JP3799403B2 - Earth retaining structure using steel mesh - Google Patents
Earth retaining structure using steel mesh Download PDFInfo
- Publication number
- JP3799403B2 JP3799403B2 JP2002262361A JP2002262361A JP3799403B2 JP 3799403 B2 JP3799403 B2 JP 3799403B2 JP 2002262361 A JP2002262361 A JP 2002262361A JP 2002262361 A JP2002262361 A JP 2002262361A JP 3799403 B2 JP3799403 B2 JP 3799403B2
- Authority
- JP
- Japan
- Prior art keywords
- expanded metal
- retaining structure
- insert
- anchor
- earth retaining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、斜面に階段状の植樹帯を形成して法面の崩壊防止及び緑化促進に寄与する土留構造に関し、特に所要の土圧に対し施工性、経済性及び耐久性に富む鋼製網を受圧板として用いる土留構造に関する。
【0002】
【従来の技術】
近年景観保護や地球環境保全を重視して、斜面上に平らな地盤を形成して崩落防止及び緑化を図る所謂グリーンベンチ工法の施工が増加している。このグリーンベンチ工法は、急傾斜地の斜面に壁体立設用の平坦部を形成し、この平坦部に壁体を略垂直に載置すると共に地山に固定したアンカーを壁体に略直交して接続し、この壁体背面上部に樹木の生育に好適な土砂を裏込して壁体頂部に植樹帯を形成し、樹木の成長により地盤の強化を図るという工法である。
【0003】
従来のグリーンベンチ工法では、壁体として高さ1.5m程度のコンクリートパネルを用いてきたが、コンクリートパネルは土圧の大きさに比べて重すぎ、現地への搬入や設置を行なう際の作業性に難点があった。又樹木がパネルを覆い隠す状態に生長するまでは、コンクリート部が自然景観にマッチしないという欠点もあった。
【0004】
そこで、出願人は国内森林資源で使用用途が定まらずに多量に放置されている間伐材を用いて、重さの軽減と費用の低廉化を図りながら外観を整える土留構造を先に提案した。この土留構造は特開2002-81075号公報に記載されるもので、アンカーに支持され適宜間隔で立設するコンクリート製の柱体と締結金具を介して水平に緊結される間伐材を備える構造で、間伐材の背面には樹木の生育に好適な土砂を裏込し、間伐材が構造材としての使用期限に至った時には締結金具を切断して新たな材料に取り替える方式であった。
【0005】
出願人の提案したこの土留構造は、自然景観に調和する間伐材の有効活用が図れると共に間伐材に最小限の加工を施すのみで使用可能であるのでコスト低減も図れ、かつ部材の軽量化が実現されるので運搬が容易になり施工箇所の適用範囲も拡大するという長所を多々備えるものであった。
【0006】
【発明が解決しようとする課題】
しかし、間伐材は腐食に対する耐久性という点で不安があるため、なかなか積極的な使用に至っていない。又軽量化された構造ではあったが、アンカーに支持されるコンクリート製の柱体を用いていたため未だ施工性、経済性の点でも改良の余地があった。
【0007】
この発明は、上記のような従来の土留構造が有する問題点を解消すべくなされたものであり、間伐材が腐食した後も土砂の垂直性を確保することができ、受圧板のより軽量化並びにより低コスト化を図れる土留構造を提供することを目的としている。
【0008】
【課題を解決するための手段】
上記課題を解決するため、この発明の土留構造は、水平方向又は水平及び垂直の両方向に適宜間隔で配設する型鋼で所要剛性を保有するよう補強されたエキスパンドメタルを受圧板として立設し、このエキスパンドメタルの背面に吸排水性の高い吸出し防止材を介在させながら樹木の生育に好適な土砂を裏込すると共に、前記受圧板に直接連結する接続金具と、この接続金具を自在継手状に係止するアンカーにて支持し、前記エキスパンドメタルの前面に受圧板補強用の間伐材を立設係止することを特徴とするものである。
【0009】
この土留構造は専ら平らな地盤の造成を目的とするもので、垂直の壁面に作用する圧力は比較的小さい。従ってアンカーとしては、主にボルトを採用する。垂直面の主構造となる鋼材で補強された鋼製網が、地山に設置するボルトと連結され、この時に地山から得られる水平力が反力となって垂直面の安定が図られる。鋼製網には所要の土圧に対し施工性、経済性及び耐久性に富むエキスパンドメタルを使用するのが望ましい。約30年くらいの耐久性を確保すれば補強用の間伐材が腐食して壁体の補強部材としての機能を喪失した場合にも、鋼製網の腐食の限度まで耐久性を延長することができる。
【0010】
なお水平面に植栽する樹木の生長年数を約20年とすれば、間伐材が腐食した時点で既に樹木が生育していく為の基盤は保たれているので、壁面に作用する圧力は軽減されており新たな補強材は不要となる。鋼製網が腐食した後、その役割は樹木の育成によって代行され、終には天然の森と同様の斜面の安定が実現する。又、鉄製品が腐食した後は土中に鉄分が溶出することによって重要な鉱物要素が還元され生物の生長に不可欠な養分を提供することになる。
【0011】
又鋼製網は水平・垂直方向に適宜間隔で配設する鋼材、例えば山形鋼などの型鋼で所要剛性を保有するよう補強されているが、前面に立設する間伐材の剛性を生かすことで垂直方向の鋼材は省略も可能である。間伐材は伐採によって発生した材木を、長さを切り揃える程度でより自然の状態で最小限の加工を施して使用する。網の任意の穴を利用して間伐材を直接括り付けることができるため、取付作業は非常に簡易である。又間伐材の径は一般に不揃いであるが、本土留構造では網の補強に用いているので厳密なる均等配置を確保しなくともよく、材料のあらゆる不揃いを許容できる。
【0012】
吸出し防止材には排水性・通気性に優れた素材、例えば椰子繊維などを使用し水の浸透を許しつつ土砂の流出防止を図りながら、植栽する樹木の根の成長に必要な酸素の供給を十分に行ない、自然再生力の増強を図る。樹木の生育に好適な裏込土としては地山掘削土及び自然に存在する表土を活用し、必要な場合には客土を行って階段状の植林空間を創造する。斜面上の平らな地盤が植生の成長を促進し、その結果として地盤そのものは樹木の根によって補強され、更に降雨の影響力からの保護を受けるという、互いに好影響を与え合う関係を作り上げる。樹木は自らの成長と風等気象に対する安定のために根を伸ばすため、地盤と一体となってその形状を固定するので、本土留構造の役割は時間経過と共に少しずつ軽減されていく。
【0013】
アンカーは、地山の強化・安定及びエキスパンドメタルにかかる水平力に対処することを目的として最も効率のよい角度、即ち水平方向あるいはこれに極めて近い角度をもって設置し、地山内に固定するアンカーバーをねじとナットの構造を生かす簡易な金具でエキスパンドメタルに接続するのが望ましい。請求項2記載の土留構造における接続金具は、支持板の中心に突設するねじ付柱体をエキスパンドメタルの前面より差込むインサートと、このインサートとエキスパンドメタルとの間に介在するインサートプレートと、エキスパンドメタルの背面でインサートのねじ付柱体に螺着する筒体を有し、前記アンカーは、この筒体に自在継手状に掛止することを特徴とするものである。金具の一例としては、エキスパンドメタルの前面より差込むプレート付柱体と、この柱体と螺着して内部にナット付のアンカーバーを自在継手状に係止する筒体とで構成される接続金具等が考えられる。この場合も網の任意の穴を利用して取り付けることができるため、アンカーバーとの連結が容易かつ合理的にできる。アンカーバーの地山への固定法としては、地山へ固定ボルトを打込む方法やアンカーバーと直交して地山に埋められる支圧板方式が存在するが、これは地形や地質の条件によって選択が行なわれ、合理性と経済性が図られる。
【0014】
【発明の実施の形態】
次にこの発明の実施の形態を添付図面に基づき詳細に説明する。図1は急傾斜地に施工する土留工の断面図、図2はその一部拡大断面図、図3は図2のIII−III断面を示す断面図である。この土留工が適用される地山1はボルトの植込みが可能な地質であって安定している斜面である。このような急傾斜地の斜面2を削って壁体3を設置するための平坦部4を等高線に沿って形成すると共にボルト孔5を穿設するための立上り部6を適宜形成する。
【0015】
壁体3は地山1に略水平に設置するボルト7で支持され、その背面には樹木の生育に好適な裏込土8を投入して頂部に水平もしくは緩勾配の植樹帯9を段々に形成し、各段には壁体3を覆うような樹木10を植える。この壁体3は1.5メートル程度の高さであって、各段毎に形成していく。例えば上方から切土を行う場合には先ず最上段の壁体3を据付けた後、下段の斜面2を削り、この掘削した土砂を表土とそれ以外の土石とに分割して仮置きする。形成された下段の平坦部4を利用して立上り部6にボルト孔5を穿設し、ボルト7を地山1に打ち込んでグラウト等により固定する。下段の壁体3をボルト7で接続し、仮置きした土石及び表土を裏込土8として投入して新たな植樹帯9を形成する。上記手順により順次下方に切り下げながら斜面2を削って得られた土砂の無駄を極力なくすと共に、作業足場を確保して安全を図る。
【0016】
壁体3は型鋼11で補強された鋼製網12と、この鋼製網12に結束ワイヤ等の締結部材13を介して垂直に緊結される間伐材14と、鋼製網12の背面に配設する吸出し防止材15よりなる。この実施形態で使用する鋼製網12は図4に示すように水平・垂直方向に適宜間隔で型鋼11を配設しているが、前面に立設する間伐材の剛性を生かすことで垂直方向の型鋼を省略することも可能である。
【0017】
壁体3をボルト7で支持するため接続金具16を用いる。この接続金具の詳細を図5に基づき説明する。図5はボルト接続部の拡大縦断面図である。接続金具16は、鋼製網12の前面より差込むインサート17と、これと鋼製網12との間に介在するインサートプレート18と、鋼製網12の背面でインサート17に螺着する筒体19よりなる。インサート17は矩形又は円形に形成する支持板17aと、その中心に突設するねじ付柱体17bを有し、地山に固定するボルト7は鋼製網12側の端部にナット7aを螺着する。筒体19は内面に凸部19aを周設し、外方から挿入するボルト7にナット7aを捻じ込んだ後これを自在継手状に掛止する。又筒体19の内面他端には雌ねじ19bを螺刻し、ねじ付柱体17bと螺合する。
【0018】
インサート17は鋼製網12の任意の網目を通すことができるのでボルト7の位置に合せやすく、又所定範囲内であればボルト7が、あらゆる方向に傾いていても筒体19とインサート17を接続することができる。このためボルト7の設置が容易になる。又ボルト7と鋼製網12を直接連結することによって柱構造を省くことができる。鋼製網12は型鋼11による補強によって重量増があっても、一平方メートル当たり10kg程度であり傾斜地で使用することの多いこの種の工法としては、格段の軽量化が実現し、施工性は著しく向上する。
【0019】
なお以上説明した土留構造では地山へ固定ボルトを打込むケースで説明したが、ボルト後端にアンカープレートを固定してこれを地山に埋設する方式でもよい。又既設の切土・盛土法面や自然斜面の中腹に水平面を設けようという場合でも、鋼製網の使用は有効である。斜面に打込んだ固定ボルトの強力な引抜耐力を活用することによって、鋼製網の上方から切り取った土砂をその中に埋め込めば固定ボルトによって支えられた安定した水平面を得ることが可能である。
【0020】
水平面は植樹スペースとして利用できるほかに、遊歩道や管理用道路として重要な価値を有する。又、盛土を構築する際に有孔管等を埋設して雨水の集水を図ることが可能である。これは森が本来有している緑のダムの機能を拡大するものであり、土が有する貯水機能を最大に発揮させて脱ダム時代の有力な代替策と成り得るものである。広幅員の水平面を要する場合には、下段部から徐々に上部へ移行し複数の水平な固定ボルトの使用によって、工事用進入路や車線増設への対応へ発展させることも可能である。
【0021】
【発明の効果】
以上説明したように、この発明の土留構造は、受圧板として型鋼で所要剛性を保有するよう補強されたエキスパンドメタルを用いこれに補強用の間伐材を立設係止するので、耐用年数が短い間伐材が腐食した後もエキスパンドメタルの腐食の限度まで耐久性を延長することができ、この間土砂の垂直性を確保することができる。又エキスパンドメタルは型鋼による補強によって重量増があっても、一平方メートル当たり10kg程度であり壁体の格段の軽量化が実現し、施工性は著しく向上する。又間伐材のあらゆる不揃いを許容できるのでより低コスト化が図れる。又受圧板に直接連結する接続金具を用いるので、垂直面の主構造となる柱構造を省くことができる。又接続金具とアンカーを自在継手状に係止するので所定範囲内であればアンカーが、あらゆる方向に傾いていても接続することができ、アンカーの設置が容易になる。又請求項2記載の土留構造における接続金具は、エキスパンドメタルの前面より差込むインサートを用いるので網の任意の穴を利用して取り付けることができるため、アンカーの位置に合せやすく、アンカーとの連結が容易かつ合理的にできる。
【図面の簡単な説明】
【図1】土留工の断面図である。
【図2】図1の一部拡大断面図である。
【図3】図2のIII−III断面を示す断面図である。
【図4】鋼製網の正面図である。
【図5】ボルト接続部の拡大縦断面図である。
【符号の説明】
1 地山
3 壁体
7 ボルト
8 裏込土
10 樹木
11 型鋼
12 鋼製網
13 締結部材
14 間伐材
15 吸出し防止材
16 接続金具[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a soil retaining structure that contributes to preventing slope failure and promoting greening by forming a stepped tree-planting zone on a slope, and in particular, a steel net that is rich in workability, economy, and durability against required earth pressure. The present invention relates to a soil retaining structure that uses as a pressure receiving plate.
[0002]
[Prior art]
In recent years, with an emphasis on landscape protection and global environmental conservation, the construction of so-called green bench methods for preventing flattening and greening by forming a flat ground on the slope is increasing. In this green bench method, a flat part for standing a wall is formed on the slope of a steep slope, the wall is placed substantially vertically on this flat part, and the anchor fixed to the ground is almost orthogonal to the wall. This is a construction method in which earth and sand suitable for the growth of trees are backed up on the upper back of the wall body to form a planting zone at the top of the wall body, and the ground is strengthened by the growth of the tree.
[0003]
In the conventional green bench construction method, a concrete panel with a height of about 1.5m has been used as the wall, but the concrete panel is too heavy compared to the earth pressure, and work for carrying in and installing on the site. There was a difficulty in sex. In addition, there was a drawback that the concrete portion did not match the natural landscape until the tree grew to cover the panel.
[0004]
Therefore, the applicant previously proposed a soil retaining structure that uses thinned wood that has been left untreated for a long time in domestic forest resources, while reducing the weight and reducing the cost. This earth retaining structure is described in Japanese Patent Application Laid-Open No. 2002-81075, and is a structure including a concrete pillar body that is supported by an anchor and is erected at an appropriate interval, and a thinning material that is tightened horizontally via a fastening bracket. The back of the thinned wood was backed with earth and sand suitable for tree growth, and when the thinned wood reached the expiration date for use as a structural material, the fastener was cut and replaced with a new material.
[0005]
This soil retaining structure proposed by the applicant enables effective use of thinned wood that harmonizes with the natural landscape, and can be used with only minimal processing on the thinned wood, thus reducing costs and reducing the weight of components. Since it is realized, it has many advantages that it is easy to transport and expands the scope of construction.
[0006]
[Problems to be solved by the invention]
However, since thinned wood is uneasy in terms of durability against corrosion, it has not been actively used. Although the structure was lighter, there was still room for improvement in terms of workability and economy because of the use of concrete pillars supported by anchors.
[0007]
The present invention was made to solve the problems of the conventional earth retaining structure as described above, and can ensure the verticality of the earth and sand even after the thinned wood is corroded, making the pressure plate lighter. In addition, an object of the present invention is to provide a soil retaining structure capable of reducing costs.
[0008]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the earth retaining structure of the present invention is provided with an expanded metal reinforced as a pressure receiving plate, which is reinforced so as to have the required rigidity with a steel plate arranged at appropriate intervals in both the horizontal direction and the horizontal and vertical directions , The back of this expanded metal is backed with earth and sand suitable for tree growth while interposing an anti-suction material with high water absorption and drainage properties, and a connection fitting directly connected to the pressure receiving plate , and the connection fitting in a universal joint shape. It is supported by an anchor to be locked, and a thinning material for pressure-receiving plate reinforcement is erected and locked on the front surface of the expanded metal .
[0009]
This earth retaining structure is exclusively for the purpose of creating a flat ground, and the pressure acting on the vertical wall surface is relatively small. Therefore, bolts are mainly used as anchors. The steel net reinforced with the steel material that is the main structure of the vertical surface is connected to the bolts installed on the natural ground, and the horizontal force obtained from the natural ground at this time acts as a reaction force to stabilize the vertical surface. It is desirable to use an expanded metal that is rich in workability, economy and durability against the required earth pressure for the steel net. If durability for about 30 years is secured, even if the thinning material for reinforcement corrodes and loses its function as a reinforcing member for the wall, the durability can be extended to the limit of corrosion of the steel net. it can.
[0010]
If the growing age of trees planted on a horizontal surface is about 20 years, the base for the growth of the trees is maintained when the thinned wood is corroded, so the pressure acting on the wall is reduced. New reinforcement is not required. After the steel mesh is corroded, its role is surrogate by growing trees and finally the slope stability similar to that of a natural forest is realized. In addition, after iron products are corroded, iron is eluted into the soil, so that important mineral elements are reduced and provide essential nutrients for the growth of organisms.
[0011]
Steel nets are reinforced with steel materials, such as angle steels, arranged at appropriate intervals in the horizontal and vertical directions to maintain the required rigidity, but by utilizing the rigidity of thinned wood standing up front. The steel material in the vertical direction can be omitted. For thinned wood, use the timber produced by logging with minimal processing in a more natural state to the extent that the length is trimmed. Since thinned wood can be tied directly using any hole in the net, installation work is very simple. In addition, the diameter of thinned wood is generally uneven, but the main retaining structure is used to reinforce the net, so it is not necessary to ensure a strict uniform arrangement, and any uneven material can be allowed.
[0012]
Use a material with excellent drainage and breathability as an anti-suction material, such as coconut fiber, to prevent the outflow of earth and sand while allowing water to penetrate, and to supply oxygen necessary for the growth of tree roots to be planted Sufficiently do it to increase natural regeneration. As the backfill suitable for the growth of trees, natural ground excavated soil and naturally existing topsoil are utilized, and if necessary, customer soil is used to create a step-like afforestation space. The flat ground on the slope promotes the growth of vegetation, and as a result, the ground itself is reinforced by the roots of the trees and further protects against the influence of rainfall, creating a mutually beneficial relationship. Since trees grow their roots for their growth and stability against wind and other weather conditions, the shape of the mainland structure is gradually reduced over time because the shape is fixed integrally with the ground.
[0013]
Anchors are installed at the most efficient angle, that is, at an angle that is horizontal or very close to the purpose of coping with the strength and stability of the natural ground and the horizontal force applied to the expanded metal. It is desirable to connect to expanded metal with simple metal fittings that make use of the screw and nut structure. The connection bracket in the earth retaining structure according to claim 2, an insert for inserting a threaded column projecting from the front surface of the expanded metal projecting from the center of the support plate, an insert plate interposed between the insert and the expanded metal, It has a cylinder body screwed to the threaded column of the insert on the back surface of the expanded metal, and the anchor is hooked on the cylinder body in a universal joint shape. As an example of metal fittings, a connection consisting of a column with a plate that is inserted from the front surface of the expanded metal , and a cylindrical body that is screwed to this column and locks an anchor bar with a nut into a universal joint. A metal fitting etc. can be considered. Also in this case, since it can be attached using an arbitrary hole of the net, the connection with the anchor bar can be easily and rationally performed. There are two methods for fixing the anchor bar to the ground: a method of driving a fixing bolt into the ground and a bearing plate method that is buried in the ground perpendicular to the anchor bar, but this is selected according to topography and geological conditions. Is carried out, and rationality and economy are achieved.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described in detail with reference to the accompanying drawings. 1 is a cross-sectional view of a earth retaining work constructed on a steep slope, FIG. 2 is a partially enlarged cross-sectional view thereof, and FIG. 3 is a cross-sectional view showing a III-III cross section of FIG. The
[0015]
The
[0016]
The
[0017]
A connection fitting 16 is used to support the
[0018]
Since the
[0019]
In the soil retaining structure described above, the case where the fixing bolt is driven into the natural ground has been described, but an anchor plate may be fixed to the rear end of the bolt and embedded in the natural ground. The use of steel nets is also effective in the case where a horizontal surface is to be provided in the middle of an existing cut / fill slope or natural slope. By utilizing the strong pulling strength of the fixing bolt driven into the slope, it is possible to obtain a stable horizontal plane supported by the fixing bolt by embedding earth and sand cut out from above the steel mesh.
[0020]
In addition to being used as a planting space, the horizontal plane has an important value as a promenade and administrative road. It is also possible to collect rainwater by embedding a perforated pipe or the like when constructing the embankment. This expands the function of the green dam that the forest originally has, and it can serve as a powerful alternative in the era of dam removal by maximizing the water storage function of the soil. When a wide horizontal surface is required, it is possible to gradually move from the lower stage to the upper part and use a plurality of horizontal fixing bolts to develop a construction approach path or lane extension.
[0021]
【The invention's effect】
As described above, the earth retaining structure of the present invention uses an expanded metal reinforced with a steel plate as a pressure receiving plate so as to have the required rigidity, and stands up and locks the thinning material for reinforcement thereto, so that the service life is short. Even after the thinned wood is corroded, the durability can be extended to the limit of the corrosion of the expanded metal , and the verticality of the soil between these can be ensured. Moreover, even if the expanded metal is increased in weight by reinforcement with the steel mold , it is about 10 kg per square meter, realizing a significant weight reduction of the wall body, and the workability is remarkably improved. Moreover, since all irregularities of thinned wood can be tolerated, the cost can be further reduced. Further, since the connection fitting directly connected to the pressure receiving plate is used, the column structure which is the main structure of the vertical plane can be omitted. Further, since the connection fitting and the anchor are locked in a universal joint shape, the anchor can be connected even if the anchor is inclined in any direction within the predetermined range, and the anchor can be easily installed. In addition, since the metal fitting in the earth retaining structure according to claim 2 uses an insert inserted from the front surface of the expanded metal, it can be attached using any hole in the mesh, so that it can be easily aligned with the anchor position and connected to the anchor. Is easy and reasonable.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view of a earth retaining work.
FIG. 2 is a partially enlarged cross-sectional view of FIG.
3 is a cross-sectional view showing a III-III cross section of FIG.
FIG. 4 is a front view of a steel net.
FIG. 5 is an enlarged vertical sectional view of a bolt connection portion.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002262361A JP3799403B2 (en) | 2002-09-09 | 2002-09-09 | Earth retaining structure using steel mesh |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002262361A JP3799403B2 (en) | 2002-09-09 | 2002-09-09 | Earth retaining structure using steel mesh |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004100237A JP2004100237A (en) | 2004-04-02 |
| JP3799403B2 true JP3799403B2 (en) | 2006-07-19 |
Family
ID=32262424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002262361A Expired - Fee Related JP3799403B2 (en) | 2002-09-09 | 2002-09-09 | Earth retaining structure using steel mesh |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3799403B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013174102A (en) * | 2012-02-27 | 2013-09-05 | Okabe Co Ltd | Structure and method for reinforcing natural ground |
| KR101212518B1 (en) | 2012-08-07 | 2012-12-14 | 정택동 | Prefabricated revet construction and prefabricatedrevet construction method using thereof |
| CN106677197A (en) * | 2017-02-28 | 2017-05-17 | 中铁上海工程局集团有限公司 | Railway slope structural steel stiffened plain concrete column combination supporting structure and construction method thereof |
| CN110820760B (en) * | 2019-11-18 | 2025-05-09 | 上海泾东建筑发展有限公司 | Underground structure support replacement construction system and construction method |
-
2002
- 2002-09-09 JP JP2002262361A patent/JP3799403B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004100237A (en) | 2004-04-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109537604A (en) | A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil | |
| CN101240550A (en) | Construction method for lattice type steel column tower crane pedestal | |
| KR101031583B1 (en) | Natural Stone Retaining Wall Structure Using Blasting Stone and Concrete Resistance Block and Its Construction Method | |
| CN218880906U (en) | High slope support reinforced structure | |
| JP3799403B2 (en) | Earth retaining structure using steel mesh | |
| CN114673178B (en) | Miniature anti-slide pile combined structure for ecological protection of side slope and construction method thereof | |
| KR101300770B1 (en) | Multi-stage retaining wall planted tree | |
| CN213741133U (en) | Rock slope's planting technique device | |
| KR100458928B1 (en) | Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid | |
| CN210341948U (en) | Ecological bank protection in gardens | |
| KR101244804B1 (en) | Retaining law carbon eco-friendiy wall | |
| KR100758231B1 (en) | Environmentally friendly sloped block structure for landscaping | |
| KR102875246B1 (en) | Soil support structure | |
| KR100362697B1 (en) | Green concrete retaining wall and method for constructing the same | |
| JP2002081075A (en) | Earth retaining structure using lumber from thinning | |
| CN224119578U (en) | Anchor rod and gabion mesh combined slope protection structure | |
| CN116180769B (en) | Construction method of planting bag cofferdam pit-making transplanting and greening system | |
| JPH11293678A (en) | Slope protection construction method | |
| JPH07158073A (en) | Steel frame member for slope surface and slope greening method using the member | |
| CN213625629U (en) | Deep soft soil district small-span city open channel supporting construction | |
| CN223647090U (en) | Gravity type retaining wall facing structure | |
| JP4012403B2 (en) | Wall greening method | |
| CN218292019U (en) | Reinforced structure of bituminous paving steel column base | |
| KR102651458B1 (en) | Ground reinforcement structure for installing supports on sloping ground | |
| JP4411396B2 (en) | Sediment retaining wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050705 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050819 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060314 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20060327 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060327 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060327 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3799403 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120512 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120512 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150512 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |