JP3787971B2 - How to install seismic isolation devices - Google Patents
How to install seismic isolation devices Download PDFInfo
- Publication number
- JP3787971B2 JP3787971B2 JP21909997A JP21909997A JP3787971B2 JP 3787971 B2 JP3787971 B2 JP 3787971B2 JP 21909997 A JP21909997 A JP 21909997A JP 21909997 A JP21909997 A JP 21909997A JP 3787971 B2 JP3787971 B2 JP 3787971B2
- Authority
- JP
- Japan
- Prior art keywords
- seismic isolation
- plate
- jig plate
- isolation device
- lower structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Vibration Prevention Devices (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、上部構造物を免震支持するために、積層ゴム等からなる免震装置を上部構造物と下部構造物との間に設置する方法に関する。
【0002】
【発明が解決しようとする課題】
免震装置は、通常、上部構造物と下部構造物とのそれぞれに設置された上部及び下部アンカープレートを介して上部構造物と下部構造物との間に設置される。そして、この上部及び下部アンカープレートのそれぞれには、袋ナット、アンカーボルト等が予め溶接されて固着されており、これらの袋ナット、アンカーボルト等は、上部構造物と下部構造物とのそれぞれに埋設され、上部及び下部アンカーボルトにより上部及び下部アンカープレートのそれぞれを上部構造物と下部構造物とのそれぞれにしっかりと固定し、上部及び下部袋ナットのそれぞれにボルトを螺合させて、免震装置を上部及び下部アンカープレートにボルト止めしている。
【0003】
ところで、上部及び下部アンカープレートに袋ナット、アンカーボルトを溶接すると、上部及び下部アンカープレートに一旦熱を加えるため、冷却後に上部及び下部アンカープレートに歪みを生じさせ、上部及び下部アンカープレートの平坦度を低下させる。この平坦度の低下は、免震装置を上部構造物と下部構造物との間に設置した後において、上部構造物からの下部構造物への鉛直荷重の伝達及び免震装置の機能に悪影響を及ぼし、結果として、所望に上部構造物を免震支持し得ない虞がある。このため上部及び下部アンカープレートに歪み修正を行うが、この歪み修正において所望の平坦度(1.5mm/m以下)を確保することが極めて難しく、多くの工数を費やして、コストアップの要因となる。
【0004】
また、下部アンカープレートの下面にコンクリート又はモルタルを打ち込んで、下部構造物に下部アンカープレートを固定しているが、下部アンカープレートは下部構造物の上面に設置したままとなるため、下部アンカープレートの下面にコンクリート又はモルタルが完全に充填されていることを確認することが困難であって、また、仮にコンクリート又はモルタルが未充填であることがコンクリート又はモルタルの乾燥後に確認し得たとしても、その補充が困難である。下部アンカープレートの下面にコンクリート又はモルタルの未充填部が存在すると、上記と同様に、免震装置の機能に悪影響を及ぼし、免震装置に設計通りの免震、支承機能を発揮させることができない虞が生じ得る。
【0005】
更に、上部及び下部アンカープレートは、比較的その価格が高く、このため価格についての要求が厳しい、いわゆるマンションのような集合住宅に免震装置を適用することにつての障害要因の一つにもなっている。
【0006】
本発明は、前記諸点に鑑みてなされたものであって、その目的とするところは、下部アンカープレートを省略することができ、下部アンカープレートに起因する上記の種々の不都合をなくし得る免震装置の設置方法を提供することにある。
【0007】
【課題を解決するための手段】
本発明の免震装置の設置方法は、免震装置の下プレートに形成された貫通孔に対応して複数の貫通孔が形成されたジグプレートと、このジグプレートの各貫通孔に挿通されており、頭部がジグプレートの一方の面に配されたボルトと、ジグプレートの他方の面から突出した各ボルトのねじ部に螺合された袋ナットと、ジグプレートを基礎床の上に支持する支柱手段とを具備した組み合わせ体を準備し、この組み合わせ体を、支柱手段を介して基礎床の上に配置して、ジグプレートの下面下にコンクリート又はモルタルを打ち込んで、袋ナットが埋設された下部構造物を形成すると共に、下部構造物の上面をジグプレートの下面全体で平坦に形成し、この下部構造物の形成後、各ボルトを取り外してジグプレートを下部構造物の上面から除去し、ジグプレートが除去された下部構造物の上面に免震装置を載置して、免震装置の下プレートに形成された貫通孔を介してボルトを下部構造物中の袋ナットに螺合させて、免震装置を下部構造物上に固定する。
【0008】
本発明の設置方法において、支柱手段は、複数の袋ナットのうちの少なくとも一部の袋ナットの一端に固着されたスタッドを具備している。本発明では、このスタッドを伸縮自在として、基礎床からのジグプレートの高さをスタッドにより調整してもよい。また、支柱手段は、上記のスタッドに代えて又はこれと共に、頭部がジグプレートの一方の面に配されて、ジグプレートに螺合された長尺ボルトを具備している。支柱手段が長尺ボルトを具備する場合、基礎床からのジグプレートの高さをこの長尺ボルトにより調整し、下部構造物の形成後、ジグプレートからこの長尺ボルトを除去する。以上の方法によれば、ジグプレートの水平度を調整し得る結果、正確にジグプレートを水平に配し得、したがって、下部構造物の上面の水平度を容易に確保し得る。なお、スタッドは、ジグプレートの他方の面に配された全ての袋ナットに固着してもよいが、組み合わせ体を基礎床の上に倒れないように配置して、ジグプレートを水平に配し得るように、少なくとも一部の袋ナット、例えば3個の袋ナットの一端に固着されていればよい。長尺ボルトの場合も同様である。
【0009】
また、本発明の設置方法においては、組み合わせ体のジグプレートの下面並びに免震装置の下プレート及び上プレートの下面及び上面に離型材を予め付与する。組み合わせ体のジグプレートの下面に離型材を予め付与する方法によれば、下部構造物の上面からのジグプレートの除去を容易に行い得、また、免震装置の下プレート及び上プレートの下面及び上面に離型材を予め付与する方法によれば、免震装置の取換えの際に、下部構造物と上部構造物との間から容易に免震装置を除去し得る。
【0010】
上記方法において、ジグプレートを下部構造物の上面から除去した後に、当該上面にコンクリート又はモルタルの未充填部がある場合又は当該上面の平坦度若しくは水平度が不備の場合、下部構造物の上面にコンクリート又はモルタルを充填して、下部構造物の上面を平坦若しくは水平にする。これにより、下部構造物の上面の平坦度とこれに加えて水平度とを確実に確保し得る。
【0011】
本発明方法では、免震装置を下部構造物上に固定した後、免震装置の上プレートの上面上にコンクリート又はモルタルを打ち込んで、免震装置によって免震支持される上部構造物を形成する。この場合、下部構造物の上面に載置する免震装置の上プレートの上面には、袋ナットが当該上プレートに形成された複数の貫通孔に挿通されたボルトに螺合されて予め取り付けられており、免震装置の上プレートの上面上へのコンクリート又はモルタルの打ち込みにより、上プレートの上面に取り付けられた袋ナットを埋設した上部構造物を形成する。上プレートに袋ナットが予め取り付けられた免震装置を用いことにより、上部アンカープレートを省くことができてコスト低減を図り得る。
【0012】
本発明により設置する免震装置としては、ゴム層と補強鋼板とを交互に積層した積層ゴム体と、この積層ゴム体の両端面に一体的に固着された下プレート及び上プレートとを主として具備したもの、又は上記の積層ゴム体の内部に鉛支柱を配したもの等のいずれであってもよく、更には、積層ゴム体に代えて、ゴム支柱からなる免震装置であってもよい。
【0013】
【発明の実施の形態】
次に本発明の実施の形態を、図に示す好ましい実施例に基づいて更に詳細に説明する。なお、本発明はこれら実施例に何等限定されないのである。
【0014】
【実施例】
図1に示すように、まず、基礎床31の上に鋼筋からなる配筋1を溶接等により組み立てる。そして、次に、図2及び図3に示す組み合わせ体2を準備する。組み合わせ体2は、免震装置3(図6参照)の円盤状の下プレート4に形成された複数個の貫通孔5のそれぞれに対応して複数の貫通孔6が形成された矩形のジグプレート7と、ジグプレート7の各貫通孔6に挿通されており、頭部8がジグプレート7の一方の面9に配されたボルト10と、ジグプレート7の他方の面11から突出した各ボルト10のねじ部12に螺合された袋ナット13と、複数の袋ナット13のうちの少なくとも一部の袋ナット13、本例では軸対称に配された4個の袋ナット13の一端14に固着された伸縮自在なスタッド15とを具備している。
【0015】
本例の複数個の貫通孔5は、免震装置3の下プレート4に、その周方向に等間隔に形成されており、免震装置3の円盤状の上プレート21にも同様に、その周方向に等間隔に複数個の貫通孔22が形成されている。なお、免震装置3は、本例では、図6に示すように、積層ゴム体23と、積層ゴム体23の両端面にそれぞれ固着された上記の上下プレート4及び21とを具備している。
【0016】
複数の貫通孔6が形成された鋼板等からなるジグプレート7には、更に、その中央に大径の貫通孔25が形成されており、貫通孔25を介して後述するコンクリートの打ち込み(打設)がなされる。なお、ジグプレート7の下面11には、離型材を予め付与しておく。
【0017】
支柱手段としての伸縮自在なスタッド15は、袋ナット13の一端14に溶接により固着された長ナット26と、長ナット26に螺合したボルト27とからなり、ボルト27を回転させることにより、支柱として用いるスタッド15の高さ(長さ)を調整することができる。
【0018】
次に、組み合わせ体2を、図4に示すように、袋ナット13に固着された各スタッド15を支柱として配筋1が配された基礎床31の上に配置する。この配置において、各ボルト27の頭部32と基礎床31との間にそれぞれ鋼板33を敷き、頭部32に鋼板33を溶接により固定するとよい。配置後、各スタッド15を伸縮させて、ジグプレート7の高さを調節すると共にジグプレート7を水平に配置する。この際、組み合わせ体2の水平位置を調整、設定するために、L型金具35と、L型金具35に螺合したボルト36とからなる調整具37を、ボルト36の先端がジグプレート7の側面に当接し得るようにして、組み合わせ体2の周囲の基礎床31に仮固定して、ボルト36を回転させジグプレート7を水平方向に移動させてもよい。
【0019】
組み合わせ体2の配置、調整後、図4及び図5に示すように、組み合わせ体2を取り囲んで型枠41を組み立てる。型枠41の組み立て後、貫通孔25を介してジグプレート7の下面11下にコンクリートを打ち込んで、各袋ナット13が埋設された下部構造物45(図6参照)を形成する。なお、ジグプレート7の下面11下へのコンクリートの打ち込みは、上記のように貫通孔25を介して行ってもよいが、ジグプレート7の周囲に隙間ができるようにして型枠41を組み立てて、この隙間からジグプレート7の下面11下にコンクリートを打ち込んでもよい。このようにすると、貫通孔25を有しないジグプレート7を用いることができ、しかも、下部構造物45の上面46をジグプレート7の下面11全体で容易に平坦に形成できる。
【0020】
下部構造物45の形成後、各ボルト10を取り外してジグプレート7を下部構造物45の上面46から除去すると共に、必要によりこの時点で調整具37をも除去する。ジグプレート7の除去において、引っ掛け具51をジグプレート7の上面9に溶接して、引っ掛け具51にワイヤを掛けてクレーン等により持ち上げるとよい。ジグプレート7の除去後、下部構造物45の上面46にコンクリートの未充填部等が存在する場合には、そこにコンクリート又はモルタルを打ち込んで充填して、下部構造物45の上面46の平坦度及び水平度を確保する。
【0021】
次に、図6に示すように、上プレート21の上面61に袋ナット62が当該上プレート21に形成された複数の貫通孔22に挿通された各ボルト63に螺合されて取り付けられた免震装置3を準備し、この免震装置3をジグプレート7が除去された下部構造物45の上面46にクレーン等を用いて載置して、図7に示すように、免震装置3の下プレート4に形成された貫通孔5を介してボルト65を下部構造物5中の袋ナット13に螺合させて、免震装置3を下部構造物45上に固定する。
【0022】
免震装置3を下部構造物5上に固定した後、免震装置3の上プレート21の周りに型枠71を配置して、免震装置3の上プレート21の上面61上にモルタルを打ち込んでモルタル層72を、次にコンクリートを打ち込んでコンクリート層73をそれぞれ形成する。このモルタル及びコンクリートの打ち込みにより、袋ナット62を埋設した上部構造物74を形成する。
【0023】
以下、型枠71を除去することにより、図8に示すように、免震装置3によって免震支持される上部構造物74が形成される。
【0024】
なお、免震装置3の下部構造物45の上面46への載置前に、免震装置3の下プレート4及び上プレート21の下面75及び上面61に、離型材を付与しておくことにより、免震装置3の交換時、下部構造物45と上部構造物74との間から容易に免震装置3を除去し得る。
【0025】
上記の設置方法では、上部及び下部アンカープレートを用いないのでコストを低減し得る上に、下プレート4及び上プレート21が歪むこともなく、歪み修正のための経費も必要としない。更に、ジグプレート7を除去するので、下部構造物45の上面46にコンクリート又はモルタルを再打ち込みでき、下部構造物45の上面46の平坦度及び水平度を調整でき、したがって下部構造物45の上面46の平坦度及び水平度を容易に確保できる。
【0026】
なお、上記の設置方法ではジグプレート7を再利用できるので、この点からもコストを低減し得る。
【0027】
支柱手段として、上記では伸縮自在なスタッド15で実施したが、これに代えて又はこれと共に、それぞれの頭部がジグプレート7の一方の面9に配されて、それぞれのねじ部がジグプレート7に螺合され、それぞれの先端が基礎床31に当接し得る以上の長さをそれぞれ有した複数の長尺ボルトから支柱手段を構成し、基礎床31からのジグプレート7の高さ及びその水平度をこの長尺ボルトを適宜回転させることにより調整し、下部構造物45の形成後、各長尺ボルトを回転させて下部構造物45及びジグプレート7から各長尺ボルトを除去するようにしてもよい。この場合、各長尺ボルトのねじ部に離型材を付与しておくと、下部構造物45からのその除去を容易に行い得る。また、除去後、下部構造物45の上面46に除去穴が生じるが、適宜にコンクリート又はモルタルを打ち込んで当該穴を埋めるようにすればよい。
【0028】
【発明の効果】
以上のように本発明によれば、下部アンカープレートを省略することができ、下部アンカープレートに起因する種々の不都合をなくし得、免震装置を設置する下部構造物の上面を平坦に且つ水平に形成し得る結果、免震装置に設計通りの免震、支承機能を発揮させることができる。
【図面の簡単な説明】
【図1】本発明の好ましい一実施例の説明のための配筋組み立ての斜視図である。
【図2】本発明の好ましい一実施例の説明のための組み合わせ体の斜視図である。
【図3】図2に示す組み合わせ体の側面図である。
【図4】図1及び図2に示す配筋組み立て及び組み合わせ体と型枠との配置の側面図である。
【図5】図4に示す配筋組み立て及び組み合わせ体と型枠との配置の斜視図である。
【図6】本発明の好ましい一実施例の説明のための免震装置及び下部構造物の配置の側面図である。
【図7】本発明の好ましい一実施例の説明のための免震装置及び下部構造物と型枠との配置の側面図である。
【図8】本発明の好ましい一実施例により下部構造物と上部構造物との間に設置された免震装置の側面図である。
【符号の説明】
2 組み合わせ体
3 免震装置
4 下プレート
5、6 貫通孔
7 ジグプレート
10 ボルト
13 袋ナット
15 スタッド
45 下部構造物
65 ボルト[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of installing a seismic isolation device made of laminated rubber or the like between an upper structure and a lower structure in order to support the upper structure in isolation.
[0002]
[Problems to be solved by the invention]
The seismic isolation device is usually installed between the upper structure and the lower structure via upper and lower anchor plates installed in the upper structure and the lower structure, respectively. Each of the upper and lower anchor plates has a cap nut, an anchor bolt, etc., which are welded and fixed in advance, and these cap nut, anchor bolt, etc. are respectively attached to the upper structure and the lower structure. The upper and lower anchor plates are buried in the upper and lower anchor bolts, and the bolts are screwed into the upper and lower cap nuts. The device is bolted to the upper and lower anchor plates.
[0003]
By the way, when cap nuts and anchor bolts are welded to the upper and lower anchor plates, heat is once applied to the upper and lower anchor plates, so that the upper and lower anchor plates are distorted after cooling, and the flatness of the upper and lower anchor plates. Reduce. This decrease in flatness adversely affects the transmission of vertical load from the upper structure to the lower structure and the function of the seismic isolation device after the seismic isolation device is installed between the upper structure and the lower structure. As a result, there is a possibility that the upper structure cannot be seismically isolated as desired. For this reason, distortion correction is performed on the upper and lower anchor plates. However, it is extremely difficult to secure a desired flatness (1.5 mm / m or less) in this distortion correction, and a lot of man-hours are spent, which is a factor of cost increase. Become.
[0004]
In addition, concrete or mortar is driven into the lower surface of the lower anchor plate, and the lower anchor plate is fixed to the lower structure, but the lower anchor plate remains installed on the upper surface of the lower structure. Even if it is difficult to confirm that the concrete or mortar is completely filled on the lower surface, and it can be confirmed that the concrete or mortar is unfilled after drying the concrete or mortar, Replenishment is difficult. If there is an unfilled part of concrete or mortar on the lower surface of the lower anchor plate, the function of the seismic isolation device will be adversely affected as described above, and the seismic isolation device cannot exhibit the designed seismic isolation and support functions. Concern can arise.
[0005]
In addition, the upper and lower anchor plates are relatively expensive, which is one of the obstacles to the application of seismic isolation devices to apartment buildings such as so-called condominiums. It has become.
[0006]
The present invention has been made in view of the above-described points, and an object of the present invention is to provide a seismic isolation device that can omit the lower anchor plate and eliminate the above-described various problems caused by the lower anchor plate. It is to provide an installation method.
[0007]
[Means for Solving the Problems]
The seismic isolation device installation method of the present invention includes a jig plate in which a plurality of through holes are formed corresponding to the through holes formed in the lower plate of the seismic isolation device, and inserted into each through hole of the jig plate. The head has a bolt placed on one side of the jig plate, a cap nut screwed into the threaded part of each bolt protruding from the other side of the jig plate, and the jig plate supported on the foundation floor A combination body comprising a supporting column means is prepared, and this combined body is placed on the foundation floor via the supporting column means, and concrete or mortar is driven under the lower surface of the jig plate, and a cap nut is embedded. The lower structure is formed, and the upper surface of the lower structure is formed flat on the entire lower surface of the jig plate. After the lower structure is formed, each bolt is removed to remove the jig plate from the upper surface of the lower structure. Place the seismic isolation device on the upper surface of the lower structure from which the jig plate has been removed, and screw the bolt into the cap nut in the lower structure via the through hole formed in the lower plate of the seismic isolation device. The seismic isolation device is fixed on the substructure.
[0008]
In the installation method of the present invention, the support means includes a stud fixed to one end of at least some of the plurality of cap nuts. In the present invention, the height of the jig plate from the foundation floor may be adjusted with the stud by making the stud extendable. Further, the support means includes a long bolt that is replaced with or along with the above-mentioned stud and whose head is disposed on one surface of the jig plate and screwed to the jig plate. When the column means includes a long bolt, the height of the jig plate from the foundation floor is adjusted by the long bolt, and after the formation of the lower structure, the long bolt is removed from the jig plate. According to the above method, as a result of adjusting the level of the jig plate, the jig plate can be accurately arranged horizontally, and therefore the level of the upper surface of the lower structure can be easily ensured. The studs may be fixed to all the cap nuts on the other side of the jig plate, but the assembly is placed so as not to fall on the foundation floor, and the jig plate is placed horizontally. As long as it is obtained, it is only necessary to be fixed to one end of at least some of the cap nuts, for example, three cap nuts. The same applies to a long bolt.
[0009]
Moreover, in the installation method of this invention, a mold release material is previously provided to the lower surface and upper surface of the lower plate and upper plate of the seismic isolation device as well as the lower surface of the jig plate of the combined body. According to the method of preliminarily applying the release material to the lower surface of the jig plate of the combined body, the jig plate can be easily removed from the upper surface of the lower structure, and the lower surface of the seismic isolation device and the lower surface of the upper plate and According to the method of previously applying the release material to the upper surface, the seismic isolation device can be easily removed from between the lower structure and the upper structure when the seismic isolation device is replaced.
[0010]
In the above method, after removing the jig plate from the upper surface of the lower structure, if there is an unfilled portion of concrete or mortar on the upper surface, or if the flatness or levelness of the upper surface is insufficient, the upper surface of the lower structure Fill with concrete or mortar to make the upper surface of the substructure flat or horizontal. Thereby, the flatness of the upper surface of the lower structure and the levelness in addition to this can be reliably ensured.
[0011]
In the method of the present invention, after the seismic isolation device is fixed on the lower structure, concrete or mortar is driven on the upper surface of the upper plate of the seismic isolation device to form an upper structure that is supported by the seismic isolation device. . In this case, on the upper surface of the upper plate of the seismic isolation device placed on the upper surface of the lower structure, a cap nut is screwed into a plurality of through holes formed in the upper plate and attached in advance. The upper structure in which the cap nut attached to the upper surface of the upper plate is embedded is formed by driving concrete or mortar onto the upper surface of the upper plate of the seismic isolation device. By using the seismic isolation device in which the cap nut is attached to the upper plate in advance, the upper anchor plate can be omitted and the cost can be reduced.
[0012]
The seismic isolation device installed according to the present invention mainly comprises a laminated rubber body in which rubber layers and reinforcing steel plates are alternately laminated, and a lower plate and an upper plate integrally fixed to both end faces of the laminated rubber body. Or a structure in which a lead strut is disposed inside the laminated rubber body, or a seismic isolation device including a rubber strut may be used instead of the laminated rubber body.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described in more detail based on preferred examples shown in the drawings. The present invention is not limited to these examples.
[0014]
【Example】
As shown in FIG. 1, first, a reinforcing
[0015]
The plurality of through
[0016]
A large-diameter through
[0017]
The
[0018]
Next, as shown in FIG. 4, the
[0019]
After the arrangement and adjustment of the
[0020]
After the formation of the
[0021]
Next, as shown in FIG. 6, a
[0022]
After the
[0023]
Hereinafter, by removing the
[0024]
Note that a release material is applied to the
[0025]
In the above installation method, since the upper and lower anchor plates are not used, the cost can be reduced, and the
[0026]
In addition, since the
[0027]
In the above description, the strut means is a
[0028]
【The invention's effect】
As described above, according to the present invention, the lower anchor plate can be omitted, various inconveniences caused by the lower anchor plate can be eliminated, and the upper surface of the lower structure on which the seismic isolation device is installed is flat and horizontal. As a result of the formation, the seismic isolation device can exhibit the seismic isolation and support functions as designed.
[Brief description of the drawings]
FIG. 1 is a perspective view of a bar arrangement for explaining a preferred embodiment of the present invention.
FIG. 2 is a perspective view of a combination for explaining a preferred embodiment of the present invention.
FIG. 3 is a side view of the combination shown in FIG. 2;
FIG. 4 is a side view of the arrangement of bar arrangement and combination and formwork shown in FIGS. 1 and 2;
5 is a perspective view of the arrangement of bar arrangement and combination and formwork shown in FIG. 4; FIG.
FIG. 6 is a side view of an arrangement of a base isolation device and a substructure for explaining a preferred embodiment of the present invention.
FIG. 7 is a side view of the seismic isolation device for explaining a preferred embodiment of the present invention and the arrangement of the substructure and the formwork.
FIG. 8 is a side view of a seismic isolation device installed between a lower structure and an upper structure according to a preferred embodiment of the present invention.
[Explanation of symbols]
2
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21909997A JP3787971B2 (en) | 1997-07-30 | 1997-07-30 | How to install seismic isolation devices |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP21909997A JP3787971B2 (en) | 1997-07-30 | 1997-07-30 | How to install seismic isolation devices |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1150694A JPH1150694A (en) | 1999-02-23 |
| JP3787971B2 true JP3787971B2 (en) | 2006-06-21 |
Family
ID=16730250
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP21909997A Expired - Fee Related JP3787971B2 (en) | 1997-07-30 | 1997-07-30 | How to install seismic isolation devices |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3787971B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4486456B2 (en) * | 2004-09-17 | 2010-06-23 | 株式会社竹中工務店 | Seismic isolation device installation unit |
| JP4486455B2 (en) * | 2004-09-17 | 2010-06-23 | 株式会社竹中工務店 | Seismic isolation device installation unit and method for installing and manufacturing the unit |
| JP4928142B2 (en) * | 2006-03-30 | 2012-05-09 | 普代産業株式会社 | Seismic isolation structure construction method |
| JP4876039B2 (en) * | 2007-08-01 | 2012-02-15 | 株式会社ブリヂストン | Anchor bolt fixing method |
| JP5147069B2 (en) * | 2008-12-26 | 2013-02-20 | 岡部株式会社 | Base plate construction method for seismic isolation device installation and anchor bolt anchoring structure in corner pillar for seismic isolation device installation |
| JP5147068B2 (en) * | 2008-12-26 | 2013-02-20 | 岡部株式会社 | Base plate construction method for attaching a seismic isolation device, and reinforcing bars for base plate installation used in the construction method |
| JP5619459B2 (en) * | 2010-03-31 | 2014-11-05 | 株式会社フジタ | Installation structure of base plate assembly for seismic isolation device |
| JP6114973B2 (en) * | 2013-09-11 | 2017-04-19 | 株式会社竹中工務店 | Screw member position securing jig and screw member arrangement method |
-
1997
- 1997-07-30 JP JP21909997A patent/JP3787971B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1150694A (en) | 1999-02-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3787971B2 (en) | How to install seismic isolation devices | |
| JP3554755B2 (en) | How to install the vibration control device | |
| JP2000303695A (en) | Tower crane for construction of base isolated building and method for installation thereof | |
| JPH1060913A (en) | How to install machinery and equipment | |
| JPH10246004A (en) | Aseismic base isolation load changing method | |
| JP3700096B2 (en) | Seismic isolation device installation method | |
| JP3438407B2 (en) | Method of installing seismic isolation device between foundation and structure or removing seismic isolation device from between them | |
| JP7049961B2 (en) | How to add equipment mount | |
| JP3829458B2 (en) | Attaching the vibration control device to the building | |
| JP3587761B2 (en) | How to install concrete blocks | |
| JPH10311045A (en) | Surface plate construction method and apparatus for erection of pillars | |
| JP2670968B2 (en) | Jig for temporary assembly of frame structure and method of temporary assembly of frame structure | |
| JP2021195834A (en) | Column base anchor structure, trestle, and design method for column base anchor structure | |
| CN115404893B (en) | Steel column pier foundation, construction method and emergency temporary building | |
| JP2001032302A (en) | Height adjusting device for cover receiving frame | |
| JP2021038614A (en) | Construction method of equipment installation stand, equipment installation stand and foundation bolt installation template | |
| JPH0821126A (en) | Frame device for mounting base isolation device | |
| JP2020159105A (en) | Base plate installation method of seismic isolation device | |
| JP3079420B2 (en) | Precast concrete girder installation structure and method, and PC girder | |
| JPH06229141A (en) | How to build a seismic isolated building | |
| JP6368839B2 (en) | How to install the seismic isolation device | |
| KR102221019B1 (en) | Leveling support method of tower | |
| JPH09158640A (en) | Gatepost and installing method of gatepost | |
| JPH0728322Y2 (en) | Temporary enclosure unit | |
| JPS6022437A (en) | Fixing device for rotating electric machines |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040512 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051125 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051206 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060206 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060307 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060320 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090407 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100407 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |