JP3880738B2 - Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet - Google Patents
Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet Download PDFInfo
- Publication number
- JP3880738B2 JP3880738B2 JP02622499A JP2622499A JP3880738B2 JP 3880738 B2 JP3880738 B2 JP 3880738B2 JP 02622499 A JP02622499 A JP 02622499A JP 2622499 A JP2622499 A JP 2622499A JP 3880738 B2 JP3880738 B2 JP 3880738B2
- Authority
- JP
- Japan
- Prior art keywords
- composite plate
- carbon fiber
- cement mortar
- concrete structure
- fiber sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G2023/0251—Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
- E04G2023/0262—Devices specifically adapted for anchoring the fiber reinforced plastic elements, e.g. to avoid peeling off
Landscapes
- Bridges Or Land Bridges (AREA)
- Lining And Supports For Tunnels (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、山岳トンネル、シールドトンネル、橋梁のスラブ、橋脚、地下鉄や地下共同溝および地下通路等の地下建造物、桟橋、護岸、煙突などのコンクリート構造物の補強方法に関する。
【0002】
【従来の技術】
上記のようなコンクリート構造物は、経年劣化によりひび割れが発生して、内蔵されている鉄筋が腐食したり、断面欠損などを生じてその耐力が減少し、繰り返し荷重や地震に対し当初の設計強度を有していないものが多いことが問題となっている。
【0003】
上記の問題点を解消させる手段として、従来から下記の方法によりコンクリート構造物の補強が行なわれている。すなわち
▲1▼ コンクリートの表面に新しいコンクリートを打ち足して増厚させる補強方法。
【0004】
▲2▼ コンクリートの表面に鉄筋コンクリートのプレキャスト二次製品コンクリートを設置する補強方法。
【0005】
▲3▼ コンクリートの表面に炭素繊維シートを接着して被覆する補強方法。
【0006】
▲4▼ コンクリートの表面を鉄板で覆い、コンクリートと鉄板との間にエポキシ樹脂やモルタル等を充填して一体化させる補強方法。
などである。
【0007】
【発明が解決しようとする課題】
しかるに上記▲1▼、▲2▼および▲4▼による補強方法では、コンクリート構造物の表面を増厚させて補強するものであるため、トンネルなどの地下構造物においては内空断面が大幅に減少して車輌限界を超えたり、水路の流量の確保ができなくなるなどの問題がある。
【0008】
また上記従来のいずれの補強方法においても、活線施工を行なうためには施工に要する期間が著しく長くかかることや、仮設の設備が大掛りになること、および設置する機械機具類が大型化するなどの問題がある。
【0009】
前記▲3▼による補強方法では、既設コンクリートと炭素繊維シートとの接着面が剥離しやすく、実際に剥れた事例もみられ、加えて火災発生時に燃えやすく、かつ有毒ガスが発生するという問題があった。
【0010】
本発明は上記従来の補強方法による諸問題を解決することを課題とするもので、仮設の設備が簡単ですみ、トンネル等では内空断面の減少を僅少とし、かつ活線施工が可能であり、既設コンクリートとの一体性が確保できるとともに施工に要する工期を著しく短縮することを可能とするものである。
【0011】
【課題を解決するための手段】
上記課題を解決する手段として本発明は、炭素繊維シートを内蔵したセメントモルタル複合板にあらかじめ固着されているスペーサに、40〜90mmの間隔をおいて打設したボルトを挿通することにより、該複合板を補強すべきコンクリート構造物の表面に少許の間隙をおいて固定し、上記複合板とコンクリート構造物との間の間隙にモルタルを注入して一体化することを特徴とする。
【0012】
前記複合板の板厚は5〜15mmの範囲とし、前記複合板とコンクリート構造物の表面との間の間隔は15〜20mmの範囲とすることが望ましい。
【0013】
前記複合板は、コンクリート構造物に40〜90mmの間隔をおいて打設したボルトにより固定するようにすることが施工を容易とするうえで好ましい。
【0014】
隣在する複合板同士の接合部においては、各複合板の表面側を片側80〜120mm、より好ましくは片側100mmずつ合計160〜240mm、好ましくは200mmの範囲をシート材で被覆し、このシート材の外面を早強性セメントモルタルにより仕上げるようにするのがよい。
【0015】
【発明の実施の形態】
以下、本発明を図面に示す実施の形態を参照して説明する。
図1、図2は本発明によるコンクリート構造物の補強方法において用いられる炭素繊維シート内蔵セメントモルタル複合板1(以下単に複合板と略称する)の一例を示す平面図および側面図で、この複合板1は例えば長さ1800mm、幅900mmの矩形板状に形成される。
【0016】
すなわち上記複合板1は、セメントモルタル製の基板2(厚さ4mm程度)の上にこれと同大同形の炭素繊維シート3(厚さ2mm程度)を接着等により固着し、その上にセメントモルタルを厚さ4mm程度塗布してセメントモルタル層4が形成されたもので、工場において製造される。
【0017】
上記基板2および炭素繊維シート3は前記セメントモルタル層4よりその四辺が幅100mmにわたり大きく形成され、この段差となるスペース部5にボルト挿通孔6,6…が400mm程度の間隔をおいて所要数穿設されている。
【0018】
上記のようにして構成された複合板1は、基板2およびセメントモルタル層4に炭素繊維が混入しており、それにより複合板1を曲げてもひび割れの発生がなく、構造耐力には影響を及ぼすことがない。
【0019】
前記複合板1の中央の適所にはモルタル注入孔7が表裏に貫通して穿設されている。
【0020】
前記ボルト挿通孔6の下面側には、既設コンクリートの表面に対し一定の間隔を保持するためのスペーサ8が予め工場において接着等により固着されている。このスペーサ8は、プラスチック(好ましくはウレタン製)または金属(例えば鋼管)からなるもので、外径30mm、孔径8mm、長さ50mm程度のパイプ状のものである。
【0021】
前記炭素繊維シート3は、1方向繊維、直交する2方向クロス繊維のいずれであってもよい。また基板2およびセメントモルタル層4については、曲げに対しても表面にひび割れの発生しない曲げ強度および剪断強度を有するものを用いるのがよく、セメントモルタル層4の表面平滑度は粗度係数で0.011以内に仕上げられる。
【0022】
上記複合板1を用いたコンクリート構造物の補強施工例として図3にトンネルの内面を補強する場合の施工状態を、図4にその一部の拡大断面図を示している。
【0023】
施工に際しては、先ずトンネルの既設コンクリート10に長さ50mm以上、直径6mmのボルト11を前記複合板1のボルト挿通孔6のピッチに合わせてその基部を埋設固定する。
【0024】
次いで複合板1の下面に予め固着されているスペーサ8を通じて複合板1のボルト挿通孔6を前記ボルト11に挿通すれば、そのボルト11の先端が複合板1のスペース部5から若干突出し、このボルト11にナット12を螺合して締着する。これにより既設コンクリート10の表面と複合板1との間にはスペーサ8の長さ分(50mm)だけの間隙13が形成される。
【0025】
上記のようにセットしたのち、複合板1のモルタル注入孔7から前記間隙13内にモルタル14を注入する。このモルタル14としては超早強無収縮モルタルを用いることが好ましく、このモルタル14は圧縮強度が350kgf/cm2 以上のものが適している。これは複合板1の圧縮強度が600〜800kgf/cm2 程度であり、既設コンクリート10の圧縮強度が100〜350kgf/cm2 程度であることから、上記モルタル14の強度は両者の中間程度であることが応力の伝達上良好となるからである。
【0026】
上記補強施工に当っては、複合板1を簡単な支保工を用いて設置し、複合板1と既設コンクリート10との間の間隙13内に超早強無収縮モルタル14を充填することで両者一体となり、超早強無収縮モルタル14は6時間で200kgf/cm2 程度の強度を発現するので、活線改修工事に対しても十分対応することができる。活線改修以外では圧縮強度300kgf/cm2 以上の早強性モルタルを用いてもよい。
【0027】
また活線改修工事において、仮に施工期間内にモルタル14を注入するに至ることができない状況におかれた場合や、モルタル14を注入しても強度発現が遅れた場合であっても、複合板1はボルト11により既設コンクリート10に支持されているので安全性が常に確保される。
【0028】
前記施工において、隣接する複合板1同士の突き合わせ接合部については、図4にみられるように突き合わされた複合板1,1のスペース部5,5に跨がるように幅200mmの炭素繊維シート15を貼り付け、その上に早強性セメントモルタル16を塗布して仕上げる。こうすることにより、接合部の耐力は曲げ試験の結果、図5に示すように全く低下は認められなかった。
【0029】
図6は橋脚17の補強施工例を示すもので、橋脚17を構成しているコンクリートの表面に高所作業車18を用いて前記トンネルの場合と同様にして複合板1を取付け、この複合板1と既設コンクリートとの間に超早強無収縮モルタル14を注入して施工する。
【0030】
上記の場合、他の施工の仕方として図7に水平断面図を示すように、橋脚17の下部から複合板1を既設コンクリートの四面にそわせ、複合板1の外面側を鋼材、パイプ材などの支保工材19,19…を当て、これらを交差端で結束またはボルト止めして複合板1,1…を保持し、橋脚17と複合板1との間隙13に超早強無収縮モルタル14を注入充填して一体化させるようにしてもよい。
【0031】
なお前述の高所作業車18を配置するスペースがない場合には、一般的な簡易な支保工足場を用いればよい。
【0032】
【発明の効果】
以上説明したように本発明によれは下記の効果が得られる。
(1) 炭素繊維シートを組み込んだ複合板と既設コンクリートとの間に間隙を設け、この間隙内にモルタルを注入して両者を一体化するので、曲げ強度および剪断強度を同時に補強することができる。
(2) 補強施工完了後は表面が複合板のセメントモルタル層で覆われた構造となるので、耐火性、耐候性、耐久性に優れた構造体となる。
(3) 複合板の板厚は10mm程度であるから、1枚当りの重量が小さく、作業性にきわめて優れている。
(4) 複合板は曲線部への適用時に曲げることが可能であり、既設コンクリートに曲線部があってもそのまま対応することができる。
(5) 複合板は既設コンクリートの形状等に応じ、ボルト、鋼材、パイプ材、バンド等を用いて既設コンクリートの表面に取り付けることができるので、仮設設備が簡単になる。
(6) 補強施工後の断面増厚が25mm程度ときわめて少なくてすむので、トンネルの場合などでは内空断面の確保ができ、水路トンネルでは複合板の表面のセメントモルタル層の粗度係数を小さくできるので水路の流量を容易に確保することができる。
(7) 仮設設備が簡単でかつ極初期強度が得られるので、活線改修が可能となり、工期を著しく短縮することができる。
(8) 特殊技能を有する作業者を必要としないので、従来の鉄板工法や炭素繊維を直接貼り付ける工法、および鉄筋コンクリートにより増厚する工法に比べ遥かに工期が短くてすみ、経済的に大きな利益が得られる。
(9) 複合板は工場生産が可能であるため品質が安定し、施工現場では無収縮モルタルを用いることにより剥離やひび割れの発生をなくすることができる。
(10) 複合板は、補強すべきコンクリート構造物の設計基準強度および荷重の掛り方により炭素繊維シートを1方向または2方向として得ることが容易にできる。
(11) 複合板の大きさは施工方法の如何により縦横の寸法を変えることができ、また予め角部や曲面に合わせたものとして製作することができる。
【図面の簡単な説明】
【図1】本発明において用いられる炭素繊維シート内蔵セメントモルタル複合板の一実施形態の平面図。
【図2】同、側面図。
【図3】本発明をトンネルの補強に適用した場合の断面図。
【図4】図3における複合板の接合部を示す拡大断面図。
【図5】同、接合部の曲げ強度試験の結果を示すグラフ。
【図6】本発明を橋脚の補強に適用した場合の施工例を示す説明図。
【図7】同、他の施工例を示す水平断面図。
【符号の説明】
1 炭素繊維シート内蔵セメントモルタル複合板
2 基板
3,15 炭素繊維シート
4 セメントモルタル層
5 スペース部
6 ボルト挿通孔
7 モルタル注入孔
8 スペーサ
10 既設コンクリート
11 ボルト
12 ナット
13 間隙
14 16 モルタル(超早強無収縮モルタル)
17 橋脚
18 高所作業車
19 支保工材[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for reinforcing concrete structures such as mountain tunnels, shield tunnels, bridge slabs, piers, underground structures such as subways, underground common grooves and underground passages, piers, revetments, and chimneys.
[0002]
[Prior art]
Concrete structures such as the above will crack due to aging, and the built-in rebar will be corroded and cross-sectional defects will occur, reducing its proof strength, and the original design strength against repeated loads and earthquakes. There is a problem that many do not have.
[0003]
As means for solving the above-mentioned problems, a concrete structure has been conventionally reinforced by the following method. In other words, (1) A reinforcing method in which new concrete is added to the surface of the concrete to increase the thickness.
[0004]
(2) Reinforcement method by installing precast secondary product concrete of reinforced concrete on the concrete surface.
[0005]
(3) A reinforcing method in which a carbon fiber sheet is adhered and coated on the concrete surface.
[0006]
(4) A reinforcing method in which the concrete surface is covered with an iron plate, and an epoxy resin or mortar is filled between the concrete and the iron plate to integrate them.
Etc.
[0007]
[Problems to be solved by the invention]
However, in the reinforcing method according to the above (1), (2) and (4), the surface of the concrete structure is reinforced to reinforce it, so that the internal cross section is greatly reduced in underground structures such as tunnels. Thus, there are problems such as exceeding the vehicle limit and being unable to secure the flow rate of the waterway.
[0008]
Also, in any of the above conventional reinforcing methods, it takes a considerably long time to perform the hot line construction, the provisional equipment becomes large, and the equipment to be installed is enlarged. There is a problem.
[0009]
In the reinforcing method according to (3) above, the adhesion surface between the existing concrete and the carbon fiber sheet is easy to peel off, and there are cases where it is actually peeled off. In addition, it is easy to burn in the event of a fire, and toxic gas is generated. there were.
[0010]
The object of the present invention is to solve the problems caused by the above-mentioned conventional reinforcing method, and temporary equipment is simple. In tunnels and the like, the reduction of the internal air cross-section is small, and live line construction is possible. It is possible to ensure the integrity with the existing concrete and to significantly shorten the construction period required for the construction.
[0011]
[Means for Solving the Problems]
As a means for solving the above-mentioned problems, the present invention is designed by inserting bolts placed at intervals of 40 to 90 mm through spacers fixed in advance to a cement mortar composite plate incorporating a carbon fiber sheet. The plate is fixed to the surface of the concrete structure to be reinforced with a small gap, and mortar is injected into the gap between the composite plate and the concrete structure to be integrated.
[0012]
The thickness of the composite plate is preferably in the range of 5 to 15 mm, and the distance between the composite plate and the surface of the concrete structure is preferably in the range of 15 to 20 mm.
[0013]
The composite plate is preferably fixed to a concrete structure with bolts placed at an interval of 40 to 90 mm for easy construction.
[0014]
In the joint portion between adjacent composite plates, the surface side of each composite plate is 80 to 120 mm on one side, more preferably 100 mm on one side, and a total of 160 to 240 mm, preferably 200 mm, is covered with a sheet material. It is recommended that the outer surface of the steel be finished with a fast-strength cement mortar.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
The present invention will be described below with reference to embodiments shown in the drawings.
FIG. 1 and FIG. 2 are a plan view and a side view showing an example of a carbon fiber sheet built-in cement mortar composite plate 1 (hereinafter simply referred to as composite plate) used in the method for reinforcing a concrete structure according to the present invention. For example, 1 is formed in a rectangular plate shape having a length of 1800 mm and a width of 900 mm.
[0016]
That is, the
[0017]
The
[0018]
In the
[0019]
A
[0020]
On the lower surface side of the
[0021]
The
[0022]
As an example of reinforcing construction of a concrete structure using the
[0023]
At the time of construction, first,
[0024]
Next, when the
[0025]
After setting as described above, the
[0026]
In the above-described reinforcement construction, the
[0027]
In addition, even if the
[0028]
In the construction described above, the butt joint between adjacent
[0029]
FIG. 6 shows an example of reinforcing construction of the
[0030]
In the above case, as another construction method, as shown in a horizontal sectional view in FIG. 7, the
[0031]
In addition, when there is no space for arranging the above-described
[0032]
【The invention's effect】
As described above, according to the present invention, the following effects can be obtained.
(1) Since a gap is provided between the composite plate incorporating the carbon fiber sheet and the existing concrete, and mortar is injected into the gap to integrate both, the bending strength and the shear strength can be reinforced at the same time. .
(2) Since the surface is covered with the cement mortar layer of the composite board after the reinforcement work is completed, the structure is excellent in fire resistance, weather resistance, and durability.
(3) Since the thickness of the composite plate is about 10 mm, the weight per sheet is small and the workability is extremely excellent.
(4) The composite plate can be bent at the time of application to the curved portion, and even if the existing concrete has a curved portion, it can be handled as it is.
(5) Since the composite plate can be attached to the surface of the existing concrete using bolts, steel materials, pipe materials, bands, etc., according to the shape of the existing concrete, the temporary facilities are simplified.
(6) Since the cross-section thickness after reinforcement work is as small as about 25mm, it is possible to secure a cross-section inside the tunnel in the case of tunnels, etc., and the roughness coefficient of the cement mortar layer on the surface of the composite board is reduced in the canal tunnel. Therefore, the flow rate of the water channel can be easily secured.
(7) Since the temporary facilities are simple and the initial strength can be obtained, the hot wire can be repaired and the construction period can be shortened remarkably.
(8) Since there is no need for workers with special skills, the construction period is much shorter than the conventional steel plate method, the method of directly attaching carbon fiber, and the method of thickening with reinforced concrete, and it is economically significant. Is obtained.
(9) The quality of the composite plate is stable because it can be manufactured at the factory, and the use of non-shrink mortar on the construction site can eliminate the occurrence of peeling and cracking.
(10) The composite plate can easily obtain the carbon fiber sheet in one direction or two directions depending on the design standard strength of the concrete structure to be reinforced and how to apply the load.
(11) The size of the composite plate can be changed in length and width depending on the construction method, and can be manufactured according to the corner or curved surface in advance.
[Brief description of the drawings]
FIG. 1 is a plan view of an embodiment of a cement mortar composite plate with a built-in carbon fiber sheet used in the present invention.
FIG. 2 is a side view of the same.
FIG. 3 is a cross-sectional view when the present invention is applied to tunnel reinforcement.
4 is an enlarged cross-sectional view showing a joint portion of the composite plate in FIG. 3;
FIG. 5 is a graph showing the results of a bending strength test of a joint part.
FIG. 6 is an explanatory diagram showing a construction example when the present invention is applied to reinforcement of a pier.
FIG. 7 is a horizontal sectional view showing another construction example.
[Explanation of symbols]
1 Carbon fiber sheet built-in cement mortar
17
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02622499A JP3880738B2 (en) | 1999-02-03 | 1999-02-03 | Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02622499A JP3880738B2 (en) | 1999-02-03 | 1999-02-03 | Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000220304A JP2000220304A (en) | 2000-08-08 |
| JP3880738B2 true JP3880738B2 (en) | 2007-02-14 |
Family
ID=12187420
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP02622499A Expired - Lifetime JP3880738B2 (en) | 1999-02-03 | 1999-02-03 | Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3880738B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015203227A (en) * | 2014-04-14 | 2015-11-16 | 大成建設株式会社 | Junction method for laminate panel and junction structure for laminate panel |
| CN105178203A (en) * | 2015-09-02 | 2015-12-23 | 东北林业大学 | Method for reinforcing bridge member through polyurethane-cement composite material and reinforcing mesh |
Families Citing this family (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4783242B2 (en) * | 2006-08-30 | 2011-09-28 | 大成建設株式会社 | How to construct segments and merging tunnels |
| KR100950320B1 (en) * | 2007-09-12 | 2010-03-31 | 주식회사 대영 | Reinforcement panel for concrete structure and reinforcement method of concrete structure using same |
| JP5568349B2 (en) * | 2010-03-24 | 2014-08-06 | 公益財団法人鉄道総合技術研究所 | Reinforcement joint structure and method for constructing the joint structure |
| JP5945489B2 (en) * | 2012-10-02 | 2016-07-05 | 大成建設株式会社 | LAMINATED PANEL JOINT METHOD AND LAMINATED PANEL JOINT STRUCTURE |
| CN103541559B (en) * | 2013-11-07 | 2015-07-22 | 湖南大学 | Reinforced composite board based on concrete bending member |
| CN103899096B (en) * | 2014-04-08 | 2016-09-14 | 东莞市彩丽建筑维护技术有限公司 | Improve construction method and the special-purpose member of precast concrete board wall local strength |
| CN107245947A (en) * | 2017-06-29 | 2017-10-13 | 上海罗洋新材料科技有限公司 | A kind of reinforced concrete structure containing early-strength ultra-high performance concrete |
| JP2019015109A (en) * | 2017-07-07 | 2019-01-31 | 大成建設株式会社 | Anti-seismic reinforcement structure for existing concrete member |
| CN111441559B (en) * | 2020-05-15 | 2025-04-01 | 浙江万寿建筑工程有限公司 | A controller for filling mortar thickness and construction method thereof |
| JP7509653B2 (en) * | 2020-10-23 | 2024-07-02 | 株式会社熊谷組 | Reinforcement structure of building frame |
| KR102286562B1 (en) * | 2020-11-03 | 2021-08-06 | 한국건설기술연구원 | Grid fixing apparatus having spacer integrated retaining clip for grid reinforcement, and method using the same |
| KR102559172B1 (en) * | 2021-03-18 | 2023-07-25 | 한경국립대학교 산학협력단 | Concrete column member reinforcement method using precast fabric reinforced cementitious matrix |
| CN120889466B (en) * | 2025-09-30 | 2026-01-20 | 福建省兴岩建设集团有限公司 | Seepage-proofing method and structure of waste percolate collecting pond |
-
1999
- 1999-02-03 JP JP02622499A patent/JP3880738B2/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015203227A (en) * | 2014-04-14 | 2015-11-16 | 大成建設株式会社 | Junction method for laminate panel and junction structure for laminate panel |
| CN105178203A (en) * | 2015-09-02 | 2015-12-23 | 东北林业大学 | Method for reinforcing bridge member through polyurethane-cement composite material and reinforcing mesh |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000220304A (en) | 2000-08-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101994852B1 (en) | Concrete structure using reinforcing member reinforced by embedded grid, and repairing and strengthening method for the same | |
| JP3880738B2 (en) | Reinforcement method of concrete structure by cement mortar composite board with carbon fiber sheet | |
| CN115110969B (en) | Reinforcement and protection methods for tunnel lining defects | |
| McKenna et al. | Strengthening of reinforced concrete flexural members using externally applied steel plates and fibre composite sheets—A survey | |
| JP4541916B2 (en) | Synthetic floor slab | |
| CN110258789A (en) | A kind of beam-column connection and its construction method that energy consumption rod iron is replaceable | |
| JP2022165931A (en) | Reinforcement structure for concrete columnar body | |
| Jawdhari | Behavior of RC beams strengthened in flexure with spliced CFRP rod panels | |
| JP4137287B2 (en) | High durability structure embedded formwork method | |
| JP6811678B2 (en) | Method of joining concrete structures and concrete members to which continuous fiber reinforced concrete is applied | |
| KR100783818B1 (en) | Seismic Strengthening Method of Structures Using Tough Cement Composites | |
| JP2007239421A (en) | Reinforcement method for existing structures | |
| EP0845063B1 (en) | Reinforcing masonry structures | |
| Nordin | Fibre reinforced polymers in civil engineering: flexural strengthening of concrete structures with prestressed near surface mounted CFRP rods | |
| CN107165059B (en) | Construction method of a bridge prestressed high-strength steel wire rope anti-bending reinforcement device | |
| KR0164667B1 (en) | Method for reinforcing cracked concrete structure | |
| JP2001182171A (en) | How to join concrete structures | |
| CN113216016A (en) | Reinforcing method for bearing structure of old bridge based on reinforcement carbon fiber resin plate internal mesh method in earthquake high-risk area | |
| EP1481138B1 (en) | Use of a film to join and/or seal and/or statically reinforce two rigid surfaces or surfaces which can move towards each other | |
| KR100882830B1 (en) | Crack Induced Structure Using Organic Fiber Reinforced Mortar Cured Body | |
| Mander | Use of resins in road and bridge construction and repair | |
| KR100404538B1 (en) | Precast light-weight fire-resistant panel, composite panel and construction method of the same | |
| JP2002371795A (en) | Repair structure of main structure and method of repair of main structure | |
| Korany et al. | Retrofit of unreinforced masonry buildings: the state-of-the-art | |
| JPH023843B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060222 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060721 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060919 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061013 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061108 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091117 Year of fee payment: 3 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091117 Year of fee payment: 3 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091117 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101117 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111117 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111117 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121117 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121117 Year of fee payment: 6 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121117 Year of fee payment: 6 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121117 Year of fee payment: 6 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20151117 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |