Method for assembling tunnel lining segments Download PDF

Info

Publication number
JP3798332B2
JP3798332B2 JP2002102889A JP2002102889A JP3798332B2 JP 3798332 B2 JP3798332 B2 JP 3798332B2 JP 2002102889 A JP2002102889 A JP 2002102889A JP 2002102889 A JP2002102889 A JP 2002102889A JP 3798332 B2 JP3798332 B2 JP 3798332B2
Authority
JP
Japan
Prior art keywords
segment
ring
steel material
tunnel
tunnel lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002102889A
Other languages
Japanese (ja)
Other versions
JP2003293697A (en
Inventor
安宏 藤元
勝彦 金守
浩司 石井
宗孝 大関
博英 橋本
正憲 若林
Original Assignee
株式会社ピーエス三菱
石川島建材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ピーエス三菱, 石川島建材工業株式会社 filed Critical 株式会社ピーエス三菱
Priority to JP2002102889A priority Critical patent/JP3798332B2/en
Publication of JP2003293697A publication Critical patent/JP2003293697A/en
Application granted granted Critical
Publication of JP3798332B2 publication Critical patent/JP3798332B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、トンネル覆工用セグメントの組立方法に関する。
【0002】
【従来の技術】
従来、プレストレスを導入するトンネル覆工用セグメントは、セグメントリングを形成し、円周方向ストランドを一円周に亘って挿通し、この円周方向ストランドに緊張力を加えて、一体リングを形成し、これを切羽側からジャッキ等で既設セグメントリングに押圧して位置を保ち、複数列の一体リングをトンネル推進方向に連結して形成されていた。
【0003】
以上のトンネルセグメント形成に際し、
(1)セグメントを切羽側からシールドジャッキ等にて既設セグメントリングに押圧しながら組立てるが、周方向ストランドを挿入してはじめてセグメントリングが安定するので、それまで、不安定要素があり、危険な作業であった。
(2)また、推進方向は複数列のセグメントリングを緊張材を挿通して緊張するが、その作業が容易でなかった。
(3)セグメントリングの周方向緊張を円周上の1個所で行うので、周方向ストランドの挿入に手間を要し、定着部のセグメントに設ける切欠が大きく、また緊張には強力な重装備のジャッキを装着する必要があり、作業性が劣っていた。
【0004】
【発明が解決しようとする課題】
本発明は、トンネル推進方向に対してX字状にPC鋼材を配設したトンネル覆工用セグメントを用いて、セグメントリングの組立作業を安全に安定的に容易に行うことができるように改善した技術を提供することを目的とする。
【0005】
【課題を解決するための手段】
本発明は、上記問題を解決するためになされたもので、セグメントのほぼ中央部を通ってトンネル推進方向に対してX字状にセグメント内に配設され、両端に接続具を備えたポストテンション方式のPC鋼材を備えたトンネル覆工用セグメントを用いて、安定的に作業を行う技術を提供する。ここでトンネル推進方向にX字状に配設とは、セグメントの展開図において、トンネル推進方向に対してそれぞれ同一の正負の傾き角を有する斜方向PC鋼材がに配設され、隣接セグメントと背悦属するようになっており、セグメント全体に付いてみるとPC鋼材が菱形網目状を形成して配設されていることを云う。
【0006】
本発明のセグメントの組立方法は次の通りである。すなわち、両端に接続具を備えたポストテンション方式のPC鋼材がセグメントのほぼ中央部を通ってトンネル推進方向に対してX字状にセグメント内に配設されたトンネル覆工用セグメントを用い、新設セグメントリングの各セグメントピースを1個づつ切羽側からシールドジャッキで既設セグメントリングに押圧し、押圧したセグメントピースに内蔵するPC鋼材を既設セグメントリングのPC鋼材端部に連結して仮緊張仮定着し、新設セグメントリングの組立終了後、該セグメントリング全体をシールドジャッキで一体に押圧しながら、前記PC鋼材を本緊張して定着し、セグメントのトンネル推進方向と円周方向の応力導入及び定着を同時に達成することを特徴とするトンネル覆工用セグメントの組立方法である。
【0007】
【発明の実施の形態】
以下図面を参照して本発明の実施の形態を説明する。
【0008】
図1は本発明の1実施例のセグメントピース100の模式的正面図である。このセグメントピース100はトンネル推進方向にX字状にPC鋼材2を内蔵しており、このPC鋼材2の一端には、接続具3を備えている。このセグメントピース100に隣接する既設セグメントリングのセグメントピース110は千鳥配列でこのセグメントピース100に接し、PC鋼材2は互いに連結可能な位置に配設されている。
【0009】
図2〜図4は、実施例のセグメント100の組立工程を示す工程図である。図2〜図4はトンネルライニングの展開図を示している。図2に示すように、既設セグメントリング110の切羽側に新設セグメントピース100aを取付ける。このとき、シールドマシンの掘削ヘッド31からシールドジャッキ33でセグメントピース100aを押圧し、X字状に内蔵しているPC鋼材2aを電動トルクレンチ34を用いて既設セグメントリング110のPC鋼材2aと結合させ、仮緊張する。掘削ヘッド31はカッタービット32が切羽に接している。
【0010】
図3は、図2で連結したセグメントピース100aの隣に別のセグメントピース100bを設置した状態を示している。電動又はエアトルクレンチ34を用いて、PC鋼材2と既設セグメントリング110のPC鋼材2aとを結合し、仮緊張する工程は図2と同様である。次々とセグメントピースを取付ける。図4は一列のセグメントリング100が既設セグメントリング110に接続され、PC鋼材2が結合され、油圧トルクレンチ43等によって新設セグメントリング100のPC鋼材2に緊張力を導入する状態を示している。このようにして、セグメントのトンネル推進方向及び円周方向に一様に適正なプレストレスを付与することが可能である。
【0011】
【発明の効果】
本発明によれば、PC鋼材をセグメントピース内にX字状に形成しておき、既設PC鋼材と連結することによって、簡単に安全にセグメントピースを既設セグメントリングに接続、緊張できる。このPC鋼材を仮緊張することによってセグメントピースを固定することができる。緊張は切羽側で行うために、セグメント内面に切欠を必要としない。セグメントリングの各PC鋼材を本緊張することにより推進方向及び円周方向プレストレスを確実に均一に導入することが可能である。緊張は、トルクレンチで緊張するために、緊張に要する作業は簡単、軽作業であり、また小さいスペースで済むと言う利点がある。
【図面の簡単な説明】
【図1】実施例のセグメントピースの模式的正面図である。
【図2】実施例のセグメントピースの組立工程図である。
【図3】実施例のセグメントピースの組立工程図である。
【図4】実施例のセグメントピースの組立工程図である。
【符号の説明】
2 PC鋼材
3 連結装置
31 掘削ヘッド
32 カッタービット
33 シールドジャッキ
34 電動又はエアトルクレンチ
43 油圧トルクレンチ
100 新設セグメントピース
110 既設セグメントリング
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of assembling segment tunnel lining.
[0002]
[Prior art]
Conventionally, tunnel lining segments that introduce pre-stress form a segment ring, insert a circumferential strand over one circumference, and apply tension to this circumferential strand to form an integral ring However, this was pressed from the face side to the existing segment ring with a jack or the like to maintain the position, and a plurality of rows of integral rings were connected in the tunnel propulsion direction.
[0003]
When forming the above tunnel segment,
(1) While assembling the segment while pressing it against the existing segment ring with a shield jack from the face side, the segment ring is stable only after the circumferential strand is inserted. Met.
(2) In addition, the propulsion direction is strained by inserting a tension material through a plurality of rows of segment rings, but the operation is not easy.
(3) Since the circumferential tension of the segment ring is performed at one place on the circumference, it takes time to insert the circumferential strand, the notch provided in the anchoring segment is large, and the tension is strong and heavy equipment It was necessary to wear a jack, and workability was inferior.
[0004]
[Problems to be solved by the invention]
The present invention uses the tunnel lining for segments arranged an X-shape PC steel for the tunnel propulsion direction, so that assembly of the segment ring can be safely and stably carried out easily be The aim is to provide improved technology.
[0005]
[Means for Solving the Problems]
The present invention has been made to solve the above problems, is disposed in the segment through a substantially central portion in an X shape for the tunnel propulsion direction of the segment, the post having a connector on both ends using tunnel lining for segment with PC steel tension method provides a technique to work stably. Here, the arrangement in the X shape in the tunnel propulsion direction means that, in the development view of the segments, oblique PC steel materials having the same positive and negative inclination angles with respect to the tunnel propulsion direction are arranged on the adjacent segments and the back side. When the entire segment is attached, it means that the PC steel material is arranged in a rhombus network.
[0006]
The segment assembling method of the present invention is as follows. In other words, using a tunnel lining segment in which a post-tension PC steel material with connectors at both ends passes through the center of the segment and is arranged in the segment in an X shape with respect to the tunnel propulsion direction. Each segment piece of the segment ring is pressed against the existing segment ring with a shield jack from the face side one by one, and the PC steel material built in the pressed segment piece is connected to the end of the PC steel material of the existing segment ring, and a temporary tension is assumed. after completion of assembly of the newly established segment ring, while the entire the segment ring pressed together with the shield jack fixed to the tension the PC steel stress introduction and fixing of the tunnel propulsion direction and the circumferential direction of the segment A method for assembling a tunnel lining segment, which is achieved simultaneously.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0008]
FIG. 1 is a schematic front view of a segment piece 100 according to one embodiment of the present invention. This segment piece 100 incorporates a PC steel material 2 in an X shape in the tunnel propulsion direction, and the PC steel material 2 has a connector 3 at one end. The segment pieces 110 of the existing segment ring adjacent to the segment pieces 100 are in contact with the segment pieces 100 in a staggered arrangement, and the PC steel materials 2 are arranged at positions where they can be connected to each other.
[0009]
2 to 4 are process diagrams showing an assembly process of the segment 100 of the embodiment. 2 to 4 show development views of the tunnel lining. As shown in FIG. 2, the new segment piece 100 a is attached to the face side of the existing segment ring 110. At this time, the segment piece 100a is pressed from the excavation head 31 of the shield machine by the shield jack 33, and the PC steel material 2a built in the X shape is coupled to the PC steel material 2a of the existing segment ring 110 using the electric torque wrench 34. Let me be tense. The excavation head 31 has a cutter bit 32 in contact with the face.
[0010]
FIG. 3 shows a state in which another segment piece 100b is installed next to the segment piece 100a connected in FIG. The electric steel or air torque wrench 34 is used to connect the PC steel material 2 and the PC steel material 2a of the existing segment ring 110, and the process of temporarily tensioning is the same as in FIG. Install the segment pieces one after another. FIG. 4 shows a state in which one row of segment rings 100 is connected to the existing segment ring 110, the PC steel material 2 is coupled, and tension is introduced into the PC steel material 2 of the new segment ring 100 by the hydraulic torque wrench 43 or the like. In this way, it is possible to apply an appropriate prestress uniformly in the tunnel propulsion direction and the circumferential direction of the segment.
[0011]
【The invention's effect】
According to the present invention, a PC steel material is formed in an X shape in a segment piece and connected to an existing PC steel material, whereby the segment piece can be easily and safely connected to an existing segment ring. The segment piece can be fixed by temporarily tensioning the PC steel material. Since tension is applied on the face side, no cutout is required on the inner surface of the segment. It is possible to introduce the propulsion direction and the circumferential prestress uniformly evenly by fully tensioning each PC steel material of the segment ring. Since tension is tensioned with a torque wrench, there is an advantage that the work required for tension is simple and light, and requires a small space.
[Brief description of the drawings]
FIG. 1 is a schematic front view of a segment piece of an embodiment.
FIG. 2 is an assembly process diagram of the segment piece of the embodiment.
FIG. 3 is an assembly process diagram of the segment piece of the embodiment.
FIG. 4 is an assembly process diagram of the segment piece of the embodiment.
[Explanation of symbols]
2 PC steel 3 Connecting device 31 Excavation head 32 Cutter bit 33 Shield jack 34 Electric or air torque wrench 43 Hydraulic torque wrench 100 New segment piece 110 Existing segment ring

Claims (1)

両端に接続具を備えたポストテンション方式のPC鋼材がセグメントのほぼ中央部を通ってトンネル推進方向に対してX字状にセグメント内に配設されたトンネル覆工用セグメントを用い、新設セグメントリングの各セグメントピースを1個づつ切羽側からシールドジャッキで既設セグメントリングに押圧し、押圧したセグメントピースに内蔵するPC鋼材を既設セグメントリングのPC鋼材端部に連結して仮緊張仮定着し、新設セグメントリングの組立終了後、該セグメントリング全体をシールドジャッキで一体に押圧しながら、前記PC鋼材を本緊張して定着し、セグメントのトンネル推進方向と円周方向の応力導入及び定着を同時に達成することを特徴とするトンネル覆工用セグメントの組立方法。 A new segment ring using a tunnel lining segment in which post-tensioned PC steel with connectors at both ends passes through the center of the segment and is arranged in the segment in an X-shape with respect to the tunnel propulsion direction. Each segment piece is pressed into the existing segment ring with a shield jack from the face side, and the PC steel contained in the pressed segment piece is connected to the end of the PC steel material of the existing segment ring. After the assembly of the segment ring, the PC steel material is fully tensioned and fixed while pressing the entire segment ring together with a shield jack, and simultaneously introduces and fixes the stress in the tunnel propulsion direction and the circumferential direction of the segment. A method for assembling a tunnel lining segment.
JP2002102889A 2002-04-04 2002-04-04 Method for assembling tunnel lining segments Expired - Lifetime JP3798332B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002102889A JP3798332B2 (en) 2002-04-04 2002-04-04 Method for assembling tunnel lining segments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002102889A JP3798332B2 (en) 2002-04-04 2002-04-04 Method for assembling tunnel lining segments

Publications (2)

Publication Number Publication Date
JP2003293697A JP2003293697A (en) 2003-10-15
JP3798332B2 true JP3798332B2 (en) 2006-07-19

Family

ID=29242442

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002102889A Expired - Lifetime JP3798332B2 (en) 2002-04-04 2002-04-04 Method for assembling tunnel lining segments

Country Status (1)

Country Link
JP (1) JP3798332B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155010A (en) * 2003-11-20 2005-06-16 Kajima Corp Prestressed concrete segment for tunnel lining
JP4452170B2 (en) * 2004-12-17 2010-04-21 株式会社ピーエス三菱 Construction method of shaft
CN113551986B (en) * 2021-07-24 2024-01-19 郑州大学 Indoor testing device and method for static soil pressure coefficient under complex stress state

Also Published As

Publication number Publication date
JP2003293697A (en) 2003-10-15

Similar Documents

Publication Publication Date Title
JP3798332B2 (en) Method for assembling tunnel lining segments
CN115522750B (en) Carbon fiber tendon anchor pre-tensioning and tensioning integrated system and pre-tensioning and tensioning method
CN116122810A (en) Pick-shaped cutting pick for coal rock exploitation and mounting and dismounting method thereof
CN108708283B (en) Method for installing bridge prestressed porous anchorage
CN114833937B (en) Casting mold for shield tunnel scale model and use method thereof
CN110230498A (en) A kind of fast disassembly type shield tail brush and tail sealing device of shield
CN210369872U (en) High mortise-tenon joint formula scaffold frame of security
CN2856580Y (en) Scraper wire rope connector
CN116084280B (en) Cable buckling and arranging device and cable buckling saddle system
CN218953319U (en) Shield constructs quick-witted pipe piece connecting device
CN208326436U (en) A kind of stage loader connector component
CN220909726U (en) A quick installation mechanism for steel arch frame used in tunnel
JPH02153167A (en) Built-up pc twist steel wire tenser, tension work thereof, retension work thereof, and jack chair
CN223225089U (en) Flat chain connecting ring for mining high-strength round-link chain
CN219173362U (en) Conveniently-detached chain connecting ring
CN214303865U (en) Tunnel big pipe shed reinforced structure
JP2002013392A (en) Shield tunnel lining method and segment for lining body
JP2015040372A (en) Inner form for cast-in-place lining concrete construction method by shield
CN222256588U (en) Guard plate for cement dry method rotary kiln with long service life
CN105986548B (en) A kind of low retraction anchorage tensioning equipment and method for stretching
CN220365015U (en) Auxiliary device of slope active protective net
CN218540418U (en) Prestressed steel strand releasing and tensioning device
JPH0623512Y2 (en) Track link device for tracked vehicle
JP3771997B2 (en) PC fixing device and PC fixing method
RU2142563C1 (en) Reusable roof pinning

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060411

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060419

R150 Certificate of patent or registration of utility model

Ref document number: 3798332

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120428

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150428

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term