Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3875532B2 - Snow melting equipment - Google Patents
[go: Go Back, main page]

JP3875532B2 - Snow melting equipment - Google Patents

Snow melting equipment Download PDF

Info

Publication number
JP3875532B2
JP3875532B2 JP2001322034A JP2001322034A JP3875532B2 JP 3875532 B2 JP3875532 B2 JP 3875532B2 JP 2001322034 A JP2001322034 A JP 2001322034A JP 2001322034 A JP2001322034 A JP 2001322034A JP 3875532 B2 JP3875532 B2 JP 3875532B2
Authority
JP
Japan
Prior art keywords
concrete block
snow melting
hole
hot air
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001322034A
Other languages
Japanese (ja)
Other versions
JP2003129694A (en
Inventor
稔 米澤
Original Assignee
株式会社よねざわ工業
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社よねざわ工業 filed Critical 株式会社よねざわ工業
Priority to JP2001322034A priority Critical patent/JP3875532B2/en
Publication of JP2003129694A publication Critical patent/JP2003129694A/en
Application granted granted Critical
Publication of JP3875532B2 publication Critical patent/JP3875532B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cleaning Of Streets, Tracks, Or Beaches (AREA)
  • Building Environments (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Central Heating Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、燃焼などによって発生した温風を利用して雪を溶かす融雪装置に関する。
【0002】
【従来の技術】
従来、この種の融雪装置としては、例えば特開平2−300402号公報に記載されたものがある。図12はこの従来の融雪装置を示す構成図である。
温風発生手段100で発生した温風は、パイプ101を通り、送風手段102により、融雪用平面体103の温風入口部104に送出される。融雪用平面体103は、アスファルトなどの材料の中に、温風を環流させる環流パイプ105が埋め込まれている。そして、温風がこの環流パイプ105を通過する際に、温風の熱が融雪用平面体103に伝達され、融雪用平面体103の上部に載置された雪106を溶かす。
【0003】
【発明が解決しようとする課題】
しかし、上記従来の融雪装置は、設置場所ごとに、融雪用平面体103の寸法が異なるため、設置の度に異なる融雪用平面体103を作る必要があった。このため、環流パイプ105の形状は、設置場所の表面の全面を交叉することなく覆う形状となるように、設置の度に作る必要があり、設置工数が多くなるという問題があるとともに、熱の伝達が、環流パイプ105の断面から融雪用平面体103のアスファルトを経て、融雪用平面体103の上部の雪106に達するのに時間を要する問題や、融雪用平面体103の施工時の作業性と、出来上がった融雪用平面体103の強度と、供給する熱が有効に雪に伝わる熱伝導特性の3特性が共に優れたものが得られていないという問題も有していた。
【0004】
そこで本発明は、施工時の作業性がよく、強度に優れ、熱伝導性の高い融雪装置を提供することを目的とする。
特に本発明は、塀や壁面、土台などに広く利用されているコンクリートブロックを融雪装置として利用することを目的とする。
【0005】
【課題を解決するための手段】
請求項1記載の本発明の融雪装置は、対向する2つの表面部(6)(7)と、2つの前記表面部(6)(7)の間に形成される4つの側面部(2)(3)(4)(5)と、いずれかの前記側面部(2)(3)(4)(5)で開口する貫通穴(8)とからなり、隣接する面(2)(3)(4)(5)(6)(7)が互いに直交する6面体からなるコンクリートブロックを用い、前記コンクリートブロックの側面部(2)(3)(4)(5)をそれぞれ当接させて配置し、隣接する前記コンクリートブロック間の前記貫通穴(8)を連続させ、連続させた前記貫通穴(8)を温風通路とし、前記表面部(6)(7)の少なくとも一方の面を融雪面とした融雪装置であって、前記コンクリートブロックを、2つの前記貫通穴(8)平行に設けることで相対する2つの前記側面部(2)(3)に開口させた第1の前記コンクリートブロックと、2つの前記貫通穴(8a)平行に設けることで相対する2つの前記側面部(2)(3)に開口し、更に2つの前記側面部(2)(3)のいずれかの面の開口を連通させるとともに別の前記側面部(4)にも開口する貫通穴(8b)を前記貫通穴(8a)と直交させて設けることで少なくとも3箇所の面で開口させた第2の前記コンクリートブロックとで構成し、第1の前記コンクリートブロックと第2の前記コンクリートブロックとを、第1の前記コンクリートブロックの貫通穴(8)と第2の前記コンクリートブロックの貫通穴(8a)とが同一の方向となるように連接し、第2の前記コンクリートブロックの前記側面部(4)に、更に他の第2の前記コンクリートブロックを、それぞれの貫通穴(8a)が直交する方向となるように連接したことを特徴とする。
請求項2記載の本発明は、請求項1に記載の融雪装置において、隣接する前記コンクリートブロック間に、前記貫通穴から前記融雪面に連通する連通路を設けたことを特徴とする。
請求項3記載の本発明は、請求項1または請求項2に記載の融雪装置において、温風を発生する温風発生手段と、前記コンクリートブロックの前記貫通穴に前記温風を送風する送風手段とを備えたことを特徴とする。
請求項4記載の本発明の建物用融雪システムは、請求項1から請求項3のいずれかに記載の融雪装置を、建物の屋根又は屋上に配設することを特徴とする。
【0006】
【発明の実施の形態】
本発明の第1の実施の形態における融雪装置は、前記コンクリートブロックを、2つの前記貫通穴(8)平行に設けることで相対する2つの前記側面部(2)(3)に開口させた第1の前記コンクリートブロックと、2つの前記貫通穴(8a)平行に設けることで相対する2つの前記側面部(2)(3)に開口し、更に2つの前記側面部(2)(3)のいずれかの面の開口を連通させるとともに別の前記側面部(4)にも開口する貫通穴(8b)を前記貫通穴(8a)と直交させて設けることで少なくとも3箇所の面で開口させた第2の前記コンクリートブロックとで構成し、第1の前記コンクリートブロックと第2の前記コンクリートブロックとを、第1の前記コンクリートブロックの貫通穴(8)と第 2の前記コンクリートブロックの貫通穴(8a)とが同一の方向となるように連接し、第2の前記コンクリートブロックの前記側面部(4)に、更に他の第2の前記コンクリートブロックを、それぞれの貫通穴(8a)が直交する方向となるように連接したものである。この構成により、コンクリートブロックは貫通穴から暖められ、コンクリートブロックの表面の温度が上昇し、表面に積載される雪を溶かすことができる。コンクリートブロックは熱伝導性がよいので、貫通穴に流す温風の熱が速やかに表面に伝わるため、雪を早く溶かすことができる。また、隣り合うコンクリートブロックの貫通穴が連設するように設置すればよいため、施工時の作業性が高い。また、コンクリートブロックはそれ自身で強度が高いため、強度が高い融雪装置を容易に実現できる。また、生産が容易なコンクリートブロックを利用できるとともに、施工時の作業性も高い。
【0007】
本発明の第2の実施の形態は、第1の実施の形態による融雪装置において、隣接するコンクリートブロック間に、貫通穴から融雪面に連通する連通路を設けたものである。本実施の形態によれば、連通穴から融雪面に温風を導出させることができる。従って、温風通路の長さに対して、供給する温風量が十分にある場合には、連通穴を設けることで融雪効果を高めることができる。
【0008】
本発明の第3の実施の形態は、第1または第2の実施の形態による融雪装置において、温風を発生する温風発生手段と、コンクリートブロックの貫通穴に温風を送風する送風手段とを備えたものである。本実施の形態によれば、送風手段によって貫通穴に温風を送風することで、例え温風通路が長くても、温風を十分に供給することができる。
【0009】
本発明の第4の実施の形態は、第1から第3の実施の形態による融雪装置を、建物の屋根又は屋上に配設するものである。本実施の形態によれば、建物の屋根又は屋上の融雪を行うことができる。
【0010】
【実施例】
以下本発明の実施例について図面に基づいて説明する。
図1は本発明の一実施例における融雪装置の平面断面図、図2(a)は同実施例における融雪装置を構成するコンクリートブロックの斜視図、図2(b)は同実施例におけるコンクリートブロックの平面断面図である。
図1の融雪装置は、図2に示すコンクリートブロック1を、5列7段、側面部で接合して並べて構成したものである。
図2のコンクリートブロック1は、4つの側面部2〜5と2つの表面部6、7とから立方体を構成し、2つの貫通穴8を平行に有している。この貫通穴8は、側面部2、3に開口するように設けられている。また、コンクリートブロック1は、各面がほぼ四辺形の6面体で、6面体の隣接する面は互いに直交する。なお、コンクリートブロック1の外形形状は直方体に限らず、側面部2〜5、及び表面部6、7の表面に凹凸が形成されていてもよい。貫通穴8の開口が形成される側面部2、3に凹凸を有する場合には、隣り合うコンクリートブロック1の側面部2、3が互いに嵌合できる形状であることが好ましい。また、コンクリートブロック1の相対する面の形状が同一であれば、四角形以外に、平行四辺形や台形などの形状で構成してもよい。
【0011】
図1の融雪装置は、貫通穴8が隣接したコンクリートブロック1の接合した側面部2、3で連接するように構成することによって、長い連接した貫通穴a〜jを形成することができる。この長い連接した貫通穴a〜jの一方の端部には入口部9と、他方の端部には出口部10が設けられる。入口部9は、複数の連接した貫通穴a〜jに同時に温風を吹き込むことが出来るように、入口ダクト11が設けられている。また、出口部10は、複数の連接した貫通穴a〜jから出てくる温風を集めて排出することが出来るように、出口ダクト12が設けられている。この構成により、コンクリートブロック1は貫通穴8から暖められ、コンクリートブロック1の表面の温度が上昇し、表面に積載される雪を溶かすことができる。
【0012】
また、図3(a)は本実施例における融雪装置に用いることができる他のコンクリートブロックの斜視図、図3(b)は同コンクリートブロックの平面断面図である。
また、図4は他の実施例における融雪装置の平面断面図である。
本実施例によるコンクリートブロック1は、側面部2と側面部3とに開口する貫通穴8aと、相対する2つの面の側面部2、3以外の側面部4に開口した貫通穴8bとがあり、貫通穴8aと貫通穴8bは連接した構造となっている。このように、コンクリートブロック1の貫通穴は、相対する2つの面に開口し、更に別の側面部の面にも開口することで少なくとも3箇所の面で開口した構成としている。
【0013】
図4は別の融雪装置の例を示し、図2と図3のコンクリートブロックを複数個組み合わせて構成したものである。3箇所の側面部に開口したコンクリートブロック1を組み合わせることにより、温風通路を蛇行させることができる。図4に示す温風通路は、入口部9と出口部10とを同一方向に設けている。このように温風通路を長く構成することで、入口部9や出口部10の開口を少なくすることができるので、融雪面に対して供給する温風量が少ない場合に利用することができる。
【0014】
図5は建物に利用した融雪装置の実施例を示す断面図、図6は同斜視図である。
図5及び図6において、地面に配設される融雪装置15Aと、建物の屋上に配設される融雪装置15Bとは、温風を発生する温風発生手段16と、温風を送風する送風手段17と、温風を排出する排出手段18とを備えている。温風発生手段16から供給される温風は、ダクトによって融雪装置15A、15Bの側面部に開口した入口部から導入される。また融雪装置15A、15Bの側面部に開口した出口部には排出手段18が設けられ、送風手段17は入口部側か若しくは出口部側かのどちらか一方又は両方に配置される。この構成により、温風発生手段16で発生した温風は、送風手段17により融雪装置15A、15Bの貫通穴に供給され、この貫通穴を通過する時に、温風の熱がコンクリートブロックの表面部に伝達され、融雪装置の上面の積雪を溶解させることができる。
【0015】
図7は本実施例における建物用融雪システムの斜視図である。
融雪装置15を建物の屋根構造に用い、温風発生手段16と送風手段17と排出手段18で構成する。なお、図7に示すような木造家屋の屋根に用いる場合には、空隙の多い軽量のコンクリート材を用いたコンクリートブロックが適している。この構成により、温風発生手段16で発生した温風を送風手段17により融雪装置15の貫通穴を通過させることにより、温風の熱が屋根を暖め、屋根に積もった雪を溶解させることができる。
【0016】
本実施例の融雪装置に用いることができるコンクリートブロックの他の実施例について以下に説明する。
図8は他の実施例によるコンクリートブロックの斜視図である。なお上記実施例と同一機能を有する構成には同一番号を付して説明を省略する。
図8(a)に示すコンクリートブロック1には、側面部2に、貫通穴8aから融雪面となる表面部6に連通する連通路8cを設けている。また図8(b)に示すコンクリートブロック1には、側面部2及び側面部3に、貫通穴8aから融雪面となる表面部6に連通する連通路8cを設けている。従って、温風は、連通路8cから融雪面に吹き出すため、融雪効果を高めることができる。なお、表面に延設された連通路8cの穴径は小さなものでよい。また、この表面に延設された連通穴8cは、コンクリートブロックの施工時に、貫通穴8aの位置を示すので、隣り合うコンクリートブロックの貫通穴8aが連設されているかどうかを確認でき、施工性が向上する。
【0017】
図9(a)に示すコンクリートブロック1には、側面部4に貫通穴8bから融雪面となる表面部6に連通する連通路8cを設けている。また図9(b)に示すコンクリートブロック1には、側面部2に貫通穴8aから融雪面となる表面部6に連通する連通路8cを、側面部4に貫通穴8bから融雪面となる表面部6に連通する連通路8cをそれぞれ設けている。また図9(c)に示すコンクリートブロック1には、側面部2と側面部3とに貫通穴8aから融雪面となる表面部6に連通する連通路8cを、側面部4に貫通穴8bから融雪面となる表面部6に連通する連通路8cをそれぞれ設けている。従って、温風は、連通路8cから融雪面に吹き出すため、融雪効果を高めることができる。なお、表面に延設された連通路8cの穴径は小さなものでよい。また、この表面に延設された連通穴8cは、コンクリートブロックの施工時に、貫通穴8aの位置を示すので、隣り合うコンクリートブロックの貫通穴8aが連設されているかどうかを確認でき、施工性が向上する。
【0018】
図10は本実施例における空調装置の平面図である。
図10において、空調装置20は、上記各実施例で説明したコンクリートブロック1のそれぞれの側面部2、3、4を当接させて配置し、隣接するコンクリートブロック1間の貫通穴8cを連続させ、連続させた貫通穴8cを通風路とし、少なくとも一方の表面部6を空調空間側として設置したものである。この空調装置20は、冷風又は温風を発生する冷温風発生手段21と、冷風又は温風を送風する送風手段22と、冷風又は温風を排出する排出手段23とを備え、空調装置20の側面部に開口した貫通穴8cの一方の端部である入口部24にはダクトによって冷温風発生手段21が連設され、空調装置20の他方の端部である出口部25には排出手段23が連設され、送風手段22は入口部側か若しくは出口部側かのどちらか一方又は両方に配置される。この構成により、冷温風発生手段21で発生した冷風又は温風は、送風手段22により空調装置20の貫通穴8cを通過する時に、コンクリートブロック1の表面部の温度を調整することができる。
また、図8又は図9に示すコンクリートブロック1を用いた場合は、冷風又は温風が空調装置20の表面からも吹き出すため、空調装置20自身が冷えたり暖まったりすることに加えて、空調装置20の表面から吹き出す冷風又は温風により、効率の高い冷房や暖房の効果を実現できる。
【0019】
図11は本実施例における建物用空調システムを示す断面構成図である。
図11に示す建物用空調システムは、図10に示す空調装置20を建物の屋根構造又は天井構造26、壁構造27、28、及び床構造29,30に用い、冷温風発生手段31と送風手段32と排出手段33を備えている。この構成により、冷温風発生手段31で発生した冷風又は温風を、送風手段32により屋根構造、天井構造26、壁構造27、28、及び床構造29、30の空調装置を通過させることにより、効率のよい家屋の冷暖房を実現できる。
【0020】
なお、図2、図3、図8、又は図9に示すコンクリートブロック1は、側面部の中心で2分割される構成であってもよい。また貫通穴は一つでもよく、貫通穴の形状は円柱状以外の、例えば柱状であってもよい。
また、本実施例では、貫通穴を温風通路として利用する場合で説明したが、温水、又は蒸気を導入することでコンクリートブロックの外周面の雪を溶かしてもよい。
また、本実施例では、コンクリートブロックを平面状に配設する場合で説明したが、複数段積み上げて構成してもよく、また例えば壁面と床下、又は壁面と屋上の貫通穴を連接した構成としてもよい。
またコンクリートブロックの融雪面としない表面部、すなわちコンクリートブロックの下面にラバーなどの断熱材を敷設することが好ましい。
なお、コンクリートブロックとしては、セメントを用いたものであれば特に特定の原料に限られるものではなく、砕石の他、アスファルト、火山れきなどを含んでいてもよい。
【0021】
【発明の効果】
以上のように本発明は、塀や壁面、土台などに広く利用されているコンクリートブロックを融雪装置として利用することで、施工性がよく、強度に優れ、熱伝導性の高い融雪装置を提供することができる。
【図面の簡単な説明】
【図1】 本発明の一実施例における融雪装置の平面断面図
【図2】 同実施例における融雪装置を構成するコンクリートブロックの斜視図及び平面断面図
【図3】 本実施例における融雪装置に用いることができる他のコンクリートブロックの斜視図及び平面断面図
【図4】 他の実施例における融雪装置の平面断面図
【図5】 建物に利用した融雪装置の実施例を示す断面図
【図6】 同斜視図
【図7】 本実施例における建物用融雪システムの斜視図
【図8】 他の実施例によるコンクリートブロックの斜視図
【図9】 更に他の実施例によるコンクリートブロックの斜視図
【図10】 本実施例における空調装置の平面図
【図11】 本実施例における建物用空調システムを示す断面構成図
【図12】 従来の融雪装置を示す構成図
【符号の説明】
1 コンクリートブロック
2 側面部
3 側面部
4 側面部
5 側面部
6 表面部
8a 貫通穴
8b 貫通穴
8c 連通穴
9 入口部
10 出口部
15 融雪装置
16 温風発生手段
17 送風手段
18 排出手段
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a snow melting device that melts snow using hot air generated by combustion or the like.
[0002]
[Prior art]
Conventionally, as this type of snow melting device, for example, there is one described in JP-A-2-300402. FIG. 12 is a block diagram showing this conventional snow melting apparatus.
The hot air generated by the hot air generating means 100 passes through the pipe 101 and is sent to the hot air inlet 104 of the snow melting flat body 103 by the air blowing means 102. In the snow melting flat body 103, a circulating pipe 105 for circulating hot air is embedded in a material such as asphalt. When the hot air passes through the circulating pipe 105, the heat of the hot air is transmitted to the snow melting flat body 103 to melt the snow 106 placed on the snow melting flat body 103.
[0003]
[Problems to be solved by the invention]
However, in the conventional snow melting apparatus, the size of the snow melting flat body 103 differs depending on the installation location, so that it is necessary to make a different snow melting flat body 103 for each installation. For this reason, the shape of the reflux pipe 105 needs to be made every time it is installed so as to cover the entire surface of the installation place without crossing, and there is a problem that the number of installation steps increases, It takes time for the transmission to reach the snow 106 on the upper part of the snow melting plane 103 from the cross section of the circulating pipe 105 through the asphalt of the snow melting plane 103, and workability during construction of the snow melting plane 103. In addition, there is a problem in that a product having both excellent strength of the completed snow-melting flat body 103 and heat transfer characteristics in which the supplied heat is effectively transferred to the snow cannot be obtained.
[0004]
Accordingly, an object of the present invention is to provide a snow melting device that has good workability during construction, excellent strength, and high thermal conductivity.
In particular, an object of the present invention is to use a concrete block widely used for a fence, a wall surface, a base or the like as a snow melting device.
[0005]
[Means for Solving the Problems]
The snow melting device according to the first aspect of the present invention includes two opposing surface portions (6) and (7) and four side surface portions (2) formed between the two surface portions (6) and (7 ). (3) (4) and (5), one of said side portions (2) (3) (4) (5) Ri Do from the through-hole opening (8), the adjacent faces (2) (3 ) (4) (5) (6) (7) with concrete blocks ing from hexahedron mutually orthogonal, the side portions of the concrete blocks (2) (3) (4) respectively brought into contact with (5) Te placed, is continuously the through-hole between adjacent said concrete block (8), and the through-hole is continuously (8) and the hot air passage, at least one surface of the surface portion (6) (7) In which the concrete block is provided with two through holes (8) in parallel. Two opposite of the side portions in the (2) (3) and the first said concrete block is opened, the two opposite said side portions by parallel providing two of said through holes (8a) (2 ) And (3) , the through-hole (8b) that opens the other side surface (4) and communicates the opening of any one of the two side surfaces (2) and (3). The first concrete block and the second concrete block are composed of the second concrete block opened at least at three positions by being provided orthogonal to the through hole (8a) . The through-hole (8) of the concrete block and the through-hole (8a) of the second concrete block are connected so as to be in the same direction, and the side surface portion (4) of the second concrete block, Yet another The second concrete blocks are connected so that the respective through holes (8a) are orthogonal to each other .
According to a second aspect of the present invention, in the snow melting device according to the first aspect, a communication path communicating from the through hole to the snow melting surface is provided between the adjacent concrete blocks.
According to a third aspect of the present invention, in the snow melting device according to the first or second aspect, the hot air generating means for generating the hot air and the air blowing means for blowing the hot air into the through hole of the concrete block. It is characterized by comprising.
A snow melting system for buildings according to a fourth aspect of the present invention is characterized in that the snow melting device according to any one of the first to third aspects is disposed on a roof or a roof of a building.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
In the snow melting apparatus in the first embodiment of the present invention, the concrete block is opened in the two side surface portions (2) and (3) facing each other by providing the two through holes (8) in parallel . a first said concrete blocks, two opposing said side portions by parallel providing two of said through holes (8a) (2) (3) to open and further two of said side portions (2) (3 ) And the through hole (8b) that opens in the other side surface part (4) at right angles to the through hole (8a). constituted by a second of the concrete blocks is, first the concrete block and a second of said concrete block, through-holes of the first said concrete blocks (8) second said concrete blocks The through holes (8a) are connected so as to be in the same direction, and another second concrete block is further connected to the side surface (4) of the second concrete block. ) Are connected so as to be orthogonal to each other. With this configuration, the concrete block is heated from the through hole, the temperature of the surface of the concrete block rises, and the snow loaded on the surface can be melted. Since the concrete block has good thermal conductivity, the heat of the hot air flowing through the through hole is quickly transmitted to the surface, so that the snow can be melted quickly. Moreover, since it should just install so that the through-hole of an adjacent concrete block may continue, the workability | operativity at the time of construction is high. Moreover, since the concrete block itself has high strength, it is possible to easily realize a snow melting device having high strength. In addition, it is possible to use a concrete block that is easy to produce, and the workability during construction is high.
[0007]
According to the second embodiment of the present invention, in the snow melting apparatus according to the first embodiment, a communication path communicating from the through hole to the snow melting surface is provided between adjacent concrete blocks. According to the present embodiment, the hot air can be led out from the communication hole to the snow melting surface. Therefore, when there is a sufficient amount of hot air to be supplied with respect to the length of the hot air passage, the snow melting effect can be enhanced by providing the communication hole.
[0008]
According to a third embodiment of the present invention, in the snow melting device according to the first or second embodiment, hot air generating means for generating hot air, and air blowing means for blowing hot air into the through holes of the concrete block. It is equipped with. According to the present embodiment, the hot air can be sufficiently supplied even if the hot air passage is long by blowing the hot air into the through hole by the blowing means.
[0009]
In the fourth embodiment of the present invention, the snow melting apparatus according to the first to third embodiments is arranged on the roof or the roof of a building. According to the present embodiment, snow melting can be performed on the roof or roof of a building.
[0010]
【Example】
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a plan sectional view of a snow melting device in one embodiment of the present invention, FIG. 2 (a) is a perspective view of a concrete block constituting the snow melting device in the embodiment, and FIG. 2 (b) is a concrete block in the embodiment. FIG.
The snow melting apparatus of FIG. 1 is configured by joining the concrete blocks 1 shown in FIG.
The concrete block 1 in FIG. 2 forms a cube from the four side surface portions 2 to 5 and the two surface portions 6 and 7, and has two through holes 8 in parallel. The through hole 8 is provided so as to open to the side surface portions 2 and 3. Further, the concrete block 1 is a hexahedron having substantially quadrilateral faces, and adjacent faces of the hexahedron are orthogonal to each other. In addition, the external shape of the concrete block 1 is not limited to a rectangular parallelepiped, and irregularities may be formed on the surfaces of the side surface portions 2 to 5 and the surface portions 6 and 7. When the side surface portions 2 and 3 where the openings of the through holes 8 are formed have irregularities, it is preferable that the side surface portions 2 and 3 of the adjacent concrete blocks 1 can be fitted to each other. Moreover, if the shape of the opposing surface of the concrete block 1 is the same, you may comprise in shapes, such as a parallelogram and a trapezoid other than a square.
[0011]
The snow melting apparatus of FIG. 1 can form long connected through holes a to j by configuring the through holes 8 to be connected by the side portions 2 and 3 joined to the adjacent concrete block 1. An inlet portion 9 is provided at one end of the long connected through holes a to j, and an outlet portion 10 is provided at the other end. The inlet portion 11 is provided with an inlet duct 11 so that warm air can be simultaneously blown into the plurality of connected through holes a to j. Moreover, the exit part 10 is provided with the exit duct 12 so that the warm air which comes out from the several through-holes aj connected with each other can be collected and discharged | emitted. With this configuration, the concrete block 1 is heated from the through hole 8, the temperature of the surface of the concrete block 1 rises, and the snow loaded on the surface can be melted.
[0012]
Moreover, Fig.3 (a) is a perspective view of the other concrete block which can be used for the snow melting apparatus in a present Example, FIG.3 (b) is a plane sectional view of the concrete block.
FIG. 4 is a cross-sectional plan view of a snow melting device in another embodiment.
The concrete block 1 according to the present embodiment has a through hole 8a that opens to the side surface portion 2 and the side surface portion 3, and a through hole 8b that opens to the side surface portion 4 other than the side surface portions 2 and 3 of the two opposing surfaces. The through hole 8a and the through hole 8b are connected to each other. As described above, the through holes of the concrete block 1 are configured to be opened on at least three surfaces by opening on two opposing surfaces and further opening on another side surface.
[0013]
FIG. 4 shows another example of the snow melting device, which is constructed by combining a plurality of the concrete blocks of FIGS. By combining the concrete blocks 1 opened at the three side portions, the hot air passage can be meandered. The warm air passage shown in FIG. 4 has an inlet portion 9 and an outlet portion 10 provided in the same direction. Since the hot air passage is configured to be long in this way, the openings of the inlet portion 9 and the outlet portion 10 can be reduced, and therefore it can be used when the amount of hot air supplied to the snow melting surface is small.
[0014]
FIG. 5 is a sectional view showing an embodiment of a snow melting device used in a building, and FIG. 6 is a perspective view thereof.
5 and 6, the snow melting device 15 </ b> A disposed on the ground and the snow melting device 15 </ b> B disposed on the roof of the building are hot air generating means 16 that generates hot air, and air that blows hot air. Means 17 and discharge means 18 for discharging warm air are provided. The hot air supplied from the hot air generating means 16 is introduced from an inlet portion opened to the side surface portions of the snow melting devices 15A and 15B by a duct. In addition, a discharge means 18 is provided at an outlet portion opened in the side surface portion of the snow melting devices 15A and 15B, and the blower means 17 is disposed on either the inlet side or the outlet side or both. With this configuration, the warm air generated by the warm air generating means 16 is supplied to the through holes of the snow melting devices 15A and 15B by the air blowing means 17, and when passing through the through holes, the heat of the warm air is supplied to the surface portion of the concrete block. The snow accumulation on the upper surface of the snow melting device can be dissolved.
[0015]
FIG. 7 is a perspective view of the building snow melting system in the present embodiment.
A snow melting device 15 is used for a roof structure of a building, and is constituted by warm air generating means 16, air blowing means 17, and discharge means 18. In addition, when using for the roof of a wooden house as shown in FIG. 7, the concrete block using the lightweight concrete material with many space | gap is suitable. With this configuration, the hot air generated by the hot air generating means 16 is passed through the through hole of the snow melting device 15 by the air blowing means 17, so that the heat of the hot air warms the roof and melts the snow accumulated on the roof. it can.
[0016]
Another embodiment of the concrete block that can be used in the snow melting device of this embodiment will be described below.
FIG. 8 is a perspective view of a concrete block according to another embodiment. In addition, the same number is attached | subjected to the structure which has the same function as the said Example, and description is abbreviate | omitted.
The concrete block 1 shown in FIG. 8A is provided with a communication path 8c communicating with the surface portion 6 serving as a snow melting surface from the through hole 8a in the side surface portion 2. Further, in the concrete block 1 shown in FIG. 8B, the side surface 2 and the side surface 3 are provided with a communication path 8c that communicates from the through hole 8a to the surface portion 6 serving as a snow melting surface. Therefore, since the warm air blows out from the communication path 8c to the snow melting surface, the snow melting effect can be enhanced. In addition, the hole diameter of the communication path 8c extended on the surface may be small. Moreover, since the communication hole 8c extended in this surface shows the position of the through-hole 8a at the time of construction of a concrete block, it can be confirmed whether the through-hole 8a of the adjacent concrete block is provided continuously, and workability Will improve.
[0017]
The concrete block 1 shown in FIG. 9A is provided with a communication passage 8c communicating with the surface portion 6 serving as a snow melting surface from the through hole 8b in the side surface portion 4. Further, the concrete block 1 shown in FIG. 9B has a communication path 8c that communicates with the side surface portion 2 from the through hole 8a to the surface portion 6 that becomes the snow melting surface, and a side surface 4 that has the surface that becomes the snow melting surface from the through hole 8b. A communication path 8 c communicating with the portion 6 is provided. Further, in the concrete block 1 shown in FIG. 9C, a communication path 8 c that communicates with the side surface portion 2 and the side surface portion 3 from the through hole 8 a to the surface portion 6 that becomes a snow melting surface, and the side surface portion 4 from the through hole 8 b. Communication passages 8c communicating with the surface portion 6 serving as a snow melting surface are provided. Therefore, since the warm air blows out from the communication path 8c to the snow melting surface, the snow melting effect can be enhanced. In addition, the hole diameter of the communication path 8c extended on the surface may be small. Moreover, since the communication hole 8c extended in this surface shows the position of the through-hole 8a at the time of construction of a concrete block, it can be confirmed whether the through-hole 8a of the adjacent concrete block is provided continuously, and workability Will improve.
[0018]
FIG. 10 is a plan view of the air conditioner in the present embodiment.
In FIG. 10, the air conditioner 20 arrange | positions each side part 2, 3, and 4 of the concrete block 1 demonstrated in each said embodiment contact | abutted, and makes the through-hole 8c between the adjacent concrete blocks 1 continue. The continuous through hole 8c is used as a ventilation path, and at least one surface portion 6 is installed as the air-conditioned space side. The air conditioner 20 includes a cold / hot air generating means 21 that generates cold air or hot air, a blower means 22 that blows cold air or hot air, and a discharge means 23 that discharges the cold air or hot air. The inlet / outlet portion 24, which is one end portion of the through hole 8 c opened in the side surface portion, is connected to the cool / warm air generating means 21 by a duct, and the outlet portion 25, which is the other end portion of the air conditioner 20, is discharged to the outlet portion 23. Are arranged continuously, and the air blowing means 22 is arranged on either the inlet side or the outlet side or both. With this configuration, when the cool air or warm air generated by the cool / warm air generating means 21 passes through the through hole 8c of the air conditioner 20 by the blower means 22, the temperature of the surface portion of the concrete block 1 can be adjusted.
Moreover, when the concrete block 1 shown in FIG. 8 or FIG. 9 is used, since the cold air or the warm air blows out from the surface of the air conditioner 20, in addition to the air conditioner 20 itself being cooled or warmed, the air conditioner By the cool air or the warm air blown out from the surface of 20, it is possible to realize the effect of high efficiency cooling and heating.
[0019]
FIG. 11 is a cross-sectional configuration diagram showing a building air conditioning system in the present embodiment.
The building air conditioning system shown in FIG. 11 uses the air conditioner 20 shown in FIG. 10 for the roof structure or ceiling structure 26 of the building, the wall structures 27 and 28, and the floor structures 29 and 30, and the cool / warm air generating means 31 and the air blowing means. 32 and discharge means 33 are provided. With this configuration, the cool air or the warm air generated by the cool / warm air generating means 31 is passed through the air conditioner of the roof structure, the ceiling structure 26, the wall structures 27 and 28, and the floor structures 29 and 30 by the air blowing means 32. Efficient house air conditioning can be realized.
[0020]
The concrete block 1 shown in FIG. 2, FIG. 3, FIG. 8, or FIG. 9 may be divided into two at the center of the side surface. The number of through holes may be one, and the shape of the through holes may be other than a columnar shape, for example, a columnar shape.
Moreover, although the present Example demonstrated the case where a through-hole was utilized as a warm air path, you may melt the snow of the outer peripheral surface of a concrete block by introduce | transducing warm water or a steam | vapor.
Further, in this embodiment, the concrete block is described in the case where it is arranged in a planar shape, but it may be configured by stacking a plurality of stages, for example, as a structure in which a wall and a through-hole are connected to each other. Also good.
Moreover, it is preferable to lay a heat insulating material such as rubber on the surface portion of the concrete block that does not serve as a snow melting surface, that is, on the lower surface of the concrete block.
In addition, as a concrete block, if it uses a cement, it will not be restricted to a specific raw material in particular, Asphalt, volcanic rubble etc. may be included besides a crushed stone.
[0021]
【The invention's effect】
As described above, the present invention provides a snow melting device having good workability, excellent strength, and high thermal conductivity by using a concrete block widely used for fences, wall surfaces, foundations, and the like as a snow melting device. be able to.
[Brief description of the drawings]
FIG. 1 is a plan sectional view of a snow melting device in an embodiment of the present invention. FIG. 2 is a perspective view and a plan sectional view of a concrete block constituting the snow melting device in the embodiment. Perspective view and plan sectional view of other concrete blocks that can be used. FIG. 4 is a plan sectional view of a snow melting device in another embodiment. FIG. 5 is a sectional view showing an embodiment of a snow melting device used in a building. ] Perspective view [FIG. 7] Perspective view of building snow melting system in this embodiment [FIG. 8] Perspective view of concrete block according to another embodiment [FIG. 9] Perspective view of concrete block according to yet another embodiment [FIG. 10] Plan view of the air conditioner in the present embodiment. [FIG. 11] Cross sectional configuration diagram showing the building air conditioning system in the present embodiment. [FIG. 12] Configuration diagram showing a conventional snow melting device.
DESCRIPTION OF SYMBOLS 1 Concrete block 2 Side surface part 3 Side surface part 4 Side surface part 5 Side surface part 6 Surface part 8a Through hole 8b Through hole 8c Communication hole 9 Inlet part 10 Outlet part 15 Snow melting device 16 Hot air generating means 17 Blowing means 18 Discharge means

Claims (4)

対向する2つの表面部(6)(7)と、2つの前記表面部(6)(7)の間に形成される4つの側面部(2)(3)(4)(5)と、いずれかの前記側面部(2)(3)(4)(5)で開口する貫通穴(8)とからなり、隣接する面(2)(3)(4)(5)(6)(7)が互いに直交する6面体からなるコンクリートブロックを用い、
前記コンクリートブロックの側面部(2)(3)(4)(5)をそれぞれ当接させて配置し、
隣接する前記コンクリートブロック間の前記貫通穴(8)を連続させ、
連続させた前記貫通穴(8)を温風通路とし、
前記表面部(6)(7)の少なくとも一方の面を融雪面とした融雪装置であって、
前記コンクリートブロックを、
2つの前記貫通穴(8)平行に設けることで相対する2つの前記側面部(2)(3)に開口させた第1の前記コンクリートブロックと、
2つの前記貫通穴(8a)平行に設けることで相対する2つの前記側面部(2)(3)に開口し、更に2つの前記側面部(2)(3)のいずれかの面の開口を連通させるとともに別の前記側面部(4)にも開口する貫通穴(8b)を前記貫通穴(8a)と直交させて設けることで少なくとも3箇所の面で開口させた第2の前記コンクリートブロックとで構成し、
第1の前記コンクリートブロックと第2の前記コンクリートブロックとを
第1の前記コンクリートブロックの貫通穴(8)と第2の前記コンクリートブロックの貫通穴(8a)とが同一の方向となるように連接し、
第2の前記コンクリートブロックの前記側面部(4)に、更に他の第2の前記コンクリートブロックを、それぞれの貫通穴(8a)が直交する方向となるように連接したことを特徴とする融雪装置。
Two surfaces portions facing (6) (7), and two of the surface portion (6) four side portions formed between (7) (2) (3) (4) (5), either Kano said side portions (2) (3) (4) (5) Ri Do from the through-hole opening (8), the adjacent faces (2) (3) (4) (5) (6) (7 ) using a concrete block ing from hexahedron mutually orthogonal,
Place the side surfaces (2), (3), (4), and (5) of the concrete block in contact with each other,
The through-hole between adjacent said concrete block (8) is continuously,
The continuous through hole (8) is used as a hot air passage,
A snow melting device having at least one surface of the surface portions (6) and (7) as a snow melting surface,
The concrete block,
The first concrete block opened in the two side surfaces (2) and (3) facing each other by providing two through holes (8) in parallel ;
Two opposite said side portion by providing two of said through-holes a (8a) parallel to (2) (3) to open and further two of said side portions (2) either side opening (3) the second of the concrete block are opened on another side of the side portion (4) at at least three locations by providing with the opening to the through hole (8b) is perpendicular to the through holes (8a) also with communicating the and composed of a,
The first concrete block and the second concrete block ,
The through hole (8) of the first concrete block and the through hole (8a) of the second concrete block are connected in the same direction,
A snow melting device characterized in that another second concrete block is connected to the side surface portion (4) of the second concrete block so that the respective through holes (8a) are orthogonal to each other. .
隣接する前記コンクリートブロック間に、前記貫通穴から前記融雪面に連通する連通路を設けたことを特徴とする請求項1に記載の融雪装置。  The snow melting device according to claim 1, wherein a communication passage communicating with the snow melting surface from the through hole is provided between the adjacent concrete blocks. 温風を発生する温風発生手段と、前記コンクリートブロックの前記貫通穴に前記温風を送風する送風手段とを備えたことを特徴とする請求項1または請求項2に記載の融雪装置。  The snow melting apparatus according to claim 1 or 2, further comprising: hot air generating means for generating hot air; and air blowing means for blowing the hot air into the through hole of the concrete block. 請求項1から請求項3のいずれかに記載の融雪装置を、建物の屋根又は屋上に配設することを特徴とする建物用融雪システム。  A snow melting system for buildings, wherein the snow melting device according to any one of claims 1 to 3 is disposed on a roof or a roof of a building.
JP2001322034A 2001-10-19 2001-10-19 Snow melting equipment Expired - Fee Related JP3875532B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001322034A JP3875532B2 (en) 2001-10-19 2001-10-19 Snow melting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001322034A JP3875532B2 (en) 2001-10-19 2001-10-19 Snow melting equipment

Publications (2)

Publication Number Publication Date
JP2003129694A JP2003129694A (en) 2003-05-08
JP3875532B2 true JP3875532B2 (en) 2007-01-31

Family

ID=19139149

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001322034A Expired - Fee Related JP3875532B2 (en) 2001-10-19 2001-10-19 Snow melting equipment

Country Status (1)

Country Link
JP (1) JP3875532B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4560842B2 (en) * 2006-03-15 2010-10-13 株式会社北村製作所 Radio equipment storage station

Also Published As

Publication number Publication date
JP2003129694A (en) 2003-05-08

Similar Documents

Publication Publication Date Title
CN111877562A (en) Novel house building structure
US6453625B1 (en) Insulated building block
JP3875532B2 (en) Snow melting equipment
KR20220010817A (en) Slim type heat exchange moudle installed in heat energy recovery ventilation system
JP2000039163A (en) Cooling and heating structure having water permeable concrete surface layer
AU743755B2 (en) Device forming a partition between storeys
JP3784919B2 (en) Body heat storage air conditioning system
JPS61184337A (en) Heat storage tank for floor heating
JP2005146673A (en) Snow melting device
JP2524075Y2 (en) White smoke prevention cooling tower
KR102366805B1 (en) Thermal Storage Slim Heat Exchanger Module for Heat Exchange Ventilation System
JPH0533860Y2 (en)
JP5132356B2 (en) Floor heating system
WO1990011476A1 (en) Method and arrangement for controlling the temperature in buildings
EP2693128B1 (en) Heating and drying system for a building
KR100218844B1 (en) Floor structure for radiant air conditioning of building
JP4035327B2 (en) Thermal storage floor heating structure
JPH0517541Y2 (en)
JP3664540B2 (en) Floor heating and cooling panel
JP2004036138A (en) Building panel
JPH0356602Y2 (en)
JP2511354Y2 (en) White smoke prevention cooling tower
JP2003302074A (en) Adjustment method of space environmental element, adjustment system of space environmental element, surface soil humidifying method and surface soil humidifying system
JP2000240220A (en) Metallic tile and roof structure using metallic tile
WO2022114001A1 (en) Ventilation device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040720

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060502

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060703

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060725

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060923

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061017

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061026

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees