Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3880002B2 - Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame - Google Patents
[go: Go Back, main page]

JP3880002B2 - Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame - Google Patents

Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame Download PDF

Info

Publication number
JP3880002B2
JP3880002B2 JP2004001632A JP2004001632A JP3880002B2 JP 3880002 B2 JP3880002 B2 JP 3880002B2 JP 2004001632 A JP2004001632 A JP 2004001632A JP 2004001632 A JP2004001632 A JP 2004001632A JP 3880002 B2 JP3880002 B2 JP 3880002B2
Authority
JP
Japan
Prior art keywords
injection
bag
pile
steel frame
tubular member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004001632A
Other languages
Japanese (ja)
Other versions
JP2005194766A (en
Inventor
正 星野
一 藤沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2004001632A priority Critical patent/JP3880002B2/en
Publication of JP2005194766A publication Critical patent/JP2005194766A/en
Application granted granted Critical
Publication of JP3880002B2 publication Critical patent/JP3880002B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は先端に注入バッグを設けて杭底で膨らませる先端強化型場所打ちコンクリート杭の施工法、注入バッグ及び鋼製フレームに関する。   The present invention relates to a method for constructing a tip-reinforced cast-in-place concrete pile provided with an injection bag at the tip and inflated at the bottom of the pile, an injection bag, and a steel frame.

本出願人は既に先端に注入バッグを設けて杭底で膨らませる先端プレロード場所打ち杭工法を提案している(特許文献1)。この先端プレロード場所打ち杭工法は、杭先端地盤を高圧で加圧圧縮して強化することにより、支持地盤性状を改善して杭の沈下を抑制し、杭先端設計支持力を向上させる工法である。   The present applicant has already proposed a tip preload cast-in-place pile method in which an injection bag is provided at the tip and inflated at the bottom of the pile (Patent Document 1). This tip preload cast-in-place pile method is a method that improves the support ground properties and suppresses the settlement of the pile, and improves the pile tip design support force by compressing and strengthening the pile tip ground with high pressure. .

図14は既提案の先端プレロード場所打ち杭工法を説明するための図、図15は鋼製フレームを説明する図である。
図14において、場所打ち杭を施工する杭孔1に配設する鉄筋籠2の先端に、鋼製フレーム3を番線等の固定具で取り付ける。鋼製フレーム3を囲むように、上側と下側の2枚の基布の縁を縫い合わした注入バッグ4が取り付けられ、さらに図示は省略するが、この外側に間隔保持材、保護用としてのブルーシートと、これを囲む不織布が設けられる。この鉄筋籠2を掘削した杭孔1に建て込み、杭底で鋼製フレームを潰して注入バッグを杭底全体に拡げる。鋼製フレーム3は上下端のリング状の辺とこれを繋ぐ複数の縦辺、下端リング状の辺に接続される十字状辺の編組構造をしており、縦辺は中央部の点Pが折曲点になっていて、この部分に折れ曲がったフレームが注入バッグを破らないように保護辺5が設けられている。
FIG. 14 is a view for explaining the proposed tip preload cast-in-place pile method, and FIG. 15 is a view for explaining a steel frame.
In FIG. 14, a steel frame 3 is attached to a tip of a reinforcing bar 2 disposed in a pile hole 1 for constructing a cast-in-place pile with a fixture such as a number wire. An infusion bag 4 in which the edges of the two upper and lower base fabrics are sewn so as to surround the steel frame 3 is attached. A blue sheet and a non-woven fabric surrounding it are provided. This reinforcing bar 2 is built in the excavated pile hole 1, and the steel frame is crushed at the bottom of the pile to spread the injection bag over the entire pile bottom. The steel frame 3 has a braided structure with a ring-shaped side at the upper and lower ends and a plurality of vertical sides connecting the ring-shaped sides, and a cross-shaped side connected to the lower-end ring-shaped side. A protective side 5 is provided so that the frame bent at this portion does not break the injection bag.

図15に示すように、鋼製フレーム3が潰れると縦辺は折曲点Pで折れ曲がり、鋼製フレームのQ点はqの位置に変位し、折曲点Pは外側の点pの位置にはみ出して注入バッグを拡げ、このとき保護辺5によりバッグにフレームが突き刺さって破ってしまうのを防止している。   As shown in FIG. 15, when the steel frame 3 is crushed, the vertical side is bent at a bending point P, the point Q of the steel frame is displaced to the position q, and the bending point P is at the position of the outer point p. The infusion bag is bulged out, and at this time, the protective side 5 prevents the frame from sticking into the bag and breaking.

図16は場所打ち杭の施工法を説明する図である。
図16(a)は杭孔の掘削が終了した状態を示しており、杭底はスライムが多くあって脆弱である。この杭孔に対して先端に鋼製フレーム、注入バッグからなる先端プレロードユニットが設置された鉄筋籠を挿入し(図16(b))、注入バッグを杭底に押し付けて鋼製フレームを潰し、注入バッグを杭底に拡げた後(図16(c))、注入バッグを杭底に残して鉄筋籠を所定位置へ持ち上げる(図16(d))。次いで、コンクリートを打設・硬化後、杭体の中を通した注入ホースよりセメントミルクを加圧注入(図16(e))して注入バッグを膨張させ、杭先端地盤を加圧圧縮して強化する。このとき、バッグ背面を通して配設され、複数の孔が形成されたスライム排出ホースを通してスライムが排出される。
特開2003−171930号公報
FIG. 16 is a diagram for explaining a method for constructing cast-in-place piles.
FIG. 16A shows a state in which the excavation of the pile hole has been completed, and the pile bottom is fragile with a lot of slime. Insert a steel frame at the tip of this pile hole, a reinforcing bar rod installed with a tip preload unit consisting of an injection bag (Fig. 16 (b)), press the injection bag against the pile bottom and crush the steel frame, After spreading the injection bag on the bottom of the pile (FIG. 16C), the reinforcing bag is lifted to a predetermined position while leaving the injection bag on the bottom of the pile (FIG. 16D). Next, after placing and hardening concrete, cement milk is pressurized and injected from the injection hose through the pile body (Fig. 16 (e)) to inflate the injection bag, and the pile tip ground is compressed and compressed. Strengthen. At this time, the slime is discharged through the slime discharge hose disposed through the back surface of the bag and having a plurality of holes.
JP 2003-171930 A

従来の先端プレロード場所打ち杭工法においては、拡径杭や、スライムが多く堆積するBH工法などの杭、余掘りが多い杭に対応できない。拡径杭の場合、鋼製フレームが拡径杭の底盤部の拡径に追随できず、杭長を余掘りした場合には、鉄筋籠を所定位置まで引き上げるため、注入バッグが孔内水重を背負い、鉄筋籠を吊り上げているクレーンに負荷がかかるなどの問題があるためである。また、BH杭等の杭先端にスライムを多く残す工法の場合には、先端プレロード時にスライムを多く押しのけるために、注入バッグの膨らみ代が大きく必要である。さらに、スライム量も多く、それに追随できるスライム排出機能が必要である。   In the conventional tip preload cast-in-place pile method, it is not possible to cope with a pile with a large diameter, a pile such as a BH method in which a large amount of slime is accumulated, and a pile with a lot of excavation. In the case of an expanded pile, the steel frame cannot follow the expanded diameter of the bottom plate of the expanded pile, and when the pile length is dug, the reinforcing bag is pulled up to a predetermined position. This is because there is a problem that a load is applied to the crane carrying the steel rod and lifting the reinforcing bar rod. Moreover, in the case of a construction method in which a large amount of slime is left at the tip of a pile such as a BH pile, in order to push away a large amount of slime at the time of preloading the tip, a large expansion allowance is required for the injection bag. Furthermore, the amount of slime is large, and the slime discharge function that can follow it is necessary.

本発明は上記課題を解決しようとするものであり、スライムが多くたまる工法や拡径杭、余掘りが多い杭などの場合に対応可能で、注入バッグ背面にスライムやコンクリートの回り込みを解消し、確実に杭先端地盤を強化可能にすることを目的とする。
本発明は、鉄筋籠先端に取り付けられた鋼製フレーム底部に設置され、注入材の注入により杭先端地盤を加圧圧縮する注入バッグにおいて、両端開口の中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体構造からなり、前記二重反転袋体の開口部内に管状部材を取り付けるとともに、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにしたことを特徴とする。
また、本発明は、前記二重反転袋体は、杭径より僅かに大きい径を有し、杭底でのスライム及びコンクリートの裏側への回り込みを防止可能にしていることを特徴とする。
また、本発明は、前記二重反転袋体は折り畳まれており、注入材の注入により縦方向に伸びることを特徴とする。
また、本発明は、前記注入バッグは太糸の織物からなり、不織布等の袋で覆ったことを特徴とする。
また、本発明は、両端開口の中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体からなり、前記二重反転袋体の開口部内に管状部材を取り付け、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにした注入バッグがフレーム底部に取り付けられ、鉄筋籠先端に配置され鋼製フレームであって、前記鋼製フレームは、複数のリング状フレーム辺と、リング状フレーム辺を縦方向に繋ぐ複数の縦フレーム辺との編組構造でフレーム底面の十字状のアームを省略し、下側中央部から前記注入バッグの管状部材が挿入可能であることを特徴とする。
また、本発明は、両端開口の中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体からなり、前記二重反転袋体の開口部内に管状部材を取り付け、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにした注入バッグの管状部材が下側中央部から挿入取り付けられた鋼製フレームを鉄筋籠先端に取り付けて掘削孔に建て込む段階、一方の注入ホースから前記注入バッグへ注入材を注入し、前記注入ホースと反対側に配置された他方の注入ホースからエアー抜きする段階、両側の注入ホースから注入材を加圧注入して注入バッグを膨らませて地盤を加圧圧縮する段階を含むことを特徴とする。
The present invention is intended to solve the above-mentioned problem, and can be applied to a construction method in which a large amount of slime is accumulated, an expanded-diameter pile, a pile having a large amount of extra excavation, etc. The purpose is to make sure that the pile tip ground can be strengthened.
The present invention relates to an injection bag that is installed at the bottom of a steel frame attached to the tip of a reinforcing bar rod and pressurizes and compresses a pile tip ground by injection of an injection material. And a tubular member attached to the opening of the contra-inverted bag body, and an injection tube attached through the tubular member, between the folded inner part and outer part. The injection material is injected from the injection tube through the tubular member.
Further, the present invention is characterized in that the contra-rotating bag body has a diameter slightly larger than the pile diameter and can prevent the slime and the concrete from entering the back side of the pile bottom.
Further, the present invention is characterized in that the contra-rotating bag body is folded and extends in the longitudinal direction by injection of an injection material.
Further, the present invention is characterized in that the infusion bag is made of a thick woven fabric and covered with a bag of non-woven fabric or the like.
Further, the present invention comprises a contra-inversion bag body in which one half of a hollow tubular body having both ends open is folded back inside the other half, and a tubular member is attached in the opening of the counter-inversion bag body. An injection tube is attached through the member, and an injection bag in which an injection material is injected from the injection tube through the tubular member between the folded inner part and outer part is attached to the bottom of the frame, and the steel is disposed at the tip of the reinforcing bar rod The steel frame is a braided structure of a plurality of ring-shaped frame sides and a plurality of vertical frame sides that connect the ring-shaped frame sides in the vertical direction, omitting the cross-shaped arm on the bottom surface of the frame, The tubular member of the infusion bag can be inserted from the lower center part.
Further, the present invention comprises a contra-inversion bag body in which one half of a hollow tubular body having both ends open is folded back inside the other half, and a tubular member is attached in the opening of the counter-inversion bag body. The injection tube is attached through the member, and the tubular member of the injection bag in which the injection material is injected from the injection tube through the tubular member between the folded inner portion and the outer portion is inserted and attached from the lower central portion. A step of attaching a frame to the end of a reinforcing rod and installing it in a drilling hole, a step of injecting an injection material from one injection hose into the injection bag, and venting from the other injection hose arranged on the opposite side of the injection hose, The method includes a step of pressurizing and compressing the ground by injecting the injection material from the injection hoses on both sides to inflate the injection bag.

本発明の二重反転袋体は、注入材の注入により膨らんだとき杭径より大きい径を有しているので、スライム及びコンクリートが裏側へ回り込むのを防止できる。
また、本発明は、二重反転袋体を折り畳んでおくことにより、注入材の注入により縦方向に伸び、膨らみ代を大きくすることができる。
また、本発明は、注入バッグを太糸の織物として強固にすることにより、従来バッグを覆うために使われていたブルーシート(カバーシート)を不要にし、工事中に注入バッグが縦方向に伸びてしまわないように袋で覆うだけにすることができる。
また、本発明は、二重反転袋体からなる注入バッグを使用する場合、鋼製フレームをリング状フレーム辺と縦フレーム辺との編組構造とすることにより、底部側のリング状フレーム辺で形成される開口部に注入バッグの管状部材を配置することができる。
また、本発明は、注入ホース複数箇所から注入材を加圧注入することにより、注入バッグに均等に注入材を注入できる。
Since the contra-rotating bag body of the present invention has a diameter larger than the pile diameter when inflated by the injection of the injection material, the slime and concrete can be prevented from turning around to the back side.
Moreover, this invention can extend the vertical direction by injection | pouring of an injection material, and can enlarge a bulge allowance by folding the contra-fold bag body.
In addition, the present invention makes the injection bag strong as a thick woven fabric, eliminating the need for a blue sheet (cover sheet) conventionally used to cover the bag and extending the injection bag in the longitudinal direction during construction. It can only be covered with a bag so that it will not be damaged.
In addition, when using an infusion bag made of a contra-rotating bag, the present invention forms a steel frame with a ring-shaped frame side on the bottom side by adopting a braided structure of a ring-shaped frame side and a vertical frame side. The tubular member of the infusion bag can be placed in the opening to be made.
Moreover, this invention can inject | pour an injection material equally to an injection bag by inject | pouring injection material from multiple injection | pouring hose places.

以下、本発明の実施の形態について説明する。
図1は先端強化型場所打ち杭の施工法に用いる本実施形態の鋼製フレームの構造を説明する図である。
鋼製フレーム3は、場所打ち杭を施工する杭孔に配設する鉄筋籠の先端に取り付けられ、その底部に図示しない注入バッグが設置され、鉄筋籠を杭孔に建て込み、杭底で鋼製フレームを潰して注入バッグを杭底全体に拡げ、コンクリートの注入・硬化後に杭体の中に通した管を使って地上から注入バッグの中へセメントミルク等の注入材を加圧注入し、注入バッグを膨張させて、杭先端地盤を加圧圧縮して強化する。
Embodiments of the present invention will be described below.
FIG. 1 is a view for explaining the structure of a steel frame of this embodiment used in a method for constructing a tip-reinforced cast-in-place pile.
The steel frame 3 is attached to the tip of the reinforcing bar to be placed in the pile hole where the cast-in-place pile is to be constructed, and an injection bag (not shown) is installed at the bottom of the steel frame 3, and the reinforcing bar is built into the pile hole and Crush the frame and spread the injection bag over the entire pile bottom, press the injection material such as cement milk into the injection bag from the ground using the pipe passed through the pile after concrete injection and hardening, The infusion bag is inflated and the pile tip ground is pressurized and reinforced.

鋼製フレーム3は上下端のリング状の辺と複数の縦辺の編組構造をしていて、この縦辺は中央部の点Pが折曲点になっていて、この部分より上方に延びる注入バッグ拡張アーム10が設けられていている。そして、鋼製フレーム3が潰れたとき、フレーム底辺のQ点はqの位置に、折曲点Pは外方のp点に変位し、このとき注入バッグ拡張アーム10はpの位置よりさらに外方に延びて拡径杭であってもその底部全面に注入バッグを拡げることが可能である。なお、注入バッグ拡張アームを設ける代わりに、鋼製フレームの高さを高くし、折曲点PからQ点までを長くすれば、フレームが潰れたときにq点からp点までが長くなって拡径杭の底部全面に注入バッグを拡げることが可能である。   The steel frame 3 has a braided structure of ring-shaped sides at the upper and lower ends and a plurality of vertical sides. The vertical side of the steel frame 3 has a center point P as a bending point. A bag extension arm 10 is provided. When the steel frame 3 is crushed, the Q point at the bottom of the frame is displaced to the q position, and the bending point P is displaced to the outer p point. At this time, the injection bag expansion arm 10 is further out of the p position. Even if it is a diameter-expanded pile extending in the direction, it is possible to expand the injection bag over the entire bottom surface. In addition, if the height of the steel frame is increased and the length from the bending point P to the point Q is lengthened instead of providing the injection bag extension arm, the point q to the point p becomes longer when the frame is crushed. It is possible to spread the injection bag over the entire bottom of the expanded pile.

図2は本実施形態の鋼製フレームの他の例を説明する図である。
従来の鋼製フレームは鉄筋籠に結束しているため杭底で潰れても外れない。しかし、拡径杭や余掘りのある杭では、鋼製フレームを潰して注入バッグを拡げた後、鉄筋籠を持ち上げる必要があり、このとき潰れた鋼製フレームが杭孔の側壁に引っかかってしまう不都合が生じる。これを解消するため、本実施形態では、鋼製フレームが潰れたときに鉄筋籠から離脱するような構成としている。
FIG. 2 is a view for explaining another example of the steel frame of the present embodiment.
Since the conventional steel frame is bound to the reinforcing bar, it cannot be removed even if it is crushed at the bottom of the pile. However, it is necessary to lift the reinforcing bar rod after crushing the steel frame and expanding the injection bag in the case of piles with expanded diameter or overexcavation. At this time, the collapsed steel frame is caught on the side wall of the pile hole. Inconvenience arises. In order to eliminate this, in this embodiment, it is set as the structure which detaches | leaves from a rebar rod when a steel frame is crushed.

鋼製フレーム3の縦辺に折曲点Pが形成されているのは図1の場合と同様であり、この縦辺と同じ箇所にフック辺11を設けて、その先端を鉄筋籠の主鉄筋6を結束している帯鉄筋7に引っかけるようにする。そして、杭底で鋼製フレームが潰れ、フレーム底辺のQ点がqの位置に、折曲点Pがp点に変位する過程でフック辺11の先端が帯鉄筋6から外れてp点より外方に張り出し、注入バッグを杭全体に拡げる。フック辺11が帯鉄筋から外れるため、鉄筋籠を持ち上げたとき鋼製フレームと拡がったバッグは杭底に残り、拡径杭や余掘りのある杭であっても何の支障もなく鉄筋籠を持ち上げることができる。   The bending point P is formed on the vertical side of the steel frame 3 as in the case of FIG. 1, and a hook side 11 is provided at the same position as the vertical side, and the tip thereof is the main reinforcing bar of the reinforcing bar rod. 6 is hooked to the rebar 7 that binds it. Then, the steel frame is crushed at the bottom of the pile, the Q point of the frame bottom is in the position of q, and the tip of the hook side 11 is disengaged from the rebar 6 in the process of displacing the bending point P to the p point. Overhang and spread the injection bag over the entire pile. Since the hook side 11 is detached from the rebar, when the rebar is lifted, the steel frame and the expanded bag remain on the bottom of the pile. Can be lifted.

なお、上記の例ではフック辺を帯鉄筋に引っかけるようにしたが、時計方向にスプリング付勢された回転可能なフックをより大きなスプリング力で反時計方向に付勢して帯鉄筋に引っかけるラッチ式ユニットを鋼製フレームに取り付け、鋼製フレームが潰れたときに反時計方向のスプリング力がなくなって時計方向のスプリング力でフックが外れるような機構を用いるようにしてもよい。   In the above example, the hook side is hooked on the band reinforcing bar, but the latch type that hooks the rotating hook biased clockwise in the clockwise direction counterclockwise with a larger spring force and hooks on the band reinforcing bar. The unit may be attached to a steel frame, and a mechanism may be used in which when the steel frame is crushed, the counterclockwise spring force disappears and the hook is released by the clockwise spring force.

また、スライムが多い場合には、鋼製フレームの強度を強くしないと注入バッグを拡げることが困難である。そこで、図1、図2の例の場合、編組構造の鋼製フレームの縦辺の本数を従来6本であったものを8本以上とし、また、鋼製フレームの各辺の厚さ3mmをより厚くし、また幅15mmをより広くしてスライムに抗して注入バッグを拡張できるようにする。   In addition, when there is a large amount of slime, it is difficult to expand the injection bag unless the strength of the steel frame is increased. Therefore, in the case of the example in FIGS. 1 and 2, the number of the vertical sides of the steel frame having a braided structure is 8 or more in the past, and the thickness of each side of the steel frame is 3 mm. Thicker and wider 15mm to allow expansion of the infusion bag against slime.

図3は余掘りが多いか、スライムが多い場合の場所打ち杭の施工法を説明する図であり、この例では鋼製フレームが離脱するタイプのものを用いる。
図3(a)は杭孔の掘削が終了した状態を示しており、孔壁にはマッドケーキがあり、杭底にはスライムが多くあって脆弱である。この杭孔に対して先端に鋼製フレーム、注入バッグからなる先端プレロードユニットが設置された鉄筋籠を挿入し(図3(b))、注入バッグを杭底に押し付けて鋼製フレームを潰し、注入バッグを杭底に拡げた後(図3(c))、離脱した鋼製フレームと注入バッグを杭底に残して鉄筋籠を所定位置へ持ち上げる(図3(d))。次いで、杭本体コンクリートを打設・硬化後、杭体の中を通した注入ホースよりセメントミルクを加圧注入してバッグを膨張させ、杭先端地盤を加圧圧縮して強化する。このとき、バッグ背面を通して配設され、複数の孔が形成されたスライム排出ホースを通してスライムが排出される。
FIG. 3 is a diagram for explaining a method for constructing a cast-in-place pile when there is a lot of overexcavation or a large amount of slime. In this example, a type in which the steel frame is detached is used.
FIG. 3A shows a state in which the excavation of the pile hole has been completed, and there is a mud cake on the hole wall, and there is a lot of slime on the bottom of the pile and it is fragile. Insert a steel frame with a steel frame at the tip of this pile hole, a reinforcing bar rod with a tip preload unit consisting of an injection bag (Fig. 3 (b)), press the injection bag against the pile bottom and crush the steel frame, After the injection bag is spread on the pile bottom (FIG. 3C), the steel frame and the injection bag that have been detached are left on the pile bottom, and the reinforcing bar is lifted to a predetermined position (FIG. 3D). Next, after placing and hardening the pile body concrete, cement milk is pressurized and injected from an injection hose passing through the pile body to inflate the bag, and the pile tip ground is pressurized and reinforced. At this time, the slime is discharged through the slime discharge hose disposed through the back surface of the bag and having a plurality of holes.

図4は拡径杭の場合の場所打ち杭の施工法を説明する図であり、この例でも鋼製フレームは離脱するものを用いている。
図4(a)は杭孔の掘削が終了した状態を示しており、孔壁にはマッドケーキがあり、杭底にはスライムが多くあって脆弱である。この杭孔に対して先端に鋼製フレーム、注入バッグが設置された鉄筋籠を挿入し(図4(b))、注入バッグを杭底に押し付けて鋼製フレームを潰し、注入バッグを拡径杭の底に拡げた後(図4(c))、離脱した鋼製フレームと注入バッグを杭底に残して鉄筋籠を所定位置へ持ち上げる(図4(d))。次いで、杭本体コンクリートを打設・硬化後、杭体の中を通した注入ホースよりセメントミルクを加圧注入してバッグを膨張させ、杭先端地盤を加圧圧縮して強化する(図4(e))。この時、バッグ背面を通して配設され、複数の孔が形成されたスライム排出ホースを通してスライムが排出される。
FIG. 4 is a diagram for explaining a method for constructing a cast-in-place pile in the case of an expanded-diameter pile. In this example, the steel frame is separated.
FIG. 4A shows a state in which the excavation of the pile hole has been completed. There is a mud cake on the hole wall, and there is a lot of slime on the bottom of the pile, which is fragile. Reinforcing bar with steel frame and injection bag installed at the tip of this pile hole is inserted (Fig. 4 (b)), the injection bag is pressed against the pile bottom, the steel frame is crushed, and the injection bag is expanded. After spreading to the bottom of the pile (FIG. 4 (c)), the steel frame and the injection bag that have been detached are left on the bottom of the pile, and the reinforcing bar is lifted to a predetermined position (FIG. 4 (d)). Next, after placing and hardening the pile body concrete, cement milk is pressurized and injected from an injection hose passing through the pile body to inflate the bag, and the pile tip ground is pressurized and reinforced (FIG. 4 ( e)). At this time, the slime is discharged through a slime discharge hose disposed through the back of the bag and having a plurality of holes.

図5は本実施形態の注入バッグを説明する図で、図5(a),(b)は小径反転タイプ、図5(c),(d)は大径反転タイプを示している。
本実施形態の注入バッグは二重反転袋体からなるシームレス構造であり、図5(a),(b)の場合、小径部20aと大径部20(b)からなるポリエステル製織物等からなる両端開口の中空管状体20(図5(a))の小径部20aを大径部20b内に折り返した構造であり(図5(b))、小径部20aと大径部20bとの間(図の斜線部)にセメントミルク等の注入材が入れられる。注入バッグはポリエステル以外にもナイロン等でもよく、糸の太さを太くして強くしたものを用いる。なお、糸を太くしてバッグを織ると縫い目が粗くなり、そこからセメントミルクが漏れる可能性があるので、バッグの内側に目の細かいシートを張り、漏れない構造としている。この構造であるため、開口部以外は縫い目がないシームレス構造のため、注入材が漏れるおそれがないとともに、耐圧強度が向上する。
FIG. 5 is a view for explaining the infusion bag of the present embodiment. FIGS. 5A and 5B show a small-diameter reversal type, and FIGS. 5C and 5D show a large-diameter reversal type.
The infusion bag of the present embodiment has a seamless structure made of a contra-rotating bag, and in the case of FIGS. 5 (a) and 5 (b), it is made of a polyester fabric or the like made up of a small diameter portion 20a and a large diameter portion 20 (b). It is a structure in which the small-diameter portion 20a of the hollow tubular body 20 (FIG. 5 (a)) open at both ends is folded back into the large-diameter portion 20b (FIG. 5 (b)), and between the small-diameter portion 20a and the large-diameter portion 20b ( An injection material such as cement milk is put in the shaded area in the figure. The infusion bag may be nylon or the like other than polyester, and a thickened yarn is used. If the bag is woven with a thicker thread, the seam becomes rough, and cement milk may leak from there, so a fine sheet is applied inside the bag to prevent leakage. Since this structure is a seamless structure with no seams other than the opening, there is no possibility of the injection material leaking and the pressure resistance is improved.

図5(c),(d)の場合はポリエステル製等の織物からなる両端開口の大径の中空管状体21(図5(c))の一方の開口部21aを管状体内へ折り返して他方の開口部21bの方まで引っ張り込んだ構造(図5(d))であり、折り返した内側部分と外側部分との間(図の斜線部)にセメントミルク等の注入材が入れられる。図5(a),(b)の場合と同様に、開口部以外は縫い目がないシームレス構造のため、注入材が漏れるおそれがないとともに、耐圧強度が向上する。   In the case of FIGS. 5 (c) and 5 (d), one opening 21a of the large-diameter hollow tubular body 21 (FIG. 5 (c)) having a double-end opening made of a woven fabric made of polyester or the like is folded back into the tubular body. The structure is pulled up to the opening 21b (FIG. 5D), and an injection material such as cement milk is put between the folded inner part and outer part (shaded area in the figure). As in the case of FIGS. 5A and 5B, since the seamless structure has no seams other than the openings, there is no possibility of the injection material leaking and the pressure resistance is improved.

図6は二重反転袋体構造の注入バッグの例を3次元的に示した断面図である。
二重反転袋体30は折り畳んで薄くした状態にあり、開口部にプラスチック管31を取り付けて鋼製バンドで補強し、プラスチック管や鋼管等からなる管状部材31内に注入管33を通して袋体内にセメントミルクを注入する構造になっている。
FIG. 6 is a cross-sectional view three-dimensionally showing an example of an infusion bag having a contra-rotating bag structure.
The contra-rotating bag 30 is folded and thinned, and a plastic tube 31 is attached to the opening and reinforced with a steel band, and the tube member 31 made of a plastic tube or a steel tube is inserted into the bag through the injection tube 33. It is structured to inject cement milk.

この注入バッグは、セメントミルクを加圧注入すると、折り畳んだ部分が伸びるため、図の下側(縦方向)へ長く伸びていき、杭径より大きいバッグとしておくことにより、スライムやコンクリートの回りこみを防止するとともに、伸び代を大きくとれるためスライムや余掘りが多い場合にも十分に杭底を圧縮強化することができる。なお、注入バッグの材料をポリエステル製織物のように丈夫な材料とし、シームレス化を図ることにより従来バッグを覆うために使われていたブルーシートを不要にすることもできる。ただし、鉄筋籠を杭孔に挿入していく過程で注入バッグが縦方向に伸びてしまわないように不織布等の袋で覆うことが望ましい。   This injection bag is expanded when the cement milk is injected under pressure, so that the folded part will extend to the lower side (longitudinal direction) of the figure. In addition, the pile bottom can be sufficiently compressed and strengthened even when there is a lot of slime and excessive digging. In addition, the material of the injection bag is made of a strong material such as a polyester fabric, and by making it seamless, the blue sheet that has been used to cover the bag can be eliminated. However, it is desirable to cover with a bag such as a nonwoven fabric so that the injection bag does not extend in the vertical direction in the process of inserting the reinforcing bar rod into the pile hole.

図6に示すように、二重反転袋体構造の注入バッグは袋体の真ん中から上方に向かってプラスチック管等の管状部材が設けられるため、従来の鋼製フレームのように、フレーム底面に十字状のアームが組まれているとバッグの取り付けに支障をきたす。そこで、鋼製フレームの底面の十字状のアームを省略し、上下端のリング状辺と、これを結ぶ複数の縦方向の辺との編組構造とすることにより、取り付けに支障をきたすのを防止することができる。   As shown in FIG. 6, since the infusion bag having a contra-rotating bag structure is provided with a tubular member such as a plastic tube from the center of the bag upward, a cross is formed on the bottom of the frame like a conventional steel frame. If the arm is shaped, it will interfere with the bag installation. Therefore, the cross-shaped arms on the bottom surface of the steel frame are omitted, and a braided structure with ring-shaped sides at the upper and lower ends and a plurality of vertical sides connecting them prevents the installation from being hindered. can do.

図7、図8は二重反転袋体構造の利点を説明するための図である。
図7(a)に示す従来の注入バッグ40は、上側と下側の円形状の基布をその周囲の縁で縫い合わした構造で、伸び代が少ないため、通常、杭径の1.5倍程の径のものを使用している。しかし、この構造では鉄筋籠を杭孔に挿入し(図8(a))、バッグを杭底に押しつけたとき、周囲部分が孔壁側に折れ曲がり(図8(b))、折れ曲がった部分と孔壁との間を通してコンクリートが回り込んでしまう。
7 and 8 are diagrams for explaining the advantages of the contra-rotating bag structure.
The conventional infusion bag 40 shown in FIG. 7 (a) has a structure in which upper and lower circular base fabrics are stitched together at the peripheral edges thereof, and has a small stretch allowance. A double diameter is used. However, in this structure, when the reinforcing bar is inserted into the pile hole (Fig. 8 (a)) and the bag is pressed against the pile bottom, the surrounding portion is bent to the hole wall side (Fig. 8 (b)), and the bent portion is Concrete wraps around between the hole walls.

これに対して図7(b)の二重反転袋体構造では、縦方向の伸び代が大きいため、袋の径を杭径に対して僅かに大きくする程度(例えば、杭径+20cm程度)でも十分に杭底の圧縮力が得られるため、孔壁側に折れ曲がることがなく、コンクリートの回り込みを防止することができる。すなわち、二重反転袋体構造のバッグを取り付けた鉄筋籠を杭孔に挿入し(図8(c))、バッグを杭底に押しつけても周囲部分が孔壁側に折れ曲がることがなく(図8(d))、コンクリートの回り込みを防止することができる。   On the other hand, in the contra-rotating bag structure of FIG. 7 (b), since the allowance in the vertical direction is large, even if the bag diameter is slightly larger than the pile diameter (for example, pile diameter +20 cm). Since the compressive force of the pile bottom can be obtained sufficiently, the concrete can be prevented from wrapping around without being bent to the hole wall side. That is, even if the reinforcing bar with the bag of the inverted bag structure is inserted into the pile hole (FIG. 8 (c)) and the bag is pressed against the pile bottom, the surrounding portion does not bend to the hole wall side (see FIG. 8 (d)), it is possible to prevent the wraparound of concrete.

図9はスライム排出ホースの杭底における配置方法を説明する図である。
杭底のスライムは、杭本体コンクリートを打設・硬化後、杭体の中を通した注入ホースよりセメントミルクを加圧注入してバッグを膨張させ、杭先端地盤を加圧したときに、バッグ背面に配設されたスライム排出ホースの複数の孔を通して地上へ押し出される。
図9(a)は従来のスライム排出ホースの杭底部における配置図であり、スライム排出ホース50を1本のみバッグ外側に配置しているが、スライムが多い場合には十分排出することができない。そこで、図9(b)に示すように、スライム排出ホース51を任意の形状に曲げて配置し、排出ホースが杭底に当たる面積を多くする。また、図9(c)に示すように排出ホースの本数を多くして杭底に配置する。このような構成とすることにより、スライムの排出を効果的に行うことができる。
FIG. 9 is a view for explaining a method of arranging the slime discharge hose on the pile bottom.
The slime at the bottom of the pile is placed when the pile body concrete is placed and hardened, and then the cement milk is pressurized and injected from the injection hose through the pile body to inflate the bag. It is pushed out to the ground through a plurality of holes of a slime discharge hose disposed on the back surface.
FIG. 9A is an arrangement view of a conventional slime discharge hose at the bottom of the pile, and only one slime discharge hose 50 is arranged outside the bag. However, when there is a large amount of slime, it cannot be discharged sufficiently. Therefore, as shown in FIG. 9B, the slime discharge hose 51 is bent and arranged in an arbitrary shape to increase the area where the discharge hose hits the pile bottom. Moreover, as shown in FIG.9 (c), the number of discharge hoses is increased and it arrange | positions to a pile bottom. By adopting such a configuration, slime can be discharged effectively.

なお、スライム排出ホースを複数本設置して注入バッグの背面側を通して配置し、スライム排出ホースで注入バッグを吊ることにより注入バッグが落下するのを防止することができる。
図10はスライム排出ホースで注入バッグを吊る例を説明する図である。
スライム排出ホース60は地上側から鉄筋籠内を通って注入バッグ61の背面側を通っており、スライム排出ホースを2本以上とすることにより、注入バッグを吊ってバッグが下側に伸びたり、落下するのを防止することができる。
A plurality of slime discharge hoses can be installed and arranged through the back side of the injection bag, and the injection bag can be prevented from falling by hanging the injection bag with the slime discharge hose.
FIG. 10 is a diagram for explaining an example in which an infusion bag is suspended by a slime discharge hose.
The slime discharge hose 60 passes through the inside of the reinforcing bar from the ground side and passes through the back side of the injection bag 61. By using two or more slime discharge hoses, the injection bag is suspended and the bag extends downward, It can prevent falling.

次に、鋼製フレームを不要にできる実施形態について説明する。
図11は注入バッグへ水を入れる実施形態の例を説明する図である。
図11(a)は拡径杭の掘削が終了した状態を示しており、孔壁にはマッドケーキがあり、杭底にはスライムが多くあって脆弱である。この杭孔に対して先端に注入バッグが設置された鉄筋籠を挿入する(図11(b))。なお、鋼製フレームを介して注入バッグを設置してもよい。鉄筋籠を定位置または底まで挿入した後、注入バッグへ水を加圧注入してバッグを拡径の底面全体に拡げる(図11(c))。次いで、杭本体コンクリートを打設すると(図11(d))、注入バッグは杭の重みで加圧されて縮み、バッグ内の水は注入ホースを通して排出される。次いで、注入ホースを通してバッグ内にセメントミルク等の注入材を加圧注入してバッグを膨張させ、杭先端地盤を加圧圧縮して強化する。このとき、バッグ背面を通して配設されたスライム排出ホースを通してスライムが排出される。
Next, an embodiment that can eliminate the need for a steel frame will be described.
FIG. 11 is a diagram illustrating an example of an embodiment in which water is poured into an infusion bag.
FIG. 11 (a) shows a state where the excavation of the enlarged-diameter pile has been completed. There is a mud cake on the hole wall, and there is a lot of slime on the bottom of the pile, which is fragile. A reinforcing bar with an injection bag installed at the tip is inserted into the pile hole (FIG. 11B). An injection bag may be installed through a steel frame. After inserting the reinforcing bar rod to a fixed position or the bottom, water is injected into the injection bag under pressure to expand the bag over the entire bottom surface of the enlarged diameter (FIG. 11 (c)). Next, when pile main body concrete is laid (FIG. 11 (d)), the injection bag is pressurized and compressed by the weight of the pile, and the water in the bag is discharged through the injection hose. Next, an injection material such as cement milk is pressurized and injected into the bag through the injection hose to expand the bag, and the pile tip ground is pressurized and reinforced. At this time, the slime is discharged through a slime discharge hose disposed through the back of the bag.

図12は注入バッグへ水を入れる実施形態の他の例を説明する図である。
図12(a)は拡径杭の掘削が終了した状態を示しており、孔壁にはマッドケーキがあり、杭底にはスライムが多くあって脆弱である。この杭孔(孔水あり)の中へ重りなどで注入バッグを沈設する(図12(a))。次いで、杭孔に鉄筋籠を挿入し(図12(b))、注入ホースから注入バッグへ水を注入してバッグを拡径の底面全体に拡げる(図12(c))。次いで、杭本体コンクリートを打設すると(図12(d))、注入バッグは杭の重みで加圧されて縮み、バッグ内の水は注入ホースを通して排出される。次いで、注入ホースを通してバッグ内にセメントミルク等の注入材を加圧注入してバッグを膨張させ、杭先端地盤を加圧圧縮して強化する。このとき、バッグ背面を通して配設されたスライム排出ホースを通してスライムが排出される(図12(e))。
Drawing 12 is a figure explaining other examples of an embodiment which puts water into an infusion bag.
FIG. 12 (a) shows a state where the excavation of the enlarged-diameter pile has been completed. There is a mud cake on the hole wall, and there is a lot of slime on the bottom of the pile, which is fragile. An injection bag is set in the pile hole (with water) with a weight or the like (FIG. 12A). Next, a reinforcing bar rod is inserted into the pile hole (FIG. 12B), water is injected from the injection hose into the injection bag, and the bag is expanded over the entire bottom surface of the enlarged diameter (FIG. 12C). Subsequently, when pile main body concrete is laid (FIG.12 (d)), an injection bag will be pressurized and shrunk with the weight of a pile, and the water in a bag will be discharged | emitted through an injection hose. Next, an injection material such as cement milk is pressurized and injected into the bag through the injection hose to expand the bag, and the pile tip ground is pressurized and reinforced. At this time, slime is discharged through the slime discharge hose disposed through the back of the bag (FIG. 12 (e)).

図13はバッグへの注入方法を説明する図である。
図13(a),(b)は従来の注入方法を説明する図で、地上側から注入ホースの片方(図の注入ホースA)よりセメントミルク等を注入し(図13(a))、続けて加圧注入を行って杭底を加圧圧縮する(図13(b))。なお、この過程でスライム排出ホースを通してスライムが排出される。しかし、この方法ではセメントミルクを片側から注入し、注入バッグを片側から膨らまして最終的に全体が膨らむようにしているため、片寄って膨らむ現象が生じてしまう可能性がある。
FIG. 13 is a view for explaining an injection method into a bag.
FIGS. 13 (a) and 13 (b) are diagrams for explaining a conventional injection method, in which cement milk or the like is injected from one side of the injection hose (injection hose A in the figure) from the ground side (FIG. 13 (a)). Then, pressure injection is performed to compress and compress the pile bottom (FIG. 13B). In this process, slime is discharged through the slime discharge hose. However, in this method, cement milk is injected from one side and the injection bag is inflated from one side so that the whole is finally inflated. Therefore, there is a possibility that a phenomenon of inflating will occur.

図13(c),(d)は本実施形態の注入方法を説明する図で、注入ホースの片方(図の注入ホースA)よりセメントミルクを注入して逆側(図の注入ホースB)からエアを抜き(図13(c))、その後、注入ホースA、B両側からセメントミルクを注入して加圧する(図13(d))。このような注入方法によりバッグを均等に膨らませることができる。   FIGS. 13C and 13D are diagrams for explaining the injection method of the present embodiment, in which cement milk is injected from one side of the injection hose (injection hose A in the figure) and from the opposite side (injection hose B in the figure). The air is extracted (FIG. 13 (c)), and then cement milk is injected from both sides of the injection hoses A and B and pressurized (FIG. 13 (d)). By such an injection method, the bag can be inflated evenly.

本発明によれば、スライムが多くたまる工法や拡径杭、余掘りが多い杭などの場合に対応可能で、注入バッグ背面にスライムやコンクリートの回り込みを解消し、確実に杭先端地盤を強化できるので産業上の利用価値は大きい。   According to the present invention, it is possible to cope with a construction method in which a large amount of slime accumulates, an enlarged diameter pile, a pile with a lot of excavation, etc., eliminating the sneak of slime and concrete on the back of the injection bag, and reliably reinforcing the pile tip ground Therefore, the industrial utility value is great.

本実施形態の鋼製フレームの構造を説明する図である。It is a figure explaining the structure of the steel frame of this embodiment. 本実施形態の鋼製フレームの他の例を説明する図である。It is a figure explaining the other example of the steel frame of this embodiment. 本実施形態の余掘りが多いか、スライムが多い場合の場所打ち杭の施工法を説明する図である。It is a figure explaining the construction method of the cast-in-place pile when there is much excessive digging of this embodiment or there are many slimes. 本実施形態の拡径杭の場合の場所打ち杭の施工法を説明する図である。It is a figure explaining the construction method of the cast-in-place pile in the case of the diameter-expanded pile of this embodiment. 本実施形態の注入バッグを説明する図である。It is a figure explaining the injection bag of this embodiment. 二重反転袋体構造の注入バッグの例を3次元的に示した断面図である。It is sectional drawing which showed the example of the injection bag of a contra-rotation bag body structure three-dimensionally. 二重反転袋体構造の利点を説明するための図である。It is a figure for demonstrating the advantage of a contra-rotating bag structure. 二重反転袋体構造の利点を説明するための図である。It is a figure for demonstrating the advantage of a contra-rotating bag structure. スライム排出ホースの杭底における配置方法を説明する図である。It is a figure explaining the arrangement | positioning method in the pile bottom of a slime discharge hose. スライム排出ホースで注入バッグを吊る例を説明する図である。It is a figure explaining the example which hangs an injection bag with a slime discharge hose. 注入バッグへ水を入れる実施形態の例を説明する図である。It is a figure explaining the example of embodiment which puts water into an injection bag. 注入バッグへ水を入れる実施形態の他の例を説明する図である。It is a figure explaining the other example of embodiment which puts water into an injection bag. バッグへの注入方法を説明する図である。It is a figure explaining the injection | pouring method to a bag. 既提案の先端プレロード場所打ち杭工法を説明するための図である。It is a figure for demonstrating the existing tip preload cast-in-place pile method. 既提案の鋼製フレームを説明する図である。It is a figure explaining the proposed steel frame. 既提案の場所打ち杭の施工法を説明する図である。It is a figure explaining the construction method of the existing cast-in-place pile.

符号の説明Explanation of symbols

1…杭孔、2…鉄筋籠、3…鋼製フレーム、6…主鉄筋、7…帯鉄筋、10…拡張アーム、11…フック辺。 DESCRIPTION OF SYMBOLS 1 ... Pile hole, 2 ... Reinforcing bar, 3 ... Steel frame, 6 ... Main reinforcement, 7 ... Band reinforcement, 10 ... Extension arm, 11 ... Hook side

Claims (6)

鉄筋籠先端に取り付けられた鋼製フレーム底部に設置され、注入材の注入により杭先端地盤を加圧圧縮する注入バッグにおいて、
両端開口の中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体構造からなり、前記二重反転袋体の開口部内に管状部材を取り付けるとともに、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにしたことを特徴とする注入バッグ。
In the infusion bag that is installed at the bottom of the steel frame attached to the tip of the rebar bar and presses and compresses the pile tip ground by injecting the injection
It has a contra-inverted bag structure in which one half of a hollow tubular body having both ends opened is folded inward of the other half, and a tubular member is attached in the opening of the contra-inverted bag body, and an injection tube is passed through the tubular member. The injection bag is characterized in that the injection material is injected from the injection tube through the tubular member between the inner portion and the outer portion that are folded.
前記二重反転袋体は、杭径より僅かに大きい径を有し、杭底でのスライム及びコンクリートの裏側への回り込みを防止可能にしていることを特徴とする請求項1記載の注入バッグ。 The injection bag according to claim 1, wherein the contra-rotating bag body has a diameter slightly larger than a pile diameter, and prevents the slime and concrete from entering the back side of the pile bottom. 前記二重反転袋体は折り畳まれており、注入材の注入により縦方向に伸びることを特徴とする請求項1記載の注入バッグ。 The infusion bag according to claim 1, wherein the contra-rotating bag is folded and extends in a longitudinal direction by injection of an injecting material. 前記注入バッグは太糸の織物からなり、不織布等の袋で覆ったことを特徴とする請求項1記載の注入バッグ。 The infusion bag according to claim 1, wherein the infusion bag is made of a thick woven fabric and is covered with a non-woven fabric bag. 両端開口の中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体からなり、前記二重反転袋体の開口部内に管状部材を取り付け、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにした注入バッグがフレーム底部に取り付けられ、鉄筋籠先端に配置され鋼製フレームであって、
前記鋼製フレームは、複数のリング状フレーム辺と、リング状フレーム辺を縦方向に繋ぐ複数の縦フレーム辺との編組構造でフレーム底面の十字状のアームを省略し、下側中央部から前記注入バッグの管状部材が挿入可能であることを特徴とする鋼製フレーム。
It consists of a contra-reversal bag body in which one half of a hollow tubular body having both ends open is folded inside the other half, and a tubular member is mounted in the opening of the contra-rotating bag body, and an injection tube is mounted through the tubular member An infusion bag adapted to inject an injection material from an injection tube through the tubular member between the folded inner portion and outer portion is attached to the bottom of the frame, and is a steel frame disposed at the end of the reinforcing bar rod,
The steel frame has a braided structure of a plurality of ring-shaped frame sides and a plurality of vertical frame sides that connect the ring-shaped frame sides in the vertical direction, omitting a cross-shaped arm on the bottom surface of the frame, A steel frame in which a tubular member of an infusion bag can be inserted.
両端開口中空管状体の一方の半分を他方の半分の内側へ折り返した二重反転袋体からなり、前記二重反転袋体の開口部内に管状部材を取り付け、該管状部材を通して注入管を取り付け、折り返した内側部分と外側部分との間に前記管状部材を通して注入管から注入材を注入するようにした注入バッグの管状部材が下側中央部から挿入取り付けられた鋼製フレームを鉄筋籠先端に取り付けて掘削孔に建て込む段階、
一方の注入ホースから前記注入バッグへ注入材を注入し、前記注入ホースと反対側に配置された他方の注入ホースからエアー抜きする段階、
両側の注入ホースから注入材を加圧注入して注入バッグを膨らませて地盤を加圧圧縮する段階、
を含む先端強化型場所打ち杭の施工法。
It consists of a contra-reversal bag body in which one half of a hollow tubular body having both ends open is folded inside the other half, and a tubular member is mounted in the opening of the contra-rotating bag body, and an injection tube is mounted through the tubular member A steel frame in which a tubular member of an injection bag in which an injection material is injected from the injection tube through the tubular member between the folded inner part and outer part is inserted and attached from the lower central part is attached to the end of the reinforcing bar rod Attach and install in the borehole,
Injecting an injection material from one injection hose into the injection bag, and venting air from the other injection hose arranged on the opposite side of the injection hose;
A step of pressurizing and compressing the ground by injecting injection material from the injection hose on both sides to inflate the injection bag,
Of tip-reinforced cast-in-place piles including
JP2004001632A 2004-01-07 2004-01-07 Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame Expired - Fee Related JP3880002B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004001632A JP3880002B2 (en) 2004-01-07 2004-01-07 Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004001632A JP3880002B2 (en) 2004-01-07 2004-01-07 Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame

Publications (2)

Publication Number Publication Date
JP2005194766A JP2005194766A (en) 2005-07-21
JP3880002B2 true JP3880002B2 (en) 2007-02-14

Family

ID=34817091

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004001632A Expired - Fee Related JP3880002B2 (en) 2004-01-07 2004-01-07 Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame

Country Status (1)

Country Link
JP (1) JP3880002B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6539566B2 (en) * 2015-10-29 2019-07-03 大亜ソイル株式会社 Construction method of cast-in-place concrete pile
CN111851481B (en) * 2020-08-25 2024-09-03 长安大学 A variable-section steel frame bag pile structure and construction method
CN113737786B (en) * 2021-08-09 2025-08-08 高永光 Pile end bottom grouting device, cast-in-place pile and construction method thereof
CN113718752A (en) * 2021-09-10 2021-11-30 中国电建集团成都勘测设计研究院有限公司 Ground diaphragm wall composite grouting method and grouting structure

Also Published As

Publication number Publication date
JP2005194766A (en) 2005-07-21

Similar Documents

Publication Publication Date Title
CN101392527B (en) Method of treating soft foundation with geotextile bulk pile
JP4938543B2 (en) Manufacturing frame for bag and manufacturing method of bag
JP3880002B2 (en) Construction method of tip-reinforced cast-in-place concrete pile, injection bag and steel frame
CN213233429U (en) Full-assembly pressure-bearing type variable-diameter steel reinforcement cage enlarged footing anchor pile system
CN210658330U (en) Reduce bored concrete pile of anti-frictional resistance
CN102852140B (en) Curtain type cave filling pile construction method and elastic mesh cloth
JP2005146577A (en) Reinforcing cage for foundation pile, and method of reinforcement arrangement for enlarging enlarged bottom part
JP2008248524A (en) Steel pipe pile construction method
WO2010005137A1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
KR101764242B1 (en) Soil back
JP3926364B2 (en) Construction method of tip-reinforced cast-in-place piles
JP3650712B2 (en) Bags for civil engineering bag materials and filling materials
CN114908730B (en) Reinforced vibroflotation gravel pile construction method
KR101656696B1 (en) Apparatus for dismantling wire for pile lifting and pile construction method using the same
JP5180858B2 (en) How to build cast-in-place piles
JP2963360B2 (en) Wall structure of reinforced soil structure
JP4048326B2 (en) Pile head processing method
JP7138818B1 (en) Formwork device for bags for civil engineering work
CN209308014U (en) Reinforcement cage for uplift piles
CN217580075U (en) Diameter-expanding spray head for vibroflotation gravel pile
JP4707599B2 (en) Construction method of tip-reinforced cast-in-place piles
JP2008291574A (en) Bag body for pile body, pile with bag body, and installation method of pile body
JP4054304B2 (en) Restrained soil structure and its construction method
CN222275523U (en) A geological safety reinforcement device
CN212052723U (en) Building foundation filling pile for civil engineering

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060222

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060420

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060531

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060830

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061003

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061102

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101117

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111117

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131117

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees