Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3843482B2 - Steel ball feeder - Google Patents
[go: Go Back, main page]

JP3843482B2 - Steel ball feeder - Google Patents

Steel ball feeder Download PDF

Info

Publication number
JP3843482B2
JP3843482B2 JP11059596A JP11059596A JP3843482B2 JP 3843482 B2 JP3843482 B2 JP 3843482B2 JP 11059596 A JP11059596 A JP 11059596A JP 11059596 A JP11059596 A JP 11059596A JP 3843482 B2 JP3843482 B2 JP 3843482B2
Authority
JP
Japan
Prior art keywords
steel ball
steel
inclined chute
guide groove
steel balls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11059596A
Other languages
Japanese (ja)
Other versions
JPH09278157A (en
Inventor
邦雄 河島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NSK Ltd
Original Assignee
NSK Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NSK Ltd filed Critical NSK Ltd
Priority to JP11059596A priority Critical patent/JP3843482B2/en
Priority to US08/835,477 priority patent/US5921851A/en
Publication of JPH09278157A publication Critical patent/JPH09278157A/en
Application granted granted Critical
Publication of JP3843482B2 publication Critical patent/JP3843482B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Grinding And Polishing Of Tertiary Curved Surfaces And Surfaces With Complex Shapes (AREA)
  • Feeding Of Articles To Conveyors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、鋼球研磨盤への鋼球供給に円形コンベアを用いている鋼球供給装置に関し、特に、転がり軸受け等の鋼球製造工程で使用される鋼球研磨盤に好適な鋼球供給装置に関する。
【0002】
【従来の技術】
一般に、転がり軸受け等の鋼球製造工程では鋼球研磨盤による鋼球の研磨が行われ、その鋼球研磨盤への鋼球供給には鋼球供給装置が用いれている。
【0003】
この鋼球供給装置を用いている鋼球研磨盤について図4ないし図6を参照しながら説明する。図4は従来の鋼球研磨盤の構成を示す全体図、図5は図4の鋼球供給装置から鋼球研磨盤内へ鋼球を案内する傾斜シュートの平面およびその断面を示す図、図6は図5の傾斜シュートにおける鋼球の流れを示す側面図である。
【0004】
鋼球研磨盤は、図4に示すように、鋼球供給装置50を備える。鋼球供給装置50は、円形コンベア3を有する。円形コンベア3は、駆動機構(図示せず)によって回転される円盤状の移動部3aと、その周囲を囲う固定外壁3bとから構成され、移動部3aと固定外壁3bとは互いに共働して鋼球収容空間を形成する。
【0005】
固定外壁3bには、移動部3aの回転駆動によって搬送された鋼球をせき止め、その鋼球を出口3dへ導くためのせき止め板3cが設けられている。
【0006】
出口3dには、それから排出される鋼球をその自重と研磨液によって研磨盤本体へ導くための傾斜シュート4が接続されている。傾斜シュート4は、図5(a),(b)に示すように、上方に開口する凹状の断面形状を有し、その底部には、鋼球を研磨盤本体の入口へ整列させながら導くための複数の案内溝4aが形成されている。
【0007】
研磨盤本体は、図4に示すように、固定盤2と、それに所定の加工力で押し付けられながら回転する回転盤1とから構成されている。回転盤1の固定盤2対向面には、鋼球を受け入れる複数の溝(図示せず)が同心円上に形成されている。同様に、固定盤2の回転盤1対向面には、鋼球を受け入れる複数の溝(図示せず)が同心円上に形成され、各溝は対応する回転盤1の溝に対向するように配置されている。
【0008】
傾斜シュート4から供給された鋼球はその供給順にほぼ一定の間隔で回転盤1の溝とそれに対向する固定盤2の溝とで回転盤1と固定盤2との間に保持され、回転盤1の回転に伴い保持された各鋼球は回転盤1から所定の圧力を受けながら固定盤2の溝に沿って移動される。この移動によって鋼球には研磨加工が施され、回転盤1のほぼ2回転毎に1回の研磨加工(1サイクル)が行われることになる。研磨加工が施された鋼球は、出口シュート5を介して外部に搬出される。
【0009】
この鋼球研磨盤では、例えば、直径10mmの鋼球に対し1ロット100Kgの研磨加工を行う場合、その1ロット全ての鋼球を1サイクルの研磨加工するのに20分の時間が掛かる。この円形コンベア3と研磨盤本体との間での循環を多数回繰り返すことにより所望の仕上げ精度を得るのであるが、この加工時間を短縮するために、研磨盤本体への鋼球の流れ込み速度すなわち単位時間当りの供給個数を増大させる方法が考えられている。
【0010】
すなわち、一般的な加工条件においては、回転盤1と固定盤2との間で同一の円周上に配列されている各鋼球間の間隔をほぼ一定に確保するように、鋼球の供給が行われるが、この鋼球の1サイクル当りの研磨量は各鋼球間の間隔に依存することなくその1球当りの加工圧力に応じて決定されるから、回転盤1と固定盤2との間で同一の円周上に配列されている各鋼球間の間隔をさらに密にするように鋼球の供給個数を増せば、1サイクル当り加工される鋼球数は増すことになり、加工時間の短縮化を図ることができる。例えば、供給個数を通常の2倍にすれば、加工時間を通常の1/2にすることが可能である。
【0011】
【発明が解決しようとする課題】
研磨盤本体への鋼球の流れ込み速度すなわち単位時間当りの供給個数を増大させるために、円形コンベア3の回転速度を増すことによる円形コンベア3の供給速度の増大が考えられるが、円形コンベア3の回転速度を増大させると、傾斜シュート4において案内溝4aに受け入れらない一部の鋼球が他の鋼球の流れを阻害し、鋼球の単位時間当りの供給個数の増大に対応することができない。また、案内溝4a内の鋼球とその溝4aから押し出された鋼球とが重なりながら研磨盤本体へ供給されると、その鋼球間の咬み込みが生じ、鋼球に有害な傷を付けるなどの不具合が発生することがある。
【0012】
具体的には、図5(a)に示すように、傾斜シュート4において、円形コンベア3から排出された鋼球6の内の案内溝4aに受け入れらない一部の鋼球6bが案内溝4aに沿って流れる他の鋼球6の流れを阻害し、円形コンベア3の回転速度増大に対応する個数の鋼球を供給することができないことがある。また、案内溝4aから押し出された鋼球6aは、図5(a)に示すように、案内溝4a内の鋼球6と重なりながら研磨盤本体入口まで移動する。鋼球6aが案内溝4a内の鋼球6と重なりながら研磨盤本体入口まで移動すると、図6に示すように、a部において、鋼球6aは回転盤1の回転力を受けて鋼球6へ咬み込み、双方の鋼球が損傷されることがある。
【0013】
よって、この傾斜シュート4では、円形コンベア3の回転速度を増大に伴う鋼球の単位時間当りの供給個数の増大に対応することができない。すなわち、従来の鋼球供給装置50では、円形コンベア3の回転速度の増大によって、研磨盤本体への単位時間当りの鋼球供給個数を増大させることができない。
【0014】
本発明の目的は、鋼球研磨盤の研磨盤本体への単位時間当りの鋼球供給個数を増大させることができるとともに、その鋼球供給個数の増大に起因する鋼球の損傷を未然に防止することができる鋼球供給装置を提供することにある。
【0015】
【課題を解決するための手段】
請求項1記載の発明は、鋼球研磨盤への鋼球供給に円形コンベアを用いている鋼球供給装置において、前記円形コンベアの出口から搬出された鋼球を前記鋼球研磨盤の入口へ整列させながら導くための案内溝が形成され、その案内溝における前記鋼球研磨盤入口近傍部分の上方が上板で閉じられている傾斜シュートと、前記案内溝の外部に押し出された鋼球を前記傾斜シュートの上板の上流側位置で前記傾斜シュートから取り出すための咬み込み防止オーバーフロー機構と、前記咬み込み防止オーバーフロー機構によって前記傾斜シュートから取り出された鋼球を前記円形コンベア側へ戻す戻し機構とを備え、前記咬み込み防止オーバーフロー機構は、前記円形コンベア側の端部が傾斜し、該端部から前記案内溝の外部に押し出された鋼球が乗り上げる乗り上げ部と、前記乗り上げ部に乗り上げた鋼球を前記戻し機構側へ導く傾斜路とを有することを特徴とする。
【0016】
請求項1記載の鋼球供給装置では、円形コンベアの出口から搬出された鋼球を鋼球研磨盤の入口へ整列させながら導くための案内溝が形成され、その案内溝における鋼球研磨盤入口近傍部分の上方が上板で閉じられている傾斜シュートを設け、案内溝の外部に押し出された鋼球は咬み込み防止オーバーフロー機構で傾斜シュートの上板の上流側位置で傾斜シュートから取り出され、その傾斜シュートから取り出された鋼球は戻し機構で円形コンベア側へ戻されるから、円形コンベアの回転速度を増大させることによって鋼球の単位時間当りの供給個数の増大を図るとき、傾斜シュート内における鋼球の流れを円滑にすることができ、鋼球の単位時間当りの供給個数の増大に対応することができるとともに、傾斜シュートによって鋼球を整列させなが研磨盤本体入口に導くことができ、鋼球の咬み込みなどをなくすことができる。
【0017】
【発明の実施の形態】
以下に、本発明の実施の形態について図を参照しながら説明する。
【0018】
(実施の第1形態)
図1は本発明の鋼球供給装置の実施の第1形態の主要部の上面およびその断面を示す図、図2は図1の傾斜シュートの縦断面図である。なお、本実施の形態では、本発明の主要部のみを説明し、従来と同じ部分については、その説明を簡単にまたは省略する。
【0019】
転がり軸受け等の鋼球製造工程では鋼球研磨盤による鋼球の研磨が行われ、その鋼球研磨盤は、図1(a)に示すように、固定盤2と、それに所定の加工力で押し付けられながら回転する回転盤1とから構成されている研磨盤本体と、研磨盤本体へ鋼球を供給する鋼球供給装置20とを備える。
【0020】
この鋼球供給装置20は、円形コンベア(図示せず)を有し、その円形コンベアの構成は、従来の技術で述べた構成と同じである。
【0021】
円形コンベアの出口3dには、それから排出される鋼球6をその自重と研磨液によって研磨盤本体へ導くための傾斜シュート4が接続されている。傾斜シュート4は、上方に開口する凹状の断面形状を有し、その底部には、図4(b)に示すように、鋼球6を研磨盤本体の入口へ整列させながら導くための複数の案内溝4aが形成されている。傾斜シュート4の研磨本体盤入口近傍部分は、鋼球の流れる方向に沿って固定盤の溝および案内溝4aが滑らかにつながる円弧状に曲げられ、その曲率半径はrに設定されている。
【0022】
傾斜シュート4の研磨本体盤入口近傍部分には、その位置ある案内溝4aの上方を覆う上板13が設けられ、上板13の傾斜シュート4の曲げ部分に対向する部分は、図2に示すように、所定の曲率半径Rで曲げられ、その曲率中心は傾斜シュート4の曲率rの中心と同じである。なお、曲率半径Rは次の関係式(1)を満足する設定されていることが好ましい。
【0023】
r+1.1D≦R≦r+1.2D …(1)
但し、上限に関しては、傾斜シュート4の傾きの大きさなどの条件により、多少大きくしても構わない。なお、式中のDは鋼球6の直径寸法を示す。
【0024】
上板13の下面と案内溝4a底部との間の間隔は後述する跳ね上げ駒10で後述する間隔hになるように規定されている。
【0025】
傾斜シュート4における上板13と円形コンベアとの間の位置には、案内溝4aの外に押し出された鋼球例えば鋼球6a,6bを傾斜シュート4から取り出すための咬み込み防止オーバーフロー機構が配置されている。
【0026】
この咬み込み防止オーバーフロー機構は、複数の跳ね上げ駒10と跳ね上げ部11とからなる。各跳ね上げ駒10は、案内溝4aに沿って伸びる細長い板状部材からなり、その部材は対応する案内溝4a間に配置されている。跳ね上げ駒10の円形コンベア側の端部は、案内溝4aに沿う方向に傾斜するようにテーパ状に形成されている。
【0027】
跳ね上げ部11は、傾斜シュート4の上方に配置されている枠体からなり、その枠体の円形コンベアに向う側部は、傾斜シュート4の案内溝4aの外部に押し出された鋼球を受入れかつ排出するように開口されている。跳ね上げ部11は、跳ね上げ板11aを有し、跳ね上げ板11aの円形コンベア側端部は、テーパ状に形成されている。跳ね上げ板11aの上面は、受け入れた鋼球を傾斜シュート4の外部に導くように傾斜シュート4の一方の側部に向けて傾斜した第1の斜面部分と、第1の斜面に沿って導かれた鋼球を円形コンベア側に導くように円形コンベア側に傾斜した第2の斜面とからなる。跳ね上げ板11aの下面は、図1(b)に示すように、案内溝4aに平行な面からなり、その下面と案内溝4a底部との間の間隔hは、鋼球6の直径D以上の値に跳ね上げ駒10で規定されている。なお、間隔hを次の関係式(2)を満足するように設定することが好ましい。
【0028】
1.1D≦h≦1.2D …(2)
跳ね上げ板11aの第2斜面に沿って導かれた鋼球6は戻し機構によって傾斜シュート4の入口近傍位置に戻される。戻し機構は、跳ね上げ板11aの第2斜面に沿って導かれた鋼球6を搬送する戻しコンベア12と、戻しコンベア12で搬送された鋼球6を傾斜シュート4の入口近傍位置に導くための戻しシュート14とから構成されている。戻しコンベア12は棧付きコンベア例えばチェーンコンベアからなり、その駆動には駆動モータ15が用いられている。
【0029】
次に、鋼球供給装置20による供給動作について説明する。
【0030】
円形コンベアから傾斜シュート4に送り出された各鋼球6は、その自重および研磨液によって互い重なり合いながら研磨盤本体入口に向けて傾斜シュート4内を移動する。移動中の鋼球6の内の一部は案内溝4aに受け入れられ、その案内溝4aに沿って移動するが、その鋼球6の一部の上に重なる他の鋼球例えば6a,6bは、案内溝4aに受け入れられずに、案内溝4aの外に押し出された状態で移動する。
【0031】
その鋼球6a,6bなどは、その移動途中で、跳ね上げ駒10上に乗り上げ、その後に跳ね上げ板11a上に乗り上げる、または、直接跳ね上げ板11a上に乗り上げる。具体的には、案内溝4a間に位置する鋼球例えば6bは、図1(a)に示すように、跳ね上げ駒10を経て跳ね上げ板11a上に乗り上げ、この鋼球の乗上げは、跳ね上げ駒10の円形コンベア側端部および跳ね上げ板11の円形コンベア側端部がテーパ状に形成されていることから、円滑かつ確実に行われ、この鋼球6bによって、鋼球の流れが阻害されることを未然に防止することができる。
【0032】
これに対し、案内溝4a内の鋼球6に重なりながら移動する移動する鋼球例えば6aは、図2に示すように、直接跳ね上げ板11a上に乗り上げ、この乗上げは、跳ね上げ板11の円形コンベア側端部がテーパ状に形成されているとともに案内溝4aの底部と跳ね上げ板11aの下面との間の間隔がhに設定されていることによって、鋼球6bの乗上げと同様に、円滑かつ確実に行われ、この鋼球6aによって、鋼球の流れが阻害されることを未然に防止することができる。
【0033】
跳ね上げ板11a上に乗り上げた鋼球は、跳ね上げ板11a上面の傾斜に沿って戻しコンベア12の搬送入口まで導かれ、戻しコンベア12は鋼球を戻しシュート14内に搬送する。この戻しシュート14は、鋼球6を傾斜シュート4へ導くように傾斜シュート4側に傾斜した斜面を有し、戻しシュート14内に搬送された鋼球は、その戻しシュート14によって傾斜シュート4内に戻される。
【0034】
案内溝4aに受け入れられた鋼球6は、その案内溝4a内を移動するが、各案内溝4aと跳ね上げ板11aと跳ね上げ駒10とによって形成される各導入路に流れ込むと、鋼球6は各導入路毎に1列に整列しながら移動し、案内溝4a間の鋼球移動が阻止される。各案内溝4aと跳ね上げ板11aと跳ね上げ駒10とによって形成される各導入路を経た鋼球は、各案内溝4aと上板13と跳ね上げ駒10とによって形成される各導入路に流れ込み、各導入路毎に1列に整列しながら研磨盤本体入口に導かれる。
【0035】
また、各導入路の案内溝4aの底部と跳ね上げ板11aの下面との間の間隔h、および案内溝4aの底部と上板13の下面との間の間隔hを上述の(2)式を満足する値特に1.1D以上の値に設定することによって、各導入路内において研磨液の粘性の影響により鋼球6の流れが円滑でなくなるなどの不具合は発生しない。特に鋼球6の直径寸法が小さいときには、研磨液の粘性の影響を受け易いが、間隔hを1.1D以上の値に設定することによって、その研磨液の粘性の影響を受けることを回避することができる。
【0036】
逆に、上限に関しては、研磨液の粘性や傾斜シュート4の傾斜の大きさに応じて上述の(2)式より多少大きくてもよい。
【0037】
鋼球が研磨盤本体入口に流れ込むとき、上板13の傾斜シュート4の曲げ部分に対向する部分が所定の曲率Rで曲げられているから、鋼球6は、研磨盤本体の回転盤1と固定盤2との間に円滑に流れ込み、その流れ込み時に鋼球6が回転盤1に大きな力で衝突することはない。特に、鋼球6の流れ込み速度が大きいときに、鋼球6の回転盤1との衝突が緩和されるから、その衝突力による鋼球6に損傷を無くすことができる。
【0038】
また、上板13の傾斜シュート4の曲げ部分に対向する部分の曲率Rを上述の(1)を満足するように設定することによって、鋼球6の流れ込み速度が大きいときにおける鋼球6と回転盤1との衝突をさらに緩和することができる。
【0039】
さらに、鋼球6は、各案内溝4aと上板13と跳ね上げ駒10とによって形成される各導入路毎に1列に整列しながら研磨盤本体入口に導かれるから、鋼球の咬み込みをなくすことができる。
【0040】
以上により、本実施の形態の鋼球供給装置20によれば、研磨盤本体による加工時間を短縮するように、円形コンベアの回転速度を増大させることによって鋼球の単位時間当りの供給個数の増大を図るとき、傾斜シュート4内における鋼球の流れを阻害する鋼球6a,6bを傾斜シュート4外に一旦取り出すことができるから、傾斜シュート4内における鋼球6は円滑に流れ、鋼球の単位時間当りの供給個数の増大に対応することができる。例えば、先に示した直径1mm、1ロット100Kgの場合では、1ロットを1回通すのに従来20分要していたものが半分の10分でできるようになり、これに伴い研磨加工に要する時間もほぼ半分に短縮することができる。
【0041】
また、鋼球の単位時間当りの供給個数の増大させたときでも、鋼球6を1列に整列させなが研磨盤本体入口に導くから、鋼球の咬み込みなどによる鋼球の損傷を未然に防止することができる。
【0042】
(実施の第2形態)
次に、本発明の実施の第2形態について図3を参照しながら説明する。図3は本発明の鋼球供給装置の実施の第2形態における傾斜シュート周りの縦断面図である。
【0043】
本実施の形態では、図3に示すように、上板13に開口を設け、その開口を介して移動中の鋼球にその移動方向に送り力を作用させるための定配制御機構16を設けている。
【0044】
この定配制御機構16は、駆動モータなどによって図中の矢印の方向へ回転される軸16aに取り付けられ、その軸16aの周りに等間隔に配列されている複数のブラシ状の突起16bを有する回転体からなり、その回転体は、ブラシ状の突起16bが上板13の開口を介して鋼球6に接触可能なように位置決めされている。
【0045】
定配制御機構16は、駆動モータなどによって複数のブラシ状の突起16bを回転させ、回転中の各ブラシ状の突起16bを移動中の鋼球6に接触させることによって、鋼球6にその移動方向に送り力を作用させる。これによって、鋼球6は所定の送り力で送り出されるとともに、鋼球6の送出し間隔が制御される。すなわち、各ブラシ状の突起16bの回転速度を制御することによって、鋼球6の供給速度、その供給間隔を制御することができ、より安定した鋼球供給を行うことができる。
【0046】
【発明の効果】
以上に説明したように、請求項1記載の鋼球供給装置によれば、円形コンベアの出口から搬出された鋼球を鋼球研磨盤の入口へ整列させながら導くための案内溝が形成され、その案内溝における鋼球研磨盤入口近傍部分の上方が上板で閉じられている傾斜シュートを設け、案内溝の外部に押し出された鋼球は咬み込み防止オーバーフロー機構で傾斜シュートの上板の上流側位置で傾斜シュートから取り出され、その傾斜シュートから取り出された鋼球は戻し機構で円形コンベア側へ戻されるから、円形コンベアの回転速度を増大させることによって鋼球の単位時間当りの供給個数の増大を図るとき、傾斜シュート内における鋼球の流れを円滑にすることができ、鋼球の単位時間当りの供給個数の増大に対応することができるとともに、傾斜シュートによって鋼球を整列させなが研磨盤本体入口に導くことができ、鋼球の咬み込みなどをなくすことができる。よって、鋼球研磨盤の研磨盤本体への単位時間当りの鋼球供給個数を増大させ加工時間の短縮化を図ることができるとともに、その鋼球供給個数の増大に起因する鋼球の損傷を未然に防止することができる。
【図面の簡単な説明】
【図1】本発明の鋼球供給装置の実施の第1形態の主要部の上面およびその断面を示す図である。
【図2】図1の傾斜シュートの縦断面図である。
【図3】本発明の鋼球供給装置の実施の第2形態における傾斜シュート周りの縦断面図である。
【図4】従来の鋼球研磨盤の構成を示す全体図である。
【図5】図4の鋼球供給装置から鋼球研磨盤内へ鋼球を案内する傾斜シュートの平面およびその断面を示す図である。
【図6】図5の傾斜シュートにおける鋼球の流れを示す側面図である。
【符号の説明】
1 回転盤
2 固定盤
4 傾斜シュート
4a 案内溝
6,6a,6b 鋼球
10 跳ね上げ駒(咬み込み防止オーバーフロー機構)
11 跳ね上げ部(咬み込み防止オーバーフロー機構)
11a 跳ね上げ板(咬み込み防止オーバーフロー機構)
12 戻しコンベア(戻し機構)
13 上板
14 戻しシュート(戻し機構)
15 駆動モータ(戻し機構)
20 鋼球供給装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a steel ball supply device that uses a circular conveyor to supply a steel ball to a steel ball polishing machine, and in particular, a steel ball supply suitable for a steel ball polishing machine used in a steel ball manufacturing process such as a rolling bearing. Relates to the device.
[0002]
[Prior art]
Generally, in the manufacturing process of a steel ball such as a rolling bearing, the steel ball is polished by a steel ball polishing machine, and a steel ball supply device is used to supply the steel ball to the steel ball polishing machine.
[0003]
A steel ball polishing machine using this steel ball supply device will be described with reference to FIGS. FIG. 4 is an overall view showing the configuration of a conventional steel ball polishing machine, and FIG. 5 is a diagram showing a plane and a cross section of an inclined chute for guiding a steel ball from the steel ball supply device of FIG. 4 into the steel ball polishing machine. 6 is a side view showing the flow of the steel ball in the inclined chute of FIG.
[0004]
As shown in FIG. 4, the steel ball polishing machine includes a steel ball supply device 50. The steel ball supply device 50 has a circular conveyor 3. The circular conveyor 3 is composed of a disc-shaped moving portion 3a rotated by a drive mechanism (not shown) and a fixed outer wall 3b surrounding the periphery, and the moving portion 3a and the fixed outer wall 3b cooperate with each other. A steel ball housing space is formed.
[0005]
The fixed outer wall 3b is provided with a damming plate 3c for damming the steel ball conveyed by the rotational drive of the moving portion 3a and for guiding the steel ball to the outlet 3d.
[0006]
Connected to the outlet 3d is an inclined chute 4 for guiding the steel balls discharged therefrom to the main body of the polishing disk by its own weight and polishing liquid. As shown in FIGS. 5A and 5B, the inclined chute 4 has a concave cross-sectional shape that opens upward, and a steel ball is guided to the bottom of the inclined chute 4 while being aligned with the inlet of the polishing disc body. A plurality of guide grooves 4a are formed.
[0007]
As shown in FIG. 4, the polishing disk main body is composed of a fixed disk 2 and a rotating disk 1 that rotates while being pressed with a predetermined processing force. A plurality of grooves (not shown) for receiving steel balls are formed concentrically on the surface of the rotating disk 1 facing the fixed disk 2. Similarly, a plurality of grooves (not shown) for receiving steel balls are concentrically formed on the surface of the fixed platen 2 facing the rotating plate 1, and each groove is arranged to face the corresponding groove of the rotating plate 1. Has been.
[0008]
The steel balls supplied from the inclined chute 4 are held between the rotating plate 1 and the fixed platen 2 by the groove of the rotating plate 1 and the groove of the fixed platen 2 opposed to the groove at a substantially constant interval in the supply order. Each steel ball held by the rotation of 1 is moved along the groove of the stationary platen 2 while receiving a predetermined pressure from the rotating platen 1. By this movement, the steel balls are polished, and one polishing process (one cycle) is performed every two rotations of the turntable 1. The polished steel balls are carried out to the outside through the exit chute 5.
[0009]
In this steel ball polishing machine, for example, when one lot of 100 kg is polished on a steel ball having a diameter of 10 mm, it takes 20 minutes to polish one cycle of the steel balls in one cycle. The desired finishing accuracy is obtained by repeating the circulation between the circular conveyor 3 and the polishing disc body many times. In order to shorten the processing time, the flow rate of the steel balls into the polishing disc body, that is, A method of increasing the number of supplies per unit time has been considered.
[0010]
That is, in general machining conditions, the steel balls are supplied so as to ensure a substantially constant spacing between the steel balls arranged on the same circumference between the rotating disk 1 and the fixed disk 2. However, the polishing amount per cycle of the steel balls is determined according to the processing pressure per one ball without depending on the interval between the steel balls. If the number of steel balls supplied is increased so that the distance between the steel balls arranged on the same circumference between each other is increased, the number of steel balls processed per cycle will increase. Processing time can be shortened. For example, if the supply number is doubled as usual, the processing time can be halved.
[0011]
[Problems to be solved by the invention]
In order to increase the flow speed of the steel balls into the main body of the polishing disk, that is, the supply number per unit time, the supply speed of the circular conveyor 3 can be increased by increasing the rotational speed of the circular conveyor 3. When the rotational speed is increased, some steel balls that are not received in the guide grooves 4a in the inclined chute 4 obstruct the flow of other steel balls, and this can correspond to an increase in the number of steel balls supplied per unit time. Can not. Further, if the steel balls in the guide grooves 4a and the steel balls pushed out from the grooves 4a are supplied to the main body of the polishing disk while being overlapped, biting between the steel balls occurs, and the steel balls are harmfully damaged. Such problems may occur.
[0012]
Specifically, as shown in FIG. 5A, in the inclined chute 4, a part of the steel balls 6 b that are not received in the guide grooves 4 a in the steel balls 6 discharged from the circular conveyor 3 are formed in the guide grooves 4 a. The number of steel balls corresponding to the increase in the rotational speed of the circular conveyor 3 cannot be supplied. Further, as shown in FIG. 5A, the steel ball 6a pushed out from the guide groove 4a moves to the polishing disk main body entrance while overlapping with the steel ball 6 in the guide groove 4a. When the steel ball 6a moves to the polishing disk main body entrance while overlapping with the steel ball 6 in the guide groove 4a, the steel ball 6a receives the rotational force of the rotating disk 1 at a portion a as shown in FIG. The steel ball may be damaged and both steel balls may be damaged.
[0013]
Therefore, this inclined chute 4 cannot cope with an increase in the number of steel balls supplied per unit time accompanying an increase in the rotational speed of the circular conveyor 3. That is, in the conventional steel ball supply device 50, the number of steel balls supplied per unit time to the polishing board main body cannot be increased by increasing the rotation speed of the circular conveyor 3.
[0014]
The object of the present invention is to increase the number of steel balls supplied per unit time to the main body of the steel ball polishing machine and to prevent damage to the steel balls due to the increase in the number of supplied steel balls. An object of the present invention is to provide a steel ball supply device capable of performing the above.
[0015]
[Means for Solving the Problems]
The invention according to claim 1 is the steel ball supply device using a circular conveyor for supplying the steel balls to the steel ball polishing machine, wherein the steel balls carried out from the outlet of the circular conveyor are supplied to the inlet of the steel ball polishing machine. A guide groove for guiding while being aligned is formed, and an inclined chute in which the upper portion of the guide ball in the vicinity of the steel ball polishing board entrance is closed by an upper plate, and a steel ball pushed out of the guide groove A biting prevention overflow mechanism for taking out from the inclined chute at a position upstream of the upper plate of the inclined chute, and a return mechanism for returning the steel balls taken out from the inclined chute by the biting prevention overflow mechanism to the circular conveyor side with the door, preventing overflow mechanism narrowing the bite, the end of the carousel side inclined steel balls extruded to the outside of the guide groove from the end portion And riding portion raising Ri, and having a ramp for guiding the riding portion of the steel ball to the return mechanism side riding on.
[0016]
In the steel ball supply device according to claim 1, a guide groove is formed for guiding the steel ball carried out from the exit of the circular conveyor while being aligned with the inlet of the steel ball polishing machine, and the steel ball polishing machine inlet in the guide groove is formed. The upper part of the vicinity is provided with an inclined chute that is closed by the upper plate, and the steel ball pushed out of the guide groove is taken out of the inclined chute at a position upstream of the upper plate of the inclined chute by the biting prevention overflow mechanism, Since the steel balls taken out from the inclined chute are returned to the circular conveyor by the return mechanism, when increasing the number of steel balls supplied per unit time by increasing the rotational speed of the circular conveyor, The flow of the steel balls can be made smooth, and the increase in the number of steel balls supplied per unit time can be accommodated, and the steel balls are aligned by the inclined chute. Can lead to long-grinder body inlet, it can be eliminated, such as bite of the steel ball.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0018]
(First embodiment)
FIG. 1 is a view showing an upper surface and a cross section of a main part of a first embodiment of a steel ball supply apparatus according to the present invention, and FIG. 2 is a vertical cross sectional view of the inclined chute of FIG. In the present embodiment, only the main part of the present invention will be described, and the description of the same part as the conventional one will be simplified or omitted.
[0019]
In the manufacturing process of steel balls such as rolling bearings, the steel balls are polished by a steel ball polishing machine. The steel ball polishing machine has a fixed plate 2 and a predetermined processing force as shown in FIG. It comprises a polishing disc body composed of a rotating disc 1 that rotates while being pressed, and a steel ball supply device 20 that supplies steel balls to the polishing disc body.
[0020]
The steel ball supply device 20 has a circular conveyor (not shown), and the configuration of the circular conveyor is the same as the configuration described in the related art.
[0021]
An inclined chute 4 is connected to the exit 3d of the circular conveyor to guide the steel balls 6 discharged therefrom to the main body of the polishing board by its own weight and polishing liquid. The inclined chute 4 has a concave cross-sectional shape that opens upward, and a plurality of guides for guiding the steel ball 6 while aligning it to the inlet of the polishing disc main body are arranged at the bottom thereof as shown in FIG. 4 (b). A guide groove 4a is formed. A portion of the inclined chute 4 in the vicinity of the polishing main body entrance is bent into an arc shape in which the groove of the stationary plate and the guide groove 4a are smoothly connected along the flowing direction of the steel ball, and the radius of curvature is set to r.
[0022]
An upper plate 13 that covers the upper portion of the guide groove 4a at the position of the inclined chute 4 near the polishing body board entrance is provided, and the portion of the upper plate 13 that faces the bent portion of the inclined chute 4 is shown in FIG. Thus, it is bent with a predetermined radius of curvature R, and the center of curvature is the same as the center of curvature r of the inclined chute 4. The radius of curvature R is preferably set to satisfy the following relational expression (1).
[0023]
r + 1.1D ≦ R ≦ r + 1.2D (1)
However, the upper limit may be slightly increased depending on conditions such as the magnitude of the inclination of the inclined chute 4. In addition, D in a type | formula shows the diameter dimension of the steel ball 6. FIG.
[0024]
The distance between the lower surface of the upper plate 13 and the bottom of the guide groove 4a is defined to be the distance h described later by the flip-up piece 10 described later.
[0025]
At the position between the upper plate 13 and the circular conveyor in the inclined chute 4, a biting prevention overflow mechanism for taking out the steel balls pushed out of the guide groove 4 a, for example, the steel balls 6 a and 6 b from the inclined chute 4 is arranged. Has been.
[0026]
This biting prevention overflow mechanism includes a plurality of flip-up pieces 10 and a flip-up portion 11. Each flip-up piece 10 is formed of an elongated plate-like member extending along the guide groove 4a, and the member is disposed between the corresponding guide grooves 4a. The end of the flip-up piece 10 on the circular conveyor side is formed in a tapered shape so as to incline in the direction along the guide groove 4a.
[0027]
The flip-up portion 11 is made of a frame disposed above the inclined chute 4, and a side portion of the frame facing the circular conveyor receives the steel ball pushed out of the guide groove 4 a of the inclined chute 4 and Opened to drain. The flip-up portion 11 has a flip-up plate 11a, and the circular conveyor side end of the flip-up plate 11a is formed in a tapered shape. The upper surface of the flip-up plate 11a is guided along a first slope portion inclined toward one side of the inclined chute 4 so as to guide the received steel ball to the outside of the inclined chute 4 and the first inclined surface. It consists of the 2nd slope inclined to the circular conveyor side so that the steel ball which was written may be guided to the circular conveyor side. As shown in FIG. 1B, the lower surface of the flip-up plate 11a is a surface parallel to the guide groove 4a, and the distance h between the lower surface and the bottom of the guide groove 4a is equal to or greater than the diameter D of the steel ball 6. Is specified by the flip-up piece 10. The interval h is preferably set so as to satisfy the following relational expression (2).
[0028]
1.1D ≦ h ≦ 1.2D (2)
The steel ball 6 guided along the second slope of the flip-up plate 11a is returned to the position near the entrance of the inclined chute 4 by the return mechanism. The return mechanism guides the steel ball 6 conveyed by the return conveyor 12 to the position near the entrance of the inclined chute 4 and the return conveyor 12 that conveys the steel ball 6 guided along the second slope of the flip-up plate 11a. Return chute 14. The return conveyor 12 is a conveyor with a hook, for example, a chain conveyor, and a drive motor 15 is used to drive it.
[0029]
Next, the supply operation | movement by the steel ball supply apparatus 20 is demonstrated.
[0030]
Each steel ball 6 sent out from the circular conveyor to the inclined chute 4 moves in the inclined chute 4 toward the polishing disk main body entrance while overlapping each other by its own weight and polishing liquid. A part of the moving steel ball 6 is received in the guide groove 4a and moves along the guide groove 4a. However, other steel balls such as 6a and 6b that overlap the part of the steel ball 6 are The guide groove 4a is not accepted and moves while being pushed out of the guide groove 4a.
[0031]
During the movement, the steel balls 6a, 6b, etc. ride on the flip-up piece 10, and then ride on the jump-up plate 11a or directly on the jump-up plate 11a. Specifically, as shown in FIG. 1A, a steel ball, for example, 6b, positioned between the guide grooves 4a rides on the flip-up plate 11a through the flip-up piece 10, Since the circular conveyor side end of the flip-up piece 10 and the circular conveyor side end of the flip-up plate 11 are formed in a tapered shape, the steel ball 6b allows the flow of the steel ball to be performed smoothly and reliably. It is possible to prevent obstruction.
[0032]
On the other hand, a moving steel ball, for example, 6a that moves while overlapping with the steel ball 6 in the guide groove 4a rides directly on the flip-up plate 11a, as shown in FIG. The end of the circular conveyor is tapered and the distance between the bottom of the guide groove 4a and the lower surface of the flip-up plate 11a is set to h, so that the steel ball 6b is lifted up. In addition, it is possible to prevent the flow of the steel balls from being obstructed by the steel balls 6a.
[0033]
The steel ball riding on the flip-up plate 11a is guided to the transport entrance of the return conveyor 12 along the inclination of the upper surface of the flip-up plate 11a, and the return conveyor 12 transports the steel ball into the return chute 14. The return chute 14 has a slope inclined toward the inclined chute 4 so as to guide the steel ball 6 to the inclined chute 4, and the steel ball conveyed into the return chute 14 is moved into the inclined chute 4 by the return chute 14. Returned to
[0034]
The steel ball 6 received in the guide groove 4a moves in the guide groove 4a. When the steel ball 6 flows into each introduction path formed by each guide groove 4a, the flip-up plate 11a, and the flip-up piece 10, the steel ball 6 moves while being aligned in a row for each introduction path, and the movement of the steel balls between the guide grooves 4a is prevented. The steel balls that have passed through the respective introduction paths formed by the respective guide grooves 4a, the flip-up plates 11a, and the flip-up pieces 10 enter the respective introduction paths formed by the respective guide grooves 4a, the upper plate 13, and the flip-up pieces 10. It flows in and is guided to the polishing disk main body inlet while being aligned in a row for each introduction path.
[0035]
In addition, the distance h between the bottom of the guide groove 4a and the lower surface of the flip-up plate 11a and the distance h between the bottom of the guide groove 4a and the lower surface of the upper plate 13 in each introduction path are expressed by the above formula (2). By setting the value to satisfy the value of 1.1D or more, in particular, there is no problem that the flow of the steel ball 6 becomes unsmooth due to the influence of the viscosity of the polishing liquid in each introduction path. In particular, when the diameter of the steel ball 6 is small, it is easily affected by the viscosity of the polishing liquid. However, by setting the interval h to a value of 1.1D or more, the influence of the viscosity of the polishing liquid is avoided. be able to.
[0036]
On the contrary, the upper limit may be slightly larger than the above equation (2) according to the viscosity of the polishing liquid and the inclination of the inclined chute 4.
[0037]
When the steel ball flows into the grinder main body inlet, the portion of the upper plate 13 that faces the bent portion of the inclined chute 4 is bent with a predetermined curvature R. Therefore, the steel ball 6 is connected to the rotating disc 1 of the grinder main body. The steel ball 6 flows smoothly between the stationary platen 2 and the steel ball 6 does not collide with the rotating plate 1 with a large force. Particularly, when the inflow speed of the steel ball 6 is high, the collision of the steel ball 6 with the rotating disk 1 is alleviated, so that damage to the steel ball 6 due to the collision force can be eliminated.
[0038]
Further, by setting the curvature R of the portion of the upper plate 13 facing the bent portion of the inclined chute 4 so as to satisfy the above-mentioned (1), the rotation of the steel ball 6 and the steel ball 6 when the inflow speed of the steel ball 6 is high. The collision with the board 1 can be further mitigated.
[0039]
Further, since the steel balls 6 are guided to the inlet of the polishing board while being aligned in a row for each introduction path formed by each guide groove 4a, the upper plate 13, and the flip-up piece 10, the biting of the steel balls is performed. Can be eliminated.
[0040]
As described above, according to the steel ball supply device 20 of the present embodiment, the number of steel balls supplied per unit time is increased by increasing the rotational speed of the circular conveyor so as to reduce the processing time of the polishing board body. Therefore, the steel balls 6a and 6b that obstruct the flow of the steel balls in the inclined chute 4 can be temporarily taken out of the inclined chute 4, so that the steel balls 6 in the inclined chute 4 flow smoothly and the steel balls It is possible to cope with an increase in the number of supplies per unit time. For example, in the case of a diameter of 1 0 mm, 1 lot 100Kg indicated above, that it takes the conventional 20 minutes to pass once one lot is to be at 10 minutes half polished Accordingly The time required for this can be reduced to almost half.
[0041]
Further, even when the supply number of steel balls per unit time is increased, the steel balls 6 are not aligned but are guided to the polishing disk main body entrance, so that the steel balls are not damaged due to the biting of the steel balls. Can be prevented.
[0042]
(Second embodiment)
Next, a second embodiment of the present invention will be described with reference to FIG. FIG. 3 is a longitudinal sectional view around the inclined chute in the second embodiment of the steel ball supply device of the present invention.
[0043]
In the present embodiment, as shown in FIG. 3, an opening is provided in the upper plate 13, and a constant distribution control mechanism 16 is provided for causing a feeding force to act on the moving steel ball through the opening in the moving direction. ing.
[0044]
This constant distribution control mechanism 16 is attached to a shaft 16a rotated in the direction of the arrow in the figure by a drive motor or the like, and has a plurality of brush-like projections 16b arranged at equal intervals around the shaft 16a. The rotating body is positioned so that the brush-like protrusion 16b can contact the steel ball 6 through the opening of the upper plate 13.
[0045]
The fixed distribution control mechanism 16 rotates a plurality of brush-like protrusions 16b by a drive motor or the like, and brings each rotating brush-like protrusion 16b into contact with the moving steel ball 6, thereby moving the steel ball 6 to its movement. Apply feed force in the direction. As a result, the steel balls 6 are sent out with a predetermined feed force, and the delivery interval of the steel balls 6 is controlled. That is, by controlling the rotation speed of each brush-like protrusion 16b, the supply speed of the steel balls 6 and the supply interval thereof can be controlled, and a more stable supply of steel balls can be performed.
[0046]
【The invention's effect】
As described above, according to the steel ball supply device according to claim 1, a guide groove is formed for guiding the steel balls carried out from the outlet of the circular conveyor while aligning them to the inlet of the steel ball polishing machine, An inclined chute is provided in which the upper part of the guide groove in the vicinity of the entrance of the steel ball polishing board is closed by the upper plate, and the steel ball pushed out of the guide groove is upstream of the upper plate of the inclined chute by the biting prevention overflow mechanism. Since the steel balls taken out from the inclined chute at the side position and returned from the inclined chute are returned to the circular conveyor by the return mechanism, the number of steel balls supplied per unit time can be increased by increasing the rotational speed of the circular conveyor. When the increase is made, the flow of the steel balls in the inclined chute can be made smooth, and the increase in the number of steel balls supplied per unit time can be accommodated. Although such align the steel ball can be guided to the polishing plate body inlet by chromatography preparative it can be eliminated and biting of the steel ball. Therefore, the number of steel balls supplied to the grinder body of the steel ball grinder can be increased to shorten the processing time, and damage to the steel balls due to the increase in the number of steel balls supplied can be reduced. It can be prevented in advance.
[Brief description of the drawings]
FIG. 1 is a view showing an upper surface of a main part of a first embodiment of a steel ball supply device of the present invention and a cross section thereof.
2 is a longitudinal sectional view of the inclined chute of FIG. 1. FIG.
FIG. 3 is a longitudinal sectional view around an inclined chute in a second embodiment of the steel ball supply device of the present invention.
FIG. 4 is an overall view showing a configuration of a conventional steel ball polishing machine.
5 is a view showing a plane of an inclined chute for guiding a steel ball from the steel ball supply device of FIG. 4 into a steel ball polishing machine and a cross section thereof. FIG.
6 is a side view showing the flow of a steel ball in the inclined chute of FIG. 5. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Rotating disc 2 Fixed disc 4 Inclined chute 4a Guide groove 6, 6a, 6b Steel ball 10 Bounce-up piece (biting prevention overflow mechanism)
11 Bounce-up part (biting prevention overflow mechanism)
11a Bounce-up plate (biting prevention overflow mechanism)
12 Return conveyor (return mechanism)
13 Upper plate 14 Return chute (return mechanism)
15 Drive motor (return mechanism)
20 Steel ball feeder

Claims (1)

鋼球研磨盤への鋼球供給に円形コンベアを用いている鋼球供給装置において、前記円形コンベアの出口から搬出された鋼球を前記鋼球研磨盤の入口へ整列させながら導くための案内溝が形成され、その案内溝における前記鋼球研磨盤入口近傍部分の上方が上板で閉じられている傾斜シュートと、前記案内溝の外部に押し出された鋼球を前記傾斜シュートの上板の上流側位置で前記傾斜シュートから取り出すための咬み込み防止オーバーフロー機構と、前記咬み込み防止オーバーフロー機構によって前記傾斜シュートから取り出された鋼球を前記円形コンベア側へ戻す戻し機構とを備え、
前記咬み込み防止オーバーフロー機構は、前記円形コンベア側の端部が傾斜し、該端部から前記案内溝の外部に押し出された鋼球が乗り上げる乗り上げ部と、前記乗り上げ部に乗り上げた鋼球を前記戻し機構側へ導く傾斜路とを有することを特徴とする鋼球供給装置。
In a steel ball supply apparatus using a circular conveyor for supplying a steel ball to a steel ball polishing machine, a guide groove for guiding the steel balls carried out from the outlet of the circular conveyor while aligning them to the inlet of the steel ball polishing machine An inclined chute in which the upper portion of the guide groove in the vicinity of the steel ball polishing disk entrance is closed by an upper plate, and the steel ball pushed out of the guide groove is disposed upstream of the upper plate of the inclined chute. A biting prevention overflow mechanism for taking out from the inclined chute at a side position, and a return mechanism for returning the steel ball taken out from the inclined chute by the biting prevention overflow mechanism to the circular conveyor side,
The bite prevention overflow mechanism has an end portion on the circular conveyor side inclined, a steel ball pushed out of the guide groove from the end portion, and a steel ball riding on the ride portion. A steel ball supply device comprising an inclined path leading to the return mechanism side .
JP11059596A 1996-04-08 1996-04-08 Steel ball feeder Expired - Fee Related JP3843482B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP11059596A JP3843482B2 (en) 1996-04-08 1996-04-08 Steel ball feeder
US08/835,477 US5921851A (en) 1996-04-08 1997-04-08 Sphere polisher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11059596A JP3843482B2 (en) 1996-04-08 1996-04-08 Steel ball feeder

Publications (2)

Publication Number Publication Date
JPH09278157A JPH09278157A (en) 1997-10-28
JP3843482B2 true JP3843482B2 (en) 2006-11-08

Family

ID=14539847

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11059596A Expired - Fee Related JP3843482B2 (en) 1996-04-08 1996-04-08 Steel ball feeder

Country Status (1)

Country Link
JP (1) JP3843482B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5169051B2 (en) * 2007-07-25 2013-03-27 株式会社ジェイテクト Sphere processing equipment
JP5402295B2 (en) * 2009-06-22 2014-01-29 株式会社ジェイテクト Sphere polishing equipment
CN101817447B (en) 2010-01-21 2012-05-02 上海克来机电自动化工程有限公司 Steel ball automatic discharge conveying device
CN110124806B (en) * 2019-04-24 2024-05-24 本钢板材股份有限公司 Automatic ball adding machine
CN110861894B (en) * 2019-12-10 2024-06-14 苏州吉禄自动化科技有限公司 Steel ball feeding equipment and method
CN110899603B (en) * 2019-12-19 2024-09-24 江苏钰特耐磨科技有限公司 A non-powered three-point shooting device
CN112720085B (en) * 2021-01-27 2024-07-30 镇江润茂钢球有限公司 Grinding tool for steel ball machining and application method thereof
CN116142588B (en) * 2022-12-22 2024-04-16 中信重工机械股份有限公司 Intelligent ball feeding machine for adding various types of steel balls
CN116948777B (en) * 2023-09-18 2023-12-08 山西荣欣酿造有限公司 Vinegar fermentation device and use method thereof
CN118926197B (en) * 2024-10-14 2025-03-25 江苏日升电力机械有限公司 Steel ball cleaning device

Also Published As

Publication number Publication date
JPH09278157A (en) 1997-10-28

Similar Documents

Publication Publication Date Title
JP3843482B2 (en) Steel ball feeder
US4604881A (en) Shot peening machine
KR950014079B1 (en) Coin dispenser
CN108789160B (en) Bearing ring processing device
CN109551334B (en) a grinding machine
US3984945A (en) Device for lapping balls in continuous operation
KR20000002672A (en) Pipe grinding device
US4492102A (en) Separating and feeding system for a shot peening machine
JP2010149215A (en) Blast device
US5921851A (en) Sphere polisher
KR101522008B1 (en) The pinion gear units to the vehicle ignition device for the automatic polishing equipment
CN212918705U (en) Automatic grinding equipment for outer wall of bearing inner ring
KR20110130680A (en) Strip guide device
CN216097983U (en) Full automated processing grinding machine of magnet
KR101340132B1 (en) Ball separator assembling of ball bearing used rotating instrument
US4599879A (en) Conveyor system for a shot peening machine
US3266694A (en) Wire handling machine
KR102688892B1 (en) Automated conveyor device for transporting small parts
CN223406676U (en) A high-precision bearing roller spherical grinding device
JP2532768B2 (en) Screw material alignment feed device
CN220094269U (en) Abrasive material conveying device and polishing machine
JP2001314637A (en) Spherical body carrying and polishing device
KR100663764B1 (en) chain
JPH05253823A (en) Feeding device of sphere
JPS6236926B2 (en)

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060111

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060313

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060725

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060807

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees