Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3796018B2 - Segment transport system for shield tunnel construction - Google Patents
[go: Go Back, main page]

JP3796018B2 - Segment transport system for shield tunnel construction - Google Patents

Segment transport system for shield tunnel construction Download PDF

Info

Publication number
JP3796018B2
JP3796018B2 JP24410297A JP24410297A JP3796018B2 JP 3796018 B2 JP3796018 B2 JP 3796018B2 JP 24410297 A JP24410297 A JP 24410297A JP 24410297 A JP24410297 A JP 24410297A JP 3796018 B2 JP3796018 B2 JP 3796018B2
Authority
JP
Japan
Prior art keywords
segment
rack
shield tunnel
transport
segment rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP24410297A
Other languages
Japanese (ja)
Other versions
JPH1181897A (en
Inventor
勉 今川
信行 松井
勝次 池添
勝二 式見
善一 石田
信昭 稲葉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Komatsu Ltd
Original Assignee
Kajima Corp
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Komatsu Ltd filed Critical Kajima Corp
Priority to JP24410297A priority Critical patent/JP3796018B2/en
Publication of JPH1181897A publication Critical patent/JPH1181897A/en
Application granted granted Critical
Publication of JP3796018B2 publication Critical patent/JP3796018B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、シールドトンネル構築用セグメントの搬送システムに関する。
【0002】
【従来の技術】
シールド工法においては、立坑を介して地上から降下した覆工用のセグメントを、シールドトンネル内を走行するセグメント搬送台車によってシールド機の近傍まで搬送し、その後、このセグメントをホイストを用いて覆工現場に搬入している。
【0003】
セグメントの搬送効率を向上するには、一度に多数個のセグメントを搬送台車で搬送すれば良いが、この場合、上記ホイストの可動範囲等の制限のために、搬送されたセグメントを一度に覆工現場に搬入することができない。
【0004】
したがって、上記ホイストを複数回操作して搬送台車上のセグメントを運び出すことになるが、これは、搬送台車の引返し時点を遅延させるので、結果的にセグメントの搬送効率を低下させることになる。
【0005】
そこで、シールド機の近傍にセグメントラックを配置して、上記搬送台車によって搬送されてきたセグメントをこのセグメントラックに一時的に保持させ、このラックに保持させたセグメントを上記ホイストで覆工現場まで移送するという手法が提案されている。
【0006】
この手法によれば、上記ホイストによるセグメント移送作業の終了を待つことなく搬送台車を引返すことが可能になるので、上記セグメントラックを用いない場合に比してセグメントの搬送効率が向上する。
【0007】
【発明が解決しようとする課題】
シールド工区が長距離に亘っている場合には、セグメントの搬送距離が長くなるので、該セグメントの搬送に要する時間も長くなり、したがって、セグメントの搬送効率を更に向上する必要がる。
【0008】
本発明の目的は、かかる状況に鑑み、セグメントの搬送効率を一層向上することができるシールドトンネル構築用セグメントの搬送システムを提供することにある。
【0009】
【課題を解決するための手段および作用・効果】
上記目的を達成するため、第1の発明に関わるシールドトンネル構築用セグメントの搬送システムは、シールド機の近傍位置に第1のセグメントラックを配設し、立坑を介して降下されたセグメントを前記第1のセグメントラックまで搬送して該ラックに保持させるようにしたシールドトンネル構築用セグメントの搬送システムにおいて、シールドトンネルの入口端部と前記第1のセグメントラックとの間に、少なくとも1つの別のセグメントラックを配設し、前記立坑を介して降下されたセグメントを、一旦前記別のセグメントラックに保持させてから、前記第1のセグメントラックへ搬送するようにしたことを特徴としている。
【0010】
この第1の発明によれば、シールドトンネルの入口端部と第1のセグメントラックとの間に配設した別のセグメントラックにセグメントを蓄積保持させておくことができる。したがって、待ち時間を要することなく、速やかにセグメントをシールド機の近傍位置に置かれた第1のセグメントラックまで搬送することができ、その結果、セグメントの搬送効率が向上する。
【0011】
第2の発明に関わるシールドトンネル構築用セグメントの搬送システムは、第1の発明において、前記別のセグメントラックの少なくとも1つを、シールドトンネルの入口端部に配設したことを特徴としている。
【0012】
この第2の発明によれば、立坑を介して降下されたセグメントをシールドトンネルの入口端部に配設した別のセグメントラックに蓄積保持させることができるので、該別のセグメントラックと第1のセグメントラックの間に更に別のセグメントラックを配設することにより、第1のセグメントラックからシールドトンネルの入口端部に配設した別のセグメントラックまでセグメントを取りに行く必要がなくなるので、シールドトンネルの長さが大きくなってもセグメントを効率良く搬送することができる。なお、シールドトンネルの入口端部に配設した別のセグメントラックと第1のセグメントラックの間に配設する更に別のセグメントラックの数量は、シールドトンネルの長さに応じて適宜調整される。
【0013】
第3の発明に関わるシールドトンネル構築用セグメントの搬送システムは、シールド機の近傍位置に第1のセグメントラックを配設し、立坑を介して降下されたセグメントを前記第1のセグメントラックまで搬送して該ラックに保持させるようにしたシールドトンネル構築用セグメントの搬送システムにおいて、前記セグメントを予め保持させた第2のセグメントラックを前記立坑を介して降下させ、この第2のセグメントラックに保持させたセグメントを前記第1のセグメントラックまで搬送するようにしたことを特徴としている。
【0014】
この第3の発明によれば、搬送台車がシールド機のシールド機の近傍位置に配設した第1のセグメントラックと立坑の底部を往復している空き時間にセグメントを予積載した第2のセグメントラックが立坑の底部に降下載置されるので、シールドトンネル内で第2のセグメントラックにセグメントを積載する工程が不要となり、その結果、搬送台車が立坑の底部に戻ると同時にセグメントを第1のセグメントラックに向って搬出することができる。
【0015】
第4の発明に関わるシールドトンネル構築用セグメントの搬送システムは、第3の発明において、前記第1のセグメントラックと第2のセグメントラックの間に少なくとも1つの別のセグメントラックを配設し、前記第2のセグメントラックに保持させたセグメントを一旦この別のセグメントラックに保持してから、前記第1のセグメントラックへ搬送するようにしたことを特徴としている。
【0016】
この第4の発明によれば、第1のセグメントラックから立坑の底部までまでセグメントを取りに行く必要がなくなるので、シールドトンネルの長さが大きくなっても、セグメントを効率良く搬送することができる。
【0017】
【発明の実施の形態】
図1において、途中まで形成された状態にあるシールドトンネル1内には、2台のセグメントラック2,2′が配置されるとともに、3台のセグメント搬送台車3が配置されている。
【0018】
一方、シールドトンネル1の始端に連通する立坑4の入口部位には、地上から該立坑4を介してセグメント5を降下させるクレーン6が設けてあり、また、立坑4の底部には、セグメントローダとして使用するセグメント搬送台車3′が配置されている。
【0019】
上記セグメントラック2は、シールドトンネル1の入口端部に、また、セグメントラック2′はシールド機7の手前近傍にそれぞれ位置されている。
【0020】
図2に示すように、上記セグメンラック2は、搬送台車3を通行させるための空間8をその内部に貫通形成してあり、該空間8がシールドトンネル1の長手方向に沿う態様で配設してある。
【0021】
このセグメントラック2は、その長手方向に沿って配列する3つの作業セクション9,10および11を有し、それらのセクション9,10および11における一方の内側および他方の内側にそれぞれ一対の支持爪12を相対向する態様で設けてある。
【0022】
上記各支持爪12は、所定の高さ位置に水平に設けてあり、かつ、それぞれ上記空間8内に突出している。
【0023】
他方のセグメントラック2′は、図3に示すように、上部にホイストビーム40を設けた点を除き上記セグメントラック2と同一の構成を有する。
【0024】
上記セグメント搬送台車3,3′は、エンジンや電動モータ等を駆動源として自走する無人搬送車(AGV)であり、図4〜図6に示すように、セグメント5を搭載する台車本体13と、セグメント5を上下に移動させる一対の昇降機構14とを備えている。
【0025】
台車本体13は、上記駆動源および走行用の車輪15を備えた車体フレーム16と、該車体フレーム16を覆うボディー17とを具備し、該ボディー17の上面にセグメント5を支える複数のサポートブロック18を設けてある。
【0026】
上記セグメント5は、図4および図5に示すように、自身の長手方向の中心軸(湾曲方向に延びる中心軸)s−sが搬送台車3,3′の前後軸o−oに沿う態様で、かつ凸側が下方に向く姿勢で台車本体13に搭載される。
【0027】
また、上記セグメント5は、重心の位置する中央部分が台車本体13の中央に位置する態様で載置され、その際、その前半部および後半部が上記サポートブロック18によって支持される。
【0028】
なお、本実施例においては、セグメント搬送台車3,3′にそれぞれ2個のセグメント5が積み重ね載置される。
【0029】
上記昇降機構14は、台車本体13に揺動自在に支承された一対の揺動アーム19と、該揺動アーム19の自由端部に取り付けた一対の支持ローラ20と、上記揺動アーム19を揺動させるためのシリンダアクチュエータ21とを備え、台車本体13の前半部および後半部にそれぞれ配設されている。
【0030】
なお、上記支持ローラ20は、セグメント5に傷を付けることのないようにゴムタイヤ等によって構成されている。また、シリンダアクチュエータ21は、基端部を車体フレーム13に枢着するとともに、先端部を上記揺動アーム19の自由端側にピン結合してある。
【0031】
上記構成の昇降機構14において、上記シリンダアクチュエータ21を伸張・縮退動作させると、上記揺動アーム19および支持ローラ20が実線で示す上動位置と鎖線で示す収容位置との間を移動することになる。
【0032】
各昇降機構14の揺動アーム19および支持ローラ20が収容位置にあるとすると、この場合、図4に鎖線で示すようにセグメント5が台車本体13上に載置された状態になる。そして、上記揺動アーム19と支持ローラ20とを上動位置まで移動させると、セグメント5が揺動アーム19および支持ローラ20で支えられながら実線で示す上昇位置まで移動する。
【0033】
このとき、セグメント5が仮に湾曲s−s(図5参照)方向にずれ動いたとしても、各昇降機構14の支持ローラ20の回転によって安定位置、つまり、それらのローラ20間に重心が位置する安定位置に戻される。したがって、セグメント5は、常にバランスよく、安定した姿勢を保ちながら、下降位置から上昇位置へ移動されることとなり、また、下降位置から上昇位置へ移動される場合においても、上記と同様にその姿勢が安定に維持される。
【0034】
なお、上記各昇降機構14は、作業員によるスイッチ操作あるいはコントローラからの制御信号に基づき互いに同期して動作する。
【0035】
以下、上記セグメント搬送台車3,3′を用いたセグメント5の搬送手順について説明する。
【0036】
(1) 図1において、立坑4の底部に位置したセグメントローダとしての搬送台車3′は、積み重ねた状態でクレーン6によって降下された複数個(この例では2個)のセグメント5を積載し、ついで、図4に示した揺動アーム19を上昇揺動させて各セグメント5を図4および図6に実線で示した上昇位置まで移動させる。
【0037】
(2) 搬送台車3′をセグメントラック2の空間8内に進入させる。この台車3′に搭載された各セグメント5が上昇位置まで移動された状態においては、図6に示したように、前記セグメントラック2の爪12(図2参照)の先端部が下側のセグメント5の下面とボデー13の上面との間に形成された空間に位置される。したがって、上記空間8内で搬送台車3が爪12に接触する虞れはない。
【0038】
(3) 搬送台車3′がセグメントラック2の作業セクション9内まで進行した時点で該搬送台車3′を停止し、ついで、図4に示した揺動アーム19を下降揺動させて各セグメント5を下降させる。
【0039】
下側のセグメント5は、その下降中にその下面が上記セクション9の爪12に当接するので、上記揺動アーム19が図4に鎖線で示した収容位置まで降下した時点では、各セグメント5が上記爪12上に載置される。つまり、各セグメント5がセグメントラック2のセクション9の部位に保持される。
【0040】
(4) 搬送台車3′が立坑4の底部位置まで後退する。このとき、上記揺動アーム19およびローラ20はボデー13内に収容されており、したがって、上記後退時に搬送台車3′と上記爪12とが干渉する虞れはない。
【0041】
(5) 搬送台車3′は、上記に準じた動作を繰返し実行し、これによってセグメントラック2の作業セクション10,11の爪12上にも2段積みセグメント5が順次載置される(図2参照)。
【0042】
(6) シールドトンネル1内に予め配した3台のセグメント搬送台車3(以下、1号台車〜3号台車と呼ぶ)を移動させて、それらをセグメントラック2の作業セクション9,10,11内にそれぞれ位置決めする。
【0043】
つまり、1号台車3、2号台車3および3号台車3をそれぞれ1号台車荷積位置P1、2号台車荷積位置P2および3号台車荷積位置P3にそれぞれ位置めする。なお、このとき、各台車3は、図4に示した揺動アーム19およびローラ20をボデー13内に収容した状態にある。
【0044】
(7) 荷積位置P1の1号台車3は、揺動アーム19を上昇揺動させてセクション9に載置されているセグメント5を積み込む。つまり、図7の(a)に示すように、位置P1において1号台車3がセルフローディング動作を実行する。
【0045】
セグメント5の積み込みを終えた1号台車3は、低速で図1に示す速度切替位置P4まで移動し、ここで、セグメント5を前記下降位置まで移動させた後、高速で速度切替位置P4′まで移動する。
【0046】
なお、セグメントラック2の出口から上記位置P4までの距離および上記位置P4′からセグメントラック2′の入口までの距離は、それぞれ、例えば6m程度に設定される。
【0047】
位置P4′まで移動した1号台車3は、セグメント5を前記上昇位置まで移動した後、低速で自動走行しながらセグメントラック2′内に進入して該セグメントラック2′のセクション9(1号台車荷降位置P1′)で停止し、ついで、セルフアンローディング動作、つまり、前記揺動アーム19を下降揺動させて上記セクション9の爪12上にセグメント5を載置する動作を実行して信号待ち状態となる。
【0048】
(8) 図7(b)に示すように、荷積位置P2に位置した2号台車3は、当初において信号待ち状態にある。そして、1号台車3が荷積位置P1から出たことを示す信号を図示していないセンサが出力した時点で、上記1号台車3に準じた一連の荷積、搬送、荷降し動作を順次実行し、この結果、セグメントラック2′におけるセクション10の爪12上にセグメント5が載置される。なお、この2号台車3も、上記セルフアンローディング動作後に信号待ち状態となる。
【0049】
(9) 図7(c)に示すように、荷積位置P3に位置した3号台車3も、当初は信号待状態にある。そして、2号台車3が荷積位置P2から出たことを示す信号を図示していないセンサが出力すると、この3号台車が上記1,2号台車と同様の荷積、搬送、荷降し動作を順次実行し、その結果、セグメントラック2′におけるセクション11の爪12上にセグメント5が載置される。これにより、セグメントラック2′の各セクション9,10および11の爪12全てにセグメント5が載置されたことになる。
【0050】
(10) 3号台車3がセグメントラック2から出ると、該セグメントラック2が保持していたセグメント5は全て搬出されたことになる。そこで、搬送台車3′が再び上記(1)〜(5)のセグメント搬入作業を実行して、セグメントラック2のセクション9,10,11にセグメント5を載置する。
【0051】
(11) 一方、セグメントラック2′の各セクション9,10および11に載置されたセグメント5は、該セグメントラック2′に設けられた前記ホイストビーム40に支持された図示していないホイストにより覆工現場に移送される。
【0052】
(12) 図7(c)に示したように、3号台車3はセグメントラック2′におけるセルフアンローディング動作後、ただちにセグメントラック2に向って低速自動走行を開始する。そして、加速しながら前記位置P4′まで走行した後、前記位置P4まで高速自動走行し、さらに、減速しながらセグメントラック2に接近した後、セグメントラック2内を低速自動走行して前記荷積位置P3で停止する。
【0053】
(13) 3号台車3がセグメントラック2′から出ると、図示していないセンサがそのことを示す信号を出力する。そこで、セグメントラック2′内に位置していた2号台車3は、上記3号台車3と同様の速度変更を実行しながらセグメントラック2に向って走行し、前記荷積位置P2で停止する。
【0054】
(14) 2号台車3がセグメントラック2′から出ると、やはり図示していないセンサが信号を出力する。これに伴い、該セグメントラック2′内の1号台車3は、上記2号台車3と同様の速度変更を実行しながらセグメントラック2に向って走行し、前記荷積位置P1で停止する。
【0055】
(15) 図1に示した実施例においては、セグメントラック2,2′間の距離が比較的長く、したがって、1号台車3、2号台車3および3号台車が上記セグメントラック2,2′間を往復する間に、上記台車3′によるセグメントラック2へのセグメント供給作業は既に終了している。
【0056】
そこで、荷積位置P1、P2およびP3に戻った各搬送台車3は、再び、前記荷積、搬送、荷降、戻り動作を順次実行し、その後も同様の動作を繰返す。
【0057】
なお、上記セグメントラック2′は、シールド機7の掘削進行に伴って前方に移動される。
【0058】
搬送台車3,3′を用いたセグメント5の搬送手順は以上の通りであり、この手順によれば、以下の理由によりセグメント5の搬送効率が向上する。
【0059】
すなわち、前記クレーン6によって多数個のセグメント5を一度に降下させることは、設備コストや作業の安全性等の観点から望ましくないので、このクレーン6によるセグメントの吊り下げ個数は上記した2個程度に制限される。
【0060】
しかし、上記手順によれば、1号台車3、2号台車3および3号台車3がセグメントラック2,2′間を往復している間にセグメントラック2に1リング分である6個のセグメント5を蓄積保持させておくことが可能である。つまり、該セグメントラック2が上記1リング分のセグメント5を一時的に蓄積保持するセグメントバッファとしての機能を有する。
【0061】
したがって、1〜3号台車3がセグメントラック2に戻ると同時に、これらの台車3によって上記1リング分のセグメント5をセグメントラック2′に向けて搬送することができ、その結果、セグメントの搬送効率が向上する。
【0062】
ところで、上記各台車3の往復時間は、トンネル1の長さに比例して増大するので、トンネル1の長さが大きくなるに伴ってセグメントの搬送効率が低下することになる。
【0063】
そこで、トンネル1の長さが一定以上大きくなった場合には、上記ラックセグメント2,2′の間にセグメントラック2と同一の構成を有する中間セグメントラック(図示せず)を配設することが望ましい。
【0064】
この場合には、セグメントラック2と上記中間セグメントラックとの間に上記1〜3号台車3に対応する台車3を配するとともに、該中間セグメントラックと前記セグメントラック2′との間にも上記1〜3号台車3に対応する3台の台車3を配することになる。
【0065】
上記セグメントラック2と中間セグメントラックとの間に配された3台の台車3は、該各セグメントラック間でのセグメント5の受渡しに供され、また、中間セグメントラックとセグメントラック2′間に配された3台の台車3は、これらのセグメントラック間でのセグメント5の受渡しに供される。
【0066】
上記中間セグメントラックを設ければ、セグメントラック2からではなく、該中間セグメントラックからセグメントラック2′に向けてセグメントを搬送すれば良いので、換言すれば、セグメントラック2までセグメント5を取りに行く必要がないので、セグメント5の搬送効率が向上する。
【0067】
なお、トンネル1の長さの増大に応じてセグメントラック2,2′間に複数の中間セグメントラックを配置することも可能である。
【0068】
上記実施形態では、シールドトンネル1の入口端部にセグメントラック2を配置しているが、このセグメントラック2をシールドトンネル1入口端部とセグメントラック2′の間に位置させても上記と同様の搬送効率の向上を図ることができる。
【0069】
図8は、本発明の別の実施形態を示している。この実施形態では、地上においてセグメント5をセグメントラック2に予め積載し、このセグメントラック2をリフタ30によって立坑4の底部まで降下させるようにしている。
【0070】
この場合、図1に示したクレーン6および搬送台車3′は当然不要となる。また、図1に示した各搬送台車3は、リフタ30の台部31に連結した走行板32上を通ってセグメントラック2に出入りすることになる。
【0071】
この実施形態によれば、搬送台車3がセグメントラック2,2′間を往復走行している空き時間に、セグメント5を予積載したセグメントラック2が立坑4の底部に降下載置されるので、図1の実施形態の場合と同様に、搬送台車3が上記底部に戻ると同時に1リング分のセグメント5をセグメントラック2′に向かって搬出することができる。
【0072】
しして、この実施形態においても、シールドトンネル1の入口端部と図1に示したセグメントラック2′との間に少なくとも1台のセグメントラックを配設することにより搬送効率を一層向上することができる。
【0073】
上記した各実施形態では、各セグメントラック間に配した複数の台車3が互いに分離しているが、これらの台車3を相互に連結することも可能であり、この場合、各台車3における前記揺動アーム19の揺動動作を同期させる。
【0074】
なお、セグメントラック2,2′および搬送台車3は、必ずしも上記の構成に限定されない。
【図面の簡単な説明】
【図1】本発明の一実施形態を示した概念図。
【図2】セグメントラックの構成を例示した斜視図。
【図3】セグメントラックの構成を例示した斜視図。
【図4】セグメントを搭載した搬送台車の側面図。
【図5】搬送台車の平面図。
【図6】搬送台車の正面図。
【図7】各搬送台車の移動態様を示した流れ図。
【図8】本発明の他の実施形態を示した概念図。
【符号の説明】
1 シールドトンネル
2,2′ セグメントラック
3,3′ セグメント搬送台車
4 立坑
5 セグメント
6 クレーン
7 シールド機
8 空間
12 支持爪
14 昇降機構
30 リフタ
40 ホイストビーム
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a transport system for a shield tunnel construction segment.
[0002]
[Prior art]
In the shield method, the segment for lining that descends from the ground via the shaft is transported to the vicinity of the shield machine by the segment transport carriage that runs in the shield tunnel, and then this segment is used on the lining site using a hoist. It is carried in.
[0003]
In order to improve the transport efficiency of the segments, it is only necessary to transport a large number of segments at a time with a transport cart. In this case, the transported segments are lined at a time due to limitations on the movable range of the hoist. It cannot be brought into the field.
[0004]
Therefore, the hoist is operated a plurality of times to carry out the segment on the transport carriage. However, this delays the return time of the transport carriage, and as a result, the transport efficiency of the segment is lowered.
[0005]
Therefore, a segment rack is arranged in the vicinity of the shield machine, the segment transported by the transport carriage is temporarily held by the segment rack, and the segment held by the rack is transferred to the lining site by the hoist. The technique of doing is proposed.
[0006]
According to this method, it is possible to return the transport carriage without waiting for the end of the segment transfer work by the hoist, so that the segment transport efficiency is improved as compared with the case where the segment rack is not used.
[0007]
[Problems to be solved by the invention]
When the shield work area is long, the segment transport distance becomes long, so the time required for transporting the segment also becomes long. Therefore, it is necessary to further improve the segment transport efficiency.
[0008]
In view of such a situation, an object of the present invention is to provide a shield tunnel construction segment transport system that can further improve the segment transport efficiency.
[0009]
[Means for solving the problems and actions / effects]
To achieve the above object, the segment transport system for constructing a shield tunnel according to the first aspect of the present invention has a first segment rack disposed in the vicinity of the shield machine, and the segment lowered through the vertical shaft is disposed in the first segment rack. In a transport system for a shield tunnel construction segment transported to and held by one segment rack, at least one other segment is provided between the entrance end of the shield tunnel and the first segment rack. A rack is provided, and the segment lowered through the shaft is once held in the other segment rack and then transported to the first segment rack.
[0010]
According to the first aspect of the present invention, the segments can be accumulated and held in another segment rack disposed between the entrance end of the shield tunnel and the first segment rack. Therefore, the segment can be quickly transported to the first segment rack placed in the vicinity of the shield machine without waiting time, and as a result, the segment transport efficiency is improved.
[0011]
The shield tunnel construction segment transport system according to the second invention is characterized in that, in the first invention, at least one of the other segment racks is arranged at the entrance end of the shield tunnel.
[0012]
According to the second aspect of the invention, since the segment lowered through the shaft can be accumulated and held in another segment rack disposed at the entrance end of the shield tunnel, the other segment rack and the first By disposing another segment rack between the segment racks, it is not necessary to go to the segment from the first segment rack to another segment rack disposed at the entrance end of the shield tunnel. Even if the length of the segment increases, the segments can be efficiently conveyed. Note that the number of other segment racks disposed between another segment rack disposed at the entrance end of the shield tunnel and the first segment rack is appropriately adjusted according to the length of the shield tunnel.
[0013]
According to a third aspect of the present invention, there is provided a transport system for a shield tunnel construction segment, in which a first segment rack is disposed in the vicinity of a shield machine, and a segment lowered via a shaft is transported to the first segment rack. In the transport system for the shield tunnel construction segment that is held by the rack, the second segment rack that holds the segment in advance is lowered through the shaft and is held by the second segment rack. The segment is transported to the first segment rack.
[0014]
According to the third aspect of the present invention, the second segment in which the segment is preloaded in the idle time in which the transport carriage is reciprocating between the first segment rack disposed near the shield machine of the shield machine and the bottom of the shaft. Since the rack is lowered and mounted on the bottom of the shaft, the process of loading the segment on the second segment rack in the shield tunnel is not required. As a result, the transport carriage returns to the bottom of the shaft and the segment is moved to the first segment. Can be carried out toward the segment rack.
[0015]
According to a fourth aspect of the present invention, there is provided a shield tunnel construction segment transport system according to the third aspect, wherein at least one other segment rack is disposed between the first segment rack and the second segment rack, The segment held in the second segment rack is once held in the other segment rack and then transported to the first segment rack.
[0016]
According to the fourth aspect of the invention, since it is not necessary to go to the segment from the first segment rack to the bottom of the shaft, the segment can be efficiently transported even if the length of the shield tunnel is increased. .
[0017]
DETAILED DESCRIPTION OF THE INVENTION
In FIG. 1, two segment racks 2 and 2 ′ are arranged in a shield tunnel 1 that is formed partway, and three segment transport carriages 3 are arranged.
[0018]
On the other hand, a crane 6 for lowering the segment 5 from the ground via the shaft 4 is provided at the entrance portion of the shaft 4 communicating with the starting end of the shield tunnel 1, and a segment loader is provided at the bottom of the shaft 4. A segment transport carriage 3 'to be used is arranged.
[0019]
The segment rack 2 is positioned at the entrance end of the shield tunnel 1, and the segment rack 2 ′ is positioned near the front side of the shield machine 7.
[0020]
As shown in FIG. 2, the segment rack 2 has a space 8 through which the transport carriage 3 passes, and the space 8 is arranged along the longitudinal direction of the shield tunnel 1. It is.
[0021]
This segment rack 2 has three working sections 9, 10 and 11 arranged along the longitudinal direction thereof, and a pair of support claws 12 are provided inside one of the sections 9, 10 and 11 and inside the other, respectively. Are provided so as to face each other.
[0022]
Each of the support claws 12 is provided horizontally at a predetermined height, and projects into the space 8.
[0023]
As shown in FIG. 3, the other segment rack 2 'has the same configuration as the segment rack 2 except that a hoist beam 40 is provided on the upper portion.
[0024]
The segment transport carriages 3 and 3 'are automatic guided vehicles (AGV) that self-run using an engine, an electric motor, or the like as a drive source. As shown in FIGS. 4 to 6, the segment transport carriages 3 and 3' And a pair of lifting mechanisms 14 for moving the segment 5 up and down.
[0025]
The cart body 13 includes a vehicle body frame 16 provided with the driving source and traveling wheels 15, and a body 17 that covers the vehicle body frame 16, and a plurality of support blocks 18 that support the segment 5 on the upper surface of the body 17. Is provided.
[0026]
As shown in FIGS. 4 and 5, the segment 5 has a longitudinal center axis (center axis extending in the bending direction) s-s along the longitudinal axis oo of the transport carriages 3, 3 ′. And it mounts in the trolley | bogie main body 13 with the attitude | position which a convex side faces below.
[0027]
Further, the segment 5 is placed in such a manner that the center portion where the center of gravity is located is located in the center of the carriage main body 13, and the front half portion and the latter half portion thereof are supported by the support block 18.
[0028]
In this embodiment, two segments 5 are stacked and placed on the segment transport carriages 3 and 3 ', respectively.
[0029]
The lifting mechanism 14 includes a pair of swing arms 19 that are swingably supported by the carriage body 13, a pair of support rollers 20 that are attached to the free ends of the swing arms 19, and the swing arms 19. It is provided with a cylinder actuator 21 for swinging, and is disposed in the front half part and the rear half part of the carriage main body 13, respectively.
[0030]
The support roller 20 is composed of a rubber tire or the like so as not to damage the segment 5. The cylinder actuator 21 has a base end pivotally attached to the vehicle body frame 13 and a tip connected to the free end of the swing arm 19 by a pin.
[0031]
In the lifting mechanism 14 configured as described above, when the cylinder actuator 21 is extended / retracted, the swing arm 19 and the support roller 20 move between an upward movement position indicated by a solid line and an accommodation position indicated by a chain line. Become.
[0032]
Assuming that the swing arm 19 and the support roller 20 of each elevating mechanism 14 are in the storage position, in this case, the segment 5 is placed on the carriage main body 13 as shown by a chain line in FIG. When the swing arm 19 and the support roller 20 are moved to the upward movement position, the segment 5 is moved to the raised position indicated by the solid line while being supported by the swing arm 19 and the support roller 20.
[0033]
At this time, even if the segment 5 is displaced in the direction of the curve ss (see FIG. 5), the center of gravity is located between the rollers 20 in a stable position by the rotation of the support roller 20 of each lifting mechanism 14. Return to the stable position. Therefore, the segment 5 is always moved from the lowered position to the raised position while maintaining a stable posture in a balanced manner. Also, when the segment 5 is moved from the lowered position to the raised position, the posture is the same as described above. Is maintained stably.
[0034]
The elevating mechanisms 14 operate in synchronization with each other based on a switch operation by an operator or a control signal from the controller.
[0035]
Hereinafter, the transport procedure of the segment 5 using the segment transport carts 3 and 3 ′ will be described.
[0036]
(1) In FIG. 1, a transport carriage 3 ′ as a segment loader located at the bottom of the shaft 4 is loaded with a plurality of (two in this example) segments 5 lowered by a crane 6 in a stacked state. Next, the swing arm 19 shown in FIG. 4 is lifted and swinged to move each segment 5 to the lift position indicated by the solid line in FIGS.
[0037]
(2) The transport carriage 3 ′ enters the space 8 of the segment rack 2. In the state where each segment 5 mounted on the carriage 3 'is moved to the raised position, as shown in FIG. 6, the tip of the claw 12 (see FIG. 2) of the segment rack 2 is the lower segment. 5 and a space formed between the lower surface of the body 13 and the upper surface of the body 13. Therefore, there is no possibility that the transport carriage 3 contacts the claw 12 in the space 8.
[0038]
(3) When the transport carriage 3 'has advanced into the work section 9 of the segment rack 2, the transport carriage 3' is stopped, and then the swing arm 19 shown in FIG. Is lowered.
[0039]
Since the lower segment 5 is in contact with the claw 12 of the section 9 while the lower segment 5 is being lowered, when the swing arm 19 is lowered to the accommodation position indicated by the chain line in FIG. It is placed on the claw 12. That is, each segment 5 is held at the section 9 of the segment rack 2.
[0040]
(4) The transport carriage 3 ′ moves backward to the bottom position of the shaft 4. At this time, the swing arm 19 and the roller 20 are accommodated in the body 13, so that there is no possibility that the carriage 3 ′ and the claw 12 interfere with each other during the backward movement.
[0041]
(5) The transport carriage 3 ′ repeatedly executes the operation according to the above, whereby the two-stage stacked segments 5 are sequentially placed on the claws 12 of the work sections 10 and 11 of the segment rack 2 (FIG. 2). reference).
[0042]
(6) Move the three segment transport carriages 3 (hereinafter referred to as No. 1 truck to No. 3 carriage) arranged in advance in the shield tunnel 1 and move them in the work sections 9, 10, 11 of the segment rack 2. Position each.
[0043]
That is, No. 1 bogie 3, No. 2 bogie 3 and No. 3 bogie 3 are positioned at No. 1 bogie loading position P1, No. 2 bogie loading position P2 and No. 3 bogie loading position P3, respectively. At this time, each carriage 3 is in a state in which the swing arm 19 and the roller 20 shown in FIG.
[0044]
(7) The No. 1 carriage 3 at the loading position P1 loads the segment 5 placed on the section 9 by moving the swinging arm 19 upward and swinging. That is, as shown in FIG. 7A, the first car 3 performs the self-loading operation at the position P1.
[0045]
The first truck 3 that has finished loading the segments 5 moves to the speed switching position P4 shown in FIG. 1 at a low speed. Here, after moving the segment 5 to the lowered position, it moves to the speed switching position P4 ′ at a high speed. Moving.
[0046]
The distance from the exit of the segment rack 2 to the position P4 and the distance from the position P4 ′ to the entrance of the segment rack 2 ′ are each set to about 6 m, for example.
[0047]
After moving the segment 5 to the raised position, the first carriage 3 moved to the position P4 ′ enters the segment rack 2 ′ while automatically traveling at a low speed, and enters the section 9 (the first carriage) of the segment rack 2 ′. Stop at the unloading position P1 ′), and then perform a self-unloading operation, that is, an operation of placing the segment 5 on the claw 12 of the section 9 by moving the swinging arm 19 downward and swinging. It will be in a waiting state.
[0048]
(8) As shown in FIG.7 (b), the 2nd trolley | bogie 3 located in the loading position P2 is in a signal waiting state at the beginning. When a sensor (not shown) outputs a signal indicating that the first truck 3 has left the loading position P1, a series of loading, transporting and unloading operations in accordance with the first truck 3 are performed. As a result, the segment 5 is placed on the claw 12 of the section 10 in the segment rack 2 '. The No. 2 cart 3 also enters a signal waiting state after the self-unloading operation.
[0049]
(9) As shown in FIG.7 (c), the No. 3 trolley | bogie 3 located in the loading position P3 is also in a signal waiting state at the beginning. When a sensor not shown in the figure outputs a signal indicating that the No. 2 cart 3 has left the loading position P2, the No. 3 cart is loaded, transported and unloaded in the same manner as the No. 1 and No. 2 carts. The operations are performed sequentially, and as a result, the segment 5 is placed on the claw 12 of the section 11 in the segment rack 2 '. As a result, the segments 5 are placed on all the claws 12 of the sections 9, 10 and 11 of the segment rack 2 '.
[0050]
(10) When the No. 3 cart 3 comes out of the segment rack 2, all the segments 5 held by the segment rack 2 are carried out. Therefore, the transport carriage 3 ′ again executes the segment loading operations (1) to (5) described above, and places the segment 5 on the sections 9, 10, and 11 of the segment rack 2.
[0051]
(11) On the other hand, the segments 5 placed in the sections 9, 10 and 11 of the segment rack 2 'are covered by a hoist (not shown) supported by the hoist beam 40 provided in the segment rack 2'. Transferred to the construction site.
[0052]
(12) As shown in FIG. 7 (c), the No. 3 bogie 3 starts low-speed automatic traveling toward the segment rack 2 immediately after the self-unloading operation in the segment rack 2 ′. Then, the vehicle travels to the position P4 ′ while accelerating, then automatically travels at high speed to the position P4, and further approaches the segment rack 2 while decelerating, and then automatically travels at low speed in the segment rack 2 to perform the loading position. Stop at P3.
[0053]
(13) When the third truck 3 comes out of the segment rack 2 ', a sensor (not shown) outputs a signal indicating that. Accordingly, the second car 3 located in the segment rack 2 'travels toward the segment rack 2 while executing the same speed change as the third car 3, and stops at the loading position P2.
[0054]
(14) When the second carriage 3 comes out of the segment rack 2 ', a sensor (not shown) outputs a signal. Accordingly, the first car 3 in the segment rack 2 'travels toward the segment rack 2 while executing the same speed change as the second car 3, and stops at the loading position P1.
[0055]
(15) In the embodiment shown in FIG. 1, the distance between the segment racks 2 and 2 'is relatively long. Therefore, the first truck 3, the second truck 3 and the third truck are the segment racks 2, 2'. While reciprocating between them, the segment supply operation to the segment rack 2 by the carriage 3 'has already been completed.
[0056]
Therefore, each transport carriage 3 that has returned to the loading positions P1, P2, and P3 again sequentially performs the loading, transport, unloading, and return operations, and thereafter repeats the same operations.
[0057]
The segment rack 2 ′ is moved forward as the shield machine 7 is excavated.
[0058]
The procedure for transporting the segment 5 using the transport carts 3 and 3 'is as described above. According to this procedure, the transport efficiency of the segment 5 is improved for the following reason.
[0059]
That is, it is not desirable to lower a large number of segments 5 at once by the crane 6 from the viewpoints of equipment cost, work safety, etc., so the number of segments suspended by the crane 6 is about 2 as described above. Limited.
[0060]
However, according to the above procedure, the six trucks corresponding to one ring in the segment rack 2 while the first car 3, the second car 3 and the third car 3 reciprocate between the segment racks 2 and 2 '. 5 can be accumulated and held. That is, the segment rack 2 functions as a segment buffer that temporarily stores and holds the segments 5 for one ring.
[0061]
Therefore, at the same time as the No. 1 to No. 3 carts 3 return to the segment rack 2, the carts 3 can transport the segment 5 for one ring toward the segment rack 2 ', resulting in the segment transport efficiency. Will improve.
[0062]
By the way, the reciprocation time of each carriage 3 increases in proportion to the length of the tunnel 1, so that the segment transport efficiency decreases as the length of the tunnel 1 increases.
[0063]
Therefore, when the length of the tunnel 1 becomes larger than a certain length, an intermediate segment rack (not shown) having the same configuration as the segment rack 2 may be disposed between the rack segments 2 and 2 '. desirable.
[0064]
In this case, the carriage 3 corresponding to the No. 1 to No. 3 carriage 3 is arranged between the segment rack 2 and the intermediate segment rack, and the intermediate rack and the segment rack 2 'are also Three carriages 3 corresponding to the No. 1 to No. 3 carriages 3 are arranged.
[0065]
The three carriages 3 arranged between the segment rack 2 and the intermediate segment rack are used for delivery of the segment 5 between the segment racks, and are arranged between the intermediate segment rack and the segment rack 2 ′. The three trolleys 3 are used for delivery of the segment 5 between these segment racks.
[0066]
If the intermediate segment rack is provided, the segment may be transported from the intermediate segment rack to the segment rack 2 'instead of from the segment rack 2. In other words, the segment 5 is taken to the segment rack 2. Since there is no need, the transport efficiency of the segment 5 is improved.
[0067]
It is also possible to arrange a plurality of intermediate segment racks between the segment racks 2 and 2 'according to the increase in the length of the tunnel 1.
[0068]
In the above embodiment, the segment rack 2 is arranged at the entrance end of the shield tunnel 1. However, if the segment rack 2 is positioned between the entrance end of the shield tunnel 1 and the segment rack 2 ′, the same as described above. The conveyance efficiency can be improved.
[0069]
FIG. 8 illustrates another embodiment of the present invention. In this embodiment, the segments 5 are previously loaded on the segment rack 2 on the ground, and the segment rack 2 is lowered to the bottom of the shaft 4 by the lifter 30.
[0070]
In this case, the crane 6 and the carriage 3 'shown in FIG. Further, each transport carriage 3 shown in FIG. 1 enters and exits the segment rack 2 through the traveling plate 32 connected to the base portion 31 of the lifter 30.
[0071]
According to this embodiment, the segment rack 2 preloaded with the segments 5 is lowered and placed on the bottom of the shaft 4 during the idle time when the transport carriage 3 is traveling back and forth between the segment racks 2 and 2 '. As in the case of the embodiment of FIG. 1, the segment 5 for one ring can be carried out toward the segment rack 2 ′ at the same time when the transport carriage 3 returns to the bottom.
[0072]
Even in this embodiment, the transportation efficiency is further improved by disposing at least one segment rack between the entrance end of the shield tunnel 1 and the segment rack 2 'shown in FIG. Can do.
[0073]
In each of the above-described embodiments, the plurality of carriages 3 arranged between the segment racks are separated from each other. However, these carriages 3 can also be connected to each other. The swinging motion of the moving arm 19 is synchronized.
[0074]
The segment racks 2 and 2 'and the transport carriage 3 are not necessarily limited to the above configuration.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing an embodiment of the present invention.
FIG. 2 is a perspective view illustrating the configuration of a segment rack.
FIG. 3 is a perspective view illustrating the configuration of a segment rack.
FIG. 4 is a side view of a transport carriage equipped with segments.
FIG. 5 is a plan view of a transport cart.
FIG. 6 is a front view of a transport cart.
FIG. 7 is a flowchart showing a movement mode of each transport carriage.
FIG. 8 is a conceptual diagram showing another embodiment of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Shield tunnel 2, 2 'Segment rack 3, 3' Segment conveyance trolley 4 Vertical shaft 5 Segment 6 Crane 7 Shield machine 8 Space 12 Supporting claw 14 Lifting mechanism 30 Lifter 40 Hoist beam

Claims (4)

シールド機の近傍位置に第1のセグメントラックを配設し、立坑を介して降下されたセグメントを前記第1のセグメントラックまで搬送して該ラックに保持させるようにしたシールドトンネル構築用セグメントの搬送システムにおいて、
シールドトンネルの入口端部と前記第1のセグメントラックとの間に、少なくとも1つの別のセグメントラックを配設し、
前記立坑を介して降下されたセグメントを、一旦前記別のセグメントラックに保持させてから、前記第1のセグメントラックへ搬送するようにしたことを特徴とするシールドトンネル構築用セグメント搬送システム。
Transportation of a shield tunnel construction segment in which a first segment rack is disposed in the vicinity of the shield machine, and a segment lowered through a shaft is transported to the first segment rack and held in the rack. In the system,
At least one other segment rack is disposed between the entrance end of the shield tunnel and the first segment rack;
A segment transport system for constructing a shield tunnel, wherein a segment lowered through the shaft is once held in the other segment rack and then transported to the first segment rack.
請求項1において、前記別のセグメントラックの少なくとも1つを、シールドトンネルの入口端部に配設したことを特徴とするシールドトンネル構築用セグメントの搬送システム。2. The shield tunnel construction segment transport system according to claim 1, wherein at least one of the other segment racks is disposed at an entrance end of the shield tunnel. シールド機の近傍位置に第1のセグメントラックを配設し、立坑を介して降下されたセグメントを前記第1のセグメントラックまで搬送して該ラックに保持させるようにしたシールドトンネル構築用セグメントの搬送システムにおいて、
前記セグメントを予め保持させた第2のセグメントラックを前記立坑を介して降下させ、この第2のセグメントラックに保持させたセグメントを前記第1のセグメントラックまで搬送するようにしたことを特徴とするシールドトンネル構築用セグメントの搬送システム。
Transportation of a shield tunnel construction segment in which a first segment rack is disposed in the vicinity of the shield machine, and a segment lowered through a shaft is transported to the first segment rack and held in the rack. In the system,
The second segment rack holding the segment in advance is lowered through the shaft, and the segment held in the second segment rack is transported to the first segment rack. Segment transport system for shield tunnel construction.
請求項3において、前記第1のセグメントラックと第2のセグメントラックの間に少なくとも1つの別のセグメントラックを配設し、前記第2のセグメントラックに保持させたセグメントを一旦前記別のセグメントラックに保持してから、前記第1のセグメントラックへ搬送するようにしたことを特徴とするシールドトンネル構築用セグメント搬送システム。4. The segment segment according to claim 3, wherein at least one other segment rack is disposed between the first segment rack and the second segment rack, and the segment held by the second segment rack is temporarily the another segment rack. A segment transport system for constructing a shield tunnel, wherein the segment transport system is configured to be transported to the first segment rack.
JP24410297A 1997-09-09 1997-09-09 Segment transport system for shield tunnel construction Expired - Lifetime JP3796018B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24410297A JP3796018B2 (en) 1997-09-09 1997-09-09 Segment transport system for shield tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24410297A JP3796018B2 (en) 1997-09-09 1997-09-09 Segment transport system for shield tunnel construction

Publications (2)

Publication Number Publication Date
JPH1181897A JPH1181897A (en) 1999-03-26
JP3796018B2 true JP3796018B2 (en) 2006-07-12

Family

ID=17113790

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24410297A Expired - Lifetime JP3796018B2 (en) 1997-09-09 1997-09-09 Segment transport system for shield tunnel construction

Country Status (1)

Country Link
JP (1) JP3796018B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108216975A (en) * 2018-01-09 2018-06-29 江苏力特工程物流有限公司 Section of jurisdiction pallet for transporting and its application method

Also Published As

Publication number Publication date
JPH1181897A (en) 1999-03-26

Similar Documents

Publication Publication Date Title
US5577597A (en) Work transport system including pallet transport apparatus
CN212424716U (en) Automatic loading and unloading vehicle system
CN111573316B (en) Automatic loading and unloading system, automatic loading method and automatic unloading method
CN211140612U (en) RGV dolly
JP4273423B2 (en) Transport device
JP3796018B2 (en) Segment transport system for shield tunnel construction
JP3343061B2 (en) Entry and exit equipment and entry / exit method for shield tunnel construction segment
CN218756798U (en) Sleeper replacing vehicle and combined sleeper replacing unit
JPS61106321A (en) Cargo transfer device
CN117284669A (en) Article storage device
JP3813074B2 (en) Work transfer device
JPH11106009A (en) Automatic high-rise warehouse for container
JP3192599B2 (en) Plane reciprocating parking system
JP3721492B2 (en) Tunnel sliding method and shear transfer cart
JPH05213437A (en) Transfer system and transfer machine
JPH07185828A (en) Panel member welding equipment
JPH0925095A (en) Automated guided vehicle with lifter
JPS6039323Y2 (en) Conveyance device
JPH1111892A (en) Forklift
JP4331058B2 (en) Segment transshipment transport apparatus and transport method for shield tunnel
JP3562438B2 (en) Loading system
KR100259565B1 (en) A car of recycle parking system
JP4065631B2 (en) Plane reciprocating parking system
JP3314558B2 (en) Mechanical parking device
JP2003191875A (en) Work transfer method and work transfer device in vehicle body assembly line

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060414

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100421

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100421

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110421

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110421

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120421

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130421

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150421

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term