JP3785446B2 - Pipe fitting pre-tightening jig - Google Patents
[go: Go Back, main page]

JP3785446B2 - Pipe fitting pre-tightening jig - Google Patents

Pipe fitting pre-tightening jig Download PDF

Info

Publication number
JP3785446B2
JP3785446B2 JP08914595A JP8914595A JP3785446B2 JP 3785446 B2 JP3785446 B2 JP 3785446B2 JP 08914595 A JP08914595 A JP 08914595A JP 8914595 A JP8914595 A JP 8914595A JP 3785446 B2 JP3785446 B2 JP 3785446B2
Authority
JP
Japan
Prior art keywords
tube
jig
insertion portion
nut
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08914595A
Other languages
Japanese (ja)
Other versions
JPH08281568A (en
Inventor
耕吉 岩寺
和夫 佐々木
隆泰 中浜
邦彦 大道
利夫 北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujikin Inc
Original Assignee
Fujikin Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujikin Inc filed Critical Fujikin Inc
Priority to JP08914595A priority Critical patent/JP3785446B2/en
Publication of JPH08281568A publication Critical patent/JPH08281568A/en
Application granted granted Critical
Publication of JP3785446B2 publication Critical patent/JP3785446B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Hand Tools For Fitting Together And Separating, Or Other Hand Tools (AREA)

Description

【0001】
【産業上の利用分野】
この発明は、管継手組立時におけるナット締付け作業を容易にするための管継手予備締め治具に関する。
【0002】
【従来の技術および発明が解決しようとする課題】
従来、管継手として、一端部内周に管挿入部が、同外周におねじがそれぞれ形成された管状継手部材、継手部材の管挿入部に挿入される管、継手部材のおねじにねじ嵌められる内向きフランジ付きナットおよび管挿入部から突出した管の周囲に嵌められかつナット締付けによって継手部材とナットの内向きフランジとの間に挟み止められるとともに管に締付けられてこれに固定される締付けスリーブよりなるものが知られている。
【0003】
上記管継手の組立は、配管工事の作業現場において、ナットを手で締付けた後、さらにスパナ等により例えば5/4回転させて締付けることにより行われていた。しかし、配管工事の作業現場では、スパナを1回転させることが困難な場所や手が届きにくい場所等があり、そのような場所においては、ナット締付け作業は極めて困難であった。
【0004】
この発明の目的は、管継手を組み立てる前に、管に締付けスリーブを締付けておくことにより、配管工事の作業現場におけるナット締付け作業を容易にする管継手予備締め治具を提供することにある。
【0005】
【課題を解決するための手段】
この発明による管継手予備締め治具は、一端部内周に管挿入部、同外周におねじがそれぞれ形成された管状継手部材、継手部材の管挿入部に挿入される管、継手部材のおねじにねじ嵌められ内向きフランジ付きナットおよび管挿入部から突出した管の周囲に嵌められかつナット締付けによって継手部材とナットの内向きフランジとの間に挟み止められるとともに管に締付けられてこれに固定される締付けスリーブよりなる管継手を組み立てる前に、管に締付けスリーブを締付けておくための治具であって、一端に形成された管状頭部、管状頭部の外周に形成されたおねじ、管状頭部の内周に形成された管挿入部、管挿入部の奥に形成された内方突出状ストッパ部および管挿入部の先端に形成された内向き傾斜状テーパ面を備えた治具本体と、管状頭部のおねじにねじ嵌められ、管挿入部に挿入されて管挿入部より突出している管の周囲に嵌められた締付けスリーブを管に締付けるための内向きフランジ付きナットとよりなるものである。
【0006】
上記治具本体には、握り棒が取り付けられていることがある。
【0007】
【作用】
この発明の管継手予備締め治具は管継手を組み立てる前に使用されるもので、予備締め作業は、管挿入部に管を挿入し、管状頭部から突出した管の周囲に締付けスリーブを嵌め、ナットを管側からおねじに嵌めて手で締付けた後、ナットをスパナ等で例えば3/4回転させて締付けることにより行われる。スパナ等により締付けるときには、治具本体をバイス等でつかんで固定しておく。この予備締めによりスリーブが管挿入部とナットの内向きフランジとの間に挟み止められるとともに管に締付けられて管に固定される。
【0008】
予備締め後は、ナットを緩めてスリーブが固定された管を治具から一旦取り外し、これを配管工事の作業現場に運んで管状継手部材の管挿入部に挿入し、ナットを管側から継手部材のおねじに嵌めて手で締付けた後、ナットをスパナ等で締付けることにより、管継手を組み立てる。予備締め時のスパナ等によるナットの締付け分は手で締付けることができるので、管継手組立時のスパナ等によるナットの締付け量は、例えば1/2回転で十分である。
【0009】
治具本体に握り棒が取り付けられているものでは、予備締めは、握り棒を手で保持しておいてナットをスパナ等で締付けることにより行われる。
【0010】
【実施例】
この発明の実施例を、以下図面を参照して説明する。なお、以下の説明において、左右および上下はそれぞれ図2の左右および上下をいうものとする。
【0011】
図4は、この発明の管継手予備締め治具(21)により、予備締めされる管継手の一例を示している。
【0012】
この管継手は、右端側から管(8)が挿入される管状継手部材(1) と、この継手部材(1)の右端側から突出した管(8)の周囲に嵌められる第1および第2締付けスリーブ(3)(4)と、締付けスリーブ(3)(4)を締付けて管(8)を継手部材(1)に固定するナット(5)とを備えている。
【0013】
管状継手部材(1)の右端部の内周に管挿入部(12)が形成され、同外周におねじ(10)が形成されている。管挿入部(12)の左端部には、内方に突出したストッパ部(12a)が形成され、同右端部には内向きに傾斜したテーパ面(12b) が形成されている。
【0014】
第1スリーブ(3)の左端寄りの部分の内周に環状溝(13)が、右端部外周に外向きフランジ部(14)が、右端部内周に、内向きに傾斜したテーパ面がそれぞれ形成されている。そして、第1スリーブ(3) の左端部が管挿入部(12)右端のテーパ面(12a)の内側に少し入り込んでいる。第2スリーブ(4)の左端面は、外向きに傾斜したテーパ面となっている。第2スリーブ(4)の右端部外周に外向きフランジ部(15)が形成され、右端面はわずかに外向きに傾斜したテーパ面となっている。そして、第2スリーブ(4)の左端面が第1スリーブ(3) のテーパ面に密接している。ナット(5)の右端部側の内周に左側の部分より内径の小さい小径部(17)が形成され、この小径部(17)の右端部側の部分に内向きフランジ部(18)が形成されている。ナット(5)の左端部側の内周にめねじ(16)が形成されており、これが管状頭部(6)のおねじ(10)にねじ嵌められている。ナット(5)の内向きフランジ部(18)の左側の面はわずかに内向きに傾斜しており、この面が第2スリーブ(4) の右端のテーパ面に密接している。
【0015】
上記管継手では、ナット(5)を手で締付けた後、さらにスパナにより締付けると、2つのスリーブ(3)(4)が継手部材(1)とナット(5) のフランジ部(18)との間に挟み止められ、これにより、2つのスリーブ(3)(4)が締付けられて、管(8)が継手部材(1)に固定される。この管継手では、スパナによるナット(5)の締付け量は、5/4回転とされている。管継手の組立は、配管工事の作業現場において行われるが、配管工事の作業現場では、スパナを1回転させることが困難な場所や手が届きにくい場所等があり、そのような場所においては、スパナによりナット(5)を5/4回転させる作業は非常に困難であった。
【0016】
図1に示す管継手予備締め治具(21)は、配管工事の作業現場におけるナット締付け作業を容易にするために、上記管継手を組み立てる前に管(8)に締付けスリーブ(3)(4)を締付けておくための治具であって、略円柱状の治具本体(22)の右端に、図4に示す管状継手部材(1)の右端部の形状と同一形状となされた管状頭部(23)が形成されているものである。管継手予備締め治具(21)を使用しないときには、めねじが形成されたキャップ(24)が管状頭部(23)に被せられる。
【0017】
管継手予備締め治具(21)には、治具本体(22)の両側面が左端部から右端部近くまで切削されることにより、平行な2平面を備えた工具係合部(25)が形成されている。切削されていない治具本体(22)の右端部(22a)は、治具本体(22)をバイスに保持させるさいの落下防止用ストッパの役目を果たす。
【0018】
図2は、図1の管継手予備締め治具(21)を使用して管(8)に締付けスリーブ(3)(4)を締付けるさいの縦断面を示すもので、同図に詳しく示すように、管継手予備締め治具(21)の管状頭部(23)の内周には、管状継手部材(1)の管挿入部(12)と同一形状の管挿入部(32)が形成され、同外周には、管状継手部材(1)のおねじ(10)と同一形状のおねじ(30)が形成されている。管挿入部(32)の左端部には、内方突出状ストッパ部(32a)が形成され、同右端部には、内向き傾斜状テーパ面(32b)が形成されている。
【0019】
上記実施例において、管継手予備締め治具(21)は特殊鋼製で、キャップ(24)は黄銅製となされている。
【0020】
管継手予備締め治具(21)による予備締めは次のようにして行われる。
【0021】
まず、工具係合部(25)をバイス等でつかんで治具本体(22)を固定し、管状頭部(23)の管挿入部(32)に管(8)をストッパ部(32a)に当たるまで挿入する。次に、管状頭部(23)より右側に突出した管(8)の周囲に第1スリーブ(3)と第2スリーブ(4)を順に嵌める。次に、ナット(5)を管状頭部(23) のおねじ (30) にねじ嵌めて手で締付ける。最後に、ナット(5)をスパナ等で例えば3/4回転させる。これにより、第1および第2スリーブ(3)(4)が締付けられて第1および第2スリーブ(3)(4)と管(8)との間のシール性が確保され、第1および第2スリーブ(3)(4)が管(8)に固定される。
【0022】
この予備締めが終ると、ナット(5)を緩めてスリーブ(3)(4)が固定された管(8)を予備締め治具(21)から一旦外して、これを配管工事の作業現場に運んで管状継手部材(1)に挿入し、ナット(5)を管(8) 側から継手部材(1)に嵌めて手で締付けた後、さらにこれをスパナ等で締付けることにより、管継手を組み立てる。予備締め時のスパナ等によるナット(5)の締付け分は手で締付けることができるので、管継手組立時のスパナ等によるナット(5)の締付け量は、例えば1/2回転程度で十分であり、これによって十分なシール性を有する管継手が得られる。したがって、スパナを1回転させる空間がない場所や手が届きにくい場所等におけるナット締付け作業も容易に行うことができる。
【0023】
上記実施例において、治具本体(22)は略円柱状となされているが、四角柱状や六角柱状であってもよい。工具係合部(25)は、治具本体(22)の両側面が切削されることにより形成されているが、工具係合部の形状や形成方法はこれに限らず、適宜変更できる。
【0024】
なお、上記実施例の予備締め時において使用されるナット(5) は、管継手に使用されるものと同じものが使用されているが、予備締め専用のナットを使用することもできる。この場合には、ナットのめねじおよび予備締め治具のおねじは、管状継手部材(1)のおねじ(10)に合わせなくてもよい。
【0025】
図3は、この発明の管継手予備締め治具の他の実施例を示している。
【0026】
同図に示すように、この管継手予備締め治具(41)は、略角柱状の治具本体(42)の右端に管状頭部(23)が形成されており、治具本体(42)に上下方向にのびる握り棒(43)が取り付けられているものである。管状頭部(23)は、前記実施例と同一形状であるので、説明を省略する。管継手予備締め治具(41)を使用しないときには、めねじが形成されたキャップ(24)が管状頭部(23)に被せられる。
【0027】
握り棒(43)の上端にはおねじ(44)が形成され、治具本体(42)にはこのおねじ(44)に合う上下方向のめねじ(45)が形成されており、握り棒(43)は着脱自在となされている。握り棒(43)の下端にはローレット加工等の滑り防止が施された把持部(43a)が形成されている。
【0028】
上記実施例において、治具本体(42)は特殊鋼製となされ、握り棒(43)はカーボンスチール製となされている。なお、治具本体(42)は略角柱状となされているが、その他の形状であってももちろんよい。また、握り棒(43)は着脱自在となされているが、着脱自在でなくてもよい。着脱自在とすることにより、管状頭部形状がそれぞれ異なる複数の予備締め治具を使用する場合でも、1本の握り棒(43)により作業が行える。
【0029】
【発明の効果】
この発明の管継手予備締め治具によると、管継手組立前にスリーブを管に固定しておくことができる。予備締め時のスパナ等によるナットの締付け分は手で締付けることができるので、管継手組立時には、スパナ等によるナットの締付け量は、例えば1/2回転で十分であり、スパナを1回転させる空間がない場所や手が届きにくい場所等においても、ナット締付け作業が容易に行える。
【0030】
治具本体に握り棒が取り付けられているものでは、予備締めは、握り棒を手で保持しておいてナットをスパナ等で締付けることにより行えるので、バイス等の本体固定治具を必要とせず、どのような現場に於いても管継手予備締め作業ができる。
【図面の簡単な説明】
【図1】 この発明による管継手予備締め治具の一実施例を示す斜視図である。
【図2】 図1の治具を使用して予備締めするときの状態を示す縦断面図である。
【図3】 この発明による管継手予備締め治具の他の実施例を示す斜視図である。
【図4】 この発明による管継手予備締め治具により予備締めされる管継手の一例を示す縦断面図である。
【符号の説明】
(1) 管状継手部材
(3)(4) 締付けスリーブ
(5) ナット
(8) 管
(10) おねじ
(12) 管挿入部
(18) 内向きフランジ
(21)(41) 管継手予備締め治具
(22)(42) 治具本体
(23) 管状頭部
(30) おねじ
(32) 管挿入部
(32a) ストッパ部
(32b) テーパ部
(43) 握り棒
[0001]
[Industrial application fields]
The present invention relates to a pipe joint preliminary tightening jig for facilitating a nut tightening operation when assembling a pipe joint.
[0002]
[Background Art and Problems to be Solved by the Invention]
Conventionally, as a pipe joint, the pipe insertion portion into the inner circumference of the one end, screwed to the outer periphery a male thread tubular joint member formed respectively, the tube to be inserted into the tube insertion portion of the joint member, the male thread of the joint hand member clamping is secured thereto are fastened to the tube with stopped sandwiched between the inward flange of the joint member and the nut by fitting is and nuts tightened around the tube projecting from the inwardly flanged nut and tube insertion portion is What consists of a sleeve is known.
[0003]
The assembly of the pipe joint has been performed at the work site of the piping work by tightening the nut by hand and then further tightening it by, for example, 5/4 rotation with a spanner or the like. However, there are places where it is difficult to rotate the wrench once or places where it is difficult to reach at the work site of the piping work, and the nut tightening work is extremely difficult in such places.
[0004]
An object of the present invention is to provide a pipe joint pre-fastening jig that facilitates nut tightening work at a work site of piping work by fastening a fastening sleeve to the pipe before assembling the pipe joint.
[0005]
[Means for Solving the Problems]
Pipe joint preswaged jig according to the present invention, the tube insertion part into the inner periphery of the one end, the tubular coupling member external thread in the outer periphery are formed respectively, the tube to be inserted into the tube insertion portion of the joint member, the joint hand member clamped to the tube together with the stopped sandwiched between the inward flange of the joint member and the nut by fitting is and nuts tightened around the tube projecting from the inwardly flanged nut and tube insertion portion that is screwed to the external thread Before assembling a pipe joint comprising a fastening sleeve fixed to this, it is a jig for fastening the fastening sleeve to the pipe, and is formed on the tubular head formed at one end, the outer periphery of the tubular head A male screw, a tube insertion portion formed on the inner periphery of the tubular head portion, an inward protruding stopper portion formed at the back of the tube insertion portion, and an inwardly inclined tapered surface formed at the tip of the tube insertion portion Jig body , It is screwed to the male screw of the tubular head made more the inward flange nut for tightening the fitted clamping sleeve around the tube is inserted into the tube insertion portion protrudes from tube insertion portion into the tube It is.
[0006]
The aforementioned jig body, there may be a grip bar is attached.
[0007]
[Action]
The pipe joint pre-fastening jig of the present invention is used before assembling the pipe joint. The pre-tightening work is performed by inserting a pipe into the pipe insertion portion and placing a fastening sleeve around the pipe protruding from the tubular head. The nut is inserted into the male screw from the pipe side and tightened by hand, and then the nut is tightened by, for example, 3/4 rotation with a spanner or the like. When tightening with a spanner or the like, hold the jig body with a vise or the like and fix it. By this preliminary fastening, the sleeve is clamped between the pipe insertion portion and the inward flange of the nut, and is fastened to the pipe and fixed to the pipe.
[0008]
After pre-tightening, loosen the nut and temporarily remove the tube with the sleeve fixed from the jig, carry it to the work site for piping work, insert it into the pipe insertion part of the tubular joint member , and insert the nut from the pipe side to the joint member After fitting onto the male screw and tightening by hand, the nut is tightened with a spanner or the like to assemble the pipe joint. Since the tightened portion of the nut by a spanner or the like at the time of preliminary tightening can be tightened by hand, the amount of tightening of the nut by the spanner or the like at the time of assembling the pipe joint is sufficient, for example, 1/2 turn.
[0009]
In the case where the grip bar is attached to the jig body, the preliminary tightening is performed by holding the grip bar by hand and tightening the nut with a spanner or the like.
[0010]
【Example】
Embodiments of the present invention will be described below with reference to the drawings. In the following description, left and right and top and bottom refer to left and right and top and bottom in FIG. 2 , respectively.
[0011]
FIG. 4 shows an example of a pipe joint that is pre-tightened by the pipe joint pre-fastening jig (21) of the present invention.
[0012]
This pipe joint includes a tubular joint member (1) into which the pipe (8) is inserted from the right end side, and first and second fittings fitted around the pipe (8) protruding from the right end side of the joint member (1). A tightening sleeve (3) (4) and a nut (5) for tightening the tightening sleeve (3) (4) to fix the pipe (8) to the joint member (1) are provided.
[0013]
A tube insertion portion (12) is formed on the inner periphery of the right end portion of the tubular joint member (1), and a screw (10) is formed on the outer periphery thereof. A stopper portion (12a) projecting inward is formed at the left end portion of the tube insertion portion (12), and a tapered surface (12b) inclined inward is formed at the right end portion.
[0014]
An annular groove (13) is formed on the inner periphery of the portion near the left end of the first sleeve (3), an outward flange portion (14) is formed on the outer periphery of the right end portion, and an inwardly tapered surface is formed on the inner periphery of the right end portion. Has been. The left end portion of the first sleeve (3) slightly enters the inside of the tapered surface (12a) at the right end of the tube insertion portion (12). The left end surface of the second sleeve (4) is a tapered surface inclined outward. An outward flange portion (15) is formed on the outer periphery of the right end portion of the second sleeve (4), and the right end surface is a tapered surface slightly inclined outward. The left end surface of the second sleeve (4) is in close contact with the tapered surface of the first sleeve (3). A small diameter part (17) having a smaller inner diameter than the left part is formed on the inner periphery of the right end part of the nut (5), and an inward flange part (18) is formed on the right end part part of the small diameter part (17). Has been. A female screw (16) is formed on the inner periphery of the nut (5) on the left end side, and this is screwed onto the male screw (10) of the tubular head (6). The left side surface of the inward flange portion (18) of the nut (5) is slightly inclined inward, and this surface is in close contact with the taper surface at the right end of the second sleeve (4).
[0015]
In the above pipe joint, after tightening the nut (5) by hand and further tightening with a spanner, the two sleeves (3) and (4) are connected to the joint member (1) and the flange (18) of the nut (5). Thus, the two sleeves (3) and (4) are fastened, and the pipe (8) is fixed to the joint member (1). In this pipe joint, the tightening amount of the nut (5) by the spanner is 5/4 rotation. Assembling of pipe joints is performed at the work site of piping work, but at the work site of piping work, there are places where it is difficult to rotate the spanner or where it is difficult to reach, and in such places, It was very difficult to rotate the nut (5) 5/4 with a spanner.
[0016]
The pipe joint pre-fastening jig (21) shown in FIG. 1 has a tightening sleeve (3) (4) before assembling the pipe joint in order to facilitate the nut tightening work at the piping work site. ) a jig for keeping tightening the, the right end of the generally cylindrical jig main body (22), the tubular joint members (1) tube shape was made and the right end portion of the same shape of that shown in FIG. 4 in which the head portion (23) is formed. When the pipe joint pre-fastening jig (21) is not used, a cap (24) in which a female thread is formed is put on the tubular head (23).
[0017]
The tool joint pre-tightening jig (21) has a tool engaging part (25) having two parallel planes by cutting both side surfaces of the jig main body (22) from the left end part to the right end part. Is formed. The right end portion of the jig body (22) which is not cut (22a) plays the role of fall prevention stopper again to hold the jig body (22) to the device.
[0018]
FIG. 2 shows a longitudinal section when the fastening sleeves (3) and (4) are fastened to the pipe (8) using the pipe joint pre-fastening jig (21) of FIG. 1, as shown in detail in FIG. In addition, a tube insertion portion (32) having the same shape as the tube insertion portion (12) of the tubular joint member (1) is formed on the inner periphery of the tubular head portion (23) of the pipe joint pre-fastening jig (21). A male screw (30) having the same shape as the male screw (10) of the tubular joint member (1) is formed on the outer periphery. An inward projecting stopper portion (32a) is formed at the left end portion of the tube insertion portion (32), and an inwardly inclined tapered surface (32b) is formed at the right end portion.
[0019]
In the above embodiment, the pipe joint pre-fastening jig (21) is made of special steel, and the cap (24) is made of brass.
[0020]
Preswaged by pipe joint preswaged fixture (21) is performed as follows.
[0021]
First, the tool engaging part (25) is grasped with a vise or the like to fix the jig body (22), and the pipe (8) hits the stopper part (32a) against the pipe insertion part (32) of the tubular head part (23). Insert until Next, the first sleeve (3) and the second sleeve (4) are sequentially fitted around the tube (8) protruding to the right side from the tubular head (23). Next, the nut (5) is screwed onto the male screw (30) of the tubular head (23) and tightened by hand. Finally, the nut (5) is rotated, for example, 3/4 with a spanner or the like. As a result, the first and second sleeves (3) and (4) are tightened to ensure the sealing performance between the first and second sleeves (3) and (4) and the pipe (8). Two sleeves (3) and (4) are fixed to the pipe (8).
[0022]
When this preliminary tightening is finished, loosen the nut (5) and remove the pipe (8) with the sleeve (3) (4) fixed from the preliminary tightening jig (21), and place it at the work site for piping work. And then inserting it into the tubular joint member (1), fitting the nut (5) to the joint member (1) from the pipe (8) side and tightening it by hand, and then tightening it with a spanner etc. assemble. The nut (5) can be tightened by hand with a wrench at the time of preliminary tightening, so the amount of tightening of the nut (5) with the wrench at the time of assembling the fitting is sufficient, for example, about 1/2 turn. As a result, a pipe joint having a sufficient sealing property can be obtained. Therefore, it is possible to easily perform nut tightening work in a place where there is no space for rotating the spanner or where it is difficult to reach.
[0023]
In the above embodiment, the jig body (22) has a substantially cylindrical shape, but it may have a rectangular column shape or a hexagonal column shape. The tool engaging portion (25) is formed by cutting both side surfaces of the jig body (22) , but the shape and forming method of the tool engaging portion are not limited to this, and can be changed as appropriate.
[0024]
The nut (5) used at the time of preliminary tightening in the above embodiment is the same as that used for the pipe joint, but a nut exclusively for preliminary tightening can also be used. In this case, the female screw of the nut and the male screw of the pre-fastening jig need not match the male screw (10) of the tubular joint member (1).
[0025]
FIG. 3 shows another embodiment of the pipe joint pre-fastening jig according to the present invention.
[0026]
As shown in the figure, the pipe joint preswaged jig (41) is the right end tube Joatama of the substantially prismatic jig body (42) (23) is formed, the jig body (42 ) Is attached with a grip bar (43) extending vertically. Since the tubular head portion (23) has the same shape as in the above embodiment, the description thereof is omitted. When the pipe joint pre-fastening jig (41) is not used, a cap (24) formed with a female thread is put on the tubular head (23).
[0027]
A male screw (44) is formed at the upper end of the grip rod (43), and a vertical female screw (45) is formed on the jig body (42) to match the male screw (44). 43) is made detachable. At the lower end of the grip rod (43), a grip portion (43a) is formed which is prevented from slipping such as knurling.
[0028]
In the above embodiment, the jig body (42) is made of special steel, and the grip bar (43) is made of carbon steel. The jig body (42) has a substantially prismatic shape, but may be of other shapes. Further, although the grip rod (43) is detachable, it may not be detachable. By detachable, even when the shape of the tubular head uses a plurality of different pre-clamping fixture, able to work by one of the handlebar (43).
[0029]
【The invention's effect】
According to the pipe joint preliminary fastening jig of the present invention, the sleeve can be fixed to the pipe before the pipe joint is assembled . Tightening amount of nut by a wrench or the like during the pre備締first is, it is possible to tighten by hand, at the time of pipe joint assembly, tightening of the nut by a wrench or the like, for example, a sufficient half turn, rotates one spanner The nut tightening operation can be easily performed even in a place where there is no space to allow or where it is difficult to reach.
[0030]
When the grip body is attached to the jig body, preliminary tightening can be done by holding the grip bar by hand and tightening the nut with a spanner, etc., so there is no need for a body fixing jig such as a vise. , Pipe joint pre-tightening work can be done at any site.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an embodiment of a pipe joint pre-fastening jig according to the present invention.
FIG. 2 is a longitudinal sectional view showing a state when preliminary tightening is performed using the jig of FIG.
FIG. 3 is a perspective view showing another embodiment of the pipe joint pre-fastening jig according to the present invention.
FIG. 4 is a longitudinal sectional view showing an example of a pipe joint preliminarily tightened by a pipe joint pre-tightening jig according to the present invention.
[Explanation of symbols]
(1) Tubular joint member
(3) (4) Tightening sleeve
(5) Nut
(8) Tube
(10) Male thread
(12) Pipe insertion part
(18) Inward flange
(21) (41) Pipe joint pre-tightening jig
(22) (42) Jig body
(23) Tubular head
(30) Male thread
(32) Pipe insertion part
(32a) Stopper
(32b) Tapered part
(43) Grip stick

Claims (2)

一端部内周に管挿入部、同外周におねじがそれぞれ形成された管状継手部材、継手部材の管挿入部に挿入される管、継手部材のおねじにねじ嵌められ内向きフランジ付きナットおよび管挿入部から突出した管の周囲に嵌められかつナット締付けによって継手部材とナットの内向きフランジとの間に挟み止められるとともに管に締付けられてこれに固定される締付けスリーブよりなる管継手を組み立てる前に、管に締付けスリーブを締付けておくための治具であって、一端に形成された管状頭部、管状頭部の外周に形成されたおねじ、管状頭部の内周に形成された管挿入部、管挿入部の奥に形成された内方突出状ストッパ部および管挿入部の先端に形成された内向き傾斜状テーパ面を備えた治具本体と、管状頭部のおねじにねじ嵌められ、管挿入部に挿入されて管挿入部より突出している管の周囲に嵌められた締付けスリーブを管に締付けるための内向きフランジ付きナットとよりなる管継手予備締め治具。 Tube insertion portion into the inner circumference of the one end, the tubular joint member formed with a male respectively on the outer periphery, the tube to be inserted into the tube insertion portion of the joint member, joint hands with inward flanges that are screwed to the male screw member pipe joint made of clamping sleeve is secured thereto are fastened to the tube with stopped sandwiched between the inward flange of the joint member and the nut by fitting is and nuts tightened around the tube that protrudes from the nut and tube insertion portion Before assembling the jig, it is a jig for fastening the fastening sleeve to the tube, and is formed on the tubular head formed at one end, the external thread formed on the outer periphery of the tubular head, and the inner periphery of the tubular head A jig main body having a formed tube insertion portion, an inwardly projecting stopper formed at the back of the tube insertion portion, and an inwardly inclined tapered surface formed at the tip of the tube insertion portion; Screwed into the screw, Become more pipe joint preswaged jig and the inward flange nut for tightening the tubes fitted clamping sleeve around it is inserted into the insertion portion protrudes from the pipe insertion portion tube. 治具本体に握り棒が取り付けられている請求項1記載の管継手予備締め治具。The pipe joint pre-fastening jig according to claim 1, wherein a grip bar is attached to the jig body.
JP08914595A 1995-04-14 1995-04-14 Pipe fitting pre-tightening jig Expired - Fee Related JP3785446B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08914595A JP3785446B2 (en) 1995-04-14 1995-04-14 Pipe fitting pre-tightening jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08914595A JP3785446B2 (en) 1995-04-14 1995-04-14 Pipe fitting pre-tightening jig

Publications (2)

Publication Number Publication Date
JPH08281568A JPH08281568A (en) 1996-10-29
JP3785446B2 true JP3785446B2 (en) 2006-06-14

Family

ID=13962707

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08914595A Expired - Fee Related JP3785446B2 (en) 1995-04-14 1995-04-14 Pipe fitting pre-tightening jig

Country Status (1)

Country Link
JP (1) JP3785446B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108357694B (en) * 2018-04-24 2024-02-20 中电科芜湖钻石飞机制造有限公司 General aircraft ventilation pipe joint installation frock

Also Published As

Publication number Publication date
JPH08281568A (en) 1996-10-29

Similar Documents

Publication Publication Date Title
US5680800A (en) Socket drive extension grip
CN100434731C (en) Fitting
US4614372A (en) Device for joining a pipe and a connection piece
CA2206230A1 (en) Bolted connection for connecting two profiles
JP3785446B2 (en) Pipe fitting pre-tightening jig
JPH0782841A (en) Rebar joint device
US4380940A (en) No torque tool
KR200194821Y1 (en) Connector fasteners
JP3395047B2 (en) How to connect plastic tubes
JPH0488288A (en) Branch pipe joint
JP3146263U (en) Fitting for piping
JPH0223918Y2 (en)
JPH0512551Y2 (en)
JPS6114775Y2 (en)
KR0114249Y1 (en) Support tool of pipe joint
JP3012394U (en) Union nut tightening wrench
KR200337739Y1 (en) Combined structure of pipe
JP4845161B2 (en) Anti-rotation device for fittings
JPH0310466Y2 (en)
JP3499313B2 (en) Screw pipe fasteners
JPH0338531Y2 (en)
KR960009112Y1 (en) Pipe fittings
JPH0732279U (en) Piping connection
JPH045268Y2 (en)
JPH11310957A (en) Connecting structure of truss

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041022

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050614

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050811

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060124

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20060221

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060221

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100331

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110331

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120331

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120331

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130331

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130331

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140331

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees