JP3787198B2 JP32261096A JP32261096A JP3787198B2 JP 3787198 B2 JP3787198 B2 JP 3787198B2 JP 32261096 A JP32261096 A JP 32261096A JP 32261096 A JP32261096 A JP 32261096A JP 3787198 B2 JP3787198 B2 JP 3787198B2
Authority
JP
Japan
Prior art keywords
boom
pin
attachment
fluid
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP32261096A
Other languages
Japanese (ja)
Other versions
JPH10159121A (en
Inventor
一博 木村
Original Assignee
石川島建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島建機株式会社 filed Critical 石川島建機株式会社
Priority to JP32261096A priority Critical patent/JP3787198B2/en
Publication of JPH10159121A publication Critical patent/JPH10159121A/en
Application granted granted Critical
Publication of JP3787198B2 publication Critical patent/JP3787198B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Shovels (AREA)
  • Component Parts Of Construction Machinery (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、掘削機、建設機械等の作業機のアタッチメントに関するものである。
【0002】
【従来の技術】
図5及び図6は従来から使用されているアタッチメントの一例を装着した作業機を示すものである。
【0003】
1は下部走行体であり、該下部走行体1は、無端状のゴムクローラシュー2を左右に有し、前端に排土板3を有している。
【0004】
4は、上部旋回体等の作業機本体であり、該作業機本体4は、略円形の平面形状を有し、且つ前記の下部走行体1の上部に旋回可能に取り付けられている。
【0005】
5はキャブであり、該キャブ5は、作業機本体4の前端左側寄りの部分に搭載されている。
【0006】
6,7はブラケットであり、ブラケット6は、作業機本体4の中心よりもやや右側(反キャブ側)に位置するように、作業機本体4の上面に固着され、また、ブラケット7は、前記のブラケット6よりも作業機本体4の前端側に位置するように、作業機本体4の上面に固着されている。
【0007】
8はメインブームであり、該メインブーム8の基端部は、作業機本体4の幅方向(左右方向)へ略水平に延びるピン9によってブラケット6に枢支されている。
【0008】
10はブーム起伏用シリンダであり、該ブーム起伏用シリンダ10のシリンダ本体11は、ピン9と平行なピン12によってブラケット7に枢支され、また、ブーム起伏用シリンダ10のピストンロッド13の先端部は、ピン9と平行なピン14によってメインブーム8の先端部に設けたブラケット15に枢支されており、ブーム起伏用シリンダ10のヘッド側流体室あるいはロッド側流体室に作動流体を給排すると、ピン9を中心としてメインブーム8が起伏するようになっている。
【0009】
16は中間ブームであり、該中間ブーム16の基端部は、ピン9に対して直交する方向へ延びるピン17によりメインブーム8の先端部に枢支されている。
【0010】
18は先端ブームであり、該先端ブーム18は、ピン17と平行なピン19によって中間ブーム16の先端部に枢支されている。
【0011】
この先端ブーム18には、側方から見て該先端ブーム18の基端部と先端部との中間部分から中間ブーム16の基端部側へ向かって該中間ブーム16の上方に位置するように延びるシリンダ支持部20が設けられている。
【0012】
21はリンクバーであり、該リンクバー21は、中間ブーム16の左側(キャブ側)に該中間ブーム16に対して略平行に配置されている。
【0013】
このリンクバー21の基端部は、ピン17と平行なピン22によってメインブーム8の先端左側下部に設けた上下一対のリンクバー基端支持ブラケット23,23に枢支され、また、リンクバー21の先端部は、ピン17と平行なピン32によって先端ブーム18の左側部に設けたリンクバー及びシリンダ先端支持ブラケット24とリンクバー先端下部支持ブラケット25に枢支されている。
【0014】
図6に示すように、上方から見て、前記のピン17とピン22とを結ぶ仮想線a(メインブーム8に属する)に対してピン19とピン32とを結ぶ仮想線b(先端ブーム18に属する)が平行に位置し、中間ブーム16に対してリンクバー21が平行に位置するようになっており、これら中間ブーム16及びリンクバー21等によって、仮想線a(メインブーム8に属する)を固定リンクとする平行四辺形リンク機構26を構成している。
【0015】
27はオフセット用シリンダであり、該オフセット用シリンダ27は、中間ブーム16の左側(キャブ側)に、該中間ブーム16の左側面の上部に沿い且つ前記のリンクバー21の上方に位置するように配置されている。
【0016】
このオフセット用シリンダ27のシリンダ本体28の基端部は、ピン17と平行なピン29によって中間ブーム16の基端左側部に設けた上下一対のシリンダ基端支持ブラケット30,30に枢着され、また、オフセット用シリンダ27のピストンロッド31の先端部は、先に述べたピン32によって先端ブーム18の左側部に設けたシリンダ先端上部支持ブラケット33と前記のリンクバー21及びシリンダ先端支持ブラケット24に枢着されており、オフセット用シリンダ27のヘッド側流体室あるいはロッド側流体室に作動流体を給排すると、ピン17を中心として中間ブーム16が左右に揺動するようになっている。
【0017】
このように中間ブーム16が揺動する場合、メインブーム8と先端ブーム18は、先に述べた平行四辺形リンク機構26を構成する中間ブーム16、リンクバー21を介して連結されているので、上方から見ると先端ブーム18はメインブーム8に対して常に平行状態(図6参照)を保持する。
【0018】
34はアームであり、該アーム34の基端部は、ピン9と平行なピン35によって先端ブーム18に枢着されている。
【0019】
36はアーム回動用シリンダ(図5参照)であり、該アーム回動用シリンダ36本体の基端部は、ピン9と平行なピン37によって先端ブーム18のシリンダ支持部20に枢支され、また、アーム回動用シリンダ36のピストンロッド38の先端部は、ピン9と平行なピン39によってアーム34の基端部に設けたブラケット40に枢着されており、アーム回動用シリンダ36のヘッド側流体室あるいはロッド側流体室に作動流体を給排すると、ピン35を中心としてアーム34が回動するようになっている。
【0020】
41は掘削作業を行うためのバケットであり、該バケット41の背面に突出するように設けたブラケット42は、ピン9と平行なピン43によってアーム34の先端部に枢支されている。
【0021】
44はバケット回動用シリンダであり、該バケット回動用シリンダ44のシリンダ本体45は、ピン9と平行なピン46によってアーム34の基端部に設けたブラケット47に枢支され、また、バケット回動用シリンダ44のピストンロッド48の先端部には、ピン9と平行なピン49によってバケットリンク50及びアームリンク51のそれぞれの一端部が枢支されている。
【0022】
更に、バケットリンク50の他端部は、ピン9と平行なピン52によってバケット41の背面のブラケット42に枢支され、また、アームリンク51の他端部は、ピン9と平行なピン53によってアーム34の先端部近傍に枢支されており、バケット回動用シリンダ44のヘッド側流体室あるいはロッド側流体室に作動流体を給排すると、ピン43を中心としてバケット41が回動するようになっている。
【0023】
上述したメインブーム8、中間ブーム16、先端ブーム18、アーム34、バケット41、並びにこれらを作動させるブーム起伏用シリンダ10、オフセット用シリンダ27、アーム回動用シリンダ36、バケット回動用シリンダ44等によって、作業機のアタッチメントが構成されている。
【0024】
図5及び図6に示す作業機のアタッチメントでは、たとえば、メインブーム8を起立させた状態で、キャブ5に向ってアーム34の先端部が接近するように該アーム34を回動させるとともに、中間ブーム16を左方へ揺動させると、バケット41がキャブ5に接触することがある。
【0025】
そこで、作業機本体4に対するメインブーム8の起伏角度、メインブーム8に対する中間ブーム16の揺動角度、先端ブーム18に対するアーム34の回動角度が所定値に到達したか否かを検知するセンサをアタッチメントの構成部材の所定箇所に取り付け、このセンサからの検知信号に基づき、バケット41等がキャブ5に干渉する前に、ブーム起伏用シリンダ10、オフセット用シリンダ27、アーム回動用シリンダ36の作動を停止させる制御器を作業機本体に搭載し、これらセンサ及び制御器で構成されるキャブ干渉防止装置によって、キャブ5とバケット41等の干渉を防止するようにしている。
【0026】
このキャブ干渉防止装置のセンサと制御器との間で信号の授受を行う手段とし、メインブーム8の側面には、センサと制御器とを電気的に接続する電線62が多数のクランプ63を介して取り付けられている。
【0027】
【発明が解決しようとする課題】
しかしながら、アタッチメントの構成部材であるメインブーム8等に多数のクランプ63を介して電線62を固定するのは容易ではない。
【0028】
また、電線62がメインブーム8の側面に支持されているため、作業時に樹木の枝、解体現場でコンクリート躯体から突出した鉄筋等の障害物に電線62が引っ掛かって、電線62を破断してしまうことがある。
【0029】
本発明は、このような問題を解消し、アタッチメントに取り付けられている電気機器に給電する電線を固定するための部品を使わなくて済むようにし、しかも電線が外部に露出しないようにして破断されないようにした作業機のアタッチメントを提供することを目的とするものである。
【0030】
【課題を解決するための手段】
本発明は、作業機本体に起伏可能に支持されたブームを有し且つアタッチメントを構成する流体圧機器へ作動流体を給排する流体配管をブームの背面に対して所定の間隔を隔てて設けた作業機のアタッチメントにおいて、ブームの背面と流体配管との間にブームの基端部から先端部に向かって延びる配線挿通管を、該配線挿通管が前記ブームの背面と2本の流体配管とによって挟持されるように設け、アタッチメントに取り付けられた電気機器へ前記作業機本体から給電するための電線を配線挿通管に挿通したことを特徴とする
【0031】
【発明の実施の形態】
以下、本発明の実施の形態を、図を参照しつつ説明する。
【0032】
図1は本発明の実施の形態の一例を示す側面図であって、図5と同一部分には同一符号を付してある。
【0033】
メインブーム8の背面には、従来のアタッチメントと同様に、作業機本体4から図5に示すオフセット用シリンダ27、アーム回動用シリンダ36、バケット回動用シリンダ44等の流体機器へ作動流体を給排する流体配管54が、図2に示すように並べて配設されている。
【0034】
これらの流体配管54は、図4に示すように、メインブーム8の背面に固着された配管支持台55の表面に載置され、配管用クランプ56とボルト57とによって、配管支持台55の表面上に固定されるようになっている。
【0035】
このためメインブーム8の背面と流体配管54との間には、図3に示すように、配管支持台55の高さに略等しい寸法の所定の間隔58が空くようになる。
【0036】
図4に示すように、配管支持台55の表面の隣り合った流体配管54,54の間には、半円形の座ぐり59が形成されていて、この座ぐり59には断面円形の配線挿通管60が嵌められ、隣り合った流体配管54,54によって座ぐり59内に押さえ込まれるようになっている。
【0037】
配線挿通管60はコルゲートが施されている可撓性のもので、図1、図2に示すようにメインブーム8の基端部から先端部に向かって延びており、上述した配管支持台55から離れた箇所においては、図1、図3に示すようにメインブーム8の背面に接して2本の流体配管54,54によりメインブーム8の背面に押し付けられ、メインブーム8の背面と流体配管54,54とに挟持されてメインブーム8の背面から離れないようになっている。
【0038】
配線挿通管60の内部には、図3、図4に示すように電線61,61が挿通されていて、作業機本体4に設けてある図示しない電源から、先端ブーム18(図5参照)等に取り付けてある図示しない照明灯等の電気機器に給電するように接続される。
【0039】
図1ないし図4に示すアタッチメントを組み付ける際には、配線挿通管60の内部に予め電線61,61を挿通しておく。
【0040】
そして図1、図4に示すようにメインブーム8の背面に配管支持台55を固着し、予め電線61,61を挿通しておいた配線挿通管60を配置した後に流体配管54を配設し、配管用クランプ56とボルト57とによって流体配管54を配管支持台55の表面上に固定する。そして配線挿通管60がメインブーム8の背面と流体配管54,54とに挟持されるようにする。
【0041】
上述した実施の形態は、メインブーム8の背面に配線挿通管60を配置する場合を図示して説明したが、中間ブーム16、先端ブーム18等のブームに対しても、同様にして配線挿通管60を配置することができる。
【0042】
尚、本発明の作業機のアタッチメントは、上述した実施の形態のみに限定されるものではなく、本発明の要旨を逸脱しない範囲において種々の変更を加え得ることは勿論である。
【0043】
【発明の効果】
以上述べたように、本発明の作業機のアタッチメントにおいては、下記のような種々の優れた効果を奏し得る。
【0044】
(1)本発明の請求項1あるいは請求項2に記載の作業機のアタッチメントのいずれにおいても、作業機本体からアタッチメントに取り付けられた電気機器へ給電するための電線が露出せずに配線挿通管で保護されるため、電線の破断を防止することができる。
【0045】
(2)本発明の請求項2に記載の作業機のアタッチメントにおいては、電気機器に給電するための電線を挿通した配線挿通管をブームに固定するのに特別な部品を使用する必要がないため、部品点数と組み付け工数を削減でき、また、配線挿通管が流体配管に隠れるため、機械装置の外観の見栄えが良くなる。
【図面の簡単な説明】
【図1】本発明の実施の形態の一例を示す側面図である。
【図2】図1をII方向から見た背面図である。
【図3】図2のIII−III断面図である。
【図4】図2のIV−IV断面図である。
【図5】従来から使用されている作業機の一例を示す側面図である。
【図6】図5のVI−VI矢視図である。
【符号の説明】
4 作業機本体
8 メインブーム(ブーム)
54 流体配管
58 間隔
60 配線挿通管
61 電線
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to attachments for work machines such as excavators and construction machines.
[0002]
[Prior art]
5 and 6 show a working machine equipped with an example of an attachment conventionally used.
[0003]
Reference numeral 1 denotes a lower traveling body. The lower traveling body 1 has endless rubber crawler shoes 2 on the left and right sides and a soil discharge plate 3 on the front end.
[0004]
Reference numeral 4 denotes a work machine body such as an upper swing body, and the work machine body 4 has a substantially circular plane shape and is attached to the upper portion of the lower traveling body 1 so as to be turnable.
[0005]
Reference numeral 5 denotes a cab, and the cab 5 is mounted on the left side of the front end of the work machine body 4.
[0006]
Reference numerals 6 and 7 denote brackets, and the bracket 6 is fixed to the upper surface of the work machine body 4 so as to be located slightly on the right side (the opposite cab side) from the center of the work machine body 4. The bracket 6 is fixed to the upper surface of the work implement main body 4 so as to be positioned on the front end side of the work implement main body 4 with respect to the bracket 6.
[0007]
Reference numeral 8 denotes a main boom, and a base end portion of the main boom 8 is pivotally supported on the bracket 6 by a pin 9 extending substantially horizontally in the width direction (left-right direction) of the work machine body 4.
[0008]
Reference numeral 10 denotes a boom hoisting cylinder. A cylinder main body 11 of the boom hoisting cylinder 10 is pivotally supported on the bracket 7 by a pin 12 parallel to the pin 9, and a tip end portion of a piston rod 13 of the boom hoisting cylinder 10. Is pivotally supported by a bracket 15 provided at the tip of the main boom 8 by a pin 14 parallel to the pin 9, and when working fluid is supplied to or discharged from the head side fluid chamber or the rod side fluid chamber of the boom hoisting cylinder 10. The main boom 8 undulates around the pin 9.
[0009]
Reference numeral 16 denotes an intermediate boom, and a base end portion of the intermediate boom 16 is pivotally supported by a distal end portion of the main boom 8 by a pin 17 extending in a direction orthogonal to the pin 9.
[0010]
Reference numeral 18 denotes a tip boom, and the tip boom 18 is pivotally supported on the tip of the intermediate boom 16 by a pin 19 parallel to the pin 17.
[0011]
The distal boom 18 is positioned above the intermediate boom 16 from the intermediate portion between the proximal end and the distal end of the distal boom 18 toward the proximal end of the intermediate boom 16 when viewed from the side. An extending cylinder support 20 is provided.
[0012]
Reference numeral 21 denotes a link bar, and the link bar 21 is disposed on the left side (cab side) of the intermediate boom 16 so as to be substantially parallel to the intermediate boom 16.
[0013]
The base end portion of the link bar 21 is pivotally supported by a pair of upper and lower link bar base end support brackets 23, 23 provided on the lower left side of the front end of the main boom 8 by a pin 22 parallel to the pin 17. The front end of the shaft is pivotally supported by a link bar and a cylinder front end support bracket 24 and a link bar front end lower support bracket 25 provided on the left side of the front end boom 18 by a pin 32 parallel to the pin 17.
[0014]
As shown in FIG. 6, when viewed from above, an imaginary line b (the tip boom 18) connecting the pin 19 and the pin 32 to an imaginary line a (belonging to the main boom 8) connecting the pin 17 and the pin 22 described above. Are located in parallel, and the link bar 21 is located in parallel to the intermediate boom 16, and the virtual line a (belongs to the main boom 8) by these intermediate boom 16 and link bar 21, etc. The parallelogram link mechanism 26 is configured with a fixed link.
[0015]
Reference numeral 27 denotes an offset cylinder. The offset cylinder 27 is positioned on the left side (cab side) of the intermediate boom 16 along the upper portion of the left side surface of the intermediate boom 16 and above the link bar 21. Has been placed.
[0016]
The base end portion of the cylinder body 28 of the offset cylinder 27 is pivotally attached to a pair of upper and lower cylinder base end support brackets 30, 30 provided on the left side of the base end of the intermediate boom 16 by a pin 29 parallel to the pin 17. The tip of the piston rod 31 of the offset cylinder 27 is connected to the cylinder tip upper support bracket 33 provided on the left side of the tip boom 18 by the pin 32 described above, the link bar 21 and the cylinder tip support bracket 24. When the working fluid is supplied to or discharged from the head-side fluid chamber or the rod-side fluid chamber of the offset cylinder 27, the intermediate boom 16 swings left and right around the pin 17.
[0017]
When the intermediate boom 16 swings in this way, the main boom 8 and the tip boom 18 are connected via the intermediate boom 16 and the link bar 21 that constitute the parallelogram link mechanism 26 described above. When viewed from above, the tip boom 18 is always kept parallel to the main boom 8 (see FIG. 6).
[0018]
Reference numeral 34 denotes an arm, and a base end portion of the arm 34 is pivotally attached to the distal end boom 18 by a pin 35 parallel to the pin 9.
[0019]
Reference numeral 36 denotes an arm rotation cylinder (see FIG. 5), and the base end portion of the arm rotation cylinder 36 is pivotally supported by the cylinder support portion 20 of the tip boom 18 by a pin 37 parallel to the pin 9. The distal end portion of the piston rod 38 of the arm rotation cylinder 36 is pivotally attached to a bracket 40 provided at the proximal end portion of the arm 34 by a pin 39 parallel to the pin 9. Alternatively, when the working fluid is supplied to or discharged from the rod-side fluid chamber, the arm 34 is rotated around the pin 35.
[0020]
Reference numeral 41 denotes a bucket for performing excavation work. A bracket 42 provided so as to protrude from the back surface of the bucket 41 is pivotally supported by a tip 43 of the arm 34 by a pin 43 parallel to the pin 9.
[0021]
Reference numeral 44 denotes a bucket rotation cylinder, and a cylinder main body 45 of the bucket rotation cylinder 44 is pivotally supported by a bracket 47 provided at a proximal end portion of the arm 34 by a pin 46 parallel to the pin 9, and is also used for bucket rotation. One end of each of the bucket link 50 and the arm link 51 is pivotally supported at the tip of the piston rod 48 of the cylinder 44 by a pin 49 parallel to the pin 9.
[0022]
Further, the other end of the bucket link 50 is pivotally supported by a bracket 42 on the back surface of the bucket 41 by a pin 52 parallel to the pin 9, and the other end of the arm link 51 is supported by a pin 53 parallel to the pin 9. It is pivotally supported in the vicinity of the tip of the arm 34, and when the working fluid is supplied to or discharged from the head side fluid chamber or the rod side fluid chamber of the bucket rotating cylinder 44, the bucket 41 rotates around the pin 43. ing.
[0023]
By the main boom 8, the intermediate boom 16, the tip boom 18, the arm 34, the bucket 41, and the boom hoisting cylinder 10, the offset cylinder 27, the arm rotating cylinder 36, the bucket rotating cylinder 44, and the like that operate these, A work implement attachment is configured.
[0024]
In the attachment of the working machine shown in FIGS. 5 and 6, for example, in a state where the main boom 8 is erected, the arm 34 is rotated so that the tip of the arm 34 approaches toward the cab 5, When the boom 16 is swung to the left, the bucket 41 may come into contact with the cab 5.
[0025]
Therefore, sensors for detecting whether the undulation angle of the main boom 8 with respect to the work implement body 4, the swing angle of the intermediate boom 16 with respect to the main boom 8, and the rotation angle of the arm 34 with respect to the tip boom 18 have reached predetermined values. Based on the detection signal from this sensor, the boom raising cylinder 10, the offset cylinder 27, and the arm turning cylinder 36 are operated before the bucket 41 and the like interfere with the cab 5 based on the detection signal from the sensor. A controller to be stopped is mounted on the work machine main body, and interference between the cab 5 and the bucket 41 is prevented by a cab interference preventing device including these sensors and controllers.
[0026]
As a means for transmitting and receiving signals between the sensor and the controller of the cab interference prevention device, an electric wire 62 for electrically connecting the sensor and the controller is provided on the side surface of the main boom 8 via a number of clamps 63. Attached.
[0027]
[Problems to be solved by the invention]
However, it is not easy to fix the electric wire 62 to the main boom 8 or the like that is a constituent member of the attachment via a large number of clamps 63.
[0028]
Moreover, since the electric wire 62 is supported by the side surface of the main boom 8, the electric wire 62 is caught by obstacles, such as a branch of a tree at the time of work, and the reinforcing bar which protruded from the concrete frame in the demolishing site, and the electric wire 62 will be broken. Sometimes.
[0029]
The present invention solves such a problem, eliminates the need for using a part for fixing an electric wire for supplying electric power to an electric device attached to the attachment, and prevents the electric wire from being exposed to the outside so as not to be broken. An object of the present invention is to provide an attachment for a working machine.
[0030]
[Means for Solving the Problems]
The present invention is provided at a predetermined distance a fluid pipe for supplying and discharging hydraulic fluid to the fluid pressure device constituting the organic and and attachment of the boom which is contoured rotatably supported to the work machine body to the back of the boom In the attachment of the work machine, a wiring insertion pipe extending from the base end portion of the boom toward the distal end portion is provided between the rear surface of the boom and the fluid piping, and the wiring insertion tube is formed by the rear surface of the boom and the two fluid pipings. The electric wire for supplying electric power from the work implement main body to the electric device provided to be sandwiched and attached to the attachment is inserted into the wiring insertion tube .
[0031]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0032]
FIG. 1 is a side view showing an example of an embodiment of the present invention, and the same parts as those in FIG.
[0033]
As with the conventional attachment, the working boom is supplied and discharged from the work machine body 4 to the fluid equipment such as the offset cylinder 27, the arm turning cylinder 36, and the bucket turning cylinder 44 shown in FIG. The fluid pipes 54 are arranged side by side as shown in FIG.
[0034]
As shown in FIG. 4, these fluid pipes 54 are placed on the surface of a pipe support base 55 fixed to the back surface of the main boom 8, and the surface of the pipe support base 55 is connected by a pipe clamp 56 and a bolt 57. It is supposed to be fixed on the top.
[0035]
For this reason, as shown in FIG. 3, a predetermined gap 58 having a dimension substantially equal to the height of the pipe support base 55 is provided between the back surface of the main boom 8 and the fluid pipe 54.
[0036]
As shown in FIG. 4, a semi-circular counterbore 59 is formed between the adjacent fluid pipes 54, 54 on the surface of the pipe support base 55. A pipe 60 is fitted and pressed into the counterbore 59 by the adjacent fluid pipes 54, 54.
[0037]
The wiring penetration pipe 60 is a flexible corrugated pipe and extends from the base end portion of the main boom 8 toward the tip end portion as shown in FIGS. 1 and 2. 1 and 3, in contact with the back surface of the main boom 8, it is pressed against the back surface of the main boom 8 by the two fluid pipes 54, 54, as shown in FIGS. 1 and 3. 54 and 54 so as not to be separated from the back surface of the main boom 8.
[0038]
As shown in FIGS. 3 and 4, electric wires 61 and 61 are inserted into the wiring insertion tube 60, and a tip boom 18 (see FIG. 5) or the like is supplied from a power source (not shown) provided in the work machine body 4. It is connected so as to supply power to an electric device such as an illuminating lamp (not shown) attached to the.
[0039]
When assembling the attachment shown in FIG. 1 to FIG. 4, the electric wires 61 and 61 are inserted into the wiring insertion tube 60 in advance.
[0040]
As shown in FIGS. 1 and 4, a pipe support base 55 is fixed to the back of the main boom 8, and after the wiring insertion pipe 60 through which the electric wires 61 and 61 are inserted in advance is arranged, the fluid pipe 54 is arranged. The fluid pipe 54 is fixed on the surface of the pipe support base 55 by the pipe clamp 56 and the bolt 57. The wiring insertion tube 60 is sandwiched between the back surface of the main boom 8 and the fluid pipes 54 and 54.
[0041]
In the above-described embodiment, the case where the wiring insertion pipe 60 is disposed on the back surface of the main boom 8 is illustrated and described. However, the wiring insertion pipe is also similarly applied to booms such as the intermediate boom 16 and the tip boom 18. 60 can be arranged.
[0042]
Note that the attachment of the working machine of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the scope of the present invention.
[0043]
【The invention's effect】
As described above, in the attachment of the working machine of the present invention, various excellent effects as described below can be obtained.
[0044]
(1) In any of the attachments of the work machine according to claim 1 or 2 of the present invention, the wire insertion pipe without exposing the electric wire for supplying power from the work machine main body to the electric device attached to the attachment Therefore, the breakage of the electric wire can be prevented.
[0045]
(2) In the attachment of the work machine according to claim 2 of the present invention, it is not necessary to use a special part to fix the wiring insertion tube through which the electric wire for supplying electric power to the electric device is fixed to the boom. The number of parts and assembly man-hours can be reduced, and the wiring insertion pipe is hidden in the fluid piping, so that the appearance of the mechanical device is improved.
[Brief description of the drawings]
FIG. 1 is a side view showing an example of an embodiment of the present invention.
FIG. 2 is a rear view of FIG. 1 viewed from the II direction.
3 is a cross-sectional view taken along the line III-III in FIG.
4 is a cross-sectional view taken along the line IV-IV in FIG.
FIG. 5 is a side view showing an example of a working machine used conventionally.
6 is a view taken along arrow VI-VI in FIG. 5;
[Explanation of symbols]
4 Work implement body 8 Main boom (boom)
54 Fluid piping 58 Spacing 60 Wiring insertion pipe 61 Electric wire

Claims (1)

作業機本体に起伏可能に支持されたブームを有し且つアタッチメントを構成する流体圧機器へ作動流体を給排する流体配管をブームの背面に対して所定の間隔を隔てて設けた作業機のアタッチメントにおいて、ブームの背面と流体配管との間にブームの基端部から先端部に向かって延びる配線挿通管を、該配線挿通管が前記ブームの背面と2本の流体配管とによって挟持されるように設け、アタッチメントに取り付けられた電気機器へ前記作業機本体から給電するための電線を配線挿通管に挿通したことを特徴とする作業機のアタッチメント。Working machine attachment provided at a predetermined interval with respect to undulations capable have a supported boom and back to the fluid pipe for supplying and discharging fluid pressure device to the working fluid which constitutes the attachment of the boom to the working machine body In this case, a wiring insertion pipe extending from the base end portion of the boom toward the distal end portion is interposed between the rear surface of the boom and the fluid piping so that the wiring insertion tube is sandwiched between the rear surface of the boom and the two fluid pipings. An attachment for a work implement, wherein an electric wire for supplying power from the work implement main body to an electrical device attached to the attachment is inserted into a wiring insertion tube.
JP32261096A 1996-12-03 1996-12-03 Attachment of work equipment Expired - Lifetime JP3787198B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32261096A JP3787198B2 (en) 1996-12-03 1996-12-03 Attachment of work equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32261096A JP3787198B2 (en) 1996-12-03 1996-12-03 Attachment of work equipment

Publications (2)

Publication Number Publication Date
JPH10159121A JPH10159121A (en) 1998-06-16
JP3787198B2 true JP3787198B2 (en) 2006-06-21

Family

ID=18145644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32261096A Expired - Lifetime JP3787198B2 (en) 1996-12-03 1996-12-03 Attachment of work equipment

Country Status (1)

Country Link
JP (1) JP3787198B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4973637B2 (en) * 2008-10-10 2012-07-11 コベルコ建機株式会社 Tube clamp structure for construction machinery
JP5403013B2 (en) * 2011-08-24 2014-01-29 コベルコ建機株式会社 Piping mounting structure for work machines

Also Published As

Publication number Publication date
JPH10159121A (en) 1998-06-16

Similar Documents

Publication Publication Date Title
JP2004285702A (en) Piping routing structure of swing type excavator
JP3787198B2 (en) Attachment of work equipment
JPH10266260A (en) Arrangement structure of hydraulic pipes for work equipment
JP5789158B2 (en) Cylinder equipment for construction machinery
JP3697367B2 (en) Work equipment
JP2001090107A (en) Swiveling construction machine
JP3981459B2 (en) Ultra-small turning work vehicle
JP7385615B2 (en) Arms for working machines, working machines and working machines
JP3622626B2 (en) Hydraulic piping of excavator
JP3762137B2 (en) Construction machinery
JP2001329559A (en) Work machine piping structure of excavation work vehicle
JP2001115487A (en) Swiveling construction machine
JPH0728206Y2 (en) Boom offset type excavator
JPH061641Y2 (en) Piping structure of dump plate cylinder
JP3633708B2 (en) Construction machine attachment
JP7833933B2 (en) Working machinery
JP2877716B2 (en) Backhoe arm angle detector
JPH0124207Y2 (en)
JPH03448Y2 (en)
JP3396151B2 (en) Boom piping structure of swing work machine
JP3252089B2 (en) Hydraulic excavator offset boom
JPS6220734Y2 (en)
JP3637990B2 (en) Hydraulic piping structure of excavator
JP3804486B2 (en) Offset boom type construction machine
JP3416513B2 (en) Hydraulic piping structure of offset backhoe

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050512

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050712

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050726

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060228

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060324

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090331

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100331

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110331

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110331

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120331

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120331

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130331

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130331

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140331

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term
S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370