JP3824445B2 - Inverter control method and apparatus for parallel operation with generator - Google Patents
[go: Go Back, main page]

JP3824445B2 - Inverter control method and apparatus for parallel operation with generator - Google Patents

Inverter control method and apparatus for parallel operation with generator Download PDF

Info

Publication number
JP3824445B2
JP3824445B2 JP14530499A JP14530499A JP3824445B2 JP 3824445 B2 JP3824445 B2 JP 3824445B2 JP 14530499 A JP14530499 A JP 14530499A JP 14530499 A JP14530499 A JP 14530499A JP 3824445 B2 JP3824445 B2 JP 3824445B2
Authority
JP
Japan
Prior art keywords
load
generator
inverter
capacity
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14530499A
Other languages
Japanese (ja)
Other versions
JP2000341864A (en
Inventor
裕二 中井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP14530499A priority Critical patent/JP3824445B2/en
Publication of JP2000341864A publication Critical patent/JP2000341864A/en
Application granted granted Critical
Publication of JP3824445B2 publication Critical patent/JP3824445B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、自家発電設備などで、負荷に発電機からの出力電力とともに商用系統からの電力をインバータを介して供給する発電機と並列運転を行うインバータの制御方法および装置に関する。
【0002】
【従来の技術】
従来から、コージェネレーションシステムを含む自家発電設備では、発電機の故障時の電力確保や、発電機の運転を効率が良い状態で行うために、商用系統からの電力供給も併用されている。商用系統からの電力供給と、発電機からの電力供給とを並列運転で行うためには、発電機の発電出力を、商用系統から供給される交流電力と振幅、周波数および位相などを合わせる系統連携運転を行う必要がある。
【0003】
図6は、商用系統からの電力供給をインバータを介して行い、発電機とインバータとを並列運転するシステムの概要を示す。このようなシステムは、たとえば1つの工場やビルなどに設けられ、各種設備などの負荷1,2を、並列運転システム3として、自家発電用の発電機4からの出力電力と、インバータ5を介して与えられる商用の電力系統6からの電力とによって稼動させる。なお、発電機4は、できるだけ効率のよい状態で運転させることが望ましく、そのためには定格容量に見合った負荷に対して出力を供給することが望ましい。このため、複数の負荷1,2のうち、発電機4からの電力を供給する対象となる負荷1と、商用の電力系統6からのみ電力を供給する対象とする負荷2とを分けておく。負荷2へは、商用の電力系統6から、遮断器7のみを介して電力が直接与えられる。このような負荷2としては、投入と遮断との繰返し頻度が高いものや、通常はほとんど使用しないものなどが該当する。
【0004】
インバータ5は、コージェネレーションシステムの一環などとして設置される発電機4の発電電圧や周波数に対して同期を取りつつ運転され、負荷容量と発電機定格容量の差分電力を出力するように、制御装置8によって制御される。
【0005】
負荷1に対しては、発電機4の定格容量内の範囲で、発電機4からの出力を供給する。負荷1の容量が発電機4の定格容量を超過する場合には、インバータ5を介して電力系統6からの電力を供給する。負荷1に対して、発電機4からの電力供給とインバータ5を介する電力供給との間の電力分担についての制御は、制御装置8によって行われる。制御装置8が、インバータ5を介して負荷1に供給する電力量が多くなるように制御すると、相対的に発電機4から負荷1に供給される電力は減少する。逆に、制御装置8によって、インバータ5から負荷1に供給する電力が少なくなるように制御すると、相対的に発電機4から負荷1に供給される電力が増加する。このようなインバータ5を用いる並列運転システム3では、発電機4が効率の高い定格容量付近で運転を続けさせ、負荷1の変動分を電力系統6から負荷1に供給する電力量を変化させて吸収し、発電機4の高負荷運転を行うことができる。また、発電機4の出力が負荷1の容量を上回っても、余剰の電力が電力系統6に流れ込む逆潮流を起こさないようにすることができる。
【0006】
すなわち、発電機4から定格容量付近で負荷1に電力を供給している状態で、新たに起動入力スイッチ9を投入して負荷1を追加するときには、発電機4の定格容量を超過する電力量が、インバータ5を介して電力系統6から供給されるようにすることができる。また、運転中の負荷1のうちの一部の負荷を停止すると、負荷容量の減少分は、インバータ5から供給する電力量の減少として調整される。さらに負荷1の容量の減少分が、インバータ5から供給する電力量よりも大きくなるときには、発電機4の出力が低下する。電力系統6との間には、インバータ5が設けられているので、発電機4の出力の過剰分が電力系統6に流れ込む逆潮流は生じない。
【0007】
【発明が解決しようとする課題】
ビルや工場などで使用される負荷1,2は、白熱電灯や電気炉のヒータなど、起動時からほぼ一定の電力を消費する抵抗性の負荷と、モータなどのリアクタンス性の負荷とが存在する。モータなどのリアクタンス性の負荷では、起動時に多くの電力を必要とし、起動が終了した後の定格動作時には、一般に起動時に比較して小さな電力消費で動作を継続することができる。
【0008】
図7は、発電機4とインバータ5とを並列運転して負荷1に電力を供給している際に、起動入力スイッチ9を操作して新たに負荷を追加して起動するときの、負荷電流瞬時値、インバータ出力瞬時値、および発電機出力電流瞬時値の変化を、(a),(b),(c)でそれぞれ示す。追加の負荷を起動すると、負荷電流値は直ちに増加するけれども、インバータ5の出力電流値は徐々に増加する。したがって追加の負荷を起動した時点では、追加の負荷への電流は発電機4から供給される。
【0009】
インバータ5の出力の変化は、制御時間遅れのために、充分に早くすることはできず、モータの起動時などでの瞬時の電力分担を行う際には問題が生じる。すなわち、発電機4の定格容量付近で負荷1への電力供給を行っている場合に、追加の負荷1を投入すると、瞬時ではあるが発電機4の定格容量以上の負荷1に対して電力供給を行わなければならず、場合によっては発電機4の停止に至ってしまう。
【0010】
図7では、発電機定格容量として60kW、初期の負荷容量として49kW、追加の負荷容量として30kWの条件での実験結果である。負荷がヒータであるので、抵抗性であり、起動時の瞬間的な負荷の増加はほとんど生じない。それでも、インバータ5の出力が増加するまでは、発電機4の出力が定格容量を超えた状態となる。
【0011】
発電機4の停止を避けるためには、負荷1が必要とする電力量に対して、インバータ5において発電機4の定格容量の設定値を小さく設定し、定格容量に対して余裕がある状態で発電機4を運転し、不足分の電力をインバータ5を介して供給するように電力分担を調整する必要がある。発電機4を定格容量に比較して余裕がある状態で常時運転させることは、発電機4としての効率を低下させ、電力系統6からインバータ5を介して負荷1に供給する電力量の割合を大きくしてしまう。インバータ5は、電力系統6から供給される電力を一旦直流に変換し、さらに半導体回路の動作で交流に変換しているので、電力系統6から供給される電力と、インバータ5として出力する電力との間に、変換損失が生じる。このため、発電機4の出力に大きな余裕を持たせることは、発電機4としての効率低下と、インバータ5としての損失増加とを招いてしまう。
【0012】
本発明の目的は、負荷を追加して投入して起動する場合であっても、発電機が過負荷状態とならないように制御することができる発電機と並列運転を行うインバータの制御方法および装置を提供することである。
【0013】
【課題を解決するための手段】
本発明は、発電機の定格容量を超過する電力量が商用電源からインバータを介して供給されるように、発電機と並列運転を行うインバータの制御方法において、
電力供給の対象となる負荷について、起動時に必要となる瞬間的な負荷容量を予め求めておき、
負荷を追加して起動する前に、該負荷について求められている起動時に必要な負荷容量分の電力を発電機から出力できるように、発電機からインバータに負荷移行を行っておくことを特徴とする発電機と並列運転を行うインバータの制御方法である。
【0014】
本発明に従えば、電力供給の対象となる負荷について、起動時に必要となる瞬間的な負荷容量を予め求めておく。負荷を追加して起動する前には、予め求められている起動時に必要な負荷容量分の電力を発電機から出力できるように、発電機からインバータに負荷移行を行っておく。負荷を起動する際、発電機の出力容量には、負荷の起動時に必要な負荷容量分の余裕があるので、発電機を過負荷状態にすることなく、起動時に必要な瞬間的な電力を発電機から供給することができる。
【0015】
また本発明は、前記発電機からインバータへの負荷移行後、前記負荷の起動が完了した後に、インバータ出力のうち発電機定格容量余裕分を発電機に負荷移行させることを特徴とする。
【0016】
本発明に従えば、負荷の追加起動時に、起動に必要な瞬間的な電力が供給可能なように負荷移行を行ってインバータの出力を増加させた後、負荷の起動が完了すると、インバータ出力のうち発電機定格容量余裕分を発電機に負荷移行させるので、負荷の起動完了後には、発電機を定格容量で運転させることができる。発電機が定格容量で運転されるので、発電効率が向上し、インバータでの電力変換効率の低下を最小限に抑えることができる。
【0017】
さらに本発明は、発電機の定格容量を超過する電力量が商用電源からインバータを介して供給されるように、発電機と並列運転を行うインバータの制御装置において、
電力供給の対象となる負荷について、起動指令を入力するための起動信号入力部と、
負荷について、起動時に必要となる瞬間的な負荷容量が予め設定され、起動信号入力部に起動指令が入力される負荷について設定されている負荷容量を認識し、認識された負荷容量を導出する負荷容量認識部と、
電力供給中の負荷容量を検出して演算し、演算結果を導出する負荷容量演算部と、
負荷容量認識部および負荷容量演算部から導出される負荷容量に基づいて、負荷の起動前に発電機からインバータに移行させる負荷としての移行容量を演算して導出する移行容量演算部と、
移行容量演算部から導出される移行容量だけ出力が増加するようにインバータを制御して負荷移行を行い、負荷移行後に、該起動指令が入力された負荷が起動するように制御し、負荷の起動完了後に、インバータ出力のうち発電機定格容量余裕分が発電機に負荷移行してインバータ出力が減少するように制御する負荷移行制御部とを含むことを特徴とする発電機と並列運転を行うインバータの制御装置である。
【0018】
本発明に従えば、電力供給の対象となる負荷については、起動信号入力部に起動指令を入力する。負荷容量認識部は、起動時に必要となる瞬間的な負荷容量が予め設定され、起動信号入力部に起動指令が入力される負荷について設定されている負荷容量を認識し、認識された負荷容量を導出する。負荷容量演算部は、電力供給中の負荷容量を検出して演算し、演算結果を導出する。移行容量演算部は、負荷容量認識部および負荷容量演算部から導出される負荷容量に基づいて、負荷の起動前に発電機からインバータに移行させる移行容量を演算して導出する。負荷移行制御部は、移行容量演算部から導出される移行容量だけ出力が増加するように、インバータを制御して負荷移行を行い、負荷移行後に、起動指令が入力された負荷が起動するように制御し、負荷の起動完了後に、インバータ出力のうち発電機定格容量余裕分が発電機に負荷移行してインバータ出力が減少するように制御する。負荷の起動時だけ、インバータを予め負荷移行して増加させておくので、負荷の起動時に必要となる瞬間的な電力は、発電機から供給することができる。負荷の起動完了後には発電機を定格容量で運転することができるので、発電機を効率よく運転し、インバータでの電力変換に伴う損失を最小限に抑えることができる。
【0019】
【発明の実施の形態】
図1は、本発明の実施の一形態としてのインバータの制御装置の概略的な構成を示す。本実施形態では、たとえば工場、ビル、あるいは地域などに設けられる各種の負荷11,12のうち、一定の範囲の負荷11に対し、並列運転システム13を構成している発電機14およびインバータ15から電力を供給する。インバータ15は、商用の交流電源である電力系統16から遮断器17を介して供給される電力を整流して一旦直流に変換し、半導体の発振回路で発電機14の発電電圧や周波数に同期した交流電力に変換する。並列運転システム13に接続される負荷12としては、インバータ15を介さずに、電力系統16からの電力を直接供給するように接続されるものもある。このような負荷12は発電機14と並列運転を行うインバータ15の制御対象とはならない。
【0020】
負荷11に対する電力供給は、制御装置18によって制御される。制御装置18は、発電機14の定格容量で発電される電力が負荷11に供給され、発電機14の定格容量を超過する電力量がインバータ15を介して供給されるようにインバータ15を制御する。本実施形態の制御装置18では、負荷11を追加して起動する場合に操作される起動信号入力部である起動入力スイッチ19への入力に基づいて、実際に負荷11を起動する前と後とに、インバータ15の出力を増減させる制御も行う。
【0021】
図2は、図1の制御装置18の構成を示す。図1に示す負荷11に供給する電力は、交流電圧変成器20および交流電流変成器21によって検出される。この電力は、図1の発電機14とインバータ15との並列運転に基づいて供給される。インバータ15の出力は、インバータ出力演算部22から導出される出力信号に従って制御される。インバータ出力演算部22は、発電機定格容量設定部23に手動で設定される発電機定格容量設定値が入力される。インバータ出力演算部22には、交流電圧変成器20および交流電流変成器21の出力に基づいて、負荷容量演算部24が算出する実際に負荷に供給される電力としての負荷容量も入力される。インバータ出力演算部22では、実際の負荷容量に対し、発電機定格容量設定値の不足分を、インバータ15を介して供給するように制御を行う。
【0022】
本実施形態での負荷移行制御では、負荷移行容量演算部25が発電機定格容量設定部23に対し、負荷11の起動前に、発電機定格容量が見かけ上低下することと等価な負荷移行容量の導出を行う。負荷移行容量演算部25での演算は、負荷容量演算部24から導出される現在の負荷容量と、負荷容量認識部26から導出される負荷容量とを比較して算出される。負荷容量認識部26は、予め図1の負荷11として起動の対象となる負荷について、負荷種別毎に起動時の負荷容量が設定されている。起動入力スイッチ19として、いずれかの負荷を起動する負荷起動指令信号が起動信号入力部27に入力されると、負荷容量認識部26は、負荷起動指令信号が入力された負荷種別を表す識別コードなどに基づいて、設定されている負荷容量を認識し、認識された負荷容量を負荷移行容量演算部25に与える。これから起動する負荷に必要な起動時の負荷容量を発電機14から負荷11に供給しようとすると、負荷移行容量演算部25は、発電機14の定格容量を超過する電力量を、負荷移行容量として算出し、発電機定格容量設定部23に設定されている発電機定格容量設定値を減少させる。
【0023】
インバータ出力演算部22は、発電機定格容量設定部23に設定されている発電機の定格容量設定値で発電機14を運転されるようにインバータ15の出力を制御するので、発電機定格容量設定値が下がれば、インバータ15の出力電力を増加させる。インバータ15から負荷11に供給される電力が増加すると、発電機14にとっては負荷11が軽くなり、発電機14から負荷11に供給される電力は減少する。実際に負荷11が起動されるのは、起動信号出力部28から、負荷移行完了認識部29による負荷移行の完了認識に基づいて導出される負荷起動信号に従って行われる。インバータ出力演算部22、発電機定格容量設定部23、起動信号出力部28および負荷移行完了認識部29は、負荷移行制御部30を構成し、負荷11を追加して起動する際のインバータ15と発電機14との間での負荷移行に関連する制御を行う。
【0024】
図3は、本実施形態の制御装置で負荷移行を行う基本的な論理判断手順を示す。ステップa1で、負荷を起動するための起動入力スイッチ19が投入されると、図2の起動信号入力部27に負荷起動指令信号が与えられる。ステップa2では、負荷容量認識部26および負荷移行容量演算部25によって、負荷移行が必要であるか否かが判断される。この判断は、次の式1に従って行われる。
(発電機定格容量)−(発電機出力) < K×(追加の負荷容量) …(1)
【0025】
式1で、Kは負荷種別によって変化する係数である。係数Kは、定常状態に必要となる電力に対し、起動時に必要となる電力の倍数を表す。抵抗性の負荷では、起動時にも特に大きな電力を必要としないので、K=1である。モータのようなリアクタンス性の負荷では、K=3〜4程度となり得る。負荷容量認識部26には、負荷11として起動することができる各負荷について、負荷種別と定格容量とを設定しておくことができる。式1の「発電機定格容量」は、発電機定格容量設定部23に手動で設定される。「発電機出力」は負荷容量演算部24から導出される負荷容量と、インバータ出力演算部22が制御中のインバータ15からの出力との差として、算出することができる。
【0026】
図3のステップa2で、式1の条件が成立すると判断されるときには、ステップa3に移り、新たに負荷11を起動する際に必要となる負荷容量分をインバータ15に負荷移行させる。ステップa3の負荷移行が終了した後、またはステップa2で、負荷移行が必要でないと判断された後、ステップa4で手順を終了する。
【0027】
図4は、本実施形態の制御装置18によってインバータ15を制御して行う負荷移行のロジックを示す。ステップb1から動作を開始し、ステップb2で追加の負荷に対する負荷起動スイッチとして、起動入力スイッチ19のいずれかがON状態に操作される。ステップb3では、起動された負荷に対し、図3のステップa2で説明したように、負荷移行容量の判断ロジックに基づいて、図3のステップa3に示すような負荷移行が行われる。ステップb4では、インバータ15に対する負荷移行の動作が行われる。インバータ15は、出力を急激に変化させると動作が不安定となるので、たとえば500ms程度の時間をかけて、負荷移行を行う。移行完了の確認を一定回数繰返した場合には、Error出力を導出し、システムに備えられているエラー処理ルーチンに移る。ステップb4で、エラーと判断される前に、負荷移行が完了すると、ステップb5で、負荷起動を行う。負荷の起動状態は、ステップb6で確認する。ステップb6の起動完了の確認を一定回数繰返した場合には、Error出力を行い、エラーとして処理する。ステップb6で、エラーとならずに起動完了と判断されるときには、ステップb7で、インバータ15から発電機14への負荷移行を行う。ステップb8では、移行が完了することを確認する。移行完了の確認が一定回数繰返した場合には、Error出力を行い、エラー処理に移る。ステップb8で移行完了と判断された後は、ステップb9で手順を終了する。
【0028】
図5は、図4に示す手順で負荷移行の制御を行う際の発電機出力およびインバータ出力の変化の例を示す。時刻t0で、負荷投入指令が起動入力スイッチ19の操作によって行われると、時刻t1までに、図4のステップb3の負荷移行容量の判断ロジックに従って、負荷移行容量の算出が図2の負荷移行容量演算部25および発電機定格容量設定部23で行われる。図2のインバータ出力演算部22は、時刻t1から時刻t2までに、インバータ15の出力を0からP3まで増加させる制御を行う。インバータ15から負荷11に供給される電力が増加するので、発電機出力はP1からP2まで低下する。すなわち、P1−P2=P3である。時刻t2でインバータ15への負荷移行が完了し、図2に示す負荷移行完了認識部29によって完了が認識されると、起動信号出力部28は、時刻t3から負荷を起動する。負荷起動時には、負荷11に瞬間的に大きな電力が供給され、この電力は主として発電機14から供給される。発電機14は、時刻t3での負荷起動前に、出力が予め低下した状態となっているので、負荷起動時に必要となる電力を供給しても、定格容量であるP0を超えないようにすることができる。
【0029】
時刻t3での負荷起動後に、時刻t4で負荷起動に伴う負荷の増加分が減少し、負荷起動完了と判断される。ただし実際には、実線で示すように、インバータ15の出力が発電機14の出力増加分を打ち消すように、P3から徐々に増加するので、発電機14の出力は対応して低下する。図4のステップb6での起動完了の判断は、このような発電機出力の低下傾向の変化を検出したり、インバータ出力の増加を検出したりして行うことができる。時刻t4での負荷起動完了の確認後に、図4のステップb7に示すインバータから発電機への負荷移行を開始する。負荷移行は、発電機14が定格容量P0で動作するように負荷移行容量としての定格容量の余裕分が算出され、時刻t5で定格容量余裕分だけインバータ15の出力を減少させ、発電機14からの出力を増大させる負荷移行を開始する。時刻t6で、発電機14から定格容量の出力が負荷11に供給されるようになると、負荷移行の手順が完了する。新たに負荷を追加してあるので、時刻t6移行もインバータ15から電力が供給され、発電機14とインバータ15との並列運転が行われる。
【0030】
以上のように、本実施形態では、追加の負荷11を起動する際の電力供給は、発電機14から行うことになる。ただし、負荷11の起動前に、発電機14の容量は、モータなどの負荷11の起動電流相当分は実質的にインバータ15から供給されるように、負荷移行が行われる。負荷の追加後に、再び発電機14への負荷移行を行い、発電機14からの出力は定格容量まで上昇させるので、高い稼動率を得て効率的に発電を行わせることができる。これらのことから、系統連携を行わずに系統連携に類似した効果を得ることが可能となる。
【0031】
【発明の効果】
以上のように本発明によれば、負荷を追加する際には負荷の起動時に必要となる瞬間的な負荷容量をインバータから供給するように予め負荷移行を行っておき、発電機の出力が起動時に必要な負荷容量の余裕を持たせておくので、負荷の起動時に必要な電力を発電機の過負荷状態にすることなく、発電機から供給することができる。瞬間的に大きな電力を供給する必要がある負荷を起動する際にも、発電機は過負荷状態にならないので、発電機動作停止などの事態を避けることができる。
【0032】
また本発明によれば、負荷の起動時にインバータ側へ負荷移行を行っておいて、起動時に必要となる瞬間的な電力を発電機から供給した後、負荷の起動完了後には、インバータから発電機定格容量余裕分を負荷移行させるので、発電機は定格容量で運転されるようになり、効率の向上と、インバータでの損失の低下とを図ることができる。
【0033】
さらに本発明によれば、起動信号入力部で起動指令を入力して起動させる負荷については、予め起動時に必要となる瞬間的な負荷容量が設定され、負荷容量認識部から導出される。現在電力供給中の負荷容量は、負荷容量演算部において、電圧値および電流値を検出して導出され、移行容量演算部では負荷容量認識部および負荷容量演算部から導出される負荷容量に基づいて発電機からインバータに移行させる移行容量を演算して導出し、負荷移行制御部がインバータの移行容量だけ増加するように制御する。負荷移行起動指令が入力された負荷が起動されるので、負荷の起動時に必要となる瞬間的な電力は、発電機から供給することができ、しかも発電機が過負荷状態となることはない。負荷の起動後には、インバータ出力のうち発電機定格容量余裕分が発電機に負荷移行してインバータ出力が減少するように制御するので、発電機を定格容量で運転することができる。負荷の起動時の電力供給のために発電機の出力が低下するようにインバータの出力を増加させる時間は、負荷の起動時の短い時間であり、負荷が起動した後は発電機を定格容量で運転し、発電効率を高めることができる。インバータからは、必要最小限の電力しか供給しないので、変換に伴う損失を最小限度に抑えることができる。
【図面の簡単な説明】
【図1】本発明の実施の一形態の発電機とインバータとの並列運転システムの基本的な概念を示すブロック図である。
【図2】図1のインバータ15および制御装置18の電気的構成を示すブロック図である。
【図3】図1の実施形態で、負荷11を追加して起動するのに行われる基本的な負荷移行容量の判断ロジックを示すフローチャートである。
【図4】図1の実施形態で行われる負荷移行の制御動作を示すフローチャートである。
【図5】図4の制御に伴う発電機出力とインバータ出力との変化を示すタイムチャートである。
【図6】従来からの発電機とインバータとの並列運転システムの概略的な構成を示すブロック図である。
【図7】図6の並列運転システムで、負荷1を追加して起動する際の負荷電流、インバータ出力電流および発電機出力電流の瞬時値の変化を示すタイムチャートである。
【符号の説明】
11,12 負荷
13 並列運転システム
14 発電機
15 インバータ
16 電力系統
18 制御装置
19 起動入力スイッチ
20 交流電圧変成器
21 交流電流変成器
22 インバータ出力演算部
23 発電機定格容量設定部
24 負荷容量演算部
25 負荷移行容量演算部
26 負荷容量認識部
27 起動信号入力部
28 起動信号出力部
29 負荷移行完了認識部
30 負荷移行制御部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a control method and apparatus for an inverter that performs parallel operation with a generator that supplies power from a commercial system together with output power from a generator to a load via an inverter in a private power generation facility or the like.
[0002]
[Prior art]
Conventionally, in a private power generation facility including a cogeneration system, power supply from a commercial system has also been used in order to ensure electric power when a generator fails and to operate the generator in an efficient state. In order to perform power supply from the commercial system and power supply from the generator in parallel operation, the power generation output of the generator is linked to the AC power supplied from the commercial system, and the system linkage matches the amplitude, frequency, phase, etc. It is necessary to drive.
[0003]
FIG. 6 shows an outline of a system in which power is supplied from a commercial system via an inverter and a generator and an inverter are operated in parallel. Such a system is provided in, for example, one factory or building, and loads 1 and 2 such as various facilities are used as a parallel operation system 3 through an output power from a generator 4 for private power generation and an inverter 5. And the electric power from the commercial electric power system 6 given. The generator 4 is desirably operated as efficiently as possible, and for that purpose, it is desirable to supply output to a load corresponding to the rated capacity. For this reason, among the plurality of loads 1 and 2, a load 1 to be supplied with power from the generator 4 and a load 2 to be supplied with power only from the commercial power system 6 are separated. Electric power is directly supplied to the load 2 from the commercial power system 6 only through the circuit breaker 7. Examples of such a load 2 include those having a high repetition frequency of turning on and off, and those that are rarely used.
[0004]
The inverter 5 is operated in synchronism with the power generation voltage and frequency of the generator 4 installed as part of the cogeneration system and outputs a differential power between the load capacity and the generator rated capacity. 8 is controlled.
[0005]
An output from the generator 4 is supplied to the load 1 within a range within the rated capacity of the generator 4. When the capacity of the load 1 exceeds the rated capacity of the generator 4, power from the power system 6 is supplied via the inverter 5. The control device 8 controls the power sharing between the power supply from the generator 4 and the power supply via the inverter 5 with respect to the load 1. When the control device 8 performs control so that the amount of power supplied to the load 1 through the inverter 5 is increased, the power supplied from the generator 4 to the load 1 is relatively decreased. Conversely, when the control device 8 controls the power supplied from the inverter 5 to the load 1 to decrease, the power supplied from the generator 4 to the load 1 relatively increases. In the parallel operation system 3 using such an inverter 5, the generator 4 continues to operate near a highly efficient rated capacity, and the amount of power supplied from the power system 6 to the load 1 is changed by changing the fluctuation of the load 1. It can be absorbed and the generator 4 can be operated at a high load. Moreover, even if the output of the generator 4 exceeds the capacity of the load 1, it is possible to prevent a reverse power flow in which surplus power flows into the power system 6.
[0006]
That is, when power is supplied from the generator 4 to the load 1 in the vicinity of the rated capacity, when the start input switch 9 is newly added and the load 1 is added, the amount of power that exceeds the rated capacity of the generator 4 Can be supplied from the power system 6 via the inverter 5. When a part of the operating load 1 is stopped, the decrease in the load capacity is adjusted as a decrease in the amount of power supplied from the inverter 5. Further, when the decrease in the capacity of the load 1 becomes larger than the amount of power supplied from the inverter 5, the output of the generator 4 decreases. Since the inverter 5 is provided between the power system 6 and the inverter 5, there is no reverse power flow in which the excess output of the generator 4 flows into the power system 6.
[0007]
[Problems to be solved by the invention]
Loads 1 and 2 used in buildings and factories include resistive loads that consume almost constant power from the start-up, such as incandescent lamps and electric furnace heaters, and reactive loads such as motors. . With a reactive load such as a motor, a large amount of power is required at the time of start-up, and during a rated operation after the start-up is completed, the operation can generally be continued with lower power consumption than at the time of start-up.
[0008]
FIG. 7 shows the load current when the starter input switch 9 is operated to start a new load by operating the generator 4 and the inverter 5 in parallel to supply power to the load 1. Changes in the instantaneous value, the inverter output instantaneous value, and the generator output current instantaneous value are indicated by (a), (b), and (c), respectively. When the additional load is activated, the load current value immediately increases, but the output current value of the inverter 5 gradually increases. Therefore, when the additional load is activated, current to the additional load is supplied from the generator 4.
[0009]
The change in the output of the inverter 5 cannot be made sufficiently early due to a delay in the control time, and a problem occurs when instantaneous power sharing is performed at the time of starting the motor. That is, when power is supplied to the load 1 in the vicinity of the rated capacity of the generator 4, if the additional load 1 is turned on, power is supplied to the load 1 that is instantaneously higher than the rated capacity of the generator 4. And the generator 4 may be stopped in some cases.
[0010]
FIG. 7 shows the experimental results under the conditions of a generator rated capacity of 60 kW, an initial load capacity of 49 kW, and an additional load capacity of 30 kW. Since the load is a heater, it is resistive, and there is almost no instantaneous load increase at startup. Nevertheless, until the output of the inverter 5 increases, the output of the generator 4 exceeds the rated capacity.
[0011]
In order to avoid the stop of the generator 4, the set value of the rated capacity of the generator 4 is set small in the inverter 5 with respect to the amount of power required by the load 1, and there is a margin with respect to the rated capacity. It is necessary to adjust the power sharing so that the generator 4 is operated and the insufficient power is supplied via the inverter 5. If the generator 4 is always operated with a margin compared to the rated capacity, the efficiency as the generator 4 is reduced, and the ratio of the amount of power supplied from the power system 6 to the load 1 via the inverter 5 is reduced. Make it bigger. The inverter 5 temporarily converts the power supplied from the power system 6 into direct current, and further converts it into alternating current by the operation of the semiconductor circuit. Therefore, the power supplied from the power system 6 and the power output as the inverter 5 In the meantime, conversion loss occurs. For this reason, giving a large margin to the output of the generator 4 causes a decrease in efficiency as the generator 4 and an increase in loss as the inverter 5.
[0012]
An object of the present invention is to provide a control method and apparatus for an inverter that performs parallel operation with a generator that can be controlled so that the generator does not enter an overload state even when the load is added and started. Is to provide.
[0013]
[Means for Solving the Problems]
The present invention provides a method for controlling an inverter that performs parallel operation with a generator so that an amount of power exceeding the rated capacity of the generator is supplied from a commercial power source via the inverter.
For the load to be supplied with power, obtain the instantaneous load capacity required at startup in advance,
Before starting by adding a load, the load is transferred from the generator to the inverter so that the power for the load capacity required for the load required for the load can be output from the generator. It is the control method of the inverter which performs parallel operation with the generator to perform.
[0014]
According to the present invention, the instantaneous load capacity required at the start-up is determined in advance for the load to be supplied with power. Before starting with the addition of a load, the load is transferred from the generator to the inverter so that the power for the load capacity required at the time of start-up can be output from the generator. When starting a load, the generator output capacity has a margin for the load capacity required when starting the load, so the instantaneous power required at startup can be generated without overloading the generator. Can be supplied from the machine.
[0015]
In addition, the present invention is characterized in that after the load shift from the generator to the inverter, after the start of the load is completed, the generator rated capacity margin of the inverter output is transferred to the generator.
[0016]
According to the present invention, at the time of additional start-up of the load, after the load shift is performed so that instantaneous power necessary for start-up can be supplied and the output of the inverter is increased, Since the generator rated capacity margin is transferred to the generator, the generator can be operated at the rated capacity after the start of the load is completed. Since the generator is operated at the rated capacity, the power generation efficiency is improved, and a decrease in power conversion efficiency in the inverter can be minimized.
[0017]
Furthermore, the present invention provides a control device for an inverter that performs parallel operation with a generator so that an amount of power exceeding the rated capacity of the generator is supplied from a commercial power source via the inverter.
For a load to be supplied with power, an activation signal input unit for inputting an activation command,
The load that is set for the load for which the start command is input to the start signal input unit, and the recognized load capacity is derived, with the instantaneous load capacity required at the start being set in advance for the load A capacity recognition unit;
A load capacity calculation unit for detecting and calculating a load capacity during power supply and deriving a calculation result;
Based on the load capacity derived from the load capacity recognition unit and the load capacity calculation unit, a transfer capacity calculation unit that calculates and derives a transfer capacity as a load to be transferred from the generator to the inverter before starting the load, and
The inverter is controlled so that the output is increased by the transfer capacity derived from the transfer capacity calculation unit, the load is transferred, and after the load is transferred, the load to which the start command is input is controlled to start. An inverter that performs parallel operation with a generator, comprising: a load transition control unit that controls the inverter output so that an inverter output is reduced by a load transition of the generator rated capacity of the inverter output to the generator after completion. It is a control device.
[0018]
According to the present invention, an activation command is input to the activation signal input unit for a load to be supplied with power. The load capacity recognizing unit recognizes the load capacity that is set for the load for which the start command is input to the start signal input unit, and the recognized load capacity is determined. To derive. The load capacity calculation unit detects and calculates a load capacity during power supply, and derives a calculation result. Based on the load capacity derived from the load capacity recognition unit and the load capacity calculation unit, the transfer capacity calculation unit calculates and derives the transfer capacity to be transferred from the generator to the inverter before starting the load. The load transition control unit controls the inverter to perform load transition so that the output increases by the transition capacity derived from the transition capacity calculation unit, and after the load transition, the load to which the start command is input starts. After the start of the load is completed, control is performed so that the generator rated capacity margin of the inverter output is transferred to the generator and the inverter output decreases. Since the inverter is shifted and increased in advance only at the time of starting the load, the instantaneous power required at the time of starting the load can be supplied from the generator. Since the generator can be operated at the rated capacity after the start of the load is completed, the generator can be operated efficiently and the loss associated with power conversion by the inverter can be minimized.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows a schematic configuration of an inverter control apparatus according to an embodiment of the present invention. In the present embodiment, for example, among the various loads 11 and 12 provided in a factory, a building, or an area, the generator 14 and the inverter 15 that constitute the parallel operation system 13 with respect to the load 11 in a certain range. Supply power. The inverter 15 rectifies the power supplied from the power system 16 which is a commercial AC power supply via the circuit breaker 17 and converts it into DC once, and synchronizes with the generated voltage and frequency of the generator 14 by a semiconductor oscillation circuit. Convert to AC power. Some of the loads 12 connected to the parallel operation system 13 are connected so as to directly supply power from the power system 16 without going through the inverter 15. Such a load 12 is not a control target of the inverter 15 that performs parallel operation with the generator 14.
[0020]
The power supply to the load 11 is controlled by the control device 18. The control device 18 controls the inverter 15 so that the power generated with the rated capacity of the generator 14 is supplied to the load 11 and the amount of power exceeding the rated capacity of the generator 14 is supplied via the inverter 15. . In the control device 18 of the present embodiment, before and after actually starting the load 11 based on an input to the start input switch 19 which is a start signal input unit operated when the load 11 is added and started. In addition, control for increasing or decreasing the output of the inverter 15 is also performed.
[0021]
FIG. 2 shows a configuration of the control device 18 of FIG. The power supplied to the load 11 shown in FIG. 1 is detected by an AC voltage transformer 20 and an AC current transformer 21. This electric power is supplied based on the parallel operation of the generator 14 and the inverter 15 of FIG. The output of the inverter 15 is controlled according to the output signal derived from the inverter output calculation unit 22. The inverter output calculation unit 22 receives a generator rated capacity setting value that is manually set in the generator rated capacity setting unit 23. Based on the outputs of the AC voltage transformer 20 and the AC current transformer 21, the inverter output calculation unit 22 is also input with the load capacity as the power actually supplied to the load calculated by the load capacity calculation unit 24. In the inverter output calculation unit 22, control is performed so as to supply the shortage of the generator rated capacity set value via the inverter 15 with respect to the actual load capacity.
[0022]
In the load transition control in the present embodiment, the load transition capacity calculation unit 25 is equivalent to the generator rated capacity setting unit 23 that the generator rated capacity is apparently reduced before the load 11 is activated. Is derived. The calculation in the load transfer capacity calculation unit 25 is calculated by comparing the current load capacity derived from the load capacity calculation unit 24 and the load capacity derived from the load capacity recognition unit 26. In the load capacity recognition unit 26, the load capacity at the time of activation is set for each load type for the load to be activated as the load 11 in FIG. When a load start command signal for starting one of the loads is input to the start signal input unit 27 as the start input switch 19, the load capacity recognition unit 26 identifies the load type to which the load start command signal is input. Based on the above, the set load capacity is recognized, and the recognized load capacity is given to the load transfer capacity calculation unit 25. When it is going to supply the load capacity at the time of starting required for the load to be started from the generator 14 to the load 11, the load transfer capacity calculating unit 25 uses the amount of power exceeding the rated capacity of the generator 14 as the load transfer capacity. The generator rated capacity setting value set in the generator rated capacity setting unit 23 is calculated and decreased.
[0023]
Since the inverter output calculation unit 22 controls the output of the inverter 15 so that the generator 14 is operated at the rated capacity setting value of the generator set in the generator rated capacity setting unit 23, the generator rated capacity setting is performed. When the value decreases, the output power of the inverter 15 is increased. When the power supplied from the inverter 15 to the load 11 increases, the load 11 becomes lighter for the generator 14 and the power supplied from the generator 14 to the load 11 decreases. The load 11 is actually activated in accordance with the load activation signal derived from the activation signal output unit 28 based on the load transfer completion recognition unit 29 by the load transfer completion recognition unit 29. The inverter output calculation unit 22, the generator rated capacity setting unit 23, the activation signal output unit 28, and the load transition completion recognition unit 29 constitute a load transition control unit 30, and the inverter 15 when the load 11 is added and started Control related to load transfer with the generator 14 is performed.
[0024]
FIG. 3 shows a basic logic determination procedure for performing load transfer in the control device of this embodiment. When the activation input switch 19 for activating the load is turned on in step a1, a load activation command signal is given to the activation signal input unit 27 in FIG. In step a2, the load capacity recognition unit 26 and the load transfer capacity calculation unit 25 determine whether or not load transfer is necessary. This determination is made according to the following equation 1.
(Generator rated capacity)-(Generator output) <K x (Additional load capacity) ... (1)
[0025]
In Equation 1, K is a coefficient that varies depending on the load type. The coefficient K represents a multiple of the power required at startup relative to the power required in the steady state. With a resistive load, K = 1 because no particularly large power is required even at startup. With a reactive load such as a motor, K can be about 3 to 4. The load capacity recognition unit 26 can set the load type and the rated capacity for each load that can be activated as the load 11. The “generator rated capacity” in Expression 1 is manually set in the generator rated capacity setting unit 23. The “generator output” can be calculated as a difference between the load capacity derived from the load capacity calculation unit 24 and the output from the inverter 15 being controlled by the inverter output calculation unit 22.
[0026]
When it is determined in Step a2 of FIG. 3 that the condition of Expression 1 is satisfied, the process proceeds to Step a3, and the load capacity necessary for newly starting the load 11 is transferred to the inverter 15. After the load transfer at step a3 is completed, or after it is determined at step a2 that load transfer is not necessary, the procedure is ended at step a4.
[0027]
FIG. 4 shows the logic of load transfer performed by controlling the inverter 15 by the control device 18 of the present embodiment. The operation is started from step b1, and one of the start input switches 19 is operated to be an ON state as a load start switch for the additional load in step b2. In step b3, as described in step a2 of FIG. 3, load transition as shown in step a3 of FIG. 3 is performed on the activated load based on the determination logic of the load transition capacity. In step b4, the load transfer operation for the inverter 15 is performed. Since the operation of the inverter 15 becomes unstable when the output is suddenly changed, the load is transferred over, for example, about 500 ms. When the confirmation of the completion of the transition is repeated a certain number of times, an error output is derived and the process proceeds to an error processing routine provided in the system. If load transfer is completed before it is determined in step b4 that an error has occurred, load activation is performed in step b5. The activation state of the load is confirmed in step b6. If the confirmation of the start completion in step b6 is repeated a certain number of times, an error output is made and processed as an error. When it is determined in step b6 that the start is completed without causing an error, load transfer from the inverter 15 to the generator 14 is performed in step b7. In step b8, it is confirmed that the migration is completed. If the confirmation of the completion of the migration is repeated a certain number of times, an error output is made and the process proceeds to error processing. After it is determined in step b8 that the migration is complete, the procedure is terminated in step b9.
[0028]
FIG. 5 shows an example of changes in the generator output and the inverter output when the load shift control is performed according to the procedure shown in FIG. When a load input command is issued by operating the start input switch 19 at time t0, the load transfer capacity is calculated according to the load transfer capacity determination logic in step b3 of FIG. 4 by time t1. This is performed by the calculation unit 25 and the generator rated capacity setting unit 23. The inverter output calculation unit 22 in FIG. 2 performs control to increase the output of the inverter 15 from 0 to P3 from time t1 to time t2. Since the power supplied from the inverter 15 to the load 11 increases, the generator output decreases from P1 to P2. That is, P1-P2 = P3. When the load transition to the inverter 15 is completed at time t2, and the completion is recognized by the load transition completion recognition unit 29 shown in FIG. 2, the activation signal output unit 28 activates the load from time t3. When the load is activated, a large amount of power is instantaneously supplied to the load 11, and this power is mainly supplied from the generator 14. Since the output of the generator 14 is lowered in advance before starting the load at the time t3, the generator 14 does not exceed the rated capacity P0 even if the power necessary for starting the load is supplied. be able to.
[0029]
After the load activation at time t3, the increase in load accompanying the load activation decreases at time t4, and it is determined that the load activation is completed. However, in practice, as indicated by the solid line, the output of the inverter 15 gradually increases from P3 so as to cancel the increase in the output of the generator 14, so that the output of the generator 14 correspondingly decreases. The determination of the start completion in step b6 in FIG. 4 can be made by detecting such a change in the decrease tendency of the generator output or by detecting an increase in the inverter output. After confirming the completion of load activation at time t4, load transition from the inverter to the generator shown in step b7 of FIG. 4 is started. In the load transition, the rated capacity margin as the load transition capacity is calculated so that the generator 14 operates at the rated capacity P0, and the output of the inverter 15 is reduced by the rated capacity margin at time t5. Start load transition to increase the output of When the output of the rated capacity is supplied from the generator 14 to the load 11 at time t6, the load transfer procedure is completed. Since a load is newly added, power is supplied from the inverter 15 at time t6, and the generator 14 and the inverter 15 are operated in parallel.
[0030]
As described above, in the present embodiment, power supply when starting the additional load 11 is performed from the generator 14. However, before the load 11 is started, the load is transferred so that the capacity of the generator 14 is substantially supplied from the inverter 15 by the amount corresponding to the start current of the load 11 such as a motor. After the load is added, the load is transferred to the generator 14 again, and the output from the generator 14 is increased to the rated capacity, so that a high operation rate can be obtained and power can be generated efficiently. From these things, it becomes possible to obtain the effect similar to system cooperation, without performing system cooperation.
[0031]
【The invention's effect】
As described above, according to the present invention, when a load is added, a load transition is performed in advance so that an instantaneous load capacity necessary for starting the load is supplied from the inverter, and the output of the generator is started. Since the load capacity that is sometimes required is provided, it is possible to supply the power necessary for starting the load from the generator without causing the generator to be overloaded. Even when starting a load that needs to supply a large amount of electric power instantaneously, the generator does not enter an overload state, so that it is possible to avoid a situation such as a generator operation stop.
[0032]
Further, according to the present invention, the load is transferred to the inverter side at the time of starting the load, the instantaneous electric power required at the time of starting is supplied from the generator, and after the start of the load is completed, from the inverter to the generator Since the rated capacity margin is transferred to the load, the generator is operated at the rated capacity, so that the efficiency can be improved and the loss in the inverter can be reduced.
[0033]
Further, according to the present invention, for the load to be activated by inputting the activation command at the activation signal input unit, the instantaneous load capacity required at the time of activation is set in advance and derived from the load capacity recognition unit. The load capacity currently being supplied is derived by detecting the voltage value and current value in the load capacity calculation unit, and the transition capacity calculation unit is based on the load capacity derived from the load capacity recognition unit and the load capacity calculation unit. The transfer capacity to be transferred from the generator to the inverter is calculated and derived, and the load transfer control unit controls so as to increase by the transfer capacity of the inverter. Since the load to which the load transition activation command is input is activated, the instantaneous electric power required when the load is activated can be supplied from the generator, and the generator is not overloaded. After starting the load, the generator rated capacity margin of the inverter output is controlled so that the load shifts to the generator and the inverter output decreases, so that the generator can be operated at the rated capacity. The time to increase the output of the inverter so that the output of the generator is reduced for power supply at the start of the load is a short time at the start of the load. It can be operated and power generation efficiency can be increased. Since only the minimum necessary power is supplied from the inverter, the loss associated with the conversion can be minimized.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a basic concept of a parallel operation system of a generator and an inverter according to an embodiment of the present invention.
2 is a block diagram showing an electrical configuration of an inverter 15 and a control device 18 of FIG.
FIG. 3 is a flowchart showing basic load transfer capacity determination logic performed to add and start a load 11 in the embodiment of FIG. 1;
FIG. 4 is a flowchart showing a load transfer control operation performed in the embodiment of FIG. 1;
5 is a time chart showing changes in generator output and inverter output accompanying the control of FIG. 4; FIG.
FIG. 6 is a block diagram showing a schematic configuration of a conventional parallel operation system of a generator and an inverter.
7 is a time chart showing changes in instantaneous values of load current, inverter output current, and generator output current when the load 1 is added and started in the parallel operation system of FIG. 6;
[Explanation of symbols]
11, 12 Load 13 Parallel operation system 14 Generator 15 Inverter 16 Power system 18 Control device 19 Start input switch 20 AC voltage transformer 21 AC current transformer 22 Inverter output calculation unit 23 Generator rated capacity setting unit 24 Load capacity calculation unit 25 Load transfer capacity calculation unit 26 Load capacity recognition unit 27 Start signal input unit 28 Start signal output unit 29 Load transfer completion recognition unit 30 Load transfer control unit

Claims (3)

発電機の定格容量を超過する電力量が商用電源からインバータを介して供給されるように、発電機と並列運転を行うインバータの制御方法において、
電力供給の対象となる負荷について、起動時に必要となる瞬間的な負荷容量を予め求めておき、
負荷を追加して起動する前に、該負荷について求められている起動時に必要な負荷容量分の電力を発電機から出力できるように、発電機からインバータに負荷移行を行っておくことを特徴とする発電機と並列運転を行うインバータの制御方法。
In the control method of the inverter that operates in parallel with the generator so that the amount of power exceeding the rated capacity of the generator is supplied from the commercial power source via the inverter,
For the load to be supplied with power, obtain the instantaneous load capacity required at startup in advance,
Before starting by adding a load, the load is transferred from the generator to the inverter so that the power for the load capacity required for the load required for the load can be output from the generator. Control method of the inverter that operates in parallel with the generator.
前記発電機からインバータへの負荷移行後、前記負荷の起動が完了した後に、インバータ出力のうち発電機定格容量余裕分を発電機に負荷移行させることを特徴とする請求項1記載の発電機と並列運転を行うインバータの制御方法。2. The generator according to claim 1, wherein after the load is transferred from the generator to the inverter, after the start of the load is completed, the generator rated capacity margin of the inverter output is transferred to the generator. Inverter control method for parallel operation. 発電機の定格容量を超過する電力量が商用電源からインバータを介して供給されるように、発電機と並列運転を行うインバータの制御装置において、
電力供給の対象となる負荷について、起動指令を入力するための起動信号入力部と、
負荷について、起動時に必要となる瞬間的な負荷容量が予め設定され、起動信号入力部に起動指令が入力される負荷について設定されている負荷容量を認識し、認識された負荷容量を導出する負荷容量認識部と、
電力供給中の負荷容量を検出して演算し、演算結果を導出する負荷容量演算部と、
負荷容量認識部および負荷容量演算部から導出される負荷容量に基づいて、負荷の起動前に発電機からインバータに移行させる負荷としての移行容量を演算して導出する移行容量演算部と、
移行容量演算部から導出される移行容量だけ出力が増加するようにインバータを制御して負荷移行を行い、負荷移行後に、該起動指令が入力された負荷が起動するように制御し、負荷の起動完了後に、インバータ出力のうち発電機定格容量余裕分が発電機に負荷移行してインバータ出力が減少するように制御する負荷移行制御部とを含むことを特徴とする発電機と並列運転を行うインバータの制御装置。
In the inverter control device that operates in parallel with the generator so that the amount of power exceeding the rated capacity of the generator is supplied from the commercial power supply via the inverter,
For a load to be supplied with power, an activation signal input unit for inputting an activation command,
The load that is set for the load for which the start command is input to the start signal input unit, and the recognized load capacity is derived, with the instantaneous load capacity required at the start being set in advance for the load A capacity recognition unit;
A load capacity calculation unit for detecting and calculating a load capacity during power supply and deriving a calculation result;
Based on the load capacity derived from the load capacity recognition unit and the load capacity calculation unit, a transfer capacity calculation unit that calculates and derives a transfer capacity as a load to be transferred from the generator to the inverter before starting the load, and
The inverter is controlled so that the output is increased by the transfer capacity derived from the transfer capacity calculation unit, the load is transferred, and after the load is transferred, the load to which the start command is input is controlled to start. An inverter that performs parallel operation with a generator, comprising: a load transition control unit that controls the inverter output so that an inverter output is reduced by a load transition of the generator rated capacity of the inverter output to the generator after completion. Control device.
JP14530499A 1999-05-25 1999-05-25 Inverter control method and apparatus for parallel operation with generator Expired - Fee Related JP3824445B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14530499A JP3824445B2 (en) 1999-05-25 1999-05-25 Inverter control method and apparatus for parallel operation with generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14530499A JP3824445B2 (en) 1999-05-25 1999-05-25 Inverter control method and apparatus for parallel operation with generator

Publications (2)

Publication Number Publication Date
JP2000341864A JP2000341864A (en) 2000-12-08
JP3824445B2 true JP3824445B2 (en) 2006-09-20

Family

ID=15382065

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14530499A Expired - Fee Related JP3824445B2 (en) 1999-05-25 1999-05-25 Inverter control method and apparatus for parallel operation with generator

Country Status (1)

Country Link
JP (1) JP3824445B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5818644B2 (en) * 2011-11-15 2015-11-18 北越工業株式会社 Engine-driven inverter generator control method and engine-driven inverter generator
US11264801B2 (en) * 2018-02-23 2022-03-01 Schlumberger Technology Corporation Load management algorithm for optimizing engine efficiency

Also Published As

Publication number Publication date
JP2000341864A (en) 2000-12-08

Similar Documents

Publication Publication Date Title
KR890002456B1 (en) Escalator Control
JP3824445B2 (en) Inverter control method and apparatus for parallel operation with generator
JP5573154B2 (en) Power conditioner and power generation system equipped with the same
JPH10229679A (en) Grid-connected inverter device
US7619905B2 (en) Method of controlling connection of a supply of AC power to a load and to a power supply grid
JP3499942B2 (en) Solar power generator
JP3456005B2 (en) Inverter device and control method thereof
JPH08182343A (en) Solar power system
JP5079865B2 (en) Induction melting furnace
JPH06189572A (en) Induction motor starter
JP4077326B2 (en) Method of processing regenerative power of inverter device and inverter device used in this method
JP2005045856A (en) Uninterruptible power system
JP3886101B2 (en) Selector
JPH11178350A (en) Power supply device
JP3743950B2 (en) Control device for power converter
JP3632322B2 (en) Starting method of inverter for solar cell
JP3925989B2 (en) Inverter control device
JPH07245876A (en) Control device for grid-connected inverter
KR100218411B1 (en) Elevator power transmission apparatus
JP2521646Y2 (en) Voltage control device for main shaft drive generator
JPH10285806A (en) Sunlight generator
JP2000278948A (en) Power supplies and electrical equipment
JP2002291160A (en) Cogeneration power generation system
JPH08223987A (en) Inverter control method for momentary power interruption
JP2000330430A (en) Image forming device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050204

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060620

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060627

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090707

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120707

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150707

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees