checked as a test run.
[0004]
In particular, the above-mentioned thermal valve is structured so that heater heating is performed in response to an opening operation command from the controller, and the opening conversion operation is performed in response to this heating. It is important to check whether or not to perform the test operation.
[0005]
The above check on the thermal valve is usually performed by monitoring the variation in the temperature difference between the outgoing hot water circulated between the circulation pump and the terminal radiator and the return hot water. Yes. That is, hot water heated to a predetermined temperature by the heat exchanger is circulated in the heating circuit by the operation of the circulation pump, and in this state, an opening operation command is output to the thermal valve to be checked. If the thermal valve normally opens and converts, it is heated and the high-temperature forward hot water is supplied from the heating circuit to the terminal radiator through the circulation pipe, and is radiated by the terminal radiator to a low temperature. Return-side hot water is returned to the circulation pump. Therefore, the temperature difference between the temperature detection values of the forward-side hot water and the return-side hot water before the output of the opening operation command to the thermal valve increases and fluctuates due to heat radiation from the terminal radiator. Therefore, by detecting that the temperature difference is stabilized in an increased state, it is detected that the thermal valve has been normally opened and converted to an open state.
[0006]
[Problems to be solved by the invention]
However, the conventional open-conversion operation check for the above-described thermal valve requires a very long time, and there is a problem that the total time required for the trial operation is lengthened.
[0007]
That is, in the conventional open conversion operation check, since the heat radiation gradually proceeds after the hot water is supplied to the terminal radiator, the temperature difference is gradually increased even if the thermal valve is normally opened. In addition to increasing, this increase will proceed for a relatively long time. Moreover, even if the thermal valve has actually been fully opened, the above heat dissipation does not become stable and continues for some time thereafter, so both hot water temperatures on the forward side and the return side are detected. Even if the temperature difference is monitored, the temperature difference will increase for a while after the thermal valve reaches the fully open state. For this reason, a time longer than the actual thermal valve operation elapses until the temperature difference becomes stable, and a predetermined determination time elapses to determine that the temperature has reached the stable state. It is necessary to expect. As a result, in order to obtain the result of the open conversion operation check, there is an inconvenience that a long standby time (for example, 12 minutes) longer than the time required for the actual open conversion operation of the thermal valve is required.
[0008]
In addition, conventionally, after performing an open conversion operation check for one thermal valve, a close operation command is subsequently output to perform a close conversion operation check, and then the other thermal valve is opened and closed as described above. Both the open / closed conversion operation checks are sequentially performed for each thermal valve such that both conversion operation checks are performed. The waiting time required for the closing conversion operation check is slightly shorter (for example, 10 minutes) than the opening conversion operation check, but double waiting time is required for both opening and closing.
[0009]
In particular, in a hot water heater, normally, there are many cases where multiple or many (for example, 4 to 10) terminal radiators are connected to a heat source unit, and it is necessary to check the same number of thermal valves as the terminal radiator. Therefore, the time required for the entire test run is extremely long.
[0010]
The present invention has been made in view of such circumstances, and an object of the present invention is to provide a test operation time for checking the open conversion operation of a thermal valve that requires a particularly long time even during a test operation of a hot water heater. An object of the present invention is to provide a test operation control method for a hot water heating apparatus that can be shortened as much as possible.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a heat source device having a heating circuit in which at least a heating unit and a circulation pump are disposed, and the heating device provided outside the heat source device by an individual thermal valve and a circulation pipe. At least one terminal radiator connected to the circuit, and hot water heated from the heating circuit by the conversion of the thermal valve to an open state is circulated and supplied to the terminal radiator through the circulation pipe. Concerning the hot water heating apparatus configured in the above, the following specific matters are intended for the trial operation control method of the hot water heating apparatus that checks whether or not the above-mentioned thermal valve operates normally before performing normal operation. It is. That is, the hot water heating device is installed using a variable flow rate pump driven by a DC motor as the circulation pump and the discharge flow rate is variable by changing the rotation speed, and then the heat source device and the circulation pipe are installed. In the water-filled state, the DC motor is controlled to operate at a constant rotational speed by a controller that performs trial operation control, and an opening operation command is output to the thermal valve. Thereafter, the voltage value or current value applied during the operation control of the DC motor, or at least one of the circulating flow rate value or the piping pressure value in the heating circuit is set as the monitoring target value, and the monitoring target value is set. monitoring the variation, in which a main specific matters to make it detects that the opening conversion operation of the heat valve train to be successful by predetermined variation occurs in the monitored value.
[0012]
Here, as the “heating unit”, a combination of a combustion burner and a heat exchanger heated by the combustion heat of the combustion burner, or an electric heater or the like is used.
[0013]
If it has the above-mentioned main specific matters, it becomes possible to shorten the time required for the open conversion operation check whether or not the thermal valve normally performs the open conversion operation based on the open operation command. It is possible to significantly reduce the total time required for the trial operation of the apparatus. In other words, when the thermal valve receives an opening operation command, if it is normal, heating by the heater is started and initially the opening operation is only slightly performed from the fully closed state due to a heating delay, but the opening degree suddenly increases when heating is sufficient. Then it will be almost fully open. Due to the rapid increase in the opening degree, the circulating flow rate value of the water circulated from the heating circuit of the heat source machine to the circulation pipe also increases rapidly. As a result, the piping pressure value also fluctuates suddenly due to new resistance based on the piping length of the circulating piping and the presence of the terminal radiator, or the DC motor of the circulating pump that is affected by these fluctuations is kept at a constant rotation speed. In the operation control for maintaining, the applied voltage value fluctuates, or the current value fluctuates as the applied voltage value changes. Therefore, any one of current value, voltage value, pipe pressure value and circulating flow value is monitored as a monitoring target, and the monitoring target value indicates that a predetermined fluctuation corresponding to the sudden increase in the opening degree has occurred. By detecting, it becomes possible to detect reliably and early that the thermal valve has been normally opened and converted.
[0014]
As described above, in the conventional technology, after the thermal valve is fully opened, it is necessary to wait until the temperature difference between the warm water on the return side and the return side of the warm water becomes stable before the normal operation is performed. Compared to the fact that it was not possible to determine that the open conversion operation has been performed, it is possible to determine that the open conversion operation has been performed normally without waiting for the fully open state. Figured. In particular, in the case of a hot water heating apparatus in which a plurality or a large number of thermal valves are installed, it is possible to greatly reduce the time. In addition, when it is detected that the open conversion operation of the thermal valve is normally performed, for example, a notification that the notification is normal or a voice notification is given by a notification means such as a remote controller connected to the controller. To the operator.
[0015]
In addition, since the open conversion operation check can be performed without depending on the temperature fluctuation, the heating operation in the heating unit, which was necessary in the prior art in the case of the above-described invention, is unnecessary, and the water filled in the pipe line is not necessary. It is possible to perform the open conversion operation check of the thermal valve in the state. Thereby, simplification of trial run control is achieved.
[0016]
In response to the above-mentioned main specific items , the timer value starts until the monitoring target value reaches a stable state after the timer is started at the same time as the output of the opening operation command to the thermal valve and a predetermined fluctuation occurs in the monitoring target value. detects, so as to store sets the detection timer value as an open conversion reference open time value required for the operation to fully open the opening operation start of the heat valve train to controller. In this case, in the normal heating operation after the trial operation, by detecting the time required for the open conversion operation, it is possible to detect an abnormality such as a failure by comparing the detection time value with the reference open time value. It becomes possible.
[0017]
In addition to the above-mentioned main specific matters , the terminal radiator, the circulation pipe for circulating the hot water individually to each terminal radiator, and the heat for switching the opening and closing of the supply of hot water through the circulation pipe to the terminal radiator When targeting a hot water heater with two or more terminal systems consisting of a combination with a valve, by adding the following specific items, the time required for the trial operation time required to check the open conversion of the heat valve Further and drastic reduction will be achieved. That is, first, a thermal valve of any one terminal system is to be checked, an opening operation command is output to this check target thermal valve, and when the monitored value fluctuates, the check target thermal valve is opened. Perform an open conversion operation check to detect that the operation is normal, and then change the check target thermal valve to any new thermal valve until the open conversion operation check has been completed for all the thermal valves. When the check target thermal valve is changed, the check target thermal valve is opened simultaneously with the detection of the normally open conversion operation for the current check valve. The opening operation command may be output to the next check target thermal valve while the state is maintained.
[0018]
In this case, it is possible to start the opening operation for the next check target thermal valve at the stage before the current check target thermal valve is fully opened. Compared with the prior art that waits for the passage of time, the time can be greatly shortened. Thus, even if the opening operation command is output to the next check target thermal valve, it is not opened immediately due to the heating delay of the thermal valve at the initial stage after the output as described above. On the other hand, when the opening of the next check target thermal valve suddenly increases, the previous check target thermal valve is already fully open, and there is no further change to the circulation flow rate value, etc. Therefore, even if the previous check target thermal valve is opened, the open conversion operation check for the current check target valve can be reliably performed.
[0019]
Further, in the case where the plurality of terminal systems are targeted, after completion of the open conversion operation check for the total thermal valve, a closing operation command may be simultaneously output to the total thermal valve. .
[0020]
In the monitoring of the monitoring target value in the above invention, when the circulation flow rate value or the pipe pressure value is set as the monitoring target, for example, the flow rate detection means or the pressure detection means may be disposed in the heating circuit and detected. Not limited to this, as long as the heat source device has a hot water supply circuit, a bath pouring circuit or a bath reheating circuit, etc., a flow rate detecting means or a pressure detecting means already installed in a circuit other than the heating circuit. May be temporarily used effectively only during trial operation.
[0021]
【The invention's effect】
As described above, according to the trial operation control method for a hot water heating apparatus according to any one of
[0022]
In particular , according to the first aspect , the time from the output of the thermal valve opening operation command to the fully open state during the trial operation is stored in advance as a reference opening time value, so that the heat during the normal heating operation can be stored. It becomes possible to easily detect the abnormality of the valve operating.
[0023]
Further, according to
[0024]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0025]
FIG. 1 shows an example of a composite heat source machine to which an embodiment of the present invention is applied. The composite
[0026]
(Hot water supply circuit 21)
The hot
[0027]
The hot water supply
[0028]
Then, water such as tap water supplied to the hot water
[0029]
(Heating circuit 22)
The
[0030]
The heating
[0031]
The
[0032]
The
[0033]
An upstream end of the low-
[0034]
The upstream end of the high-
[0035]
The upstream end of the
[0036]
[0037]
The terminals installed in parallel outside the
[0038]
Returning to FIG. 1, the outlet temperature of the outgoing hot water from the
[0039]
Further, a bath
[0040]
(Turning circuit 23)
The reheating
[0041]
The
[0042]
(Controller 24)
The
[0043]
(Test run control)
On the premise of the above configuration, the pressure sensor 7 (see FIG. 2) as pressure detection means for detecting the pressure in the pipeline with respect to the discharge side pipeline of the
[0044]
This trial operation control is performed after the installation of the
[0045]
This trial run control is started, for example, by turning on an automatic trial run switch disposed on the
[0046]
In the water filling process SUB1, water is injected into the
[0047]
In the pump characteristic value correction processing SUB2, the operation of the
[0048]
In the above-mentioned internal circulation state, a predetermined applied voltage command value is output to the circulating
[0049]
In the newly selected terminal thermal valve opening check process SUB3, as shown in FIG. 5, while performing the constant rotation speed continuous control (step S11) for maintaining the rotation speed of the
[0050]
If the opened
[0051]
Therefore, any one of the current value, voltage value, pressure value, and flow rate value (for example, the pressure detection value by the pressure sensor 7) is detected and monitored, and the detected value increases the opening degree rapidly. It is determined whether or not the corresponding predetermined fluctuation has occurred until the determination time by the timer has elapsed (steps S13 and S14). “Open check OK” is displayed on the display unit (steps S13 and S15). Next, if the monitored value after the fluctuation stabilizes without further fluctuation, the timer value at the stable time is stored and set in the storage means as the reference open time value (steps S16 and S17). If the fluctuation does not occur even after a predetermined determination time has elapsed, it is determined that there is an abnormality in the opening operation of the
[0052]
With the above-described open check process SUB3, in the prior art, it is not necessary to wait for the temperature difference between the return side and the return side of the heated hot water to be in a fully open state and the temperature difference between the heated warm water and the return side becomes stable. Therefore, the time required for the open check can be shortened in that the normal open operation can be determined without waiting for the full open state. In particular, when a plurality or a large number of thermal valves are installed, a significant time reduction can be obtained. As a result, as shown in FIG. 6, the opening operation of the next thermal valve can be started before the current thermal valve is fully opened, and the current thermal valve is fully opened. The next process (for example, the pressure loss check process SUB4) can be started from the position immediately before becoming. As a result, the overall time required for the trial run can be greatly shortened.
[0053]
In the pressure loss check process SUB4, as shown in FIG. 7, first, the rotational speed of the circulation pump 67 (indicated as “heating pump” in FIG. 7) is increased from the initial rotational speed (for example, 2000 rpm) to a predetermined rotational speed (for example, 100 rpm). ) Step by step (step S21). For each speed increase step of the rotational speed, the relationship between the pressure value P and the flow rate value Q (PQ relationship) at that time is sequentially acquired and stored in the storage means of the controller 24 (step S22). At this time, the pressure value P is directly detected from the pressure sensor 7, while the flow rate value Q may be obtained by calculating from the control rotation speed and the current detection value at that time. Next, the pressure loss curve for the terminal system (for example,
[0054]
When the terminal system 1 (A1) is selected in step S1, SUB3 to 5 are performed for the
[0055]
At that time, a pressure loss curve in the case of a single terminal system newly selected by comparison between the pressure loss curve obtained this time and the pressure loss curve obtained last time is sequentially acquired and stored (step S24). For example, if the combined pressure loss curve of the above two
[0056]
FIG. 10 shows an example in which six pressure loss curves are obtained for each of the six
[0057]
The normal operation check processing SUB5 of the newly selected terminal system determines whether or not the terminal radiator of the terminal system is normally heated by circulating and supplying hot water heated to a predetermined temperature by burning the
[0058]
And in the thermal valve closing check processing SUB6 after the simultaneous closing operation start (step S3) of all the
[0059]
Conversely, if the actual circulating flow value is larger than the bypass flow value, it is determined that an abnormality has occurred in which one of the thermal valves is not fully closed, and is identified (step) S34). That is, the pressure loss curve that matches the combination of the flow value at that time and the pressure value detected by the pressure sensor 7 is calculated from the various pressure loss curves stored and held in the pressure loss check process SUB4. If the calculated pressure loss curve is a pressure loss curve when used alone, it is specified that the thermal valve of the terminal system is not fully closed but is still open, and the calculated pressure loss curve has two or more terminal systems. If it is a pressure loss curve at the time of combination use, it will be specified that each thermal valve of two or more terminal systems concerning the combination is not fully closed but is still open.
[0060]
And it displays on the liquid crystal display part of the
[0061]
Finally, in the pressure loss variation check process SUB7 of each terminal system 1-6, as shown in FIG. 12, the maximum pressure loss curve Wmax among the various pressure loss curves stored and held in the storage means in the pressure loss check process SUB4, The minimum pressure loss curve Wmin is extracted (step S41), and it is determined whether the ratio of Wmax to Wmin (degree of variation; Wmax / Wmin) is larger than a limit value α (for example, α = 1.6) (step S41). S42). If the degree of variation is smaller than the limit value α, “pressure loss variation check OK” is displayed on the liquid crystal display unit of the
[0062]
When the above trial operation control is completed, the heating operation control during normal use is performed by the heating control means. In this case, control is started by turning on the heating operation switch of one or more terminal radiators that the user wants to use from among the terminal radiators A1 to A6 using the
[0063]
To give a more specific example, for example, in FIG. 10, a flow rate value with a pressure loss of 5.00 × 9.8 kPa is calculated from six pressure loss curves, and the flow rate value is circulated at the time of circulation supply to the corresponding terminal system. The operation control standard of the
[0064]
<Other embodiments>
In addition, this invention is not limited to the said embodiment, Other various embodiment is included. That is, in the above-described embodiment, the pressure sensor 7 as pressure detecting means is disposed on the discharge side pipe of the
[0065]
Further, by omitting the provision of the pressure sensor 7 or the
[0066]
Alternatively, neither the pressure detection means nor the flow rate detection means for trial operation is provided in the
[Brief description of the drawings]
FIG. 1 is an overall schematic diagram showing a composite heat source apparatus to which an embodiment of the present invention is applied.
FIG. 2 is a schematic diagram showing a heat source unit in a heating circuit portion and a terminal radiator outside the heat source unit.
FIG. 3 is an overall flowchart of test operation control.
FIG. 4 is a pressure-flow rate relationship diagram for explaining correction of a pump characteristic table.
FIG. 5 is a flowchart showing a subroutine of thermal valve open check processing;
FIG. 6 is a time-passing flow rate relationship diagram showing an open characteristic of a thermal valve.
FIG. 7 is a flowchart showing a subroutine of pressure loss check processing.
FIG. 8 is a pressure-flow rate relationship diagram for explaining a method of acquiring a pressure loss curve when one terminal system is used alone.
FIG. 9 is a pressure-flow rate relationship diagram for explaining each pressure loss curve of a single terminal system and two terminal systems, and a method for obtaining a pressure loss curve when using an unknown terminal system alone from these.
FIG. 10 is a pressure (pressure loss) -flow rate relationship diagram illustrating an example of a pressure loss curve when each of the six terminal systems is used alone.
FIG. 11 is a flowchart showing a subroutine for thermal valve closing check processing;
FIG. 12 is a flowchart showing a subroutine of pressure loss variation check processing;
FIG. 13 is a view corresponding to FIG. 2 showing a heating circuit to which another embodiment is applied.
[Explanation of symbols]
A1 to
54 Heating burner (heating unit)
67 Circulation pump for heating (variable flow rate type pump)
151,152
721-724 Thermally operated valve
Claims (4)
上記循環ポンプとして直流電動機により駆動されその回転数の変更により吐出流量が可変とされる流量可変型のポンプを用いて上記温水暖房装置を設置し、
次に、上記熱源機及び循環配管に水張りした状態で、試運転制御を行うコントローラにより上記直流電動機をその回転数が一定回転数を持続するように作動制御する一方、上記熱動弁に対し開作動指令を出力し、
以後、上記直流電動機の作動制御中に印加される電圧値もしくは電流値又は上記暖房回路内の循環流量値もしくは配管圧力値の内の少なくともいずれか1の値を監視対象値としてその監視対象値の変動を監視し、
その監視対象値に所定の変動が発生することにより上記熱動弁の開変換作動が正常に行われることを検出するようにする一方、
上記熱動弁への開作動指令の出力と同時にタイマーをスタートさせ、
監視対象値に所定の変動が発生した後、その監視対象値が安定状態に至るまでのタイマー値を検出し、その検出タイマー値をコントローラに対し上記熱動弁の開作動開始から全開状態までの開変換作動に要する基準開時間値として記憶設定するようにする
ことを特徴とする温水暖房装置の試運転制御方法。 A heat source device having a heating circuit in which at least a heating unit and a circulation pump are disposed, and at least one terminal radiator installed outside the heat source device and connected to the heating circuit by individual thermal valves and circulation piping; A hot water heating apparatus configured to circulate and supply hot water heated from the heating circuit by the conversion to an open state of the thermal valve through the circulation pipe to the terminal radiator. In the test operation control method of the hot water heating apparatus for checking whether or not the above-mentioned thermal valve normally performs a conversion operation before performing,
The hot water heating device is installed using a flow rate variable type pump that is driven by a DC motor as the circulation pump and the discharge flow rate is variable by changing the rotation speed thereof.
Next, in a state where the heat source unit and the circulation pipe are filled with water, the controller that performs trial operation control controls the operation of the DC motor so that the number of rotations of the DC motor remains constant, while opening the thermal valve. Command output,
Thereafter, the voltage value or current value applied during the operation control of the DC motor, or at least one of the circulating flow rate value or the piping pressure value in the heating circuit is set as the monitoring target value, and the monitoring target value is set. Monitor changes,
While detecting that a predetermined fluctuation occurs in the monitored value, the open conversion operation of the thermal valve is normally performed,
The timer is started simultaneously with the output of the opening operation command to the thermal valve,
After a predetermined fluctuation occurs in the monitored value, a timer value until the monitored value reaches a stable state is detected, and the detected timer value is detected from the start of the thermal valve to the fully opened state for the controller. to store set as the reference open time value required for the opening transformation operation
Commissioning method of controlling temperature water heating system, characterized in that.
端末放熱器と、この各端末放熱器に温水を個別に循環させる循環配管と、上記端末放熱器に対し上記循環配管を通しての温水の供給を開閉切換する熱動弁との組み合わせからなる端末系統を2以上備えた温水暖房装置について、
上記循環ポンプとして直流電動機により駆動されその回転数の変更により吐出流量が可変とされる流量可変型のポンプを用いて上記温水暖房装置を設置し、
次に、上記熱源機及び循環配管に水張りした状態で、試運転制御を行うコントローラにより上記直流電動機をその回転数が一定回転数を持続するように作動制御する一方、上記熱動弁に対し開作動指令を出力し、
以後、上記直流電動機の作動制御中に印加される電圧値もしくは電流値又は上記暖房回路内の循環流量値もしくは配管圧力値の内の少なくともいずれか1の値を監視対象値としてその監視対象値の変動を監視し、
その監視対象値に所定の変動が発生することにより上記熱動弁の開変換作動が正常に行われることを検出するようにし、その際に、
まず、任意の1の端末系統の熱動弁をチェック対象にして、このチェック対象熱動弁に開作動指令を出力し、監視対象値の変動発生によりそのチェック対象熱動弁の開変換作動が正常に行われることを検出する開変換作動チェックを行い、
以後、全数の熱動弁についての開変換作動チェックが完了するまでチェック対象熱動弁を任意の新たな熱動弁に変更して開変換作動チェックを順次繰り返すようにし、
上記チェック対象熱動弁の変更の際、今回のチェック対象熱動弁についての正常開変換作動の検出と同時に、上記今回のチェック対象熱動弁を開状態にしたまま次回のチェック対象熱動弁に対し開作動指令を出力するようにする
ことを特徴とする温水暖房装置の試運転制御方法。 A heat source device having a heating circuit in which at least a heating unit and a circulation pump are disposed, and at least one terminal radiator installed outside the heat source device and connected to the heating circuit by individual thermal valves and circulation piping; A hot water heating apparatus configured to circulate and supply hot water heated from the heating circuit by the conversion to an open state of the thermal valve through the circulation pipe to the terminal radiator. In the test operation control method of the hot water heating apparatus for checking whether or not the above-mentioned thermal valve normally performs a conversion operation before performing,
A terminal system comprising a combination of a terminal radiator, a circulation pipe that circulates hot water individually in each terminal radiator, and a thermal valve that opens and closes the supply of hot water through the circulation pipe to the terminal radiator. attached to the hot-water heating apparatus having two or more,
The hot water heating device is installed using a flow rate variable type pump that is driven by a DC motor as the circulation pump and the discharge flow rate is variable by changing the rotation speed thereof.
Next, in a state where the heat source unit and the circulation pipe are filled with water, the controller that performs trial operation control controls the operation of the DC motor so that the number of rotations of the DC motor remains constant, while opening the thermal valve. Command output,
Thereafter, the voltage value or current value applied during the operation control of the DC motor, or at least one of the circulating flow rate value or the piping pressure value in the heating circuit is set as the monitoring target value, and the monitoring target value is set. Monitor changes,
In order to detect that the open conversion operation of the thermal valve is normally performed when a predetermined fluctuation occurs in the monitoring target value,
Also not a, and the Netsudoben of any one of the terminal system to be checked, and outputting an open operation command to the checked thermal valve train, opening conversion operation of the checked thermal valve operating fluctuations occur in the monitored value Perform an open conversion operation check to detect that the
Thereafter, until the open conversion operation check for all the thermal valves is completed, the check target thermal valve is changed to any new thermal valve, and the open conversion operation check is sequentially repeated.
When the above check target thermal valve is changed, the next check target thermal valve is kept open while the above check target thermal valve is kept open at the same time as detecting the normally open conversion operation for the current check valve. you to output an open operation command to
Commissioning method of controlling temperature water heating system, characterized in that.
全熱動弁についての開変換作動チェックを完了した後、その全熱動弁に対し閉作動指令を一斉に出力するようにする、温水暖房装置の試運転制御方法。A test operation control method for a hot water heater according to claim 2 ,
A test operation control method for a hot water heating apparatus in which, after completing an open conversion operation check for a total heat operated valve, a close operation command is simultaneously output to the total heat operated valve.
コントローラに対し報知手段を接続し、Connect the notification means to the controller,
開変換作動が正常に行われたことを検出したとき、そのチェック結果を上記報知手段により報知するようにする、温水暖房装置の試運転制御方法。A test operation control method for a hot water heating apparatus, wherein when the open conversion operation is normally detected, the check result is notified by the notification means.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000135140A JP3774615B2 (en) | 2000-05-08 | 2000-05-08 | Test run control method for hot water heater |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000135140A JP3774615B2 (en) | 2000-05-08 | 2000-05-08 | Test run control method for hot water heater |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001317749A JP2001317749A (en) | 2001-11-16 |
| JP3774615B2 true JP3774615B2 (en) | 2006-05-17 |
Family
ID=18643281
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000135140A Expired - Fee Related JP3774615B2 (en) | 2000-05-08 | 2000-05-08 | Test run control method for hot water heater |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3774615B2 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4602816B2 (en) * | 2005-03-25 | 2010-12-22 | 株式会社東芝 | Heat source pump control method and air conditioning heat source system |
| JP2007085708A (en) * | 2005-09-26 | 2007-04-05 | Sanwa System Kk | Control apparatus, method and program |
| JP2010151394A (en) * | 2008-12-25 | 2010-07-08 | Noritz Corp | Heating device and method of injecting heat medium liquid in heating system |
| JP5584052B2 (en) * | 2010-08-20 | 2014-09-03 | 東洋熱工業株式会社 | High efficiency heat transfer device in air conditioning system |
| JP5988080B2 (en) * | 2012-03-07 | 2016-09-07 | 株式会社ノーリツ | Heat source equipment |
| JP5975271B2 (en) * | 2012-06-29 | 2016-08-23 | 株式会社ノーリツ | Hot water storage hot water supply system |
| JP6138549B2 (en) * | 2013-03-29 | 2017-05-31 | 株式会社ガスター | Liquid feeding device and heat source device |
| JP6540378B2 (en) * | 2015-08-27 | 2019-07-10 | 株式会社ノーリツ | Combined heat source machine |
| JP6825265B2 (en) * | 2016-08-25 | 2021-02-03 | 株式会社ノーリツ | Hot water mixing hot water supply device |
| JP2020056544A (en) * | 2018-10-02 | 2020-04-09 | 大阪瓦斯株式会社 | Method for inspecting heat supply system |
-
2000
- 2000-05-08 JP JP2000135140A patent/JP3774615B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001317749A (en) | 2001-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5226384B2 (en) | Hot water storage type hot water supply device and hot water storage type hot water supply and heating device | |
| CN112189118A (en) | Boiler for both heating and hot water and control method thereof | |
| JP3774615B2 (en) | Test run control method for hot water heater | |
| JP3773752B2 (en) | Test run control method for hot water heater | |
| KR101514896B1 (en) | Heat pump heating system | |
| JP5712196B2 (en) | Heat pump heating system | |
| JP5516138B2 (en) | Hot water system | |
| JP5505129B2 (en) | Hot water system | |
| US20220205682A1 (en) | Smart circulation control instantaneous-heating storage heat exchanger | |
| JP2004232978A (en) | Heat pump type hot water supply and heating apparatus | |
| JP3867771B2 (en) | Water heater | |
| JP4994291B2 (en) | Heat source machine | |
| JP7560328B2 (en) | Bathroom air conditioning system | |
| JP3676062B2 (en) | Hot water heater | |
| JP7543211B2 (en) | Hot water system | |
| JP2001124357A (en) | Water heater with instantaneous hot water supplying function and method for detecting fault of water heater with instantaneous hot water supplying function | |
| CN219103314U (en) | Water heater system | |
| JP5589610B2 (en) | Hot water system | |
| JP5063575B2 (en) | Hot water heating system | |
| JP3266510B2 (en) | Antifreezing method and antifreezing device for gas hot water heater | |
| JP2004085112A (en) | Heating system | |
| JP2026017007A (en) | heating device | |
| JP4215337B2 (en) | Heat supply system | |
| JP3532768B2 (en) | Heating boiler | |
| JP3487101B2 (en) | Hot water heating system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051021 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051108 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20051226 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060214 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060220 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100224 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100224 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110224 Year of fee payment: 5 |
|
| LAPS | Cancellation because of no payment of annual fees |