JP3877370B2 - Reinforcement method for reinforced concrete piers - Google Patents
Reinforcement method for reinforced concrete piers Download PDFInfo
- Publication number
- JP3877370B2 JP3877370B2 JP02682197A JP2682197A JP3877370B2 JP 3877370 B2 JP3877370 B2 JP 3877370B2 JP 02682197 A JP02682197 A JP 02682197A JP 2682197 A JP2682197 A JP 2682197A JP 3877370 B2 JP3877370 B2 JP 3877370B2
- Authority
- JP
- Japan
- Prior art keywords
- pier
- rod
- reinforced concrete
- drilled
- housing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、既設の壁式鉄筋コンクリート橋脚の橋脚躯体の壁面を鋼板で被覆してロッド状部材により一体化する鉄筋コンクリート橋脚の補強工法に関する。
【0002】
【従来の技術】
震度法による許容応力度設計にのみ従って耐震設計された既設の壁式鉄筋コンクリート橋脚は、円形や矩形断面の様な柱式橋脚と比較すると、一般にコンクリート断面が大きく、軸方向鉄筋比が小さい構造であり、相対的に曲げ耐力が小さくなっていることが多い。
【0003】
また、壁式橋脚の様な幅の広い断面では、その形状的な影響により、橋軸直角方向の側面に対する帯鉄筋による拘束効果も小さくなっている。
【0004】
したがって、壁式鉄筋コンクリート橋脚の補強では、曲げ耐力とじん性の両者を向上させる補強を行うのが望ましい。なお、ここでいう壁式橋脚とは、橋脚の橋軸直角方向の断面寸法aと橋軸方向の断面寸法bとの比a/bが3を超える幅広長方形断面または小判型断面の鉄筋コンクリート橋脚である。
【0005】
従来、壁式鉄筋コンクリート橋脚の補強工法としては、鋼板併用鉄筋コンクリート巻立て工法が施工されている。この工法は、図27に示す様に、橋脚躯体2を鉄筋コンクリートで巻立てる(巻立て鉄筋コンクリート部C)と共に、橋脚基部Bにおいて長辺側の両壁面を鋼板3で挟み込み、これらをロッド状部材、すなわち断面貫通型のPC鋼棒(以下、中間貫通PC鋼棒という)4により一体化させた構造である。
【0006】
この工法においては、巻立て鉄筋コンクリート部Cの軸方向鉄筋K1とK2とをフーチングFに1本おきに定着している。なお、符号K3は帯鉄筋を示している。そして、鋼板3と両端をナットで締着させた中間貫通PC鋼棒4とを併用してコンクリート断面を拘束し、また、鋼板下端とフーチングFの上面との間dに5〜10cm程度の隙間を設けて、鋼板下端とフーチングF上面とが接触して予期せぬ力が鋼板3に作用することを防止している。
【0007】
なお、鋼板3の設置範囲Hは、断面基部から補強後の橋軸方向幅に相当する高さまでの範囲とするのが標準である。また、符号p1はPC鋼棒4の橋軸直角方向の挿入ピッチで補強後の壁厚以下、符号p2は橋脚軸方向のピッチで30cm以下としている。
【0008】
上記の鋼板併用鉄筋コンクリート巻立て工法による橋脚の補強工法においては、橋脚躯体に中間貫通PC鋼棒を貫通させるために穿孔する必要があるが、この孔は、橋脚躯体内の鉄筋を避けて穿孔する必要がある。そして、従来、この穿孔には、例えば、ロータリーパーカッションによって穿孔が行われている。
【0009】
しかし、一般には、躯体内の鉄筋位置を正確に予見することは困難である。そして、ロータリーパーカッションにより穿孔している際に鉄筋に当たってしまうと、穿孔した孔を埋め戻して再び穿孔をやり直す必要がある。ここで、再穿孔を行えば工数が増加するためコスト増を招く。
【0010】
また、ロータリーパーカッションにより穿孔に際して、誤って鉄筋を切断してしまうと、橋脚の強度に悪影響を与える。
【0011】
一方、ドリフタを用いて穿孔する工法が公知である。図28〜図31には、ドリフタ(例えば、三菱重工(株)製の穿孔機:商品名「MRD150」)を用いた自穿孔工法によるロックボルトの打設方法が示されている。
【0012】
図28において、ロックボルト15を把持した穿孔機械10が、ロックボルト打設位置に設置されている。そのロックボルト15は、先端にロストビット16を備えた中空軸で、その後端に設けられたウォータスイベル17を介して高圧水が供給されている。そして、ロックボルト15は、ガイドセル11上を穿孔方向に前後進可能に設けられたドリフタ12に把持装置13を介して把持され、符号D方向の打撃と回転Rが与えられて推進し、ロックボルト15の中空孔よりフラッシングを行いながら、地山を穿孔する。
【0013】
図29に示す様に、ドリフタ12がストロークSだけ推進してストロークエンドに達したら、把持装置13を緩めて後退する。そして、図30に示す様に後退位置からロックボルト15を再び把持して穿孔する。これを繰返し、図31に示す様に所定深さまで穿孔したら、中空孔から定着材を注入して、ロックボルト15を定着させる。
【0014】
この様な穿孔工法は有効な技術であるが、既設の壁式鉄筋コンクリート橋脚の橋脚躯体の壁面を鋼板で被覆して、ロッド状部材により一体化する鉄筋コンクリート橋脚の補強するに際して、コンクリート橋脚の躯体に貫通孔を穿孔する際には用いられていない。
【0015】
【発明が解決しようとする課題】
本発明は上述した従来技術の問題点に鑑みて提案されたもので、橋脚躯体内に鉄筋が配置されていても、ロッド状部材の挿入孔を容易に穿孔することができる様な鉄筋コンクリート橋脚の補強工法の提供を目的としている。
【0016】
【課題を解決するための手段】
本発明によれば、既設の壁式鉄筋コンクリート橋脚の橋脚躯体の壁面を鋼板で被覆しロッド状部材を橋脚躯体に挿通して鋼板と一体化する鉄筋コンクリート橋脚の補強工法において、前記橋脚躯体に前記ロッド状部材の挿入孔を穿孔するに際し、ロータリパーカッションで穿孔する穿孔機械にウオータジェットを有するモニタを先端に取り付けた中空ロッドを把持し、その穿孔機械によって前記橋脚躯体の鉄筋を含む部分をウオータジェットで穿孔し、鉄筋を含まぬ部分をロータリーパーカッションで穿孔し、そしてロッド状部材の挿入孔が橋脚躯体を貫通したら前記中空ロッドを挿通してその周囲に充填材を注入し、その中空ロッドの両端部を締結部材と係合して橋脚躯体と鋼板とを一体化している。
【0017】
この様な構成を具備する本発明によれば、鉄筋を含む部分はウォータジェットで穿孔が為される。ここで、ウォータジェットは所謂「はつり」工でも用いられ、鉄筋を損傷すること無く、コンクリートを除去する。ここで、穿孔している際に鉄筋に当たっても、モニタ或いはロッド状部材が通過出来る状態であれば鉄筋が露出していても構わない。
従って、鉄筋が露出しても穿孔した孔を全て埋め戻して再び穿孔をやり直す必要は無い。そのため、再穿孔が必要となるケースが飛躍的に減少し、再穿孔に費やされるコストが大幅に減少する。さらに、ウォータジェットによる穿孔であれば、鉄筋を損傷することが無いので、橋脚の強度に悪影響を与える恐れは小さくなる。
【0019】
また、本発明によれば、既設の壁式鉄筋コンクリート橋脚の橋脚躯体の壁面を鋼板で被覆しロッド状部材を橋脚躯体に挿入して鋼板と一体化する鉄筋コンクリート橋脚の補強工法において、前記橋脚躯体に前記ロッド状部材の挿入孔を穿孔するに際し、ロータリパーカッションで穿孔する穿孔機械にウオータジェットを有するモニタを先端に取り付けた中空ロッドを把持し、その穿孔機械によって前記橋脚躯体の鉄筋を含む部分をウオータジェットで穿孔し、鉄筋を含まぬ部分をロータリーパーカッションで穿孔し、そしてロッド状部材の挿入孔を橋脚躯体の所定深さまで穿孔したら、前記中空ロッドを挿入してその周囲に充填材を注入し、その中空ロッドの挿入孔に挿入されていない側の端部を締結部材と係合して橋脚躯体と鋼板とを一体化している。
【0020】
さらに本発明の鉄筋コンクリート橋脚の補強工法は、前記ロッド状部材の挿入孔は、橋脚躯体の両側から穿孔された孔同士を接続して貫通されている。
【0021】
これに加えて本発明の鉄筋コンクリート橋脚の補強工法は、前記橋脚躯体の両側から穿孔されたロッド状部材の挿入孔は、前記橋脚躯体の一方の側から穿孔された孔の径が、他方の側から穿孔された孔の径に比較して拡径した状態で穿孔されている。
ここで、前記橋脚躯体の一方の側から穿孔された孔と、他方の側から穿孔された孔とが芯ずれを生じていた場合に、ロッド状部材を挿入するのとは反対の側から樋状の案内部材を挿入し、該案内部材によってロッド状部材を挿通せしめるのが好ましい。
この様に構成することにより、鉄筋の配置等に起因して、橋脚躯体の一方の側から穿孔された孔と、他方の側から穿孔された孔とをオフセットせざるを得ない様な場合であっても、対処することが出来る。
【0022】
ここで、上述した本発明の鉄筋コンクリート橋脚の補強工法において、既設の壁式鉄筋コンクリート橋脚の橋脚躯体の壁面を鋼板で被覆するのに先立って、当該橋脚躯体を鉄筋コンクリートで巻立てる工程を含んでいるのが好ましい。
【0023】
【発明の実施の形態】
以下、図面を参照して本発明の実施形態を説明する。
【0024】
図1において、橋脚躯体2の中間貫通PC鋼棒用の挿入孔8の穿孔位置に、穿孔機械10が設置されている。その穿孔機械10は、ウォータジェットによる穿孔と、ロータリーパーカッションによる穿孔とが行える穿孔機械であって、例えば前記した三菱重工(株)製の穿孔機MRD150等が好ましい。すなわち、穿孔機械10には、ガイドセル11上を穿孔方向(図の左右方向)に前後進可能なドリフタ12が設けられており、そのドリフタ12には、中空軸で、外周にはねじが設けられたロッド5が把持されている。そのロッド5には、先端にウォータジェットJを噴出するモニタ6が設けられ、後端には圧水を供給するウォータスイベル16を設けられており、ドリフタ12によって打撃Dと回転Rとが伝達されている。
【0025】
次に、図2ないし図8により施工の態様を説明する。
図2に示す様に、橋脚躯体2の鉄筋のある部分A1においてはロッド5を回転Rしながら先端のモニタ6からウォータジェットJを噴出して穿孔する。そして、鉄筋のある部分A1を貫通したら(図3)、モニタ6を脱し、パーカッションDにより穿孔する(図4)。対向側の鉄筋のある部分A2に達したら再びウォータジェットJで穿孔し(図5)、貫通する。
【0026】
貫通後、ロッド5を中間貫通PC鋼棒としてそのまま残し、挿入孔8の一端をパッカ9で塞ぎ、他端から注入ノズルNを挿入して(図6)、充填材Zを注入し(図7)、ロッド5を固着させて(図8)、躯体2の両側に鋼板3、3を当接し、ナット7、7で締結する(図9)。
【0027】
また、図10ないし図13には、孔を貫通しない実施形態が示されている。橋脚躯体2の一方からウォータジェットJ(およびパーカッション) で孔8Aを穿孔し(図10)、所定深さまで穿孔したらロッド5の中空孔から充填材Zを注入して(図11)、孔8A内を充填し、ロッド5が固着したら(図12)、鋼板3を当接してナット7で締結する(図13)。なお、図11で示す様にロッド5より充填材Zを注入することに代えて、ロッド5を一旦引抜き、新たにPSロッドを挿入して、該PSロッドより充填材Zを注入しても良い。
【0028】
図14ないし図18には、橋脚躯体2の両側から穿孔する実施形態が示されてる。図14において、躯体2の一端からウォータジェットJにより穿孔して所定深さまで穿孔(符号「8A」で示す)したら(図15)、対向する他端から、芯ずれを考慮して前記穿孔径より大径にウォータジェットJで孔8Bを穿孔する(図16)。貫通したらロッド5を通し(図17)、充填材Zを注入して、両側に鋼板3、3を当接してナット7、7で締結する(図18)。
【0029】
図19ないし図26に示す実施形態も両側から穿孔するものである。図19に示す様に、一端からウォータジェットJで孔8Aを穿孔し、途中で拡径して孔8Bを所定深さまで穿孔し(図20)、他端からは、通常径で孔8Aを穿孔して (図21)、前記拡径部8Bに貫通し(図22)する。ここで、芯ずれ分が存在してもロッド5を挿通出来る様にするため、例えば「樋」の様な形状の工具Tを挿入し(図23)、該工具T(樋)を案内用のガイドとしてロッド5を挿通する(図24)。ロッド5を挿通したならば(図25)、充填材Zを注入して、両側に鋼板3、3を当接し、ナット7、7で締結する(図26)。
【0030】
【発明の効果】
以上説明した様に本発明によれば、橋脚躯体の鉄筋のある部分は、ウォータジェットで穿孔されるので、鉄筋に当たってもダメージを与えることがなく、また、鉄筋のない部分は、ロータリーパーカッションで迅速容易に穿孔することができる。したがって、従来の様に鉄筋のある位置を探ったり、また、鉄筋に当たって埋め戻す必要がない。
【図面の簡単な説明】
【図1】本発明を施工する装置の概要を示す全体構成図。
【図2】ウォータジェットによる鉄筋のある部分の穿孔の説明図。
【図3】鉄筋のある部分を貫通した状態の説明図。
【図4】ロータリーパーカッションによる穿孔状態の説明図。
【図5】対向側の鉄筋のある部分の穿孔状態の説明図。
【図6】貫通後のロッドの挿入状態の説明図。
【図7】充填材の注入状態の説明図。
【図8】充填材の注入後の説明図。
【図9】鋼板をナットで締結した状態の説明図。
【図10】別の実施形態の穿孔状態の説明図。
【図11】充填材を注入している状態の説明図。
【図12】充填材の注入後の状態の説明図。
【図13】鋼板をナットで締結した状態の説明図。
【図14】両側から穿孔する実施形態の穿孔開始状態の説明図。
【図15】ウォータジェットによる穿孔終了状態の説明図。
【図16】他方側から穿孔をしている状態の説明図。
【図17】貫通しロッドを挿通した状態の説明図。
【図18】鋼板を締結した状態の説明図。
【図19】両側から穿孔する別の実施形態の穿孔開始状態の説明図。
【図20】拡径して穿孔している状態の説明図。
【図21】他方側から穿孔をしている状態の説明図。
【図22】貫通状態の説明図。
【図23】はつりを行っている状態の説明図。
【図24】ロッドを挿通している状態の説明図。
【図25】ロッドを挿通した状態の説明図。
【図26】鋼板を締結した状態の説明図。
【図27】従来の鋼板併用鉄筋コンクリート巻立てによる橋脚補強工法を示す斜視図。
【図28】ドリフタを用いたロックボルト打設の穿孔工法の説明図。
【図29】ドリフタがストロークエンドまで進んだ状態の説明図。
【図30】ドリフタが後退して再び穿孔を開始した状態の説明図。
【図31】所定深さまで穿孔した状態の説明図。
【符号の説明】
1・・・橋脚
2・・・躯体
3・・・鋼板
4・・・中間貫通PC鋼棒
5・・・ロッド
6・・・モニタ
7・・・ナット
8・・・孔
9・・・パッカ
10・・・穿孔機
11・・・ガイドセル
12・・・ドリフタ
13・・・把持装置
15・・・ロックボルト
16・・・ロストビット
17・・・ウォータスイベル
J・・・ウォータジェット[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a reinforcing method for a reinforced concrete pier in which a wall surface of an existing wall-type reinforced concrete pier is covered with a steel plate and integrated with a rod-shaped member.
[0002]
[Prior art]
Existing wall-type reinforced concrete piers that are seismically designed only in accordance with the allowable stress design based on the seismic intensity method generally have a larger concrete cross-section and a smaller axial rebar ratio than column-type piers such as circular or rectangular cross-sections. In many cases, the bending strength is relatively small.
[0003]
Further, in a wide cross section such as a wall-type pier, due to its shape, the restraining effect by the band reinforcement on the side surface in the direction perpendicular to the bridge axis is reduced.
[0004]
Therefore, it is desirable to reinforce the wall-type reinforced concrete pier to improve both the bending strength and toughness. The wall-type pier here is a reinforced concrete pier with a wide rectangular cross section or an oval cross section in which the ratio a / b of the cross-sectional dimension a in the direction perpendicular to the bridge axis to the cross-sectional dimension b in the bridge axis direction exceeds 3. is there.
[0005]
Conventionally, as a method of reinforcing a wall-type reinforced concrete pier, a steel plate combined reinforced concrete winding method has been constructed. As shown in FIG. 27, this construction method winds up the
[0006]
In this construction method, every two axial rebars K1 and K2 of the wound reinforced concrete portion C are fixed to the footing F. In addition, the code | symbol K3 has shown the band reinforcement. And, the
[0007]
In addition, it is standard that the installation range H of the
[0008]
In the pier reinforcement method using the steel plate combined reinforced concrete hoisting method described above, it is necessary to drill in order to pass the intermediate penetration PC steel rod through the pier frame, but this hole is drilled avoiding the reinforcing bar in the pier frame. There is a need. Conventionally, this perforation is performed by, for example, rotary percussion.
[0009]
However, in general, it is difficult to accurately predict the position of the reinforcing bar in the housing. And if it hits a reinforcing bar while drilling by rotary percussion, it is necessary to refill the drilled hole and start drilling again. Here, if the re-drilling is performed, the number of steps increases, resulting in an increase in cost.
[0010]
In addition, if the rebar is accidentally cut during drilling by rotary percussion, the strength of the pier will be adversely affected.
[0011]
On the other hand, a method of drilling using a drifter is known. 28 to 31 show a method for driving a lock bolt by a self-drilling method using a drifter (for example, a drilling machine manufactured by Mitsubishi Heavy Industries, Ltd .: trade name “MRD150”).
[0012]
In FIG. 28, the
[0013]
As shown in FIG. 29, when the
[0014]
Although such a drilling method is an effective technique, the wall of the existing reinforced concrete pier is covered with a steel plate, and when reinforcing a reinforced concrete pier that is integrated with a rod-shaped member, It is not used when drilling through holes.
[0015]
[Problems to be solved by the invention]
The present invention has been proposed in view of the above-mentioned problems of the prior art, and even if a reinforcing bar is arranged in the pier frame, a reinforced concrete pier that can easily drill the insertion hole of the rod-shaped member. The purpose is to provide a reinforcement method.
[0016]
[Means for Solving the Problems]
According to the present invention, in the reinforcing method of a reinforced concrete pier in which the wall surface of an existing wall-type reinforced concrete pier is covered with a steel plate and a rod-shaped member is inserted into the pier housing and integrated with the steel plate, the rod is attached to the pier housing. When piercing the insertion hole of the cylindrical member, a hollow rod with a water jet attached to the tip of a drilling machine drilled by rotary percussion is held, and the part including the reinforcing bar of the pier frame is waterjetted by the drilling machine. Drill the part that does not contain the reinforcing bar with rotary percussion, and when the insertion hole of the rod-shaped member penetrates the pier housing, insert the hollow rod through it and inject the filler around it, both ends of the hollow rod Is engaged with the fastening member to integrate the pier housing and the steel plate.
[0017]
According to the present invention having such a configuration, a portion including a reinforcing bar is perforated by a water jet. Here, the water jet is also used in so-called “hanger” work, and removes the concrete without damaging the reinforcing bars. Here, even if it hits the reinforcing bar when drilling, the reinforcing bar may be exposed as long as the monitor or the rod-shaped member can pass therethrough.
Therefore, even if the reinforcing bars are exposed, there is no need to refill all the holes that have been drilled and start drilling again. For this reason, the number of cases where re-drilling is necessary is drastically reduced, and the cost spent for re-drilling is greatly reduced. Furthermore, since the water jet does not damage the reinforcing bars, the possibility of adversely affecting the strength of the pier is reduced.
[0019]
Further, according to the present invention, in the reinforcing method of a reinforced concrete pier in which the wall surface of an existing wall-type reinforced concrete pier is covered with a steel plate and a rod-shaped member is inserted into the pier housing and integrated with the steel plate, When the insertion hole of the rod-shaped member is drilled, a hollow rod with a water jet monitor attached to the tip of the drilling machine drilled by rotary percussion is gripped, and the portion including the reinforcing bar of the pier frame is watered by the drilling machine. Drilling with a jet, drilling the part that does not contain the reinforcing bar with rotary percussion, and drilling the insertion hole of the rod-shaped member to a predetermined depth of the pier housing, insert the hollow rod and inject filler around it, The end of the hollow rod that is not inserted into the insertion hole is engaged with the fastening member so that the pier frame and the steel plate are integrated. It is.
[0020]
Furthermore, in the reinforcing method for a reinforced concrete bridge pier according to the present invention, the insertion hole of the rod-shaped member is penetrated by connecting holes drilled from both sides of the pier frame.
[0021]
In addition, the reinforcing method of the reinforced concrete bridge pier according to the present invention is such that the insertion hole of the rod-like member drilled from both sides of the pier frame has a diameter of the hole drilled from one side of the pier frame. The hole is drilled in a state where the diameter is larger than the diameter of the hole drilled.
Here, when the hole drilled from one side of the pier frame and the hole drilled from the other side are misaligned, the rod is inserted from the side opposite to the side where the rod-shaped member is inserted. It is preferable that a rod-shaped member is inserted through the guide member.
By configuring in this way, due to the arrangement of reinforcing bars, etc., it is necessary to offset the hole drilled from one side of the pier housing and the hole drilled from the other side. If there is, you can deal with it.
[0022]
Here, the reinforcing method for a reinforced concrete pier of the present invention described above includes a step of winding the pier frame with reinforced concrete prior to covering the wall surface of the pier frame of the existing wall-type reinforced concrete pier with a steel plate. Is preferred.
[0023]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0024]
In FIG. 1, a
[0025]
Next, the construction mode will be described with reference to FIGS.
As shown in FIG. 2, in the portion A1 of the
[0026]
After the penetration, the
[0027]
10 to 13 show an embodiment that does not penetrate the hole. A hole 8A is drilled from one side of the
[0028]
FIGS. 14 to 18 show an embodiment in which drilling is performed from both sides of the
[0029]
The embodiment shown in FIGS. 19 to 26 is also perforated from both sides. As shown in FIG. 19, a hole 8A is drilled from one end with a water jet J, and the diameter of the hole 8B is increased in the middle to drill a hole 8B to a predetermined depth (FIG. 20). (FIG. 21), and penetrates the enlarged diameter portion 8B (FIG. 22). Here, in order to allow the
[0030]
【The invention's effect】
As described above, according to the present invention, the part of the pier frame with the reinforcing bars is perforated by the water jet, so that it does not cause damage even if it hits the reinforcing bars, and the part without the reinforcing bars can be quickly removed by rotary percussion. It can be easily drilled. Therefore, there is no need to search for the position where the reinforcing bar is located or hit back the reinforcing bar as in the prior art.
[Brief description of the drawings]
FIG. 1 is an overall configuration diagram showing an outline of an apparatus for constructing the present invention.
FIG. 2 is an explanatory view of perforation of a portion having a reinforcing bar by a water jet.
FIG. 3 is an explanatory view showing a state in which a part having a reinforcing bar is penetrated.
FIG. 4 is an explanatory diagram of a perforated state by rotary percussion.
FIG. 5 is an explanatory diagram of a state in which a portion having a reinforcing bar on the opposite side is perforated.
FIG. 6 is an explanatory diagram of the inserted state of the rod after penetration.
FIG. 7 is an explanatory diagram of a filling material injection state.
FIG. 8 is an explanatory diagram after injection of a filler.
FIG. 9 is an explanatory diagram of a state in which a steel plate is fastened with a nut.
FIG. 10 is an explanatory diagram of a perforated state according to another embodiment.
FIG. 11 is an explanatory diagram of a state where a filler is being injected.
FIG. 12 is an explanatory diagram of a state after the filling material is injected.
FIG. 13 is an explanatory diagram of a state in which a steel plate is fastened with a nut.
FIG. 14 is an explanatory diagram of a drilling start state of an embodiment in which drilling is performed from both sides.
FIG. 15 is an explanatory diagram of a state in which drilling is completed by a water jet.
FIG. 16 is an explanatory diagram of a state in which perforation is performed from the other side.
FIG. 17 is an explanatory view of a state where the rod is inserted through the rod.
FIG. 18 is an explanatory diagram of a state in which a steel plate is fastened.
FIG. 19 is an explanatory diagram of a drilling start state of another embodiment in which drilling is performed from both sides.
FIG. 20 is an explanatory diagram of a state where the diameter is expanded and perforated.
FIG. 21 is an explanatory diagram of a state in which perforation is performed from the other side.
FIG. 22 is an explanatory diagram of a penetrating state.
FIG. 23 is an explanatory diagram of a state in which fishing is performed.
FIG. 24 is an explanatory diagram of a state in which a rod is inserted.
FIG. 25 is an explanatory diagram of a state where a rod is inserted.
FIG. 26 is an explanatory diagram of a state in which a steel plate is fastened.
FIG. 27 is a perspective view showing a conventional pier reinforcement method using steel plate combined reinforced concrete winding.
FIG. 28 is an explanatory diagram of a drilling method for placing a lock bolt using a drifter.
FIG. 29 is an explanatory diagram of a state where the drifter has advanced to the stroke end.
FIG. 30 is an explanatory diagram of a state where the drifter has retracted and drilling has started again.
FIG. 31 is an explanatory diagram of a state where a hole is drilled to a predetermined depth.
[Explanation of symbols]
DESCRIPTION OF
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02682197A JP3877370B2 (en) | 1997-02-10 | 1997-02-10 | Reinforcement method for reinforced concrete piers |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02682197A JP3877370B2 (en) | 1997-02-10 | 1997-02-10 | Reinforcement method for reinforced concrete piers |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10219625A JPH10219625A (en) | 1998-08-18 |
| JP3877370B2 true JP3877370B2 (en) | 2007-02-07 |
Family
ID=12203951
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP02682197A Expired - Fee Related JP3877370B2 (en) | 1997-02-10 | 1997-02-10 | Reinforcement method for reinforced concrete piers |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3877370B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101204301B1 (en) | 2011-06-27 | 2012-11-23 | 서남섬 | Boring Apparatus for transporting Steel Wire in Prestressed Concrete Girder |
| CN106049289A (en) * | 2016-06-30 | 2016-10-26 | 中铁第四勘察设计院集团有限公司 | Construction method for transforming Bailey beam temporary bridge into reinforced concrete combined permanent bridge |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4253785B2 (en) * | 2001-03-13 | 2009-04-15 | 清水建設株式会社 | Reinforcing method for reinforced concrete structure and reinforced concrete structure |
| JP2008115584A (en) * | 2006-11-02 | 2008-05-22 | Penta Ocean Construction Co Ltd | Reinforcement method for reinforced concrete structures |
| JP5512342B2 (en) * | 2010-03-23 | 2014-06-04 | 五洋建設株式会社 | Reinforcing and anticorrosion method for concrete structure and its structure |
| JP5629218B2 (en) * | 2011-01-05 | 2014-11-19 | 東急建設株式会社 | Shear reinforcement method and shear reinforcement support |
| JP5672197B2 (en) * | 2011-08-25 | 2015-02-18 | 住友大阪セメント株式会社 | Anchor construction method |
| JP5939532B2 (en) * | 2011-12-05 | 2016-06-22 | 阿部 秀幸 | Reinforcement structure of existing buildings |
| CN109098085B (en) * | 2017-06-21 | 2020-01-10 | 济宁市鸿翔公路勘察设计研究院有限公司 | Bridge guardrail drilling and bar planting structure and construction method thereof |
| CN107288041B (en) * | 2017-08-14 | 2019-07-12 | 天台建瑞电子设备有限公司 | A kind of bridging apparatus |
| CN108677760B (en) * | 2018-06-13 | 2020-06-09 | 安徽省新路建设工程集团有限责任公司 | Automatic bridge pier reinforcing equipment and bar planting reinforcing construction process thereof |
| CN111578989B (en) * | 2020-05-06 | 2022-06-10 | 中铁第四勘察设计院集团有限公司 | Exploration method of fault confined water bridge abutment and bridge abutment erection method |
| CN113512929B (en) * | 2021-03-19 | 2022-10-25 | 宁波市政工程建设集团股份有限公司 | Steel-concrete combined structural hidden cover beam structure system and construction method thereof |
-
1997
- 1997-02-10 JP JP02682197A patent/JP3877370B2/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101204301B1 (en) | 2011-06-27 | 2012-11-23 | 서남섬 | Boring Apparatus for transporting Steel Wire in Prestressed Concrete Girder |
| CN106049289A (en) * | 2016-06-30 | 2016-10-26 | 中铁第四勘察设计院集团有限公司 | Construction method for transforming Bailey beam temporary bridge into reinforced concrete combined permanent bridge |
| CN106049289B (en) * | 2016-06-30 | 2018-01-16 | 中铁第四勘察设计院集团有限公司 | Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10219625A (en) | 1998-08-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3877370B2 (en) | Reinforcement method for reinforced concrete piers | |
| KR101723512B1 (en) | Pile construction apparatus for drilling and piling | |
| AU738934B2 (en) | Method and device for drilling holes | |
| US6210077B1 (en) | Mechanical ground anchor | |
| JP3878104B2 (en) | Construction method of double pipe digging rock bolt using drilling rod | |
| JP4478348B2 (en) | Steel pipe pile driving method and apparatus | |
| KR100537443B1 (en) | Method for Driving Pile having End Tip Apparatus for Reducing Opening Cross Section of Pile | |
| CN115198750B (en) | Cast-in-place pile head blocking and cutting device and method | |
| JP3134898U (en) | Concrete pile | |
| JP3921657B2 (en) | Construction method of large-diameter rock bolt anchors for ground reinforcement | |
| JP4884276B2 (en) | Rotating press pile construction method and slope construction equipment | |
| JP2007107372A (en) | Partial double-tube lock bolt construction method | |
| CN211395661U (en) | Prefabricated combined pile | |
| KR20130002797A (en) | Reinforced concrete pile construction method for which steel pipe casing structure for steel pipe casing recovery this were used | |
| JP2832508B2 (en) | Retaining wall structure and retaining method | |
| JP3620323B2 (en) | How to renovate underground structures | |
| JP3805342B2 (en) | Yamadome wall structure | |
| JP3450639B2 (en) | Rock bolt driving method and rock bolt driving machine | |
| KR100455064B1 (en) | Construction Method of Prestressed spun High strength Concrete Pile | |
| KR102445354B1 (en) | End reinforcement ring for micro pile | |
| KR102914242B1 (en) | Casing for a pile driver equipped with a cement milk injection device | |
| JP3298845B2 (en) | Ground reinforcement method | |
| JPH07331666A (en) | Slope cutting method | |
| KR100711574B1 (en) | Soil Nail | |
| JPH0336314A (en) | Driving construction for underground pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040204 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20040218 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060614 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060704 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060725 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061031 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061031 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121110 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20151110 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |