Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3784564B2 - Earthquake remote monitoring device - Google Patents
[go: Go Back, main page]

JP3784564B2 - Earthquake remote monitoring device - Google Patents

Earthquake remote monitoring device Download PDF

Info

Publication number
JP3784564B2
JP3784564B2 JP05318399A JP5318399A JP3784564B2 JP 3784564 B2 JP3784564 B2 JP 3784564B2 JP 05318399 A JP05318399 A JP 05318399A JP 5318399 A JP5318399 A JP 5318399A JP 3784564 B2 JP3784564 B2 JP 3784564B2
Authority
JP
Japan
Prior art keywords
earthquake
value
detected
slave station
master station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP05318399A
Other languages
Japanese (ja)
Other versions
JP2000253467A (en
Inventor
一男 中岡
義章 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP05318399A priority Critical patent/JP3784564B2/en
Publication of JP2000253467A publication Critical patent/JP2000253467A/en
Application granted granted Critical
Publication of JP3784564B2 publication Critical patent/JP3784564B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/01Measuring or predicting earthquakes

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Safety Valves (AREA)
  • Emergency Alarm Devices (AREA)
  • Telephonic Communication Services (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Pipeline Systems (AREA)
  • Alarm Systems (AREA)
  • Selective Calling Equipment (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、地震発生時に閉じられるガバナなどの開閉弁の状態を監視する地震用遠隔監視装置に関し、さらにその他の災害のための災害用遠隔監視装置に関する。
【0002】
【従来の技術】
従来から、都市ガスなどの流体を輸送する管路には、開閉機能を有する複数のガバナが介在され、各ガバナ毎に、感震器を有する子局が設けられ、感震器によって地震の発生が検出されたとき、地震を検出した感震器に対応するガバナが遮断されるようにして、安全が図られるように構成されている。各ガバナが閉じた状態を表す子局からの情報を、親局で収集するには、ガバナが閉じたとき、電話回線を介して自動発呼し、その情報を子局から親局に送信することが提案されている。
【0003】
このような構成では、地震発生時に、多数のガバナが閉じられたとき、一斉に、各ガバナが閉じた状態を表す信号が、子局から自動発呼されて親局に送信されることになるので、親局の電話回線が話中になることを防ぐためには、親局には多数の電話回線を必要とする。このことは特に、地震情報だけでなく、各ガバナに関連する停電、1次圧力低下、2次圧力低下およびガス漏れなどの各警報状態の発生時にも、各警報状態の発生のたびに、子局から自動発呼して親局に警報情報を送信する構成としたとき、地震発生時には、ガバナの閉じた状態だけでなく、上述の各警報状態が発生することによって、各ガバナ毎に、複数回の自動発呼が行われてしまう。したがって地震発生時には、親局への地震情報および前記警報情報の送信が殺到し、親局の電話回線が話中にならないようにするには、さらに多数の電話回線を親局に設ける必要が生じる。
【0004】
上述の提案された構成における他の問題は、各ガバナ毎に設けられる子局から、親局に情報が送信されて来ないとき、子局が被災して故障したか、または健常であるかを親局で知ることができない。
【0005】
【発明が解決しようとする課題】
本発明の目的は、電話回線などの通信路の数を増大することなく、短時間に多数の子局からのガバナなどの開閉弁の開閉状態を表す情報を、親局で収集することができるとともに、子局が被災して故障しているかまたは健常であるかを容易に知ることができるようにした地震用遠隔監視装置を提供することである。
【0006】
また本発明の他の目的は、地震だけでなく、その他の風水害などの災害発生時に、子局から親局に、多数の通信路を必要とすることなく、短時間に情報を収集することができるようにするとともに、子局が被災しているか健常であるかを容易に知ることができるようにした災害用遠隔監視装置を提供することである。
【0007】
【課題を解決するための手段】
本発明は、複数の各ブロック毎に、相互に接続された複数の管路に複数の開閉弁が介在され、
各ブロック毎に、地震計がそれぞれ設けられ、
各開閉弁毎に、子局が設けられ、
子局は、
感震器と、
感震器によって検出される地震の程度SIを、予め定める第1の値SI1でレベル弁別する第1レベル弁別手段と、
第1レベル弁別手段の出力に応答し、検出された地震の程度が第1の値SI1以上であるとき、開閉弁を閉じる閉駆動手段と、
開閉弁の開閉状態を表す開閉状態信号を、送信要求信号を受信したとき、送信する子局用制御手段とを有し、
各地震計および子局用制御手段に接続される親局が設けられ、この親局は、
各地震計の出力に応答し、地震計によって検出された地震の程度を、第1の値SI1未満である第2の値SI2でレベル弁別する第2レベル弁別手段と、
各子局毎の開閉状態信号を受信し、第2レベル弁別手段の出力に応答し、検出された地震の程度が第2の値SI2以上であるとき、その検出した地震計が設けられているブロックに属する各子局を、順次的にポーリングして送信要求信号を送信する親局用制御手段とを有することを特徴とする地震用遠隔監視装置である。
【0008】
本発明に従えば、管路網が複数の各ブロックに区分され、各ブロック内の複数の管路には複数の開閉弁、たとえば遮断機能を備えるガバナが介在され、各開閉弁毎に子局が設けられる。また各ブロック毎には地震計がそれぞれ設けられる。地震計によって、検出された地震の程度SIは、親局に設けられた第2レベル弁別手段によって、第2の値SI2でレベル弁別される。地震の程度SIは、たとえば地中に埋設された管路の地震による被害の程度を、単位カインで数値を用いて表すようにしてもよい。
【0009】
地震計によって検出された地震の程度SIが第2の値SI2以上であるとき(SI2≦SI)、その第2の値SI2以上の地震の程度を検出した地震計が設けられているブロックに属する各子局を、親局用制御手段によって順次的にポーリングして、送信要求信号を各子局に送信する。
【0010】
子局に設けられる子局用制御手段は、親局用制御手段のポーリングによって送信される送信要求信号を受信し、開閉弁の開閉状態を表す開閉状態信号を送信し、親局用制御手段に与える。これによって親局では、第2の値SI2以上の地震が地震計によって検出されたブロック内のすべての子局における開閉弁の開閉状態を知ることができる。親局用制御手段によるポーリング動作によって、複数の子局が順次的に開閉状態信号を送信するので、電話回線などの通信路の数が少なくてすむとともに、電話回線の話中になるおそれをなくすことができ、短時間に複数の開閉弁の開閉状態を親局で知ることが容易に可能になる。
【0011】
子局用制御手段では、送信要求信号に応答して、開閉状態信号だけを送信し、その他の警報情報を送信しないように構成してもよい。このようにすることによって親局用制御手段が各子局用制御手段と通信する時間を短縮することができ、したがって複数の開閉状態信号を短時間に収集することができるようになる。
【0012】
さらに親局用制御手段のポーリングによって子局用制御手段からの開閉状態信号を受信するようにしたので、その開閉状態信号を受信したとき、子局は健常であることを知ることができ、また開閉状態信号を受信することができなかったとき、子局が被災などによって故障しているおそれがあることを知ることができる。また親局では、このような開閉状態信号を受信することによって、開閉状態信号が開いていることを表す開閉弁を閉駆動手段によって閉じるように、閉駆動指令信号を子局に送信して遠隔制御してもよい。
【0013】
さらに本発明に従えば、子局には、感震器が設けられ、この感震器によって検出される地震の程度SIが、子局に設けられた第1レベル弁別手段によって第1の値SI1以上であるとき(SI≧SI1)、閉駆動手段は、開閉弁を閉駆動する。前述の第1の値SI1は、たとえば60カインであり、第2の値SI2は、第1の値SI1未満であって、たとえば30カインであってもよい(SI2<SI1)。
【0014】
子局用制御手段は、第1レベル弁別手段が感震器によって検出された地震の程度を第1の値SI1以上であるとレベル弁別したとき、開閉弁を閉じて安全を確保する。本発明の実施の一形態では、子局用制御手段は、このとき、開閉状態信号を親局に送信する。したがって地震計によって検出された地震の程度が第2の値SI2未満であっても、親局用制御手段には、感震器によって検出された地震の程度が第1の値SI1以上であるとき、その第1の値SI1以上の地震の程度を検出した感震器を備える子局のみの開閉弁の開閉状態信号が、親局用制御手段に送信されることになる。このとき感震器は、たとえばボールが衝突したことによって、または掃除中の箒が衝突したことによって出力を導出したおそれがあり、または1つのブロック内における局所的な地震が発生したおそれがある。
【0015】
親局では前述のように地震計によって検出された地震の程度が第2の値SI2以上であるとき、ポーリング動作を行い、第2の値SI2以上の地震の程度を検出した地震計が備えられているブロック内に属するすべての子局から、開閉弁の開閉状態信号を受信し、開閉弁の開閉状態を親局で知ることができる。地震計によって検出された地震の程度が、第1の値SI1以上であるとき、そのブロック内の子局からの開閉状態信号をポーリングによって受信することによって、開閉弁の開閉状態を知ることができる。
【0016】
また本発明は、親局用制御手段は、
各地震計によって検出された地震の程度が、第2の値SI2以上であるとき、検出された地震の程度が大きいブロックから小さいブロックの順に、順序付けを行い、
この順序付けられたブロックの順に、開閉弁の開閉状態を出力することを特徴とする。
【0017】
本発明に従えば、複数のブロックにわたって、各ブロック毎の地震計によってそれぞれ検出された地震の程度が第2の値SI2以上であれば、親局用制御手段は、地震の程度が大きいブロックから小さいブロックの順に、ブロックの順序付けを行い、この順序付けられたブロックの順に、各ブロックに属する開閉弁の開閉状態を出力し、たとえば目視表示手段によって目視表示を行い、またはプリンタによって記録紙に印字を行い、さらに音声合成回路とスピーカとを備える構成によって音響表示を行う。これによって地震による管路の被害が大きいと推測されるブロックの順に、開閉弁の開閉状態を点検することが容易に可能になる。
【0018】
また本発明は、子局用制御手段は、個別的に電話回線に接続され、
親局用制御手段は、地震計の出力を受信する1または複数の受信用電話回線に接続され、
親局側にはまた、
電話機と、
複数の電話回線を、親局用制御手段と電話機とに選択的に切換える切換え手段とが設けられ、
検出された地震の程度が第2の値SI2以上であるとき、切換え手段は、電話機に接続されている電話回線の少なくとも一部を、親局用制御手段に切換えて接続することを特徴とする。
【0019】
本発明に従えば、子局用制御手段は、個別的に電話回線、たとえば単一本の一般電話回線に接続され、親局用制御手段のポーリング動作による送信要求信号に応答して開閉状態信号を子局用制御手段から送信することができる。
【0020】
親局用制御手段は、1または複数の受信用電話回線、たとえば災害時優先電話回線に接続され、各グループ毎に設けられている地震計からの出力を受信することができる。
【0021】
地震の程度が第2の値SI2以上であることを検出した地震計が属するグループ内の子局の開閉弁の開閉状態を、親局側でさらに短時間にポーリング動作によって知ることができるようにするために、地震発生時以外では切換え手段によって電話機に接続されている複数の電話回線の少なくとも一部を、上述の地震発生時に、切換え手段によって親局用制御手段に切換えて接続する。したがって親局用制御手段は、これらの電話機から切換えられた電話回線を用いて並列に複数のポーリング動作を行うことができる。したがってさらに短時間に多くの子局からの開閉状態信号を収集することができる。親局用制御手段にはまた、ポーリング動作のための1または複数の一般電話回線が常時接続されていてもよい。
【0022】
また本発明は、親局は、
各地震計の出力に応答し、地震計によって検出された地震の程度を、第2の値SI2を超える予め定める第3の値SI3でレベル弁別する第3レベル弁別手段をさらに有し、
親局用制御手段は、第3レベル弁別手段の出力に応答し、検出された地震の程度が第3の値SI3以上であるブロックを、識別することを特徴とする。
【0023】
本発明に従えば、地震計によって検出された地震の程度SIが、第3の値SI3以上であることが第3レベル弁別手段によってレベル弁別されたとき、その第3の値SI3以上である地震の程度が検出された地震計が属するブロックを識別して目視または音響による表示を行い、または記録紙にプリンタによって記録する。第3の値SI3は、第2の値SI2を超える予め定める値であって(SI2<SI3)、たとえば第1の値SI1と等しくてもよい。したがって各ブロック毎に地震計によって検出される地震の程度SIが、第3の値SI3以上であるとき、たとえば60カイン以上であるとき、ポーリング動作によって得られたそのブロック内の開閉弁毎の開閉状態信号によってすべての開閉弁が閉じているかどうかを知ることが容易である。もしも、1つのブロック内で開いている開閉弁が存在するとき、作業者は、その開閉弁を閉じる作業を行うべきであることが判る。こうして各ブロック毎に、地震計によって検出された地震の程度が、第3の値SI3以上であれば、そのブロック内のすべての開閉弁を速やかに遮断状態にすることが可能になる。したがってもしも開いている開閉弁が残っているならば、作業者は、その開閉弁を閉じる作業を行い、安全を確保する。
【0024】
また本発明は、子局は、管路に輸送される流体に関するデータを検出する検出手段を有し、
子局用制御手段は、検出手段の出力を、予め定める時間毎に周期的に受信し、各出力のうちの少なくとも1つが変化したとき、感震器および検出手段の状態変化信号を送信して親局用制御手段に与え、
親局用制御手段は、状態変化信号を受信して出力することを特徴とする。
【0025】
本発明に従えば、子局には、検出手段が備えられ、この検出手段は、管路によって輸送される都市ガスなどの流体に関するデータを検出し、たとえば子局の停電、開閉機能を有してもよい圧力制御弁であるガバナの1次圧力低下、ガバナの2次圧力低下およびガス漏れなどの警報情報であるデータを検出する。子局用制御手段は、感震器が地震を検出したとき、および検出手段が前述のデータを検出したとき、状態変化信号を親局用制御手段に送信し、親局用制御信号は、その状態変化信号を受信して表示手段またはプリンタなどによって出力する。こうして地震だけでなく、その他の検出手段によって検出されるデータである警報状態を、親局用制御手段において常時知ることができる。
【0026】
感震器および検出手段が状態変化信号を送信するにあたっては、子局用制御手段では、予め定める時間たとえばマイクロコンピュータによるごく短時間毎に周期的に感震器および検出手段の出力を受信し、感震器および検出手段の今回の出力を、前回の出力と比較し、これらの各出力のうちの少なくとも1つが変化したとき、状態変化信号を導出する。こうして子局用制御手段からは、感震器によって地震が検出されたときおよび検出手段によって前述のデータが検出されたときなどの警報状態の発生時点でのみ、状態変化信号が送信される。したがって複数回繰返して送信が行われることを防ぎ、電話回線などの通信路の占有状態をできるだけ短くして伝送効率を向上する。
【0027】
また本発明は、複数の各ブロック毎に、災害の発生の程度SIを検出する第1検出手段がそれぞれ設けられ、
各ブロック内に、複数の子局が設けられ、各子局は、
災害の発生の程度を検出する第2検出手段と、
第2検出手段によって検出された災害の程度を、予め定める第1の値SI1でレベル弁別する第1レベル弁別手段と、
第1レベル弁別手段の出力に応答し、検出された災害の程度が第1の値SI1以上であるとき、安全のための動作を行う手段と、
前記安全のための動作が行われている状態を表す状態信号を、送信要求信号を受信したとき、送信する子局用制御手段とを有し、
第1検出手段および子局用制御手段に接続される親局が設けられ、この親局は、
各第1検出手段の出力に応答し、第1検出手段によって検出された災害の程度を、第1の値SI1未満である第2の値SI2でレベル弁別する第2レベル弁別手段と、
各子局毎の状態信号を受信し、第2レベル弁別手段の出力に応答し、検出された災害の程度が第2の値SI2以上であるとき、その検出した第1検出手段が設けられているブロックに属する各子局を、順次的にポーリングして送信要求信号を送信する親局用制御手段とを有することを特徴とする災害用遠隔監視装置である。
【0028】
本発明に従えば、台風の風水害などの災害時に、複数の地域である各ブロック毎に、風雨または河川の増水による水位などの物理的または化学的値SIである災害の発生の程度を第1検出手段によって検出し、子局には、第2検出手段が設けられ、第1検出手段と同様に災害の発生の程度を検出し、その第2検出手段によって検出された災害の発生の程度が、第1の値SI1以上であることが第1レベル弁別手段によってレベル弁別されると、安全のための動作、たとえば河川における開閉弁を開くなどの動作を行い、さらにこのような安全のための動作が行われている状態を表す状態信号が、子局用制御手段は、親局用制御手段のポーリング動作による送信要求信号を受信することによって、親局用制御手段に送信する。
【0029】
親局の親局用制御手段は、各第1検出手段によって検出された災害の程度が、第2の値SI2未満である第1の値SI1以上であるとき、第1検出手段が設けられているブロックに属する子局を順次的にポーリングし、各子局から、安全のための動作が行われていることを表す状態信号を受信する。こうして各ブロック毎の子局の安全のための動作が行われているかどうかを、親局で点検することができる。これによって災害発生時の安全が確保されることになる。
【0030】
【発明の実施の形態】
図1は、本発明の実施の一形態の地震用遠隔監視装置1のブロック図である。複数の各ブロックB毎に、地震計Qと子局Aとが設けられる。これらの地震計Qと子局Aとは、公衆電話回線Lを介して電話回線網2に接続される。この電話回線網2は、受信用電話回線Laおよび一般電話回線Lb1を介して親局3に接続される。地震発生時には、地震計Qおよび各子局Aからの情報が、親局3に収集される。参照符Qは、個別的な参照符Q1,Q2,…を総括的に示し、参照符Aは子局A11,A12,…A1i;A21,…A2j;…を総括的に示す。参照符B1,B2,…を総括的に参照符Bで示す。さらに参照符L1,L2,…;L11,L12,…を総括的に参照符Lで示す。本発明の実施の他の形態では、地震計Qは、親局3に、その重要度および信頼度に応じて、自営無線網を介して接続されるようにしてもよい。
【0031】
図2は、各ブロックBを簡略化して示す図である。各ブロックBにおいて、相互に接続された複数の管路4には、遮断機能を有する複数のガバナ5が介在される。このガバナ5は、2次圧力を予め定める値に一定に保ち、各家、工場などの消費個所に供給する。ガバナ5は、ガスを供給し、および遮断することができ、開閉弁としての働きを兼ねる。このようなガバナ5は、圧力制御弁と開閉弁とが一体的に組合されて構成されてもよく、または個別に構成されて組合されてもよい。各ブロックBには、地震計Qが配置され、各ブロックB毎の地震の程度を検出する。子局Aは、各ガバナ5毎にそれぞれ設けられる。
【0032】
再び図1を参照して、子局Aには、マイクロコンピュータなどによって実現される処理回路7が備えられる。この処理回路7には、感震器8からの地震の程度を表す出力が与えられる。さらにガバナ5が遮断していることを検出するマイクロスイッチなどの遮断検出手段9と、商用交流電源が停電していることを表す停電検出手段10と、ガバナ5の1次圧力が予め定める第1の圧力値未満であることを検出する1次圧力低下検出手段11、ガバナ5の2次圧力が予め定める第2の圧力値未満であることを検出する2次圧力低下検出手段12と、ガバナ5付近からのガスの漏洩を検出するガス漏れ検出手段13とが備えられる。これらの各検出手段9〜13の出力は、警報情報として処理回路7に与えられる。停電発生時には、処理回路7は、バッテリなどによって駆動される。処理回路7は、ガバナ5の遮断動作を制御する。さらに処理回路7には、メモリ14が備えられ、感震器8および各検出手段9〜13の出力がストアされるとともに、親局3からの信号がストアされる。処理回路7は、電話回線L11に接続される。地震計Q1は、地震計L1に接続される。その他のブロックB2,…に関しても、ブロックB1と同様な構成となっている。
【0033】
親局3には、マイクロコンピュータなどによって実現される処理回路16が備えられる。処理回路16には、液晶または陰極線管などの目視表示手段17と、記録紙に印字を行うプリンタ18とが接続され、さらに音声合成回路およびスピーカなどを含む音響表示手段が備えられてもよい。処理回路16は、受信用電話回線Laに接続される。処理回路16はまた、1または複数の電話回線Lb2および切換え手段19を介して、複数の一般電話回線Lb1に接続される。さらに電話回線Lb3は、複数の内線電話機21に接続される。
【0034】
地震が発生していない状態では、処理回路16に接続される電話回線Lb2の数は、たとえば零または予め定める比較的少ない数である。このとき多くの電話回線Lb3が内線電話機21に接続される。こうして一般電話回線Lb1が用いられる。
【0035】
地震発生時には、処理回路16に切換え手段19によって接続される送信用電話回線Lb2の数は、増大される。電話機21に接続される電話回線Lb3の数は、減少される。このようにして切換え手段19による一般電話回線Lb1の切換え動作が行われる。
【0036】
図3は、地震発生時に、親局3の処理回路16によるポーリング動作によって、複数の子局Aから情報を収集するために、親局3の処理回路16から送信用電話回線Lb2および一般電話回線Lb1を経て子局Aに送信される信号22の構成を示す図である。親局3の処理回路16から送信される信号22は、子局Aをアドレス指定する子局アドレス指定信号23と、そのアドレス指定された子局Aから、感震器8によって検出された地震の程度を表す信号を親局3に送信すべきことを要求する送信要求信号24とを含む。
【0037】
子局Aの処理回路7は、親局3の処理回路16から送信される信号22の子局アドレス指定信号23が、自局を識別する予め定める子局アドレスと一致したとき、その自局の子局アドレス送信信号とともに、感震器8および検出手段9〜13の出力を、監視データとして電話回線L11を介して親局3に送信する。
【0038】
図4は、子局Aの処理回路7が、送信要求信号24に応答して親局3に送信する信号25の構成を示す図である。子局アドレス指定信号26は、信号25を送信する子局Aを識別する子局アドレスである。この子局アドレス指定信号26に後続して、監視データ27が送信される。監視データ27は、前述のように感震器8および各検出手段9〜13の出力を含んでもよいけれども、本発明の実施の他の形態では感震器8の出力だけであり、これによって親局3による複数の各子局Aからの情報収集の時間を短縮するようにしてもよい。
【0039】
図5は子局Aの処理回路7の送信要求信号24を受信したときの動作を説明するためのフローチャートである。ステップa1からステップa2に移り、親局3の処理回路16によるポーリング動作によって、処理回路7が送信要求信号24を受信すると、次のステップa3では、メモリ14にストアされている感震器8および検出手段9〜13の各出力を読出して、監視データ27として、さらに自局のアドレス指定信号26を付加し、図4に示される信号25を構成し、電話回線L11から次のステップa4において電話回線L11に送信し、親局3に与える。
【0040】
図6は、子局Aの処理回路7のさらに他の動作を説明するためのフローチャートである。地震発生時、または地震が発生していないとき、ステップb1からステップb2に移り、予め定める比較的短時間の周期で、感震器8および各検出手段9〜13の出力をメモリ14に順次的にストアする。ステップb3において、メモリ14に今回ストアしたデータと、前回ストアしたデータとが、各データ毎に異なっているかどうかを判断する。今回のデータと前回のデータとが異なっているとき、図4に示される信号25が、子局Aから親局3に、送信される。
【0041】
図6の送信動作28において、子局Aは、電話回線Lから、信号25を送信する。このとき親局3に接続されている電話回線Lb2が話中でなければ、ステップb5において、その信号25を送信し、親局3の処理回路16に与える。信号25には、今回のデータと前回のデータとが異なっているデータだけが含まれてもよいけれども、すべての監視データ27、すなわち感震器8および検出手段9〜13の出力が含まれていてもよい。
【0042】
ステップb4において子局Aから信号25を送信したとき、親局3の電話回線Lb2が話中であるときには、次のステップb6に移り、予め定める時間、たとえば3分間、待機し、その後、再発信であるリダイアル動作を処理回路7によって再度、送信動作を行うとともに、そのリダイアル回数Nを計数する。ステップb7では、計数したリダイアル回数Nが、予め定める回数N0を超えているか(N>N0)を、判断し、そうでなければ、ステップb4に移る。リダイアル回数Nが、予め定める回数N0を超えているとき、ステップb2に戻る。こうして感震器8および検出手段9〜13の出力が、前回の出力と内容が異なっているとき、子局Aから親局3に信号25が送信され、また自動的なリダイアル動作が行われる。
【0043】
図7は、親局3と電話回線網2との接続構成を示す簡略化した回路図である。事業所29には、親局3が配置される。本社31には、親局3の処理回路16が、内線電話網32を介して接続される。事業所29において受信用電話回線Laは、親局3の処理回路16に直接に接続される。本発明の実施の他の形態では、受信用電話回線Laに代えて、自営無線網が用いられてもよい。事業所29の切換え手段19aは、電話回線網2と電話回線Lb11を介して接続される。この電話回線Lb11は、たとえば災害用優先電話40回線、および一般電話回線112回線である。親局3の処理回路16には、いずれかの地震計Qが第2の値SI2以上の地震の程度を検出した地震発生時のみ、災害用優先電話40回線のうち、37回線が接続され、さらに一般電話回線112回線のうち、20回線が切換えられて接続され、これらの電話回線37回線および一般電話回線20回線は、参照符Lb21で示される。内線電話機21には、電話回線Lb31が接続される。この電話回線Lb31には、処理回路16に接続されない残りの電話回線である。各電話回線の参照符を、回線数をも表すものとすると、Lb11=Lb21+Lb31である。地震が発生しないとき、電話回線Lb21は、内線電話機21aのために用いられる。
【0044】
本社31における切換え手段19bには、災害用優先電話26回線と一般電話回線50回線が、参照符Lb12で示されるようにして電話回線網2に接続される。地震発生時に、優先電話26回線のうち、20回線が、参照符Lb22で示されるようにして、内線電話網32を介して処理回路16に接続される。こうして図1の電話回線Lb2は、地震発生時には、電話回線Lb21,Lb22によって構成される。本社31における内線電話機21bには、残りの電話回線Lb32によって接続される(Lb12=Lb32+Lb22)。地震が発生しないとき、切換え手段19bでは、電話回線Lb12を内線電話機21bに接続して使用可能とする。内線電話網32は、バケット通信を行うことができる。切換え手段19a,19bは、図1では参照符19で示され、この切換え手段19は、処理回路16によって制御される。
【0045】
図8は、親局3の処理回路16の動作を説明するためのフローチャートである。ステップc1からステップc2に移り、各ブロックB毎に設けられた地震計Qおよび/または各子局A毎の感震器8からのたとえば地震の程度が2〜5カイン以上の地震発生が生じたことを表す信号を受信すると、次のステップc3では、すべての地震計Qの出力を処理回路16において収集し、メモリ33にストアする。ステップc4では、複数の地震計Qによって検出された地震の程度SIが、予め定める第2の値SI2である、たとえば30カイン以上であるかが判断される。
【0046】
SI ≧ SI2 …(1)
ステップc4において、上述の式1が成立するとき、ステップc5〜c12の地震モード動作が行われる。この地震モードでは、ステップc5において再度、前述のステップc3と同様に、地震計Qの出力を収集する。ステップc6では、各地震計Qによって検出された地震の程度SIが、上述の式1を満たし、すなわち第2の値SI2以上であるとき、検出された地震の程度SIが大きいブロックから小さいブロックの順に、順序付けを行う。
【0047】
ステップc7では、地震の程度が大きいブロックに属する子局Aから順に、図3に示されるポーリング動作の信号22を送信して子局Aを送信要求し、これによって子局Aは、信号25を親局3に送信する。こうして第2の値SI2以上である地震の程度を検出した地震計Qが備えられたブロックからのガバナ5の開閉状態を表す開閉状態信号を、地震の程度SIが大きいブロックから小さいブロックの順に収集する。こうして地震計Qによって検出された地震の程度SIが、第2の値SI2以上であるブロックBの監視データの収集が完了したかどうかが判断される。ブロックBの監視データ27の収集が完了していなければ、次のステップc8において信号28による子局Aからの監視データ27の収集動作が行われる。
【0048】
図9は、処理回路16による順序付けられた各ブロック毎の監視データ27を示す図である。図9に示される情報収集結果は、メモリ33にストアされ、表示手段17によって表示され、またプリンタ18によって印字されることができ、この動作は図8のステップc12において行われる。図9の実施の形態では、地震の程度が最も高いブロックから小さいブロックの順に、一例としてB4,B2,B1,B3の順に順序付けられており、これらの各ブロックに含まれるガバナ毎に、その開閉状態であるオン/オフを表す開閉状態信号が処理回路16において収集される。
【0049】
こうして第2の値SI2以上である地震の程度を検出した地震計Qが配置されたブロックのすべての監視データ27の収集が完了したことが判断されると、ステップc10では、処理を終了し、こうしてステップc11では、一連の動作を終了する。
【0050】
本発明は、都市ガスなどの流体を輸送する地震用遠隔監視装置に関連して実施されるだけでなく、その他の種類の災害の遠隔監視のために広範囲に実施することができる。本発明の実施の他の形態では、地震以外の災害の発生時に、地震計Qに対応する第1検出手段が複数の各ブロック毎に設けられる。この第1検出手段は、台風の風水害において、水位などの物理的または化学的値SIである災害の発生の程度を検出する。各ブロック内には、複数の子局が設けられ、この子局の第2検出手段は、災害の発生の程度、たとえば水位を検出し、第1レベル弁別手段によってその検出された水位が予め定めた第1の値SI1以上であるとき、安全のための動作、たとえば河川における開閉弁を開く、または閉じるなどの動作を行い、洪水の発生を未然に防ぐ。親局では、第2レベル弁別手段によって、第1検出手段からの災害の程度が、第1の値SI1未満である第2の値SI2であることがレベル弁別されると、その検出した第1検出手段が設けられているブロックに属する各子局を親局用制御手段が順次的にポーリングして送信要求信号を送信し、子局からの第2検出手段による検出データおよびそのほかの検出手段によるデータを収集する。そのほかの構成と動作は、前述の実施の形態と同様である。
【0051】
【発明の効果】
請求項1の本発明によれば、各ブロック毎に設けられた地震計によって検出された地震の程度SIが、第2の値SI2以上であるとき、その第2の値SI2以上の地震の程度を検出した地震計が設けられているブロック内の各子局を、ポーリング動作によって送信要求信号を送信し、各子局から開閉弁の開閉状態信号を子局用制御手段から送信させ、これによって開閉弁の開閉状態を親局側で知ることができる。親局用制御手段は、上述のポーリング動作によって、開閉状態信号による情報を収集するので、電話回線などの通信路を多く必要とすることはなく、短時間に開閉状態信号の収集を行うことができる。さらにポーリング動作による送信要求信号を送信しても、開閉状態信号が親局用制御手段で受信されないとき、子局が被災して故障しているおそれがあることを知ることができ、こうして子局が被災したか、健常であるかを区別して知ることができる。
【0052】
子局では、各開閉弁に対応して設けられている感震器によって検出される地震の程度SIが、第2の値SI2を超える第1の値SI1以上であるとき、閉駆動手段は、開閉弁を自動的に閉じる。したがって地震計によって検出された地震の程度が、第1の値SI1以上であるときには、親局用制御手段によって収集された開閉状態信号に基づき、第2の値SI2以上の地震の程度を検出した地震計のブロック内における開閉弁がたとえばすべて閉じているかどうかを確認し、安全のための作業を行うことが容易に可能になる。
【0053】
請求項2の本発明によれば、各ブロック毎に設けられた地震計が検出した地震の程度が大きいブロックから小さいブロックの順に、順序付けられて、各ブロック毎の開閉弁の開閉状態が、目視もしくは音響による表示手段によって、またはプリンタによって出力することができる。したがって地震による災害の程度が大きいブロックから順に、開閉弁の開閉状態を点検することができ、安全のための対策を行うことが容易に確実に可能になる。
【0054】
請求項3の本発明によれば、親局用制御手段は、地震計の出力を常時受信することができるようにするための受信用電話回線に接続されている。さらに地震計によって検出された地震の程度が、第2レベル弁別手段によって第2の値SI2以上であることが判断されると、子局のポーリングのために、切換え手段は、電話機に接続されていた複数の電話回線のうちの少なくとも一部を、親局用制御手段に切換えて接続する。したがってポーリング動作によって子局用制御手段からの開閉状態信号の情報収集時間をさらに短縮することができる。さらに、使用頻度が少ない地震発生時のポーリング動作のために、電話回線が常時、親局用制御手段に接続されることはなく、電話機のために用いることができ、通信効率が良好である。
【0055】
請求項4の本発明によれば、親局用制御手段は、地震計によって検出された地震の程度が、第3の値SI3以上であるブロックを、第3レベル弁別手段の出力によって識別する。これによって地震による災害の程度が大きいブロックにおける開閉弁の開閉状態を親局側で点検することが容易に可能になる。さらにこの第3の値SI3を、第2の値SI2と同一の値、または第2の値SI2を超える値に設定することによって、そのブロック内における開いている開閉弁を作業者が閉じる安全のための動作を、迅速に行うことができるようになる。
【0056】
請求項5の本発明によれば、子局には、前述の感震器だけでなく、管路によって輸送される流体に関するデータ、たとえば停電、1次圧力低下、2次圧力低下およびガス漏れなどを検出する検出手段が備えられ、周期的な検出手段の出力の変化の検出によって、状態変化信号を、子局用制御手段から発生する。こうして親局側で、子局の状態の変化を受信して知ることができ、地震発生時以外においても、子局の遠隔監視を行うことができ、このような親局用制御手段による子局用制御手段からの状態変化信号は、たとえば受信用電話回線を用いて受信することができる。
【0057】
請求項6の本発明によれば、複数の各ブロック毎に設けられた第1検出手段によって災害の発生の程度SIが第2の値SI2以上であるとき、各子局を親局用制御手段は順次的にポーリング動作し、安全のための動作が行われている状態を表す状態信号を受信し、その安全のための動作を、親局側で容易に知ることができる。子局では、第2検出手段によって第2の値SI2を超える第1の値SI1以上の災害の発生の程度が検出されたとき、安全のための動作が自動的に行われ、安全性が確保される。
【図面の簡単な説明】
【図1】本発明の実施の一形態の地震用遠隔監視装置1のブロック図である。
【図2】各ブロックBを簡略化して示す図である。
【図3】地震発生時に、親局3の処理回路16によるポーリング動作によって、複数の子局Aから情報を収集するために、処理回路16から電話回線Lb2および一般電話回線Lb1を経て子局Aに送信される信号22の構成を示す図である。
【図4】子局Aの処理回路7が、送信要求信号24に応答して親局3に送信する信号25の構成を示す図である。
【図5】子局Aの処理回路7の送信要求信号24を受信したときの動作を説明するためのフローチャートである。
【図6】子局Aの処理回路7によるさらに他の動作を説明するためのフローチャートである。
【図7】親局3と電話回線網2との接続構成を示す簡略化した回路図である。
【図8】親局3の処理回路16の動作を説明するためのフローチャートである。
【図9】処理回路16による順序付けられた各ブロック毎の監視データ27を示す図である。
【符号の説明】
1 地震用遠隔監視装置
2 電話回線網
3 親局
4 管路
5 ガバナ
7 処理回路
8 感震器
9 遮断検出手段
10 停電検出手段1
11 1次圧力低下検出手段
12 2次圧力低下検出手段
13 ガス漏れ検出手段
14 メモリ
16 処理回路
19 切換え手段
A 子局
B ブロック
Q 地震計
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an earthquake remote monitoring device that monitors the state of an on-off valve such as a governor that is closed when an earthquake occurs, and further relates to a disaster remote monitoring device for other disasters.
[0002]
[Prior art]
Conventionally, pipelines that transport city gas and other fluids have been equipped with multiple governors with open / close functions, and each governor has been provided with a slave station that has a seismic device. When is detected, safety is achieved by shutting off the governor corresponding to the seismoscope that detected the earthquake. In order to collect information from the slave station indicating that each governor is closed at the master station, when the governor is closed, an automatic call is made via the telephone line, and the information is transmitted from the slave station to the master station. It has been proposed.
[0003]
In such a configuration, when a large number of governors are closed at the time of an earthquake, a signal representing the state in which each governor is closed is automatically called from the slave station and transmitted to the master station. Therefore, in order to prevent the telephone line of the master station from being busy, the master station requires a large number of telephone lines. This is particularly true not only for earthquake information but also for the occurrence of alarms such as power outages, primary pressure drops, secondary pressure drops and gas leaks related to each governor. When the station is automatically called and the alarm information is transmitted to the master station, in the event of an earthquake, not only the governor is closed, but also each of the above-mentioned alarm states occurs. Automatic calls are made. Therefore, in the event of an earthquake, there will be a flood of earthquake information and alarm information transmission to the master station, and in order to prevent the master station's telephone line from being busy, it will be necessary to provide more telephone lines in the master station. .
[0004]
Another problem in the proposed configuration described above is whether the slave station is damaged due to a disaster or is healthy when the slave station provided for each governor does not transmit information to the master station. It cannot be known at the master station.
[0005]
[Problems to be solved by the invention]
The object of the present invention is to allow the master station to collect information representing the open / close states of the open / close valves such as governors from a large number of slave stations in a short time without increasing the number of communication channels such as telephone lines. Another object of the present invention is to provide a seismic remote monitoring device that makes it possible to easily know whether a slave station is damaged by a disaster or is healthy.
[0006]
Another object of the present invention is to collect information in a short time without requiring a large number of communication paths from a slave station to a master station in the event of a disaster such as an earthquake and other storms and floods. It is another object of the present invention to provide a disaster remote monitoring apparatus that can make it possible to easily know whether a slave station is damaged or healthy.
[0007]
[Means for Solving the Problems]
In the present invention, a plurality of on-off valves are interposed in a plurality of mutually connected pipelines for each of a plurality of blocks,
Each block has a seismometer,
A slave station is provided for each on-off valve,
The slave station
A seismic instrument,
A first level discriminating means for discriminating the level SI of the earthquake detected by the seismic sensor with a predetermined first value SI1;
In response to the output of the first level discriminating means, when the detected magnitude of the earthquake is equal to or greater than the first value SI1, closing drive means for closing the on-off valve;
An open / close state signal indicating an open / close state of the open / close valve, and a slave station control means for transmitting when a transmission request signal is received;
A master station connected to each seismometer and the slave station control means is provided.
A second level discriminating means for discriminating the level of the earthquake detected by the seismometer with a second value SI2 which is less than the first value SI1 in response to the output of each seismometer;
An open / close state signal for each slave station is received, responds to the output of the second level discriminating means, and when the detected earthquake level is equal to or greater than the second value SI2, the detected seismometer is provided. An earthquake remote monitoring device comprising: a master station control means for sequentially polling each slave station belonging to a block and transmitting a transmission request signal.
[0008]
According to the present invention, the pipeline network is divided into a plurality of blocks, and a plurality of on-off valves, for example, governors having a shut-off function are interposed in the plurality of pipelines in each block. Is provided. A seismometer is provided for each block. The seismic degree SI detected by the seismometer is discriminated by the second value SI2 by the second level discriminating means provided in the master station. The degree of earthquake SI may represent, for example, the degree of damage caused by an earthquake in a pipeline buried in the ground using a numerical value in units of cain.
[0009]
When the magnitude SI of the earthquake detected by the seismometer is equal to or greater than the second value SI2 (SI2 ≦ SI), the seismometer that detects the magnitude of the earthquake equal to or greater than the second value SI2 belongs to the block Each slave station is sequentially polled by the master station control means, and a transmission request signal is transmitted to each slave station.
[0010]
The slave station control means provided in the slave station receives a transmission request signal transmitted by polling of the master station control means, transmits an open / close state signal indicating the open / close state of the open / close valve, and transmits to the master station control means. give. As a result, the master station can know the open / close state of the on / off valves in all the slave stations in the block in which the earthquake of the second value SI2 or more is detected by the seismometer. A plurality of slave stations sequentially send open / closed status signals by the polling operation by the control means for the master station, so that the number of communication paths such as a telephone line can be reduced and the possibility of becoming busy on the telephone line is eliminated. It is possible to easily know the open / closed states of the plurality of on-off valves in a short time in the master station.
[0011]
The slave station control means may be configured to transmit only the open / close state signal and not transmit other alarm information in response to the transmission request signal. By doing so, it is possible to shorten the time for the master station control means to communicate with each slave station control means, and it is therefore possible to collect a plurality of open / closed state signals in a short time.
[0012]
Furthermore, since the open / close state signal from the slave station control means is received by polling the master station control means, when the open / close state signal is received, it can be known that the slave station is healthy, When the open / close state signal cannot be received, it is possible to know that the slave station may be damaged due to a disaster or the like. Further, the master station receives such an open / close state signal, and transmits a close drive command signal to the slave station so that the open / close valve indicating that the open / close state signal is open is closed by the close drive means. You may control.
[0013]
Further, according to the present invention, the slave station is provided with a seismic device, and the magnitude SI of the earthquake detected by the seismic device is determined by the first level discrimination means provided in the slave station. When this is the case (SI ≧ SI1), the closing drive means drives the on-off valve to close. The first value SI1 described above may be, for example, 60 kanes, and the second value SI2 may be less than the first value SI1 and may be, for example, 30 kanes (SI2 <SI1).
[0014]
The slave station control means closes the on-off valve to ensure safety when the first level discriminating means discriminates that the degree of earthquake detected by the seismic sensor is equal to or greater than the first value SI1. In one embodiment of the present invention, the slave station control means transmits an open / close state signal to the master station at this time. Therefore, even if the magnitude of the earthquake detected by the seismometer is less than the second value SI2, the control means for the master station has the magnitude of the earthquake detected by the seismometer being equal to or greater than the first value SI1. Then, an open / close state signal of the on / off valve of only the slave station provided with the seismic device that detects the degree of the earthquake of the first value SI1 or more is transmitted to the master station control means. At this time, the seismic device may have derived an output, for example, due to a collision of a ball or a collision of a spear that is being cleaned, or a local earthquake may occur in one block.
[0015]
As described above, the master station is equipped with a seismometer that performs a polling operation when the degree of earthquake detected by the seismometer is equal to or greater than the second value SI2, and detects the magnitude of the earthquake greater than or equal to the second value SI2. The open / close valve open / close state signal is received from all the slave stations belonging to the block, and the open / close state of the open / close valve can be known from the master station. When the degree of earthquake detected by the seismometer is equal to or greater than the first value SI1, the open / close state of the open / close valve can be known by receiving the open / close state signal from the slave station in the block by polling. .
[0016]
In the present invention, the control means for the master station
When the magnitude of the earthquake detected by each seismometer is equal to or greater than the second value SI2, ordering is performed in order from the block with the largest magnitude of the detected earthquake to the smallest block,
The on / off state of the on-off valve is output in the order of the ordered blocks.
[0017]
According to the present invention, if the degree of earthquake detected by the seismometer for each block over a plurality of blocks is greater than or equal to the second value SI2, the control unit for the master station starts from the block having the greater magnitude of earthquake. The blocks are ordered in the order of the smaller blocks, and the open / close state of the on-off valves belonging to each block is output in the order of the ordered blocks, for example, visually displayed by visual display means, or printed on recording paper by a printer. In addition, sound display is performed by a configuration including a speech synthesis circuit and a speaker. As a result, it is possible to easily check the open / close state of the on-off valve in the order of the blocks that are estimated to be damaged by the earthquake.
[0018]
In the present invention, the slave station control means is individually connected to the telephone line,
The master station control means is connected to one or more receiving telephone lines that receive the output of the seismometer,
On the master station side,
A phone,
A switching means for selectively switching a plurality of telephone lines between the control means for the master station and the telephone;
When the detected magnitude of the earthquake is equal to or greater than the second value SI2, the switching means switches at least a part of the telephone line connected to the telephone to the master station control means and connects it. .
[0019]
According to the present invention, the slave station control means is individually connected to a telephone line, for example, a single general telephone line, and is opened and closed in response to a transmission request signal by the polling operation of the master station control means. Can be transmitted from the slave station control means.
[0020]
The master station control means is connected to one or a plurality of reception telephone lines, for example, a disaster priority telephone line, and can receive an output from a seismometer provided for each group.
[0021]
To detect the open / close state of the on / off valves of the slave stations in the group to which the seismometer that has detected that the degree of earthquake is greater than or equal to the second value SI2 by polling operation on the master station side in a shorter time Therefore, at least a part of the plurality of telephone lines connected to the telephone by the switching means is switched to and connected to the master station control means by the switching means when the above-mentioned earthquake occurs except when the earthquake occurs. Therefore, the master station control means can perform a plurality of polling operations in parallel using the telephone lines switched from these telephones. Therefore, it is possible to collect open / close state signals from many slave stations in a shorter time. One or a plurality of general telephone lines for polling operation may be always connected to the master station control means.
[0022]
In the present invention, the master station
In response to the output of each seismometer, there is further provided a third level discriminating means for discriminating the level of the earthquake detected by the seismometer with a predetermined third value SI3 exceeding the second value SI2.
The master station control means is responsive to the output of the third level discriminating means, and identifies a block whose degree of detected earthquake is greater than or equal to the third value SI3.
[0023]
According to the present invention, when the degree SI of the earthquake detected by the seismometer is equal to or higher than the third value SI3, when the level is discriminated by the third level discriminating means, the earthquake having the third value SI3 or higher is detected. The block to which the seismometer is detected is identified and displayed visually or acoustically, or recorded on a recording sheet by a printer. The third value SI3 is a predetermined value that exceeds the second value SI2 (SI2 <SI3), and may be equal to the first value SI1, for example. Therefore, when the magnitude SI of the earthquake detected by the seismometer for each block is equal to or greater than the third value SI3, for example, equal to or greater than 60 kines, the open / close for each on-off valve in the block obtained by the polling operation It is easy to know whether all the open / close valves are closed by the status signal. If there is an open / close valve that is open in one block, the operator knows that an operation to close the open / close valve should be performed. In this way, if the degree of earthquake detected by the seismometer is greater than or equal to the third value SI3 for each block, all the on-off valves in that block can be promptly shut off. Therefore, if the open / close valve remains open, the operator performs an operation of closing the open / close valve to ensure safety.
[0024]
In the present invention, the slave station has detection means for detecting data relating to the fluid transported to the pipeline,
The slave station control means periodically receives the output of the detection means every predetermined time, and when at least one of the outputs changes, transmits a state change signal of the seismoscope and the detection means. To the control means for the master station,
The master station control means receives and outputs the state change signal.
[0025]
According to the present invention, the slave station is provided with detection means, and this detection means detects data relating to a fluid such as city gas transported by a pipeline, and has a power failure and opening / closing function of the slave station, for example. Data that is alarm information such as a primary pressure drop of the governor, which is a pressure control valve, a secondary pressure drop of the governor, and a gas leak is detected. The slave station control means transmits a state change signal to the master station control means when the seismic device detects an earthquake and when the detection means detects the aforementioned data, and the master station control signal The state change signal is received and output by a display means or a printer. In this way, not only the earthquake but also the alarm state, which is data detected by other detection means, can be known at all times by the master station control means.
[0026]
When the seismic device and the detecting means transmit the state change signal, the slave station control means receives the outputs of the seismic device and the detecting means periodically at a predetermined time, for example, every short time by a microcomputer, The current output of the seismoscope and detection means is compared with the previous output, and when at least one of these outputs changes, a state change signal is derived. In this way, the slave station control means transmits a state change signal only when an alarm condition occurs, such as when an earthquake is detected by the seismic sensor and when the above-mentioned data is detected by the detection means. Therefore, the transmission is prevented from being repeated a plurality of times, and the occupation state of the communication path such as a telephone line is made as short as possible to improve the transmission efficiency.
[0027]
Further, the present invention is provided with first detection means for detecting the degree SI of the occurrence of disaster for each of a plurality of blocks,
A plurality of slave stations are provided in each block, and each slave station is
A second detection means for detecting the degree of occurrence of the disaster;
First level discriminating means for discriminating the level of disaster detected by the second detecting means with a predetermined first value SI1;
Means for responding to the output of the first level discriminating means and performing an operation for safety when the degree of disaster detected is not less than the first value SI1;
A state signal indicating a state in which the operation for safety is performed, and a control unit for a slave station that transmits when a transmission request signal is received;
A master station connected to the first detection means and the slave station control means is provided.
Second level discriminating means for responding to the output of each first detecting means and discriminating the level of disaster detected by the first detecting means by a second value SI2 which is less than the first value SI1;
When the status signal for each slave station is received and in response to the output of the second level discriminating means, and the degree of disaster detected is greater than or equal to the second value SI2, the detected first detecting means is provided. The remote monitoring device for disaster is characterized by having a master station control means for sequentially polling each slave station belonging to a certain block and transmitting a transmission request signal.
[0028]
According to the present invention, in the event of a disaster such as a typhoon caused by a typhoon, the degree of occurrence of a disaster that is a physical or chemical value SI such as a water level due to wind and rain or increased river water is determined for each block in a plurality of areas. Detected by the detecting means, the slave station is provided with the second detecting means, and the degree of occurrence of the disaster is detected similarly to the first detecting means, and the degree of occurrence of the disaster detected by the second detecting means is determined. If the first level discriminating means is equal to or greater than the first value SI1, a safety operation is performed, for example, an open / close valve in a river is opened. The status signal indicating the state in which the operation is performed is transmitted from the slave station control means to the master station control means by receiving a transmission request signal from the polling operation of the master station control means.
[0029]
The master station control means is provided with the first detection means when the degree of disaster detected by each first detection means is equal to or greater than the first value SI1 which is less than the second value SI2. A slave station belonging to a certain block is sequentially polled, and a status signal indicating that a safety operation is being performed is received from each slave station. In this way, it is possible to check at the master station whether or not the operation for safety of the slave station for each block is performed. This ensures safety in the event of a disaster.
[0030]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a block diagram of a seismic remote monitoring apparatus 1 according to an embodiment of the present invention. A seismometer Q and a slave station A are provided for each of the plurality of blocks B. The seismometer Q and the slave station A are connected to the telephone line network 2 via the public telephone line L. The telephone line network 2 is connected to the master station 3 via a receiving telephone line La and a general telephone line Lb1. When the earthquake occurs, information from the seismometer Q and each slave station A is collected in the master station 3. Reference symbol Q generally indicates individual reference symbols Q1, Q2,..., And reference symbol A generally indicates slave stations A11, A12,... A1i; Reference symbols B1, B2,... Are generally indicated by reference symbol B. Further, reference symbols L1, L2,..., L11, L12,. In another embodiment of the present invention, the seismometer Q may be connected to the master station 3 via a private radio network according to its importance and reliability.
[0031]
FIG. 2 is a diagram showing each block B in a simplified manner. In each block B, a plurality of governors 5 having a blocking function are interposed in a plurality of pipelines 4 connected to each other. The governor 5 keeps the secondary pressure constant at a predetermined value and supplies it to a consumer place such as each house or factory. The governor 5 can supply and shut off gas, and also serves as an on-off valve. Such a governor 5 may be configured by integrally combining a pressure control valve and an on-off valve, or may be configured separately and combined. In each block B, a seismometer Q is arranged to detect the degree of earthquake for each block B. The slave station A is provided for each governor 5.
[0032]
Referring to FIG. 1 again, the slave station A is provided with a processing circuit 7 realized by a microcomputer or the like. The processing circuit 7 is provided with an output representing the degree of earthquake from the seismic device 8. Further, a shutoff detection means 9 such as a micro switch for detecting that the governor 5 is shut off, a power failure detection means 10 indicating that the commercial AC power supply has failed, and a primary pressure of the governor 5 that is determined in advance. Primary pressure drop detecting means 11 for detecting that the pressure is less than the second pressure value, secondary pressure drop detecting means 12 for detecting that the secondary pressure of the governor 5 is less than a predetermined second pressure value, and the governor 5. Gas leakage detection means 13 for detecting gas leakage from the vicinity is provided. The outputs of these detection means 9 to 13 are given to the processing circuit 7 as alarm information. When a power failure occurs, the processing circuit 7 is driven by a battery or the like. The processing circuit 7 controls the cutoff operation of the governor 5. Further, the processing circuit 7 is provided with a memory 14, in which outputs of the seismic device 8 and the detection means 9 to 13 are stored, and signals from the master station 3 are stored. The processing circuit 7 is connected to the telephone line L11. Seismometer Q1 is connected to seismometer L1. The other blocks B2,... Have the same configuration as the block B1.
[0033]
The master station 3 is provided with a processing circuit 16 realized by a microcomputer or the like. The processing circuit 16 may be connected to a visual display means 17 such as a liquid crystal or a cathode ray tube and a printer 18 for printing on a recording paper, and may further include an acoustic display means including a voice synthesis circuit and a speaker. The processing circuit 16 is connected to the reception telephone line La. The processing circuit 16 is also connected to a plurality of general telephone lines Lb1 via one or a plurality of telephone lines Lb2 and switching means 19. Further, the telephone line Lb3 is connected to a plurality of extension telephones 21.
[0034]
In a state where no earthquake has occurred, the number of telephone lines Lb2 connected to the processing circuit 16 is, for example, zero or a relatively small number set in advance. At this time, many telephone lines Lb3 are connected to the extension telephone 21. Thus, the general telephone line Lb1 is used.
[0035]
When an earthquake occurs, the number of transmission telephone lines Lb2 connected to the processing circuit 16 by the switching means 19 is increased. The number of telephone lines Lb3 connected to the telephone 21 is reduced. In this way, the switching operation of the general telephone line Lb1 by the switching means 19 is performed.
[0036]
FIG. 3 shows a transmission telephone line Lb2 and a general telephone line from the processing circuit 16 of the master station 3 in order to collect information from the plurality of slave stations A by a polling operation by the processing circuit 16 of the master station 3 when an earthquake occurs. It is a figure which shows the structure of the signal 22 transmitted to the sub_station | mobile_unit A via Lb1. The signal 22 transmitted from the processing circuit 16 of the master station 3 includes a slave station addressing signal 23 for addressing the slave station A and the earthquake detected by the seismoscope 8 from the slave station A that is addressed. And a transmission request signal 24 for requesting that a signal indicating the degree should be transmitted to the master station 3.
[0037]
When the slave station address designation signal 23 of the signal 22 transmitted from the processor circuit 16 of the master station 3 coincides with a predetermined slave station address for identifying the slave station A, the processor circuit 7 of the slave station A Along with the slave station address transmission signal, the outputs of the seismoscope 8 and the detection means 9 to 13 are transmitted as monitoring data to the master station 3 via the telephone line L11.
[0038]
FIG. 4 is a diagram showing a configuration of a signal 25 that the processing circuit 7 of the slave station A transmits to the master station 3 in response to the transmission request signal 24. The slave station address designation signal 26 is a slave station address that identifies the slave station A that transmits the signal 25. Subsequent to the slave station address designation signal 26, monitoring data 27 is transmitted. Although the monitoring data 27 may include the output of the seismic device 8 and each of the detection means 9 to 13 as described above, in the other embodiment of the present invention, only the output of the seismic device 8 is used. The time for collecting information from each of the plurality of slave stations A by the station 3 may be shortened.
[0039]
FIG. 5 is a flowchart for explaining the operation when the transmission request signal 24 of the processing circuit 7 of the slave station A is received. Moving from step a1 to step a2, when the processing circuit 7 receives the transmission request signal 24 by the polling operation by the processing circuit 16 of the master station 3, in the next step a3, the seismoscope 8 stored in the memory 14 and The outputs of the detection means 9 to 13 are read out, and the address designation signal 26 of the own station is further added as the monitoring data 27 to form the signal 25 shown in FIG. The data is transmitted to the line L11 and given to the master station 3.
[0040]
FIG. 6 is a flowchart for explaining still another operation of the processing circuit 7 of the slave station A. When an earthquake occurs or when an earthquake does not occur, the process proceeds from step b1 to step b2, and the outputs of the seismic device 8 and the detection means 9 to 13 are sequentially transferred to the memory 14 at a predetermined relatively short period. To store. In step b3, it is determined whether the data stored in the memory 14 this time and the data stored last time are different for each data. When the current data and the previous data are different, the signal 25 shown in FIG. 4 is transmitted from the slave station A to the master station 3.
[0041]
In the transmission operation 28 of FIG. 6, the slave station A transmits the signal 25 from the telephone line L. At this time, if the telephone line Lb2 connected to the master station 3 is not busy, the signal 25 is transmitted to the processing circuit 16 of the master station 3 in step b5. The signal 25 may include only data in which the current data differs from the previous data, but includes all the monitoring data 27, that is, the outputs of the seismic device 8 and the detection means 9-13. May be.
[0042]
When the signal 25 is transmitted from the slave station A in step b4, if the telephone line Lb2 of the master station 3 is busy, the process proceeds to the next step b6, waits for a predetermined time, for example, 3 minutes, and then retransmits. The redialing operation is again performed by the processing circuit 7 and the number N of redialing operations is counted. In step b7, it is determined whether the counted number N of redials exceeds a predetermined number N0 (N> N0). If not, the process proceeds to step b4. When the number of redials N exceeds the predetermined number N0, the process returns to step b2. Thus, when the outputs of the seismic sensor 8 and the detection means 9 to 13 are different from the previous output, the signal 25 is transmitted from the slave station A to the master station 3, and an automatic redial operation is performed.
[0043]
FIG. 7 is a simplified circuit diagram showing a connection configuration between the master station 3 and the telephone line network 2. In the office 29, the master station 3 is arranged. A processing circuit 16 of the master station 3 is connected to the head office 31 via an extension telephone network 32. In the office 29, the reception telephone line La is directly connected to the processing circuit 16 of the master station 3. In another embodiment of the present invention, a private wireless network may be used instead of the reception telephone line La. The switching means 19a of the office 29 is connected to the telephone line network 2 via the telephone line Lb11. The telephone line Lb11 is, for example, a disaster priority telephone line 40 and a general telephone line 112 line. The processing circuit 16 of the master station 3 is connected to 37 of the 40 priority telephone lines for disaster only when any seismometer Q detects the degree of earthquake of the second value SI2 or more. Furthermore, 20 lines out of the 112 general telephone lines are switched and connected, and the 37 telephone lines and the 20 general telephone lines are indicated by a reference symbol Lb21. A telephone line Lb31 is connected to the extension telephone 21. This telephone line Lb31 is the remaining telephone line that is not connected to the processing circuit 16. Assuming that the reference number of each telephone line also represents the number of lines, Lb11 = Lb21 + Lb31. When an earthquake does not occur, the telephone line Lb21 is used for the extension telephone 21a.
[0044]
The switching means 19b in the head office 31 is connected to the telephone line network 2 as indicated by the reference symbol Lb12, the disaster priority telephone line 26 and the general telephone line 50. At the time of the earthquake, 20 of the 26 priority telephone lines are connected to the processing circuit 16 via the extension telephone network 32 as indicated by reference numeral Lb22. Thus, the telephone line Lb2 in FIG. 1 is configured by the telephone lines Lb21 and Lb22 when an earthquake occurs. The extension telephone 21b in the head office 31 is connected by the remaining telephone line Lb32 (Lb12 = Lb32 + Lb22). When an earthquake does not occur, the switching means 19b enables the telephone line Lb12 to be connected to the extension telephone 21b. The extension telephone network 32 can perform bucket communication. The switching means 19 a and 19 b are indicated by reference numeral 19 in FIG. 1, and this switching means 19 is controlled by the processing circuit 16.
[0045]
FIG. 8 is a flowchart for explaining the operation of the processing circuit 16 of the master station 3. From step c1 to step c2, the occurrence of an earthquake with a seismometer of 2 to 5 or more, for example, from the seismometer Q provided for each block B and / or the seismic device 8 for each slave station A occurred. In the next step c 3, the outputs of all the seismometers Q are collected in the processing circuit 16 and stored in the memory 33. In step c4, it is determined whether or not the degree of earthquake SI detected by the plurality of seismometers Q is a predetermined second value SI2, for example, 30 or more.
[0046]
SI ≧ SI2 (1)
In step c4, when the above-described equation 1 is established, the earthquake mode operations in steps c5 to c12 are performed. In this earthquake mode, the output of the seismometer Q is collected again in step c5, as in step c3 described above. In step c6, when the earthquake degree SI detected by each seismometer Q satisfies the above-described equation 1, that is, the second value SI2 or more, the detected earthquake degree SI is changed from a larger block to a smaller block. In order, order.
[0047]
In step c7, in order from the slave station A belonging to the block having a large earthquake level, the polling operation signal 22 shown in FIG. 3 is transmitted in order to request the slave station A to transmit. Transmit to the master station 3. Thus, the open / closed state signal indicating the open / closed state of the governor 5 from the block provided with the seismometer Q that detects the degree of earthquake that is equal to or greater than the second value SI2 is collected in order from the block having the largest earthquake degree SI to the smallest block. To do. In this way, it is determined whether or not the collection of the monitoring data of the block B in which the magnitude SI of the earthquake detected by the seismometer Q is equal to or greater than the second value SI2 is determined. If the collection of the monitoring data 27 of the block B is not completed, the collecting operation of the monitoring data 27 from the slave station A by the signal 28 is performed in the next step c8.
[0048]
FIG. 9 is a diagram showing monitoring data 27 for each block ordered by the processing circuit 16. The information collection result shown in FIG. 9 is stored in the memory 33, displayed by the display means 17, and can be printed by the printer 18. This operation is performed in step c12 of FIG. In the embodiment of FIG. 9, the blocks are ordered in the order of B4, B2, B1, and B3, for example, from the block with the highest level of earthquake to the block with the smallest magnitude. An open / close state signal indicating the on / off state is collected in the processing circuit 16.
[0049]
When it is determined that the collection of all the monitoring data 27 of the block in which the seismometer Q that has detected the degree of earthquake that is equal to or greater than the second value SI2 is completed, the process ends in step c10. Thus, in step c11, a series of operations is completed.
[0050]
The present invention is not only implemented in connection with seismic remote monitoring devices that transport fluids such as city gas, but can also be implemented extensively for remote monitoring of other types of disasters. In another embodiment of the present invention, a first detection means corresponding to the seismometer Q is provided for each of a plurality of blocks when a disaster other than an earthquake occurs. The first detection means detects the degree of occurrence of a disaster having a physical or chemical value SI such as a water level in a typhoon damage caused by a typhoon. A plurality of slave stations are provided in each block, and the second detection means of this slave station detects the degree of disaster occurrence, for example, the water level, and the detected water level is predetermined by the first level discrimination means. When the value is equal to or greater than the first value SI1, an operation for safety, for example, an operation such as opening or closing an on-off valve in a river is performed to prevent the occurrence of a flood. In the master station, when the second level discriminating means level discriminates that the degree of disaster from the first detecting means is the second value SI2 which is less than the first value SI1, the detected first level is detected. The master station control means sequentially polls each slave station belonging to the block in which the detection means is provided, transmits a transmission request signal, and the detection data from the slave station by the second detection means and other detection means Collect data. Other configurations and operations are the same as those of the above-described embodiment.
[0051]
【The invention's effect】
According to the present invention of claim 1, when the magnitude SI of the earthquake detected by the seismometer provided for each block is equal to or greater than the second value SI2, the magnitude of the earthquake equal to or greater than the second value SI2. Each slave station in the block in which the seismometer is detected transmits a transmission request signal by a polling operation, and each slave station transmits an open / close state signal of the on-off valve from the slave station control means, thereby The master station can know the open / close state of the on / off valve. Since the master station control means collects information based on the open / close state signal by the above-described polling operation, it does not require a large communication path such as a telephone line and can collect the open / close state signal in a short time. it can. Furthermore, even if the transmission request signal is transmitted by the polling operation, when the open / close state signal is not received by the control means for the master station, it is possible to know that the slave station may be damaged due to the disaster, and thus the slave station. You can tell if it is damaged or healthy.
[0052]
In the slave station, when the magnitude SI of the earthquake detected by the seismoscope provided corresponding to each on-off valve is equal to or greater than the first value SI1 exceeding the second value SI2, the closing drive means The on-off valve is automatically closed. Therefore, when the magnitude of the earthquake detected by the seismometer is equal to or greater than the first value SI1, the magnitude of the earthquake equal to or greater than the second value SI2 is detected based on the open / closed state signal collected by the master station control means. For example, it is possible to easily check whether all the on-off valves in the seismometer block are closed and to perform a safety work.
[0053]
According to the present invention of claim 2, the seismometer provided for each block is ordered in the order from the block with the largest earthquake to the block with the smaller magnitude, and the open / close state of the on-off valve for each block is visually checked. Alternatively, it can be output by acoustic display means or by a printer. Accordingly, it is possible to check the open / close state of the on-off valve in order from the block having the greatest degree of disaster due to the earthquake, and it is possible to easily and reliably take safety measures.
[0054]
According to the third aspect of the present invention, the master station control means is connected to a reception telephone line so that the output of the seismometer can be received at all times. When the second level discrimination means determines that the degree of earthquake detected by the seismometer is equal to or greater than the second value SI2, the switching means is connected to the telephone for polling the slave station. At least a part of the plurality of telephone lines is switched to and connected to the master station control means. Therefore, the polling operation can further shorten the information collection time of the open / close state signal from the slave station control means. Furthermore, the telephone line is not always connected to the control unit for the master station because of the polling operation at the occurrence of an earthquake that is not frequently used, and can be used for the telephone, and the communication efficiency is good.
[0055]
According to the fourth aspect of the present invention, the master station control means discriminates a block whose degree of earthquake detected by the seismometer is equal to or greater than the third value SI3 by the output of the third level discrimination means. As a result, it is possible to easily check the open / close state of the on-off valve in the block where the degree of disaster due to the earthquake is large on the master station side. Further, by setting the third value SI3 to the same value as the second value SI2 or a value exceeding the second value SI2, it is possible for the operator to close the open on-off valve in the block. Therefore, it becomes possible to quickly perform the operation.
[0056]
According to the present invention of claim 5, the slave station includes not only the above-mentioned seismic device but also data relating to the fluid transported by the pipeline, such as power failure, primary pressure drop, secondary pressure drop and gas leakage And detecting a change in the output of the periodic detection means to generate a state change signal from the slave station control means. In this way, the master station can receive and know changes in the status of the slave station, and can remotely monitor the slave station even when an earthquake does not occur. The state change signal from the control means can be received using, for example, a reception telephone line.
[0057]
According to the present invention of claim 6, when the disaster occurrence degree SI is not less than the second value SI2 by the first detection means provided for each of the plurality of blocks, each slave station is controlled by the master station control means. Performs a polling operation sequentially, receives a status signal indicating a state in which a safety operation is being performed, and the master station side can easily know the safety operation. In the slave station, the safety operation is automatically performed when the degree of occurrence of the disaster exceeding the second value SI2 is detected by the second detection means and the safety operation is automatically performed. Is done.
[Brief description of the drawings]
FIG. 1 is a block diagram of a seismic remote monitoring apparatus 1 according to an embodiment of the present invention.
FIG. 2 is a diagram showing each block B in a simplified manner.
FIG. 3 shows that when a earthquake occurs, in order to collect information from a plurality of slave stations A by a polling operation by the processing circuit 16 of the master station 3, the slave station A passes from the processing circuit 16 via the telephone line Lb2 and the general telephone line Lb1. It is a figure which shows the structure of the signal 22 transmitted to.
4 is a diagram showing a configuration of a signal 25 that is transmitted from the processing circuit 7 of the slave station A to the master station 3 in response to the transmission request signal 24. FIG.
FIG. 5 is a flowchart for explaining the operation when the transmission request signal 24 of the processing circuit 7 of the slave station A is received.
6 is a flowchart for explaining still another operation by the processing circuit 7 of the slave station A. FIG.
7 is a simplified circuit diagram showing a connection configuration between a master station 3 and a telephone line network 2. FIG.
FIG. 8 is a flowchart for explaining the operation of the processing circuit 16 of the master station 3;
FIG. 9 is a diagram showing monitoring data 27 for each block ordered by the processing circuit 16;
[Explanation of symbols]
1 Remote monitoring device for earthquake
2 Telephone network
3 master station
4 pipelines
5 Governor
7 Processing circuit
8 Seismic instruments
9 Blocking detection means
10 Power failure detection means 1
11 Primary pressure drop detection means
12 Secondary pressure drop detection means
13 Gas leak detection means
14 memory
16 Processing circuit
19 Switching means
A child station
B block
Q Seismometer

Claims (6)

複数の各ブロック毎に、相互に接続された複数の管路に複数の開閉弁が介在され、
各ブロック毎に、地震計がそれぞれ設けられ、
各開閉弁毎に、子局が設けられ、
子局は、
感震器と、
感震器によって検出される地震の程度SIを、予め定める第1の値SI1でレベル弁別する第1レベル弁別手段と、
第1レベル弁別手段の出力に応答し、検出された地震の程度が第1の値SI1以上であるとき、開閉弁を閉じる閉駆動手段と、
開閉弁の開閉状態を表す開閉状態信号を、送信要求信号を受信したとき、送信する子局用制御手段とを有し、
各地震計および子局用制御手段に接続される親局が設けられ、この親局は、
各地震計の出力に応答し、地震計によって検出された地震の程度を、第1の値SI1未満である第2の値SI2でレベル弁別する第2レベル弁別手段と、
各子局毎の開閉状態信号を受信し、第2レベル弁別手段の出力に応答し、検出された地震の程度が第2の値SI2以上であるとき、その検出した地震計が設けられているブロックに属する各子局を、順次的にポーリングして送信要求信号を送信する親局用制御手段とを有することを特徴とする地震用遠隔監視装置。
For each of a plurality of blocks, a plurality of on-off valves are interposed in a plurality of mutually connected pipelines,
Each block has a seismometer,
A slave station is provided for each on-off valve,
The slave station
A seismic instrument,
A first level discriminating means for discriminating the level SI of the earthquake detected by the seismic sensor with a predetermined first value SI1;
In response to the output of the first level discriminating means, when the detected magnitude of the earthquake is equal to or greater than the first value SI1, closing drive means for closing the on-off valve;
An open / close state signal indicating an open / close state of the open / close valve, and a slave station control means for transmitting when a transmission request signal is received;
A master station connected to each seismometer and the slave station control means is provided.
A second level discriminating means for discriminating the level of the earthquake detected by the seismometer with a second value SI2 which is less than the first value SI1 in response to the output of each seismometer;
An open / close state signal for each slave station is received, and in response to the output of the second level discriminating means, the detected seismometer is provided when the degree of detected earthquake is greater than or equal to the second value SI2. An earthquake remote monitoring apparatus comprising: a master station control means for sequentially polling each slave station belonging to a block and transmitting a transmission request signal.
親局用制御手段は、
各地震計によって検出された地震の程度が、第2の値SI2以上であるとき、検出された地震の程度が大きいブロックから小さいブロックの順に、順序付けを行い、
この順序付けられたブロックの順に、開閉弁の開閉状態を出力することを特徴とする請求項1記載の地震用遠隔監視装置。
The control means for the master station is
When the magnitude of the earthquake detected by each seismometer is equal to or greater than the second value SI2, ordering is performed in order from the block with the largest magnitude of the detected earthquake to the smallest block,
2. The earthquake remote monitoring device according to claim 1, wherein the open / close state of the on-off valve is output in the order of the ordered blocks.
子局用制御手段は、個別的に電話回線に接続され、
親局用制御手段は、地震計の出力を受信する1または複数の受信用電話回線に接続され、
親局側にはまた、
電話機と、
複数の電話回線を、親局用制御手段と電話機とに選択的に切換える切換え手段とが設けられ、
検出された地震の程度が第2の値SI2以上であるとき、切換え手段は、電話機に接続されている電話回線の少なくとも一部を、親局用制御手段に切換えて接続することを特徴とする請求項1または2記載の地震用遠隔監視装置。
The slave station control means is individually connected to the telephone line,
The master station control means is connected to one or more receiving telephone lines that receive the output of the seismometer,
On the master station side,
A phone,
A switching means for selectively switching a plurality of telephone lines between the control means for the master station and the telephone;
When the detected magnitude of the earthquake is equal to or greater than the second value SI2, the switching means switches at least a part of the telephone line connected to the telephone to the master station control means and connects it. The remote monitoring apparatus for earthquakes according to claim 1 or 2.
親局は、
各地震計の出力に応答し、地震計によって検出された地震の程度を、第2の値SI2を超える予め定める第3の値SI3でレベル弁別する第3レベル弁別手段をさらに有し、
親局用制御手段は、第3レベル弁別手段の出力に応答し、検出された地震の程度が第3の値SI3以上であるブロックを、識別することを特徴とする請求項1〜3のうちの1つに記載の地震用遠隔監視装置。
The master station
In response to the output of each seismometer, there is further provided a third level discriminating means for discriminating the level of the earthquake detected by the seismometer with a predetermined third value SI3 exceeding the second value SI2.
The control means for master station is responsive to the output of the third level discriminating means, and identifies the block whose degree of detected earthquake is greater than or equal to the third value SI3. The remote monitoring device for earthquakes according to one of the above.
子局は、管路に輸送される流体に関するデータを検出する検出手段を有し、
子局用制御手段は、検出手段の出力を、予め定める時間毎に周期的に受信し、
各出力のうちの少なくとも1つが変化したとき、感震器および検出手段の状態変化信号を送信して親局用制御手段に与え、
親局用制御手段は、状態変化信号を受信して出力することを特徴とする請求項1〜4のうちの1つに記載の地震用遠隔監視装置。
The slave station has detection means for detecting data relating to the fluid transported to the pipeline,
The slave station control means periodically receives the output of the detection means at predetermined time intervals,
When at least one of the outputs changes, a state change signal of the seismoscope and the detection means is transmitted and given to the control means for the master station,
5. The earthquake remote monitoring apparatus according to claim 1, wherein the master station control means receives and outputs a state change signal.
複数の各ブロック毎に、災害の発生の程度SIを検出する第1検出手段がそれぞれ設けられ、
各ブロック内に、複数の子局が設けられ、各子局は、
災害の発生の程度を検出する第2検出手段と、
第2検出手段によって検出された災害の程度を、予め定める第1の値SI1でレベル弁別する第1レベル弁別手段と、
第1レベル弁別手段の出力に応答し、検出された災害の程度が第1の値SI1以上であるとき、安全のための動作を行う手段と、
前記安全のための動作が行われている状態を表す状態信号を、送信要求信号を受信したとき、送信する子局用制御手段とを有し、
第1検出手段および子局用制御手段に接続される親局が設けられ、この親局は、
各第1検出手段の出力に応答し、第1検出手段によって検出された災害の程度を、第1の値SI1未満である第2の値SI2でレベル弁別する第2レベル弁別手段と、
各子局毎の状態信号を受信し、第2レベル弁別手段の出力に応答し、検出された災害の程度が第2の値SI2以上であるとき、その検出した第1検出手段が設けられているブロックに属する各子局を、順次的にポーリングして送信要求信号を送信する親局用制御手段とを有することを特徴とする災害用遠隔監視装置。
First detection means for detecting the degree SI of the occurrence of disaster is provided for each of the plurality of blocks,
A plurality of slave stations are provided in each block, and each slave station is
A second detection means for detecting the degree of occurrence of the disaster;
First level discriminating means for discriminating the level of disaster detected by the second detecting means with a predetermined first value SI1;
Means for responding to the output of the first level discriminating means and performing an operation for safety when the degree of disaster detected is not less than the first value SI1;
A state signal indicating a state in which the operation for safety is performed, and a control unit for a slave station that transmits when a transmission request signal is received;
A master station connected to the first detection means and the slave station control means is provided.
Second level discriminating means for responding to the output of each first detecting means and discriminating the level of disaster detected by the first detecting means by a second value SI2 which is less than the first value SI1;
When the status signal for each slave station is received and in response to the output of the second level discriminating means, and the degree of disaster detected is greater than or equal to the second value SI2, the detected first detecting means is provided. A remote monitoring device for disaster, comprising: master station control means for sequentially polling each slave station belonging to a certain block and transmitting a transmission request signal.
JP05318399A 1999-03-01 1999-03-01 Earthquake remote monitoring device Expired - Lifetime JP3784564B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05318399A JP3784564B2 (en) 1999-03-01 1999-03-01 Earthquake remote monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05318399A JP3784564B2 (en) 1999-03-01 1999-03-01 Earthquake remote monitoring device

Publications (2)

Publication Number Publication Date
JP2000253467A JP2000253467A (en) 2000-09-14
JP3784564B2 true JP3784564B2 (en) 2006-06-14

Family

ID=12935770

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05318399A Expired - Lifetime JP3784564B2 (en) 1999-03-01 1999-03-01 Earthquake remote monitoring device

Country Status (1)

Country Link
JP (1) JP3784564B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003044974A (en) * 2001-07-31 2003-02-14 Shiga Pref Gov Data collection method, data collection system used for implementing the method, solar cell array, and power storage device
DE202004018276U1 (en) * 2004-11-25 2005-03-24 Lachenit Heinrich Earthquake warning system has master/slave configured primary wave vibration sensors with alarm actuated at calculated secondary wave threshold
JP4616696B2 (en) * 2005-05-11 2011-01-19 株式会社日立ビルシステム Elevator control operation information collection device
JP2007228361A (en) * 2006-02-24 2007-09-06 Yokogawa Electric Corp Monitoring system
JP5038697B2 (en) * 2006-12-05 2012-10-03 東光東芝メーターシステムズ株式会社 Gas supply control system
CN111063174B (en) * 2018-10-17 2022-07-12 海隆石油集团(上海)信息技术有限公司 Pipeline line safety early warning system based on distributed optical fiber sensing

Also Published As

Publication number Publication date
JP2000253467A (en) 2000-09-14

Similar Documents

Publication Publication Date Title
WO2004049102A2 (en) Directing premises alarm panel to backup radio network upon detection of use of the pstn by another
JP3784564B2 (en) Earthquake remote monitoring device
JP3005931B2 (en) Emergency call network system
JP3599511B2 (en) Information collection control system
CN202433767U (en) Family intelligent network system based on general packet radio service (GPRS) technology
JPH06274782A (en) Full automatic disaster prevention monitoring system
JP4003782B2 (en) Fire alarm system with test function
JP2002083390A (en) Fire alarm system and its inspection method
JP3453985B2 (en) Terminal network controller
JP2000201230A (en) Interphone system
KR940007910B1 (en) Remote information processing device and method
KR920005930B1 (en) Automatic meter reading
JP2009151417A (en) Wireless meter reading system
KR970000460B1 (en) Automatic calling apparatus of existence of person
JP4075940B2 (en) Apartment fire alarm system, residential building receiver
JPH0559480B2 (en)
JPS5821470B2 (en) Cutting test method
JPH11161886A (en) Automatic reporting device and reporting system using the same
JPS6326945B2 (en)
JPH01240999A (en) Automatic meter-reading device
JPH0671291B2 (en) Building remote monitoring device
JPH0678961B2 (en) Gas leak inspection system
JP2825998B2 (en) Communication system for apartment houses
JP3750748B2 (en) Private branch exchange and button telephone equipment
JPS6326946B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040311

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060314

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060315

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120324

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150324

Year of fee payment: 9

EXPY Cancellation because of completion of term