JP3775764B2 - Operation data management device - Google Patents
[go: Go Back, main page]

JP3775764B2 - Operation data management device - Google Patents

Operation data management device Download PDF

Info

Publication number
JP3775764B2
JP3775764B2 JP16965997A JP16965997A JP3775764B2 JP 3775764 B2 JP3775764 B2 JP 3775764B2 JP 16965997 A JP16965997 A JP 16965997A JP 16965997 A JP16965997 A JP 16965997A JP 3775764 B2 JP3775764 B2 JP 3775764B2
Authority
JP
Japan
Prior art keywords
approval
data
operation data
input
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16965997A
Other languages
Japanese (ja)
Other versions
JPH113370A (en
Inventor
真理 石川
伸宏 山岸
美香 小山田
健一 松村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba System Technology Corp
Original Assignee
Toshiba Corp
Toshiba System Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba System Technology Corp filed Critical Toshiba Corp
Priority to JP16965997A priority Critical patent/JP3775764B2/en
Publication of JPH113370A publication Critical patent/JPH113370A/en
Application granted granted Critical
Publication of JP3775764B2 publication Critical patent/JP3775764B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、発電所の廃棄物処理施設や化学工場のような化学プラント等において、運転データの運転の承認を得て管理する運転データ管理装置に関する。
【0002】
【従来の技術】
例えば、A槽からB槽へある物質を移送するプラントでは、運転データを履歴保存する場合に管理責任者等の承認を得て運転管理がされている。
【0003】
従来の運転データ管理装置は、図16に示すように、プロセスデータ入力部1を用いて入力されたプラントの各種情報をデータ収集判定部2が収集し、プラントの運転上必要な予め定められた運転データを全て収集したとデータ収集判定部2が判断した場合に、その運転データを表示処理部4へ送りCRT装置5上へ表示すると共に、ハードコピーや帳票として保存していた。
【0004】
プラントの運転員は、紙に記載される運転データを責任者へ提示して承認印を得ていた。書面はデータシートと呼ばれ、プラント責任者の承認の末/済にかかわらず正式データとして保管されていた。
【0005】
【発明が解決しようとする課題】
しかしながら、図16に示す如くの運転データ管理装置100では、口頭等で承認の伺いがされており、何かの手違いで、未承認のまま保管されたり、また、承認行為を促す手間も担当者の負担となる等の管理上の問題がある。
【0006】
まず、例えば、第1に、口頭等で承認者へ承認の伺いをするのでは、不用意により承認の伺いを忘れたり、承認者の机の上に積み上げられて放置されたりするおそれがある。その上、書面では、承認を得る前や承認の伺いをする際に紛失するおそれがある。
【0007】
第2に、担当者がその都度、書面を提示して承認伺いをするのでは、担当者にとって大きな負担となる。特に、多量の書類が承認されたのか未承認なのか区別して人手によって管理しようとすることは担当者にとっての負担が大きい。
【0008】
そこで、本発明は、人手を介することなく、運転データの承認が確実にでき、未承認の対象が即座に判り、運転データの管理が徹底できると共に、担当者の負担を軽減する運転データ管理装置を提供することを目的とする。
【0009】
【課題を解決するための手段】
請求項1の発明は、プラントの運転管理に必要な運転データを収集すると共に、収集した運転データについて承認を得て運転データを保存管理する運転データ管理装置において、プラントのプロセスデータを運転データとして取込むプロセスデータ入力部と、このプロセスデータ入力部により取り込まれた運転データを収集し承認に必要な運転データが全て収集されたとき、収集完了を判定するデータ収集判定部と、このデータ収集判定部によって収集完了と判定された運転データを承認履歴テーブルへ記憶すると共に、承認要求を出力する承認要求判定部と、この承認要求判定部から承認要求を入力すると承認履歴テーブルから運転データを取出し承認指定箇所を有する承認運転データとして表示装置へ出力する表示データを作成する表示処理部と、表示処理部により作成された表示データの表示装置における表示に応じて承認実行者からの承認の指示を入力するための入力装置と、入力装置により承認の指示が入力された場合、承認運転データに対話処理にて承認行為の入力がされたとき承認者名を含む承認データと運転データとを対応させて承認履歴テーブルへ保存させる承認行為確定制御部とを備えるようにしたものである。この手段によれば、プラントの運転管理に必要な運転データが収集され、収集が完了するとテーブルへ保存されると共に、表示装置を介して承認行為を求める通知がされる。これにより、表示によって承認実行者は承認の必要なことが判り、入力装置により承認の指示を入力して直ちに承認ができる。また、運転データと承認者とが関連づけられてテーブルへ保存される。また、運転データに承認行為のデータが一体となって保存され、徹底した管理がされる。従って、従来のように、紙に記載された運転データを承認実行者に提示して承認を得る手間が削減される一方、未承認のまま放置される等の運転管理上の弊害が除去できる。
【0010】
請求項2の発明は、請求項1記載の運転データ管理装置において、予め定める承認実行者の有資格データを保存し判定するセキュリティ管理部と、表示処理部によって表示装置へ表示される運転データに対話処理にて入力装置から承認行為の入力がされたとき、セキュリティ管理部へ承認行為の資格者か否かのデータを出力して有資格者と判定された場合のみ承認行為を有効とする承認行為実行制御部とを設けるようにしたものである。この手段によれば、入力装置から承認行為をした者のデータを通知して承認行為の有資格者を判定するデータとによって有資格者と判定される承認行為のみが有効とされる。これにより、限定された有資格者の承認行為のみ保存される運転データの信頼性を確保できる。
【0011】
請求項3の発明は、請求項1記載の運転データ管理装置において、対話処理による要求によって承認履歴テーブルから承認行為のデータを取出して表示装置へ承認済と未承認とを識別して、あるいは、承認済か未承認のいずれか一方を選別して一覧表示をするようにしたものである。この手段によれば、承認実績一覧表示がされ、承認、未承認が一目で閲覧でき、管理が徹底でき、管理上の負担も軽減できる。さらに、未承認の運転データの異なる表示により、未承認のものが即座に区別して判り、徹底した管理ができる。
【0012】
請求項4の発明は、請求項1または請求項3記載の運転データ管理装置において、承認履歴テーブルに保存されるデータ内で、未承認データの保存期間をチェックして保存期間が所定期間以上の場合にその旨表示装置へ表示させる保存期間チェック部を設けるよいにしたものである。この手段によれば、所定期間以上の未承認のままの運転データが抽出され表示される。これにより、即座に再度の承認行為の要求ができ、未承認のまま長期間放置されるおそれが解消できる。
【0014】
【発明の実施の形態】
以下、本発明の実施の形態について図面を参照して説明する。
【0015】
図1は、本発明の第1実施の形態を示す運転データ管理装置の構成図であって、従来技術を示す図16と同一符号は、同一部分または相当部分を示している。
【0016】
プロセスデータ入力部1は、プロセスデータを運転データとして入力する。データ収集判定部2は、承認されるべき運転データが全て揃っているかどうかをチェックする。承認要求判定部3は、承認要求の信号を表示処理部4に送信する。承認履歴テーブル11は、承認されるべき運転データを履歴保存しておく。表示処理部4は、表示装置5によってプラント責任者に承認要求を通知する。承認行為確定制御部10は、承認運転データについて対話処理によって承認行為の入力がされたとき承認者を含む承認データと運転データとを対応させ承認履歴テーブル11へ保存する。
【0017】
次に第1実施の形態の処理を図2に従って説明する。
【0018】
まず、プロセスデータ入力部1はプロセスデータを取り込む(101)。プロセスデ−タ入力部1は、取り込んだデータをデータ収集判定部2へ送る(102)。データ収集判定部2は承認されるべきデータが全て揃っているかどうかをチェックし(103)、揃った場合のみ、そのデータを図3に示す承認履歴テーブル11に書き込む(104)。
【0019】
図3に示す承認履歴テーブル11は、承認データ毎のエリアに「承認発生日時」「承認分類名」「承認対象」「承認日時」「承認者」が保存されると共に、承認データ毎に対応する運転データを図示しないエリアに保存するように構成されている。
【0020】
この時点では、承認日時、承認者はブランクとする。データが揃ったという信号が承認要求判定部3へ送られると、承認要求判定部3から承認要求を通知させる命令が表示処理部4へ送る(105)。表示処理部4は、CRT画面の指定箇所を点滅表示させて承認要求表示を行い、プラント責任者へ通知する(106)。これに応じて入力装置6を介して承認行為がされる。
【0021】
また、図4は承認行為確定制御部10の処理を示し、まず、CRT装置5に承認実施のためのサブウィンドウ内に登録者名が表示された後、承認を行う際にそのウィンドウ内にある確定ボタンを入力装置6にて選択する(301)。承認行為確定制御部10はその信号を受け取り、承認日時、承認者名を書き込んで承認履歴テーブル11に保管する(302)。
【0022】
このように第1実施の形態によれば、プラントの各種情報がプロセスデータ入力部により入力され、入力されたプロセスデータがデータ収集判定部においてプラント責任者の承認によるプラント運転管理に必要とされる全てのデータがそろったか否かが判定され、プラント責任者によるプラントの運転データ承認が必要なプロセスデータがそろったと判定されたならば、承認要求判定部3はプラント責任者による承認が必要なデータ、すなわち、運転データの承認要求データが発生したことを示す表示を行うように表示処理部4へ通知し、表示処理部4ではその通知をもって表示装置上にプラント責任者による承認が必要であることを示す表示を行う。
【0023】
また、承認された承認データと運転データとを関連づけ承認者の指標と共に、承認行為確定制御部10によって承認済の運転データとして保存するので、運転データの管理が行われ運転データの管理が効果的にできる。
【0024】
これにより、表示によって承認実行者は承認の必要なことが判り、直ちに承認ができる。また、運転データに承認のデータが一体となって保存され、徹底した管理ができる。従って、従来のように紙に記載された運転データを承認実行者に提示して承認を得る手間が削減される一方、未承認のまま放置されることの弊害が除去できる。
【0025】
図5は、本発明の第2実施の形態を示す運転データ管理装置の構成図であって、従来例を示す図16と同一符号は、同一部分または相当部分を示している。
【0026】
表示処理部4は、承認を要するデータを記したデータシートや承認実施ためのサブウィンドウを表示させる。対話入力処理部7は、承認実施データを入力操作を受け付け、かつ、その信号を承認行為実行制御部8に送信したり、最後に承認行為確定命令を送信する。セキュリティ管理部9は、入力された承認実施データを、該当承認実施データの入力を行った者がプラント責任者としての資格を有する者が承認行為を行っているか否かの判定を行い、その結果を承認行為実行制御部に送信する。承認行為実行制御部8は、セキュリティ管理部9におけるセキュリティチェックの結果の正誤により、正の判定の場合には表示処理部4にパスワードおよびIDカード等の登録者名を表示させ、誤判定の場合には、その旨を伝えるメッセージを表示させる命令を表示処理部4に送信する。
【0027】
次に、第2実施の形態の処理を図6に従って説明する。
【0028】
まず、通知された承認要求に入力装置6を用いて応答する(201)。この信号が対話処理部7により受け取られ、表示処理部4へ表示命令が出されると表示処理部4は承認履歴テーブル11より承認されるべきデータを読み込んで図7に示すデータシート50を表示する(202)。プラント責任者がそのデータシート50のデータに対して承認を行う場合、データシートウィンドウ内の承認操作ボタン50aを入力装置6を用いて選択する(203)。
【0029】
対話入力処理部7では、その信号を受け取り表示処理部4へ表示命令を出力すると共に、表示処理部4はCRT装置5において承認を行うために、図8に示すサブウィンドウ51を表示する(204)。そして、入力装置6によりプラント責任者がパスワード入力を行った後、承認を実行するためのボタン51aを入力装置6により選択する(205)。承認行為実行制御部8はその信号を受け取り、セキュリティ管理部9にパスワード入力を行った者と、予め本装置に登録されたすなわち、プラント責任者としての資格を有する者が承認行為を行っているか杏かの判定を行うよう要求信号を送信する(206)。
【0030】
セキュリティ管理部9は、図9に示すように構成され、予め定めるパスワードとパスワード登録者名とがセキュリティチェックテーブルに登録され、セキュリティチェックを行い、その判定結果により正の場合のみ承認行為実行制御部8を介してサブウィンドウ上にパスワード登録者名を表示させ確定ボタン51bを押すと有効とされる(207)。一方、誤判定の場合には、承認行為実行制御部8を介してその旨を伝えるメッセージを表示させる(208)ように表示処理部4に信号を送る。
【0031】
このように第2実施の形態は、第1実施の形態の作用に加え、入力装置6より承認行為が必要なデータに対して承認を行ったことを示すデータ、すなわち、承認実施データを入力し、該当承認実施データの入力を行った者が予め本装置に登録された、すなわち、プラント責任者としての資格を有する者が承認行為を行っているか否かの判定をセキュリティ管理部9によって行い、承認資格を有するものが承認したと判定した場合、承認行為が行われたことを承認要求判定部3へ通知し、承認要求判定部3では該当運転データ承認要求データは承認済であることを表示処理部4へ通知し、表示処理部4では承認行為が行われたことを示す表示を表示装置5上に表示する。これにより、限定された者のみが承認でき、運転データの信頼性が確保できる。
【0032】
図10は、本発明の第3実施の形態を示す運転データ管理装置の構成図であって、従来例を示す図16と同一符号は、同一部分または相当部分を示している。
【0033】
第3実施の形態は、対話処理による要求によって承認履歴テーブル11から承認データを取出してCRT装置5へ承認実績一覧表示をすることを特徴とするものである。
【0034】
まず、通知された承認要求に入力装置6から応答すると、その信号が対話入力処理部7により受け取られ、表示処理部4へ図11に示す承認実績一覧ウィンドウ52の表示するように信号が送られる。表示処理部4は承認履歴テーブル11を読み込み、その承認データのうち、承認日時、承認者が存在するデータには承認済みデータであることを示す表示を行い、承認日時、承認者がプランクであるデータには、未承認データであることを表す表示をCRT装置5において、図11に示すように行う。この図11の承認実績一覧ウィンドウ52には、承認エリア52aに承認済データの場合「済」の表示がされ未承認データの場合「未」が表示される。これにより、承認実績を一括して閲覧することが可能となり、プラント責任者のプラント運転管理に係わる負荷軽減が図れる。
【0035】
また、第3実施の形態では、承認実績一覧表示の内で、承認済と未承認を区別して異なる表示、あるいは、未承認のみの表示の一覧表示、若しくは新たに承認行為が必要なものを異なる表示とすることを特徴とするものである。
【0036】
まず、図12に示す承認実績一覧ウィンドウ53から未承認データ一覧を表示させるために未承認データのボタン53aを押して入力装置6から応答すると、その信号が対話入力処理部7により受け取られ、表示処理部4に未承認データ一覧を表示するように信号が送られる。表示処理部4は承認履歴テーブル11を読み込み、その全データのうち、承認日時、承認者がブランクである未承認データのみの表示をCRT装置5に表示する。これにより、承認行為が必要なデータのみが一覧表示され、プラント責任者による承認が必要な運転データが即座に判り、プラント運転管理に係わる担当者の負荷軽減が図れる。
【0037】
なお、表示処理部4は承認履歴テーブル11を読み込み、該当承認要求データを引き当て、図11あるいは図12の承認実績一覧ウィンドウにおいて未承認データを最上部に表示し、その文字を色替え、点滅させて他の承認済み、未承認データとは異なる表示をCRT装置5において表示するようにしてもよい。これにより、最新の承認要求に関する情報を責任者が容易に判断できるため速やかに承認行為が実行できる。
【0038】
図13は、本発明の第4実施の形態を示す運転データ管理装置の構成図である。
【0039】
第4実施の形態は、(現在時刻−承認発生日時)と(保存期間−一定期間)とを一定の周期で比較する保存期間チェック部12と、この保存期間チェック部12での結果において、未承認の期間が保存期間より一定期間減算した値が大きい場合、直ちに再度承認要求を表示処理部4に出力させるようにする点に特徴を有している。
【0040】
まず、図14に示す処理により、承認履歴テーブル11のデータにうち、承認日時、承認者がブランクである未承認データのみ抽出がされ、その承認要求発生日時を読み込む(701)。次に、保存期間チェック部12が、現在時刻と承認要求発生日時との差と予め設定されたデータ保存期間と一定期間(一定の余裕値)との差(保存期間のデータが消去される期間)との差を常時一定周期で比較する。
【0041】
すなわち、CRT装置5の承認実績一覧、未承認データ一覧は、承認要求発生日時の最新のものから古いものという順序で上から表示しているが、(現在時刻−承認要求発生日時)≧(データ保存期間−一定期間)という条件が成立した場合には、承認要求判定部3が承認要求を通知させる命令、及び、承認実績一覧、未承認データ一覧において該当未承認データを最上部に表示する等の他のデータと区別できる表示を行う信号を表示処理部4へ送る。表示処理部4は上記のような表示を行い、プラント責任者へデータが未承認のまま消去されることのないように通知する(702)。これにより、承認されていないものが未承認のままデータが消去されることを防ぐことができる。
【0042】
図15は、本発明の第5実施の形態を示す運転データ管理装置の構成図であって、従来技術を示す図16と同一符号は、同一部分または相当部分を示している。
【0043】
プロセスデータ入力部1は、プロセスデータを運転データとして入力する。データ収集判定部2は、承認されるべき運転データが全て揃っているかどうかをチェックする。承認要求判定部3は、承認要求の信号を表示処理部4に送信する。承認履歴テーブル11は、承認されるべき運転データを履歴保存しておく。表示処理部4は、表示装置5によってプラント責任者に承認要求を通知する。
【0044】
第5実施の形態の処理は図2に示すと同様に、まず、プロセスデータ入力部1はプロセスデータを取り込む(101)。プロセスデ−タ入力部1は、取り込んだデータをデータ収集判定部2へ送る(102)。データ収集判定部2は承認されるべきデータが全て揃っているかどうかをチェックし(103)、揃った場合のみ、そのデータを図3に示す承認履歴テーブル11に書き込む(104)。
【0045】
図3に示すと同様に、承認履歴テーブル11は、承認データ毎のエリアに「承認発生日時」「承認分類名」「承認対象」「承認日時」「承認者」が保存されると共に、承認データ毎に対応する運転データを図示しないエリアに保存するように構成されている。
【0046】
この時点では、承認日時、承認者はブランクとする。データが揃ったという信号が承認要求判定部3へ送られると、承認要求判定部3から承認要求を通知させる命令が表示処理部4へ送る(105)。表示処理部4は、CRT画面の指定箇所を点滅表示させて承認要求表示を行い、プラント責任者へ通知する(106)。これに応じて入力装置6を介して承認行為がされる。
【0047】
このように第5実施の形態によれば、プラントの各種情報がプロセスデータ入力部により入力され、入力されたプロセスデータがデータ収集判定部においてプラント責任者の承認によるプラント運転管理に必要とされる全てのデータがそろったか否かが判定され、プラント責任者によるプラントの運転データ承認が必要なプロセスデータがそろったと判定されたならば、承認要求判定部3はプラント責任者による承認が必要なデータ、すなわち、運転データの承認要求データが発生したことを示す表示を行うように表示処理部4へ通知し、表示処理部4ではその通知をもって表示装置上にプラント責任者による承認が必要であることを示す表示を行う。
【0048】
【発明の効果】
以上説明したように請求項1の発明によれば、プラントの運転管理に必要な運転データの収集が完了するとテーブルへ保存されると共に、表示装置を介して承認行為を求める通知をするので、表示によって承認実行者は承認の必要なことが判り、直ちに承認ができる。従って、従来のように、紙に記載された運転データを承認実行者に提示して承認を得る手間が削減される一方、未承認のまま放置される等の運転管理上の弊害が除去できる。
【0049】
請求項2の発明によれば、承認行為者を特定するデータを通知して承認行為の有資格者のみの承認行為を有効とするので、限定されたもののみがが承認行為をでき保存される運転データの信頼性を確保できる。
【0050】
請求項3の発明によれば、承認者名等と運転データとの関連付けをすると共に、承認済を指標でテーブルへ保存するので、運転データの管理が効果的にできる。また、承認実績一覧表示をして、承認、未承認の対象が一目で閲覧できるようにしたもので、管理が徹底でき、管理上の負担も軽減できる。また、未承認データを異なる表示とするので、未承認のものが即座に区別して判り、徹底した管理ができる。
【0051】
請求項4の発明によれば、所定期間以上の未承認のままの運転データが抽出し表示するので、即座に再度の承認行為の要求ができ、未承認のまま長期間放置され未承認の状態で消去されるおそれが解消できる。
【図面の簡単な説明】
【図1】本発明の第1実施の形態を示す運転データ管理装置の構成図である。
【図2】図1の運転データ管理装置の処理を示すフローチャートである。
【図3】図1の運転データ管理装置に備える承認履歴テーブルの示す構成図である。
【図4】図1の承認行為確定制御部の処理を示すフローチャートである。
【図5】本発明の第2実施の形態を示す運転データ管理装置の構成図である。
【図6】図4の運転データ管理装置の処理を示すフローチャートである。
【図7】図4の運転データ管理装置に備えるCRT装置の第1の画面例である。
【図8】図4の運転データ管理装置に備えるCRT装置の第2の画面例である。
【図9】図4の運転データ管理装置に備えるセキュリティ管理部の一例を示す構成図である。
【図10】本発明の第3実施の形態を示す運転データ管理装置の構成図である。
【図11】図10のCRT装置に表示される第1の承認実績一覧ウィンドウの表示例である。
【図12】図10のCRT装置に表示される第2の承認実績一覧ウィンドウの表示例である。
【図13】本発明の第4実施の形態を示す運転データ管理装置の構成図である。
【図14】図13の運転データ管理装置の処理を示すフローチャートである。
【図15】本発明の第5実施の形態を示す運転データ管理装置の構成図である。
【図16】従来の運転データ管理装置を示す構成図である。
【符号の説明】
1 プロセスデータ入力部
2 データ収集判定部
3 承認要求判定部
4 表示処理部
5 表示装置
6 入力装置
7 対話入力処理部
8 承認行為実行制御部
9 セキュリティ管理部
10 承認行為確定制御部
11 承認履歴テーブル
12 保存期間チェック部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an operation data management apparatus that obtains approval and manages operation data in a wastewater treatment facility of a power plant or a chemical plant such as a chemical factory.
[0002]
[Prior art]
For example, in a plant that transfers a certain substance from tank A to tank B, operation management is performed with the approval of a manager or the like when operating data is stored in history.
[0003]
As shown in FIG. 16, in the conventional operation data management apparatus, the data collection determination unit 2 collects various types of plant information input using the process data input unit 1, and is determined in advance as necessary for plant operation. When the data collection determination unit 2 determines that all the operation data has been collected, the operation data is sent to the display processing unit 4 and displayed on the CRT device 5, and is also stored as a hard copy or a form.
[0004]
The plant operator presented the operation data described on the paper to the person in charge and obtained approval. The document was called a data sheet and was kept as official data regardless of whether or not the plant manager approved it.
[0005]
[Problems to be solved by the invention]
However, in the operation data management apparatus 100 as shown in FIG. 16, the approval is asked verbally, etc., and it is stored in an unapproved state due to some mistakes, and the person in charge is also required to promote the approval act. There is a management problem such as burden.
[0006]
First, for example, first, when an approval request is made to an approver orally, there is a risk that the user will forget to ask for approval or may be left on the desk of the approver. In addition, in writing, there is a risk of loss before obtaining approval or when asking for approval.
[0007]
Secondly, if the person in charge presents a document and asks for approval each time, it is a heavy burden on the person in charge. In particular, it is burdensome for the person in charge to distinguish whether a large amount of documents has been approved or not, and manage them manually.
[0008]
Accordingly, the present invention provides an operation data management device that can reliably approve operation data without manual intervention, can immediately recognize unapproved objects, can thoroughly manage operation data, and reduce the burden on the person in charge. The purpose is to provide.
[0009]
[Means for Solving the Problems]
The invention according to claim 1 is an operation data management device that collects operation data necessary for plant operation management, obtains approval for the collected operation data, and stores and manages the operation data. The process data of the plant is used as operation data. A process data input unit that captures data, a data collection determination unit that collects the operation data captured by the process data input unit, and determines that collection is complete when all the operation data required for approval has been collected, and this data collection determination The operation data determined to be collected by the storage unit is stored in the approval history table, and the approval request determination unit that outputs the approval request, and when the approval request is input from the approval request determination unit, the operation data is extracted from the approval history table and approved. Display that creates display data to be output to the display device as approved operation data with specified locations A processing section, when an input device for inputting an instruction authorization from authorization practitioner in accordance with the display on the display device of the display data created, an instruction of approval by the input device inputted by the display processing unit, Approval action control unit that saves the approval data including the name of the approver and the operation data in the approval history table when the approval action is input to the approved operation data through dialogue processing. is there. According to this means, operation data necessary for operation management of the plant is collected, and when the collection is completed, the operation data is stored in a table, and a notification requesting an approval action is given via the display device. Thus, the display shows that the approval executor needs to be approved, and an approval instruction can be input by the input device and the approval can be immediately made. Further, the operation data and the approver are associated and stored in the table. In addition, the data of the approval act is stored together with the operation data, and is thoroughly managed. Therefore, as in the prior art, the trouble of presenting the operation data described on the paper to the approval executor and obtaining the approval can be reduced, while the adverse effects on the operation management such as being left unapproved can be eliminated.
[0010]
The invention according to claim 2 is the operation data management device according to claim 1, wherein the security management unit stores and determines the qualified data of the predetermined approval performer, and the operation data displayed on the display device by the display processing unit. Approval that enables the approval action only when it is judged that it is qualified by outputting the data of whether or not it is a qualified person to the security management department when the input of the approval action is input from the input device in the dialogue process An action execution control unit is provided. According to this means, only the approval action determined to be a qualified person is validated by notifying the data of the person who performed the approval action from the input device and determining the qualified person of the approval action. Thereby, the reliability of the driving | running | working data preserve | saved only the limited qualified person's approval act is securable.
[0011]
The invention according to claim 3 is the operation data management device according to claim 1, wherein the data of the approval action is taken out from the approval history table by the request by the dialogue process, and the approval and non-approval are identified to the display device, or A list is displayed by selecting either approved or unapproved. According to this means, a list of approval results is displayed, approval and non-approval can be viewed at a glance, management can be performed thoroughly, and the management burden can be reduced. In addition, different displays of unapproved operating data allow you to quickly identify and identify unapproved items and perform thorough management.
[0012]
According to a fourth aspect of the present invention, in the operation data management device according to the first or third aspect, the storage period of unapproved data is checked in the data stored in the approval history table, and the storage period is equal to or longer than a predetermined period. In this case, it is preferable to provide a storage period check unit for displaying the fact on the display device. According to this means, operation data that has not been approved for a predetermined period or longer is extracted and displayed. As a result, a request for an approval act can be immediately made again, and the risk of being left unapproved for a long time can be solved.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0015]
FIG. 1 is a configuration diagram of an operation data management apparatus showing a first embodiment of the present invention. The same reference numerals as those in FIG. 16 showing the prior art denote the same or corresponding parts.
[0016]
The process data input unit 1 inputs process data as operation data. The data collection determination unit 2 checks whether all the operation data to be approved is available. The approval request determination unit 3 transmits an approval request signal to the display processing unit 4. The approval history table 11 stores the history of operation data to be approved. The display processing unit 4 notifies the plant manager of the approval request through the display device 5. The approval action confirmation control unit 10 stores the approval data including the approver in association with the operation data in the approval history table 11 when the approval action is input by the dialogue process for the approved operation data.
[0017]
Next, the processing of the first embodiment will be described with reference to FIG.
[0018]
First, the process data input unit 1 takes in process data (101). The process data input unit 1 sends the fetched data to the data collection determination unit 2 (102). The data collection determination unit 2 checks whether all the data to be approved is available (103), and writes the data in the approval history table 11 shown in FIG. 3 only when it is available (104).
[0019]
The approval history table 11 shown in FIG. 3 stores “approval date / time”, “approval classification name”, “approval object”, “approval date / time”, and “approver” in the area for each approval data, and corresponds to each approval data. The operation data is stored in an area not shown.
[0020]
At this point, the date and time of approval and the approver are blank. When a signal indicating that the data is ready is sent to the approval request determination unit 3, an instruction for notifying the approval request from the approval request determination unit 3 is sent to the display processing unit 4 (105). The display processing unit 4 blinks and displays the designated portion on the CRT screen, displays an approval request, and notifies the plant manager (106). In response to this, an approval action is performed via the input device 6.
[0021]
FIG. 4 shows the process of the approval action confirmation control unit 10. First, after the registrant name is displayed in the sub-window for executing the approval on the CRT device 5, the confirmation in the window is displayed when the approval is performed. A button is selected by the input device 6 (301). The approval action confirmation control unit 10 receives the signal, writes the approval date and time, and the name of the approver and stores it in the approval history table 11 (302).
[0022]
As described above, according to the first embodiment, various pieces of plant information are input by the process data input unit, and the input process data is required for plant operation management by the approval of the plant manager in the data collection determination unit. If it is determined whether or not all the data has been prepared, and it is determined that the process data that requires approval of the operation data of the plant by the plant manager has been prepared, the approval request determination unit 3 is the data that needs to be approved by the plant manager. That is, the display processing unit 4 is notified to display that the approval request data for the operation data has been generated, and the display processing unit 4 needs to be approved by the plant manager on the display device with the notification. Is displayed.
[0023]
Further, since the approved approval data and the driving data are associated with the approver's index and saved as the approved driving data by the approval action confirmation control unit 10, the driving data is managed and the driving data is effectively managed. Can be.
[0024]
Thereby, the display shows that the approver needs to be approved, and can immediately approve it. In addition, the approval data is stored together with the operation data, allowing thorough management. Therefore, the trouble of presenting the operation data described on the paper to the approval executor and obtaining the approval as in the conventional manner can be reduced, while the adverse effect of being left unapproved can be eliminated.
[0025]
FIG. 5 is a configuration diagram of an operation data management apparatus showing a second embodiment of the present invention, and the same reference numerals as those in FIG. 16 showing a conventional example show the same or corresponding parts.
[0026]
The display processing unit 4 displays a data sheet in which data requiring approval is displayed and a subwindow for performing approval. The dialog input processing unit 7 accepts an operation for inputting approval execution data, transmits the signal to the approval action execution control unit 8, and finally transmits an approval action confirmation command. The security management unit 9 determines whether or not the person who has entered the approval execution data is authorized as a person in charge of the plant to perform the approval act on the input approval execution data. Is transmitted to the approval action execution control unit. The approval action execution control unit 8 causes the display processing unit 4 to display a registrant name such as a password and an ID card in the case of a positive determination due to the correctness of the result of the security check in the security management unit 9, and in the case of an incorrect determination Transmits a command for displaying a message to that effect to the display processing unit 4.
[0027]
Next, processing according to the second embodiment will be described with reference to FIG.
[0028]
First, it responds to the notified approval request using the input device 6 (201). When this signal is received by the dialog processing unit 7 and a display command is issued to the display processing unit 4, the display processing unit 4 reads data to be approved from the approval history table 11 and displays the data sheet 50 shown in FIG. (202). When the person in charge of the plant approves the data in the data sheet 50, the approval operation button 50a in the data sheet window is selected using the input device 6 (203).
[0029]
The dialog input processing unit 7 receives the signal and outputs a display command to the display processing unit 4, and the display processing unit 4 displays a sub window 51 shown in FIG. 8 for approval in the CRT device 5 (204). . Then, after the person in charge of the plant inputs the password with the input device 6, the button 51a for executing the approval is selected with the input device 6 (205). Approval action execution control unit 8 receives the signal, and whether the person who entered the password to security management unit 9 and the person registered in advance in this device, that is, the person qualified as the plant manager, are performing the approval action A request signal is transmitted so as to make a determination of whether or not (206).
[0030]
The security management unit 9 is configured as shown in FIG. 9, and a predetermined password and a password registrant name are registered in the security check table, a security check is performed, and an approval action execution control unit is positive only if the determination result is positive. When the password registrant name is displayed on the sub-window via 8 and the confirm button 51b is pressed, the setting is validated (207). On the other hand, in the case of an erroneous determination, a signal is sent to the display processing unit 4 so as to display a message to that effect via the approval action execution control unit 8 (208).
[0031]
As described above, in the second embodiment, in addition to the operation of the first embodiment, data indicating that approval is required for data that requires an approval action is input from the input device 6, that is, approval execution data is input. , The person who entered the relevant approval execution data is registered in advance in this apparatus, that is, the security management unit 9 determines whether the person who has the qualification as the plant manager is performing the approval act, If it is determined that the approval qualification has been approved, the approval request determination unit 3 is notified that the approval action has been performed, and the approval request determination unit 3 displays that the corresponding operation data approval request data has been approved. The processing unit 4 is notified, and the display processing unit 4 displays on the display device 5 a display indicating that the approval action has been performed. Thereby, only a limited person can approve and the reliability of driving data can be secured.
[0032]
FIG. 10 is a block diagram of an operation data management apparatus showing a third embodiment of the present invention, and the same reference numerals as those in FIG. 16 showing a conventional example show the same or corresponding parts.
[0033]
The third embodiment is characterized in that approval data is taken out from the approval history table 11 by a request by interactive processing, and an approval result list is displayed on the CRT device 5.
[0034]
First, when the input device 6 responds to the notified approval request, the signal is received by the dialogue input processing unit 7, and a signal is sent to the display processing unit 4 to display the approval result list window 52 shown in FIG. . The display processing unit 4 reads the approval history table 11 and displays the approval date / time and data indicating that the approver is present among the approval data to indicate that the data is approved, and the approval date / time and the approver is plank. As shown in FIG. 11, the data is displayed on the CRT device 5 as being unapproved data. In the approval result list window 52 of FIG. 11, “approved” is displayed in the approval area 52a for approved data, and “not yet” is displayed for unapproved data. As a result, the approval results can be browsed collectively, and the load on the plant operation management of the plant manager can be reduced.
[0035]
Further, in the third embodiment, among the approval results list display, different display is made by distinguishing between approved and unapproved, or a list display of only unapproved display, or a new display requiring an approval action. It is characterized by being displayed.
[0036]
First, in order to display an unapproved data list from the approval result list window 53 shown in FIG. 12, when the unapproved data button 53a is pressed and a response is made from the input device 6, the signal is received by the dialog input processing unit 7 and displayed. A signal is sent to display a list of unapproved data in part 4. The display processing unit 4 reads the approval history table 11 and displays on the CRT device 5 only the unapproved data whose approval date and time and the approver are blank among all the data. As a result, only data that requires approval is displayed in a list, operation data that requires approval by the plant manager is immediately known, and the burden on the person in charge of plant operation management can be reduced.
[0037]
The display processing unit 4 reads the approval history table 11, assigns the corresponding approval request data, displays unapproved data at the top of the approval result list window of FIG. 11 or FIG. 12, changes the color of the character, and blinks. Alternatively, a display different from other approved and unapproved data may be displayed on the CRT device 5. Thereby, since the person in charge can easily determine information on the latest approval request, the approval action can be executed promptly.
[0038]
FIG. 13 is a configuration diagram of an operation data management apparatus showing a fourth embodiment of the present invention.
[0039]
The fourth embodiment is based on the results of the storage period check unit 12 that compares (current time−approval occurrence date / time) and (storage period−predetermined period) with a predetermined period. In the case where the value obtained by subtracting the approval period from the storage period for a certain period is large, the approval request is immediately output to the display processing unit 4 again.
[0040]
First, by the process shown in FIG. 14, only the unapproved data with the approval date / time and the approver blank are extracted from the data of the approval history table 11, and the approval request occurrence date / time is read (701). Next, the retention period check unit 12 determines the difference between the current time and the approval request occurrence date and time, and the difference between the preset data retention period and a certain period (a certain margin value) (a period during which data in the retention period is erased). ) Is always compared at regular intervals.
[0041]
That is, the approval result list and the unapproved data list of the CRT device 5 are displayed from the top in the order of the latest approval request occurrence date and time, but (current time-approval request occurrence date) ≧ (data If the condition “storage period−predetermined period” is satisfied, the approval request determination unit 3 displays a command to notify the approval request, and the corresponding unapproved data is displayed at the top in the approval record list and unapproved data list. A signal for performing display that can be distinguished from other data is sent to the display processing unit 4. The display processing unit 4 performs the display as described above, and notifies the plant manager so that the data is not erased without being approved (702). As a result, it is possible to prevent data that has not been approved from being erased without being approved.
[0042]
FIG. 15 is a configuration diagram of an operation data management apparatus showing a fifth embodiment of the present invention, and the same reference numerals as those in FIG. 16 showing the prior art indicate the same or corresponding parts.
[0043]
The process data input unit 1 inputs process data as operation data. The data collection determination unit 2 checks whether all the operation data to be approved is available. The approval request determination unit 3 transmits an approval request signal to the display processing unit 4. The approval history table 11 stores the history of operation data to be approved. The display processing unit 4 notifies the plant manager of the approval request through the display device 5.
[0044]
In the process of the fifth embodiment, as shown in FIG. 2, first, the process data input unit 1 takes in process data (101). The process data input unit 1 sends the fetched data to the data collection determination unit 2 (102). The data collection determination unit 2 checks whether all the data to be approved is available (103), and writes the data in the approval history table 11 shown in FIG. 3 only when it is available (104).
[0045]
As shown in FIG. 3, the approval history table 11 stores “approval date / time”, “approval classification name”, “approval object”, “approval date / time”, and “approver” in the area for each approval data. The operation data corresponding to each is stored in an area (not shown).
[0046]
At this point, the date and time of approval and the approver are blank. When a signal indicating that the data is ready is sent to the approval request determination unit 3, an instruction for notifying the approval request from the approval request determination unit 3 is sent to the display processing unit 4 (105). The display processing unit 4 blinks and displays the designated portion on the CRT screen, displays an approval request, and notifies the plant manager (106). In response to this, an approval action is performed via the input device 6.
[0047]
As described above, according to the fifth embodiment, various pieces of plant information are input by the process data input unit, and the input process data is required for plant operation management by the approval of the plant manager in the data collection determination unit. If it is determined whether or not all the data has been prepared, and it is determined that the process data that requires approval of the operation data of the plant by the plant manager has been prepared, the approval request determination unit 3 is the data that needs to be approved by the plant manager. That is, the display processing unit 4 is notified to display that the approval request data for the operation data has been generated, and the display processing unit 4 needs to be approved by the plant manager on the display device with the notification. Is displayed.
[0048]
【The invention's effect】
As described above, according to the first aspect of the invention, when collection of operation data necessary for plant operation management is completed, the data is stored in a table and a notification for an approval action is made via a display device. By this, the approver recognizes that approval is necessary, and can approve immediately. Therefore, as in the prior art, the trouble of presenting the operation data described on the paper to the approval executor and obtaining the approval can be reduced, while the adverse effects on the operation management such as being left unapproved can be eliminated.
[0049]
According to the invention of claim 2, since the data for specifying the authorized person is notified and the authorized act of the authorized person only becomes valid, only the limited person can perform the authorized act and be saved. The reliability of operation data can be secured.
[0050]
According to the invention of claim 3, since the name of the approver and the operation data are associated with each other and the approval is stored in the table with the index, the operation data can be effectively managed. In addition, a list of approval results is displayed so that approved and unapproved objects can be viewed at a glance, so that management can be performed thoroughly and management burden can be reduced. In addition, since unapproved data is displayed differently, unapproved data can be immediately distinguished and recognized and can be managed thoroughly.
[0051]
According to the invention of claim 4, since unapproved operation data for a predetermined period or longer is extracted and displayed, an approval action can be immediately requested and left unapproved for a long period of time. The possibility of being erased with can be eliminated.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of an operation data management apparatus showing a first embodiment of the present invention.
FIG. 2 is a flowchart showing processing of the operation data management apparatus of FIG.
3 is a configuration diagram showing an approval history table provided in the operation data management apparatus of FIG. 1;
4 is a flowchart showing a process of an approval action confirmation control unit in FIG. 1;
FIG. 5 is a configuration diagram of an operation data management apparatus showing a second embodiment of the present invention.
6 is a flowchart showing processing of the operation data management device of FIG. 4;
7 is a first screen example of a CRT device provided in the operation data management device of FIG. 4;
FIG. 8 is a second screen example of the CRT device provided in the operation data management device of FIG. 4;
9 is a configuration diagram illustrating an example of a security management unit provided in the operation data management apparatus of FIG. 4;
FIG. 10 is a configuration diagram of an operation data management apparatus showing a third embodiment of the present invention.
11 is a display example of a first approval result list window displayed on the CRT device of FIG. 10;
12 is a display example of a second approval results list window displayed on the CRT device of FIG. 10;
FIG. 13 is a configuration diagram of an operation data management apparatus showing a fourth embodiment of the present invention.
14 is a flowchart showing processing of the operation data management apparatus of FIG.
FIG. 15 is a configuration diagram of an operation data management apparatus showing a fifth embodiment of the present invention.
FIG. 16 is a block diagram showing a conventional operation data management device.
[Explanation of symbols]
1 Process Data Input Unit 2 Data Collection Determination Unit 3 Approval Request Determination Unit 4 Display Processing Unit 5 Display Device 6 Input Device 7 Dialogue Input Processing Unit 8 Approval Action Execution Control Unit 9 Security Management Unit 10 Approval Action Confirmation Control Unit 11 Approval History Table 12 Storage period check section

Claims (4)

プラントの運転管理に必要な運転データを収集すると共に、収集した運転データについて承認を得て運転データを保存管理する運転データ管理装置において、プラントのプロセスデータを運転データとして取込むプロセスデータ入力部と、このプロセスデータ入力部により取り込まれた運転データを収集し承認に必要な運転データが全て収集されたとき、収集完了を判定するデータ収集判定部と、このデータ収集判定部によって収集完了と判定された運転データを承認履歴テーブルへ記憶すると共に、承認要求を出力する承認要求判定部と、この承認要求判定部から承認要求を入力すると前記承認履歴テーブルから運転データを取出し承認指定箇所を有する承認運転データとして表示装置へ出力する表示データを作成する表示処理部と、前記表示処理部により作成された前記表示データの前記表示装置における表示に応じて承認実行者からの承認の指示を入力するための入力装置と、前記入力装置により承認の指示が入力された場合、前記承認運転データに対話処理にて承認行為の入力がされたとき承認者名を含む承認データと運転データとを対応させて前記承認履歴テーブルへ保存させる承認行為確定制御部とを備えることを特徴とする運転データ管理装置。In the operation data management device that collects operation data necessary for plant operation management and obtains approval for the collected operation data and stores and manages the operation data, a process data input unit that takes in the process data of the plant as operation data; When the operation data captured by the process data input unit is collected and all the operation data necessary for approval is collected, the data collection determination unit that determines completion of collection and the data collection determination unit determine that the collection is complete. The operation request data is stored in the approval history table, the approval request determination unit for outputting the approval request, and when the approval request is input from the approval request determination unit, the operation data is taken out from the approval history table and the approval operation has an approval designation part. a display processing unit for creating display data to be output to the display device as data, the An input device for inputting an instruction authorization from authorization practitioner in accordance with the display on the display device of the display data created by the shown processing section, when an instruction of approval has been input by the input device, the An approval action confirmation control unit that stores approval data including the name of the approver and operation data in association with the operation data when an approval action is input to the approved operation data through dialogue processing. Operation data management device. 予め定める承認実行者の有資格データを保存し判定するセキュリティ管理部と、前記表示処理部によって表示装置へ表示される運転データに対話処理にて前記入力装置から承認行為の入力がされたとき、前記セキュリティ管理部へ承認行為の資格者か否かのデータを出力して有資格者と判定された場合のみ前記承認行為を有効とする承認行為実行制御部とを設けることを特徴とする請求項1記載の運転データ管理装置。When the approval action is input from the input device in the interactive processing to the operation data displayed on the display device by the security management unit that stores and judges the qualified data of the predetermined approval performer , An approval action execution control unit that enables the approval action only when it is determined as a qualified person by outputting data indicating whether or not the person is a qualified person for the approval action to the security management unit. The operation data management device according to 1. 対話処理による要求によって前記承認履歴テーブルから承認行為のデータを取出して表示装置へ承認済と未承認とを識別して、あるいは、承認済か未承認のいずれか一方を選別して一覧表示をすることを特徴とする請求項1記載の運転データ管理装置。  The data of the approval action is taken out from the approval history table by the request by the dialogue process, and the display device is identified as approved or unapproved, or either the approved or unapproved is selected and displayed as a list. The operation data management device according to claim 1. 前記承認履歴テーブルに保存されるデータ内で、未承認データの保存期間をチェックして前記保存期間が所定期間以上の場合にその旨表示装置へ表示させる保存期間チェック部を備えることを特徴とする請求項1または請求項3記載の運転データ管理装置。  A storage period check unit that checks a storage period of unapproved data in the data stored in the approval history table and displays the result on a display device when the storage period is a predetermined period or longer is provided. The operation data management device according to claim 1 or 3.
JP16965997A 1997-06-12 1997-06-12 Operation data management device Expired - Fee Related JP3775764B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16965997A JP3775764B2 (en) 1997-06-12 1997-06-12 Operation data management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16965997A JP3775764B2 (en) 1997-06-12 1997-06-12 Operation data management device

Publications (2)

Publication Number Publication Date
JPH113370A JPH113370A (en) 1999-01-06
JP3775764B2 true JP3775764B2 (en) 2006-05-17

Family

ID=15890562

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16965997A Expired - Fee Related JP3775764B2 (en) 1997-06-12 1997-06-12 Operation data management device

Country Status (1)

Country Link
JP (1) JP3775764B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5379181U (en) * 1976-11-30 1978-07-01
JP2003058427A (en) * 2001-08-15 2003-02-28 Yokogawa Electric Corp Recording device
JP4531529B2 (en) * 2003-12-17 2010-08-25 キヤノンソフトウェア株式会社 Information processing apparatus management system, information processing apparatus management method, program, and recording medium
KR101086032B1 (en) * 2004-11-11 2011-11-22 주식회사 케이티 Mobile Equipment Management System and Management Method

Also Published As

Publication number Publication date
JPH113370A (en) 1999-01-06

Similar Documents

Publication Publication Date Title
JP4536461B2 (en) Image processing device
US5623653A (en) Document control, routing, and processing apparatus
JPS61216084A (en) Officer verification method
JP3775764B2 (en) Operation data management device
JP4927668B2 (en) Job management system
JP2772161B2 (en) On-site data collection support device
JPH10263234A (en) Pattern sewing work data processing device
JPH11282672A (en) Transfer method and execution system for on-line program
US5293462A (en) Electronic information processing method and device for modifying electronic information without losing high quality thereof
JP2005209049A (en) Loan review support system
JP2007065759A (en) Work proficiency judgment system and work proficiency judgment method
JP3869519B2 (en) Computer system for medical office
JPH07175668A (en) Automatic center batch operating system
JP2006072040A (en) Test providing system, test providing server, and test providing program
JPH07306123A (en) Fault diagnosis device
JP5181088B2 (en) Answer system
JPH1153429A (en) Personnel file processing device and storage medium
JP2550665B2 (en) Online batch test method
JPS60175151A (en) Information processor
JP3591732B2 (en) Labor management / wage management system, labor management / wage management program and computer-readable recording medium recording labor management / wage management program
JP2000067128A (en) System development request defining device for linking work flow with use case
JP2025130374A (en) Information processing device, information processing method, and program
JP2024085147A (en) Loan examination device, loan examination method, and loan examination program
JP2566629B2 (en) Information processing system
JPH05143465A (en) Security method for information processing system

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20050318

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050323

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050826

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051018

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060220

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100303

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees