Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3844827B2 - How to use natural stone for wall construction, wall, natural stone for wall construction - Google Patents
[go: Go Back, main page]

JP3844827B2 - How to use natural stone for wall construction, wall, natural stone for wall construction - Google Patents

How to use natural stone for wall construction, wall, natural stone for wall construction Download PDF

Info

Publication number
JP3844827B2
JP3844827B2 JP34777496A JP34777496A JP3844827B2 JP 3844827 B2 JP3844827 B2 JP 3844827B2 JP 34777496 A JP34777496 A JP 34777496A JP 34777496 A JP34777496 A JP 34777496A JP 3844827 B2 JP3844827 B2 JP 3844827B2
Authority
JP
Japan
Prior art keywords
natural stone
stone panel
wall construction
panel
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34777496A
Other languages
Japanese (ja)
Other versions
JPH10183574A (en
Inventor
功 行本
聖記 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KANKYO KOUGAKU, LTD.
Original Assignee
KANKYO KOUGAKU, LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KANKYO KOUGAKU, LTD. filed Critical KANKYO KOUGAKU, LTD.
Priority to JP34777496A priority Critical patent/JP3844827B2/en
Publication of JPH10183574A publication Critical patent/JPH10183574A/en
Application granted granted Critical
Publication of JP3844827B2 publication Critical patent/JP3844827B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)
  • Retaining Walls (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、護岸施工等に用いる壁体施工用自然石、壁体施工用自然石を用いた壁体、壁体施工用自然石の使用方法に関する。
【0002】
【従来の技術】
従来、護岸、擁壁等の壁体を施工する方法として、自然石の空積工法がある。この空積工法は、石工が、石を1個づつ積み、詰石をしながら控部に砕石を詰めて積み上げていくもので、この積み上げにより、護岸、擁壁等の壁体が構築できることになる。
【0003】
【発明が解決しようとする課題】
しかし、上記空積工法を用いた場合には、当該工法が、石を1個づつ積み、詰石をしながら控部に砕石を詰めて積み上げていくものであることから、詰め石等が外れたようなときには、そこを起点として、積み上げられた自然石が崩れる虞がある。このため、このような空積工法を用いたのでは、安定で強固な壁体を構築できないばかりか、施工中において、既に積み上げた自然石が崩れないように十分に気を配りながら、自然石を積み上げていかなければならない。
【0004】
本発明は以上のような事情を勘案してなされたもので、その目的は、自然石壁面を有する壁体の施工を容易にすると共に、そのような施工を行ったとしても、安定で強固な壁体を構築できるようにすることにある。
【0005】
【課題を解決するための手段】
上記目的を達成するために請求項1の発明にあっては、
自然石パネルの一面に、積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され
前記積み台は、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有している、ことを特徴とする壁体施工用自然石とした構成としてある。
【0006】
また、請求項1の発明の好ましい態様としては、請求項2〜の記載の通りとなる。
【0007】
上記目的を達成するために請求項の発明にあっては、
壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものが備えられ、
前記壁体施工用自然石が、該自然石パネルを外方に向けつつ複数段に積み重ねられ、
前記各壁体施工用自然石における積み台が充填材料により埋設されている、
ことを特徴とする壁体とした構成としてある。
【0008】
上記目的を達成するために請求項の発明にあっては、
壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものを用意し、
前記壁体施工用自然石を、順次、前記自然石パネルを外方に向けつつ複数段に積み重ねる一方、前記各壁体施工用自然石における積み台を充填材料により埋設する、
ことを特徴とする壁体施工用自然石の使用方法とした構成としてある。
【0009】
【発明の効果】
請求項1に記載された発明によれば、当該壁体施工用自然石が、自然石パネルの一面に積み台が該自然石パネルの一面から突出するようにして結合されているものであることから、当該壁体施工用自然石を、その自然石パネルを外方側に向けつつ順次、積み上げさえすれば、外方側において、自然石壁面を形成できる一方、その施工の段階から、積み台が、自然石パネルを基準として法面側に荷重をかけた状態で当該壁体施工用自然石の安定な載置状態を確保し、当該壁体施工用自然石を安定な積み上げ状態とすることができることになる。しかも、積み台を充填材料により順次、埋設すれば、その充填材料の重量、その重量を受ける積み台の面に対して働く摩擦力、結合力等により各積み台(自然石パネル)の保持状態(移動規制)を強固なものとすることができることになる。このため、当該壁体施工用自然石を用いることにより、自然石壁面を有する壁体の施工を容易にできると共に、そのような施工を行ったとしても、安定で強固な壁体を構築できることになる。
また、当該壁体施工用自然石は、全体的にではなく、部分的に自然石パネルが用いられることから、自然石の使用量を減らして、自然石を効果的に使用できることになる。
【0010】
さらに、積み台が、自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有していることから、積み台を充填材料により埋設すれば、その積み台における貫通孔内、すなわち、自然石パネルと連結部との間にも充填材料が充填されることになり、その充填された充填材料よって連結部の外方側(自然石パネル側)への移動が規制されて、一層確実に、当該壁体施工用自然石が滑落することを防止できることになる。このため、当該壁体施工用自然石を用いることにより、より安定で強固な壁体を構築できることになる。
【0011】
請求項2に記載された発明によれば、当該壁体施工用自然石の積み台が、自然石パネルの一面から離間するに従って横方向において狭まるようにされていることから、当該壁体施工用自然石を、横方向において隣合う壁体施工用自然石に対して傾かせて配置するとしても、隣合う壁体施工用自然石の積み台同士が干渉することを回避できることになり、当該壁体施工用自然石を、その自然石パネルを外方側に向けつつ横方向に並べて、複数の自然石パネルにより湾曲面を形成できることになる。このため、当該壁体施工用自然石を用いることにより、湾曲した自然石壁面を有する壁体を構築できることになる。
【0012】
請求項に記載された発明によれば、積み台が、板材を曲げ加工することにより形成されていることから、積み台を簡単に形成できることになる。
【0013】
請求項に記載された発明によれば、積み台が、多孔板を曲げ加工することにより形成されていることから、積み台を簡単に形成できるばかりか、その多孔板の目に棒等を通して、複数の壁体施工用自然石を横方向に並べた状態で施工個所に搬送することもできることになる。このため、施工性を向上させることができることになる。
【0014】
請求項に記載された発明によれば、積み台が、コンクリ−トブロックにより形成されていることから、自然石パネルの一面上でコンクリ−トブロックを硬化させることにより、積み台の製造と共に、自然石パネルに対する積み台の接着をも同時に行うことができることになる。このため、壁体施工用自然石の製造を容易にできることになる。
また、コンクリ−トブロックの比較的重い重量を利用して、自然石パネルをその一面側に倒れる方向に作用させておくことができることになる。このため、当該壁体施工用自然石を、自然石壁面の勾配が急になるように積み上げるとしても、外方側に滑落することを確実に防止できることになる。
【0015】
請求項に記載された発明によれば、コンクリ−トブロック内に自然石パネルの一面に結合された補強具が進入された状態で埋設されていることから、コンクリ−トブロックの脆い表面部だけでなくその内部においても結合面積を増大させることができることになり、自然石パネルに対するコンクリ−トブロックの結合強度を向上させることができることになる。
【0016】
請求項に記載された発明によれば、積み台の少なくとも各フランジ部が孔を有し、各フランジ部が、接着剤を該各フランジ部の内面側から孔を通って該フランジ部外面側に溢れ出た状態で、自然石パネルの一面に接着されていることから、自然石パネルとフランジ部とを接着剤を介して接着できるだけでなく、その接着剤は孔を通ってフランジ部外面側に溢れ出て該孔の開口よりも拡径された状態で硬化することになり、そのフランジ部外面側における接着剤硬化部分は物理的に抜け止め機能を発揮することになる。このため、自然石パネルに対する積み台の結合強度を向上させることができることになる。
【0017】
請求項に記載された発明によれば、壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものが備えられ、前記壁体施工用自然石が、該自然石パネルを外方に向けつつ複数段に積み重ねられ、前記各壁体施工用自然石における積み台が充填材料により埋設されていることから、前記請求項1に係る壁体施工用自然石を用いた場合同様、積み台が、自然石パネルを基準として法面側に荷重をかけた状態で壁体施工用自然石の安定な載置状態を確保し、壁体施工用自然石を安定な積み上げ状態とすることができることになる。しかも、充填材料の重量、その重量を受ける積み台の面に対して働く摩擦力、結合力等により各積み台(自然石パネル)の保持状態(移動規制)を強固なものとすることができることになる。このため、自然石壁面を有する壁体の施工を容易にできると共に、そのような施工を行ったとしても、安定で強固な壁体を構築できることになる。
また、当該壁体においては、全体的にではなく、部分的に自然石パネルが用いられることから、自然石の使用量を減らして、自然石を効果的に使用できることになる。
【0018】
請求項に記載された発明によれば、壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものを用意し、前記壁体施工用自然石を、順次、前記自然石パネルを外方に向けつつ複数段に積み重ねる一方、前記各壁体施工用自然石における積み台を充填材料により埋設することから、この方法を用いることにより、前述の請求項に係る壁体と同様の壁体を得ることができ、該請求項同様、自然石壁面を有する壁体の施工を容易にできると共に、そのような施工を行ったとしても、安定で強固な壁体を構築でき、しかも、壁体施工において、自然石の使用量を減らして自然石を効果的に使用できることになる。
【0019】
【発明の実施の形態】
以下、本発明の実施形態について図面に基づいて説明する。
図1〜図8は第1実施形態を示すもので、この第1実施形態においては、多数の壁体施工用自然石1を用いて壁体としての護岸10(例えば河川護岸)を施工した内容が示されている。
【0020】
先ず、壁体施工用自然石1について説明する。
各壁体施工用自然石1は、図3〜図7に示すように、自然石パネル2の一面2a(裏面)に、積み台3が該自然石パネル2の一面2aから突出するようにして結合されている。
【0021】
上記自然石パネル2は、機械加工等により厚肉(例えば約50mm程度)の長方形状とされた板状体(例えば長辺約500mm程度、短辺約400mm程度)に形成されており、この自然石パネル2は、その短辺を高さ方向(上下方向)に向け、その長辺を横方向に向けて使用される。この自然石パネル2の一面2aは、できるだけ平坦面に形成され、その他面2bは、自然石の自然感を出すために多少凹凸に形成されている。勿論、この自然石パネル2の他面2bは、施工個所、施工目的等に応じて、平坦面にも、凹凸の程度を高めることも、適宜、行われる。この自然石パネル2の大きさは、任意の大きさとすることができ、その大きさも、施工目的等により適宜、決定される。
【0022】
上記積み台3は、本実施形態においては、上記自然石パネル2と同幅の金網3a(多孔板)を曲げ加工することにより、一対のフランジ部4と、その両フランジ部4を連結する連結部5とを有することになっている。両フランジ部4は、金網3aの両端部に形成されており、その両フランジ部4は、自然石パネル2の一面2aに、その長手方向両端側において、結合されている。連結部5は、自然石パネル2の一面2aから離間するに従って横方向において先細状になるように膨らませるべく、自然石パネル2の一面2aから離れるに従って互いに近づくように傾斜される一対の側壁部6と、その一対の側壁部6をその先端部において跨ぐ後壁部7とを有している。これにより、自然石パネル2の一面2aと積み台3との間に上下方向に貫通する貫通孔8が形成されると共に、自然石パネル2における長手方向両側の一面2a側において、一対の側壁部6形状に基づき、該自然石パネルの一面2aから離れるに従って空間9が形成されることになっている。この積み台3は、フランジ部4及び連結部5の高さが自然石パネル2の高さと同じとされており、この積み台3下面(フランジ部4及び連結部5下面)と自然石パネル2の肉(下面)とにより壁体施工用自然石1の安定な載置状態が確保できることになっている。
【0023】
上記自然石パネル2の一面2aに対する積み台3の結合には、接着剤11が用いられている。接着剤11は、自然石パネル2と積み台3(フランジ部4)との良好な接着関係を得る観点から選択されており、本実施形態においては、エポキシ樹脂等が用いられている。上記自然石パネル2の一面2aに対する上記積み台3のフランジ部4の結合は、図7に示すように、自然石パネル2の一面2a上においてフランジ部4が接着剤11により埋設されるようにして行われており、接着剤11は、フランジ部4の内面側からその網目12を通って該フランジ部4外面側に溢れ出た状態となっている。これにより、接着剤11は、自然石パネルとフランジ部4とを接着すると共に、網目12を通ってフランジ部4外面側に溢れ出て該網目12よりも拡径された状態で硬化することになり、そのフランジ部4外面側における接着剤硬化部分11aは物理的に抜け止め機能を発揮することになっている。
【0024】
次に、上記壁体施工用自然石1の使用方法(護岸10の施工方法)と、その使用方法により施工された護岸10について説明する。
【0025】
護岸10の施工においては、多数の壁体施工用自然石1が、現状の岸に沿った各施工位置に運ばれる。この場合、複数(例えば4個くらい)の壁体施工用自然石1を横方向に並べた状態で、その各積み台3の網目12に棒等を通して、施工個所に搬送される。勿論、各施工位置には、多数の壁体施工用自然石1を他の搬送具を用いて搬送してもよい。
【0026】
施工位置に多数の壁体施工用自然石1が搬送されると、その各壁体施工用自然石1は、図1に示すように、自然石パネル2を外方側に向けると共に隣合う自然石パネル2に対して突き合わせつつ、その岸(或は法面)の勾配に沿わせたり或は必要な勾配(例えば3分等)をもって、順次、積み上げられる。
【0027】
この場合、各段の壁体施工用自然石1の自然石パネル2が、図1に示すように、隣合う上下段において横方向に隣接して並ぶ自然石パネル2間を跨ぐようにして配設されると共に、各積み台の側壁部6が、図2に示すように、その積み台3の下段における積み台3の側壁部6上面上に交差するように載置されることになっている。これにより、壁体施工用自然石1が、安定状態をもって順次、上方に向けて積み上げることができると共に、各段の壁体施工用自然石1の荷重が隣合う下段において横方向に隣接して並ぶ壁体施工用自然石1に作用して、その隣接状態を強固に保持できることになっている。
【0028】
また、この各壁体施工用自然石1の積み上げに際しては、そのとき最上段となっている壁体施工用自然石1の自然石パネル2と法面13との間に、充填材料(裏込材料)としての砕石、土砂、れき、コンクリ−ト廃棄物等(以下、土砂等と称す)14が充填され、その土砂等14により、そのとき最上段となっている壁体施工用自然石1の自然石パネル2の上面とほぼ同一平坦面が形成されることになっている(図1においては、土砂等14は、便宜上、省略されている)。これにより、積み上げるべき次の壁体施工用自然石1(シ−ト体3等)の安定した載置面を確保して、壁体施工用自然石1の積み上げ作業の円滑化を図る共に、積み台3と土砂等14との摩擦力により、その積み台の保持状態を高め、自然石パネル2(壁体施工用自然石1)の滑落(移動)を防止することになっている。特に本実施形態においては、積み台3に貫通孔8が形成されて、その内部にも土砂等14が充填されており、これにより、上記保持能力が高いものとされている。
【0029】
さらに、護岸10の自然石壁面を湾曲面とするときには、図8に示すように、壁体施工用自然石1を、横方向において隣合う壁体施工用自然石1に対して傾かせて配置される。これにより、このように壁体施工用自然石1を配置しても、壁体施工用自然石1の積み台3が、自然石パネル2の一面2aから離間するに従って横方向において狭まるようにされていることから、隣合う壁体施工用自然石1の積み台3同士が干渉することを回避できることになり、壁体施工用自然石1を、その自然石パネル2を外方側に向けつつ横方向に並べて、複数の自然石パネル2により湾曲面を形成できることになる。
【0030】
特に、上記施工においては、自然石パネル2の滑落を一層防止する観点から、自然石パネル2と法面13との間に土砂等14を充填した際に、外部からロ−ラ等により圧力を加えること(転圧)により土砂等14の密度を高め、土砂等14と積み台3との摩擦力が高められる。また、この場合、隣合う壁体施工用自然石1の自然石パネル2同士、或は積み台3同士(例えば上下段の側壁部6同士)を、接着剤等により結合するようにすれば、自然石パネル2滑落防止の観点から、より好ましいものとなる。
【0031】
尚、図1、図2中、符号15は吸い出し防止シ−トである。
【0032】
このような施工の結果、図1、図2に示すように、各壁体施工用自然石1の自然石パネル2が自然石壁面を構成する護岸10を形成することになり、その護岸10においては、水際が魚巣となり法面13部が自然植生が可能となり、多自然護岸を構築することができることになる。
【0033】
図9、図10は第2実施形態、図11〜図13は第3実施形態、図14は第4実施形態を示すものである。この各実施形態において、前記第1実施形態と同一構成要素については同一符号を付してその説明を省略する。
【0034】
第2実施形態においては、積み台3として、金属材料(板材)たるアングル枠材3bを用いて、前記第1実施形態と同様の形状に形成されており、その両フランジ部4には、複数の孔16が形成されている。そして、この両フランジ部4は、接着剤11を該各フランジ部4の内面側から孔16を通って該フランジ部4外面側に溢れ出させた状態で、自然石パネル2の一面2aに接着されている。
【0035】
これにより、積み台3を簡単に形成でき、また、自然石パネル2と積み台3との結合に関し、図10に示すように、自然石パネル2とフランジ部4とを接着剤11を介して接着できるだけでなく、その接着剤11は孔16を通ってフランジ部4外面側に溢れ出て該孔16の開口よりも拡径された状態で硬化し、そのフランジ部4外面側における接着剤硬化部分11aは物理的に抜け止め機能を発揮することになる。また、積み台3が、金属材料(板材)たるアングル枠材3bを用いて形成されていることから、その金属材料の強い強度を利用して、当該壁体施工用自然石1に対してラフな取り扱いをすることができることになる。
【0036】
第3実施形態においては、積み台3がコンクリ−トブロック3cにより形成されている。
【0037】
これにより、自然石パネルの一面2a上でコンクリ−トブロック3cを硬化させることにより、積み台3の製造と共に、自然石パネル2に対する積み台3の接着をも同時に行うことができることになり、壁体施工用自然石1の製造を容易にできることになる。また、コンクリ−トブロック3cの比較的重い重量をも利用して、自然石パネル2をその一面2a側(法面13側)に倒れる方向に作用させておくことができることになり、当該壁体施工用自然石1を、自然石壁面の勾配が急になるように積み上げるとしても、外方側に滑落することを確実に防止できることになる。
【0038】
この場合、コンクリ−トブロック3c表面部の脆い性質を考慮して、コンクリ−トブロック3c内に自然石パネルの一面2aに結合された金具(補強具)17が進入された状態で埋設されており、この金具17により、コンクリ−トブロック3cの脆い表面部だけでなくその内部において結合面積を増大させて、自然石パネル2に対するコンクリ−トブロック3cの結合強度を向上させることができることになっている
【0039】
第4実施形態においては、積み台3として、コンクリ−ト3cを用いて、前記第1、第2実施形態と同様の形状に形成されており、その両フランジ部4には、複数の孔16が形成されている。そして、この両フランジ部4においても、接着剤11を該各フランジ部4の内面側から孔16を通って該フランジ部4外面側に溢れ出させた状態で、自然石パネル2の一面2aに接着されている。しかも、このコンクリ−ト製積み台3の側壁部6には、比較的大きな孔6aが形成されており、これにより、土砂等14と積み台3との絡み合いを高めて壁体施工用自然石1の保持性を高めることができることになっている。
【0040】
以上実施形態について説明したが本発明においては、次のようなものを包含する。
(1)自然石パネル2の形状を、長方形状等の矩形形状に限らず、三角形状、五角形状、六角形状等にすること。
(2)壁体として擁壁に適用すること。
(3)充填材料としてコンクリ−トを、単独或いは土砂等14と共に、壁体施工用自然石1の自然石パネル2と法面13との間に流し込んで、積み台3をコンクリ−ト中に埋設し、強固な擁壁等の壁体を構築すること。この場合、自然石パネル2同士の突き合わせは、隙間を生じないようにすることが好ましい。コンクリ−トの流し込み時に、コンクリ−トが漏れることを防止できるからである。
【0041】
本発明の目的は、明記されたものに限らず、実質的に好ましいあるいは利点として記載されたものに対応したものを提供することを暗黙的に含むものである。
【図面の簡単な説明】
【図1】第1実施形態に係る河川護岸を説明する説明図。
【図2】第1実施形態に係る河川護岸を上方から見た説明図。
【図3】第1実施形態に係る壁体施工用自然石を示す斜視図。
【図4】図3の平面図。
【図5】第1実施形態に係る壁体施工用自然石を示す側面図。
【図6】図5の背面図。
【図7】自然石パネルに対する第1実施形態に係る積み台の接着を説明する拡大説明図。
【図8】第1実施形態に係る壁体施工用自然石を用いて、湾曲した自然石壁面を形成する場合を説明する説明図。
【図9】第2実施形態に係る壁体施工用自然石を示す斜視図。
【図10】自然石パネルに対する第2実施形態に係る積み台のフランジ部の接着を説明する拡大説明図。
【図11】第3実施形態に係る壁体施工用自然石を示す斜視図。
【図12】自然石パネルに対する第2実施形態に係るコンクリ−トブロックの結合を説明する部分拡大説明図。
【図13】自然石パネルに対する第2実施形態に係るコンクリ−トブロックの結合において用いられる金具17を示す斜視図。
【図14】第4実施形態に係る壁体施工用自然石を示す斜視図。
【符号の説明】
1 壁体施工用自然石
2 自然石パネル
2a 自然石パネルの一面
3 積み台
3a 金網
3b アングル枠材
3c コンクリ−トブロック
4 フランジ部
5 連結部
6 側壁部
8 貫通孔
10 護岸
11 接着剤
11a 接着剤硬化部分
12 網目
14 土砂等
16 孔
17 金具
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a natural stone for wall construction used for revetment construction, a wall body using a natural stone for wall construction, and a method for using the natural stone for wall construction.
[0002]
[Prior art]
Conventionally, as a method of constructing a wall body such as a revetment or a retaining wall, there is an empty stone construction method of natural stone. In this method, the masonry builds stones one by one, and packs the crushed stones in the holding part while filling the stones. Become.
[0003]
[Problems to be solved by the invention]
However, in the case of using the above empty construction method, the construction method is to pile the stones one by one and pack the crushed stones in the holding part while clogging the stones. In such a case, there is a risk that the accumulated natural stone will collapse from that point. For this reason, the use of such an empty construction method not only makes it possible to build a stable and strong wall, but also during the construction, while paying sufficient attention not to collapse the already built natural stone, Must be piled up.
[0004]
The present invention has been made in consideration of the above circumstances, and its purpose is to facilitate the construction of a wall body having a natural stone wall surface, and even if such construction is performed, it is stable and strong. The goal is to be able to build a wall.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, in the invention of claim 1,
A stackable stacking base is coupled to one surface of the natural stone panel so as to protrude from one surface of the natural stone panel ,
The stack is connected to one side of the natural stone panel on one side of the natural stone panel, and is connected to the one side of the natural stone panel to cooperate with one side of the natural stone panel. And a connecting part that forms a through hole between the two and the natural stone for wall construction.
[0006]
The preferred embodiments of the invention of claim 1 are as described in claims 2 to 7 .
[0007]
In order to achieve the above object, in the invention of claim 8 ,
As a natural stone for wall construction, a stacking base that can be stacked on one side of the natural stone panel is coupled so as to protrude from one side of the natural stone panel, and the natural stone panel is connected to one side of the natural stone panel. A flange portion coupled on both sides of the panel, and a connecting portion that connects the flange portions and cooperates with one surface of the natural stone panel to form a through hole with the one surface of the natural stone panel. Is equipped with what
The natural stone for wall construction is stacked in a plurality of stages with the natural stone panel facing outward,
The platform in the natural stone for each wall construction is buried with a filling material,
The wall body is characterized by this.
[0008]
In order to achieve the above object, in the invention of claim 9 ,
As a natural stone for wall construction, a stacking base that can be stacked on one side of the natural stone panel is coupled so as to protrude from one side of the natural stone panel, and the natural stone panel is connected to one side of the natural stone panel. A flange portion coupled on both sides of the panel, and a connecting portion that connects the flange portions and cooperates with one surface of the natural stone panel to form a through hole with the one surface of the natural stone panel. Prepare what you are doing,
The natural stone for the wall construction, sequentially, the natural stone panel while stacking a plurality of stages while outwardly, buried the by the filling material loading table in natural stones for each wall construction,
It is as the structure used as the usage method of the natural stone for wall construction characterized by this.
[0009]
【The invention's effect】
According to the invention described in claim 1, the wall construction natural stone is bonded to one surface of the natural stone panel so that the stack protrudes from one surface of the natural stone panel. From the construction stage, a natural stone wall surface can be formed on the outer side if the natural stone for wall construction is piled up sequentially with the natural stone panel facing outward. However, ensure that the natural stone for wall construction is stably placed and the natural stone for wall construction is in a stable piled state with a load applied on the slope side with reference to the natural stone panel. Will be able to. In addition, if the pedestal is sequentially embedded with a filling material, the holding state of each pedestal (natural stone panel) is determined by the weight of the filling material, the frictional force acting on the surface of the pedestal receiving the weight, and the binding force (Movement restriction) can be strengthened. For this reason, by using the natural stone for wall construction, it is possible to easily construct a wall having a natural stone wall surface, and to construct a stable and strong wall even if such construction is performed. Become.
Moreover, since the natural stone for wall construction is partially used as a natural stone panel, it is possible to effectively use natural stone by reducing the amount of natural stone used.
[0010]
Further, the loading platform is connected to one side of the natural stone panel on one side of the natural stone panel, and the both sides of the natural stone panel are connected to each other to cooperate with the one side of the natural stone panel. And a connecting portion that forms a through hole between them, so that if the pedestal is embedded with a filling material, the inside of the through hole in the pedestal, that is, between the natural stone panel and the connecting portion The filling material is also filled, and the movement of the connecting portion to the outside side (natural stone panel side) is regulated by the filled material, so that the natural stone for wall construction can be more reliably Can be prevented from sliding down. For this reason, a more stable and strong wall body can be constructed | assembled by using the said natural stone for wall construction.
[0011]
According to the second aspect of the present invention, the wall construction natural stone stack is narrowed in the lateral direction as it is separated from one surface of the natural stone panel. Even if the natural stones are arranged to be inclined with respect to the adjacent natural stones for wall construction in the lateral direction, it is possible to avoid interference between the adjacent natural stone construction stones for wall construction. The natural stones for body construction can be arranged in the horizontal direction with the natural stone panels facing outward, and a curved surface can be formed by a plurality of natural stone panels. For this reason, the wall body which has the curved natural stone wall surface can be constructed | assembled by using the said natural stone for wall construction.
[0012]
According to the invention described in claim 3 , since the stack is formed by bending a plate material, the stack can be easily formed.
[0013]
According to the invention described in claim 4 , since the stack is formed by bending the perforated plate, not only can the stack be formed easily, but also through a rod or the like in the perforated plate. A plurality of natural stones for wall construction can be transported to the construction site in a state of being arranged in the horizontal direction. For this reason, workability can be improved.
[0014]
According to the fifth aspect of the present invention, since the platform is formed by the concrete block, the natural block is hardened together with the production of the platform by curing the concrete block on one surface of the natural stone panel. The platform can be bonded to the stone panel at the same time. For this reason, manufacture of the natural stone for wall construction can be performed easily.
Moreover, the natural stone panel can be made to act in the direction which falls to the one surface side using the comparatively heavy weight of a concrete block. For this reason, even if the natural stone for wall construction is piled up so that the slope of the natural stone wall surface becomes steep, it can be surely prevented from sliding off to the outside.
[0015]
According to the sixth aspect of the present invention, since the reinforcing tool coupled to one surface of the natural stone panel is embedded in the concrete block, the brittle surface portion of the concrete block alone is used. In addition, the bonding area can be increased in the interior, and the bonding strength of the concrete block to the natural stone panel can be improved.
[0016]
According to the seventh aspect of the present invention, at least each flange portion of the loading platform has a hole, and each flange portion passes the hole from the inner surface side of each flange portion to the outer surface side of the flange portion. Because it is bonded to one side of the natural stone panel in an overflowing state, not only the natural stone panel and the flange part can be bonded via an adhesive, but the adhesive also passes through the hole and the outer side of the flange part. It will harden in a state where it overflows and is larger in diameter than the opening of the hole, and the adhesive hardened portion on the outer surface side of the flange portion physically exhibits a retaining function. For this reason, the bond strength of the platform with respect to the natural stone panel can be improved.
[0017]
According to have been present invention according to claim 8, as a natural stone wall body construction, loading platform that can be stacked on one side of the natural stone panel is coupled so as to protrude from one surface of the natural stone panel, the pile board A flange portion coupled to one side of the natural stone panel on both sides of the natural stone panel, and connecting the both flange portions to cooperate with the one side of the natural stone panel and between the one side of the natural stone panel And a connecting part that forms a through-hole , and the natural stone for wall construction is stacked in a plurality of stages with the natural stone panel facing outward, and each wall construction Since the platform for natural stone for use is buried with a filling material, the platform is loaded on the slope side with respect to the natural stone panel as in the case of using the natural stone for wall construction according to claim 1. Stable loading of natural stones for wall construction in the state of applying To ensure the state, so that the natural stone for the wall construction can be a stable stacked state. Moreover, the holding state (movement regulation) of each platform (natural stone panel) can be strengthened by the weight of the filling material, the frictional force acting on the surface of the platform that receives the weight, the binding force, etc. become. For this reason, construction of a wall body having a natural stone wall surface can be facilitated, and even if such construction is performed, a stable and strong wall body can be constructed.
Moreover, in the said wall body, since a natural stone panel is used partially rather than entirely, the usage-amount of a natural stone can be reduced and a natural stone can be used effectively.
[0018]
According to have been present invention according to claim 9, as a natural stone wall body construction, loading platform that can be stacked on one side of the natural stone panel is coupled so as to protrude from one surface of the natural stone panel, the pile board A flange portion coupled to one side of the natural stone panel on both sides of the natural stone panel, and connecting the both flange portions to cooperate with the one side of the natural stone panel and between the one side of the natural stone panel prepared as it has a connecting portion for forming a through hole in the natural stone wall body construction, sequentially, while stacking the natural stone panel in a plurality of stages while outwardly, wherein each wall the loading platform in a natural stone for body construction since the embedded by the filling material, by using this method, it is possible to obtain a wall similar to wall according to claim 8 described above, similarly the claim 8, Easy construction of walls with natural stone walls Rutotomoni, even were such a construction, can build a stable and strong wall body, moreover, the wall construction, the ability to use natural stone effectively reduce the amount of natural stone.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIGS. 1-8 shows 1st Embodiment, In this 1st Embodiment, the content which constructed the revetment 10 (for example, river revetment) as a wall body using many natural stones 1 for wall construction It is shown.
[0020]
First, the natural stone 1 for wall construction will be described.
As shown in FIG. 3 to FIG. 7, each wall construction natural stone 1 is arranged so that the stack 3 protrudes from the one surface 2 a of the natural stone panel 2 on the one surface 2 a (back surface) of the natural stone panel 2. Are combined.
[0021]
The natural stone panel 2 is formed into a plate-like body (for example, about 500 mm for the long side and about 400 mm for the short side) having a thick (for example, about 50 mm) rectangular shape by machining or the like. The stone panel 2 is used with its short side directed in the height direction (vertical direction) and its long side directed in the horizontal direction. One surface 2a of the natural stone panel 2 is formed as flat as possible, and the other surface 2b is formed to be somewhat uneven to give a natural feeling of natural stone. Of course, the other surface 2b of the natural stone panel 2 is also appropriately increased in the degree of unevenness on the flat surface according to the construction location, the construction purpose, and the like. The size of the natural stone panel 2 can be set to an arbitrary size, and the size is also appropriately determined depending on the construction purpose and the like.
[0022]
In this embodiment, the platform 3 is formed by bending a wire mesh 3a (perforated plate) having the same width as that of the natural stone panel 2, thereby connecting a pair of flange portions 4 and both flange portions 4 to each other. Part 5. Both flange portions 4 are formed at both ends of the wire mesh 3a, and both the flange portions 4 are coupled to one surface 2a of the natural stone panel 2 at both ends in the longitudinal direction. The connecting portion 5 is a pair of side wall portions that are inclined so as to approach each other as the distance from the one surface 2a of the natural stone panel 2 increases, so that the connecting portion 5 expands to taper in the lateral direction as the distance from the one surface 2a of the natural stone panel 2 increases. 6 and a rear wall portion 7 straddling the pair of side wall portions 6 at the front end portion thereof. Thereby, while the through-hole 8 penetrated to an up-down direction between the one surface 2a and the platform 3 of the natural stone panel 2 is formed, a pair of side wall part in the one surface 2a side of the longitudinal direction both sides in the natural stone panel 2 Based on the six shapes, a space 9 is formed as the distance from the one surface 2a of the natural stone panel increases. The height of the flange portion 4 and the connecting portion 5 is the same as the height of the natural stone panel 2 in the platform 3, and the bottom surface of the stack 3 (the flange portion 4 and the lower surface of the connecting portion 5) and the natural stone panel 2. The stable mounting state of the natural stone 1 for wall construction can be secured by the meat (lower surface).
[0023]
An adhesive 11 is used for bonding the platform 3 to the one surface 2a of the natural stone panel 2. The adhesive 11 is selected from the viewpoint of obtaining a good adhesive relationship between the natural stone panel 2 and the platform 3 (flange portion 4), and an epoxy resin or the like is used in the present embodiment. As shown in FIG. 7, the flange portion 4 of the stack 3 is bonded to the one surface 2 a of the natural stone panel 2 so that the flange portion 4 is embedded with the adhesive 11 on the one surface 2 a of the natural stone panel 2. The adhesive 11 overflows from the inner surface side of the flange portion 4 through the mesh 12 to the outer surface side of the flange portion 4. As a result, the adhesive 11 bonds the natural stone panel and the flange portion 4, and cures in a state where the adhesive 11 overflows to the outer surface side of the flange portion 4 through the mesh 12 and is larger in diameter than the mesh 12. Thus, the cured adhesive portion 11a on the outer surface side of the flange portion 4 is to physically exert a retaining function.
[0024]
Next, the usage method (the construction method of the revetment 10) of the said natural stone 1 for wall construction and the revetment 10 constructed by the usage method are demonstrated.
[0025]
In the construction of the revetment 10, a large number of natural stones 1 for wall construction are carried to each construction position along the current shore. In this case, a plurality of (for example, about four) natural stones 1 for wall construction are arranged in the horizontal direction, and are conveyed to the construction site through a bar or the like through the mesh 12 of each of the platforms 3. Of course, a large number of natural stones 1 for wall construction may be transported to each construction position using other transport tools.
[0026]
When a large number of natural stones 1 for wall construction are transported to the construction position, the natural stones 1 for construction of the walls are directed to the natural stone panel 2 toward the outside as shown in FIG. While abutting against the stone panel 2, they are sequentially stacked along the shore (or slope) slope or with a necessary slope (for example, 3 minutes).
[0027]
In this case, as shown in FIG. 1, the natural stone panels 2 of the natural stones 1 for wall construction in each step are arranged so as to straddle between the natural stone panels 2 arranged side by side in the adjacent upper and lower steps. As shown in FIG. 2, the side wall 6 of each stack is placed so as to intersect the upper surface of the side wall 6 of the stack 3 in the lower stage of the stack 3. Yes. Thereby, the natural stone 1 for wall construction can be piled up sequentially in a stable state, and the load of the natural stone 1 for wall construction of each stage is adjacent in the lateral direction in the lower stage adjacent to each other. It acts on the natural stones 1 for wall construction and can hold the adjacent state firmly.
[0028]
Further, when stacking the natural stones 1 for wall construction, a filling material (backing) is provided between the natural stone panel 2 and the slope 13 of the natural stone 1 for wall construction which is the uppermost stage at that time. Natural stone 1 for wall construction which is filled with crushed stone, earth and sand, rubble, concrete waste, etc. (hereinafter referred to as earth and sand) 14 (hereinafter referred to as earth and sand) as the material) A flat surface substantially the same as the upper surface of the natural stone panel 2 is formed (in FIG. 1, the earth and sand 14 are omitted for convenience). This ensures a stable placement surface for the next wall construction natural stone 1 (sheet body 3 etc.) to be piled up, and facilitates the work of stacking the wall construction natural stone 1. The frictional force between the platform 3 and the earth and sand 14 increases the holding state of the platform and prevents the natural stone panel 2 (natural stone 1 for wall construction) from sliding down (moving). In particular, in the present embodiment, the through hole 8 is formed in the loading platform 3 and the inside thereof is filled with earth and sand 14 or the like, so that the holding ability is high.
[0029]
Furthermore, when the natural stone wall surface of the revetment 10 is a curved surface, as shown in FIG. 8, the natural stone 1 for wall construction is inclined with respect to the natural stone 1 for wall construction adjacent in the lateral direction. Is done. Thereby, even if the natural stone 1 for wall construction is arranged in this way, the stack 3 of the natural stone 1 for wall construction is narrowed in the lateral direction as it is separated from the one surface 2a of the natural stone panel 2. Therefore, it is possible to avoid interference between the stacks 3 of the adjacent natural stones 1 for wall construction, with the natural stone panel 2 facing the natural stone panel 2 outward. A curved surface can be formed by the plurality of natural stone panels 2 in the horizontal direction.
[0030]
In particular, in the construction described above, from the viewpoint of further preventing the natural stone panel 2 from sliding down, when soil or the like 14 is filled between the natural stone panel 2 and the slope 13, pressure is applied from the outside by a roller or the like. Adding (rolling pressure) increases the density of the earth and sand 14 and increases the frictional force between the earth and sand 14 and the platform 3. Moreover, in this case, if the natural stone panels 2 of the adjacent natural stones for wall construction 1 or the stacks 3 (for example, the upper and lower side wall portions 6) are joined together by an adhesive or the like, The natural stone panel 2 is more preferable from the viewpoint of preventing sliding.
[0031]
In FIGS. 1 and 2, reference numeral 15 denotes a suction prevention sheet.
[0032]
As a result of such construction, as shown in FIG. 1 and FIG. 2, the natural stone panel 2 of each natural stone 1 for wall construction forms a revetment 10 constituting a natural stone wall surface. The waterside becomes a fish nest, and the slope 13 part can be vegetated naturally, and a multi-natural revetment can be constructed.
[0033]
9 and 10 show the second embodiment, FIGS. 11 to 13 show the third embodiment, and FIG. 14 shows the fourth embodiment. In each of the embodiments, the same components as those in the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
[0034]
In the second embodiment, an angle frame member 3b that is a metal material (plate material) is used as the loading platform 3, and the same shape as in the first embodiment is formed. The hole 16 is formed. The two flange portions 4 are bonded to the one surface 2a of the natural stone panel 2 in a state where the adhesive 11 overflows from the inner surface side of each flange portion 4 through the hole 16 to the outer surface side of the flange portion 4. Has been.
[0035]
Thereby, the platform 3 can be easily formed, and the natural stone panel 2 and the flange portion 4 are connected via the adhesive 11 as shown in FIG. In addition to bonding, the adhesive 11 overflows to the outer surface side of the flange portion 4 through the hole 16 and hardens in a state where the diameter is larger than the opening of the hole 16, and the adhesive is cured on the outer surface side of the flange portion 4. The portion 11a physically exhibits a retaining function. Moreover, since the platform 3 is formed using the angle frame material 3b which is a metal material (plate material), it is rough against the natural stone 1 for wall construction using the strong strength of the metal material. Can be handled properly.
[0036]
In the third embodiment, the loading platform 3 is formed by a concrete block 3c.
[0037]
Thereby, by hardening the concrete block 3c on one surface 2a of the natural stone panel, it is possible to simultaneously perform the bonding of the stack 3 to the natural stone panel 2 together with the manufacture of the stack 3. The natural stone 1 for construction can be easily manufactured. Moreover, the natural stone panel 2 can be made to act in the direction which falls in the one surface 2a side (slope 13 side) using the comparatively heavy weight of the concrete block 3c, and the said wall construction Even if the natural stone 1 is piled up so that the slope of the natural stone wall surface becomes steep, it can be surely prevented from sliding off outward.
[0038]
In this case, in consideration of the brittle nature of the surface portion of the concrete block 3c, the metal block (reinforcing tool) 17 coupled to the one surface 2a of the natural stone panel is embedded in the concrete block 3c. With this metal fitting 17, not only the brittle surface portion of the concrete block 3 c but also the inside of the concrete block 2 can be increased, so that the bonding strength of the concrete block 3 c to the natural stone panel 2 can be improved .
[0039]
In the fourth embodiment, the stack 3 is formed in the same shape as the first and second embodiments by using a concrete 3c, and a plurality of holes 16 are formed in both flange portions 4 thereof. Is formed. And also in both the flange parts 4, in the state which overflowed the adhesive agent 11 from the inner surface side of each flange part 4 through the hole 16 to the outer surface side of the flange part 4, it is applied to one surface 2a of the natural stone panel 2. It is glued. In addition, a relatively large hole 6a is formed in the side wall portion 6 of the concrete stack 3, so that the entanglement between the earth and sand 14 and the platform 3 is enhanced, and the natural stone for wall construction is provided. 1 can be improved.
[0040]
Although the embodiment has been described above, the present invention includes the following.
(1) The shape of the natural stone panel 2 is not limited to a rectangular shape such as a rectangular shape, but a triangular shape, a pentagonal shape, a hexagonal shape, or the like.
(2) Apply to the retaining wall as a wall.
(3) The concrete is poured as a filling material alone or together with the earth and sand 14 between the natural stone panel 2 and the slope 13 of the natural stone 1 for wall construction, and the platform 3 is put into the concrete. To embed and build a strong retaining wall. In this case, it is preferable that the natural stone panels 2 face each other so as not to generate a gap. This is because the concrete can be prevented from leaking when the concrete is poured.
[0041]
The object of the present invention is not limited to what is explicitly stated, but implicitly includes providing what is substantially preferred or corresponding to what has been described as an advantage.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram illustrating a river revetment according to a first embodiment.
FIG. 2 is an explanatory view of the river revetment according to the first embodiment as viewed from above.
FIG. 3 is a perspective view showing a natural stone for wall construction according to the first embodiment.
4 is a plan view of FIG. 3. FIG.
FIG. 5 is a side view showing a natural stone for wall construction according to the first embodiment.
6 is a rear view of FIG. 5. FIG.
FIG. 7 is an enlarged explanatory view for explaining adhesion of a stack according to the first embodiment to a natural stone panel.
FIG. 8 is an explanatory diagram for explaining a case where a curved natural stone wall surface is formed using the natural stone for wall construction according to the first embodiment.
FIG. 9 is a perspective view showing a natural stone for wall construction according to a second embodiment.
FIG. 10 is an enlarged explanatory view for explaining the adhesion of the flange portion of the loading platform according to the second embodiment to the natural stone panel.
FIG. 11 is a perspective view showing a natural stone for wall construction according to a third embodiment.
FIG. 12 is a partially enlarged explanatory view for explaining the connection of a concrete block according to a second embodiment with respect to a natural stone panel.
FIG. 13 is a perspective view showing a metal fitting 17 used in joining a concrete block according to a second embodiment to a natural stone panel.
FIG. 14 is a perspective view showing a natural stone for wall construction according to a fourth embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Natural stone for wall construction 2 Natural stone panel 2a One side of natural stone panel 3 Stacking board 3a Wire net 3b Angle frame material 3c Concrete block 4 Flange part 5 Connection part 6 Side wall part 8 Through-hole 10 Revetment 11 Adhesive 11a Adhesive Hardened part 12 Mesh 14 Earth and sand 16 Hole 17 Metal fitting

Claims (9)

自然石パネルの一面に、積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され
前記積み台は、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有している、
ことを特徴とする壁体施工用自然石。
A stackable stacking base is coupled to one surface of the natural stone panel so as to protrude from one surface of the natural stone panel ,
The stack is connected to one side of the natural stone panel on one side of the natural stone panel, and is connected to the one side of the natural stone panel to cooperate with one side of the natural stone panel. And a connecting part that forms a through hole between
Natural stone for wall construction.
請求項1において、
前記積み台は、前記自然石パネルの一面から離間するに従って横方向において狭まるようにされている、
ことを特徴とする壁体施工用自然石。
In claim 1,
The loading platform is adapted to narrow in the lateral direction as it is separated from one surface of the natural stone panel.
Natural stone for wall construction.
請求項において、
前記積み台が、板材を曲げ加工することにより形成されている、
ことを特徴とする壁体施工用自然石。
In claim 1 ,
The platform is formed by bending a plate material,
Natural stone for wall construction.
請求項において、
前記積み台が、多孔板を曲げ加工することにより形成されている、
ことを特徴とする壁体施工用自然石。
In claim 1 ,
The platform is formed by bending a perforated plate,
Natural stone for wall construction.
請求項1において、
前記積み台が、コンクリ−トブロックにより形成されている、
ことを特徴とする壁体施工用自然石。
Oite to claim 1,
The loading platform is formed by a concrete block;
Natural stone for wall construction.
請求項において、
前記コンクリ−トブロック内に、前記自然石パネルの一面に結合された補強具が進入された状態で埋設されている、
ことを特徴とする壁体施工用自然石。
In claim 5 ,
In the concrete block, a reinforcing tool coupled to one surface of the natural stone panel is embedded and is embedded.
Natural stone for wall construction.
請求項1〜5のいずれかにおいて、
前記積み台の少なくとも各フランジ部が孔を有し、
前記各フランジ部が、接着剤を該各フランジ部の内面側から前記孔を通って該フランジ部外面側に溢れ出た状態で、前記自然石パネルの一面に接着されている、
ことを特徴とする壁体施工用自然石。
In any one of Claims 1-5 ,
At least each flange portion of the loading platform has a hole,
Each flange portion is bonded to one surface of the natural stone panel in a state where an adhesive overflows from the inner surface side of each flange portion to the outer surface side of the flange portion through the hole.
Natural stone for wall construction.
壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものが備えられ、
前記壁体施工用自然石が、該自然石パネルを外方に向けつつ複数段に積み重ねられ、
前記各壁体施工用自然石における積み台が充填材料により埋設されている、
ことを特徴とする壁体。
As a natural stone for wall construction, a stacking base that can be stacked on one side of the natural stone panel is coupled so as to protrude from one side of the natural stone panel, and the natural stone panel is connected to one side of the natural stone panel. A flange portion coupled on both sides of the panel, and a connecting portion that connects the flange portions and cooperates with one surface of the natural stone panel to form a through hole with the one surface of the natural stone panel. Is equipped with what
The natural stone for wall construction is stacked in a plurality of stages with the natural stone panel facing outward,
The platform in the natural stone for each wall construction is buried with a filling material,
A wall characterized by that.
壁体施工用自然石として、自然石パネルの一面に積み上げ可能な積み台が該自然石パネルの一面から突出するようにして結合され、前記積み台が、前記自然石パネルの一面に該自然石パネルの両側において結合されるフランジ部と、該両フランジ部を連結し該自然石パネルの一面と協働して該自然石パネルの一面との間に貫通孔を形成する連結部と、を有しているものを用意し、
前記壁体施工用自然石を、順次、前記自然石パネルを外方に向けつつ複数段に積み重ねる一方、前記各壁体施工用自然石における積み台を充填材料により埋設する、
ことを特徴とする壁体施工用自然石の使用方法。
As a natural stone for wall construction, a stacking base that can be stacked on one side of the natural stone panel is coupled so as to protrude from one side of the natural stone panel, and the natural stone panel is connected to one side of the natural stone panel. A flange portion coupled on both sides of the panel, and a connecting portion that connects the flange portions and cooperates with one surface of the natural stone panel to form a through hole with the one surface of the natural stone panel. Prepare what you are doing,
The natural stone for the wall construction, sequentially, the natural stone panel while stacking a plurality of stages while outwardly, buried the by the filling material loading table in natural stones for each wall construction,
How to use natural stone for wall construction.
JP34777496A 1996-12-26 1996-12-26 How to use natural stone for wall construction, wall, natural stone for wall construction Expired - Fee Related JP3844827B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34777496A JP3844827B2 (en) 1996-12-26 1996-12-26 How to use natural stone for wall construction, wall, natural stone for wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34777496A JP3844827B2 (en) 1996-12-26 1996-12-26 How to use natural stone for wall construction, wall, natural stone for wall construction

Publications (2)

Publication Number Publication Date
JPH10183574A JPH10183574A (en) 1998-07-14
JP3844827B2 true JP3844827B2 (en) 2006-11-15

Family

ID=18392491

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34777496A Expired - Fee Related JP3844827B2 (en) 1996-12-26 1996-12-26 How to use natural stone for wall construction, wall, natural stone for wall construction

Country Status (1)

Country Link
JP (1) JP3844827B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4708086B2 (en) * 2005-05-13 2011-06-22 前田工繊株式会社 Retaining wall structure and construction method thereof

Also Published As

Publication number Publication date
JPH10183574A (en) 1998-07-14

Similar Documents

Publication Publication Date Title
JP2011168956A (en) Construction structure and construction method of road
JP3844827B2 (en) How to use natural stone for wall construction, wall, natural stone for wall construction
KR100973236B1 (en) Elevator feet support structure
JPS6360328A (en) Construction of structure of expanded resin
JP4519998B2 (en) Lightweight ground construction method, foundation construction method, and lightweight embankment construction method using polystyrene resin foam board assembly
JPH03180617A (en) Bank of sharp gradient
JP2016160627A (en) Retaining wall
JP3663045B2 (en) Reinforced soil retaining wall method
JPS636257Y2 (en)
JPH0349121Y2 (en)
JP4195890B2 (en) Stacking blocks
JP2645428B2 (en) Concrete site casting method
KR200255700Y1 (en) A Concrete-block for Crib Retaining Wall
JP5982516B1 (en) Retaining wall
KR200376796Y1 (en) Constructing structure of block type reventment of reinforied earth
JPH047415A (en) Structure of anchor plate and method for constructing anchor supporting beam
JP2004143715A (en) Divided L-shaped retaining wall, method of manufacturing the same, and method of assembling and constructing the same
JPH0346638B2 (en)
JP3392303B2 (en) PC foundation beam structure
JPH0742165A (en) Beam for building foundation and construction method of building foundation using this beam
JPH056603B2 (en)
JP2788947B2 (en) Steep embankment
JPH01318610A (en) Construction block and block structure
JP2724734B2 (en) Concrete block and retaining wall construction method
JPS5935640Y2 (en) Friction member mounting structure for gravity-type structures

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060529

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060815

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060817

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees