JP3828809B2 - Blast hearth porosity estimation method and management method - Google Patents
Blast hearth porosity estimation method and management method Download PDFInfo
- Publication number
- JP3828809B2 JP3828809B2 JP2002002341A JP2002002341A JP3828809B2 JP 3828809 B2 JP3828809 B2 JP 3828809B2 JP 2002002341 A JP2002002341 A JP 2002002341A JP 2002002341 A JP2002002341 A JP 2002002341A JP 3828809 B2 JP3828809 B2 JP 3828809B2
- Authority
- JP
- Japan
- Prior art keywords
- porosity
- blast furnace
- hearth
- potential difference
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Manufacture Of Iron (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、高炉炉床部空隙率の推定方法及び管理方法に関するものである。
【0002】
【従来の技術】
高炉炉内において、原料となる鉄鉱石はコークスとともに炉頂から炉体内に供給され、羽口から炉体内に圧送される熱風によって温度が上昇し、コークスによって還元されて溶銑となる。溶銑は炉底部に貯留し、溶銑の上に接して溶滓(スラグ)が貯留する。高炉炉内に貯留した溶銑の上部でかつ溶滓が存在する部位の高さ方向の位置を、ここでは銑滓レベルという。
【0003】
炉床部には、コークス等の固体と溶銑・溶滓等の液状物とが混在して充填されている。炉床部空間において、コークス等の固体が占める部分以外の空間の比率を、空隙率と呼ぶ。高炉の安定した操業のためには、炉床部の空隙率を最適に保持することが必要である。炉床部の空隙率が低下すると、銑滓の炉床部での流通が悪化し、出銑毎での出銑量、スラグ比、溶銑成分、スラグ成分などの差が大きくなり、安定操業に支障を来す。また、炉床部での空隙率が低下して銑滓の流通が悪化した場合、炉内の銑滓レベルの変動が大きくなり出銑時間も安定せず短くなる傾向を示す。その結果、出銑回数も増加し、作業負荷が増大する。このため、できるだけ炉床部の空隙率を高めに維持して炉床部での銑滓の流通性を高位に保つことが望ましい。
【0004】
いったん、炉床部の空隙率が低下すると、空隙率を最適な値に回復させるのには時間がかかるため、空隙率低下の早期検知、早期アクションが重要である。
【0005】
出銑を行っていないときは、時間の経過とともに炉底部に貯留する溶銑量が増大し、銑滓レベルが上昇する。炉底部に設けられた出銑口を開口すると、溶銑及び溶滓が出銑口から炉外に導き出され、炉内の銑滓レベルが低下する。
【0006】
一般に、炉内の銑滓貯留量は、銑滓の生成と排出との物質収支より大まかに推定することができる。例えば、銑滓の生成量は、単位時間あたりに高炉に装入した装入物の量とその成分から計算でき、溶銑の排出量は溶銑を収容するトーピードカーの重量変化の測定によって把握し、溶滓の排出量はスラグから製造した水滓の重量をスケールコンベアなどによって測定できるため、これらの銑滓の生成量と排出量の差分より炉内の銑滓量の増加量を推定できる。
【0007】
高炉炉底部付近の鉄皮表面の高さ方向2個所間において電位差が検出され、その電位差は高炉炉内の銑滓レベルと関係があることが知られている。Development & application of new techniques for blast furnace process control at SSAB Tunnplant, Lulea works. 1995 Ironmaking conference Proceedings pp271 - 279 によると、測定点として炉底部及び羽口上部の鉄皮表面を用いて電位差を測定した結果、出銑の開始・終了のインターバルと測定した電位差の時間的変動との間に相関が見られる点が記載されている。検出される電位差は0.2mV前後であり、出銑口を閉鎖している間に電位差は0.1mVほど増大し、出銑口を開いて出銑を行っている間に電位差は0.1mVほど減少して元に戻る。
【0008】
【発明が解決しようとする課題】
前述のように、いったん、炉床部の空隙率が低下すると、空隙率を最適な値に回復させるのには時間がかかるため、空隙率低下の早期検知、早期アクションが重要である。従って、空隙率の直接的な測定が必要であるが、従来は炉床部の空隙率を直接的に測定する手段がなかった。
【0009】
本発明は、炉床部の空隙率を直接的に測定する手段を提供することを目的とする。
【0010】
【課題を解決するための手段】
炉床部の銑滓貯留量と銑滓レベルとの関係は、炉床部の空隙率によって大きな影響を受ける。同一の銑滓貯留量であっても、空隙率が大きければ銑滓レベルは低く留まり、空隙率が小さければ銑滓レベルが高い位置となる。従って、炉床部の銑滓貯留量と銑滓レベルとを把握することができれば、これから炉床部の空隙率を推定することが可能になる。
【0011】
高炉において、出銑を行っていないときは、炉床部における銑滓の貯留量は銑滓生産速度に応じて増大していく。出銑終了時における銑滓レベルは出銑口の位置にあることがわかっている。従って、出銑終了時からの経過時間に銑滓生産速度をかけあわせて得た銑滓の貯留量は、出銑口より上側に貯留された銑滓の貯留量を表す。
【0012】
高炉鉄皮表面に高さ方向に間隔を開けて設けた複数個の電位測定点の間の電位差は、炉床部の銑滓レベルと関係を持っていることが知られている。そして、出銑を行っていないときにおいて、現在の電位差Eと出銑終了時の電位差E0との差ΔEを算出すると、ΔE、銑滓生産速度から計算した出銑口より上側の貯銑量、炉床部の空隙率の3者の間には明確な関係があり、同一の貯銑量において、空隙率が小さいときにはΔEが大きく、空隙率が大きいときにはΔEが小さいことが明らかになった。
【0013】
高炉炉体の電位差測定点を、高炉鉄皮表面ではなく内部の炉底レンガに設けて電位測定点の間の電位差を測定すると、5mV前後の電位差が存在し、かつ高炉炉内の銑滓レベルの変動に伴って電位差が5mV前後の幅で大きな変化を示すことが明らかになった。従来知られている高炉炉体の鉄皮表面で検出される電位差と比較すると、電位差の値および銑滓レベルの変動に伴う電位差の変動量ともに、1桁程度高い値である。そのため、ノイズの影響による誤差が非常に小さくなり、従来知られているいずれの方法と比較しても高い精度で銑滓レベルを推定することが可能になった。
【0014】
本発明は、上記知見に基づいてなされたものであり、その要旨とするところは以下のとおりである。
(1)高炉鉄皮表面又は炉底レンガに複数個の電位測定点を高さ方向に間隔を開けて設け、前記電位測定点の間の電位差を測定し、該高炉が出銑を行っていないときの前記測定電位差の時間変化ΔE/Δtと、銑滓生産速度Wとから下記(1)式に基づいて炉床部装入物の空隙率εを推定することを特徴とする高炉炉床部空隙率の推定方法。
ΔE/Δt=aW/ε (1)
但し、aは予め定められる比例定数。
(2)前記複数個の電位測定点のうち、少なくとも1個の取り付け位置を出銑口レベル以上とし、少なくとも1個の取り付け位置を出銑口レベル未満とすることを特徴とする上記(1)に記載の高炉炉床部空隙率の推定方法。
(3)前記電位測定点は、高炉炉底レンガ表面に設けることを特徴とする上記(1)又は(2)に記載の高炉炉床部空隙率の推定方法。
(4)上記(1)乃至(3)のいずれかに記載の高炉炉床部空隙率の推定方法によって空隙率を推定し、推定した空隙率が予め定めた適正空隙率よりも低下した場合は、装入コークス粒径上昇、および、装入コークス強度上昇のうちのいずれか又は両方を行って空隙率を適正化することを特徴とする高炉炉床部空隙率の管理方法。
【0015】
【発明の実施の形態】
高炉における銑滓の生成速度W(m3/h)は、装入物の分析値と装入量より計算が可能である。銑鉄中の鉄分の質量割合は0.95程度であり、銑鉄およびスラグの密度は7×103(kg/m3)程度および2.5×103(kg/m3)程度であるため、銑鉄単位質量当たりのスラグ質量比をS(kg/t)、時間当たりの原料装入量をG(t/h)、原料中の鉄分質量割合をF(−)とすると、銑滓の生成速度Wは次式で求められる。
W=(G×F/0.95)(1/7+S/2.5/1000)
【0016】
従来、炉床部の通液性は直接的には測定できないため、銑滓の成分、温度、量などのばらつきで評価していた。すなわち、複数の出銑口から出た銑滓の各出銑口毎の成分(銑中Si、スラグ中Sなど)、溶銑温度、銑鉄当たりのスラグ量などの日内平均値の差が炉ごとに経験的に定まる値より大きくなったときには炉床通液性不良と判断し、一定範囲内に収まっているときには良好と判断する。
【0017】
高炉の炉底付近の内部構造は、図1に示すように、鉄皮1の内側に炉底レンガ2が築造され、炉底レンガ2の最外周と鉄皮1との間にはステーブ5が設けられたりあるいはスタンプ材6が充填されている。ここでは、炉底レンガ2に複数個の電位測定点11を設け、電位測定点11から高炉炉体外部まで延びる導線12を設けた。鉄皮1やステーブ5、スタンプ材6にはこの導線12を通すための開口が設けられる。導線12は電位測定点11において炉底レンガ2に接触し、鉄皮1、ステーブ5、スタンプ材6などとの間に導通を生じないように外部に導かれ、高炉炉体外部において導線12に別の導線14を接続し、電圧計13を用いて複数の電位測定点11の間の電位差を測定した。
【0018】
出銑終了時の電位差をE0とし、出銑を行っていないときにおいて、現在の電位差Eと出銑終了時の電位差E0との差ΔEを算出した。炉床通液性が良好であることを出銑口間で溶銑成分やスラグ比の差がほとんどないことによって確認し、銑滓生産速度を2種類に変化させ、水準1においては銑滓生産速度を82〜90m3/hとし、水準2においては銑滓生産速度を57〜63m3/hとした。図2に、出銑終了からの経過時間を横軸とし、電位差の差ΔEを縦軸として、水準1(●)と水準2(○)の対比を行った。まず、電位差の差ΔEは出銑終了からの時間経過とともに一定速度で増加し、増加速度は銑滓生産速度と明瞭な関係を有し、銑滓生産速度が大きい方がΔEの増加速度が大きいことが明らかである。
【0019】
次に、銑滓生産速度を82〜90m3/hと一定に保ち、炉床通液性が良好な時期と悪化している時期とにおいて、出銑終了からの経過時間とΔEの増加傾向との関係を図3に示す。同一の銑滓生産速度であれば、炉床通液性が良好なとき(●)のΔE増加速度は、炉床通液性が悪化したとき(○)のΔE増加速度よりも小さいことが明らかである。
【0020】
以上の結果に基づき、銑滓生産速度を横軸とし、電位差の差(ΔE)増加速度(mV/h)を縦軸として、炉床通液性が良好な時期のデータを●、悪化した時期のデータを○として図4にプロットすると、●と○とは明確に分離できた。前述のように、炉床通液性は炉床部の空隙率によって直接的に影響を受ける因子であるから、高炉炉体高さ方向における電位差を測定すれば、該測定電位差の時間変化に基づいて炉床部装入物の空隙率を推定できることが明らかである。即ち、高炉が出銑を行っていないときの測定電位差の時間変化と銑滓生産速度とを対比し、該対比結果に基づいて炉床部装入物の空隙率を推定することができる。
【0021】
電位差の差ΔEを評価するにあたっては、基準となるE0の測定は出銑終了時に限定する必要はない。出銑を行っていない時期における時刻t1とその後の時刻t2において測定した電位差をそれぞれE1、E2とし、ΔE=E2−E1、Δt=t2−t1とする。ΔE/Δtを上記電位差の差(ΔE)増加速度とすれば、この値を銑滓生産速度と対比することにより、炉床部の空隙率を推定することができる。空隙率をε、銑滓生産速度をWとおくと、比例定数をaとおいて、
ΔE/Δt=aW/ε (1)
と表現することができる。即ち、予め比例定数aを定めておけば、ΔE/ΔtとWとから空隙率εを推定することができる。
【0022】
また、炉床通液性の良否の境界における空隙率を臨界空隙率εcとおくことができる。空隙率εがεcより大きければ通液性は良好であり、空隙率εがεcより小さければ通液性が悪化していると評価する。そして、測定電位差の差(ΔE)の増加速度(ΔE/Δt)については、
ΔE/Δt=aW/εc (2)
よりも増加速度が小さいときは炉床通液性が良好であり、これよりも増加速度が大きいときは炉床通液性が悪化していると判断することができる。臨界空隙率εc、比例定数aともに、高炉や高炉操業により定まる定数である。
【0023】
本発明の電位測定点については、高炉鉄皮表面又は炉底レンガに設けることができる。
【0024】
電位測定点を高炉鉄皮表面に設けるに際しては、図5に示すように、高炉鉄皮1表面に複数個の電位測定点11を高さ方向に間隔を開けて設ける。銑滓レベルを評価するために有効な電位差は、高炉の高さ方向に発生しているからである。電位差を測定するのであるから個数は最低でも2個必要であり、高さ方向3個所以上にわたって3個以上の電位測定点11を設ければ、高炉高さ方向の電位分布を評価に加えることも可能である。高さ方向複数の電位測定点の間で電位差を測定するので、この複数の電位測定点11のセットを電位差測定装置12と称する。
【0025】
複数の電位測定点11の高さ方向取り付け位置は、溶銑と溶滓の境界面を挟むように配置すると、電位差測定値から銑滓レベルを評価するためには好ましい結果を得ることができる。具体的には、少なくとも1個の取り付け位置を出銑口3のレベル以上とし、少なくとも1個の取り付け位置を出銑口3のレベル未満とするように配置すれば、銑滓レベル評価のための電位差測定を行う上で好ましい。図5において、電位測定点11aは出銑口3のレベル未満に配置され、電位測定点11bは出銑口3のレベル以上であって羽口4の位置に配置されている。羽口4のレベルを明らかにするため、図5(b)に羽口4を部分図にて示している。
【0026】
高炉の炉底付近の内部構造は、図1に示すように、鉄皮1の内側に炉底レンガ5が築造され、炉底レンガ5の最外周と鉄皮1との間にはステーブ6が設けられたりあるいはスタンプ材7が充填されている。本発明においては、電位測定点の設置位置を、図5に示す高炉鉄皮表面に代えて、図1に示す炉底レンガ5に設けるとより好ましい。高炉炉体内部に位置する炉底レンガにおける電位測定点11を用いて電位を測定するために、電位測定点11から高炉炉体外部まで延びる電極10を設ける。鉄皮1やステーブ6、スタンプ材7にはこの電極10を通すための開口が設けられる。電極10は電位測定点11において炉底レンガ5に接触し、鉄皮1、ステーブ6、スタンプ材7などとの間に導通を生じないように外部に導かれ、高炉炉体外部において電極10に別の導線14を接続し、電圧計13を用いて複数の電位測定点11の間の電位差を測定する。
【0027】
高炉炉体内部の炉底レンガ5に設けた電位測定点11の間の電位差を測定すると、5mV前後の電位差が存在し、かつ高炉炉内の銑滓レベルの変動に伴って電位差が5mV前後の幅で大きな変化を示す。従来知られている高炉炉体の鉄皮表面で検出される電位差と比較すると、電位差の値および銑滓レベルの変動に伴う電位差の変動量ともに、1桁程度高い値である。そのため、ノイズの影響による誤差が非常に小さくなり、従来知られているいずれの方法と比較しても高い精度で銑滓レベルを推定することが可能になった。
【0028】
炉底レンガ5における高炉半径方向の電位測定点11の配置位置は、図6(a)に示すように最も外周側である炉底レンガ表面に設けても良いし、図6(b)に示すように炉底レンガ5に非貫通孔20を設けた上で当該非貫通孔20の奥端を電位測定点11とする、すなわち炉底レンガ5の内部に電位測定点を設けても良い。炉底レンガ2に非貫通孔30を設けることは、炉底レンガの侵食が進行した際に溶銑もれなどによる炉底損傷を招きやすくなるという理由から好ましくないので、通常は炉底レンガ表面に電位測定点を設けることが好ましい。
【0029】
電位測定点を炉底レンガに設ける場合においても、電位測定点の高炉高さ方向の配置位置、および高炉円周方向の配置位置についての考え方は、電位測定点を高炉鉄皮表面に設ける場合と同様である。
【0030】
高炉炉床部の空隙率εが前記臨界空隙率εcよりも大きいときは、空隙率は適正空隙率であるということができる。一方、空隙率が臨界空隙率εcよりも小さくなると、空隙率が適正空隙率よりも低下したということができる。従って、臨界空隙率εcを適正空隙率として予め定めておき、本発明の高炉炉床部空隙率の推定方法によって空隙率εを推定し、測定した空隙率εが予め定めた適正空隙率よりも低下した場合は、空隙率が低下して炉床部の通液性が悪化したと判断することができる。このときには、炉床部の充填物であるコークスの性状を改善することにより、空隙率を改善することができる。即ち、本発明の上記(5)にあるように装入コークス条件を調整して空隙率を適正化することとすれば、空隙率の悪化を迅速にキャッチして早期アクションを行うことが可能になる。コークス条件の調整方法としては、本発明の上記(6)にあるように装入コークス粒径上昇、装入コークス強度上昇のいずれか又は両方の方法を採用すると好ましい。特に炉中心部に装入するコークスの性状の改善が有効である。
【0031】
【実施例】
炉内容積3273m3、炉床径12.0mの高炉において、本発明を用いて炉床部空隙率の推定と空隙率の管理を行った。図1に示すように、電位測定点を炉底レンガ表面とし、下方の測定点は炉底カーボンレンガ1段目レベルとし、上方の測定点は出銑口から3.8m上方の羽口と同一レベルとした。この2点間の電位差を測定してEとし、出銑をしていないときの単位時間当たりの電位差増加量ΔE/Δt(mV/h)を求め、同時に銑滓生産速度W(m3/h)を装入物の分析値と装入量によって求めた。この高炉においては、上記(1)式の比例定数a=0.018であり、また炉床状態が良好な状態を保持できる空隙率範囲は上記(2)式の臨界空隙率εcより大きい場合であり、臨界空隙率εc=0.36であった。即ち、炉床状態を良好に保つには、
ΔE/Δt<aW/εc=0.05×W (3)
に保持すると好適であることがわかっている。
【0032】
高炉にて出銑を行っていないときに電位測定点2点間の電位差Eを測定し、単位時間当たりの電位差増加量ΔE/Δt(mV/h)を求め、同時に銑滓生産速度W(m3/h)を装入物の分析値と装入量によって求めた。そして、ΔE/Δtが上記(3)式を満たしているときは炉底部の流通性が良好であると判断し、ΔE/Δtが増大して上記(3)式を超えたときには空隙率が低下して炉底部の流通性が悪化したと判断し、直ちに装入コークスの性状改善アクションを行った。具体的には、装入するコークスの粒径を増大するとともに、コークス強度の増加を行った。より具体的には、コークス炉の操業変更を実施し、配合石炭銘柄変更・炉温変更を行い、コークスの平均粒径を約10%上昇(48mmから53mmへ)するとともに、冷間強度を1ポイント(85から86へ)上昇させた操業を1週間継続した。
【0033】
本発明の適用時と適用前とにおいて、出銑毎のスラグ比、出銑時間、溶銑温度、銑鉄中Si、銑鉄中Sの各ばらつき(標準偏差)を調査した。結果を表1に示す。表1より明らかなように、出銑毎のスラグ比、出銑時間、溶銑温度、銑鉄中Si、銑鉄中Sの各ばらつき(標準偏差)が減少した。また、ばらつきを減少できたため、溶銑温度の低下を図ることができ、銑鉄中SiやSのレベルを下げることができ、溶銑品質の向上を図ることができる。
【0034】
【表1】
【0035】
【発明の効果】
本発明は、高炉鉄皮表面に高さ方向に間隔を開けて設けた複数個の電位測定点の間の電位差を測定し、該高炉が出銑を行っていないときの前記測定電位差の時間変化に基づいて炉床部装入物の空隙率を推定することを可能にした。
【0036】
本発明はまた、電位測定点を炉底レンガに設けることにより、空隙率の推定精度を一層向上させることができた。
【0037】
本発明はさらに、推定した空隙率が予め定めた適正空隙率よりも低下した場合は、装入コークス条件を調整して空隙率を適正化することにより、空隙率の早期適正化を可能にした。
【図面の簡単な説明】
【図1】炉底レンガで電位差を測定する本発明を示す図であり、(a)は高炉部分断面図、(b)は電位差測定装置付近の部分拡大図、(c)は高炉羽口付近の部分断面図である。
【図2】出銑終了後の経過時間と測定電位差ΔEとの関係における銑滓生産速度の影響を示す図である。
【図3】出銑終了後の経過時間と測定電位差ΔEとの関係における炉床通液性の影響を示す図である。
【図4】銑滓生産速度と電位差増加速度(ΔE/Δt)との関係における炉床通液性の影響を示す図である。
【図5】高炉鉄皮表面で電位差を測定する本発明を示す図であり、(a)は高炉部分断面図、(b)は高炉羽口付近の部分断面図である。
【図6】炉底レンガにおける電位測定点を示す図であり、(a)は炉底レンガ表面を電位測定点とし、(b)は炉底レンガ内部を電位測定点としたものである。
【符号の説明】
1 鉄皮
2 炉内構造物
3 出銑口
4 羽口
5 炉底レンガ
6 ステーブ
7 スタンプ材
8 溶銑
9 スラグ
10 電極
11 電位測定点
12 電位差測定装置
13 電圧計
14 導線
20 非貫通孔[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for estimating and managing a blast furnace hearth porosity.
[0002]
[Prior art]
In the blast furnace furnace, iron ore as a raw material is supplied from the top of the furnace together with coke into the furnace body, the temperature rises by hot air fed from the tuyere into the furnace body, and is reduced by the coke to form molten iron. The hot metal is stored at the bottom of the furnace, and the hot metal (slag) is stored in contact with the hot metal. Here, the position in the height direction of the portion of the hot metal stored in the blast furnace and where the hot metal exists is referred to as a hot metal level.
[0003]
The hearth is filled with a mixture of solids such as coke and liquid materials such as hot metal and hot metal. In the hearth space, the ratio of the space other than the portion occupied by solids such as coke is called the porosity. For stable operation of the blast furnace, it is necessary to keep the porosity of the hearth part optimal. If the porosity of the hearth decreases, the distribution of firewood in the hearth deteriorates, and the differences in the amount of slag, slag ratio, hot metal component, slag component, etc. for each slag increase, resulting in stable operation. Cause trouble. Moreover, when the porosity in a hearth part falls and the distribution | circulation of soot worsens, the fluctuation | variation of the soot level in a furnace becomes large, and the tapping time tends to become short without being stabilized. As a result, the number of taps increases and the work load increases. For this reason, it is desirable to keep the porosity of the hearth as high as possible and keep the flowability of the soot in the hearth as high as possible.
[0004]
Once the porosity of the hearth is lowered, it takes time to restore the porosity to an optimum value, so early detection and early action of porosity reduction are important.
[0005]
When brewing is not performed, the amount of hot metal stored at the bottom of the furnace increases with the passage of time, and the soot level rises. When the tap hole provided in the bottom of the furnace is opened, the hot metal and the hot metal are led out of the furnace from the tap hole, and the level of the hot metal in the furnace is lowered.
[0006]
In general, the amount of soot stored in the furnace can be roughly estimated from the material balance of soot production and discharge. For example, the amount of soot generated can be calculated from the amount of charge and its components charged into the blast furnace per unit time, and the amount of hot metal discharged can be ascertained by measuring the weight change of a torpedo car containing hot metal. The amount of soot discharged from the slag can be measured with a scale conveyor or the like, so that the amount of soot in the furnace can be estimated from the difference between the amount of soot produced and the amount discharged.
[0007]
It is known that a potential difference is detected between two places in the height direction of the iron skin surface near the bottom of the blast furnace furnace, and the potential difference is related to the soot level in the blast furnace furnace. According to Development & application of new techniques for blast furnace process control at SSAB Tunnplant, Lulea works.1995 Ironmaking conference Proceedings pp271-279 It describes that there is a correlation between the start / end interval of the output and the temporal variation of the measured potential difference. The detected potential difference is around 0.2 mV, the potential difference increases by about 0.1 mV while closing the tap and the potential difference is 0.1 mV while opening the tap. It decreases and returns to the original.
[0008]
[Problems to be solved by the invention]
As described above, once the porosity of the hearth portion is lowered, it takes time to recover the porosity to an optimum value. Therefore, early detection and early action of porosity reduction are important. Therefore, it is necessary to directly measure the porosity, but conventionally there is no means for directly measuring the porosity of the hearth.
[0009]
An object of this invention is to provide the means to measure directly the porosity of a hearth part.
[0010]
[Means for Solving the Problems]
The relationship between the amount of soot stored in the hearth and the soot level is greatly influenced by the porosity of the hearth. Even with the same amount of soot storage, if the porosity is large, the soot level remains low, and if the porosity is small, the soot level is high. Therefore, if the soot storage amount and soot level of the hearth part can be grasped, the porosity of the hearth part can be estimated from this.
[0011]
In the blast furnace, when no dredging is performed, the amount of soot stored in the hearth increases in accordance with the soot production rate. It is known that the heel level at the end of brewing is in the position of the shed. Therefore, the storage amount of the soot obtained by multiplying the elapsed time from the end of the tapping with the soot production rate represents the storage amount of the soot stored above the tapping port.
[0012]
It is known that the potential difference between a plurality of potential measurement points provided at intervals in the height direction on the surface of the blast furnace iron shell has a relationship with the soot level of the hearth portion. When the output ΔE between the current potential difference E and the potential difference E 0 at the end of the output is calculated when the output is not performed, the storage amount above the output port calculated from ΔE, the output production speed. It is clear that there is a clear relationship between the three of the porosity of the hearth part, and ΔE is large when the porosity is small and ΔE is small when the porosity is large in the same storage amount. .
[0013]
When the potential difference measurement point of the blast furnace body is provided not on the surface of the blast furnace iron core but on the inside furnace bottom brick and the potential difference between the potential measurement points is measured, there is a potential difference of around 5 mV, and the soot level in the blast furnace furnace It became clear that the potential difference showed a large change in the width of about 5 mV with the fluctuation of. Compared to the conventionally known potential difference detected on the surface of the blast furnace core, the value of the potential difference and the amount of fluctuation of the potential difference accompanying the fluctuation of the soot level are values that are about one digit higher. For this reason, the error due to the influence of noise becomes very small, and it becomes possible to estimate the eyelid level with high accuracy compared to any conventionally known method.
[0014]
This invention is made | formed based on the said knowledge, The place made into the summary is as follows.
(1) A plurality of potential measurement points are provided at intervals in the height direction on the surface of the blast furnace iron shell or the brick at the bottom of the furnace, and the potential difference between the potential measurement points is measured. The porosity ε of the hearth portion charge is estimated based on the following equation (1) from the time change ΔE / Δt of the measured potential difference and the soot production rate W: Method for estimating porosity.
ΔE / Δt = aW / ε (1)
However, a is a predetermined proportionality constant.
(2) among the plurality of potential measurement points, at least one mounting position and taphole level or higher, characterized in that at least one mounting position is less than taphole level above (1) The estimation method of the blast-furnace hearth part porosity described in 2.
( 3 ) The method for estimating the porosity of the blast furnace hearth according to (1) or (2) above, wherein the potential measurement point is provided on a blast furnace bottom brick surface.
( 4 ) When the porosity is estimated by the method for estimating the porosity of the blast furnace hearth according to any one of (1) to ( 3 ) above, and the estimated porosity is lower than a predetermined appropriate porosity A method for managing the porosity of a blast furnace hearth, wherein the porosity is optimized by performing either or both of increasing the charged coke particle size and increasing the charged coke strength .
[0015]
DETAILED DESCRIPTION OF THE INVENTION
The soot production rate W (m 3 / h) in the blast furnace can be calculated from the analytical value of the charge and the charge amount. The mass ratio of iron in pig iron is about 0.95, and the density of pig iron and slag is about 7 × 10 3 (kg / m 3 ) and about 2.5 × 10 3 (kg / m 3 ). When the mass ratio of slag per unit mass of pig iron is S (kg / t), the raw material charge per hour is G (t / h), and the mass ratio of iron in the raw material is F (-), the rate of soot formation W is obtained by the following equation.
W = (G x F / 0.95) (1/7 + S / 2.5 / 1000)
[0016]
Conventionally, since the liquid permeability of the hearth cannot be measured directly, it has been evaluated by variations in the composition, temperature, amount, etc. of the soot. That is, the difference in daily average values such as the components (Si in the iron, S in the slag, etc.), hot metal temperature, amount of slag per pig iron, etc. When it becomes larger than an empirically determined value, it is determined that the hearth permeability is poor, and when it is within a certain range, it is determined that it is good.
[0017]
As shown in FIG. 1, the internal structure of the blast furnace near the bottom of the blast furnace is constructed such that a
[0018]
The potential difference at the time of tapping the end and E 0, at the time when that has not been tapping, to calculate the difference ΔE of the current potential difference E and tapping at the end of the potential difference E 0. Confirming that the hearth liquid permeability is good by the fact that there is almost no difference in hot metal components and slag ratio between the tapping outlets, changing the soot production rate to two types. Was 82 to 90 m 3 / h, and at
[0019]
Next, when the dredging production rate is kept constant at 82 to 90 m 3 / h, the elapsed time from the end of dredging and the increasing tendency of ΔE between the period when the hearth liquid permeability is good and the period when it deteriorates The relationship is shown in FIG. It is clear that the ΔE increase rate when the hearth permeability is good (●) is smaller than the ΔE increase rate when the hearth permeability deteriorates (◯) at the same soot production rate It is.
[0020]
Based on the above results, the horizontal axis is the soot production rate and the vertical axis is the potential difference difference (ΔE) increase rate (mV / h). When the data in FIG. 4 was plotted in FIG. 4, ● and ○ were clearly separated. As described above, the hearth permeability is a factor that is directly affected by the porosity of the hearth, so if the potential difference in the blast furnace furnace body height direction is measured, the measured potential difference is based on the change over time. It is clear that the porosity of the hearth charge can be estimated. That is, it is possible to compare the time variation of the measured potential difference when the blast furnace is not tapping and the soot production rate, and to estimate the porosity of the hearth portion charge based on the comparison result.
[0021]
In evaluating the potential difference ΔE, it is not necessary to limit the measurement of the reference E 0 at the end of output. The potential differences measured at the time t 1 and the subsequent time t 2 at the time when the brewing is not performed are E 1 and E 2 , respectively, and ΔE = E 2 −E 1 and Δt = t 2 −t 1 . If ΔE / Δt is the potential difference difference (ΔE) increase rate, the porosity of the hearth can be estimated by comparing this value with the soot production rate. If the porosity is ε, the soot production rate is W, the proportionality constant is a,
ΔE / Δt = aW / ε (1)
It can be expressed as That is, if the proportionality constant a is determined in advance, the porosity ε can be estimated from ΔE / Δt and W.
[0022]
Also, the porosity at the boundary between hearth liquid permeability can be set as the critical porosity ε c . When the porosity ε is larger than ε c , the liquid permeability is good, and when the porosity ε is smaller than ε c, it is evaluated that the liquid permeability is deteriorated. And about the increase rate (ΔE / Δt) of the difference (ΔE) in the measured potential difference,
ΔE / Δt = aW / ε c (2)
It can be determined that the hearth permeability is good when the increase rate is smaller than that, and that the hearth permeability is deteriorated when the increase rate is higher than this. Both the critical porosity ε c and the proportional constant a are constants determined by the blast furnace and blast furnace operation.
[0023]
The potential measurement point of the present invention can be provided on the surface of the blast furnace iron skin or the bottom brick.
[0024]
When the potential measurement points are provided on the surface of the blast furnace iron skin, as shown in FIG. 5, a plurality of potential measurement points 11 are provided on the surface of the blast
[0025]
When the height direction attachment positions of the plurality of potential measurement points 11 are arranged so as to sandwich the interface between the hot metal and the hot metal, a preferable result can be obtained in order to evaluate the hot metal level from the potential difference measurement value. Specifically, if at least one mounting position is set to be equal to or higher than the level of the
[0026]
As shown in FIG. 1, the internal structure in the vicinity of the bottom of the blast furnace is such that a
[0027]
When the potential difference between the potential measuring points 11 provided on the
[0028]
The arrangement position of the
[0029]
Even when potential measurement points are provided on the furnace bottom brick, the concept of potential measurement point placement positions in the blast furnace height direction and blast furnace circumferential direction is the same as when potential measurement points are provided on the blast furnace iron surface. It is the same.
[0030]
When the porosity ε of the blast furnace hearth is larger than the critical porosity ε c , it can be said that the porosity is an appropriate porosity. On the other hand, when the porosity is smaller than the critical porosity ε c, it can be said that the porosity is lower than the appropriate porosity. Accordingly, the critical porosity ε c is determined in advance as an appropriate porosity, the porosity ε is estimated by the method for estimating the blast furnace hearth portion porosity of the present invention, and the measured porosity ε is greater than the predetermined appropriate porosity. Can also be determined that the porosity is lowered and the liquid permeability of the hearth is deteriorated. At this time, the porosity can be improved by improving the properties of the coke which is the filling of the hearth portion. That is, if the charging coke conditions are adjusted to optimize the porosity as described in (5) of the present invention, it becomes possible to quickly catch the deterioration of the porosity and take early action. Become. As a method for adjusting the coke conditions, it is preferable to employ either or both methods of increasing the charged coke particle size and increasing the charged coke strength as described in (6) of the present invention. In particular, it is effective to improve the properties of coke charged in the center of the furnace.
[0031]
【Example】
In a blast furnace having a furnace internal volume of 3273 m 3 and a hearth diameter of 12.0 m, estimation of the hearth part porosity and management of the porosity were performed using the present invention. As shown in Fig. 1, the potential measurement point is the furnace bottom brick surface, the lower measurement point is the first level of the furnace bottom carbon brick, and the upper measurement point is the same as the tuyere above 3.8m from the spout Level. The potential difference between these two points is measured as E, and an increase in potential difference ΔE / Δt (mV / h) per unit time when not dredging is determined. At the same time, the soot production rate W (m 3 / h ) Was determined from the analytical value of the charge and the charge. In this blast furnace, when the proportionality constant a = 0.018 in the above equation (1) and the porosity range in which the hearth state can be maintained is larger than the critical porosity ε c in the above equation (2) And the critical porosity ε c = 0.36. In other words, to keep the hearth state good,
ΔE / Δt <aW / ε c = 0.05 × W (3)
Has been found to be suitable.
[0032]
The potential difference E between two potential measurement points is measured when no dredging is performed in the blast furnace, and an increase in potential difference ΔE / Δt (mV / h) per unit time is obtained. 3 / h) was determined from the analytical value of the charge and the charge. When ΔE / Δt satisfies the above equation (3), it is determined that the flowability of the furnace bottom is good, and when ΔE / Δt increases and exceeds the above equation (3), the porosity decreases. As a result, it was judged that the flowability at the bottom of the furnace had deteriorated, and immediately, action was taken to improve the properties of the charged coke. Specifically, the coke strength was increased while increasing the particle size of the charged coke. More specifically, the operation of the coke oven was changed, the coal brand and the furnace temperature were changed, the average particle size of the coke was increased by about 10% (from 48 mm to 53 mm), and the cold strength was set to 1 The operation with increased points (from 85 to 86) was continued for one week.
[0033]
During the application and before application of the present invention, the slag ratio for each brewing, the brewing time, the hot metal temperature, Si in pig iron, and each variation (standard deviation) in S in pig iron were investigated. The results are shown in Table 1. As can be seen from Table 1, the slag ratio, the time of slagging, the temperature of hot metal, the temperature of Si in pig iron, and the variation in S in pig iron (standard deviation) decreased. Moreover, since the variation can be reduced, the hot metal temperature can be lowered, the levels of Si and S in the pig iron can be lowered, and the hot metal quality can be improved.
[0034]
[Table 1]
[0035]
【The invention's effect】
The present invention measures the potential difference between a plurality of potential measurement points provided at intervals in the height direction on the surface of the blast furnace iron shell, and the time change of the measured potential difference when the blast furnace is not exposed. Based on the above, it became possible to estimate the porosity of the hearth charge.
[0036]
In the present invention, the estimation accuracy of the porosity can be further improved by providing the potential measurement point on the furnace bottom brick.
[0037]
The present invention further enables early optimization of the porosity by adjusting the charging coke conditions to optimize the porosity when the estimated porosity is lower than the predetermined appropriate porosity. .
[Brief description of the drawings]
FIG. 1 is a diagram showing the present invention for measuring a potential difference with a furnace bottom brick, wherein (a) is a partial sectional view of a blast furnace, (b) is a partially enlarged view near a potential difference measuring device, and (c) is near a blast furnace tuyere. FIG.
FIG. 2 is a diagram showing the influence of the soot production rate on the relationship between the elapsed time after the end of tapping and the measured potential difference ΔE.
FIG. 3 is a diagram showing the influence of hearth liquid permeability on the relationship between the elapsed time after the completion of brewing and the measured potential difference ΔE.
FIG. 4 is a diagram showing the influence of hearth liquid permeability on the relationship between the soot production rate and the potential difference increase rate (ΔE / Δt).
FIGS. 5A and 5B are diagrams showing the present invention for measuring a potential difference on the surface of a blast furnace core, wherein FIG. 5A is a partial cross-sectional view of the blast furnace, and FIG.
6A and 6B are diagrams showing potential measurement points in a furnace bottom brick, where FIG. 6A shows a potential measurement point on the furnace bottom brick surface, and FIG. 6B shows a potential measurement point inside the furnace bottom brick.
[Explanation of symbols]
DESCRIPTION OF
Claims (4)
ΔE/Δt=aW/ε (1)
但し、aは予め定められる比例定数。 A plurality of potential measurement points are provided at intervals in the height direction on the surface of the blast furnace iron shell or the brick at the bottom of the furnace, the potential difference between the potential measurement points is measured, and when the blast furnace is not out Based on the following equation (1) , the porosity ε of the hearth portion charge is estimated from the time change ΔE / Δt of the measured potential difference and the soot production rate W , Estimation method.
ΔE / Δt = aW / ε (1)
However, a is a predetermined proportionality constant.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002002341A JP3828809B2 (en) | 2002-01-09 | 2002-01-09 | Blast hearth porosity estimation method and management method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002002341A JP3828809B2 (en) | 2002-01-09 | 2002-01-09 | Blast hearth porosity estimation method and management method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003201508A JP2003201508A (en) | 2003-07-18 |
| JP3828809B2 true JP3828809B2 (en) | 2006-10-04 |
Family
ID=27642222
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002002341A Expired - Lifetime JP3828809B2 (en) | 2002-01-09 | 2002-01-09 | Blast hearth porosity estimation method and management method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3828809B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005281813A (en) * | 2004-03-30 | 2005-10-13 | Jfe Steel Kk | Blast furnace output control method |
| AT506896B1 (en) | 2008-06-06 | 2010-05-15 | Siemens Vai Metals Tech Gmbh | METHOD FOR CONTROLLING A TRANSFORMATION METHOD |
-
2002
- 2002-01-09 JP JP2002002341A patent/JP3828809B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003201508A (en) | 2003-07-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6601631B2 (en) | Method for estimating amount of waste from molten metal refining vessel and method for refining molten metal | |
| JP2017160498A (en) | Estimation method of melt level in vertical furnace, and estimation device thereof | |
| JP3828809B2 (en) | Blast hearth porosity estimation method and management method | |
| JP2022148377A (en) | Blast furnace operation method | |
| JP4760013B2 (en) | Method and apparatus for measuring melt level in blast furnace | |
| JP3990560B2 (en) | Blast furnace bottom potential difference measuring apparatus and soot level evaluation method in blast furnace | |
| JPH11335710A (en) | Blast furnace heat prediction method | |
| JP4050893B2 (en) | Method and apparatus for evaluating soot level in blast furnace | |
| JP2000192124A (en) | Method and apparatus for measuring melt level in blast furnace hearth | |
| JP3715679B2 (en) | Blast furnace lap tapping judgment method and apparatus | |
| JP4313701B2 (en) | Method for leveling the level in the blast furnace | |
| JPH08273826A (en) | Computing method for optimum target total quantity of electricity supply for electric furnace and electric furnace installation | |
| JP2000192123A (en) | Method and apparatus for measuring melt level in blast furnace hearth | |
| JP2002302709A (en) | Blast furnace operation method | |
| US20110203415A1 (en) | Method of suppressing slag foaming in continuous melting furnace | |
| JP3794211B2 (en) | Method for evaluating mud material at blast furnace outlet and opening method for outlet | |
| KR20130023886A (en) | Method for predicting variation of furnace heat for blast furnace | |
| JP4184633B2 (en) | Blast furnace extraction method | |
| KR20220154826A (en) | A method for detecting fluctuations in the solidified layer and a method for operating a blast furnace | |
| KR20070060048A (en) | Molten steel manufacturing method and apparatus | |
| JPH02145716A (en) | Method for checking melting progress in arc plasma melting furnace | |
| JPH09227911A (en) | Blast furnace operation method | |
| JPH06341773A (en) | Operation stabilizing method for electric furnace | |
| KR19990009490A (en) | Method and apparatus for measuring melt level by measuring voltage difference in blast furnace bar | |
| US12577629B2 (en) | Residual liquid amount detection method and detection apparatus for the same, residual molten material amount detection method and detection apparatus for the same, and method for operating vertical furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040902 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060328 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060418 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060608 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060704 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060707 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 3828809 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090714 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100714 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110714 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120714 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130714 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130714 Year of fee payment: 7 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130714 Year of fee payment: 7 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130714 Year of fee payment: 7 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130714 Year of fee payment: 7 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| EXPY | Cancellation because of completion of term |