JP3799698B2 - Tunnel construction device - Google Patents
Tunnel construction device Download PDFInfo
- Publication number
- JP3799698B2 JP3799698B2 JP33994496A JP33994496A JP3799698B2 JP 3799698 B2 JP3799698 B2 JP 3799698B2 JP 33994496 A JP33994496 A JP 33994496A JP 33994496 A JP33994496 A JP 33994496A JP 3799698 B2 JP3799698 B2 JP 3799698B2
- Authority
- JP
- Japan
- Prior art keywords
- bolt
- segment
- erector
- tunnel
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 9
- 238000003780 insertion Methods 0.000 claims description 17
- 230000037431 insertion Effects 0.000 claims description 17
- 238000000034 method Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、セグメント同士をボルトで締結してトンネルを構築するトンネル構築装置に関する。
【0002】
【従来の技術】
シールド掘進機によって掘削された掘坑の内面には、複数のセグメントがボルトナットによって軸方向および周方向に組立られ、トンネルが構築される。詳しくは、新たに組付けるべき組付セグメントは、エレクタと呼ばれる組付装置で把持され、既に組付けられた既設セグメントの隣に移動される。そして、それらセグメント同士をボルトナットで連結してトンネルを構築していく。
【0003】
近年、上記エレクタに、セグメント同士を連結するためのボルトナットを自動的に締結する締結手段を設け、ボルトナットの締結を人手によらずに自動的に行うものが開発されている。しかし、このように自動締結する場合には、締結手段にボルトナットを供給するボルトナット供給機構が必要となり、装置の複雑化を招いていた。
【0004】
そこで、セグメントの内周面の端部に凹設されたボルト箱穴の壁面に、セグメント同士を連結するボルトを仮保持するための凹み部を設け、その凹み部に弾性体リングを介してボルトの頭部を仮保持させておき、そのボルトの軸部をエレクタに設けた補助ハンドで把持して引き抜き、そのボルトを締結手段に受け渡すことにより、上記ボルト供給機構を省略したものが提案されている(特開平8-158799号公報等)。
【0005】
【発明が解決しようとする課題】
しかし、この場合、すべてのセグメントのボルト箱穴内に、ボルトを仮保持するための凹み部および弾性体リングを特別に設ける必要があり、コスト高となる。また、仮保持したボルトの軸部を把持して引き抜き、そのボルトを締結手段に受け渡すための補助ハンドが新たに必要となる。また、補助ハンドから締結手段へのボルトの受け渡しをボルト箱穴内にて行っているため、ボルト箱穴に大きな空間が必要となり、セグメントの強度上好ましくない。
【0006】
以上の事情を考慮して創案された本発明の目的は、ボルト供給機構が不要となり、構造簡潔にして低コストなトンネル構築装置を提供することにある。
【0007】
【課題を解決するための手段】
上記目的を達成するために本発明は、組付セグメントの端部に、ネジ穴を設けてそのネジ穴にセグメント同士を連結するためのボルトを仮締めし、既設セグメントに、上記ボルトが挿通されてそのボルト頭部が係止される挿通穴を設け、上記組付セグメントを把持して既設セグメントの隣に移動するエレクタに、把持した組付セグメントのネジ穴に仮締めされたボルトの頭部を保持して着脱する着脱手段を設けたものである。
【0008】
本発明によれば、エレクタが組付セグメントを把持した後、エレクタに設けられた着脱手段が、組付セグメントのネジ穴に仮締めされたボルトの頭部を保持してボルトを一旦取り外す。ここで、エレクタが組付セグメントを把持すると、組付セグメントとエレクタとが一体となって同一の座標系となるため、エレクタに設けられた着脱手段は、組付セグメントのネジ穴に仮締めされたボルトの頭部を的確に保持でき、ボルトを確実に取り外すことができる。
【0009】
その後、エレクタが組付セグメントを既設セグメントの隣に移動させた後、上記着脱手段が、組付セグメントから取り外したボルトを既設セグメントの挿通穴を通して再び組付セグメントのネジ穴に締め付け、既設セグメントと組付セグメントとを連結する。ここで、組付セグメントとエレクタとが一体となって同一の座標系となっているので、エレクタに設けられた着脱手段は、組付セグメントのネジ穴に対してボルトを緩めたときと常に同じ位置関係を再現でき、把持したボルトを組付セグメントのネジ穴に的確に締め込むことができる。
【0010】
このように、組付セグメントのネジ穴に仮締めされたボルトを用いてセグメント同士を連結するようにしたので、ボルト供給機構が不要となる。また、セグメントの端部から突出したボルトの頭部を着脱手段で保持して着脱するので、従来のようにボルト軸部を保持する補助ハンドが不要となり、低コストとなる。
【0011】
【発明の実施の形態】
以下、本発明の一実施形態を添付図面に基づいて説明する。
【0012】
本実施形態に係るトンネル構築装置に用いるセグメントを図3(a),(b),(c) に示す。図示するようにセグメント1a,1b,1cのトンネル軸方向後方の端部の組付面2には、セグメント1同士を連結するためのボルト3が締め込まれるネジ穴4が、セグメント1の周方向に沿って複数設けられている。これらネジ穴4には、上記ボルト3がそれぞれ仮締めされている。
【0013】
また、上記セグメント1のトンネル軸方向前方の内周面5には、上記ボルト3を径方向内方から挿入するためのボルト箱穴6が、セグメント1の周方向に沿って複数設けられている。これらボルト箱穴6のセグメント1の端部側の壁面7には、上記ボルト3が挿通される挿通穴8が、それぞれ設けられている。挿通穴8は、その穴径がボルト3の軸部3aより大きく且つボルト3の頭部3bより小さく形成されており、ボルト3の軸部3aが挿通されたときに多少のクリアランス(余裕)が生じるようになっている。
【0014】
かかるセグメント1の側断面を図1(a) に示す。図1(a) において、セグメント1の右側がトンネル後方(立坑側)であり、左側がトンネル前方(切羽側)である。このセグメント1は、図1(b) に示すようにエレクタ9の把持部10に把持される。エレクタ9は、新たに組付けるべき組付セグメント1を把持し、それを既に組付けられた既設セグメント1の隣の位置に移動するものである。
【0015】
エレクタ9には、当該エレクタ9によって把持した組付セグメント1のネジ穴4に仮締めされたボルト3の頭部3bを保持し、そのボルト3をネジ穴4から着脱する着脱手段11aが設けられている。着脱手段11aは、エレクタ9にトンネル径方向に沿って設けられた径方向ガイド12と、径方向ガイド12に係合して移動する径方向移動台13と、径方向移動台13にトンネル軸方向に沿って設けられた軸方向移動ガイド14と、軸方向移動ガイド14に係合して移動する軸方向移動台15と、軸方向移動台15に設けられボルト6の頭部3bを保持して正逆回転させるボルト保持部16とを有している。
【0016】
図1(b) に示すように、エレクタ9によって組付セグメント1を把持したならば、図1(c) に示すように、径方向移動台13と軸方向移動台15とを適宜移動させ、ボルト保持部16を組付セグメント1のネジ穴4に仮締めされたボルト3の頭部3bに被嵌させる。このとき、エレクタ9が組付セグメント1を把持しているため、組付セグメント1とエレクタ9とが一体となって同一の座標系となり、エレクタ9に設けられたボルト保持部16は、軸方向と径方向と2方向の自由度のみで、組付セグメント1のネジ穴4に仮締めされたボルト3の頭部3bを的確に保持できる。
【0017】
次に、ボルト保持部16によりボルト3を緩める方向に回転させながら軸方向移動台15をトンネル後方に移動させ、保持したボルト3をネジ穴4から引き抜く。引き抜いたボルト3は、その頭部3bがボルト保持部16に保持され、組付セグメント1から離間される。次に、径方向移動台13をトンネル内方に移動させ、ボルト保持部16およびそれに保持したボルト3を、図2(d) に示すように組付セグメント1を既設セグメント1の隣に移動する際に邪魔にならない位置に移動させる。
【0018】
そして、図2(d) に示すように組付セグメント1をエレクタ9によって既設セグメント1の隣に移動させ、図2(e) に示すように、径方向移動台13をトンネル外方に移動させると共に軸方向移動台15をトンネル前方へ移動させ、ボルト保持部16およびそれに保持されたボルト3を既設セグメント1のボルト箱穴6に挿入する。そして、ボルト保持部16によりボルト3を締める方向に回転させながら、軸方向移動台15をトンネル前方へ移動させ、ボルト3を既設セグメント1の挿通穴8を通して組付セグメント1のネジ穴4に締め込む。
【0019】
このとき、組付セグメント1とエレクタ9とが一体となって同一の座標系となっているので、エレクタ9に設けられたボルト保持部16は、組付セグメント1のネジ穴4に対してボルト3を緩めたときと常に同じ位置関係を再現でき、把持したボルト3を組付セグメント1のネジ穴4に的確に締め込むことができる。なお、ボルト3(オネジ)とネジ穴4(メネジ)とは、僅かなズレでもこれらを螺合することはできず、無理をすればネジを舐めてしまうため、本実施形態のように正確な位置関係を再現できる事は重要である。
【0020】
他方、ボルト保持部16は、既設セグメント1の挿通穴8とは切り離されており同一の座標系とはなっていないため、ボルト保持部16のボルト3を挿通穴8の中心に正確に挿通させることはできないが、挿通穴8の穴径はボルト3の軸部3aの直径よりも多少大きく形成されているため、そのクリアランスの範囲であればボルト保持部16のボルト3と挿通穴8との位置関係がズレても、ボルト3を挿通穴8に通すことができる。すなわち、挿通穴8とボルト保持部16とが切り離されて同一の座標系となっていなくても、セグメント1,1同士の連結は問題なく行うことができる。
【0021】
その後、図2(f) に示すように、エレクタ9の把持部10を組付セグメント1から切り離してエレクタ9を離間移動させ組付が完了する。
【0022】
このように、組付セグメント1のネジ穴4に仮締めされたボルト3を用いてセグメント1,1同士を連結するようにしたので、セグメント1をボルト3で自動組立する装置についてボルト供給機構が不要となり、低コストとなる。また、セグメント1の端部から突出したボルト3の頭部3bをエレクタ9に設けた着脱手段11のボルト保持部16で保持して着脱するので、従来のようにボルト3の軸部3aを保持する補助ハンドが不要となり、低コストとなる。よって、構造簡潔にして低コストなトンネル構築装置が実現できる。
【0023】
以上、トンネル軸方向に隣接するセグメント1,1同士(リング間のセグメント同士)を連結する場合について述べたが、トンネル周方向に隣接するセグメント同士(ピース間のセグメント同士)を連結する場合も同様である。ピース間のセグメント同士の連結を、図3および図4を用いて以下に述べる。
【0024】
まず、図3(a) に示すセグメント1aをエレクタ9で把持して、着脱手段11aによって前述した図1(a),(b),(c) および図2(d),(e),(f) の手順で既設セグメント1に組付ける、このセグメント1aの内周面の周方向の両端部には、上述した軸方向のものと同様のボルト箱穴6が形成されている。ボルト箱穴6の端部側の壁面7には、上述した軸方向のものと同様の挿通穴8がそれぞれ設けられている。
【0025】
次に、図3(b) に示すセグメント1bをエレクタ9で把持して、図4に示すように上記セグメント1aの周方向の隣に組付ける。このセグメント1bには、図3(b) に示すように、周方向の一端にボルト箱穴6が形成されてその壁面7に挿通穴8が形成され、他端にネジ穴4が形成されてボルト3が仮締めされている。この図3(b) に示すセグメント1bは、エレクタ9で把持されてエレクタ9に設けられた図5に示す着脱手段11b(後述する)によってボルト3が取外され、そのネジ穴4側が図4に示す既設セグメント1a(図3(a) のセグメント)の周方向の隣に移動される。
【0026】
その後、着脱手段11bに保持されたボルト3が既設セグメント1aの挿通穴8を通して再び組付セグメント1bのネジ穴4に締め込まれ、セグメント1bがセグメント1aに連結される。このようにして組付けられたセグメント1bの周方向の隣に、同様に図3(b) に示すようなセグメント1bを連結する。最後に、図3(c) に示すように周方向の両端部にネジ穴4とボルト3を有するセグメント1cをエレクタ9で把持し、着脱手段11bによって図4に示すように、既設セグメント1bの間に連結する。
【0027】
以上説明したように、ピース間のセグメント1を連結する場合でも、組付セグメント1をエレクタ9で把持しそれらが一体となった状態で、把持した組付セグメント1のネジ穴4に仮締めされたボルト3をエレクタ9に設けられた着脱手段11bによって着脱するので、ボルト3を着脱手段によって確実に着脱できる。また、既設セグメント1の挿通穴8と着脱手段11bで把持したボルト3とは、切り離されて同一の座標系とはなっていないが、挿通穴8とボルト軸部3aとの間に所定のクリアランスがあるため、その範囲のズレであれば問題なく挿通させることができる。
【0028】
以下に、上述した着脱手段11a,11bおよび把持部10を有するエレクタ9について図5〜図11を用いて説明する。
【0029】
図5は、エレクタ9をトンネル軸方向後方から見た図であり、図6は上記エレクタ9を左側面から見た図である。図中、吊ビーム20は、図示しない旋回機構によってトンネル周方向に旋回自在となっていると共に、シリンダ21によってトンネル径方向に移動自在となっている。
【0030】
吊ビーム20には、トンネル軸方向に自在に移動するフレーム22が、ガイドロッド23を介して取り付けられている、フレーム22には、リング間のセグメント1をボルト3で連結するためのリング間の着脱手段11aと、ピース間のセグメント1をボルト3で連結するためのピース間の着脱手段11bと、組付セグメント1を把持する把持部10とが設けられている。リング間の着脱手段11aは、トンネル周方向に所定間隔を隔てて4個配置されている。ピース間の着脱手段11bは、把持したセグメント1の周方向の両端部に配置されている。
【0031】
把持部10の概要を図7に示す。図示するように、把持部10は、シリンダ24で昇降移動される先端テーパ状の位置決めピン25と、シリンダ26で昇降移動されるブロック27と、ブロック27に回転自在に取り付けられた保持ピン28と、保持ピン28の先端部に設けられたフック29とを有している。上記ブロック27には、当該ブロック27が昇降する際にガイドとなるロッド30が設けられ、ロッド30は、フレーム22に取り付けられたビーム31に挿通されている。
【0032】
ブロック27には、保持ピン28に設けられたピニオン32に噛合するラック33が設けられている。ラック33をシリンダ34で移動させると、ピニオン32が回転し、保持ピン28が回転する。保持ピン28の先端のフック29は、図8に示すようにセグメント1の中央部に形成された係合穴35に挿入され、90度回転されることにより係合するようになっている。また、セグメント1には、位置決めピン25が挿入されるテーパ状の位置決め穴36が形成されている。なお、図8に示すセグメントは、図示はしてないが実際には図3に示すもののようにボルト箱穴6やボルト3を有している。
【0033】
組付セグメント1の把持は次のようにして行う。まず、エレクタ9のフレーム22を組付セグメント1の上方に移動させ、位置決めピン25を下降させて位置決めピン25の先端部を組付セグメント1の位置決め穴36に挿入する。これにより、組付セグメント1とエレクタ9との位置関係が略決まる。そして、保持ピン28をシリンダ26によって下降させ、保持ピン28の先端のフック29を組付セグメント1の係合穴35に挿入する。そして、保持ピン28をラック33で90度回転させてフック29を係合穴35に係合させた後、保持ピン28を引き上げると共に位置決めピン25を押し下げる。これにより、組付セグメント1が決まった位置関係で強固にエレクタ9に固定される。
【0034】
次に、リング間およびピース間の着脱手段11a,11bの概要を図9〜図11に示す。これらの着脱手段11a,11bは、リング間用とピース間用とで本質的な違いがなく、リング間用着脱手段11aについては図1および図2に概要を示したので、以下ではピース間用着脱手段11bのみを説明する。
【0035】
この着脱手段11bは、エレクタ9のフレーム22にトンネル径方向に沿って設けられた径方向ガイド40と、径方向ガイド40に係合して移動する径方向移動台41と、径方向移動台41にトンネル周方向に沿って設けられた周方向移動ガイド42と、周方向移動ガイド42に係合して移動する周方向移動台43と、周方向移動台43に設けられボルト3の頭部3bを保持して正逆回転させるボルト保持部44とを有している。
【0036】
径方向移動台41は、一端が径方向ガイド40に他端が径方向移動台41に接続されたシリンダ45によって移動する。周方向移動台43は、一端が周方向移動ガイド42に他端が周方向移動台43に接続されたシリンダ46によって移動する。ボルト保持部44は、周方向移動台43に設けられたケーシング47を有している。ケーシング47には、モータ48が取り付けられている。ケーシング47内には、モータ48のピニオン49と、ピニオン49と噛合してギヤトレーンを構成するギヤ50a,50b,50cと、ギヤ50cに噛合する外歯ギヤを有し実質的にボルト3の頭部3bを保持するソケット51とが設けられている。ソケット51内には、ボルト頭部3bを磁気的に吸着するリング状の磁石52が設けられている。
【0037】
この構成によれば、図3(b),(c) に示すようにセグメント1の周方向の端部のネジ穴4に仮締めされたボルト3は、その頭部3bがソケット51内の磁石52に吸着されて保持され、モータ48を正逆回転させることにより、ネジ穴4に対して緩め方向または締込み方向に回転することになる。よって、この着脱手段11bを用いれば、前述したように図4のようにピース間のセグメント1,1を、ボルト供給機構なしで連結することができ、セグメント1をボルト3で自動的に締結する装置の低コスト化を図ることができる。
【0038】
なお、本実施形態にあっては、上記エレクタ9に、リング間用(軸方向締結用)の着脱手段11aとピース間用(周方向締結用)の着脱手段11bとの双方を設けたものを示したが、これに限らずいずれか一方のみを設けて他方は作業員の手作業等によってセグメント同士を連結するようにしてもよい。
【0039】
【発明の効果】
以上説明したように本発明に係るトンネル構築装置によれば、セグメント同士をボルトで自動的に締結する際に必要となるボルト供給機構が不要となると共に、構造簡潔にして低コストとなる。
【図面の簡単な説明】
【図1】本発明の一実施形態を示すトンネル構築装置によるセグメント組立手順を示す図である。
【図2】図1の続きのセグメント組立手順を示す図である。
【図3】上記セグメントの斜視図である。
【図4】上記セグメントにより構築されたトンネルの断面図である。
【図5】上記セグメントを組付けるエレクタの背面図である。
【図6】上記エレクタの側面図である。
【図7】上記エレクタに備えられた把持部を示す概略図であり、図7(a) は正面図、図7(b) は図7(a) の b-b線断面図である。
【図8】上記把持部に把持されるセグメントの斜視図である。
【図9】上記エレクタに備えられた着脱手段を示す側面図である。
【図10】図9の X-X線矢視図である。
【図11】図9の XI-XI線矢視図である。
【符号の説明】
1 セグメント
3 ボルト
3b ボルトの頭部
4 ネジ穴
8 挿通穴
9 エレクタ
11 着脱手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel construction apparatus that constructs a tunnel by fastening segments with bolts.
[0002]
[Prior art]
On the inner surface of the mine excavated by the shield machine, a plurality of segments are assembled in the axial direction and the circumferential direction by bolts and nuts to construct a tunnel. Specifically, an assembly segment to be newly assembled is gripped by an assembly device called an erector, and is moved next to an already installed existing segment. Then, the segments are connected with bolts and nuts to construct a tunnel.
[0003]
In recent years, a device has been developed in which a fastening means for automatically fastening bolts and nuts for connecting segments to each other is provided in the above-mentioned erector so that the bolts and nuts are automatically fastened without human intervention. However, in the case of automatic fastening in this way, a bolt and nut supply mechanism for supplying bolts and nuts to the fastening means is required, resulting in complication of the apparatus.
[0004]
Therefore, a recess for temporarily holding a bolt for connecting the segments to each other is provided on the wall surface of the bolt box hole provided in the end of the inner peripheral surface of the segment, and the bolt is inserted into the recess via an elastic ring. Is proposed, in which the bolt supply mechanism is omitted by temporarily holding the head of the bolt, grasping and pulling the shaft of the bolt with an auxiliary hand provided on the erector, and delivering the bolt to the fastening means. (Japanese Patent Laid-Open No. 8-158799 etc.).
[0005]
[Problems to be solved by the invention]
However, in this case, it is necessary to specially provide a recess and an elastic ring for temporarily holding the bolts in the bolt box holes of all the segments, resulting in an increase in cost. In addition, an auxiliary hand is required for gripping and pulling the shaft portion of the temporarily held bolt and transferring the bolt to the fastening means. Further, since the bolt is transferred from the auxiliary hand to the fastening means in the bolt box hole, a large space is required in the bolt box hole, which is not preferable in terms of the strength of the segment.
[0006]
The object of the present invention, which was created in view of the above circumstances, is to provide a tunnel construction device that does not require a bolt supply mechanism, has a simple structure, and is low in cost.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a screw hole at the end of the assembly segment and temporarily tightens a bolt for connecting the segments to the screw hole, and the bolt is inserted into the existing segment. The bolt head is temporarily tightened to the screw hole of the gripped assembly segment on the erector that grips the assembly segment and moves next to the existing segment. Is provided with attachment / detachment means for holding and attaching.
[0008]
According to the present invention, after the erector grips the assembly segment, the attaching / detaching means provided on the erector temporarily removes the bolt while holding the head of the bolt temporarily tightened in the screw hole of the assembly segment. Here, when the erector grips the assembly segment, the assembly segment and the erector are integrated into the same coordinate system, so the attaching / detaching means provided on the erector is temporarily tightened into the screw holes of the assembly segment. The head of the bolt can be accurately held, and the bolt can be securely removed.
[0009]
Then, after the erector moves the assembly segment next to the existing segment, the attaching / detaching means tightens the bolt removed from the assembly segment again into the screw hole of the assembly segment through the insertion hole of the existing segment. Consolidate assembly segments. Here, since the assembly segment and the erector are integrated into the same coordinate system, the attachment / detachment means provided on the erector is always the same as when the bolt is loosened with respect to the screw hole of the assembly segment. The positional relationship can be reproduced, and the gripped bolt can be accurately tightened into the screw hole of the assembly segment.
[0010]
As described above, since the segments are connected to each other using the bolts temporarily tightened in the screw holes of the assembled segments, a bolt supply mechanism is not necessary. Further, since the bolt head protruding from the end of the segment is held by the attaching / detaching means, the auxiliary hand for holding the bolt shaft portion as in the prior art becomes unnecessary, and the cost is reduced.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.
[0012]
The segments used in the tunnel construction apparatus according to this embodiment are shown in FIGS. 3 (a), (b), and (c). As shown in the drawing, a
[0013]
A plurality of
[0014]
A side cross section of the
[0015]
The
[0016]
As shown in FIG. 1 (b), if the
[0017]
Next, the
[0018]
Then, as shown in FIG. 2 (d), the
[0019]
At this time, since the
[0020]
On the other hand, since the
[0021]
Thereafter, as shown in FIG. 2 (f), the
[0022]
As described above, since the
[0023]
The case where the
[0024]
First, the
[0025]
Next, the
[0026]
Thereafter, the
[0027]
As described above, even when connecting the
[0028]
Below, the
[0029]
FIG. 5 is a view of the
[0030]
A
[0031]
An outline of the gripping
[0032]
The
[0033]
The
[0034]
Next, the outline of the attaching / detaching means 11a, 11b between the rings and between the pieces is shown in FIGS. These attachment / detachment means 11a and 11b are essentially the same between the ring and between the pieces, and the attachment / detachment means 11a between the rings is outlined in FIG. 1 and FIG. Only the attaching / detaching means 11b will be described.
[0035]
The attaching / detaching means 11b includes a
[0036]
The radial moving table 41 is moved by a
[0037]
According to this structure, as shown in FIGS. 3B and 3C, the
[0038]
In the present embodiment, the above-mentioned
[0039]
【The invention's effect】
As described above, the tunnel construction device according to the present invention eliminates the need for a bolt supply mechanism that is required when the segments are automatically fastened with bolts, and simplifies the structure and reduces the cost.
[Brief description of the drawings]
FIG. 1 is a diagram showing a segment assembling procedure by a tunnel construction device showing an embodiment of the present invention.
FIG. 2 is a diagram illustrating a segment assembling procedure continued from FIG. 1;
FIG. 3 is a perspective view of the segment.
FIG. 4 is a cross-sectional view of a tunnel constructed by the segments.
FIG. 5 is a rear view of an erector for assembling the segments.
FIG. 6 is a side view of the erector.
7A and 7B are schematic views showing a gripping portion provided in the erector, where FIG. 7A is a front view and FIG. 7B is a cross-sectional view taken along line bb of FIG. 7A.
FIG. 8 is a perspective view of a segment gripped by the grip portion.
FIG. 9 is a side view showing attachment / detachment means provided in the erector.
10 is a view taken along line XX in FIG.
11 is a cross-sectional view taken along line XI-XI in FIG.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33994496A JP3799698B2 (en) | 1996-12-19 | 1996-12-19 | Tunnel construction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33994496A JP3799698B2 (en) | 1996-12-19 | 1996-12-19 | Tunnel construction device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10176496A JPH10176496A (en) | 1998-06-30 |
| JP3799698B2 true JP3799698B2 (en) | 2006-07-19 |
Family
ID=18332244
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP33994496A Expired - Fee Related JP3799698B2 (en) | 1996-12-19 | 1996-12-19 | Tunnel construction device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3799698B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4626004B2 (en) * | 2000-01-26 | 2011-02-02 | 株式会社大林組 | Segment gripping device |
| CN114837705A (en) * | 2022-03-24 | 2022-08-02 | 中铁工程装备集团有限公司 | Gripping device of pipe piece assembling machine |
-
1996
- 1996-12-19 JP JP33994496A patent/JP3799698B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10176496A (en) | 1998-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3799698B2 (en) | Tunnel construction device | |
| JPH11294420A (en) | Auxiliary equipment mounting structure | |
| JP2002160188A (en) | Robot arm mechanism | |
| US7284624B2 (en) | Drill gripping device and method | |
| CN215632934U (en) | Dual-purpose instrument for drilling camera shooting and surrounding rock loosening ring monitoring | |
| JPS6458436A (en) | Stud bolt mounting/demounting device | |
| JP3660960B2 (en) | Panel coupling device | |
| JP2901862B2 (en) | Auger fixing device for screw auger propulsion machine for side hole excavation | |
| JP3256111B2 (en) | Auger fixing device of screw auger propulsion machine for side hole excavation | |
| JPH0543290Y2 (en) | ||
| CN215475695U (en) | Unmanned aerial vehicle's wing tubular connection structure and unmanned aerial vehicle | |
| JP3854193B2 (en) | Dividing tube and method of joining the dividing tubes | |
| JP2593009B2 (en) | Bolt and nut fastening method and device | |
| JPS6219334A (en) | Nut rotating device used in automatic bolt tightening machines | |
| JPS5932734Y2 (en) | joint structure | |
| JPS6350874Y2 (en) | ||
| JPH0743260Y2 (en) | Spindle type boring device for excavating underground | |
| JPS5934734Y2 (en) | joint structure | |
| JP3854653B2 (en) | Shield machine and segment bolt fastening machine | |
| JP3702317B2 (en) | Wire operating device | |
| JP3714641B2 (en) | Segment gripping device for shield machine | |
| JP2576365Y2 (en) | Tool for connecting extension parts | |
| JP3445701B2 (en) | Drilling machine | |
| JPS62196269A (en) | bobbin holder device | |
| JP2719286B2 (en) | Propulsion pipe for propulsion method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060320 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060404 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060417 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090512 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090512 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100512 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |