JP3796015B2 - Centralized control system for gas cylinders for inspection and adjustment of gas analyzers - Google Patents
[go: Go Back, main page]

JP3796015B2 - Centralized control system for gas cylinders for inspection and adjustment of gas analyzers - Google Patents

Centralized control system for gas cylinders for inspection and adjustment of gas analyzers Download PDF

Info

Publication number
JP3796015B2
JP3796015B2 JP22753497A JP22753497A JP3796015B2 JP 3796015 B2 JP3796015 B2 JP 3796015B2 JP 22753497 A JP22753497 A JP 22753497A JP 22753497 A JP22753497 A JP 22753497A JP 3796015 B2 JP3796015 B2 JP 3796015B2
Authority
JP
Japan
Prior art keywords
gas
gas cylinder
management
inspection
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22753497A
Other languages
Japanese (ja)
Other versions
JPH1151827A (en
Inventor
一郎 鷹野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Horiba Ltd
Original Assignee
Horiba Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Horiba Ltd filed Critical Horiba Ltd
Priority to JP22753497A priority Critical patent/JP3796015B2/en
Publication of JPH1151827A publication Critical patent/JPH1151827A/en
Application granted granted Critical
Publication of JP3796015B2 publication Critical patent/JP3796015B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)
  • Sampling And Sample Adjustment (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はガス分析計の調整および検査に用いる複数種類の標準ガスを封入した複数のガスボンベの集中管理システムに関する。
【0002】
【従来の技術】
一般に自動車排気ガスの測定などに用いるガス分析計には、水素、一酸化炭素、二酸化炭素、窒素酸化物など多種類の測定対象ガスがある。このため、ガス分析計の生産時に既知の濃度を有する幾種類もの標準ガスを流入させて、ガス分析計の調整および検査を行う必要がある。
【0003】
図4はガス分析計2を検査および調整する従来のガスボンベの接続システム20の構成を概略的に示している。図4において3はそれぞれガス分析計2の検査・調整に用いられる検査システム、4はガス分析計2の検査・調整のために用いられる各種の標準ガスを封入したガスボンベ、8は各ガスボンベ4を選択的にガス分析計2に接続する配管切換器である。すなわち、各検査システム3は適宜の既知濃度に希釈された標準ガスを封入したガスボンベ4を選択的にガス分析計2に接続し、ガス分析計2の測定結果が既知濃度を出力するように、ガス分析計2の調整および検査を行っていた。
【0004】
このように、ガスボンベ4に封入された標準ガスをガス分析計2に選択的に供給して調整・検査を行う場合、封入された標準ガスは使用するに従って残圧が低下し、やがて内容物(標準ガス)がなくなることは避けられない。このため、ガス分析計2の調整および検査の途中で標準ガスの供給が途絶えてしまったり、必要な圧力のガスを供給できなくなることがないように、事前に使用する標準ガスの残圧を確認する必要がある。
【0005】
また、一般に水素ガスなど可燃性のガスや、高濃度の一酸化炭素や、窒素酸化物など毒性を備えたガスを封入するガスボンベ4は安全管理を強化するために、別室のガスボンベの保管庫に隔離しておき、これらの各標準ガスは配管7によってガス分析計2に供給される場合が多い。
【0006】
このため、上述の標準ガスの残圧を確認するために、例えば検査システム3が使用する標準ガスの種類および使用量の一覧表21を出力し、作業者がこの表21を持ってガスボンベ4毎に取り付けた圧力計4aを見て、調整・検査のために必要な残量があるか否か目視確認していた。
【0007】
【発明が解決しようとする課題】
ところが、検査・調整対象となるガス分析計2の種類によっては、数十種類もの標準ガスを封入したガスボンベ4の確認を行う必要があった。つまり、作業者がガスボンベ4の保管庫に行って各標準ガスの量を1本ずつ圧力計4aから判断する必要があり、そのために多くの時間を必要とすると共に煩雑であり、非常に工数がかかっていた。
【0008】
さらに、作業員は各ガスボンベ4に記録された標準ガスの内容や濃度およびその残量を間違えて確認してしまうこともあり、調査および検査の途中で標準ガスの供給が途絶えてしまい、ガス分析計2の調整や検査を行えなくなることもあった。
【0009】
加えて、標準ガスの中には窒素酸化物や亜硫酸ガスなどの毒性のあるガスや、水素などの可燃性のあるガスも幾らかあり、これらを作業者が安全に目視確認するためには、作業者に安全確保のための十分の知識が必要であった。
【0010】
また、一般的にガスボンベ4は業者からリースしており、その返却のための有効期限が決められている。加えて、様々な要因でガス漏れなどが発生していないかどうかを確認することも安全確保の上で重要である。したがって、前記作業者は必要とする標準ガスの残量を確認するだけにとどまらず、ガスボンベ4の有効期限や安全性などについても、常々確認しておく必要があった。
【0011】
本発明は、上述の事柄を考慮に入れてなされたものであって、ガス分析計の調整・検査を行うときに使用するガスボンベの残量を素早くリアルタイムに確認でき、ボンベの交換、手配を含めてガス分析計の調整・検査を素早く行うことができるガス分析計の検査・調整用ガスボンベの集中管理システムを提供することを目的としている。
【0012】
【課題を解決するための手段】
上記目的を達成するために、本発明のガス分析計の検査・調整用ガスボンベの集中管理システムは、ガス分析計の検査および調整のために該ガス分析計に流入させる種類の異なる標準ガスを封入した複数のガスボンベを集中的に管理するシステムであって、各ガスボンベ毎に設けられて各ガスボンベの内圧を測定し内圧測定値信号を出力する圧力センサと、この内圧測定値信号をガスボンベ毎に設定された識別番号を含む管理データと共に送信する送信用通信部と、この送信用通信部に接続されて識別番号を含む管理データおよび内圧測定値信号を受信する受信用通信部と、この受信用通信部受信した内圧測定値を基に各ガスボンベ内のガスの残量を計算するとともに、識別番号をキーとしてガスボンベ管理データベースを作成し、かつ、受信用通信部で受信した情報を基にガスボンベ管理データベースの各情報を更新するガスボンベ管理処理部と、このガスボンベ管理処理部にネットワーク接続されて該ガスボンベ管理処理部で作成したガスボンベ管理データベースを用いて、検査・調整の対象となるガス分析計の検査および調整に用いる標準ガスを封入したガスボンベ内のガス残量及びガス濃度が検査・調整に必要かつ十分であるか否かを確認し、必要かつ十分でない場合にガスボンベの交換指示を出力するガス分析計の検査システム部とを有していることを特徴としている。
【0013】
したがって、作業者はガスボンベ管理処理部を操作してガスボンベ管理データベースを検索することにより、ガス分析計の調整・検査に必要な複数種類の標準ガスの残量を1ヶ所で容易に確認することができ、作業者がガスボンベの保管庫などに行って各ガスボンベに取り付けられた圧力計を個々に目視確認する必要がなくなる。
【0014】
また、前記ガスボンベ管理処理部にネットワーク接続されている検査システム部が、ガスボンベ管理処理部で作成した前記ガスボンベ管理データベースを用いて、検査・調整の対象となるガス分析計の検査および調整に用いる各種標準ガスのガスボンベ内のガス残量及びガス濃度を確認すると共に、その確認結果で対象となるガス分析計の検査および調整に必要かつ十分でない場合にガスボンベの交換指示を出力することになる。
【0015】
このように、対象とするガス分析計の検査および調整に必要な標準ガスの残量及び濃度確認作業が検査システムとガスボンベ管理処理部との間で行われるので、標準ガスの残量や濃度確認を作業者が行う必要がなく、システムの自動化を図ることができ、無駄工数を削減できる。また、作業者が誤って別の標準ガスの残量を確認したり、濃度や種類の異なるガスをガス分析計の検査および調整に誤って使用することも全くなくなり、ガス分析計の高精度な検査に寄与することができる。
【0016】
本発明において、請求項2に記載のように、前記ガスボンベ管理処理部に、該ガスボンベ管理処理部で作成したガスボンベ管理データベースを介して各ガスボンベの内圧測定値を常時監視し、ガス漏れの発生を検知したとき、メンテナンスの要請、ガスボンベ交換指示および発注指示を出力するガスボンベ状態管理部がネットワーク接続されていることが好ましい。
【0017】
このようにすることにより、万が一生じるかもしれないガス漏れなどの発生を素早く検知して、適切な処置を取ることができ、安全性に寄与できると共に、無駄なガスの消費を抑えることができる。また、無くなりつつあるガスの発注作業や、有効期限の管理などを合わせて行うことも可能であり、システムの省力化や自動化を飛躍的に高めることができる。
また、請求項3に記載のように、前記ガスボンベ管理処理部に、ガスボンベが入庫したとき、そのガスボンベの認識番号、封入ガスの種類および濃度,管理者名,有効期限などの発注搬入情報を前記ガスボンベ管理データベースに含めて管理すべく入力する発注搬入管理部がネットワーク接続されていることが好ましい。
このようにすることにより、ガスボンベの認識番号をキーとして各ガスボンベに固有の情報の管理を間違いなく、迅速に行うことができる。
【0018】
さらに、本発明において、請求項4に記載のように、前記圧力センサとガスボンベ管理処理部間の送信・受信用通信部が、無線通信を行なう通信部であり、圧力センサ側の送信用通信部が各圧力センサ毎に設けられていることが望ましい。この場合、各ガスボンベ毎に設けた圧力センサとガスボンベ管理処理部との間を信号線で接続する必要がなく、既存のガスボンベの接続システムに増設することにより、容易にガスボンベの集中管理システムを構成することができる。
【0019】
【発明の実施の形態】
図1,2は本発明のガス分析計の検査・調整用ガスボンベの集中管理システム1の一例を示している。図1,2において、ガスボンベの集中管理システム1はガス分析計2を検査する検査システム3と、前記ガス分析部2に供給する各種の標準ガスを封入した複数のガスボンベ4およびその圧力センサPGと、各ガスボンベ4を保管するボンベ庫5a〜5cと、各ガスボンベ4の残量等を管理するガスボンベ管理処理部6と、ガス分析計2を各ガスボンベ4に接続する配管7,配管切換器8,可撓管9と、ガスボンベ管理処理部6と各圧力センサPG間の通信を可能とする送信用通信部10,通信線11,受信用通信部12とからなっている。
【0020】
前記各ガスボンベ4には、例えば従来の目で見るだけの圧力計4aに加えて、圧力を電気信号(内圧測定値信号)に変換するための圧力センサPGを各々に取付けると共に、可撓管9を介して配管7に接続される。圧力センサPGは内圧測定値を電気信号に変換し、この内圧測定値信号を可撓管9に沿わせて設けた電線9aを介して前記送信用通信部10に転送する。
【0021】
圧力センサPGは例えばそれぞれ独自の識別番号を設定できるようにしており、この識別番号を内圧測定値信号に加えて前記送信用通信部10に出力する。この識別番号は例えば、ガスボンベ4に付されたラベル4b等に記載されている容器番号である。なお、この識別番号は前記送信用通信部10側でガスボンベ4毎に設定するようにしてもよい。また、前記圧力センサPGを前記送信用通信部10の配管接続部10a内にガスボンベ4毎に設けるようにしてもよい。この場合、可撓管9に沿わせて電線9aを設ける必要がなくなる。
【0022】
送信用通信部10は圧力センサPGから入力した各ガスボンベ4毎の内圧測定値信号と識別番号を例えばそのガスボンベ4が接続された配管接続部10aの接続位置を示す番号と共に送信するように構成されており、この送信用通信部10には例えばマイクロコンピュータを内蔵している。送信用通信部10内のマイクロコンピュータはガスボンベ4を認識するための識別番号と内圧測定値を一旦集めて、通信線11および受信用通信部12を介してガスボンベ管理処理部6に送信する。
【0023】
そして、ガスボンベ管理処理部6は配管切換器8から送信される各ガスボンベ4の内圧測定値信号および識別番号を受け取ることにより、全てのガスボンベ4の内圧測定値を入力でき、この内圧測定値を基に各ガスボンベ4の残量を計算することができる。あるいは、ガスボンベ管理処理部6から各ガスボンベ4の内圧測定値信号の送信命令を受信用通信部12を介して送信することにより、各ガスボンベ4の内圧測定値をいつでも受け取ることができる。なお、本例では送信用・受信用通信部10,12間の通信を通信線11を介してLAN(Local Area Networks)の技術を使用した通信システム(ネットワーク)で行っているが、この通信を無線で行ったり、パラレル通信を行なうケーブルを介して行なうなどあらゆる形態の通信を採用してもよい
【0024】
ガスボンベ管理処理部6は入力した識別番号をキーとして、各ガスボンベ4の内圧測定値や、これが接続された配管接続部10aの接続位置を示す番号を、封入したガスの種類、ガスボンベの管理者名、ガスの有効期限と共に記憶することによりガスボンベ管理データベースを作成する。また、受信した情報を基に随時ガスボンベ管理データベースの各情報を更新する。
【0025】
一方、本例のガスボンベの集中管理システム1は各検査システム3,ガスボンベ状態管理部13およびガスボンベの発注搬入管理部14が前記通信線11を利用してガスボンベ管理処理部6に接続されて互いにデータ通信を行うことができるようにしている。つまり、検査システム3,ガスボンベ管理処理部6,ガスボンベ状態管理部13,発注搬入管理部14が通信線11によって接続されるネットワーク(例えばLAN)を形成している。
【0026】
なお、本例では検査システム3,ガスボンベ管理処理部6,ガスボンベ状態管理部13,発注搬入管理部14間の通信を、通信部10と通信部12との間の通信と同じ通信線11を介して行うことによって通信線の数を少なくし、構成を簡素化しているが、この通信線を別々に設けてもよい。つまり、ガスボンベ4の内圧測定値および識別番号の通信と、ガスボンベ管理データベースの利用に伴う通信を別々のネットワーク上で行うことにより、両者を分離し、通信管理を簡易に行なうようにしてもよい。
【0027】
したがって、検査システム3は上述のネットワークを用いることによりガスボンベ管理処理部6が有するガスボンベ管理データベースを用いて調整・検査を行うのに充分なガス残量が残っているか、濃度データが要求されている仕様を満足しているかなどの情報をオンラインで得ることができる。そして、ガスボンベ4の交換の必要があるかどうかを判断し、追加手配の作業などを行うことができる。
【0028】
また、本例のように送信用通信部10が各ガスボンベ4の識別番号と共に、このガスボンベ4が接続された配管接続部10aの接続位置を示す番号を送信する場合には、検査システム3はその内部に設けた配管切換器8に適切な切換命令を与えて、ガス分析計2の調整および検査に必要な適宜のガスを流入させるように制御することも可能である。なお、本発明はこれに限られるものではなく、ガス分析計2に供給するガスの切換えを検査システム3の近傍で行ったり、配管接続部10aの近傍に設けた配管切換器によって行なうようにしてもよいことは言うまでもない。また、供給するガスの切換えを自動制御によって行わない場合には、送信用通信部10が配管接続部10aの接続位置を示す番号を送信する必要はない。
【0029】
次に、前記ガスボンベ状態管理部13は前記ネットワークを用いることにより、ガスボンベ管理データベースを常時監視することができる。つまり、各ガスボンベ4の内圧測定値を常時監視することにより、例えば使用していないはずのガスボンベ4の内圧が徐々に低下している場合に、ガス漏れの発生を迅速に検知することができる。そして、ガス漏れを検知した場合には、発生源を追求するために、ガスボンベ4の管理者に報告して適切なメンテナンスを要請する。
【0030】
すなわち、ガスボンベ状態管理部13は漏れていると思われるガスの種類に応じて、火気に対する注意事項や中毒に対する注意事項を添えてメンテナンスを要請することができる。更には、ガスボンベ4の有効期限をガスボンベ管理データベースに含めている場合には、期限切れとなったガスボンベ4を交換する必要があることを報告することができる。したがって、たとえ可燃性や中毒性のあるガスを封入するガスボンベ4であっても極めて安全に扱うことができるだけでなく、ガス漏れに伴う無駄を最小限に抑えることができる。
【0031】
また、本例のガスボンベの集中管理システム1は入庫したガスボンベ4や、期限切れとなったガスボンベ4を保管しておくためのボンベ庫5bを備え、このボンベ庫5b内に前記ネットワークに接続された端末コンピュータからなるガスボンベ4の発注搬入管理部14を設けている。
【0032】
したがって、業者からガスボンベ4が入庫したときに、そのガスボンベ4の認識番号,封入ガスの種類および濃度,管理者名,有効期限などの情報を発注搬入管理部14から入力し、これを前記ガスボンベ管理データベースに含めて管理することができる。このようにすることにより、ガスボンベ4の認識番号をキーとして各ガスボンベ4に固有の情報の管理を間違いなく、迅速に行うことができる。
【0033】
例えば、ボンベ庫5bに保管しているガスボンベ4をボンベ庫5aまたは5cにおいて配管接続部10aに接続するときに、ガスボンベ4の識別番号を入力するだけで、前記ネットワーク上に接続された全ての端末がこの配管接続部10aに接続されたガスボンベ4に封入されているガスの種類や濃度など様々な情報を入手することができる。加えて、各端末3,13,14において、使用しているガスボンベ4を含めて保管している全てのガスボンベ4の個数や状態に関する情報を入手できる利点もある。
【0034】
さらに、本例のガスボンベの集中管理システム1は前記ガスボンベ状態管理部13や発注搬入管理部14などのネットワーク上の端末において、使用するガスの種類の頻度を監視して、有効期限を考慮に入れた上で適宜の容量のガスボンベ4を足りなくなる前に発注する管理処理を行うことができる。そして、ガスボンベ4の発注のための伝票14aを印刷する印字部14bを設けるなどして、ガスボンベ4の管理者にかかる負担を軽減することも可能である。
【0035】
なお、上述の例では、各ガスボンベ4に目で確認できる圧力計4aとは別に、内圧測定値を電気信号に変換する圧力センサPGを設けた例を示しているが、従来から用いられる圧力計4aを省略し、前記圧力センサPGに目で確認できる圧力測定値の表示を出力できるようにしてもよい。さらには、本発明によれば目視確認用の圧力計4aを設けなくてもガスボンベ4の集中的な管理を行うことができる。
【0036】
また、作業者は各端末3,13,14の動作に関係なくLANに接続された各端末3,13,14のモニタMを見ることにより、各ガスボンベ4の残量を随時確認することも可能である。つまり、前記ガスボンベの集中管理システム1を構築するために、必ずしも各端末3,13,14全てが前記LANに接続されて完全に自動化する必要はないことは言うまでもない。
【0037】
図3は圧力センサPGに送信用通信部10’を内蔵し、電磁波によって内圧測定値を送信するように構成したガスボンベの集中管理システム1’を示している。図3において、12’はホストコンピュータ6に設けた内圧測定値信号の受信用通信部、11’は送信用・受信用通信部10’,12’間の通信に用いられる電磁波である。すなわち、本例に示すガスボンベの集中管理システム1’は電磁波11’によって内圧測定値およびガスボンベの識別番号を送信する点において、図1,2の例と異なっている。なお、図3において図1,2と同じ符号を付した部材は同一または同等の部材であるので、その詳細な説明を省略する。
【0038】
送信用通信部10’ ,受信用通信部12’間の通信は、例えば各圧力センサPGに設けた送信用通信部10’に対して受信用通信部12’が順次リクエスト信号を電磁波11’にして送信し、リクエストを受けた送信用通信部10’が順次内圧測定値信号およびガスボンベ4に付けられた識別番号を電磁波11’にして送信し、これを受信用通信部12’において受信することによって行われる。なお、この無線による通信方法はこれに限られるものではなく、適宜の方法で行うことができることは言うまでもない。
【0039】
上述のように電磁波11’によって内圧測定値およびガスボンベの識別番号を送信することにより、各圧力センサPGとホストコンピュータ6とを接続するために配線をはわす必要がなくなる。したがって、ガスボンベの集中管理システム1’を従来のガスボンベの接続システムに変更する場合、本例のようにすることによって、元のガスボンベの接続システムに増設することができ、本発明のガスボンベの集中管理システム1’を極めて容易に構築できる。
【0040】
なお、上述した図3に示す例においても、図1,2と同様の変形を実施できることは言うまでもない。
【0041】
【発明の効果】
以上説明したように、本発明のガス分析計の検査・調整用ガスボンベの集中管理システムによれば、ガスの残量、残圧がコンピュータの画面を見るだけで確認できるので、従来1本ずつ現場に行って確認していた作業をコンピュータの操作だけで行うことができる。つまり、リアルタイムに内圧測定値に基づく標準ガスの残量を始め、保管している標準ガスの本数,使用期間,封入されているガスの種類や濃度,管理者名等の各種情報を入力し、ガスボンベ管理データベースを更新するので、交換作業、手配作業、調整・検査装置への情報提供などが確実に行うことができる。
【図面の簡単な説明】
【図1】 本発明のガス分析計の検査・調整用ガスボンベの集中管理システムのブロック図である。
【図2】 前記ガスボンベの集中管理システムの一例を示す透視斜視図である。
【図3】 本発明のガス分析計の検査・調整用ガスボンベの集中管理システムの別の例を示すブロック図である。
【図4】 従来のガスボンベの接続システムの例を示すブロック図である。
【符号の説明】
1,1’…ガスボンベの集中管理システム、2…ガス分析計、3…検査システム、4…ガスボンベ、6…ガスボンベ管理処理部、10,10’…送信用通信部、12,12’…受信用通信部、13…ガスボンベ状態管理部、PG…圧力センサ。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a centralized management system for a plurality of gas cylinders filled with a plurality of types of standard gases used for adjustment and inspection of a gas analyzer.
[0002]
[Prior art]
In general, gas analyzers used for measurement of automobile exhaust gas include various types of measurement target gases such as hydrogen, carbon monoxide, carbon dioxide, and nitrogen oxides. For this reason, it is necessary to adjust and inspect the gas analyzer by introducing several kinds of standard gases having known concentrations during the production of the gas analyzer.
[0003]
FIG. 4 schematically shows the configuration of a conventional gas cylinder connection system 20 for inspecting and adjusting the gas analyzer 2. 3 the inspection system unit that is used for each test and adjustment of the gas analyzer 2 in FIG. 4, the gas cylinder encapsulating various standard gas used for the inspection and adjustment of the gas analyzer 2 4, each gas cylinder 8 4 is a pipe switching device for selectively connecting 4 to the gas analyzer 2. That is, each inspection system 3 selectively connects a gas cylinder 4 filled with a standard gas diluted to an appropriate known concentration to the gas analyzer 2 so that the measurement result of the gas analyzer 2 outputs a known concentration. The gas analyzer 2 was adjusted and inspected.
[0004]
As described above, when the standard gas sealed in the gas cylinder 4 is selectively supplied to the gas analyzer 2 for adjustment and inspection, the residual pressure of the sealed standard gas decreases with use, and the contents ( It is inevitable that the standard gas will disappear. Therefore, check the residual pressure of the standard gas to be used in advance so that the supply of the standard gas is not interrupted during the adjustment and inspection of the gas analyzer 2 or the gas at the required pressure cannot be supplied. There is a need to.
[0005]
In general, the gas cylinder 4 containing flammable gas such as hydrogen gas, toxic gas such as high-concentration carbon monoxide, and nitrogen oxide is stored in a separate gas cylinder storage to enhance safety management. In many cases, these standard gases are supplied to the gas analyzer 2 through the pipe 7.
[0006]
For this reason, in order to confirm the residual pressure of the above-mentioned standard gas, for example, a list 21 of types and amounts of standard gas used by the inspection system unit 3 is output, and the operator holds this table 21 and holds the gas cylinder 4 By checking the pressure gauge 4a attached every time, it was visually confirmed whether or not there was a remaining amount necessary for adjustment and inspection.
[0007]
[Problems to be solved by the invention]
However, depending on the type of the gas analyzer 2 to be inspected / adjusted , it is necessary to check the gas cylinder 4 filled with several tens of types of standard gas. That is, the operator must determine the remaining amount of the standard gas to go to vault gas cylinder 4 from the pressure gauge 4a one by one, is complicated as well as require a lot of time for its very man It was over.
[0008]
In addition, the operator may mistakenly check the content and concentration of the standard gas recorded in each gas cylinder 4 and the remaining amount, and the supply of the standard gas will be interrupted during the investigation and inspection. In some cases, a total of 2 adjustments and inspections could not be performed.
[0009]
In addition, some standard gases include toxic gases such as nitrogen oxide and sulfurous acid gas, and some flammable gases such as hydrogen. Workers needed sufficient knowledge to ensure safety.
[0010]
In general, the gas cylinder 4 is leased from a contractor, and an expiration date for the return is determined. In addition, it is also important for ensuring safety whether or not gas leakage has occurred due to various factors. Therefore, the worker is not only required to check the remaining amount of the standard gas required, but also has to constantly check the expiration date and safety of the gas cylinder 4.
[0011]
The present invention has been made in consideration of the above-mentioned matters, and it is possible to quickly check the remaining amount of the gas cylinder used when adjusting and inspecting the gas analyzer in real time, including replacement and arrangement of the cylinder. The purpose is to provide a centralized management system for gas cylinders for inspection and adjustment of gas analyzers that can quickly adjust and inspect gas analyzers .
[0012]
[Means for Solving the Problems]
In order to achieve the above object, the centralized management system of the gas cylinder for inspection / adjustment of the gas analyzer of the present invention encloses different types of standard gases that flow into the gas analyzer for inspection and adjustment of the gas analyzer. A system that centrally manages multiple gas cylinders that are installed in each gas cylinder and measures the internal pressure of each gas cylinder and outputs an internal pressure measurement value signal, and this internal pressure measurement value signal is set for each gas cylinder. a transmitting communication unit for transmitting with the management data including the identification number, the receiving communication unit for receiving management data and pressure measurement value signal including the connected identification number to the transmitting communication unit, the communication for this receiver with calculating the remaining amount of gas in each gas cylinder on the basis of the internal pressure measured value received in the parts, to create a gas cylinder management database identification number as a key, and, Credit gas cylinder management unit updating each information of the gas cylinder management database based on information received by the communication unit, using a gas cylinder management database created by the gas cylinder management processing unit is networked to the gas cylinder management processing unit, Check whether the remaining gas concentration and gas concentration in the gas cylinder filled with the standard gas used for inspection and adjustment of the gas analyzer to be inspected and adjusted are necessary and sufficient for inspection and adjustment. It is characterized that you have and a testing system portion of the gas analyzer that outputs a change instruction of the gas cylinder when not.
[0013]
Therefore, the operator can easily check the remaining amounts of multiple types of standard gases required for gas analyzer adjustment and inspection by operating the gas cylinder management processing unit and searching the gas cylinder management database. This eliminates the need for the operator to go to the storage of the gas cylinders and visually check the pressure gauges attached to the gas cylinders.
[0014]
In addition, the inspection system unit connected to the gas cylinder management processing unit over the network uses the gas cylinder management database created by the gas cylinder management processing unit to use various types of inspection and adjustment of the gas analyzer to be inspected and adjusted. The gas remaining amount and gas concentration in the gas cylinder of the standard gas are confirmed, and if the confirmation result is necessary and insufficient for the inspection and adjustment of the target gas analyzer, a gas cylinder replacement instruction is output .
[0015]
In this way, since the standard gas remaining amount and concentration confirmation work required for the inspection and adjustment of the target gas analyzer is performed between the inspection system unit and the gas cylinder management processing unit, the remaining amount and concentration of the standard gas. There is no need for the operator to perform confirmation, the system can be automated, and man-hours can be reduced. In addition, there is no possibility that an operator mistakenly checks the remaining amount of another standard gas, or erroneously uses gases of different concentrations or types for inspection and adjustment of the gas analyzer. Can contribute to inspection.
[0016]
In the present invention, as described in claim 2, the gas cylinder management processing unit constantly monitors the internal pressure measurement value of each gas cylinder via the gas cylinder management database created by the gas cylinder management processing unit, and detects the occurrence of gas leakage. when it is detected, the request of maintenance, it is preferable that the gas cylinder state managing section for outputting a gas cylinder replacement instruction and order instructions are networked.
[0017]
By doing so, it is possible to quickly detect the occurrence of a gas leak that may occur and take appropriate measures, contribute to safety, and suppress consumption of useless gas. In addition, it is possible to perform gas ordering work that is disappearing and management of the expiration date, and the labor saving and automation of the system can be dramatically improved.
In addition, as described in claim 3, when a gas cylinder is received in the gas cylinder management processing unit, the order delivery information such as the identification number of the gas cylinder, the type and concentration of the enclosed gas, the administrator name, the expiration date, etc. It is preferable that an order delivery management unit that is included in the gas cylinder management database for input to be managed is connected to the network.
By doing so, information unique to each gas cylinder can be managed promptly without fail using the identification number of the gas cylinder as a key.
[0018]
Furthermore, in the present invention, as described in claim 4, the transmission / reception communication unit between the pressure sensor and the gas cylinder management processing unit is a communication unit that performs wireless communication, and the transmission communication unit on the pressure sensor side Is preferably provided for each pressure sensor . In this case, there is no need to connect the pressure sensor provided for each gas cylinder and the gas cylinder management processing section with a signal line, and a centralized management system for gas cylinders can be easily configured by adding to the existing gas cylinder connection system. can do.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
1 and 2 show an example of a centralized management system 1 for an inspection / adjustment gas cylinder of a gas analyzer of the present invention. 1 and 2, a centralized gas cylinder management system 1 includes an inspection system unit 3 for inspecting a gas analyzer 2, a plurality of gas cylinders 4 filled with various standard gases supplied to the gas analysis unit 2 , and a pressure sensor PG thereof. Gas cylinders 5a to 5c for storing each gas cylinder 4, a gas cylinder management processing unit 6 for managing the remaining amount of each gas cylinder 4, a pipe 7 for connecting the gas analyzer 2 to each gas cylinder 4, and a pipe switch 8 , A flexible tube 9, a gas cylinder management processing unit 6, and a transmission communication unit 10, a communication line 11, and a reception communication unit 12 that enable communication between each pressure sensor PG .
[0020]
For example, in addition to the conventional pressure gauge 4a that can be seen with the eyes, each gas cylinder 4 is provided with a pressure sensor PG for converting the pressure into an electric signal (internal pressure measurement value signal). It is connected to the pipe 7 via The pressure sensor PG converts the internal pressure measurement value into an electrical signal, and transfers the internal pressure measurement value signal to the transmission communication unit 10 via the electric wire 9 a provided along the flexible tube 9.
[0021]
Each of the pressure sensors PG can set, for example, a unique identification number, and outputs this identification number to the transmission communication unit 10 in addition to the internal pressure measurement value signal. This identification number is, for example, a container number written on a label 4b attached to the gas cylinder 4. This identification number may be set for each gas cylinder 4 on the transmission communication unit 10 side. Further, the pressure sensor PG may be provided for each gas cylinder 4 in the pipe connection part 10 a of the transmission communication part 10. In this case, it is not necessary to provide the electric wire 9a along the flexible tube 9.
[0022]
The transmission communication unit 10 is configured to transmit the internal pressure measurement value signal and the identification number for each gas cylinder 4 input from the pressure sensor PG together with a number indicating the connection position of the pipe connection unit 10a to which the gas cylinder 4 is connected, for example. The transmission communication unit 10 has a built-in microcomputer, for example. The microcomputer in the transmission communication unit 10 once collects the identification number for recognizing the gas cylinder 4 and the internal pressure measurement value, and transmits them to the gas cylinder management processing unit 6 via the communication line 11 and the reception communication unit 12.
[0023]
The gas cylinder management processing unit 6 receives the internal pressure measurement value signal and the identification number of each gas cylinder 4 transmitted from the pipe switching unit 8 and can input the internal pressure measurement values of all the gas cylinders 4. The remaining amount of each gas cylinder 4 can be calculated. Alternatively, the internal pressure measurement value of each gas cylinder 4 can be received at any time by transmitting the transmission command of the internal pressure measurement value signal of each gas cylinder 4 from the gas cylinder management processing unit 6 via the receiving communication unit 12. In this example, communication between the transmission / reception communication units 10 and 12 is performed by a communication system (network) using a LAN (Local Area Networks) technology via the communication line 11. Any form of communication may be employed, such as wirelessly or via a cable for parallel communication.
[0024]
The gas cylinder management processing unit 6 uses the input identification number as a key, the measured value of the internal pressure of each gas cylinder 4, the number indicating the connection position of the pipe connection part 10a to which the gas cylinder 4 is connected, the type of the enclosed gas, and the administrator name of the gas cylinder The gas cylinder management database is created by storing together with the expiration date of the gas. Further, each information in the gas cylinder management database is updated as needed based on the received information.
[0025]
On the other hand, the central management system 1 of the gas cylinder of this example is configured such that each inspection system unit 3, the gas cylinder state management unit 13 and the gas cylinder order carry-in management unit 14 are connected to the gas cylinder management processing unit 6 using the communication line 11, and are mutually connected. Data communication can be performed. That is, a network (for example, LAN) in which the inspection system unit 3, the gas cylinder management processing unit 6, the gas cylinder state management unit 13, and the order carry-in management unit 14 are connected by the communication line 11 is formed.
[0026]
In this example, communication between the inspection system unit 3, the gas cylinder management processing unit 6, the gas cylinder state management unit 13, and the order carry-in management unit 14 is performed using the same communication line 11 as communication between the communication unit 10 and the communication unit 12. However, the number of communication lines is reduced and the configuration is simplified, but the communication lines may be provided separately. In other words, the communication of the internal pressure measurement value and the identification number of the gas cylinder 4 and the communication associated with the use of the gas cylinder management database may be performed on different networks, so that the two can be separated and the communication management can be easily performed.
[0027]
Therefore, the inspection system unit 3 uses the above-described network to check whether there is sufficient gas remaining to perform adjustment / inspection using the gas cylinder management database of the gas cylinder management processing unit 6 or concentration data is required. You can get information such as whether you meet certain specifications online. Then, it is possible to determine whether or not the gas cylinder 4 needs to be replaced, and to perform additional arrangement work.
[0028]
Moreover, when the transmission communication part 10 transmits the number which shows the connection position of the piping connection part 10a to which this gas cylinder 4 was connected with the identification number of each gas cylinder 4 like this example, the inspection system part 3 is It is also possible to give an appropriate switching command to the pipe switching device 8 provided in the inside thereof and control the gas analyzer 2 to flow in an appropriate gas necessary for adjustment and inspection. The present invention is not limited to this, and the gas supplied to the gas analyzer 2 is switched in the vicinity of the inspection system unit 3 or by a pipe switching device provided in the vicinity of the pipe connecting part 10a. Needless to say. Further, when the gas to be supplied is not switched by automatic control, the transmission communication unit 10 does not need to transmit a number indicating the connection position of the pipe connection unit 10a.
[0029]
Next, the gas cylinder state management unit 13 can constantly monitor the gas cylinder management database by using the network. That is, by constantly monitoring the internal pressure measurement value of each gas cylinder 4, for example, when the internal pressure of the gas cylinder 4 that should not be used gradually decreases, the occurrence of gas leakage can be detected quickly. When a gas leak is detected, an appropriate maintenance is requested by reporting to the administrator of the gas cylinder 4 in order to pursue the generation source.
[0030]
That is, the gas cylinder state management unit 13 can request maintenance with a precaution for fire and a precaution for poisoning according to the type of gas that seems to be leaking. Furthermore, when the expiration date of the gas cylinder 4 is included in the gas cylinder management database, it can be reported that the expired gas cylinder 4 needs to be replaced. Therefore, even if the gas cylinder 4 encloses a flammable or toxic gas, it can be handled extremely safely, and waste due to gas leakage can be minimized.
[0031]
Moreover, the central management system 1 of the gas cylinder of this example is equipped with the gas cylinder 4 which stood in, and the cylinder warehouse 5b for storing the gas cylinder 4 which became expired, and the terminal connected to the said network in this cylinder warehouse 5b An order delivery management unit 14 for the gas cylinder 4 comprising a computer is provided.
[0032]
Therefore, when the gas cylinder 4 is received from the supplier, information such as the identification number of the gas cylinder 4, the type and concentration of the sealed gas, the administrator name, the expiration date, and the like are input from the ordering / importing management unit 14, and this is managed by the gas cylinder management. It can be managed by including it in the database. By doing in this way, management of the information unique to each gas cylinder 4 can be performed promptly without fail using the identification number of the gas cylinder 4 as a key.
[0033]
For example, when the gas cylinder 4 stored in the cylinder storage 5b is connected to the pipe connection part 10a in the cylinder storage 5a or 5c, all the terminals connected on the network can be simply input by the identification number of the gas cylinder 4. However, various information such as the type and concentration of the gas sealed in the gas cylinder 4 connected to the pipe connection part 10a can be obtained. In addition, there is an advantage that information on the number and state of all the gas cylinders 4 stored including the gas cylinders 4 being used can be obtained at the terminals 3, 13, and 14.
[0034]
Furthermore, the central management system 1 of the gas cylinder of this example monitors the frequency of the type of gas used at the terminal on the network such as the gas cylinder state management unit 13 and the order delivery management unit 14 and takes the expiration date into account. In addition, it is possible to perform management processing for placing an order before the gas cylinder 4 having an appropriate capacity is insufficient. It is also possible to reduce the burden on the administrator of the gas cylinder 4 by providing a printing unit 14b for printing a slip 14a for ordering the gas cylinder 4.
[0035]
In the above-described example, an example in which a pressure sensor PG that converts an internal pressure measurement value into an electric signal is provided in addition to the pressure gauge 4a that can be visually confirmed in each gas cylinder 4 is shown. 4a may be omitted, and a display of a pressure measurement value that can be visually confirmed can be output to the pressure sensor PG. Furthermore, according to the present invention, the gas cylinder 4 can be centrally managed without providing the pressure gauge 4a for visual confirmation.
[0036]
In addition, the operator can check the remaining amount of each gas cylinder 4 at any time by looking at the monitor M of each terminal 3, 13, 14 connected to the LAN regardless of the operation of each terminal 3, 13, 14. It is. That is, it is needless to say that in order to construct the central management system 1 for the gas cylinder, it is not always necessary that all the terminals 3, 13 and 14 are connected to the LAN and fully automated.
[0037]
FIG. 3 shows a centralized management system 1 ′ for a gas cylinder in which a communication unit 10 ′ for transmission is built in a pressure sensor PG and an internal pressure measurement value is transmitted by electromagnetic waves. In FIG. 3, 12 'is a communication unit for receiving an internal pressure measurement value signal provided in the host computer 6, and 11' is an electromagnetic wave used for communication between the transmission / reception communication units 10 'and 12'. That is, the central management system 1 ′ of the gas cylinder shown in this example is different from the examples of FIGS. 1 and 2 in that the internal pressure measurement value and the identification number of the gas cylinder are transmitted by the electromagnetic wave 11 ′. In FIG. 3, members denoted by the same reference numerals as those in FIGS. 1 and 2 are the same or equivalent members, and thus detailed description thereof is omitted.
[0038]
Transmission communication unit 10 ' , The receiving communication unit 12 'communication between, for example transmitting communication unit 10 provided to the pressure sensor PG' receiving communication unit 12 'is a sequence request signal waves 11' and transmits the relative, the request The transmission communication unit 10 ′ that has been received sequentially transmits the internal pressure measurement value signal and the identification number attached to the gas cylinder 4 as an electromagnetic wave 11 ′, and this is received by the reception communication unit 12 ′. Needless to say, the wireless communication method is not limited to this, and can be performed by an appropriate method.
[0039]
As described above, the internal pressure measurement value and the gas cylinder identification number are transmitted by the electromagnetic wave 11 ′, so that it is not necessary to separate the wiring in order to connect each pressure sensor PG and the host computer 6. Therefore, when the gas cylinder centralized management system 1 'is changed to the conventional gas cylinder connection system, it can be added to the original gas cylinder connection system as in this example, and the central management of the gas cylinder of the present invention can be performed. System 1 'can be constructed very easily.
[0040]
Needless to say, the same modification as in FIGS. 1 and 2 can also be implemented in the example shown in FIG. 3 described above.
[0041]
【The invention's effect】
As described above, according to the centralized management system for gas cylinders for inspection and adjustment of the gas analyzer according to the present invention, the remaining amount of gas and the residual pressure can be confirmed simply by looking at the computer screen. The work that has been confirmed by going to step 1 can be performed only by operating the computer. In other words, enter the various information such as the remaining amount of standard gas based on the measured internal pressure in real time, the number of stored standard gases, the period of use, the type and concentration of the sealed gas, the administrator name, Since the gas cylinder management database is updated, replacement work, arrangement work, and provision of information to the adjustment / inspection apparatus can be reliably performed.
[Brief description of the drawings]
FIG. 1 is a block diagram of a centralized management system for gas cylinders for inspection and adjustment of a gas analyzer according to the present invention.
FIG. 2 is a perspective view showing an example of a centralized management system for the gas cylinder.
FIG. 3 is a block diagram showing another example of a centralized management system for a gas cylinder for inspection / adjustment of a gas analyzer according to the present invention.
FIG. 4 is a block diagram showing an example of a conventional gas cylinder connection system.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1,1 '... Central management system of a gas cylinder, 2 ... Gas analyzer, 3 ... Inspection system part , 4 ... Gas cylinder, 6 ... Gas cylinder management processing part, 10 , 10' ... Communication part for transmission, 12, 12 '... Reception communication unit use, 13 ... gas canister state management unit, PG ... pressure sensor.

Claims (4)

ガス分析計の検査および調整のために該ガス分析計に流入させる種類の異なる標準ガスを封入した複数のガスボンベを集中的に管理するシステムであって、各ガスボンベ毎に設けられて各ガスボンベの内圧を測定し内圧測定値信号を出力する圧力センサと、この内圧測定値信号をガスボンベ毎に設定された識別番号を含む管理データと共に送信する送信用通信部と、この送信用通信部に接続されて識別番号を含む管理データおよび内圧測定値信号を受信する受信用通信部と、この受信用通信部受信した内圧測定値を基に各ガスボンベ内のガスの残量を計算するとともに、識別番号をキーとしてガスボンベ管理データベースを作成し、かつ、受信用通信部で受信した情報を基にガスボンベ管理データベースの各情報を更新するガスボンベ管理処理部と、このガスボンベ管理処理部にネットワーク接続されて該ガスボンベ管理処理部で作成したガスボンベ管理データベースを用いて、検査・調整の対象となるガス分析計の検査および調整に用いる標準ガスを封入したガスボンベ内のガス残量及びガス濃度が検査・調整に必要かつ十分であるか否かを確認し、必要かつ十分でない場合にガスボンベの交換指示を出力するガス分析計の検査システム部とを有していることを特徴とするガス分析計の検査・調整用ガスボンベの集中管理システム。A system for centrally managing a plurality of gas cylinders filled with different types of standard gas flowing into the gas analyzer for inspection and adjustment of the gas analyzer, the internal pressure of each gas cylinder being provided for each gas cylinder A pressure sensor that measures the internal pressure and outputs an internal pressure measurement value signal, a transmission communication unit that transmits the internal pressure measurement value signal together with management data including an identification number set for each gas cylinder, and is connected to the transmission communication unit a receiving communication unit for receiving management data and pressure measurement value signal including an identification number, along with calculating the remaining amount of gas in each gas cylinder on the basis of the internal pressure measurements received by the receiving communication unit, the identification number create a gas cylinder management database as a key, and a gas cylinder management updating each information of the gas cylinder management database based on information received by the receiving communication unit A management unit, a network connection with the gas cylinder management database created by the gas cylinder management processing unit to the gas cylinder management processing unit, enclosing a standard gas used in the testing and adjustment of the gas analyzer to be inspected and adjusted It has a gas analyzer inspection system unit that confirms whether the gas remaining amount and gas concentration in the gas cylinder are necessary and sufficient for inspection and adjustment, and outputs a gas cylinder replacement instruction when necessary and insufficient. central control system of the inspection and adjustment for gas cylinder of the gas analyzer, characterized in Tei Rukoto. 前記ガスボンベ管理処理部には、該ガスボンベ管理処理部で作成したガスボンベ管理データベースを介して各ガスボンベの内圧測定値を常時監視し、ガス漏れの発生を検知したとき、メンテナンスの要請、ガスボンベ交換指示および発注指示を出力するガスボンベ状態管理部がネットワーク接続されている請求項1に記載のガス分析計の検査・調整用ガスボンベの集中管理システム。 The gas cylinder management processing unit constantly monitors the internal pressure measurement value of each gas cylinder via the gas cylinder management database created by the gas cylinder management processing unit, and when a gas leak is detected, a maintenance request, a gas cylinder replacement instruction, and 2. The centralized management system for gas cylinders for inspection and adjustment of a gas analyzer according to claim 1, wherein a gas cylinder state management unit for outputting an ordering instruction is connected to a network . 前記ガスボンベ管理処理部には、ガスボンベが入庫したとき、そのガスボンベの認識番号、封入ガスの種類および濃度,管理者名,有効期限などの発注搬入情報を前記ガスボンベ管理データベースに含めて管理すべく入力する発注搬入管理部がネットワーク接続されている請求項1または2に記載のガス分析計の検査・調整用ガスボンベの集中管理システム。When the gas cylinder is received, the gas cylinder management processing unit inputs the ordering information such as the identification number of the gas cylinder, the type and concentration of the sealed gas, the administrator name, the expiration date, and the like to be managed in the gas cylinder management database. The centralized management system for a gas cylinder for inspection / adjustment of a gas analyzer according to claim 1 or 2, wherein an order delivery management unit is connected to the network. 前記圧力センサとガスボンベ管理処理部間の送信・受信用通信部が、無線通信を行なう通信部であり、圧力センサ側の送信用通信部が各圧力センサ毎に設けられている請求項1〜3の何れかに記載のガス分析計の検査・調整用ガスボンベの集中管理システム。 The transmission / reception communication unit between the pressure sensor and the gas cylinder management processing unit is a communication unit that performs wireless communication, and a transmission communication unit on the pressure sensor side is provided for each pressure sensor. A centralized management system for gas cylinders for inspection and adjustment of gas analyzers as described in any of the above.
JP22753497A 1997-08-07 1997-08-07 Centralized control system for gas cylinders for inspection and adjustment of gas analyzers Expired - Fee Related JP3796015B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22753497A JP3796015B2 (en) 1997-08-07 1997-08-07 Centralized control system for gas cylinders for inspection and adjustment of gas analyzers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22753497A JP3796015B2 (en) 1997-08-07 1997-08-07 Centralized control system for gas cylinders for inspection and adjustment of gas analyzers

Publications (2)

Publication Number Publication Date
JPH1151827A JPH1151827A (en) 1999-02-26
JP3796015B2 true JP3796015B2 (en) 2006-07-12

Family

ID=16862418

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22753497A Expired - Fee Related JP3796015B2 (en) 1997-08-07 1997-08-07 Centralized control system for gas cylinders for inspection and adjustment of gas analyzers

Country Status (1)

Country Link
JP (1) JP3796015B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110487492A (en) * 2018-05-15 2019-11-22 株式会社堀场制作所 Storage cylinder management system, storage cylinder management method, storage medium and leakage detection system in gas

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9837293B2 (en) 2013-10-30 2017-12-05 Taiwan Semiconductor Manufacturing Co., Ltd. Mechanisms for charging gas into cassette pod
JP7005951B2 (en) * 2017-06-12 2022-01-24 株式会社島津製作所 Supercritical fluid separator
JP7722235B2 (en) * 2022-03-30 2025-08-13 横河電機株式会社 Gas Analysis System

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110487492A (en) * 2018-05-15 2019-11-22 株式会社堀场制作所 Storage cylinder management system, storage cylinder management method, storage medium and leakage detection system in gas
EP3570025A3 (en) * 2018-05-15 2020-02-12 HORIBA, Ltd. Cylinder management system, cylinder management program and gas leak detection system
US11243137B2 (en) 2018-05-15 2022-02-08 Horiba, Ltd. Cylinder management system, cylinder management program and gas leak detection system

Also Published As

Publication number Publication date
JPH1151827A (en) 1999-02-26

Similar Documents

Publication Publication Date Title
US6442639B1 (en) Docking station for environmental monitoring instruments
US11344876B1 (en) Laboratory on location test system for accreditation of breathing air quality
AU2001295183A1 (en) Docking station for environmental monitoring instruments
EP2739969A1 (en) Self-testing combustible gas and hydrogen sulfide detection apparatus
JPH0249117A (en) Portable data transmitter-receiver
CN110425126B (en) Portable air compressor testing device and testing method and application thereof
CN113219139A (en) Harmful gas detection system, detection method and device
CN114279499A (en) Online calibration device and system of oxygen production and supply equipment
JP3796015B2 (en) Centralized control system for gas cylinders for inspection and adjustment of gas analyzers
US11520793B2 (en) Servicing, diagnosing, logging, and surveying building equipment assets
CN111928933A (en) Combined weighing device and weighing method
CN213715779U (en) Network control system fault detection system
KR100506319B1 (en) Telemetering Management System For Water Quality Analyzer
WO2018180163A1 (en) Fuel supply station system
JP3149341B2 (en) Analysis equipment
JP4399152B2 (en) INSPECTION METHOD USING NETWORK, COMPUTER PROGRAM THEREOF, INSPECTION SYSTEM, INSPECTION DEVICE, AND HOST SERVER
JPH0895633A (en) Operation support system
JP2007065888A (en) Fire alarm inspection device
JPS62267697A (en) Plant constitutive-apparatus state control system
KR20130093282A (en) System and method for managing materials
JPH04328700A (en) Inspecting device for building facility monitor
JP3016934B2 (en) Test equipment for remote monitoring system
JP2008064643A (en) Plant pressure transmitter inspection system
CN120628188A (en) A circuit for monitoring equipment for railway transportation of liquefied natural gas tank containers
TWM681694U (en) Air tightness testing apparatus for large transformers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050905

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050920

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060414

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120421

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120421

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140421

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees