Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3847059B2 - Small capacity gas turbine cogeneration package - Google Patents
[go: Go Back, main page]

JP3847059B2 - Small capacity gas turbine cogeneration package - Google Patents

Small capacity gas turbine cogeneration package Download PDF

Info

Publication number
JP3847059B2
JP3847059B2 JP2000188692A JP2000188692A JP3847059B2 JP 3847059 B2 JP3847059 B2 JP 3847059B2 JP 2000188692 A JP2000188692 A JP 2000188692A JP 2000188692 A JP2000188692 A JP 2000188692A JP 3847059 B2 JP3847059 B2 JP 3847059B2
Authority
JP
Japan
Prior art keywords
gas turbine
unit
package
cooling
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000188692A
Other languages
Japanese (ja)
Other versions
JP2002004942A (en
Inventor
信機 植松
俊彦 田中
聡 柴田
健治 松田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takuma Co Ltd
Original Assignee
Takuma Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takuma Co Ltd filed Critical Takuma Co Ltd
Priority to JP2000188692A priority Critical patent/JP3847059B2/en
Publication of JP2002004942A publication Critical patent/JP2002004942A/en
Application granted granted Critical
Publication of JP3847059B2 publication Critical patent/JP3847059B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/14Combined heat and power generation [CHP]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/12Improving ICE efficiencies

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、電力と温水や蒸気等を同時に供給する小容量のガスタービンコージェネレーションパッケージの改良に関するものであり、比較的小規模な各種工場やマーケット、事務所、温室農場、集合住宅等で単独又は複数台を組み合せした状態で使用するものである。
【0002】
【従来の技術】
ガスタービン発電機と排ガスボイラ等を組み合わせた熱電併給システム(コージェネレーションシステム)は従前から広く知られており、実用にも供されている。この熱電併給システムは、タービン発電機を駆動して電力を得ると共に、ガスタービンからの高温排ガスの熱を排熱ボイラ又は排熱温水ボイラにより回収して蒸気又は温水を得るものであり、電力と温水や蒸気を同時に必要とする事業所等に於いては、これ等を別個に供給する場合に比較して総合的なエネルギー効率が向上し、経済性に優れている。
【0003】
図13は従前のコージェネレーションシステムの一例を示すものであり、外部を騒音防止用のエンクロージャで覆ったガスタービン100及び発電機101と排熱ボイラ102とを連結し、これに吸気フィルタ103、ガスタービン排気チャンバ104、排気ダクト105等を組み合せると共に、別途に設けた電気制御室に各種の制御用機器を配置することにより、コージェネレーションシステムが形成されている。
【0004】
ところで、従前のこの種システムは、何れも発電容量が5000kw前後の比較的大容量のものであり、理念的には発電装置が主体であって、その排熱を排ガスボイラで回収しようとするものである。
また、技術的には、騒音対策上必ずエンクロージャーを用いて各機器・装置の消音を図ると共に、ガスタービン、発電機、排熱ボイラ等をそれぞれ別個の独立した機器として取扱い、また、制御装置等は別個に設けた制御室に配置することを基本としている。
そのため、当該システムを構成する各機器・装置は、それぞれ工場で別個に独立して製作され、現場へ搬入の上組立及び据付がされ、最後に各機器間の配管や電気配線が現場で行われている。
【0005】
しかし、上述のような設計思想の下で製作されたガスタービンコージェネレーションシステムには、▲1▼各機器を独立した別々のものとして製作するため、製造コストが高くつくこと、▲2▼個々の機器を外部で接続するため、設置スペースが多く必要になること、▲3▼現場工事が多くなり、設置のための時間、コストが高くなること、▲4▼現場工事が多いことに起因して、工場での量産システムに比較してシステム全体の品質並びに信頼性が低いこと等の問題が存在する。
特に、ガスタービンコージェネレーションシステムがより広く普及し、その容量が小型化(例えば15〜50KW)するにつれて上述の如き問題が顕著になり、負荷電力が15〜100KW程度の小容量負荷に対しては経済的に対応し難いと云う難点がある。
【0006】
【発明が解決しようとする課題】
本発明は、比較的小容量のガスタービンコージェネレーションシステムに於ける上述のような各問題を解決せんとするものであり、ガスタービンコージェネレーションシステムを構成する各機器、配管、駆動並びに制御装置、配線等を一つの支持枠体上に立体的に且つ機能的に配置して小形のパッケージケース内へ収納することにより、工場に於ける量産性及び加工比率の向上、輸送の容易化、現場工事量の減少及び現場工事期間の短縮、据付面積の縮小、製品品質の向上、異なる容量の負荷に対する対応性の向上、運転及びメンテナンスの容易化、コストの低減等を可能にしたガスタービンコージェネレーションパッケージを提供することを、発明の主たる目的とするものである。
【0007】
【課題を解決するための手段】
請求項1の発明は、空気圧縮機と再生器とガスタービンと発電機とを一体化して成るガスタービン発電機ユニットと、前記ガスタービンからの排ガスを受け入れる排熱回収熱交換器と温水循環ポンプとから成る排熱回収ユニットと、前記発電機からの電力を受け入れるコンバータとインバータと保護継電器とトランスから成る電力機器ユニットと、制御盤を主体とする制御ユニットと、前記各ユニット相互の間を連結するガス配管と温水配管と電気配線と、空気ガイド体とガスタービン発電機ユニットを覆う消音ボックスと冷却ファンから成る冷却ユニットとをパッケージケーシング内に格納して成る小容量のガスタービンコージェネレーションパッケージにおいて、前記パッケージケーシングを、2段型の支持枠体とこれに取外し自在に固定したケーシングプレートとから形成すると共に、前記支持枠体の上段側にガスタービン発電機ユニットを、また下段側に排熱回収ユニット及び電力機器ユニットを配設し、更に前記パッケージケーシングの内部を流通せしめた冷却用空気を前記消音ボックスを通して外部へ排出する構成としたことを発明の基本構成とするものである。
【0008】
請求項2の発明は、請求項1の発明において、排熱回収熱交換器を真空型排熱温水ボイラとしたものである。
【0009】
請求項3の発明は、請求項1の発明に於いて、ガスタービン発電機ユニットを覆う消音ボックスの内部に燃焼用空気のフィルターを設け、これにより吸気音を減音させる構成としたものである。
【0010】
請求項4の発明は、請求項1の発明に於いて消音ボックスを、外部から取り入れした空気流を燃焼用空気流と各機器類の冷却用空気流に分流すると共に、分流した燃焼用空気流を消音ボックス内へ案内する空気ガイド体を備えた構成としたものである。
【0011】
請求項5の発明は、請求項1の発明に於いて消音ボックスを、空気流の排出側に屈曲通路を備え、各機器類を冷却した後の冷却用空気流を前記屈曲通路を通して冷却ファンにより外部へ排出する構成としたものである。
【0013】
【発明の実施の形態】
以下、図面に基づいて本発明の実施形態を説明する。
図1は本発明に係る小容量のガスタービンコージェネレーションパッケージ(以下GTCGPと略称する)のシステム構成図であり、また、図2は本発明で使用するガスタービン発電機ユニットの一部を破断した正面図である。
図1に於いて、1はガス圧縮機、2はガスフィルタ、3はガス管、4は空気フィルタ、5は圧縮機、6は燃焼室、7はガスタービン、8は発電機、9は再生器、10は空気予熱管、11はガスタービン排ガス管であり、前記圧縮機5、燃焼室6、ガスタービン7、発電機8、再生器9、及び空気予熱管10等により、後述するガスタービン発電機ユニットUが形成されている。
【0014】
また、図1に於いて12は低温ガスタービン排ガス管、13は排熱回収熱交換器(排熱温水ボイラ)、14は温水循環ポンプ、15は低温水管、16は高温水管、18は制御盤、19はAC/DCコンバータ、20はDC/ACインバータ、21はバッテリコントローラ、22は保護継電器、23はトランス、24はブレーカであり、前記排熱回収熱交換器13、温水循環ポンプ14、低温水管15、高温水管16等により排熱回収ユニットTが、またAC/DCコンバータ19、DC/ACインバータ20、バッテリコントローラ21、保護継電器22、トランス23、ブレーカ24等によって電力機器ユニットEが構成されている。
更に、前記各ユニットU、T、E等は、制御盤18を主体とする制御ユニットCにより制御される。
【0015】
尚、図1には示されていないが、上記参照番号1〜24に係る部材は全てパッケージケーシングP内に格納されている。
また、図1には示されていないが、パッケージケーシングP内に収納された各機器類は、後述するフィルタや空気ガイド体、消音ボックス、冷却ファン等により形成された冷却ユニットIにより、低騒音でもって機能的に冷却される。
【0016】
更に、図1に於いて25は外部ガスフィルタ、27はパソコン、28はバッテリ、29は切換制御器、30は電力負荷、31は商用電源、32は貯湯タンク、33は給湯負荷、34は排ガス管であり、上記参照番号25〜34に係る各部材は、何れもパッケージケーシングPの外部に配設されている。
【0017】
また、図2は、本発明で使用するガスタービン発電機ユニットUの概要説明図であり、圧縮機5・燃焼室6・タービン7・発電機8・再生器9・空気予熱管(通路)10・排ガス管(通路)11・空気ベアリング35・発電機冷却フィン36・再生器ケーシング37及び排ガス口38等を一体的に組み付けることにより、ガスタービン発電機ユニットUが形成されている。
【0018】
図1及び図2を参照して、当該GTCGPは燃料に都市ガス13Aを用い、熱入力112KW・発電出力28KWのタービン発電機のタービン排熱を排熱温水ボイラで温水として熱回収(56KW)するものであり、総合効率は75%である。また、図1の点線Lで囲まれた部分は一つの支持枠体上に乗せられてパッケージケーシングP内に収納されており、工場内で量産されたあと、据付場所へ搬送される。
尚、燃料としては、都市ガス13A以外の燃料ガスや灯油等の液体燃料を用いてもよく、また、排熱ボイラによって蒸気及び吸収式冷温水機によって冷水、温水を取り出すようにしてもよいことは勿論である。
【0019】
都市ガス13A(9,930Kcal/Nm3 ・9.7Nm3 /h・熱入力112kw)は、ガス圧縮器1を経てガスタービン7の燃焼室6へ送入される。一方、燃焼用空気A0 は空気フィルター4を経て圧縮機5で圧縮され、再生器9で高温のタービン排ガスによって加熱されたあと、燃焼室6へ送入され、ここで都市ガス13Aと混合燃焼される。
【0020】
ガスタービン7は、前記燃焼によって生成した高温燃焼ガスにより高速回転(96000rpm)され、これに直結した発電機8を回転させて発電をする。
発生したAC1,600Hzの電力は、AC/DCコンバーター19によって直流に変換され、その後直接(又は一旦蓄電池28へ蓄えられたあと)自動同期検定機能と保護機能をもつDC/ACインバーター20へ送られて商用周波数の交流に変換される。
また、商用周波数に変換された電力は、変圧器23によって200Vに降圧したのち、遮断器24を経て出力28KWの電力として電力負荷30へ供給される。
更に、遮断器24からの出力28KWの電力は、切換制御器29を経て電力負荷30へそのまま供給されるか、或は商業電源31と同時に、又は相互に切換えて供給される。
【0021】
ガスタービン7から排出された排ガスはガスタービン排ガス管(通路)11を経て再生器9へ送入され、ここで圧縮器5からの燃焼用圧縮空気を予熱する。また、予熱された圧縮空気は燃焼室6へ送入される。尚、再生器9は再生器ケーシング37内に内蔵されているので、空気予熱管10やガスタービン排ガス管11は、管というよりも寧ろ通路として存在する(図2参照)。
【0022】
再生器9にて熱交換をし、273℃程度の低温となったガスタービン排ガス(765Nm3 /h)は、低温ガスタービン排ガス管12を経て排熱回収熱交換器(排熱温水ボイラ)13へ入り、ここで給湯・暖房負荷33から戻ってきた低温(60℃)の給水と熱交換をしたあと、排ガス(約90℃)G0 として大気に放出される。
尚、この排ガスG0 は、通常CO2 1.5%、CO5〜10ppm、NOx9ppm(0%O2 換算)、炭化水素〜0であり、環境を著しく破壊することはない。
一方、60℃の低温給水は、温水循環ポンプ14を経て排熱回収熱交換器13により高温水(70℃・4,820kg/h・出力56KW)とされたあと、高温配管16を経て給湯・暖房負荷33へ供給される。
【0023】
尚、図1には示されていないが、前記ガスタービン発電機ユニットU、排熱回収ユニットT、電力機器ユニットE、冷却ユニットI及び制御ユニットC等は支持枠体B上に載置されており、ケーシングプレートHによって覆われている。
また、パッケージケーシングP内には、後述するように消音ボックス39や冷却ファン40、空気ガイド板41等から成る冷却ユニットIが設けられており、各機器類の空冷システムが形成されている。
【0024】
図2を参照して、空気フィルタ4を通して流入した燃焼用空気A0 は、発電機冷却フィン36により発電機8の外周部へ送入され、発電機8を冷却することにより予熱されたあと、圧縮機5で圧縮される。圧縮機5で圧縮された燃焼用空気A0 は空気予熱管(通路)10を経て再生器9へ送られ、ここで高温ガスタービン排ガスにより予熱されたあと、燃焼室6へ供給され、燃焼室6で生じた燃焼ガスにより、ガスタービンが回転駆動される。
【0025】
尚、前記ガスタービン7の回転数(96000rpm)が高いため、軸受ベアリングには空気ベアリング35が使用されており、この高速回転によって高い発電効率が得られることになる。
また、ガスタービン7からの高温排ガスは再生器9で燃焼用空気A0 と熱交換することにより273℃・765Nm3 /hのタービン排ガスGとなり、排ガス口38から排出される。
【0026】
前記ガスタービン7の外周部には、ガスタービン7を包み込むような形態で再生器9がその全周に亘って配置されており、再生器ケーシング37がガスタービン7の最外殻を覆っている。
【0027】
図2に示したような15〜50KW程度の小容量ガスタービン発電機ユニットUは、タービン回転数を速くすることによって高効率発電と、装置の小型軽量化を計ることができる。また、振動も比較的少なく、適切なケーシング37と冷却システムIとパッケージケーシングPを採用することにより騒音を65dBA(前面1m)とすることができる。
【0028】
図3乃至図6は、本発明に係るGTCGPの外形図を示すものであり、夫々パッケージケーシングPの正面図、側面図、背面図及び平面図を示すものである。当該パッケージケーシングPは、前記した各機器類を支持固定する四角状の支持枠体Bと、支持枠体Bに支持固定した各機器類と、支持枠体Bを覆うケーシングプレートHとから形成されており、ケーシングHは支持枠体Bへ着脱自在に取り付けられている。
尚、図3乃至図6に於いて、42は空気取入口、43は排ガス出口、44は燃料ガス入口、45は低温水入口、46は高温水出口、47は排気筒、G0 は排ガスであり、パッケージケーシングPを形成する鋼板に夫々設けられている。
【0029】
図7乃至図10は、本実施例に係るGTCGPのケーシングプレートHを取り外した状態に於ける正面図、側面図、背面図及び平面図を示すものであり、また図11は、図8のイーイ視図を示すものである。
【0030】
図7乃至図11に於いて、Bは支持枠体、39は消音ボックス、39bは案内板(熱遮蔽板)、40は冷却ファン、41は空気流のガイド体、48は空気フィルタ(通気用)、49は機器類冷却用空気Acの排出口である。
前記支持枠体Bは、C形鋼製の長方形状のベース台B1 と、これに立設した支柱B2 と、支柱B2 間に架設した桟体B3 等により四角状の枠体形状に形成されており、1階床面F1 と2階床面F2 とが設けられている。尚、図7乃至図11ではケーシングプレートHが取り外されているが、支持枠体Bとこれに取付けしたケーシングプレートHによりパッケージケーシングPが構成されている。
【0031】
前記支持枠体Bの1階床面F1 上には、排熱回収熱交換器(温水ボイラ)13と温水循環ポンプ14等から成る排熱回収ユニットTとトランス23・コンバーター19、インバーター20・バッテリーコントローラ21等の電力機器ユニットEと、燃料ガスフィルター2、ガス圧縮機1等の各機器が配置されている。また2階床面F2 には小容量ガスタービン発電機ユニットU、空気フィルタ4、消音ボックス39、冷却ファン40、制御ユニットC等が設けられており、パッケージ前面の制御ユニットCによりGTCGPの駆動・制御及び運転監視が行なわれる。
【0032】
前記2階床面F2 上に設置された小容量ガスタービン発電機ユニットUからの排ガスGは、ユニットUの下部の低温ガスタービン排ガス管12を通して1階床F1 上に設置した排熱回収熱交換器13へ直送される。
【0033】
燃焼用空気A0 及び機器類の冷却用空気Acは、図8に示すようにパッケージケーシングPの前面下部に設けられた空気取入孔42より入り、燃焼用空気A0 は、空気流ガイド体41の屈曲部41aで消音され乍ら空気フィルタ4を通してガスタービン発電機ユニットUの内部へ吸引され、発電機冷却フィン36を通して空気圧縮機5の内部へ吸引される。
また、ガスタービン発電機ユニットUからの排ガスは、排ガス管12を経て排熱回収熱交換器13へ入り、熱回収されたあと、パッケージケーシングPの後面の排ガス出口43より大気に放出される。尚、必要に応じて排ガス出口43側に排気筒47や消音マフラー(図示せず)が設けられる。
【0034】
即ち、空気取入口42より空気フィルタ48を通して内部へ流入した外部空気は、パッケージケーシングP内に設けられたガイド体41によって、トランス23等を主体とする電力機器ユニットEや排熱熱交換器13を主体とする排熱回収ユニットT、制御盤18を主体とする制御ユニットC等を冷却する冷却用空気流Acと、ガスタービン発電機ユニットUの消音ボックス39内へ流入する燃焼用空気流Aとに振り分けられる。そして、前者の冷却用空気流Acは、前記各ユニットE、T、Cを形成する各機器類を冷却したあと、消音ボックス39内へ吸引され、高温部であるガスタービン発電機ユニットUを冷却した後、下流側の屈曲通路39aを通して冷却ファン40により、パッケージケーシングPの後面側の空気取出口49より外部へ排出される。
【0035】
また、後者の通風ガイド体41によって分流された燃焼用空気A0 は、通風ガイド体41内の屈曲通路41aを通ることにより消音され乍ら、ガスタービン発電機ユニットUを覆う消音ボックス39内へ流入し、空気フィルタ4を通ることによって更に消音されたあと、ガスタービン発電機ユニットUの内部へ吸引されて行く。
【0036】
前記冷却用空気流Acにより各ユニットE、T、C、Uを構成する機器類が冷却されることにより、各機器類の温度は所定の安全温度以下に保持される。
また、パッケージケーシングP内の冷却用空気Acの通路は可能な限り短かくなるように設定されており、燃焼用空気の通路を形成するガイド体41とその屈曲通路41a、消音ボックス39とその屈曲通路39a及び空気フィルタ4等の消音効果と相俟って、パッケージケーシングPの周辺の騒音レベルは65dBA以下(前面1m)に抑えることができる。尚、前記ガイド体41や消音ボックス39、案内板39b、ケーシングプレートHの内面等には、吸音板が設けられていることは勿論である。
【0037】
燃料ガスはパッケージケーシングPの後面のガス入口44より入り、ガスフィルタ2、ガス圧縮機1を経てガスタービン7へ供給される。また、低温水は後面側の温水入口45より入り、排熱熱交換器13で加温され、温水ポンプ14により後面側の温水出口より出て、熱負荷側に循環供給される。
【0038】
前記GTCGPの実施態様に於いては、排熱回収熱交換器13として通常の排熱温水ボイラ又は排熱蒸気ボイラ若しくはARを使用するようにしている。
しかし、排熱回収熱交換器13としては、公知の真空式排熱回収熱交換器の使用が望ましい。
即ち、当該真空式排熱回収熱交換器は図12に示すように、タービン排ガスGによつて熱媒水51を加熱し、これによって熱媒水51を蒸発せしめると共に、減圧蒸気室52に温水加熱管53を設け、前記熱媒水51の蒸発蒸気により温水加熱管53内の低温水W0 を加熱するよう構成されており、減圧蒸気室52内に蒸気が無い場合には、低温水W0 側から熱媒水51側へ熱が移行しないと云う特徴を有している。
【0039】
一方、本発明に係るGTCGPは、これを複数台並列状に組み合せて使用する場合が屡々あり、所謂複数のGTCGPの台数制御を行ないつつ負荷に対応するケースが多くある。
このような場合、例えば3台のGTCGPの並列運転に於いて、1台を運転休止にし、他の2台のGTCGPにより熱負荷へ温水を供給するとすると、通常の排熱温水ボイラを使用している場合には、運転中のGTCGPの排熱温水ボイラの熱が温水ヘッダを通して運転休止中の排熱温水ボイラの熱媒水側へ伝わり、これによって熱損失が大幅に増大する。
これに対して、真空式排熱回収熱交換器の場合には、前述の通り運転休止中の温水加熱管53を通してその熱媒水51側へ熱が伝わることが全くないため、システム全体としての熱効率の低下が防止されることになる。
【0040】
本発明に於いては、空気圧縮機・再生器・燃焼室・ガスタービン及び発電機を一体化したガスタービン発電機ユニットを用い、当該ガスタービン発電機ユニットや排熱回収ユニット、電力機器ユニット、制御ユニット、冷却ユニット等のシステムを構成する各ユニットをパッケージケーシング内へ収納した構成とすると共に、パッケージケーシングを、2段型の支持枠体とこれに取外し自在に固定したケーシングプレートとから形成して、前記支持枠体の上段側にガスタービン発電機ユニットを、また下段側に排熱回収ユニット及び電力器ユニットを配設するようにしている。
その結果、現場作業を皆無にした工場生産による製造コストの引き下げ、製品の品質や信頼性の向上、据付時間の短縮、ガスタービンコージェネレーションパッケージの小型化及びシステム全体の熱効率の向上等の優れた効用が奏される。
また、本発明では、支持枠体上に支持固定した各機器類をケーシングによって覆うと共に、ガスタービン発電機ユニットをパッケージケーシングの上段側に配置してこれを消音ボックスによって覆い、更に前記パッケージケーシングの内部を流通せしめた冷却用空気を前記消音ボックスを通して外部へ排出する構成としている。
その結果、各機器の冷却が十分に図れると共に、騒音の大幅な低下が可能となるだけでなく、複数台のパッケージを組み合せることにより、各種の異なる容量の負荷にも容易に対応することができる。
加えて、本発明では、パッケージケーシング内に設けた通風ガイド体により、外部から取り入れた空気を消音ボックスへ流入する燃焼用空気流と消音ボックス外の各機器を冷却する冷却用空気流とに振り分けると共に、各機器類を冷却した後の空気流を可能な限り短い通風路を通して消音ボックス内へ導入して高温のガスタービン発電機ユニットを冷却し、その後消音ボックスの下流側に設けた屈曲通路を通して冷却用空気を冷却ファンにより外部へ排出する構成としている。
その結果、各機器の冷却がより一層十分に図れると共に、騒音の一層の低下が可能となる。
【0041】
都市ガス13A(9.7Nm3 /h、9,930kcal/Nm3 、熱入力112KW)を用いた発電出力28KW、熱回収量56KW、総合効率75%の本発明の小容量ガスタービンコージェネレーションパッケージの大きさは、前面幅790mm、奥行き1875mm、高さ1750mm、容積2.59m3 、重量1,000kgとなり、大幅な小形・コンパクト化が達成された。
また、パッケージ後面より排出される排ガスは、90℃、765Nm3 /hであって、その成分はCO2 1.5%、CO5〜10ppm、NOx9ppm(0%O2 換算)、炭化水素〜0であった。
更に、騒音レベルは、前面1mに於いて65dBA以下であり、大幅な低騒音化が可能となっている。
本発明は上述の通り優れた実用的効用を奏するものである。
【図面の簡単な説明】
【図1】本発明の実施態様に係るガスタービンコージェネレーションパッケージ(GTCGP)のシステム構成図である。
【図2】本発明で使用するガスタービン発電機ユニットUの説明図である。
【図3】本発明に係るGTCGPの正面図である。
【図4】本発明に係るGTCGPの側面図である。
【図5】本発明に係るGTCGPの背面図である。
【図6】本発明に係るGTCGPの平面(天井面)図である。
【図7】GTCGPのケーシングプレートを取外した状態における正面図である。
【図8】GTCGPのケーシングプレートを取外した状態における側面図である。
【図9】GTCGPのケーシングプレートを取外した状態における背面図である。
【図10】GTCGPのケーシングプレートを取外した状態における平面図(天井面)である。
【図11】図8のイ−イ視図である。
【図12】真空式排熱熱交換器の概要説明図である。
【図13】従前の熱電併給システムの概要説明図である。
【符号の説明】
(GTCGP)はガスタービンコージェネレーションパッケージ、Pはパッケージケーシング、Uはガスタービン発電機ユニット、Tは排熱回収ユニット、Eは電力機器ユニット、Cは制御ユニット、Iは冷却ユニット、Bは支持枠体、B1 はベース台、B2 は支柱、B3 は桟体、F1 は1階床面、F2 は2階床面、Hはケーシングプレート、A0 は燃焼用空気、Acは冷却用空気、Gはタービン排ガス、G0 は排ガス、1はガス圧縮機、2はガスフィルタ、3はガス管、4は空気フィルタ(燃焼用)、5は空気圧縮機、6は燃焼室、7はガスタービン、8は発電機、9は再生器、10は空気予熱管、11はガスタービン排ガス管、12は低温ガスタービン排ガス管、13は排熱回収熱交換器(排熱温水ボイラ)、14は温水循環ポンプ、15は低温水管、16は高温水管、18は制御盤、19はAC/DCコンバータ、20はDC/ACインバータ、21はバッテリコントローラ、22は保護継電器、23はトランス、24はブレーカ、25は外部ガスフィルタ、27はパソコン、28はバッテリ、29は切換制御器、30は電力負荷、31は商用電源、32は貯湯タンク、33は給湯・暖房負荷、34は排ガス管、35は空気ベアリング、36は発電機冷却フィン、37は再生器ケーシング、38は排ガス口、39は消音ボックス、39aは屈曲通路、40は冷却ファン、41は空気ガイド体、41aは屈曲通路、42は空気取入口、43は排ガス出口、44は燃料ガス入口、45は低温水入口、46は高温水出口、47は排気筒、48は空気フィルタ(通風用)、49は空気取出口、51は熱媒水、52は減圧蒸気室、53は温水加熱管。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an improvement of a small-capacity gas turbine cogeneration package that supplies electric power and hot water, steam, etc. at the same time, and can be used alone in various relatively small factories, markets, offices, greenhouse farms, apartment houses, etc. Or it is used in the state which combined multiple units | sets.
[0002]
[Prior art]
A combined heat and power system (cogeneration system) combining a gas turbine generator and an exhaust gas boiler has been widely known and has been put into practical use. This combined heat and power system obtains electric power by driving a turbine generator, and collects heat of high-temperature exhaust gas from a gas turbine by an exhaust heat boiler or an exhaust heat hot water boiler to obtain steam or hot water. In establishments that require hot water and steam at the same time, the overall energy efficiency is improved compared to the case where these are supplied separately, and the economy is excellent.
[0003]
FIG. 13 shows an example of a conventional cogeneration system, in which a gas turbine 100 and a generator 101, which are covered with a noise-preventing enclosure, are connected to an exhaust heat boiler 102, to which an intake filter 103, a gas are connected. A cogeneration system is formed by combining the turbine exhaust chamber 104, the exhaust duct 105, and the like, and arranging various control devices in a separate electric control room.
[0004]
By the way, all of these conventional systems have a comparatively large capacity with a power generation capacity of around 5000 kw, ideally a power generation device, and are intended to recover the exhaust heat with an exhaust gas boiler. It is.
In addition, technically, to prevent noise, the enclosures are always used to mute each device and equipment, and gas turbines, generators, exhaust heat boilers, etc. are handled as separate and independent devices, and control devices, etc. Is basically arranged in a separate control room.
For this reason, each device and device making up the system is manufactured independently and independently at the factory, assembled and installed on site, and finally piping and electrical wiring between each device is performed on site. ing.
[0005]
However, in the gas turbine cogeneration system manufactured under the design concept as described above, (1) each device is manufactured as an independent and separate device, so that the manufacturing cost is high. Because equipment is connected externally, a lot of installation space is required, (3) site construction is increased, time and cost for installation is high, and (4) there are many site constructions. There are problems such as low quality and reliability of the entire system as compared to mass production systems in factories.
In particular, as the gas turbine cogeneration system becomes more widespread and its capacity is reduced in size (for example, 15 to 50 kW), the above problems become more prominent. For small capacity loads with load power of about 15 to 100 kW, There is a difficulty that it is difficult to respond economically.
[0006]
[Problems to be solved by the invention]
The present invention is intended to solve the above-described problems in a relatively small capacity gas turbine cogeneration system, and each device, pipe, drive and control device constituting the gas turbine cogeneration system, Wiring etc. are three-dimensionally and functionally arranged on a single support frame and stored in a small package case, improving mass productivity and processing ratio in factories, facilitating transportation, and site construction Gas turbine cogeneration package that reduces volume, shortens construction work on site, reduces installation area, improves product quality, improves compatibility with loads of different capacities, facilitates operation and maintenance, and reduces costs It is a main object of the invention to provide the above.
[0007]
[Means for Solving the Problems]
The invention according to claim 1 is a gas turbine generator unit in which an air compressor, a regenerator, a gas turbine, and a generator are integrated, an exhaust heat recovery heat exchanger that receives exhaust gas from the gas turbine, and a hot water circulation pump. A waste heat recovery unit comprising: a power receiving unit comprising a converter, an inverter, a protective relay, and a transformer for receiving power from the generator; a control unit mainly comprising a control panel; A gas pipe, a hot water pipe, an electrical wiring, an air guide body, a silencer box covering the gas turbine generator unit, and a cooling unit comprising a cooling fan In a small-capacity gas turbine cogeneration package housed in a package casing, the package casing is formed of a two-stage support frame and a casing plate detachably fixed thereto, and the support frame A gas turbine generator unit on the upper side, an exhaust heat recovery unit and a power equipment unit on the lower side, and The basic structure of the present invention is that the cooling air circulated inside the package casing is discharged to the outside through the silencer box.
[0008]
The invention of claim 2 is the invention of claim 1, wherein the exhaust heat recovery heat exchanger is a vacuum exhaust heat hot water boiler.
[0009]
According to a third aspect of the present invention, in the first aspect of the present invention, a combustion air filter is provided in the silence box that covers the gas turbine generator unit, thereby reducing the intake noise. .
[0010]
According to a fourth aspect of the present invention, the silencer box of the first aspect is divided into a combustion air flow and a cooling air flow for each device, and the divided combustion air flow. It is set as the structure provided with the air guide body which guides in a silence box.
[0011]
According to a fifth aspect of the present invention, the silencer box according to the first aspect of the present invention is provided with a bent passage on the discharge side of the air flow, and the cooling air flow after cooling each device is sent by the cooling fan through the bent passage. It is configured to discharge to the outside.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a system configuration diagram of a small-capacity gas turbine cogeneration package (hereinafter abbreviated as GTCGP) according to the present invention, and FIG. 2 is a partially broken view of a gas turbine generator unit used in the present invention. It is a front view.
In FIG. 1, 1 is a gas compressor, 2 is a gas filter, 3 is a gas pipe, 4 is an air filter, 5 is a compressor, 6 is a combustion chamber, 7 is a gas turbine, 8 is a generator, and 9 is a regeneration. , 10 is an air preheating pipe, and 11 is a gas turbine exhaust gas pipe. The compressor 5, the combustion chamber 6, the gas turbine 7, the generator 8, the regenerator 9, the air preheating pipe 10, etc. A generator unit U is formed.
[0014]
In FIG. 1, 12 is a low temperature gas turbine exhaust pipe, 13 is an exhaust heat recovery heat exchanger (exhaust heat hot water boiler), 14 is a hot water circulation pump, 15 is a low temperature water pipe, 16 is a high temperature water pipe, and 18 is a control panel. , 19 is an AC / DC converter, 20 is a DC / AC inverter, 21 is a battery controller, 22 is a protective relay, 23 is a transformer, 24 is a breaker, and the exhaust heat recovery heat exchanger 13, hot water circulation pump 14, low temperature An exhaust heat recovery unit T is constituted by the water pipe 15, the high temperature water pipe 16, and the like, and an electric power equipment unit E is constituted by the AC / DC converter 19, the DC / AC inverter 20, the battery controller 21, the protective relay 22, the transformer 23, the breaker 24, and the like. ing.
Further, the units U, T, E and the like are controlled by a control unit C having a control panel 18 as a main component.
[0015]
Although not shown in FIG. 1, all the members according to the reference numbers 1 to 24 are stored in the package casing P.
Although not shown in FIG. 1, each device housed in the package casing P is reduced in noise by a cooling unit I formed by a filter, an air guide body, a silencer box, a cooling fan, etc., which will be described later. So it is functionally cooled.
[0016]
Further, in FIG. 1, 25 is an external gas filter, 27 is a personal computer, 28 is a battery, 29 is a switching controller, 30 is a power load, 31 is a commercial power source, 32 is a hot water storage tank, 33 is a hot water supply load, and 34 is an exhaust gas. Each of the members according to the reference numbers 25 to 34 is disposed outside the package casing P.
[0017]
FIG. 2 is a schematic explanatory diagram of the gas turbine generator unit U used in the present invention. The compressor 5, the combustion chamber 6, the turbine 7, the generator 8, the regenerator 9, and the air preheating pipe (passage) 10 are shown. The gas turbine generator unit U is formed by integrally assembling the exhaust gas pipe (passage) 11, the air bearing 35, the generator cooling fin 36, the regenerator casing 37, the exhaust gas port 38, and the like.
[0018]
Referring to FIGS. 1 and 2, the GTCGP uses city gas 13A as fuel, and recovers heat (56 KW) as hot water from a turbine generator having a heat input of 112 KW and a power generation output of 28 KW as hot water in a waste heat hot water boiler. The overall efficiency is 75%. Further, the portion surrounded by the dotted line L in FIG. 1 is placed on one support frame and stored in the package casing P, and after being mass-produced in the factory, it is transported to the installation place.
As the fuel, fuel gas other than the city gas 13A or liquid fuel such as kerosene may be used, and cold water and hot water may be taken out by steam and an absorption chiller / heater using an exhaust heat boiler. Of course.
[0019]
City gas 13A (9,930 Kcal / Nm Three ・ 9.7 Nm Three / H · heat input 112 kW) is sent to the combustion chamber 6 of the gas turbine 7 through the gas compressor 1. Meanwhile, combustion air A 0 Is compressed by the compressor 5 through the air filter 4 and heated by the high-temperature turbine exhaust gas in the regenerator 9 and then fed into the combustion chamber 6 where it is mixed and burned with the city gas 13A.
[0020]
The gas turbine 7 is rotated at a high speed (96000 rpm) by the high-temperature combustion gas generated by the combustion, and generates electricity by rotating the generator 8 directly connected thereto.
The generated AC 1,600 Hz electric power is converted into direct current by the AC / DC converter 19 and then sent directly (or once stored in the storage battery 28) to the DC / AC inverter 20 having the automatic synchronization verification function and the protection function. And converted to AC at commercial frequency.
The electric power converted into the commercial frequency is stepped down to 200 V by the transformer 23 and then supplied to the electric power load 30 through the circuit breaker 24 as electric power with an output of 28 KW.
Further, the power of 28 KW output from the circuit breaker 24 is supplied as it is to the power load 30 via the switching controller 29 or is supplied simultaneously with the commercial power source 31 or mutually switched.
[0021]
The exhaust gas discharged from the gas turbine 7 is sent to the regenerator 9 through the gas turbine exhaust pipe (passage) 11, where the combustion compressed air from the compressor 5 is preheated. Further, the preheated compressed air is sent into the combustion chamber 6. Since the regenerator 9 is built in the regenerator casing 37, the air preheating pipe 10 and the gas turbine exhaust gas pipe 11 exist as passages rather than pipes (see FIG. 2).
[0022]
Heat exchange in the regenerator 9 and gas turbine exhaust gas (765 Nm) having a low temperature of about 273 ° C. Three / H) enters the exhaust heat recovery heat exchanger (exhaust heat hot water boiler) 13 via the low temperature gas turbine exhaust gas pipe 12, where the heat exchange with the low temperature (60 ° C) supply water returned from the hot water supply / heating load 33 is performed. After the exhaust gas (about 90 ℃) G 0 Is released into the atmosphere.
This exhaust gas G 0 Is usually CO 2 1.5%, CO 5-10 ppm, NOx 9 ppm (0% O 2 In terms of hydrocarbon) to 0 and does not significantly damage the environment.
On the other hand, the low-temperature water supply at 60 ° C. is converted into high-temperature water (70 ° C., 4,820 kg / h, output 56 KW) by the exhaust heat recovery heat exchanger 13 through the hot water circulation pump 14, and then hot water supply / It is supplied to the heating load 33.
[0023]
Although not shown in FIG. 1, the gas turbine generator unit U, the exhaust heat recovery unit T, the power equipment unit E, the cooling unit I, the control unit C, and the like are mounted on the support frame B. And is covered by a casing plate H.
In the package casing P, a cooling unit I including a silencer box 39, a cooling fan 40, an air guide plate 41, and the like is provided as described later, and an air cooling system for each device is formed.
[0024]
Referring to FIG. 2, combustion air A that has flowed through air filter 4 0 Is sent to the outer periphery of the generator 8 by the generator cooling fins 36, preheated by cooling the generator 8, and then compressed by the compressor 5. Combustion air A compressed by the compressor 5 0 Is sent to a regenerator 9 through an air preheating pipe (passage) 10, where it is preheated by high-temperature gas turbine exhaust gas and then supplied to the combustion chamber 6, and the gas turbine is rotated by the combustion gas generated in the combustion chamber 6. Driven.
[0025]
Since the rotational speed (96000 rpm) of the gas turbine 7 is high, an air bearing 35 is used as the bearing, and high power generation efficiency can be obtained by this high speed rotation.
Further, the high-temperature exhaust gas from the gas turbine 7 is converted into combustion air A by the regenerator 9. 0 273 ℃ ・ 765Nm by heat exchange with Three / H turbine exhaust gas G and discharged from the exhaust port 38.
[0026]
A regenerator 9 is disposed on the outer periphery of the gas turbine 7 so as to surround the gas turbine 7, and the regenerator casing 37 covers the outermost shell of the gas turbine 7. .
[0027]
The small-capacity gas turbine generator unit U of about 15 to 50 KW as shown in FIG. 2 can achieve high-efficiency power generation and reduction in size and weight of the device by increasing the turbine rotational speed. In addition, vibration is relatively small, and by adopting an appropriate casing 37, cooling system I, and package casing P, noise can be reduced to 65 dBA (front 1 m).
[0028]
FIG. 3 to FIG. 6 show outline views of the GTCGP according to the present invention, and show a front view, a side view, a rear view, and a plan view of the package casing P, respectively. The package casing P is formed of a square support frame B that supports and fixes each device described above, each device that is supported and fixed to the support frame B, and a casing plate H that covers the support frame B. The casing H is detachably attached to the support frame B.
3 to 6, 42 is an air intake, 43 is an exhaust gas outlet, 44 is a fuel gas inlet, 45 is a low-temperature water inlet, 46 is a high-temperature water outlet, 47 is an exhaust pipe, G 0 Is exhaust gas, which is provided on each steel plate forming the package casing P.
[0029]
7 to 10 show a front view, a side view, a rear view, and a plan view of the GTCGP according to this embodiment with the casing plate H removed, and FIG. A view is shown.
[0030]
7 to 11, B is a supporting frame body, 39 is a sound deadening box, 39b is a guide plate (heat shielding plate), 40 is a cooling fan, 41 is an air flow guide body, and 48 is an air filter (for ventilation). ), 49 is a discharge port for air for cooling equipment.
The support frame B is a rectangular base base B made of C-shaped steel. 1 And the column B standing on this 2 And prop B 2 Crosspiece B built in between Three Etc., and is formed into a square frame shape. 1 And 2nd floor F 2 And are provided. 7 to 11, the casing plate H is removed, but the package casing P is constituted by the support frame B and the casing plate H attached thereto.
[0031]
The first floor F of the support frame B 1 Above, an exhaust heat recovery unit T composed of an exhaust heat recovery heat exchanger (warm water boiler) 13, a hot water circulation pump 14, and the like, a power equipment unit E such as a transformer 23, a converter 19, an inverter 20 and a battery controller 21, and a fuel Various devices such as a gas filter 2 and a gas compressor 1 are arranged. 2nd floor F 2 Is equipped with a small-capacity gas turbine generator unit U, an air filter 4, a muffler box 39, a cooling fan 40, a control unit C, etc., and the GTCGP is driven, controlled and monitored by the control unit C on the front of the package. It is.
[0032]
2nd floor F 2 The exhaust gas G from the small-capacity gas turbine generator unit U installed on the first floor F passes through the low-temperature gas turbine exhaust pipe 12 below the unit U. 1 Directly sent to the exhaust heat recovery heat exchanger 13 installed above.
[0033]
Combustion air A 0 And the cooling air Ac of equipment enters through the air intake hole 42 provided in the lower front part of the package casing P as shown in FIG. 0 Is silenced by the bent portion 41 a of the air flow guide body 41 and sucked into the gas turbine generator unit U through the air filter 4 and sucked into the air compressor 5 through the generator cooling fins 36.
Further, the exhaust gas from the gas turbine generator unit U enters the exhaust heat recovery heat exchanger 13 through the exhaust gas pipe 12, is recovered by heat, and is then released to the atmosphere from the exhaust gas outlet 43 on the rear surface of the package casing P. An exhaust pipe 47 and a muffler muffler (not shown) are provided on the exhaust gas outlet 43 side as necessary.
[0034]
That is, the external air that has flowed into the interior through the air filter 48 from the air intake 42 is guided by the guide body 41 provided in the package casing P to the power equipment unit E mainly composed of the transformer 23 and the exhaust heat exchanger 13. The cooling air flow Ac for cooling the exhaust heat recovery unit T mainly composed of the control unit C, the control unit C mainly composed of the control panel 18 and the combustion air flow A flowing into the sound deadening box 39 of the gas turbine generator unit U It is distributed to. The former cooling air flow Ac cools the devices forming the units E, T, and C, and then is sucked into the sound deadening box 39 to cool the gas turbine generator unit U, which is a high temperature part. After that, the cooling fan 40 passes through the bent passage 39a on the downstream side and is discharged to the outside from the air outlet 49 on the rear surface side of the package casing P.
[0035]
Further, the combustion air A diverted by the latter ventilation guide body 41. 0 Is silenced by passing through the bent passage 41 a in the ventilation guide body 41, flows into the silence box 39 covering the gas turbine generator unit U, and further silenced by passing through the air filter 4. It is sucked into the turbine generator unit U.
[0036]
The equipment constituting each unit E, T, C, U is cooled by the cooling air flow Ac, so that the temperature of each equipment is kept below a predetermined safe temperature.
Further, the passage of the cooling air Ac in the package casing P is set to be as short as possible, and the guide body 41 forming the combustion air passage, its bent passage 41a, the sound deadening box 39 and its bent. Combined with the silencing effect of the passage 39a and the air filter 4, the noise level around the package casing P can be suppressed to 65 dBA or less (front 1 m). Of course, a sound absorbing plate is provided on the guide body 41, the sound deadening box 39, the guide plate 39b, the inner surface of the casing plate H, and the like.
[0037]
The fuel gas enters from the gas inlet 44 on the rear surface of the package casing P, and is supplied to the gas turbine 7 through the gas filter 2 and the gas compressor 1. The low-temperature water enters from the hot water inlet 45 on the rear surface side, is heated by the exhaust heat exchanger 13, exits from the hot water outlet on the rear surface side by the hot water pump 14, and is circulated and supplied to the heat load side.
[0038]
In the embodiment of the GTCGP, a normal exhaust heat hot water boiler, exhaust heat steam boiler or AR is used as the exhaust heat recovery heat exchanger 13.
However, it is desirable to use a known vacuum exhaust heat recovery heat exchanger as the exhaust heat recovery heat exchanger 13.
That is, as shown in FIG. 12, the vacuum exhaust heat recovery heat exchanger heats the heat transfer water 51 by the turbine exhaust gas G, thereby evaporating the heat transfer water 51, and also supplies hot water to the decompression steam chamber 52. A heating pipe 53 is provided, and the low temperature water W in the hot water heating pipe 53 is formed by the evaporated vapor of the heat transfer water 51. 0 When there is no steam in the decompression steam chamber 52, the low-temperature water W is heated. 0 It has the characteristic that heat does not transfer from the side to the heat transfer water 51 side.
[0039]
On the other hand, the GTCGP according to the present invention is often used by combining a plurality of GTCCGPs in parallel, and there are many cases corresponding to loads while controlling the number of so-called multiple GTCGPs.
In such a case, for example, in parallel operation of three GTCGPs, if one unit is shut down and hot water is supplied to the heat load by the other two GTCGPs, a normal exhaust heat hot water boiler is used. If so, the heat of the exhaust heat hot water boiler of the operating GTCGP is transmitted to the heat transfer water side of the exhaust heat hot water boiler during operation stop through the hot water header, thereby greatly increasing heat loss.
On the other hand, in the case of a vacuum exhaust heat recovery heat exchanger, heat is not transmitted to the heat transfer water 51 side through the hot water heating pipe 53 during operation suspension as described above. A decrease in thermal efficiency is prevented.
[0040]
In the present invention, using a gas turbine generator unit in which an air compressor, a regenerator, a combustion chamber, a gas turbine and a generator are integrated, the gas turbine generator unit, the exhaust heat recovery unit, the power equipment unit, Each unit constituting the system such as the control unit and cooling unit is housed in a package casing, and the package casing is formed of a two-stage support frame and a casing plate that is detachably fixed to the support frame. The gas turbine generator unit is disposed on the upper side of the support frame, and the exhaust heat recovery unit and the power unit are disposed on the lower side.
As a result, the production cost has been reduced through factory production with no on-site work, product quality and reliability have been improved, installation time has been reduced, gas turbine cogeneration packages have been downsized, and overall system thermal efficiency has been improved. The effect is played.
Further, in the present invention, each device supported and fixed on the support frame is covered with a casing, the gas turbine generator unit is arranged on the upper side of the package casing, and this is covered with a silencer box. The cooling air circulated through the inside is discharged to the outside through the silencing box.
As a result, each device can be sufficiently cooled and the noise can be greatly reduced. In addition, by combining multiple packages, it is possible to easily handle loads of various different capacities. it can.
In addition, according to the present invention, the ventilation guide body provided in the package casing distributes the air taken from the outside into the combustion air flow that flows into the silencer box and the cooling air flow that cools each device outside the silencer box. At the same time, the air flow after cooling each device is introduced into the silencer box through the shortest possible ventilation path to cool the high-temperature gas turbine generator unit, and then through a bent passage provided downstream of the silencer box. The cooling air is discharged to the outside by a cooling fan.
As a result, each device can be more sufficiently cooled, and noise can be further reduced.
[0041]
City gas 13A (9.7 Nm Three / H, 9,930 kcal / Nm Three The small-sized gas turbine cogeneration package of the present invention having a power output of 28 KW using a heat input of 112 KW), a heat recovery amount of 56 KW, and an overall efficiency of 75% has a front width of 790 mm, a depth of 1875 mm, a height of 1750 mm, and a volume of 2 .59m Three With a weight of 1,000 kg, a significant reduction in size and size was achieved.
Moreover, the exhaust gas discharged from the rear surface of the package is 90 ° C. and 765 Nm. Three / H, the component of which is CO 2 1.5%, CO 5-10 ppm, NOx 9 ppm (0% O 2 Conversion), hydrocarbons to 0.
Furthermore, the noise level is 65 dBA or less at the front surface of 1 m, and the noise can be greatly reduced.
The present invention has excellent practical utility as described above.
[Brief description of the drawings]
FIG. 1 is a system configuration diagram of a gas turbine cogeneration package (GTCGP) according to an embodiment of the present invention.
FIG. 2 is an explanatory diagram of a gas turbine generator unit U used in the present invention.
FIG. 3 is a front view of a GTCGP according to the present invention.
FIG. 4 is a side view of a GTCGP according to the present invention.
FIG. 5 is a rear view of the GTCGP according to the present invention.
FIG. 6 is a plan view (ceiling surface) of the GTCGP according to the present invention.
FIG. 7 is a front view of the GTCGP with a casing plate removed.
FIG. 8 is a side view of the GTCGP with a casing plate removed.
FIG. 9 is a rear view of the GTCGP with a casing plate removed.
FIG. 10 is a plan view (ceiling surface) in a state where a casing plate of GTCGP is removed.
FIG. 11 is a view taken along the line II in FIG. 8;
FIG. 12 is a schematic explanatory diagram of a vacuum exhaust heat exchanger.
FIG. 13 is a schematic explanatory diagram of a conventional combined heat and power system.
[Explanation of symbols]
(GTCGP) is a gas turbine cogeneration package, P is a package casing, U is a gas turbine generator unit, T is an exhaust heat recovery unit, E is a power equipment unit, C is a control unit, I is a cooling unit, and B is a support frame Body, B 1 Is base stand, B 2 Is the support, B Three Is a frame, F 1 Is the first floor, F 2 Is the second floor, H is the casing plate, A 0 Is combustion air, Ac is cooling air, G is turbine exhaust gas, G 0 Is exhaust gas, 1 is a gas compressor, 2 is a gas filter, 3 is a gas pipe, 4 is an air filter (for combustion), 5 is an air compressor, 6 is a combustion chamber, 7 is a gas turbine, 8 is a generator, 9 Is a regenerator, 10 is an air preheat pipe, 11 is a gas turbine exhaust pipe, 12 is a low temperature gas turbine exhaust pipe, 13 is an exhaust heat recovery heat exchanger (exhaust heat hot water boiler), 14 is a hot water circulation pump, and 15 is a low temperature water pipe. , 16 is a high-temperature water pipe, 18 is a control panel, 19 is an AC / DC converter, 20 is a DC / AC inverter, 21 is a battery controller, 22 is a protective relay, 23 is a transformer, 24 is a breaker, 25 is an external gas filter, 27 Is a personal computer, 28 is a battery, 29 is a switching controller, 30 is a power load, 31 is a commercial power source, 32 is a hot water storage tank, 33 is a hot water supply / heating load, 34 is an exhaust gas pipe, 35 is an air bearing, 36 is Electric cooling fins, 37 is a regenerator casing, 38 is an exhaust gas outlet, 39 is a sound deadening box, 39a is a bent passage, 40 is a cooling fan, 41 is an air guide body, 41a is a bent passage, 42 is an air intake, and 43 is an exhaust gas Outlet, 44 is a fuel gas inlet, 45 is a low temperature water inlet, 46 is a high temperature water outlet, 47 is an exhaust pipe, 48 is an air filter (for ventilation), 49 is an air outlet, 51 is a heat transfer water, and 52 is a decompressed steam Chamber 53 is a hot water heating tube.

Claims (5)

空気圧縮機と再生器とガスタービンと発電機とを一体化して成るガスタービン発電機ユニットと、前記ガスタービンからの排ガスを受け入れる排熱回収熱交換器と温水循環ポンプとから成る排熱回収ユニットと、前記発電機からの電力を受け入れるコンバータとインバータと保護継電器とトランスから成る電力機器ユニットと、制御盤を主体とする制御ユニットと、前記各ユニット相互の間を連結するガス配管と温水配管と電気配線と、空気ガイド体とガスタービン発電機ユニットを覆う消音ボックスと冷却ファンから成る冷却ユニットとをパッケージケーシング内に格納して成る小容量のガスタービンコージェネレーションパッケージにおいて、前記パッケージケーシングを、2段型の支持枠体とこれに取外し自在に固定したケーシングプレートとから形成すると共に、前記支持枠体の上段側にガスタービン発電機ユニットを、また下段側に排熱回収ユニット及び電力機器ユニットを配設し、更に前記パッケージケーシングの内部を流通せしめた冷却用空気を前記消音ボックスを通して外部へ排出する構成としたことを特徴とする小容量のガスタービンコージェネレーションパッケージ。A gas turbine generator unit comprising an air compressor, a regenerator, a gas turbine and a generator integrated with each other, an exhaust heat recovery heat exchanger for receiving exhaust gas from the gas turbine, and an exhaust heat recovery unit comprising a hot water circulation pump A power device unit including a converter, an inverter, a protective relay, and a transformer that receive power from the generator, a control unit that mainly includes a control panel, and a gas pipe and a hot water pipe that connect between the units. In a small-capacity gas turbine cogeneration package in which electrical wiring, a silencing box that covers an air guide body and a gas turbine generator unit, and a cooling unit including a cooling fan are stored in a package casing, the package casing includes 2 A stepped support frame and a casing block that is detachably fixed to the frame. And forming from the over preparative, a gas turbine generator unit in the upper side of the support frame, also the exhaust heat recovery unit and a power device unit is disposed on the lower side, yielding further flowing inside of the package casing A small-capacity gas turbine cogeneration package characterized in that cooling air is discharged to the outside through the silencing box. 排熱回収熱交換器を真空型排熱温水ボイラとした請求項1に記載の小容量のガスタービンコージェネレーションパッケージ。  The small-capacity gas turbine cogeneration package according to claim 1, wherein the exhaust heat recovery heat exchanger is a vacuum type exhaust heat hot water boiler. ガスタービン発電機ユニットを覆う消音ボックスの内部に燃焼用空気のフィルターを設ける構成とした請求項1に記載の小容量のガスタービンコージェネレーションパッケージ。  The small-capacity gas turbine cogeneration package according to claim 1, wherein a filter for combustion air is provided inside a sound deadening box that covers the gas turbine generator unit. 消音ボックスを、外部から取り入れした空気流を燃焼用空気流と各機器類の冷却用空気流とに分流すると共に、分流した燃焼用空気流を消音ボックス内へ案内する空気ガイド体を備えた構成とした請求項1に記載の小容量のガスタービンコージェネレーションパッケージ。  The silencer box has an air guide body that divides the air flow taken from outside into a combustion air flow and a cooling air flow for each device, and guides the divided combustion air flow into the silencer box. The small-capacity gas turbine cogeneration package according to claim 1. 消音ボックスを、空気流の排出側に屈曲通路を備え、各機器類を冷却した後の冷却用空気流を前記屈曲通路を通して冷却ファンにより外部へ排出する構成とした請求項1に記載の小容量のガスタービンコージェネレーションパッケージ。  2. The small capacity according to claim 1, wherein the silencer box has a bent passage on the air flow discharge side, and the cooling air flow after cooling each device is discharged to the outside through the bent passage by a cooling fan. Gas turbine cogeneration package.
JP2000188692A 2000-06-23 2000-06-23 Small capacity gas turbine cogeneration package Expired - Fee Related JP3847059B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000188692A JP3847059B2 (en) 2000-06-23 2000-06-23 Small capacity gas turbine cogeneration package

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000188692A JP3847059B2 (en) 2000-06-23 2000-06-23 Small capacity gas turbine cogeneration package

Publications (2)

Publication Number Publication Date
JP2002004942A JP2002004942A (en) 2002-01-09
JP3847059B2 true JP3847059B2 (en) 2006-11-15

Family

ID=18688439

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000188692A Expired - Fee Related JP3847059B2 (en) 2000-06-23 2000-06-23 Small capacity gas turbine cogeneration package

Country Status (1)

Country Link
JP (1) JP3847059B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104736827A (en) * 2012-12-28 2015-06-24 三菱重工业株式会社 Container unit-type engine generator device having pipe connecting function
KR102834209B1 (en) * 2024-12-09 2025-07-16 비에이치아이 주식회사 Mobile Container-type Hot Water Supply Unit using a Mobile Gas Turbine Power Plant

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100702039B1 (en) 2004-12-10 2007-03-30 엘지전자 주식회사 Cogeneration System
JP2006169995A (en) * 2004-12-14 2006-06-29 Takuma Co Ltd Micro-gas turbine power generation system and auxiliary machine power supply method
JP2006348948A (en) * 2006-09-26 2006-12-28 Sanyo Electric Co Ltd Cogeneration system
JP4918404B2 (en) * 2007-05-14 2012-04-18 三菱重工業株式会社 Low pressure steam recovery turbine and installation method thereof
JP5431836B2 (en) 2009-08-27 2014-03-05 ヤンマー株式会社 Engine system with a transformer in the independent ventilation path
JP5354372B2 (en) * 2009-09-28 2013-11-27 三浦工業株式会社 Waste heat boiler and waste heat recovery system
KR101138617B1 (en) 2010-05-31 2012-04-26 삼성중공업 주식회사 Steam generating apparatus for ship
JP5548592B2 (en) * 2010-11-19 2014-07-16 本田技研工業株式会社 Cogeneration equipment
CN109213012B (en) * 2018-09-11 2021-02-09 广东明阳电气股份有限公司 Offshore wind power boost dry-type transformer control system
CN110030113B (en) * 2019-05-27 2024-04-16 宁波志胜空天动力科技有限公司 Supercharged ramjet engine and aircraft

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104736827A (en) * 2012-12-28 2015-06-24 三菱重工业株式会社 Container unit-type engine generator device having pipe connecting function
CN104736827B (en) * 2012-12-28 2017-06-09 三菱重工业株式会社 Link the container units h type engine h TRT of function with pipe arrangement
US9920707B2 (en) 2012-12-28 2018-03-20 Mitsubishi Heavy Industries, Ltd. Container unit-type engine generator device having pipe coupling function
KR102834209B1 (en) * 2024-12-09 2025-07-16 비에이치아이 주식회사 Mobile Container-type Hot Water Supply Unit using a Mobile Gas Turbine Power Plant

Also Published As

Publication number Publication date
JP2002004942A (en) 2002-01-09

Similar Documents

Publication Publication Date Title
JP3847059B2 (en) Small capacity gas turbine cogeneration package
JPH1193690A (en) Gas turbine driving power unit
EP2383522B1 (en) Thermal integration of a carbon dioxide capture and compression unit with a steam or combined cycle plant
CN103032160B (en) High-power container type diesel generating set
WO1987007360A1 (en) Heat exchanging system
US20020112850A1 (en) Energy-saving system for a multiple-function equipment consisting of engine, power generator and air conditioner
JP2001065406A (en) Mobile power car
JP2009074744A (en) Gas heat pump cogeneration system
GB2387641A (en) Combined heat and power unit
JP2002013759A (en) Desiccant air conditioning method
CN102116215A (en) Self-electricity consumption reduction combined cooling heat and power system
JP2011029117A (en) Fuel cell device
CN115763934B (en) Battery formation component equipment and cooling method thereof
EP1946008A1 (en) Device for heating, generating electric power, and cooling enclosed spaces
JP4986537B2 (en) Gas turbine built-in absorption refrigerator
JP3291508B2 (en) Gas turbine co-generation system
CN110953065B (en) Unit volume and super-power generator set
CN101672229A (en) A combined heat and power generation system
JPH062569A (en) Multi-purpose cooling method for gas turbine power generation equipment
CN217976333U (en) New energy industry power generation facility
CN217876095U (en) Light portable multifunctional power generation and supply heating furnace device
JPH10238813A (en) Air conditioning system equipment
JP3936123B2 (en) Operation control method for small capacity gas turbine cogeneration system
CN223768884U (en) A superconducting thermal energy-saving fuel steam generator
JP7526067B2 (en) Fuel Cell Systems

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050630

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060731

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060822

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100901

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100901

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110901

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120901

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130901

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees