JP3830618B2 - Assembling method of tube connecting socket and assembling structure of the socket - Google Patents
Assembling method of tube connecting socket and assembling structure of the socket Download PDFInfo
- Publication number
- JP3830618B2 JP3830618B2 JP14405497A JP14405497A JP3830618B2 JP 3830618 B2 JP3830618 B2 JP 3830618B2 JP 14405497 A JP14405497 A JP 14405497A JP 14405497 A JP14405497 A JP 14405497A JP 3830618 B2 JP3830618 B2 JP 3830618B2
- Authority
- JP
- Japan
- Prior art keywords
- socket
- mold
- holder
- wall
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 9
- 239000012778 molding material Substances 0.000 claims description 18
- 239000000463 material Substances 0.000 claims description 6
- 238000000465 moulding Methods 0.000 claims description 6
- 125000006850 spacer group Chemical group 0.000 description 7
- 230000002093 peripheral effect Effects 0.000 description 6
- 230000006866 deterioration Effects 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229920003002 synthetic resin Polymers 0.000 description 2
- 239000000057 synthetic resin Substances 0.000 description 2
- 238000009933 burial Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
- Connection Or Junction Boxes (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、主として、通信ケーブルや送電ケーブルが挿通される管路を有する金属製管体、コンクリート製管体、陶器製管体等の地下埋設用管体を接続するための接続孔を有するソケットをハンドホールの壁体に組み付けるための管体接続用ソケットの組付方法とそのソケットの組付構造に関する。
【0002】
【従来の技術】
従来、図11に示すように、地震や地盤沈下等を考慮してハンドホール101の側壁102には、その壁厚寸法よりも長い筒状のソケット130を介して地下埋設用管体108がスライド可能に接続される。
図12に示すように、前記ハンドホール101の側壁102に複数のソケット130を組み付けるために、あらかじめ、ハンドホール101の側壁102には角窓状の開口部103が形成されている。
【0003】
前記ハンドホール101の開口部103には、まず、その内周面に沿ってスペーサ150が枠組みされ、そのスペーサ150に対し固定紐152によって複数のソケット130が所要とする間隔を隔てて固定される。
その後、図13に示すように、側壁102の内側面には、開口部103を閉じて第1型枠141が貼り付けられ、側壁102の外側面には開口部103を閉じて第2型枠145が貼り付けられる。この第2型枠145には各ソケット130に対する貫通孔146が貫設されている。
【0004】
前記したように、ハンドホール101の側壁102に対し第1型枠141と第2型枠145とが型組された後、これら第1・第2の両型枠141、145の成形空間に生コンクリート材、モルタル材等の壁成形材料が流し込まれて充填される。
そして、前記壁成形材料が固化された後、第1・第2の両型枠141、145が取り外されることで、図11に示すように、ハンドホール101の側壁102の開口部103を塞いで側壁102と一体状をなす壁体104が成形され、その壁体104に前記複数のソケット130が固着される。
【0005】
【発明が解決しようとする課題】
ところで、図11に示すように、前記ハンドホール101の開口部103に対し、その内周面に沿ってスペーサ150を枠組し、そのスペーサ150に対し固定紐152によって複数のソケット130を所要とする間隔を隔てて固定する作業は厄介であり、多くの手間や時間を必要とするばかりでなく、スペーサ150と固定紐152によって複数のソケット130を正確に位置決めして固定することが困難であった。
【0006】
さらに、スペーサ150と固定紐152によって複数のソケット130の固定方法においては、その複数のソケット130の間隔のバラツキを考慮して、前記第2型枠145には各ソケット130の最大外径よりも適宜に大きい孔径で貫通孔146を貫設する必要がある。
このため、図13に示すように、第1・第2の両型枠141、145の成形空間に生コンクリート材、モルタル材等の壁成形材料が流し込まれる際、その壁成形材料の一部が前記貫通孔146から流出して固化し、壁体104の仕上がりを悪化させるという不具合もあった。
【0007】
この発明の目的は、前記問題点に鑑み、ハンドホールの壁体に対し管体接続用ソケットを容易にかつ正確に位置決めして組み付けることができる管体接続用ソケットの組付方法とそのソケットの組付構造を提供することである。
【0008】
【課題を解決するための手段】
前記目的を達成するために、請求項1の発明に係る管体接続用ソケットの組付方法は、ハンドホールの壁体に対し管体を接続するための接続孔を有するソケットを組み付けるための管体接続用ソケットの組付方法であって、
前記ソケットが嵌挿されて保持される保持孔を有して筒状をなすソケットホルダを形成する一方、前記壁体を成形するための型枠の型面には、位置決め手段によって前記ソケットホルダを位置決めして保持し、
その後、前記型枠内に壁成形材料を充填して壁体を成形すると同時にその壁体に対し前記ソケットホルダを固着することを特徴とする。
【0009】
したがって、ハンドホールの壁体には、その壁体を成形する型枠板の型面に対し、位置決め手段によってソケットホルダを所要とする配設位置に容易にかつ正確に位置決めして固着することができる。
そして、前記ソケットホルダの保持孔に対し管体接続用ソケットを嵌込むというきわめて簡単な操作によって、壁体に対し管体接続用ソケットを容易にかつ正確に組み付けることができる。
さらに、型枠には、管体接続用ソケットに対する貫通孔をそれぞれ貫設する必要性もないため、壁成形材料が貫通孔から流出して固化することが原因となって壁体の外壁面の見栄えが悪化することを解消することができる。
【0010】
また、請求項2の発明に係る管体接続用ソケットの組付方法は、請求項1に記載の管体接続用ソケットの組付方法において、位置決め手段は、型枠に位置決めされて取り付けられる取付部と、その型枠の型面に突出する嵌合保持部とを備えたホルダ位置決め治具によって構成され、前記ホルダ位置決め治具の嵌合保持部にはソケットホルダがその保持孔において挿脱可能に嵌挿される構成にしてあることを特徴とする。
したがって、位置決め手段をなすホルダ位置決め治具は、その取付部において型枠に取り付けられことで、そのホルダ位置決め治具の嵌合保持部が型枠の型面に対し突出する。そして、嵌合保持部に対しソケットホルダが挿脱可能に嵌挿されることで、型枠の型面に対し、ソケットホルダが容易にかつ正確に位置決めされて保持される。
【0011】
請求項3の発明に係る管体接続用ソケットの組付構造は、ハンドホールの壁体に対し管体を接続するための接続孔を有するソケットを組み付けるための管体接続用ソケットの組付構造であって、
壁成形材料によって前記壁体が成形される際にその壁体に位置決めされて固着されるソケットホルダには、前記ソケットが嵌挿される保持孔が形成され、
前記ソケットホルダと前記ソケットとの間には、前記ソケットホルダの保持孔に対し前記ソケットが所要とする長さだけ嵌挿されたときに弾性的に係合してソケットの抜け止めをなす係止手段が設けられていることを特徴とする。
したがって、ハンドホールの壁体に固着されたソケットホルダの保持孔に対し管体接続用ソケットを嵌込むという、きわめて簡単な操作によって管体接続用ソケットを容易にかつ正確に組み付けることができる。
【0012】
【発明の実施の形態】
(実施の形態1)
この発明の実施の形態1を図1〜図7にしたがって説明する。
図1〜図3において、ハンドホール1の側壁2に複数のソケット30を組み付けるために、ハンドホール1の側壁2には角窓状の開口部3が形成されている。
図4と図5に示すように、前記側壁2の開口部3を塞いでその開口部3に壁体4を成形するための第1・第2の両型枠41、45のうち、第2型枠45には、複数のソケット30の配設間隔に対応する間隔を隔てて複数の取付孔46が貫設されている。
【0013】
図4に示すように、前記第2型枠45の型面側には、位置決め手段としての複数のホルダ位置決め治具20によってこれと同数のソケットホルダ10がそれぞれ位置決めされて保持される。
前記ホルダ位置決め治具20は、嵌合保持部21と、取付部をなすボルト23とを一体状に備えている。
前記嵌合保持部21は、第2型枠45の型面に当接する端板部を一端に有しかつソケット30の外径寸法と略同じ外径寸法を有する筒状に形成されている。前記嵌合保持部21の端板部の中心部には、ボルト23が突設されている。
【0014】
そして、第2型枠45の各取付孔46に対し、その第2型枠45の型面側から各ホルダ位置決め治具20のボルト23が嵌挿され、そのボルト23の先端部にナット24が締め付けられることで、第2型枠45に複数のホルダ位置決め治具20がそれぞれ取り付けられる。
これによって、ホルダ位置決め治具20の各嵌合保持部21は、その端板部が第2型枠45の型面に当接した状態でそれぞれ直角に突出される。
【0015】
前記第2型枠45の複数の取付孔46に対し各ホルダ位置決め治具20がそれぞれ取り付けられ、これらホルダ位置決め治具20の各嵌合保持部21にソケットホルダ10がそれぞれ挿脱可能に嵌込まれることで、第2型枠45の型面に複数のソケットホルダ10が位置決めされて保持される。
図1と図4に示すように、前記ソケットホルダ10は、その中心部にソケット30が嵌挿されて保持される保持孔11を有しかつハンドホール1の側壁2の開口部3を塞ぐようにして側壁2の開口部3に成形される壁体4の壁厚寸法と略同じ長さ寸法を備えた両端開口の筒状に形成されている。さらに、ソケットホルダ10の保持孔11の内周面には、ソケット30に対する係止凹部12が環状に凹設されている。
【0016】
そして、第2型枠45の各ホルダ位置決め治具20の各嵌合保持部21にソケットホルダ10がその保持孔11においてそれぞれ嵌込まれ、これらソケットホルダ10の一端が第2型枠45の型面に当接して保持される。この状態において、嵌合保持部21からソケットホルダ10が不測に抜け出ることがないように、嵌合保持部21は、ソケットホルダ10の保持孔11よりも若干大径でかつ合成樹脂等によって弾性的に圧縮可能に形成されることが望ましい。
【0017】
前記したように第2型枠45に対し複数のホルダ位置決め治具20によってこれと同数のソケットホルダ10が位置決め保持された後、ハンドホール1の側壁2の内側面には、その開口部3を閉じて第1型枠141が貼り付けられ、同側壁2の外側面にはその開口部3を閉じて第2型枠45が貼り付けられる。
図5に示すように、前記ハンドホール1の側壁2に対し第1型枠41と第2型枠45とが型組された後、これら第1・第2の両型枠41、45の成形空間に生コンクリート材、モルタル材、溶融合成樹脂材等の壁成形材料が流し込まれて充填される。
【0018】
そして、前記壁成形材料が固化された後、第1・第2の両型枠41、45が取り外されることで、図に示すように、ハンドホール1の側壁2の開口部3を塞いで側壁2と一体状をなす壁体4が成形され、その壁体4に前記複数のソケットホルダ10が所要とする配設位置に位置決めされた状態で固着される。
【0019】
また、ハンドホール1の側壁2に対し第2型枠45を取り外す際、図6の(A)に示すように、その第2型枠板45の取り外しと同時に、複数のホルダ位置決め治具20の各嵌合保持部21をソケットホルダ10から抜き取ることも可能である。また、ホルダ位置決め治具20の数が多い場合には、図6の(B)に示すように、ホルダ位置決め治具20のボルト23に締め付けられたナット24を離脱して、第2型枠45を取り外した後、各ソケットホルダ10からホルダ位置決め治具20をそれぞれ抜き取ることも可能である。
図7に示すように、前記ハンドホール1の側壁2と一体状をなす壁体4に対し所要とする配設位置に位置決めされた状態で固着され複数のソケットホルダ10の保持孔11には、その保持孔11の外側開口部からソケット30が所要とする長さだけ嵌挿され、これによって、壁体4に複数のソケット30が組み付けられる。
【0020】
前記ソケット30は、管体8が差し込まれて接続される接続孔31を備えた両端開口の筒状に形成され、その接続孔31の外側開口部寄りの内周面には、管体8の外周面に弾性変形して密接する弾性シール部材34が組み付けられる保持溝33が形成されている。
さらに、ソケット30の差込側先端部には、係止突部32が形成されている。そして、ソケットホルダ10の保持孔11の外側開口部からソケット30が所要とする長さだけ嵌挿されることで、前記係止突部32がソケットホルダ10の係止凹部12と弾性的に係合し、これによってソケットホルダ10の保持孔11にソケット30が抜け止めされて保持される。
【0021】
また、ソケットホルダ10の保持孔11に対しソケット30を差し込む際、ソケット30の外周面又はソケットホルダ10の保持孔11に接着剤を塗布しその接着剤によってソケットホルダ10とソケット30とを接着することで、ソケットホルダ10に対しソケット30を確実に抜け止めして保持することもできる。
【0022】
したがって、この実施の形態1においては、ハンドホール1の側壁2の開口部3を塞いで成形された壁体4には、その壁体4の外側面を成形する第2型枠45の型面に配設の複数のホルダ位置決め治具20の各嵌合保持部21によって、これと同数のソケットホルダ10を所要とする配設位置に容易にかつ正確に位置決めして固着することができる。
そして、前記壁体4の複数のソケットホルダ10の各保持孔11にはこれと同数のソケット30を嵌込みによるきわめて簡単な操作によって容易にかつ正確に組み付けることができる。
さらに、第2型枠45には、複数のソケット30に対する貫通孔をそれぞれ貫設する必要性もないため、壁体4の壁成形材料9が貫通孔から流出して固化することが原因となる壁体4の外壁面の見栄えの悪化を解消することができる。
【0023】
なお、図1に示すように、壁体4に組み付けられた複数のソケット30の接続孔31には、従来と略同様にして管体8が所要とする長さだけ嵌込まれて接続される。なお、管体8には、金属製管体、コンクリート製管体、陶器製管体等があり、その管体8の管路には通信ケーブル(光ファイバケーブル、電線ケーブル等)や送電ケーブル等のケーブル9が挿通される。
【0024】
(実施の形態2)
次に、この発明の実施の形態2を図8〜図10にしたがって説明する。
前記実施の形態1では、ハンドホール1の埋設現場において、側壁2の開口部3を塞いで壁体4が成形されるのに対し、この実施の形態2においては、ハンドホール1は、ハンドホール本体5と、そのハンドホール本体5にボルト7等によって締め付けられて側壁を構成する壁体6によって構成されている。
壁体6は工場内において成形され、その壁体6の成形と同時に、実施の形態1と同様に構成された複数のソケットホルダ10が所要の配設位置に正確に位置決めされて固着される。
【0025】
前記壁体6を工場内において成形する場合、例えば、図9に示すように、壁体6に対応する大きさの有底薄箱状の型枠40が用いられる。この型枠40には、その底面をなす型面に位置決め手段を構成する複数のテーパ状の位置決め突部25が突出され、これら各位置決め突部25には、ソケットホルダ10が位置決めされて保持される。
その後、図10に示すように、型枠40内に壁成形材料が流し込まれ、その壁成形材料が固化され脱型されることで、壁体6が成形され、その壁体6の成形と同時に、複数のソケットホルダ10が所要の配設位置に正確に位置決めされて固着される。
【0026】
そして、ハンドホール1の埋設現場において、ハンドホール本体5にボルト7等によって壁体6が取り付けられることで、ハンドホール1が構成される。
その後は、実施の形態1と同様にして、壁体6の複数のソケットホルダ10の各保持孔11に対し、実施の形態1と同様に構成されたソケット30を嵌込みによるきわめて簡単な操作によって容易にかつ正確に組み付けることができる。
【0027】
【発明の効果】
以上述べたように、請求項1に記載の発明によれば、ハンドホールの壁体にソケットホルダを正確に位置決めして固着することができ、そのソケットホルダの保持孔に対しソケットを嵌込むというきわめて簡単な操作によって、壁体に対しソケットを容易にかつ正確に組み付けることができる。
さらに、壁成形材料が型枠から流出して固化することが原因となる壁体の外壁面の見栄えの悪化を解消することができる。
また、請求項2に記載の発明によれば、位置決め手段をなすホルダ位置決め治具の嵌合保持部に対しソケットホルダが挿脱可能に嵌挿されることで、型枠の型面に対し、ソケットホルダを容易にかつ正確に位置決めして保持することができ、ソケットホルダの位置決め作業を手早く簡単に行うことができる。
請求項3に記載の発明によれば、ハンドホールの壁体に固着されたソケットホルダの保持孔に対し管体接続用ソケットを嵌込むという、きわめて簡単な操作によって管体接続用ソケットを容易にかつ正確に組み付けることができる。
【図面の簡単な説明】
【図1】この発明の実施の形態1の管体接続用ソケットがハンドホールの壁体に組み付けられた状態を示す断面図である。
【図2】同じく管体接続用ソケットがハンドホールの壁体に組み付けられた状態を示す斜視図である。
【図3】同じく管体接続用ソケットがハンドホールの壁体に組み付けられる前の状態を示す斜視図である。
【図4】同じくハンドホールの壁体に対する型枠にホルダ位置決め治具を介してソケットホルダが取り付けられた状態を示す断面図である。
【図5】同じくハンドホールの側壁の開口部に型枠を型組しその型枠内に壁成形材料を充填して壁体を成形する状態を示す断面図である。
【図6】同じくハンドホールの側壁の開口部に壁体を成形した後に型枠及びホルダ位置決め治具を取り外す状態を示す説明図。
【図7】同じくハンドホールの壁体に固着されたソケットホルダにソケットを嵌込んで組み付ける状態を示す説明図である。
【図8】この発明の実施の形態2のハンドホールのハンドホール本体と壁体とを分離した状態を示す説明図である。
【図9】同じく壁体に対する型枠にソケットホルダを位置決めしてセットした状態を示す説明図である。
【図10】同じく型枠内に壁成形材料を流し込んで壁体を成形する状態を示す説明図である。
【図11】従来の管体接続用ソケットがハンドホールの壁体に組み付けられた状態を示す断面図である。
【図12】同じくハンドホールの側壁の開口部にスペーサと固定紐によって管体接続用ソケットを固定する状態を示す説明図である。
【図13】同じくハンドホールの側壁の開口部に型枠を型組しその型枠内に壁成形材料を充填して壁体を成形する状態を示す断面図である。
【符号の説明】
1 ハンドホール
2 側壁
3 開口部
4 壁体
5 ハンドホール本体
6 壁体
8 管体
9 壁成形材料
10 ソケットホルダ
11 保持孔
20 ホルダ位置決め治具(位置決め手段)
21 嵌合保持部
22 取付部
30 管体接続用ソケット
41,45 型枠[0001]
BACKGROUND OF THE INVENTION
The present invention mainly relates to a socket having a connection hole for connecting underground pipes such as metal pipes, concrete pipes, pottery pipes, etc., having pipe lines through which communication cables and power transmission cables are inserted. The present invention relates to a method of assembling a tube connecting socket for assembling a wall to a handhole wall and a structure for assembling the socket.
[0002]
[Prior art]
Conventionally, as shown in FIG. 11, in consideration of an earthquake, ground subsidence, etc., an underground buried
As shown in FIG. 12, in order to assemble a plurality of
[0003]
In the
Thereafter, as shown in FIG. 13, the
[0004]
As described above, after the
Then, after the wall molding material is solidified, the first and
[0005]
[Problems to be solved by the invention]
By the way, as shown in FIG. 11, a
[0006]
Furthermore, in the method of fixing the plurality of
For this reason, as shown in FIG. 13, when a wall molding material such as raw concrete material or mortar material is poured into the molding space of both the first and
[0007]
In view of the above problems, an object of the present invention is to provide a method for assembling a tube connecting socket, which can easily and accurately position and assemble a tube connecting socket with respect to a wall body of a hand hole, and the socket. It is to provide an assembly structure.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, a tube connecting socket assembling method according to the invention of
A socket holder having a cylindrical shape having a holding hole in which the socket is inserted and held is formed. On the mold surface of the mold for molding the wall body, the socket holder is placed by positioning means. Positioning and holding,
Thereafter, a wall molding material is filled into the mold to mold the wall body, and at the same time, the socket holder is fixed to the wall body.
[0009]
Accordingly, the socket holder can be easily and accurately positioned and fixed to the wall surface of the handhole with the positioning means by the positioning means with respect to the mold surface of the mold plate forming the wall body. it can.
The tube connection socket can be easily and accurately assembled to the wall body by a very simple operation of fitting the tube connection socket into the holding hole of the socket holder.
Further, since it is not necessary for the mold to have through holes for the tube connection sockets, the wall molding material flows out of the through holes and solidifies. It can eliminate the deterioration of appearance.
[0010]
According to a second aspect of the present invention, there is provided a method for assembling a tube connecting socket according to the first aspect, wherein the positioning means is positioned and attached to the formwork. And a holder holding jig that protrudes from the mold surface of the mold, and a socket holder can be inserted into and removed from the fitting hole of the holder positioning jig through the holding hole. It is the structure inserted and inserted into.
Therefore, the holder positioning jig which constitutes the positioning means is attached to the mold at the mounting portion, so that the fitting holding portion of the holder positioning jig protrudes from the mold surface of the mold. Then, the socket holder is detachably fitted to the fitting holding portion, so that the socket holder is easily and accurately positioned and held with respect to the mold surface of the mold.
[0011]
An assembly structure of a tube connection socket according to the invention of
In the socket holder that is positioned and fixed to the wall body when the wall body is molded by the wall molding material, a holding hole into which the socket is inserted is formed,
Between the socket holder and the socket, a latch that is elastically engaged to prevent the socket from coming off when the socket is inserted into the holding hole of the socket holder for a required length. Means are provided.
Therefore, the tube connection socket can be easily and accurately assembled by a very simple operation of fitting the tube connection socket into the holding hole of the socket holder fixed to the wall of the hand hole.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
(Embodiment 1)
A first embodiment of the present invention will be described with reference to FIGS.
1 to 3, a square window-
4 and 5, the second of the first and
[0013]
As shown in FIG. 4, the same number of
The
The fitting holding
[0014]
Then, the
Thereby, each fitting holding
[0015]
The holder positioning jigs 20 are respectively attached to the plurality of mounting
As shown in FIGS. 1 and 4, the
[0016]
Then, the
[0017]
As described above, after the same number of
As shown in FIG. 5, after the
[0018]
Then, after the wall molding material is solidified, both the first and
[0019]
Further, when the
As shown in FIG. 7, the holding holes 11 of the plurality of
[0020]
The
Further, a locking
[0021]
Further, when the
[0022]
Therefore, in the first embodiment, the
Then, the same number of
Furthermore, since there is no need to penetrate through the
[0023]
As shown in FIG. 1, the tube 8 is inserted into and connected to the connection holes 31 of the plurality of
[0024]
(Embodiment 2)
Next, a second embodiment of the present invention will be described with reference to FIGS.
In the first embodiment, the
The
[0025]
When the
Thereafter, as shown in FIG. 10, the wall molding material is poured into the
[0026]
And in the burial site of the
Thereafter, in the same manner as in the first embodiment, the
[0027]
【The invention's effect】
As described above, according to the first aspect of the present invention, the socket holder can be accurately positioned and fixed to the wall of the hand hole, and the socket is fitted into the holding hole of the socket holder. By a very simple operation, the socket can be easily and accurately assembled to the wall.
Furthermore, the deterioration of the appearance of the outer wall surface of the wall body, which is caused by the wall molding material flowing out of the mold and solidifying, can be eliminated.
According to the second aspect of the present invention, the socket holder is removably inserted into the fitting holding portion of the holder positioning jig that forms the positioning means, so that the socket can be inserted into the mold surface of the mold. The holder can be easily and accurately positioned and held, and the socket holder can be positioned quickly and easily.
According to the third aspect of the present invention, the tube connection socket can be easily formed by a very simple operation of fitting the tube connection socket into the holding hole of the socket holder fixed to the wall of the hand hole. And can be assembled accurately.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a state in which a tube connection socket according to a first embodiment of the present invention is assembled to a wall of a hand hole.
FIG. 2 is a perspective view showing a state where the tube connection socket is assembled to the wall of the hand hole.
FIG. 3 is a perspective view showing a state before the tube connecting socket is assembled to the wall of the hand hole.
FIG. 4 is a cross-sectional view showing a state in which a socket holder is attached to a mold for a wall of a hand hole via a holder positioning jig.
FIG. 5 is a cross-sectional view showing a state in which a mold is assembled in the opening of the side wall of the hand hole and a wall molding material is filled into the mold to mold a wall body.
FIG. 6 is an explanatory view showing a state in which the mold body and the holder positioning jig are removed after the wall body is formed in the opening of the side wall of the hand hole.
FIG. 7 is an explanatory view showing a state in which a socket is fitted and assembled in a socket holder fixed to the wall of the hand hole.
FIG. 8 is an explanatory view showing a state where a hand hole body and a wall body of a hand hole according to
FIG. 9 is an explanatory view showing a state in which the socket holder is positioned and set on the mold with respect to the wall body.
FIG. 10 is an explanatory view showing a state in which a wall body is molded by pouring a wall molding material into the mold.
FIG. 11 is a cross-sectional view showing a state where a conventional tube connection socket is assembled to a wall of a hand hole.
FIG. 12 is an explanatory view showing a state where the tube connection socket is fixed to the opening of the side wall of the hand hole by a spacer and a fixing string.
FIG. 13 is a cross-sectional view showing a state in which a mold is assembled in the opening of the side wall of the hand hole and a wall molding material is filled into the mold to mold a wall body.
[Explanation of symbols]
DESCRIPTION OF
21 Fitting holding portion 22 Mounting
Claims (3)
前記ソケットが嵌挿されて保持される保持孔を有して筒状をなすソケットホルダを形成する一方、前記壁体を成形するための型枠の型面には、位置決め手段によって前記ソケットホルダを位置決めして保持し、
その後、前記型枠内に壁成形材料を充填して壁体を成形すると同時にその壁体に対し前記ソケットホルダを固着することを特徴とする管体接続用ソケットの組付方法。A method of assembling a tube connecting socket for assembling a socket having a connection hole for connecting a tube to a wall of a hand hole,
A socket holder having a cylindrical shape having a holding hole in which the socket is inserted and held is formed. On the mold surface of the mold for molding the wall body, the socket holder is placed by positioning means. Positioning and holding,
Thereafter, a wall forming material is filled into the mold to form a wall body, and at the same time, the socket holder is fixed to the wall body.
壁成形材料によって前記壁体が成形される際にその壁体に位置決めされて固着されるソケットホルダには、前記ソケットが嵌挿される保持孔が形成され、
前記ソケットホルダと前記ソケットとの間には、前記ソケットホルダの保持孔に対し前記ソケットが所要とする長さだけ嵌挿されたときに弾性的に係合してソケットの抜け止めをなす係止手段が設けられていることを特徴とする管体接続用ソケットの組付構造。An assembly structure of a socket for connecting a tubular body for assembling a socket having a connection hole for connecting the tubular body to a wall body of a hand hole,
In the socket holder that is positioned and fixed to the wall body when the wall body is molded by the wall molding material, a holding hole into which the socket is inserted is formed,
Between the socket holder and the socket, a latch that is elastically engaged to prevent the socket from coming off when the socket is inserted into the holding hole of the socket holder for a required length. An assembly structure of a socket for connecting a tubular body, characterized in that means is provided.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14405497A JP3830618B2 (en) | 1997-06-02 | 1997-06-02 | Assembling method of tube connecting socket and assembling structure of the socket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14405497A JP3830618B2 (en) | 1997-06-02 | 1997-06-02 | Assembling method of tube connecting socket and assembling structure of the socket |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10336845A JPH10336845A (en) | 1998-12-18 |
| JP3830618B2 true JP3830618B2 (en) | 2006-10-04 |
Family
ID=15353252
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14405497A Expired - Fee Related JP3830618B2 (en) | 1997-06-02 | 1997-06-02 | Assembling method of tube connecting socket and assembling structure of the socket |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3830618B2 (en) |
-
1997
- 1997-06-02 JP JP14405497A patent/JP3830618B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10336845A (en) | 1998-12-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3830618B2 (en) | Assembling method of tube connecting socket and assembling structure of the socket | |
| CN111305558B (en) | A special-shaped fair-faced concrete aluminum formwork system and its installation method | |
| JP2645690B2 (en) | Forming method of split box culvert and forming tool therefor | |
| US7159835B2 (en) | Magnetic hole former | |
| KR200296218Y1 (en) | Terminal box | |
| KR200248024Y1 (en) | loy type electric wiring box | |
| JPH1177646A (en) | Durable form and production of concrete unit | |
| JP2873223B2 (en) | Lifting jig for concrete molding | |
| KR200370254Y1 (en) | Device For Connecting Concrete Form | |
| KR200354534Y1 (en) | Fixture for concrete mold | |
| JP3050361U (en) | Assembled duct sleeve for handhole | |
| KR200263919Y1 (en) | Base for fixing support of road facilities | |
| EP4501567B1 (en) | Installation device to be accommodated in a concrete component | |
| JP2001214536A (en) | Insert apparatus | |
| JPH0734109Y2 (en) | Reinforcing joint sleeve fixing jig | |
| JPH0823618A (en) | Fixing adapter for flush mount electric wiring box | |
| JPH0626678Y2 (en) | Insert bush coupling structure | |
| JPH0237220Y2 (en) | ||
| JP3367650B2 (en) | Manufacturing aids and manufacturing method for snow-melting blocks | |
| JPH10201068A (en) | End wall board of knocked-down buried type wiring box, and its manufacture | |
| JP2003300207A (en) | Box fixing device for planting boxes in precast reinforced concrete members | |
| JPS60212536A (en) | Embedding of water-proof ring to connection part of concretecylinder | |
| JPH10119021A (en) | Form for manufacturing segment | |
| JP3043843U (en) | Concrete product forming die with male die made of elastic material | |
| JP2001349054A (en) | Sheath pipe holding jig |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040518 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060613 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060712 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110721 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120721 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130721 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |