Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3887663B2 - Drain water discharge method and discharge device - Google Patents
[go: Go Back, main page]

JP3887663B2 - Drain water discharge method and discharge device - Google Patents

Drain water discharge method and discharge device Download PDF

Info

Publication number
JP3887663B2
JP3887663B2 JP2003096529A JP2003096529A JP3887663B2 JP 3887663 B2 JP3887663 B2 JP 3887663B2 JP 2003096529 A JP2003096529 A JP 2003096529A JP 2003096529 A JP2003096529 A JP 2003096529A JP 3887663 B2 JP3887663 B2 JP 3887663B2
Authority
JP
Japan
Prior art keywords
drain
drain water
discharge
water
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003096529A
Other languages
Japanese (ja)
Other versions
JP2004257545A (en
Inventor
潤之助 井口
廣 福原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fukuhara Co Ltd
Original Assignee
Fukuhara Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fukuhara Co Ltd filed Critical Fukuhara Co Ltd
Priority to JP2003096529A priority Critical patent/JP3887663B2/en
Publication of JP2004257545A publication Critical patent/JP2004257545A/en
Application granted granted Critical
Publication of JP3887663B2 publication Critical patent/JP3887663B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、ドレン水の排出方法および排出装置に関する技術であって、更に詳細に述べると、いかにしたら圧縮空気の無駄な排出をせずに圧縮空気より発生したドレン水を円滑に排出弁から排出することが出来るかという技術に関するものである。
【0002】
【従来の技術】
従来、ドレン水の排出方法および排出装置としては、図5に見られるように、エアーコンプレッサ(図示せず)で作り出された圧縮空気が、圧縮空気吐出配管101、102を通過するが、その途中に配設されたアフタークーラやエアータンクやエアードライヤやエアーフィルタ等の各種機器10でドレン水を発生していた。
【0003】
ここで、各種機器10で発生したドレン水は、ドレン配管111と開閉弁20とドレン配管112とストレーナ31を通ってドレン検出槽30Zに送り込まれると、順次ドレン水の液面が上昇してドレンセンサー35がドレン水の存在を確認することでドレンセンサー情報121が制御部50Zに送られていた。 そして、制御部50Zからは、ドレン水検知によるドレン水排出信号139を、ドレン検出槽30Zからドレン配管113で接続している排出弁40に送り、その事によって排出弁40を開放しドレン水を排出していた。
【0004】
一方、ドレン水の貯留された状況をドレンセンサー情報121としてとらえることにより、ドレンセンサー情報121においてドレン水を感知しているという信号が消えるとそれに対応して発していたドレン水検知によるドレン水排出信号139も送信を止め、排出弁40によるドレン水の排出も停止するようになっていた。
【0005】
尚、各種機器10からドレン水がドレン配管111と開閉弁20とドレン配管112とストレーナ31を通ってドレン検出槽30Zに送り込まれた際に、ドレン検出槽30Zに圧縮空気が充満していて排出弁40が閉じた状態になっていると、ドレン配管111と開閉弁20とドレン配管112とストレーナ31の内径が細くドレン水の通る部分が狭い程ドレン水は流入しにくい状態になる。 また、各種機器10とドレン検出槽30Z内の圧縮空気の圧力の関係からも、微妙にドレン水が流入しにくいことがあった。
【0006】
その為、ドレン水がドレン配管111と開閉弁20とドレン配管112とストレーナ31を通ってドレン検出槽30Zに送り込まれると、ドレン検出槽30Z内の圧縮空気を容易に排出することが出来るようにドレン検出槽30Zと各種機器10との間に均圧管191を設けていた。
【0007】
その他に、従来の技術の別の技術として、具体的に図示してはいないが、ドレンセンサー35に加えてその下部に別のドレンセンサーを配設して制御部50Zと接続し、ドレン水の排出を一定時間継続するのではなく、ドレンセンサー35からのドレン水を検出してから別のドレンセンサーがドレン水を検出している迄の間ドレン水の排出を継続して行なうことも考えられていた。
【0008】
また、ドレン排出の開始は、一定の周期で行ない、その間にドレン水の存在を確認するドレンセンサー情報121が有る場合だけドレン水検知によるドレン水排出信号139を発信することによって排出を行なうことも考えられていた。
【0009】
【発明が解決しようとする課題】
しかしながら、このような従来の、ドレン水の排出方法および排出装置に関する技術に関しては、以下に示すような課題があった。
【0010】
第一に、均圧管を配設するということは、各種機器とドレン検出槽を接続する必要があり、そのように構成しようとするのは非常に邪魔であった。
【0011】
第二に、均圧管の材料費、及び各種機器やドレン検出槽に孔あけ加工する為の費用や配管を接続する為の費用等を必要とした。
【0012】
第三に、均圧管を配設するということは、空気洩れ等のクレームが発生する可能性を意味していた。
本発明はこのような課題を解決することを目的としている。
【0013】
【課題を解決するための手段】
本発明は、圧縮空気から発生したドレン水狭くなった配管部20、111、112を経由してドレン検出槽30Aに貯留した状態から一定の周期Tで排出するに際し、前記ドレン検出槽30A内に位置しているドレン水検知手段35がドレン水の存在を感知している場合は感知している間、前記ドレン水検知手段35がドレン水の存在を感知していない場合は減圧の目的で微小時間Δtの間、ドレン水の排出を行うことを特徴とし、更には、前記ドレン水検知手段35がドレン水の存在を感知している場合は決められた最大の時間tに限定することを特徴とすることによって、上記課題を解決した。
【0014】
また、本発明は、圧縮空気よりドレン水を発生させる各種機器10からドレン水が通過する狭くなった配管部20、111、112に連通しているドレン検出槽30Aに位置していてドレン水の存在を検知するドレンセンサー35と、ドレン水を排出するドレン排出弁40と、前記ドレンセンサー35から信号を受信したり前記ドレン排出弁40に信号を発信することが出来る制御部50Bを配設し、前記制御部50Bが前記各種機器10に設けた上流側ドレンセンサー15によってドレン水の存在を感知することでドレン排出開始信号を発した際に、前記ドレンセンサー35がドレン水の存在を感知している場合は感知している間ドレン水検知によるドレン水排出信号134、135によって、前記ドレンセンサー35がドレン水の存在を感知していない場合は減圧の目的で微小時間Δtの間微小時間のドレン水排出信号136によって前記ドレン排出弁40がドレン水の排出を行うように構成していることを特徴とし、更には、前記ドレンセンサー35がドレン水の存在を感知している場合は感知している間に加えて更に限定する目的で前記最大の時間tの間前記ドレン水検知によるドレン水排出信号135によるものであることを特徴とすることによって、上記課題を解決した。
【0015】
【発明の実施の形態】
本願発明による、ドレン水の排出方法および排出装置を図面と共に詳細に説明する。
ここで、図1は、本願発明による第一実施例を示した図であり、図2は、本願発明による第一実施例の作動の状況を示した図であり、図3は、本願発明による第二実施例を示した図を示したものであり、図4は、本願発明による第二実施例の作動の状況を示した図である。
【0016】
(第一実施例)
図1に見られるように、10は各種機器であり、具体的には、アフタークーラやエアータンクやエアードライヤやエアーフィルタ等である。 この場合、各種機器10は、エアーコンプレッサ(図示せず)で作り出された圧縮空気が、圧縮空気配管101、102を通過する途中に配設されている。 従って、各種機器10では、ドレン水が発生する。
【0017】
ここで、各種機器10で圧縮空気より発生したドレン水は、ドレン配管111と開閉弁20とドレン配管112と各種の異物を除去する目的のストレーナ31を通ってドレン検出槽30Aに送り込まれ、その過程で制御部50Aがドレン排出開始信号を一定の周期Tで発信し、ドレン検出槽30Aにおいてはドレン水の液面が上昇することによって、ドレン水検知手段35としてのドレンセンサー35がドレン水の存在を確認すると、ドレンセンサー情報121が制御部50Aに送られるように構成されている。 そして、制御部50Aからはドレン水検知によるドレン水排出信号131、132が、ドレン検出槽30Aとドレン配管113で接続している排出弁40に送られ、その間排出弁40を開放するようになっている。
【0018】
ここで、ドレンセンサー情報121の処理に関しては、制御部50Aがドレン排出開始信号を一定の周期Tで発信する中で、制御部50Aが発する信号としては、ドレンセンサー情報121を受信している間を通して発するドレン水検知によるドレン水排出信号131と、ドレンセンサー情報121を受信している間でも決められた最大の時間tに限定して信号を発するドレン水検知によるドレン水排出信号132の両者が考えられる。
【0019】
一方、制御部50Aがドレン排出開始信号を発信する中で、何等かの事情によってドレン検出槽30Aにドレン水が流入出来なくなり、ドレンセンサー35がドレン水の存在を確認しない場合には、ドレンセンサー情報121が制御部50Aに送られることはない。 その場合には、制御部50Aからは微小時間のドレン水排出信号133が、ドレン検出槽30Aとドレン配管113で接続している排出弁40に送られ、微小時間Δtのわずかな間ではあるが排出弁40を開放するようになっている。
【0020】
この場合、各種機器10からドレン水が狭くなった配管部20、111、112であるドレン配管111と開閉弁20とドレン配管112とストレーナ31を通ってドレン検出槽30Aに送り込まれる際、ドレン検出槽30Aに圧縮空気が充満していて排出弁40が閉じた状態になっていると、ドレン配管111と開閉弁20とドレン配管112とストレーナ31の内径が小さくドレン水の通る部分が狭い程、ドレン水は流入しにくいと言える。
【0021】
また、各種機器10内とドレン検出槽30A内の圧縮空気の圧力関係からも微妙にドレン水が流入しにくいこともある。
【0022】
ここで、ドレンセンサー35を配設する位置としては、圧縮空気が最も滞留し易いドレン検出槽30Aの最上部が望ましい。
【0023】
特に、本願発明の特徴とするところを記載すると、ドレンセンサー35がドレン水の存在を確認しない場合、即ち圧縮空気がドレン検出槽30Aに滞留する等の理由でドレン水がドレン検出槽30Aに流入しにくい場合には、ドレンセンサー情報121が制御部50Aに送られることはない。 その場合には、制御部50Aからは、ドレンセンサー35からの圧縮空気が充満してドレン水が流入しにくいということから微小時間のドレン水排出信号133として微小時間Δtの排出が指示され、ドレン検出槽30Aに滞留した圧縮空気またはドレン水を排出することで、ドレン検出槽30A内を減圧させドレン水を流入し易くするように構成したのである。
【0024】
ところで、一定の周期Tや、最大の時間tや、微小時間Δtに関して効果的な具体的な値を示すと、一定の周期を0.5ないし10分間で、最大の時間3ないし30秒間で、微小時間0.1ないし0.5秒間に設定するとそれなりの効果は見られるが、一つの例として一定の周期を1分間で、最大の時間10秒間で、微小時間0.2秒間に設定するのが理想的であった。
【0025】
但し、ドレン検出槽30Aと排出弁40の大きさや、秋や冬の晴天時と夏の多湿時等ドレン水発生の状況によって理想的な設定は変化するものと考えた方が良い。
【0026】
本発明による、ドレン水の排出方法および排出装置は前述したように構成されており、以下に、その動作について詳細に説明する。
【0027】
先ず、エアーコンプレッサ(図示せず)で作り出された圧縮空気は、圧縮空気吐出配管101、102を通過する途中でその間に配設された各種機器10においてドレン水を発生させる。 ここで、発生したドレン水は、狭くなった配管部20、111、112であるドレン配管111と開閉弁20とドレン配管112とストレーナ31を通ってドレン検出槽30Aに貯留させられる。 その際、ストレーナ31では各種の異物が除去される。
【0028】
そこで、一般的な処理としては、制御部50Aに備えているタイマー機能によってドレン排出開始信号を一定の周期Tで発信する中で、ドレンセンサー35がドレン水の存在を確認すると、ドレンセンサー情報121として制御部50Aに送り、制御部50Aからはドレン水検知によるドレン水排出信号131、132として排出弁40に送り、信号が送られている間は排出弁40を開放するようになっている。
【0029】
この場合、制御部50Aが発する信号としては、ドレン排出開始信号を一定の周期Tで発信する中で、ドレンセンサー情報121を受信している間の最後まで信号を発するドレン水検知によるドレン水排出信号131と、決められた最大の時間tに限定して信号を発するドレン水検知によるドレン水排出信号132の両者が考えられる。
【0030】
一方、ドレン検出槽30A内では、ドレン検出槽30Aのドレン水が排出弁40で排出された直後の場合、ドレン配管113の接続している部分に近いところからドレン水が滞留していく。 但し、ドレン検出槽30A内の圧縮空気によって、ドレン水がドレン検出槽30A内に流入出来ないで各種機器10内に滞留している場合もある。
【0031】
この場合、ドレンセンサー35がドレン水の存在を確認しない為に、ドレンセンサー情報121が制御部50Aに送られない。 しかし、ドレン排出開始が一定の周期Tで成される中で、制御部50Aからは微小時間のドレン水排出信号133を排出弁40に送ることで、排出弁40では微小時間Δtの開放がなされることによって、ドレン検出槽30A内の圧縮空気またはドレン水が排出されることで、ドレン検出槽30A内を減圧させ、各種機器10からドレン水が容易に流入することが出来るようになるのである。
【0032】
この事をもう少し具体的に、図2によって説明する。
一つの例として、先ず、A.に見られるように、制御部50Aのタイマー機能によって、ドレン排出開始信号を一定の周期Tで発信する。 即ち、ドレン排出開始のSTART時点が、制御部50Aのタイマー機能によって計時されて発信されるようになっているのである。
【0033】
一方、B.に見られるように、A.のドレン排出開始信号に重ね合わせて、制御部50Aのタイマー機能によって、ドレン排出微小時間ΔtのONとなる時間が設定可能となっている。即ち、ドレン排出開始信号である一定の周期T毎に、常時ドレン排出微小時間Δtを設定して発することが出来るようになっているのである。
【0034】
また、C.に見られるように、制御部50Aではドレンセンサー35からのドレンセンサー情報121のONの情報を得て伝達することが出来るようになっているのである。
【0035】
以上の、A.B.による計時結果や、C.の情報により、1.に見られるように、排出弁40に、ドレン排出開始信号を一定の周期Tで発信している中で、ドレンセンサー情報121が有る場合にはドレンセンサー情報121がONの信号を発している間中、ドレン水検知によるドレン水排出信号131によってドレン水の排出を指示し、ドレンセンサー情報121がOFFの状態になっている間は、微小時間のドレン水排出信号133によって微小時間Δtを単位とするドレン水の排出を指示しているようになっているのである。
【0036】
尚、別の例として、D.に見られるように、A.のドレン排出開始信号に重ね合わせて、制御部50Aのタイマー機能によって、ドレン排出の際の最大の時間tのONとなる時間が設定可能となっている。 即ち、ドレン排出開始信号である一定の周期T毎に、常時ドレン排出の際の最大の時間tを設定して発することが出来るようになっているようになっているのである。
【0037】
従って、A.B.D.による計時結果や、C.の情報により、2.に見られるように、排出弁40に、ドレン排出開始信号を一定の周期Tで発信している中で、ドレンセンサー情報121が有る場合にはドレンセンサー情報121がONの信号を発している間、但しドレン排出の際の時間は最大の時間tを越えない範囲で、ドレン水検知によるドレン水排出信号132によってドレン水の排出を指示し、ドレンセンサー情報121がOFFの状態になっている間は、微小時間のドレン水排出信号133によって微小時間Δtを単位とするドレン水の排出を指示しているようになっているのである。
【0038】
(第二実施例)
図3に見られるように、第二実施例が第一実施例とことなる点は、各種機器10に上流側ドレンセンサー15を設けて、上流側ドレンセンサー15と制御部50Bを接続することで上流側ドレンセンサー情報122を入手可能にしたことである。
【0039】
この場合、上流側ドレンセンサー15を設けた理由は、第一実施例では、ドレン排出開始信号を一定の周期Tで発信するように制御部50Aのタイマー機能によって求めたものであるが、第二実施例では、ドレン排出開始信号を上流側ドレンセンサー15からの上流側ドレンセンサー情報122によって入手しようとしているのである。 従って、上流側ドレンセンサー15がドレン水の存在を感知すると上流側ドレンセンサー情報122を発し、その時点がドレン排出開始信号を発信したものと見なしているようになっているのである。
【0040】
尚、制御部50Bやドレン水検知によるドレン水排出信号134、135や微小時間のドレン水排出信号136も第一実施例と違っているが、ドレン排出開始信号の違いによるものである。
【0041】
従って、図4を見れば明らかなように、ドレン排出開始信号が、第一実施例では一定の周期Tで成されるのに対して、第二実施例では上流側ドレンセンサー15がドレン水の存在を感知した時点をSTARTとしているのである。 尚、それ以外の、B.C.D.に示している内容に関しては、ドレン排出開始信号開始のタイミング以外は同一の内容であるので省略する。 当然、1.2.に関しても同一のことが言える。
【0042】
最後に、ドレン排出開始信号に関しては、第一実施例と第二実施例に記載の他に、各種機器10内やドレン検出槽30A内に圧力センサーを配設し、その変化する情報によってドレン排出を開始することも考えられる。
【0043】
【発明の効果】
以上の説明から明らかなように、本発明により、下記のような効果をあげることができる。
【0044】
第一に、ドレンセンサーを配設して、ドレン水の存在を感知しない場合には減圧の目的で微小時間の間ドレン水の排出を行なうことによって、各種機器で発生したドレン水がドレン検出槽に圧縮空気に妨げられず流入させることが可能となった。
【0045】
第二に、邪魔となる均圧管の設置が不要となった。
【0046】
第三に、ドレン水が溜まり過ぎる等のトラブルが少なくなった。
【0047】
第四に、均圧管等の部品点数が減少することで、装置がすっきりとなった。
【0048】
第五に、均圧管の材料費、各種機器やドレン検出槽を孔あけ加工の為の費用や配管を接続する為の費用等が不要となった。
【図面の簡単な説明】
【図1】本願発明による第一実施例を示した図
【図2】本願発明による第一実施例の作動の状況を示した図
【図3】本願発明による第二実施例を示した図
【図4】本願発明による第二実施例の作動の状況を示した図
【図5】従来の技術を示した図
【符号の説明】
10・・・・・各種機器
15・・・・・上流側ドレンセンサー
20・・・・・開閉弁(狭くなった配管部)
30A・・・・ドレン検出槽
30Z・・・・ドレン検出槽
31・・・・・ストレーナ
35・・・・・ドレンセンサー(ドレン水検知手段)
40・・・・・排出弁
50A・・・・制御部
50B・・・・制御部
50Z・・・・制御部
101・・・・圧縮空気吐出配管
102・・・・圧縮空気吐出配管
111・・・・ドレン配管(狭くなった配管部)
112・・・・ドレン配管(狭くなった配管部)
113・・・・ドレン配管
114・・・・ドレン配管
121・・・・ドレンセンサー情報
122・・・・上流側ドレンセンサー情報
131・・・・ドレン水検知によるドレン水排出信号
132・・・・ドレン水検知によるドレン水排出信号
133・・・・微小時間のドレン水排出信号
134・・・・ドレン水検知によるドレン水排出信号
135・・・・ドレン水検知によるドレン水排出信号
136・・・・微小時間のドレン水排出信号
139・・・・ドレン水検知によるドレン水排出信号
191・・・・均圧管
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a drain water discharge method and a discharge device. More specifically, the drain water generated from the compressed air can be smoothly discharged from the discharge valve without wasteful discharge of the compressed air. It is about technology that can be done.
[0002]
[Prior art]
Conventionally, as shown in FIG. 5, the drain water discharge method and discharge device include compressed air produced by an air compressor (not shown) passing through the compressed air discharge pipes 101 and 102. Drain water was generated by various devices 10 such as an after cooler, an air tank, an air dryer, and an air filter disposed in the above.
[0003]
Here, when the drain water generated in the various devices 10 is sent to the drain detection tank 30Z through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31, the level of the drain water sequentially rises. The drain sensor information 121 has been sent to the control unit 50Z by the sensor 35 confirming the presence of drain water. And from the control part 50Z, the drain water discharge signal 139 by drain water detection is sent to the discharge valve 40 connected with the drain piping 113 from the drain detection tank 30Z, and the discharge valve 40 is open | released by that thing, and drain water is supplied. It was discharged.
[0004]
On the other hand, when the drain water is stored as the drain sensor information 121, when the signal indicating that the drain water is detected disappears in the drain sensor information 121, the drain water is discharged by detecting the drain water correspondingly. The transmission of the signal 139 is also stopped, and the drain water discharge by the discharge valve 40 is also stopped.
[0005]
In addition, when drain water is sent from various devices 10 to the drain detection tank 30Z through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31, the drain detection tank 30Z is filled with compressed air and discharged. When the valve 40 is in a closed state, the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31 have smaller inner diameters and the portion through which the drain water passes is narrower, the drain water is less likely to flow. In addition, there is a case where the drain water does not easily flow in from the relationship between the various devices 10 and the pressure of the compressed air in the drain detection tank 30Z.
[0006]
Therefore, when the drain water is sent to the drain detection tank 30Z through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31, the compressed air in the drain detection tank 30Z can be easily discharged. A pressure equalizing pipe 191 was provided between the drain detection tank 30Z and the various devices 10.
[0007]
In addition, as another technique of the conventional technique, although not specifically illustrated, in addition to the drain sensor 35, another drain sensor is disposed below the drain sensor 35 and connected to the control unit 50Z. Instead of continuing the discharge for a certain period of time, it may be considered that the drain water is continuously discharged until the drain water from the drain sensor 35 is detected until another drain sensor detects the drain water. It was.
[0008]
In addition, drain discharge is started at a constant cycle, and only when there is drain sensor information 121 for confirming the presence of drain water, drain water is discharged by sending a drain water discharge signal 139 by detecting drain water. It was thought.
[0009]
[Problems to be solved by the invention]
However, with respect to such a conventional technique related to the drain water discharge method and discharge device, there are the following problems.
[0010]
First, it is necessary to connect various devices and a drain detection tank to dispose the pressure equalizing pipe, and it was very disturbing to try to configure such a configuration.
[0011]
Secondly, the material cost of the pressure equalizing pipe, the cost for drilling various equipment and the drain detection tank, the cost for connecting the piping, etc. were required.
[0012]
Thirdly, the provision of a pressure equalizing pipe meant the possibility of complaints such as air leakage.
The present invention aims to solve such problems.
[0013]
[Means for Solving the Problems]
The present invention, when to drain from the state of being stored in the drain detection tank 30A at a fixed period T via a pipe portion 20,111,112 drain water is narrowed generated from the compressed air, the drain detection tank 30A When the drain water detection means 35 located inside senses the presence of drain water, while the drain water detection means 35 senses the presence of drain water, the purpose of pressure reduction The drain water is discharged for a minute time Δt. Further, when the drain water detecting means 35 senses the presence of the drain water, it is limited to a predetermined maximum time t. By solving the above-mentioned problems, the above problems were solved.
[0014]
Further, the present invention is located in the drain detection tank 30 </ b> A communicating with the narrow pipe portions 20, 111, and 112 through which drain water passes from various devices 10 that generate drain water from compressed air. A drain sensor 35 that detects presence, a drain discharge valve 40 that discharges drain water, and a control unit 50B that can receive a signal from the drain sensor 35 and transmit a signal to the drain discharge valve 40 are provided. When the controller 50B issues a drain discharge start signal by sensing the presence of drain water using the upstream drain sensor 15 provided in the various devices 10, the drain sensor 35 senses the presence of drain water. If the drain sensor 35 detects the presence of drain water, the drain sensor 35 detects the presence of drain water by the drain water discharge signals 134 and 135. If you are not known and characterized in that the drainage valve 40 by drain water discharge signal 136 minute time Δt during short time a reduced pressure of interest is configured to perform the discharge of drain water, and further, When the drain sensor 35 senses the presence of drain water, it is based on the drain water discharge signal 135 by the drain water detection for the maximum time t for the purpose of further limiting in addition to the sensing time. by wherein a, the above-mentioned problems are eliminated.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
A drain water discharge method and discharge device according to the present invention will be described in detail with reference to the drawings.
Here, FIG. 1 is a diagram showing a first embodiment according to the present invention, FIG. 2 is a diagram showing an operation state of the first embodiment according to the present invention, and FIG. 3 is according to the present invention. The figure which showed 2nd Example is shown, FIG. 4 is the figure which showed the condition of the action | operation of 2nd Example by this invention.
[0016]
(First Example)
As shown in FIG. 1, reference numeral 10 denotes various devices, specifically, an aftercooler, an air tank, an air dryer, an air filter, or the like. In this case, the various devices 10 are arranged in the middle of the compressed air produced by an air compressor (not shown) passing through the compressed air pipes 101 and 102. Accordingly, drain water is generated in the various devices 10.
[0017]
Here, the drain water generated from the compressed air in the various devices 10 is sent to the drain detection tank 30A through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31 for removing various foreign substances, In the process, the control unit 50A transmits a drain discharge start signal at a constant period T, and the drain water level rises in the drain detection tank 30A, so that the drain sensor 35 as the drain water detection means 35 is operated by the drain water. When the presence is confirmed, the drain sensor information 121 is configured to be sent to the control unit 50A. Then, drain water discharge signals 131 and 132 based on drain water detection are sent from the control unit 50A to the drain valve 40 connected to the drain detection tank 30A and the drain pipe 113, and the drain valve 40 is opened during that time. ing.
[0018]
Here, regarding the processing of the drain sensor information 121, while the control unit 50A transmits the drain discharge start signal at a constant period T, the signal generated by the control unit 50A is during reception of the drain sensor information 121. Both the drain water discharge signal 131 by the drain water detection emitted through the drain water and the drain water discharge signal 132 by the drain water detection by which the signal is limited to the maximum time t determined even while the drain sensor information 121 is received. Conceivable.
[0019]
On the other hand, when the control unit 50A transmits the drain discharge start signal, when the drain water cannot flow into the drain detection tank 30A for some reason and the drain sensor 35 does not confirm the presence of the drain water, the drain sensor The information 121 is not sent to the control unit 50A. In this case, the drain water discharge signal 133 for a minute time is sent from the control unit 50A to the discharge valve 40 connected to the drain detection tank 30A and the drain pipe 113, but for a short time Δt. The discharge valve 40 is opened.
[0020]
In this case, when the drain water is narrowed from various devices 10 through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31, which are the pipe parts 20, 111, 112, the drain detection is performed. When the tank 30A is filled with compressed air and the discharge valve 40 is closed, the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31 have smaller inner diameters, and the portion through which the drain water passes is narrower. It can be said that drain water is difficult to flow in.
[0021]
In addition, the drain water may be difficult to flow in due to the pressure relationship between the compressed air in the various devices 10 and the drain detection tank 30A.
[0022]
Here, as the position where the drain sensor 35 is disposed, the uppermost part of the drain detection tank 30A where compressed air is most likely to stay is desirable.
[0023]
In particular, when the features of the present invention are described, when the drain sensor 35 does not confirm the presence of the drain water, that is, because the compressed air stays in the drain detection tank 30A, the drain water flows into the drain detection tank 30A. If it is difficult to do so, the drain sensor information 121 is not sent to the control unit 50A. In this case, the controller 50A is instructed to discharge the minute time Δt as the minute time drain water discharge signal 133 because the compressed air from the drain sensor 35 is filled and the drain water is difficult to flow in. By discharging the compressed air or drain water staying in the detection tank 30A, the inside of the drain detection tank 30A is depressurized so that the drain water can easily flow in.
[0024]
By the way, when a specific value effective for the fixed period T, the maximum time t, and the minute time Δt is shown, the fixed period is 0.5 to 10 minutes and the maximum time is 3 to 30 seconds. If the minute time is set to 0.1 to 0.5 seconds, a certain effect can be seen. As an example, a certain period is set to 1 minute, the maximum time is 10 seconds, and the minute time is set to 0.2 seconds. Was ideal.
[0025]
However, it is better to consider that the ideal setting varies depending on the size of the drain detection tank 30A and the discharge valve 40 and the situation of drain water generation such as when the weather is fine in autumn or winter and when it is humid in summer.
[0026]
The drain water discharge method and discharge apparatus according to the present invention are configured as described above, and the operation thereof will be described in detail below.
[0027]
First, compressed air produced by an air compressor (not shown) generates drain water in various devices 10 disposed between them while passing through the compressed air discharge pipes 101 and 102. Here, the generated drain water is stored in the drain detection tank 30 </ b> A through the drain pipe 111, the on-off valve 20, the drain pipe 112, and the strainer 31, which are the narrow pipe sections 20, 111, and 112. At that time, various foreign substances are removed by the strainer 31.
[0028]
Therefore, as a general process, when the drain sensor 35 confirms the presence of drain water while the drain discharge start signal is transmitted at a constant period T by the timer function provided in the control unit 50A, the drain sensor information 121 Is sent to the discharge valve 40 as drain water discharge signals 131 and 132 based on drain water detection, and the discharge valve 40 is opened while the signal is being sent.
[0029]
In this case, as the signal generated by the control unit 50A, the drain water discharge by the drain water detection that emits a signal to the end while receiving the drain sensor information 121 while transmitting the drain discharge start signal at a constant period T. Both a signal 131 and a drain water discharge signal 132 by drain water detection that emits a signal only for a predetermined maximum time t are conceivable.
[0030]
On the other hand, in the drain detection tank 30 </ b> A, immediately after the drain water in the drain detection tank 30 </ b> A is discharged by the discharge valve 40, the drain water stays from a position near the portion where the drain pipe 113 is connected. However, there is a case where the drain water does not flow into the drain detection tank 30A due to the compressed air in the drain detection tank 30A and stays in the various devices 10.
[0031]
In this case, since the drain sensor 35 does not confirm the presence of drain water, the drain sensor information 121 is not sent to the control unit 50A. However, while the drain discharge is started at a constant period T, the control unit 50A sends a drain water discharge signal 133 for a minute time to the discharge valve 40, so that the minute time Δt is released in the discharge valve 40. By discharging the compressed air or the drain water in the drain detection tank 30A, the pressure in the drain detection tank 30A can be reduced, and the drain water can easily flow from the various devices 10. .
[0032]
This will be explained more specifically with reference to FIG.
As an example, first, A. As can be seen, a drain discharge start signal is transmitted at a constant period T by the timer function of the control unit 50A. That is, the START point of the drain discharge start is timed and transmitted by the timer function of the control unit 50A.
[0033]
On the other hand, B. As seen in A. The time when the drain discharge minute time Δt is turned ON can be set by the timer function of the control unit 50A, superimposed on the drain discharge start signal. That is, the drain discharge minute time Δt can always be set and issued at every fixed period T which is a drain discharge start signal.
[0034]
In addition, C.I. As can be seen, the controller 50A can obtain and transmit ON information of the drain sensor information 121 from the drain sensor 35.
[0035]
A. above. B. The time measurement result by According to the information of 1. As shown in FIG. 3, while the drain discharge start signal is transmitted to the discharge valve 40 at a constant period T, when the drain sensor information 121 is present, the drain sensor information 121 is being turned on. In the middle, while drain water is instructed by the drain water discharge signal 131 by the drain water detection and the drain sensor information 121 is in the OFF state, the minute time Δt is set to the unit by the drain water discharge signal 133 of the minute time. It is instructed to discharge drain water.
[0036]
As another example, D.I. As seen in A. The time when the maximum time t during drain discharge is ON can be set by the timer function of the control unit 50A superimposed on the drain discharge start signal. That is, it is possible to always set the maximum time t at the time of drain discharge for every fixed period T which is a drain discharge start signal.
[0037]
Therefore, A. B. D. The time measurement result by According to the information of 2. As shown in FIG. 3, while the drain discharge start signal is transmitted to the discharge valve 40 at a constant period T, when the drain sensor information 121 is present, the drain sensor information 121 is being turned on. However, the drain time is within a range not exceeding the maximum time t, while drain water is instructed by the drain water discharge signal 132 by the drain water detection, and the drain sensor information 121 is in the OFF state. The drain water discharge signal 133 for a minute time instructs the drain water to be discharged in units of the minute time Δt.
[0038]
(Second embodiment)
As seen in FIG. 3, the second embodiment is different from the first embodiment in that the upstream drain sensor 15 is provided in the various devices 10 and the upstream drain sensor 15 and the control unit 50B are connected. This is that the upstream drain sensor information 122 is made available.
[0039]
In this case, the reason why the upstream drain sensor 15 is provided is that, in the first embodiment, the drain discharge start signal is obtained by the timer function of the control unit 50A so as to be transmitted at a constant period T. In the embodiment, the drain discharge start signal is to be obtained from the upstream drain sensor information 122 from the upstream drain sensor 15. Accordingly, when the upstream drain sensor 15 senses the presence of drain water, the upstream drain sensor information 122 is issued, and it is considered that the drain discharge start signal is transmitted at that time.
[0040]
The drain water discharge signals 134 and 135 by the control unit 50B and the drain water detection and the drain water discharge signal 136 for a very short time are different from the first embodiment, but are due to the difference in the drain discharge start signal.
[0041]
Accordingly, as is apparent from FIG. 4, the drain discharge start signal is generated at a constant period T in the first embodiment, whereas in the second embodiment, the upstream drain sensor 15 is connected to the drain water. The point in time when the presence is detected is set as START. In addition, B. C. D. Since the contents shown in are the same except for the timing of the start of the drain discharge start signal, they are omitted. Naturally, 1.2. The same can be said about.
[0042]
Finally, regarding the drain discharge start signal, in addition to the description in the first embodiment and the second embodiment, a pressure sensor is disposed in the various devices 10 and in the drain detection tank 30A, and drain discharge is performed according to the changing information. It is also possible to start.
[0043]
【The invention's effect】
As is clear from the above description, the present invention can provide the following effects.
[0044]
First, if a drain sensor is installed and the presence of drain water is not sensed, drain water generated by various devices is drained by draining water for a very short time for the purpose of decompression. It was possible to flow in without being interrupted by compressed air.
[0045]
Secondly, there is no need to install a pressure equalizing tube that gets in the way.
[0046]
Third, troubles such as excessive accumulation of drain water were reduced.
[0047]
Fourth, the number of parts such as pressure equalizing pipes has been reduced, and the equipment has become cleaner.
[0048]
Fifth, the material cost of the pressure equalizing pipe, the cost for drilling the various equipment and drain detection tank, the cost for connecting the piping, etc. are no longer necessary.
[Brief description of the drawings]
FIG. 1 is a diagram showing a first embodiment according to the present invention. FIG. 2 is a diagram showing an operation state of the first embodiment according to the present invention. FIG. 3 is a diagram showing a second embodiment according to the present invention. FIG. 4 is a diagram showing the operation status of the second embodiment according to the present invention. FIG. 5 is a diagram showing a conventional technique.
10: Various equipment 15: Upstream drain sensor 20: Open / close valve (narrowed piping)
30A ... Drain detection tank 30Z ... Drain detection tank 31 ... Strainer 35 ... Drain sensor (Drain water detection means)
40 ... Drain valve 50A ... Control unit 50B ... Control unit 50Z ... Control unit 101 ... Compressed air discharge pipe 102 ... Compressed air discharge pipe 111 ... ..Drain piping (narrow piping)
112 ··· Drain piping (narrow piping)
113 ... Drain piping 114 ... Drain piping 121 ... Drain sensor information 122 ... Upstream drain sensor information 131 ... Drain water discharge signal 132 by drain water detection ... Drain water discharge signal 133 by drain water detection ... Drain water discharge signal 134 for minute time ... Drain water discharge signal 135 by drain water detection ... Drain water discharge signal 136 by drain water detection・ Drain water discharge signal 139 for a very short time .... Drain water discharge signal 191 when drain water is detected.

Claims (4)

圧縮空気から発生したドレン水狭くなった配管部(20、111、112)を経由してドレン検出槽(30A)に貯留した状態から一定の周期(T)で排出するに際し、前記ドレン検出槽(30A)内に位置しているドレン水検知手段(35)がドレン水の存在を感知している場合は感知している間、前記ドレン水検知手段(35)がドレン水の存在を感知していない場合は減圧の目的で微小時間(Δt)の間、ドレン水の排出を行うことを特徴とするドレン水の排出方法。Upon to discharge at a constant period through a pipe section drain water generated from the compressed air becomes narrower (20,111,112) from a state of being stored in the drain detection tank (30A) (T), the drain detection When the drain water detection means (35) located in the tank (30A) senses the presence of drain water, the drain water detection means (35) senses the presence of drain water. If not, drain water is discharged for a minute time (Δt) for the purpose of pressure reduction. 前記ドレン水検知手段(35)がドレン水の存在を感知している場合は決められた最大の時間(t)に限定することを特徴とする請求項1に記載のドレン水の排出方法。  The drain water discharging method according to claim 1, wherein when the drain water detecting means (35) senses the presence of drain water, the drain water detecting means (35) is limited to a predetermined maximum time (t). 圧縮空気よりドレン水を発生させる各種機器(10)からドレン水が通過する狭くなった配管部(20、111、112)に連通しているドレン検出槽(30A)に位置していてドレン水の存在を検知するドレンセンサー(35)と、ドレン水を排出するドレン排出弁(40)と、前記ドレンセンサー(35)から信号を受信したり前記ドレン排出弁(40)に信号を発信することが出来る制御部(50B)を配設し、前記制御部(50B)が前記各種機器(10)に設けた上流側ドレンセンサー(15)によってドレン水の存在を感知することでドレン排出開始信号を発した際に、前記ドレンセンサー(35)がドレン水の存在を感知している場合は感知している間ドレン水検知によるドレン水排出信号(134、135)によって、前記ドレンセンサー(35)がドレン水の存在を感知していない場合は減圧の目的で微小時間(Δt)の間微小時間のドレン水排出信号(136)によって前記ドレン排出弁(40)がドレン水の排出を行うように構成していることを特徴とするドレン水の排出装置。Drain water is located in the drain detection tank (30A) communicating with the narrow pipes (20, 111, 112) through which drain water passes from various devices (10) that generate drain water from compressed air. A drain sensor (35) for detecting presence, a drain discharge valve (40) for discharging drain water, and receiving a signal from the drain sensor (35) or transmitting a signal to the drain discharge valve (40). A control unit (50B) is provided, and the control unit (50B) generates a drain discharge start signal by sensing the presence of drain water using an upstream drain sensor (15) provided in the various devices (10). When the drain sensor (35) detects the presence of drain water, the drain water discharge signal (134, 135) by the drain water detection while detecting the drain water, When the drain sensor (35) does not detect the presence of drain water, the drain discharge valve (40) is operated by the drain water discharge signal (136) for a minute time (Δt) for the purpose of decompression. An apparatus for discharging drain water, wherein the apparatus is configured to discharge. 前記ドレンセンサー(35)がドレン水の存在を感知している場合は感知している間に加えて更に限定する目的で前記最大の時間(t)の間前記ドレン水検知によるドレン水排出信号(135)によるものであることを特徴とする請求項3に記載のドレン水の排出装置。When the drain sensor (35) senses the presence of drain water, in addition to the sensing time, in addition to the purpose of further limiting, the drain water discharge signal ( 135). The drain water discharge device according to claim 3, wherein the drain water discharge device is according to claim 135.
JP2003096529A 2003-02-25 2003-02-25 Drain water discharge method and discharge device Expired - Lifetime JP3887663B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003096529A JP3887663B2 (en) 2003-02-25 2003-02-25 Drain water discharge method and discharge device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003096529A JP3887663B2 (en) 2003-02-25 2003-02-25 Drain water discharge method and discharge device

Publications (2)

Publication Number Publication Date
JP2004257545A JP2004257545A (en) 2004-09-16
JP3887663B2 true JP3887663B2 (en) 2007-02-28

Family

ID=33127487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003096529A Expired - Lifetime JP3887663B2 (en) 2003-02-25 2003-02-25 Drain water discharge method and discharge device

Country Status (1)

Country Link
JP (1) JP3887663B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006258081A (en) * 2005-03-14 2006-09-28 Fukuhara Co Ltd Discharge method and discharge device of drain water
JP5870378B2 (en) * 2013-11-29 2016-03-01 株式会社フクハラ Automatic drain water discharge device and discharge method
CN104791572B (en) * 2014-01-20 2017-04-05 宇宙电路板设备(深圳)有限公司 A kind of flexible pipe drain pipe equipment
CN105889758A (en) * 2016-06-02 2016-08-24 平凉市老兵科技研发有限公司 Draining device for vacuum pipeline of thinning machine
CN107461607B (en) * 2017-09-25 2019-11-15 山东京博众诚清洁能源有限公司 A kind of gas conveying tube line automatic water-stopping device
KR101869014B1 (en) * 2017-12-11 2018-06-20 브니엘 네이처 주식회사 Automatic waste collecting system having function of draining condensed water
KR101942988B1 (en) 2018-04-09 2019-01-28 브니엘 네이처 주식회사 Automatic waste collecting system having function of draining condensed water
KR101942996B1 (en) 2018-04-09 2019-01-28 브니엘 네이처 주식회사 Automatic waste collecting system having function of draining condensed water
CN109027693A (en) * 2018-09-06 2018-12-18 河南中托力合化学有限公司 A kind of liquid reserve tank suitable for liquefied gas pipeline draining

Also Published As

Publication number Publication date
JP2004257545A (en) 2004-09-16

Similar Documents

Publication Publication Date Title
JP3887663B2 (en) Drain water discharge method and discharge device
CN103890478A (en) Improved method for the automated discharge of condensate from a pressurized gas system
CA2663530A1 (en) System and method for determining a fill status of a canister of fluid in a reduced pressure treatment system
US8794449B2 (en) Device and method for operating a fuel filter
CA2347115A1 (en) Negative pressure therapy using wall suction
KR20110121994A (en) Piping retractable leak detection device and pipe leak detection system using the same
CN108569792A (en) Water purification system and control method thereof
AU672324B2 (en) Process and apparatus for controlling the dewatering of suspensions
CN208043160U (en) Intellectual water meter
JPH0342007A (en) Automatic cleaning filter for liquid passage
US20120067826A1 (en) Filtration system
JP2002276842A (en) Automatic drain discharging method and device
JP2001193652A (en) Automatic drain discharge method and automatic drain discharge device
CN202867060U (en) A one-button diesel filter water discharge system
WO2000018487A1 (en) Filtration device and an indicating apparatus and method for a filtration device
JP2009192418A (en) Leakage detecting system for liquid feed pipe
JP2001173890A (en) Automatic drain discharge method and automatic drain discharge device
WO2018126172A1 (en) Sensor system for toilet flush control
JP3032118B2 (en) Drain discharge device
CN110207008B (en) Air compressor gas holder drain valve
KR100885215B1 (en) Cooling water filtration device
JP7359478B1 (en) Energy-saving drain trap and compressed air pressure circuit
WO2004094963A3 (en) Fluid detecting means
JP7311928B1 (en) Hopper and drain receiving gutter
CN205730581U (en) Cleaning filter equipment and suppressing dust with dry mist system for suppressing dust with dry mist equipment

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050607

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050803

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060926

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061010

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3887663

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091208

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091208

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091208

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121208

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141208

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term