JP3876114B2 - Ground improvement rod structure - Google Patents
Ground improvement rod structure Download PDFInfo
- Publication number
- JP3876114B2 JP3876114B2 JP2000149572A JP2000149572A JP3876114B2 JP 3876114 B2 JP3876114 B2 JP 3876114B2 JP 2000149572 A JP2000149572 A JP 2000149572A JP 2000149572 A JP2000149572 A JP 2000149572A JP 3876114 B2 JP3876114 B2 JP 3876114B2
- Authority
- JP
- Japan
- Prior art keywords
- nozzle
- cutting
- rod
- ground
- slime
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
【0001】
【発明の属する技術分野】
開示技術は、地盤改良工事に用いる地盤切削用のロッドの排泥促進用のノズル構造の技術分野に属する。
【0002】
【従来の技術】
周知の如く国土が狭隘で、多くの山間林野部が複雑に入り組んだ長い海岸線に迫っている特殊な地勢条件を有する我が国にあっては農耕牧畜用は勿論のこと、民生住宅用や各種産業施設用等に用いる平野部は限られており、したがって、国土の有効利用は旧くから重要な問題であり、そのため、地盤改良工事等は旧くからさまざまに研究開発され、その果実は実用に有効裡に共されてきた。
【0003】
而して、地盤改良用工事にあってはジェットグラウト等の如く、図5に示す様に、地盤1をガイドケーシング8で所定に削孔して削孔6内に該ガイドケーシング8を介して2重管方式または3重管方式のロッド2(2重管方式のロッドの場合も3重管方式のロッドの場合もある)を挿入し、ガイドケーシング8を少し引き抜き状態にして該ガイドケーシング8とロッド2を共に引き抜きながら噴射する(ガイドケーシング8を全部引き抜いて噴射する場合もある)。
【0004】
そして、ロッド2の先端モニター3のノズル4から切削水5(更に圧縮空気を囲繞する等の態様もある)を噴射して地盤1内を切削し、反対側のノズル4´から硬化材5´を噴出充填するようなジェットグラウト工法等の工法が盛んに用いられてきた。
【0005】
而して、上述ジェットグラウト工法等においては先端モニター3から噴出する切削水4によって切削された土壌がスライム7となって削孔6内より揚昇され、地上に設けた図示しないピット等に排出されてダンプトラック等により所定の廃棄施設に搬送されて所定に廃棄処分にされるようにされていた。
【0006】
しかしながら、揚昇されるスライム7はその粘性が高い等の場合にはスムーズに排泥できかねる欠点があり、改良径が小さくなったり、改良品質が低下するという不都合もあった。
【0007】
そして、削孔6が垂直な場合でも、スライム7の粘性が高い場合にはベタつき等が生じてスムーズな排泥が行われ難いものであるが、施工態様によっては該削孔6が大きな傾斜角度や水平状態で施工する場合もあり、これらの場合にはエアーリフト効果が効かないため、スライム7の排泥が更にスムーズに行われ難いという不具合も指摘されていた。また、エアーリフト効果も充分には期待できない場合があった。
【0008】
【発明が解決しようとする課題】
この出願の発明の目的は
上述従来技術に基づくジェットグラウト施工等の地盤改良等において必要、且つ、スムーズでない排泥処理の問題点を解決すべき技術的課題とし、
ジェットグラウト工法等で発生するスライムをよりスムーズに排泥して、設計通りの地盤改良が成し得るようにすることにある。
【0009】
【課題を解決するための手段】
このような目的は、下記(1)〜(3)に記載の地盤改良ロッド構造によって達成される。
【0010】
(1) 先端モニターに地盤切削用ノズルを有する地盤改良ロッド構造において、
地盤切削用の切削水を噴射するための地盤切削用ノズルと、
前記地盤切削用ノズルに切削水を送給するための送水路と、
前記送水路に連通するように設けられており、該送水路を通る切削水の一部をスライム排泥方向に噴射するための排泥助勢用ノズルと、を有しており、
前記排泥助勢用ノズルによって噴射された水は、前記地盤切削用ノズルによる切削に伴って生じたスライムに対し、排泥方向の流動性を付与するようになっていることを特徴とする地盤改良ロッド構造。
【0011】
(2) 先端モニターに地盤切削用ノズルを有する地盤改良ロッド構造において、
地盤切削用の切削水を噴射するための地盤切削用ノズルと、
前記地盤切削用ノズルに切削水を送給するための送水路と、
前記送水路から分岐して設けられており、該送水路を通る切削水の一部をスライム排泥方向に噴射するための排泥助勢用ノズルと、を有しており、
前記排泥助勢用ノズルによって噴射された水は、前記地盤切削用ノズルによる切削に伴 って生じたスライムに対し、排泥方向の流動性を付与するようになっていることを特徴とする地盤改良ロッド構造。
【0012】
(3) 先端モニターに地盤切削用ノズルを有する地盤改良ロッド構造において、
先端モニターと、1又は複数のユニットロッドと、少なくとも1つのバックフラッシュモニターとを連結して構成されており、
前記先端モニターは、地盤切削用の切削水を噴射するための地盤切削用ノズルを有しており、
前記ユニットロッドは、前記地盤切削用ノズルに切削水を送給するための送水路を有しており、
前記バックフラッシュモニターは、前記ユニットロッドの送水路に連通する送水路と、スライム排泥方向へ向かって水を噴射するための排泥助勢用ノズルとを有しており、
前記バックフラッシュモニターの排泥助勢用ノズルは、前記送水路に連通するように設けられており、該送水路を通る切削水の一部をスライム排泥方向へ噴射して、前記スライムに対し排泥方向の流動性を付与するようになっていることを特徴とする地盤改良ロッド構造。
【0013】
すなわち、上述目的に沿い先述特許請求の範囲を要旨とするこの出願の発明の構成は前述課題を解決するために、先端モニターに切削用ノズルを有する地盤改良ロッドであって、該ロッドの上記切削用ノズルに対する送水路に排泥助勢用ノズルを設けたバックフラッシュモニターを配設したことを基幹とし、而して、該バックフラッシュモニターをロッドジョイント部に必要数設けられているようにし、また、上記助勢用バックフラッシュモニターがロッドの後方向きであって周方向に対して傾斜して設けられているようにもし、更にまた、上記助勢用ノズルがロッドの外周面内に設けられているようにもした技術的手段を講じたものである。
【0014】
【作用】
削孔した孔内所定深度において、先端モニターに設けた地盤切削用ノズルから切削水により土壌に対する切削を行い、孔内で発生するスライムを排泥する。その際、先端モニターのノズルから切削水を噴出するとともに、バックフラッシモニターの排泥助勢用ノズル(バックノズル)から噴出する助勢用水をして排泥を助勢する。したがって、削孔がどのような深度、傾斜度(水平でも良い)であっても、スライムがその粘性に関係無くスムーズに排泥され、設計通りの地盤改良が行われる。
【0015】
【発明の実施の形態】
以下、この出願の発明の実施形態の一例を図1乃至図4に基づいて説明する。
なお、図5と同一態様部分は同一符号を用いて説明するものとする。
【0016】
図示実施例の態様はジェットグラウトの施工のものである。
地盤1に対し、削孔6をガイドケーシング8を介して形成するに際し、該削孔6内にロッド2を挿入し、硬化材5´を充填する。
【0017】
本発明のロッド2は、硬化材5´を圧送するための内管11を有している。この内管11の外側には、所定間隙を介して、シース状の外管12が外装されている。そして、内管11と外管12の間には送水路15が形成されている。所定圧で圧送された切削用水は、送水路15を通って、ロッド2の先端側に設けてある先端モニター3へ送られる。
【0018】
また、本発明のロッド2には、図1に示すように必要箇所において、図2及び図3に示すようなバックフラッシュモニター(補助モニター)9が必要本数接続してある。このバックフラッシモニター9は、連結用のネジ14が形成されたユニットジョイント13を有 している。また、バックフラッシモニター9の内管11と外管12との間には送水路15が形成されており、所定圧の切削用水を先端モニター3へ送るようになっている。
【0019】
なお、図示するロッドの態様は2重管のものであるが、エア送給の3重管でも良い。
【0020】
各バックフラッシモニター9のユニットジョイント13毎に、排泥助勢用の噴出ノズルを構成するバックノズル(排泥助勢用ノズル)16が接続されており、該バックノズル16は送水路15に連通するように設けられている。このバックノズル16は、図2及び図3に示す様に、外管12の外周面内にその先端があるように後ろ向きに傾斜した状態で設けられている。そして、バックフラッシュモニター9の外管12には、バックノズル16からの助勢用のバックジェットによって経時的に磨耗することが避けるような傾斜面17が形成されている。
【0021】
なお、ロッド2の基幹部に設けた実施内容のスイーベルジョイントからは各ユニットロッド毎の排泥助勢用のバックノズル16からの噴射水量に見合う圧送量が圧送されていることは勿論であり、バックフラッシュモニター9に設けられたバックノズル16からの噴射水量と地盤切削用の先端モニターの3に設けられた切削ノズル4からの噴射水量は、それらのノズル径を必要噴射量に見合うようにそれぞれ設計され、圧送供給されるものである。
【0022】
設計によっては、助勢用のバックノズル16の噴きだし方向を外管12の周方向に傾斜させてもよい。これにより、噴出する助勢用のジェットが削孔6内のスライムにスパイラル状の流動性を与えて、排泥がよりスムーズに行えるようになる。
【0023】
また、送水路については、図2に示すような1条の1本の送水路15に限らず、図4に示すようなパイプ状の相互に独立した送水路15´にするような設計も可能である。
【0024】
ジェットグラウト施工を行うに際しては、ロッド2の各ユニットロッドを所定深度の長さに連結し、基端部のスイーベルジョイントから切削水5を送水路15内に圧送する。送水路15を介して先端モニター3に達した切削水5は、該先端モニター3に設けた切削ノズル4から土壌中に噴出し、その噴出エネルギーにより地盤1を切削し、削孔6を形成するとともにそのスライム7を排泥し、地盤1の表面に形成した図示しないピット等に排出する。ところが、土壌1の粘性度が高い場合等には、いわゆるべたつき状態等が生じてスムーズな排泥がなされないことがある(従来の場合)。
【0025】
そこで、本発明では、所定深度に達する所定長さのロッド2のジョイント(必ずしも各ジョイントでなくても良く、例えば一箇所でも何箇所でも、また、ロッド2ごとに、或いは、一本おきに何箇所でも良い)に設けた助勢用のバックノズル16から排泥助勢用の助勢水がバック噴出されて、削孔6内のスライム7の排泥を助勢するようになっている。
しかも、所定段数複数段のバックフラッシュモニター9のバックノズル16により助勢されるため、発生したスライムがたとえ高粘性であってもスムーズに設計通りに排泥されて、地盤1上のピットに排出される。
さらに、前述した如く、バックノズル16を外管12の後方向に傾斜させて設けた場合には、バックフラッシュモニター9のバックノズル16から噴射される助勢用のジェット水はスライム7に対しスパイラル状の流動性を付加して、その排泥の上昇を助勢し、よりスムーズに排泥が行われる。
【0026】
なお、本発明に係るロッド構造は、上述の如く2重管方式でもよいが、エア送給併用の3重管方式でもよい。また、図2に例示する2重管方式では、内管11には硬化材5´を、外管12に切削水5を圧送するようにしているが、これとは逆に内管11に切削水5を、外管12内に硬化材を圧送する態様でもよい。
【0027】
また、この出願の発明の実施態様は上述実施例に限るものでないことは勿論であり、例えばバックフラッシュモニター9は一つに限らず、ロッド2のジョイント毎等に介装することにより、複数段の助勢用のバックノズル16を設けることができる。また、助勢用のバックフラッシュモニター9を二つ以上相並べて複数ユニット設けたり、ロッド2の各々に単基設けるようにする等種々の態様が採用可能である。
【0028】
そして、対象とする削孔6は基盤に対して「垂直」なものに限定されず、「傾斜」や「水平」状態の削孔をも行えるものである。
【0029】
また、内管11の外側の送水路15は、図2に示すような単一ごとのものに限らず、バックフラッシュモニター9毎に図4に示すような送水路15´ごとに相互独立のパイプ状にしてもよい等種々の態様も採用可能である。
【0030】
上述構成において、地盤1中に削孔6を削孔形成して硬化材等を充填するジェットグラウト施工等に際し、先端モニター3に設けた一方向けの切削状のノズル4から送水路15に蓄圧された削孔水を地盤1中に噴出して切削し、その際、介装したバックノズル16により後方噴出を行って、スライム7の排泥を助勢する。また、内管11内に所定の硬化材5´を送給、圧送して先端モニター3の切削水ノズル4の反対側のノズル4´から給出して充填するようにする。
【0031】
この場合、スライム7の粘性が高い場合にも、排泥が助勢されて如何に深度が深い削孔6であっても、スムーズに排泥することができ、排泥に支障を来さず、また、排泥するスライム7の粘度を低くし、流動性を与えて、よりスムーズに排泥が行われる。
【0032】
その間、硬化材5´は、内管11内を通って圧送され、モニター3の反対側のノズル4´より地盤中に充填され、所定の目的を達することができる。
【0033】
このように、バックフラッシュモニター9をロッドのジョイントに所定段数所望に介設することにより、その深度の大小に拘らず、切削削孔に伴って生ずるスライムが高粘性のものであっても、排泥作用が複数段に助勢されるためにスライムの排泥は設計通りにスムーズに行われる。
【0034】
また、先端モニター3の切削水ノズル4が切削水5のみならず、空気等をも包み込んで噴出させるタイプの施工にも用いることができる。
【0035】
また、送水路は二重管方式の外管12のみならず、三重管以上の複数外管を用いる態様も採用可能である。
【0036】
また、設計によっては助勢用のバックノズル16の交換も可能であり、その径を施工態様にしたがって、供給する削孔水の噴出量に応じて変えるようにすることも可能である。
【0037】
そして、該バックノズル16に対する助勢用の水は送水路15に畜圧された水を一種の逆流式に噴出させるばかりでなく、先端モニターの切削ノズル4とは別に独立して設ける送水路にすることも可能ではある。
【0038】
【発明の効果】
以上、この出願の発明によれば、ジェットグラウト施工等に用いるロッドに対しジョイントに排泥助勢用バックノズルを有するバックフラッシュモニターを介設したことにより、地盤切削に際して発生する高粘性のスライムをスムーズに排泥できるという優れた効果が達成される。
【0039】
また、バックフラッシュモニターは単にロッドのジョイントの連結部分等に介装するだけでよいために、予め工場で作成したバックフラッシュモニターを介装するだけで組付作業が完了する。したがって、組付や保守点検整備等が簡単であり、結果としてコストダウンに繋がるという効果が達成される。
【0040】
そして、なによりも地盤改良に際しての能率が設計通りの施工ができるために良好であり、信頼性の高い地盤改良が行われるという優れた効果が奏される。
【図面の簡単な説明】
【図1】 この出願の発明の一実施例の全体概略側断面である。
【図2】 バックフラッシュモニターの部分拡大断面図である。
【図3】 バックフラッシュモニターの概略正面図である。
【図4】 図2のIV−IV面図である。
【図5】 一般態様のジェットグラウト施工の断面図である。
【符号の説明】
1 地盤
2 ロッド
3 先端モニター
4 ノズル
4´ ノズル
5 切削水
5´ 硬化材
6 削孔
7 スライム
8 ガイドケーシング
9 バックフラッシュモニター
10 内管ネジ
11 ロッド内管
12 ロッド外管
13 ユニットジョイント
14 外管ネジ
15 送水路
16 バックノズル(排泥助勢用ノズル)
17 傾斜面[0001]
BACKGROUND OF THE INVENTION
The disclosed technology belongs to the technical field of a nozzle structure for promoting mud discharge of a rod for ground cutting used for ground improvement work.
[0002]
[Prior art]
As is well known, in Japan, where the land is narrow and many terrain conditions are close to the long coastline where many mountainous forests are intricately complicated, not only for agricultural and livestock, but also for residential housing and various industrial facilities Therefore, the effective use of the national land has been an important issue for a long time, and therefore ground improvement work has been researched and developed in various ways, and the fruits are effectively used practically. Have been shared.
[0003]
Thus, in the ground improvement work, as shown in FIG. 5, like the jet grout, the
[0004]
Then, cutting water 5 (further, there is an aspect such as surrounding compressed air) is sprayed from the
[0005]
Thus, in the above-described jet grout method or the like, the soil cut by the
[0006]
However, the lifted
[0007]
Even when the drilling hole 6 is vertical, if the
[0008]
[Problems to be solved by the invention]
The purpose of the invention of this application is a technical problem that is necessary for ground improvement such as jet grout construction based on the above-mentioned prior art, and that the problem of unsmooth waste mud treatment should be solved,
The purpose is to more smoothly drain the slime generated by the jet grout method, etc. , and to improve the ground as designed .
[0009]
[Means for Solving the Problems]
Such an object is achieved by the ground improvement rod structure described in the following (1) to (3).
[0010]
(1) In the ground improvement rod structure which has the nozzle for ground cutting in the tip monitor,
A ground cutting nozzle for injecting cutting water for ground cutting;
A water supply path for supplying cutting water to the ground cutting nozzle;
Provided to communicate with the water supply passage, and has a nozzle for assisting mud discharge for injecting a part of cutting water passing through the water supply passage in the slime discharge direction,
The ground improvement is characterized in that the water sprayed by the drainage assist nozzle imparts fluidity in the drainage direction to the slime generated by the cutting by the ground cutting nozzle. Rod structure.
[0011]
(2) In a ground improvement rod structure having a ground cutting nozzle on the tip monitor,
A ground cutting nozzle for injecting cutting water for ground cutting;
A water supply path for supplying cutting water to the ground cutting nozzle;
A branching from the water channel, and a nozzle for assisting mud discharge for injecting a part of the cutting water passing through the water channel in the direction of slime mud,
The waste sludge assist for water injected by the nozzle, Ground against slime occurring I accompanied the cutting with the nozzle for ground cutting, characterized in that is adapted to impart a waste sludge direction liquidity Improved rod structure.
[0012]
(3) In the ground improvement rod structure which has the nozzle for ground cutting in the tip monitor,
It is configured by connecting a tip monitor, one or more unit rods, and at least one backflush monitor,
The tip monitor has a ground cutting nozzle for injecting cutting water for ground cutting,
The unit rod has a water supply path for supplying cutting water to the ground cutting nozzle,
The backflush monitor has a water supply passage communicating with the water supply passage of the unit rod, and a nozzle for assisting mud discharge for injecting water toward the slime mud discharge direction,
A nozzle for assisting sludge discharge in the backflush monitor is provided so as to communicate with the water supply passage, and a part of the cutting water passing through the water supply passage is jetted in the slime discharge direction to discharge the slime. A soil-improving rod structure characterized by imparting fluidity in the mud direction.
[0013]
That is, in order to solve the above-mentioned problems, the structure of the invention of the present application, which is summarized in the scope of the above-mentioned claims along with the above-mentioned object, is a ground improvement rod having a cutting nozzle at a tip monitor, Based on the fact that a backflush monitor provided with a nozzle for draining mud is provided in the water supply passage for the nozzle for the nozzle, therefore, the required number of backflush monitors are provided in the rod joint part, The assisting back flash monitor is provided behind the rod and inclined with respect to the circumferential direction, and further, the assisting nozzle is provided within the outer peripheral surface of the rod. It has taken technical measures.
[0014]
[Action]
At a predetermined depth in the drilled hole, the soil is cut with cutting water from a ground cutting nozzle provided in the tip monitor, and slime generated in the hole is discharged. At that time, cutting water is ejected from the nozzle of the tip monitor, and assisting water ejected from the exhaust mud assist nozzle (back nozzle) of the back flash monitor is used to assist the exhaust mud . Therefore, regardless of the depth and inclination (which may be horizontal) of the drilling hole, the slime is smoothly drained regardless of its viscosity, and the ground improvement as designed is performed.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an example of an embodiment of the invention of this application will be described with reference to FIGS.
In addition, the same aspect part as FIG. 5 shall be demonstrated using the same code | symbol.
[0016]
Aspect of the illustrated embodiment Ru der intended application of jet grouting.
To
[0017]
The
[0018]
Further, the required number of back flash monitors (auxiliary monitors) 9 as shown in FIGS. 2 and 3 are connected to the
[0019]
In addition, although the aspect of the rod to show in figure is a thing of a double pipe, the triple pipe of air supply may be sufficient.
[0020]
A back nozzle (a mud assisting nozzle) 16 constituting a discharge nozzle for assisting mud discharge is connected to each
[0021]
Of course, the swivel joint of the implementation content provided in the main part of the
[0022]
Depending on the design, it may be inclined to a direction out spouting the
[0023]
In addition, the water channel is not limited to one
[0024]
When carrying out the jet grout construction, each unit rod of the
[0025]
Therefore, in the present invention, the joint of the
In addition, since the
Further, as described above, when the
[0026]
Incidentally, a rod structure according to the present invention may be a double tube type as described above, have good even triple tube type air feed combination. Further, in the double tube type illustrated in FIG. 2, the curing material 5'the
[0027]
Further, embodiments of the invention of this application is not limited to the above examples of course, for example, backflushing monitor 9 is not limited to one, by interposing the joint each
[0028]
Further, the target drilling hole 6 is not limited to the “perpendicular” one with respect to the base, but can also perform “inclined” or “horizontal” drilling.
[0029]
Further, the
[0030]
In the above configuration, when jet grout construction is performed in which the drilling hole 6 is formed in the
[0031]
In this case, even when the viscosity of the
[0032]
Meanwhile, cured material 5'is pumped through the
[0033]
In this way, the
[0034]
Further, the cutting
[0035]
In addition to the double pipe type
[0036]
Further, depending on the design, it is possible to replace the
[0037]
Further, the water for assisting the
[0038]
【The invention's effect】
As described above, according to the invention of this application, a high-viscosity slime generated during ground cutting can be smoothed by providing a back flush monitor having a back nozzle for drainage assistance at a joint to a rod used for jet grout construction or the like. The excellent effect of being able to drain mud is achieved .
[0039]
Further, since the back flash monitor need only be interposed at the joint portion of the rod joint or the like, the assembling work is completed only by interposing the back flash monitor prepared in advance at the factory . Therefore, assembly, maintenance, inspection , and the like are simple, and as a result, an effect that leads to cost reduction is achieved .
[0040]
Above all, the efficiency in improving the ground is good because the construction can be performed as designed, and an excellent effect is achieved that the ground improvement with high reliability is performed.
[Brief description of the drawings]
FIG. 1 is an overall schematic side sectional view of an embodiment of the invention of this application.
FIG. 2 is a partially enlarged cross-sectional view of a backflash monitor.
FIG. 3 is a schematic front view of a backflash monitor.
4 is a sectional view taken along the line IV-IV in FIG.
FIG. 5 is a cross-sectional view of a general embodiment of jet grouting.
[Explanation of symbols]
DESCRIPTION OF
17 Inclined surface
Claims (3)
地盤切削用の切削水を噴射するための地盤切削用ノズルと、
前記地盤切削用ノズルに切削水を送給するための送水路と、
前記送水路に連通するように設けられ、かつ、ノズル先端が前記ロッド外側の隙間を臨むように設けられており、前記送水路を通る切削水の一部をロッド外側のスライム排泥方向に噴射して排泥を容易にするための排泥助勢用ノズルと、を有しており、
前記排泥助勢用ノズルによって噴射された水は、前記地盤切削用ノズルによる切削に伴って生じたスライムの粘度を低下させるとともに、該スライムに対し排泥方向の流動性を付与し、その結果、スライムがロッド外側の隙間を介して排泥されるようになっていることを特徴とする地盤改良ロッド構造。A ground improvement rod structure having a ground cutting nozzle on the tip monitor , wherein the slime generated by cutting by the ground cutting nozzle is discharged through a gap existing outside the rod. In the rod structure ,
A ground cutting nozzle for injecting cutting water for ground cutting;
A water supply path for supplying cutting water to the ground cutting nozzle;
The nozzle is provided so as to communicate with the water supply passage , and the nozzle tip is provided so as to face the gap outside the rod, and a part of the cutting water passing through the water supply passage is sprayed in the slime sludge direction outside the rod. And a nozzle for assisting mud discharge for facilitating drainage ,
The water sprayed by the drainage assist nozzle reduces the viscosity of the slime generated along with the cutting by the ground cutting nozzle , and imparts fluidity in the drainage direction to the slime . A ground improved rod structure characterized in that the slime is drained through a gap outside the rod.
地盤切削用の切削水を噴射するための地盤切削用ノズルと、
前記地盤切削用ノズルに切削水を送給するための送水路と、
前記送水路から分岐して設けられ、かつ、ノズル先端が前記ロッド外側の隙間を臨むように設けられており、前記送水路を通る切削水の一部をロッド外側のスライム排泥方向に噴射して排泥を容易にするための排泥助勢用ノズルと、を有しており、
前記排泥助勢用ノズルによって噴射された水は、前記地盤切削用ノズルによる切削に伴って生じたスライムの粘度を低下させるとともに、該スライムに対し排泥方向の流動性を付与し、その結果、スライムがロッド外側の隙間を介して排泥されるようになっていることを特徴とする地盤改良ロッド構造。A ground improvement rod structure having a ground cutting nozzle on the tip monitor , wherein the slime generated by cutting by the ground cutting nozzle is discharged through a gap existing outside the rod. In the rod structure ,
A ground cutting nozzle for injecting cutting water for ground cutting;
A water supply path for supplying cutting water to the ground cutting nozzle;
The provided branched from the water supply passage, and has the nozzle tip is provided so as to face the gap of the rod outer injects a part of the cutting water through the feed water channel in the slime waste sludge direction of the rod outer A drainage assist nozzle for facilitating drainage, and
The water sprayed by the drainage assist nozzle reduces the viscosity of the slime generated along with the cutting by the ground cutting nozzle , and imparts fluidity in the drainage direction to the slime . A ground improved rod structure characterized in that the slime is drained through a gap outside the rod.
先端モニターと、1又は複数のユニットロッドと、少なくとも1つのバックフラッシュモニターとを連結して構成されており、
前記先端モニターは、地盤切削用の切削水を噴射するための地盤切削用ノズルを有しており、
前記ユニットロッドは、前記地盤切削用ノズルに切削水を送給するための送水路を有しており、
前記バックフラッシュモニターは、前記ユニットロッドの送水路に連通する送水路と、ロッド外側のスライム排泥方向へ向かって水を噴射して排泥を容易にするための排泥助勢用ノズルとを有しており、
前記バックフラッシュモニターの排泥助勢用ノズルは、前記送水路に連通するように設けら、かつ、ノズル先端が前記ロッド外側の隙間を臨むように設けられており、
当該排泥助勢用ノズルは、バックフラッシュモニターの送水路を通る切削水の一部をロッド外側のスライム排泥方向へ噴射して、前記スライムの粘度を低下させるとともに、該スライムに対し排泥方向の流動性を付与し、その結果、スライムがロッド外側の隙間を介して排泥されるようになっていることを特徴とする地盤改良ロッド構造。A ground improvement rod structure having a ground cutting nozzle on the tip monitor , wherein the slime generated by cutting by the ground cutting nozzle is discharged through a gap existing outside the rod. In the rod structure ,
It is configured by connecting a tip monitor, one or more unit rods, and at least one backflush monitor,
The tip monitor has a ground cutting nozzle for injecting cutting water for ground cutting,
The unit rod has a water supply path for supplying cutting water to the ground cutting nozzle,
The backflush monitor has a water supply channel communicating with the water supply channel of the unit rod and a nozzle for assisting mud discharge for facilitating mud discharge by injecting water toward the slime mud discharge direction outside the rod. And
The nozzle for assisting mud discharge of the backflush monitor is provided so as to communicate with the water supply passage , and the tip of the nozzle is provided so as to face the gap outside the rod,
The nozzle for assisting mud discharge injects a part of the cutting water passing through the water supply passage of the backflush monitor in the slime mud discharge direction outside the rod to reduce the viscosity of the slime, and in the mud discharge direction with respect to the slime. The ground improvement rod structure characterized by giving the fluidity of, and as a result, the slime is drained through the gap outside the rod.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000149572A JP3876114B2 (en) | 2000-05-22 | 2000-05-22 | Ground improvement rod structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000149572A JP3876114B2 (en) | 2000-05-22 | 2000-05-22 | Ground improvement rod structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001329528A JP2001329528A (en) | 2001-11-30 |
| JP3876114B2 true JP3876114B2 (en) | 2007-01-31 |
Family
ID=18655409
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000149572A Expired - Lifetime JP3876114B2 (en) | 2000-05-22 | 2000-05-22 | Ground improvement rod structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3876114B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6812044B1 (en) * | 2020-06-03 | 2021-01-13 | 株式会社大阪防水建設社 | Construction rod and fluid discharge device |
| JP7209683B2 (en) * | 2020-12-22 | 2023-01-20 | 株式会社不動テトラ | soil improvement equipment |
-
2000
- 2000-05-22 JP JP2000149572A patent/JP3876114B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001329528A (en) | 2001-11-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206868813U (en) | Three pipe churning systems | |
| JP3876114B2 (en) | Ground improvement rod structure | |
| KR100654272B1 (en) | Steel pipe indentation device with grouting nozzle and steel pipe indentation method using the same | |
| KR100930081B1 (en) | Excavator for underground propulsion pipes with spiral tops | |
| DE2824441A1 (en) | Ground drill for underwater boring - has hollow main drill shaft with rotor alongside also reamers hinged to tool for swivelling out as piston ascends in cylinder on shaft | |
| CN110778326A (en) | Slurry balance push bench and slurry circulation system thereof | |
| JP4887179B2 (en) | Ground improvement method and ground improvement equipment | |
| CN101663441B (en) | Grouting apparatus and grouting method | |
| JPH0949388A (en) | Male/female joint for earth retaining pipe, connecting device, formation of earth retaining wall body with it | |
| JP5875849B2 (en) | Injection stirring ground improvement method | |
| DE4217293A1 (en) | Laying drainage and sewage pipes without excavating - using water-jet mounted at front of pipe string which removes spoil internally as pipe driven through soil | |
| JP3825896B2 (en) | Ground improvement body construction method and apparatus | |
| JP3600404B2 (en) | Pipe propulsion machine | |
| CN224161713U (en) | Single-to-double liquid switching grouting system for shield tunnels with interbedded water-rich sandstone and mudstone on steep longitudinal slopes | |
| JP3622013B2 (en) | Ground injection method for grout using multiple unit pumps. | |
| JP4959382B2 (en) | Method of injecting ground improvement chemical | |
| CN112746854B (en) | Grouting structure suitable for pipe joint locking prevention of push bench and push bench | |
| JP2727153B2 (en) | Ground improvement equipment and construction method | |
| KR100805951B1 (en) | Topsoil block of Isu pressure pipeline propulsion method | |
| JP3426106B2 (en) | Excavation method without collapse of borehole inner wall | |
| DE9113179U1 (en) | Device for driving pipes into the ground | |
| JP3323478B2 (en) | Ground improvement device and improvement method | |
| DE3237820A1 (en) | Method for laying pipes underground | |
| DE19945894A1 (en) | Sealing wall trencher uses steel profile or beam with integrated pipes plus endless screw conveyor with pipe-matching blades and core pipe for suspension pumping. | |
| CN115492608A (en) | Multi-hole intelligent cooperative grouting system for tunnel leakage diseases |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040412 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051207 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051213 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060206 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060314 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060606 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060807 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061002 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061030 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3876114 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091102 Year of fee payment: 3 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091102 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091102 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131102 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |