JP3887751B2 - Power system distributed monitoring and control system - Google Patents
Power system distributed monitoring and control system Download PDFInfo
- Publication number
- JP3887751B2 JP3887751B2 JP2002290743A JP2002290743A JP3887751B2 JP 3887751 B2 JP3887751 B2 JP 3887751B2 JP 2002290743 A JP2002290743 A JP 2002290743A JP 2002290743 A JP2002290743 A JP 2002290743A JP 3887751 B2 JP3887751 B2 JP 3887751B2
- Authority
- JP
- Japan
- Prior art keywords
- subject
- equipment
- maintenance
- data
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、例えば電力系統監視制御システム等、複数の分散化された計算機により構成される電力系統分散監視制御装置に係り、特に、電力系統設備データのメンテナンス件名管理の技術に関する。
【0002】
【従来の技術】
一般的に、電力系統を構成する設備には発電機、送電線、変圧器、開閉器等が含まれており、電力系統を監視・制御する電力系統監視制御システムでは、これらの構成設備に関するデータが種類別にレコードを構成しており、さらに、これらレコードがまとまっていわゆる設備データベースを形成している。
これら電力系統に追加・削除・変更(例えば、送電線の追加、変電所の増設、容量の変更等)があった場合は、設備データベースをメンテナンスしている間、オンライン業務に影響を与えないように、オンライン業務で使用するオンライン用設備データベースとは別に、オフラインで変更できるメンテナンス用設備データベースを持ち、さらに、オフラインで設備データベースを変更した後に、一括して上記変更したメンテナンス用設備データベースをオンライン用設備データベースへ更新するようにしている(運用切替)。
また、メンテナンス用設備データベースは、オンライン運用切替単位に分けて複数持ち、運用切替日前にそれぞれ別々に作成及び確認試験ができるようにそれらを件名で管理している(件名管理)。各件名は、通常運用切替日の順(時系列順)に作成、確認試験及び運用切替している。
なお、電力系統設備は、年々拡大・複雑化しており、そのための電力系統監視制御システムも、高性能化、高信頼性化が望まれ、多重化、分散化のシステム構成が採用され、システムは複数の計算機から成り立っている。
従来、複数の計算機から構成される分散計算機システムとそのデータベース切替え方法としては、特開平11−242607号公報等で開示されているものが知られている。つまり、オンライン業務を行う主計算機と、オンライン業務を模擬(シミュレーション)する試験計算機、メンテナンス用設備データベースをメンテナンスするメンテナンス計算機とから成る分散型の計算機システムにおいて、各計算機の持つ設備データベースの件名状態(運用中、試験中、作成中など)管理し、設備データベースのメンテナンス途中や試験途中、または、試験結果が異常である設備データベースを誤ってオンライン用設備データベースへ書き込んで更新したり、あるいは、試験後にオンライン用として確定した設備データベースを誤って変更したりすることがないように、ユーザの誤操作に対してインターロックをかける機能を持つものである。
【0003】
【発明が解決しようとする課題】
しかしながら、上記従来技術では、メンテナンス計算機が持つ複数のメンテナンス用設備データベースの件名管理について検討がされていなかった。
一般的な設備データの件名管理方法によれば、各件名毎に全設備データを持つ方法があるが、件名数の増大、設備データの増大に伴い、膨大なメモリ容量を必要とする問題がある。
また、複数の件名が順次、時系列に並んでいる場合には問題無いが、運用切替日が入れ替わったりして件名の時系列順序に変更が生じ、最新件名以前の設備データに変更が必要となった場合には、それ以降、最新まで件名の設備データを各々変更しなければならず、設備データの変更に多大な時間がかかるという問題がある。
【0004】
本発明の課題は、設備の追加や変更が頻繁に行われる電力系統分散監視制御システムにおいて、複数件名のメンテナンス設備データを時系列に依存せず作成可能で、且つ、少ないメモリ容量で効率良く件名管理することが可能な電力系統分散監視制御装置を提供することにある。
【0005】
【課題を解決するための手段】
上記課題を解決するために、複数の計算機により構成される電力系統分散計算機システムであって、メンテナンス用設備データベースには、現在運用中のマスターデータとメンテナンスの単位である各件名間での変更分の差分データに分けて保有すると共に、メンテナンス計算機には、メンテナンス用設備データベースの各件名を管理する件名管理機能部と、メンテナンス用設備データの変更を行う設備データ変更機能部と、メンテナンス用の設備データをオンライン用に展開する設備データベース展開機能部と、各計算機のオンライン用設備データベースを切替える設備データベース切替機能部とを設ける。
【0006】
【発明の実施の形態】
以下、本発明の実施形態について図面を参照して詳細に説明する。
図1は、本発明の一実施形態による電力系統分散監視制御装置の構成図であり、電力系統における監視制御をオンラインで実行する二重系の主計算機A、Bと、オンライン業務を模擬(シミュレーション)する試験計算機C、設備データベース(以下、設備DBと略す。)をメンテナンスするメンテナンス計算機Dとから成るシステム(電力系統監視制御用計算機システム)の例を示す。
図1において、主計算機A、B及び試験計算機Cは、電力系統の電圧や電流の監視や発電機制御、開閉器の入/切操作指令等のオンライン業務で使用するオンライン用設備DB101、201、301と、メンテナンス計算機Dのオンライン用設備設備DB401で各計算機のオンライン用設備設備DB101、201、301を更新する設備DB切替機能部11、21、31を持つ構成となる。
さらに、メンテナンス計算機Dは、オンライン用設備DB101、201、301更新用の展開エリアとして使用するオンライン用設備DB401と、設備データの変更・追加・削除といったメンテナンス業務で使用する現在運用中のマスターデータとメンテナンスの単位である各件名間での変更分の差分データに分けて保有するメンテナンス用設備設備DB402と、メンテナンス用設備データの変更及び変更部分の差分抽出に使用する変更前設備データ403、変更後設備データ404と、メンテナンス用設備DB402の各件名の状態と運用切替日を保有する件名情報テーブル405と、メンテナンス用設備DB402の各件名を件名管理テーブル405で管理する件名管理機能部41と、メンテナンス用設備データの変更を行う設備データ変更機能部42と、変更後設備データ404をオンライン用設備DB401に展開する設備DB展開機能部43と、オンライン用設備DB401で各計算機のオンライン用設備DB101、201、301を更新する設備DB切替機能部44と、各機能部41、42、43、44に対する指示データや変更データの入力及びその処理結果を出力するデータ入出力装置51を持つ。
なお、このシステムの前提条件は以下の通りである。
(1)、主計算機AとBとは二重系をなし、主計算機A、Bには、既に設備DBがオンライン用設備DB101、201に格納されており、オンライン用設備DB101、201は全く同一内容である。
(2)、主計算機Aは、マスタ系としてオンライン業務を運用中、主計算機Bは、オフライン化しており、且つ主計算機Aのスレーブ系をなしている。
(3)、試験計算機Cは、オンライン用設備DB301を使ってのオンライン業務の模擬試験、オンライン用DB自体の模擬試験を行う。
【0007】
次に、メンテナンス計算機Dに設けられた件名情報テーブル405の構成の一例を図2に示す。
件名情報テーブル405は、各件名のメンテナンス用設備DB402の過渡状態(件名状態欄407)と、メンテナンス用設備DB402を主計算機A、Bのオンライン設備DB101、201に更新する運用切替日欄408を件名番号欄406毎に記憶している。
なお、件名状態欄407は時間の経過と共に変化し、メンテナンス用設備DB402の来歴を管理するものであり、「作成中」「試験中」「試験済」「切替中」「運用中」として指定した。
【0008】
ここで、上記の構成における一般的な設備データベース切替方法による手順と各ステップの件名状態を図3を用いて説明する。
ここでは、まず、設備DBを全て再作成すると、時間がかかり効率が悪いので、オンライン用設備DBと同じ値の初期値を持ったメンテナンス計算機Dのメンテナンス用設備DB402の指定件名の設備データを件名管理機能部41で変更後、設備データ404に呼出し、設備データ変更機能部42で変更し(S11)、それを設備DB展開機能部43でオンライン用設備DB401に展開する(S12)≪この時の件名状態欄407=「作成中」≫。
次に、メンテナンス計算機Dの設備DB切替機能部44と試験計算機Cの設備DB切替機能部31により、試験計算機Cのオンライン用設備DB301を変更したメンテナンス計算機Dのオンライン用設備DB401の値に一括更新し(S13)、この更新されたオンライン用設備DB301を試験計算機Cで模擬試験する(S14)≪この時の件名状態欄407=「試験中」≫。
この試験計算機Cによる模擬試験によって更新されたオンライン用設備DB301に問題がないか否か判断し(S15)、その結果、問題がある場合(すなわち、「No」の場合)は、再度、上記メンテナンス用設備DB402の変更のステップ(S11)からやり直す。
一方、上記ステップ(S15)での試験にて問題がない場合(すなわち、「Yes」の場合)≪この時の件名状態欄407=「試験済」≫は、まず、運用中であった主計算機Aをオフライン、且つ、待機系であった主計算機Bをオンラインとし(S16)、メンテナンス計算機Dの設備DB切替機能部44と主計算機Aの設備DB切替機能部11で、主計算機Aのオンライン用設備DB101を変更したメンテナンス計算機Dのオンライン用設備DB401の値に一括更新する(S17)。
次いで、主計算機Bをオフライン、且つ、主計算機Aをオンラインにし(S18)、メンテナンス計算機Dの設備DB切替機能部44と主計算機Bの設備DB切替機能部21により、主計算機Bのオンライン用設備DB201を変更したメンテナンス計算機Dのオンライン用設備DB401の値に一括更新する(S19)≪この時の件名状態欄407=「切替中」≫。
以上の手順により、設備DBの更新及び切り替えが完了する≪この時の件名状態欄407=「運用中」≫。
【0009】
次に、本発明の特徴であるメンテナンス計算機Dにおける件名管理について説明する。
変更前設備データ403、変更後設備データ404は、図4に示すように、各設備データの種別(変圧器、遮断器、断路器など)と情報(位置、設備、設定)をレコード形式で持っている。
メンテナンス用設備DB402は、図1及び図5に示すように、各件名の設備DBをリレーショナルデータベース管理システム(RDBMS)上での一括管理とし、各設備データ毎にマスター部分(現用データ)と、差分データ(各件名での変更分のデータ)を持つ。差分データとは、マスターデータからの変更分であり、各件名でメンテナンスされ、変更、修正、作成されたデータである。すなわち、マスターデータと差分データの組み合わせにより、各件名に対応したデータベースとなる。
図5のメンテナンス用設備DB402は、レコード毎に作成日、削除日をもっており、件名番号欄406で各データが有効になるのは、件名の運用切替日欄408が作成日〜削除日の間に入っている場合である。この作成日、削除日を元に各件名番号欄406に対応したデータベースを抽出する。
各日付の定義を以下に示す。
(日付は、YYMMDD(YY:年、MM:月、DD:日)であり、年は西暦年の下2桁を示す。)
・作成日:データを作成した件名の切替日
(いずれの件名でも有効な場合は、有効日の最小数=000000)
・削除日:データを削除した件名の切替日
(いずれの件名でも有効な場合は、有効日の最大数=999999)
各件名番号欄406のデータは、この作成日、削除日を元に次の不等式により、各テーブルから抽出する。
不等式:作成日≦運用切替日<削除日
ここで、〇印は当該件名で抽出されるデータを、×印は当該件名で抽出されないデータを示す。
【0010】
上記の構成におけるメンテナンス設備DB402の変更方法を図6を用いて説明する。
件名管理機能部41は、データ入出力装置51から入力された件名番号が件名状態テーブル405の件名番号欄406に既に有るか判断し(S21)、件名番号が無い場合(すなわち、「No」の場合)は、データ入出力装置51から入力された運用切替日に最も近い過去の運用切替日をキーとしてメンテナンス設備DB402から当該データを抽出し、変更前設備データ403を作成し(S22)、変更前設備データを変更後設備データ404にコピーする(S27)。件名番号が既に有る場合(すなわち、「Yes」の場合)は、件名状態テーブル405に記憶している件名状態欄407が運用中か判断し(S23)、運用中の場合(すなわち、「Yes」の場合)は、データ入出力装置51にエラーの旨を表示して終了する(S24)。件名状態欄407が運用中以外の場合(すなわち、「No」の場合)は、入力された件名番号の運用切替日をキーとしてメンテナンス設備DB402から当該データを抽出し、変更前設備データ403を作成し(S25)、変更前設備データを変更後設備データ404にコピーする(S27)。
設備データ変更機能部42は、データ入出力装置51から入力された指示に従い、変更後設備データ404を変更又は修正する(S28)。
件名管理機能部41は、データ入出力装置51からの終了指示に従い、変更前設備データ403と変更後設備データ404を比較してその差分をメンテナンス設備DB402の差分データに書き込み(S29)、件名状態テーブル405の件名番号の件名状態欄407を作成中にし(S30)、指定件名より運用切替日が後の件名番号が件名状態テーブル405にあった(最新件名以前の設備データに変更が生じた)場合は、その件名番号の件名状態欄407を作成中に戻す(S31)。
【0011】
図7〜図18を用いて、図5のメンテナンス設備DB402の各件名の系統図例を説明する。なお、この例は、現在運用中の件名番号=1に対して、件名番号=2、3、4、5の順に線路(断路器LS2台と遮断器CB1台の組合せ)の変更、追加、削除を行ったものである。但し、件名番号=5の運用開始日(2002/04/15)は、件名番号=4の運用開始日(2002/05/06)以前とし、時系列に変更を生じさせている。
【0012】
図7は、現在運用中の件名番号=1(運用切替日=2002/02/04)の系統図例であり、図8は、そのメンテナンス用設備DB402を示す。メンテナンス用設備DB402の各レコードの断路器LS11、LS12〜LS51、LS52、遮断器CB1〜CB5、変圧器TR1は、全て前記の不等式(作成日≦運用切替日<削除日)を満たしているので、全て有効となる。また、現在運用中のレコードは全てマスターデータとして扱われる。
【0013】
図9は、図7(件名番号=1:運用中)のCB4をCB4’に変更した件名番号=2(切替中:運用切替日=2002/03/04)の系統図例であり、図10は、そのメンテナンス用設備DB402を示す。メンテナンス用設備DB402の変更前のマスターデータCB4は、削除日が運用切替日と同じ為、無効になり、変更後の差分データCB4’は、作成日が運用切替日と同じ為、有効になる。
【0014】
図11は、図9(件名番号=2:切替中)にLS61、CB6、LS62を追加した件名番号=3(試験済:運用切替日=2002/04/08)の系統図例であり、図12は、そのメンテナンス用設備DB402を示す。メンテナンス用設備DB402に追加した差分データLS61、CB6、LS62は、作成日が運用切替日と同じ為、有効になる。
【0015】
図13は、図11(件名番号=3:試験済)からLS51、CB5、LS52を削除した件名番号=4(試験中:運用切替日=2002/05/06)の系統図例であり、図14は、そのメンテナンス用設備DB402を示す。メンテナンス用設備DB402から削除したマスターデータLS51、CB5、LS52は、削除日が運用切替日と同じ為、無効になる。
【0016】
図15は、時系列に変更を生じさせ、図11(件名番号=3:試験済)にLS71、CB7、LS72を追加した件名番号=5(試験中:運用切替日=2002/04/15)の系統図例であり、図16は、そのメンテナンス用設備DB402を示す。メンテナンス用設備DB402に追加した差分データLS71、CB7、LS72は、作成日が運用切替日と同じ為、有効になる。
なお、この時、最新件名(件名番号=4:運用切替日=2002/05/06)以前の設備データに変更が生じた為、運用切替日が件名番号=5(運用切替日=2002/04/15)より後の件名番号=4(試験中:運用切替日=2002/05/06)の件名状態は作成中に戻る。
【0017】
図17は、図15の件名番号=5(運用切替日=2002/04/15)で最新件名(件名番号=4:運用切替日=2002/05/06)以前の設備データに変更が生じた場合に、最新件名(件名番号=4:作成中:運用切替日=2002/05/06)を表示した系統図例であり、図18は、そのメンテナンス用設備DB402を示す。
ここでは、図13の件名番号=4(試験中)の系統図例と異なり、件名番号=5(運用切替日=2002/04/15)でメンテナンス用設備DB402に追加した差分データLS71、CB7、LS72は、作成日が運用切替日より前の為、有効になる。これにより、最新件名以前の設備データに変更が生じた場合でも、特別な処理をしなくとも、それ以降から最新まで件名の設備データに変更内容が反映されることがわかる。
【0018】
次に、図19〜図22を用いて、図5のメンテナンス設備DB402のマスターデータと差分データの推移例を説明する。なお、メンテナンス用設備DB402のマスターデータと差分データが変更になるタイミングは、各件名の件名状態408が運用中になった時で、その時の処理は以下の通りである。
(1)作成日≦運用切替日の差分データをマスターデータとする。
なお、作成日=000000とする。
(2)削除日≦運用切替日のマスターデータを削除する。
図19は、図5の件名番号=2(運用切替日=2002/03/04)が運用中になった時のメンテナンス用設備DB402を示す。メンテナンス用設備DB402のマスターデータCB4(削除日=2002/03/04)は削除され、差分データCB4’(作成日=2002/03/04)がマスターデータになる。
図20は、図19の件名番号=3(運用切替日=2002/04/08)が運用中になった時のメンテナンス用設備DB402を示す。メンテナンス用設備DB402の差分データLS61、CB6、LS62(作成日=2002/04/08)がマスターデータになる。
図21は、図20の件名番号=5(運用切替日=2002/04/15)が運用中になった時のメンテナンス用設備DB402を示す。メンテナンス用設備DB402の差分データLS71、CB7、LS72(作成日=2002/04/15)がマスターデータになる。
図22は、図21の件名番号=4(運用切替日=2002/05/06)が運用中になった時のメンテナンス用設備DB402を示す。メンテナンス用設備DB402のマスターデータLS51、CB5、LS52(削除日=2002/05/06)が削除される。
【0019】
【発明の効果】
以上説明したように、本発明によれば、設備の追加や変更が頻繁に行われる電力系統分散監視制御システムの電力系統設備データのメンテナンスにおいて、複数件名のメンテナンス設備データを時系列に依存せず、作成可能であり、また、最新件名以前の設備データに変更が生じた場合でも、特別な処理をしなくとも、それ以降から最新まで件名の設備データに変更内容が反映され、且つ、少ないメモリ容量で効率良く件名管理することが可能になる。
【図面の簡単な説明】
【図1】本発明の一実施形態による電力系統分散監視制御装置の構成図
【図2】本発明のメンテナンス計算機が持つ件名情報テーブル405の構成の一例
【図3】一般的な設備データベース切替方法による手順を説明するフローチャート図
【図4】本発明の変更前設備データ403、変更後設備データ404の構成の一例
【図5】本発明のメンテナンス用設備データベース402の構成と各件名のデータ抽出方法の一例(件名番号=1が運用中の場合)
【図6】本発明のメンテナンス設備データベースの変更方法を説明するフローチャート図
【図7】本発明の件名番号=1(運用中:運用切替日=2002/02/04)の系統図例
【図8】本発明の件名番号=1のメンテナンス用設備DB402の構成
【図9】本発明の件名番号=2(作成中:運用切替日=2002/03/04)の系統図例
【図10】本発明の件名番号=2のメンテナンス用設備DB402の構成
【図11】本発明の件名番号=3(作成中:運用切替日=2002/04/08)の系統図例
【図12】本発明の件名番号=3のメンテナンス用設備DB402の構成
【図13】本発明の件名番号=4(作成中:運用切替日=2002/05/06)の系統図例
【図14】本発明の件名番号=4のメンテナンス用設備DB402の構成
【図15】本発明の件名番号=5(作成中:運用切替日=2002/04/15)の系統図例
【図16】本発明の件名番号=5のメンテナンス用設備DB402の構成
【図17】本発明の最新件名(件名番号=4:運用切替日=2002/05/06)以前の設備データに変更が生じた後に、最新件名を表示した場合の系統図例
【図18】本発明の最新件名(件名番号=4:運用切替日=2002/05/06)以前の設備データに変更が生じた後の最新件名のメンテナンス用設備DB402の構成
【図19】本発明の件名番号=2が運用中になった時のメンテナンス用設備DB402の構成
【図20】本発明の件名番号=3が運用中になった時のメンテナンス用設備DB402の構成
【図21】本発明の件名番号=5が運用中になった時のメンテナンス用設備DB402の構成
【図22】本発明の件名番号=4が運用中になった時のメンテナンス用設備DB402の構成
【符号の説明】
A、B…主計算機,C…試験計算機,D…メンテナンス計算機,11、21、31…設備DB切替機能部,41…件名管理機能部,42…設備データ変更機能部,43…設備DB展開機能部,44…設備DB切替機能部,51…データ入出力装置,101、201、301、401…オンライン用設備DB,402…メンテナンス用設備DB,403…変更前設備データ,404…変更後設備データ,405…件名情報テーブル,406…件名番号欄,407…件名状態欄,408…運用切替日欄[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power system distributed monitoring control apparatus including a plurality of distributed computers, such as a power system monitoring control system, and more particularly to a technique for managing a maintenance subject of power system facility data.
[0002]
[Prior art]
Generally, facilities that make up a power system include generators, transmission lines, transformers, switches, etc. In a power system monitoring and control system that monitors and controls the power system, data on these components Constitutes records by type, and these records together form a so-called equipment database.
If these power systems are added / deleted / changed (for example, addition of transmission lines, expansion of substations, capacity changes, etc.), the online operation will not be affected while the equipment database is maintained. In addition to the online equipment database used for online operations, the maintenance equipment database that can be changed offline is available. Updating to the equipment database (operation switching).
In addition, maintenance equipment databases are divided into online operation switching units, and are managed by subject so that they can be created and confirmed separately before the operation switching date (subject management). Each subject is created, confirmed, and switched in order of normal operation switching date (in chronological order).
Power system facilities are expanding and becoming more complex year by year, and power system monitoring and control systems for this purpose are required to have higher performance and higher reliability. Multiplexing and decentralized system configurations have been adopted. It consists of multiple computers.
Conventionally, as a distributed computer system composed of a plurality of computers and its database switching method, those disclosed in Japanese Patent Application Laid-Open No. 11-242607 are known. In other words, in a distributed computer system consisting of a main computer that performs online operations, a test computer that simulates (simulates) online operations, and a maintenance computer that maintains a maintenance facility database, the subject status of each computer's facility database ( During operation, testing, creation, etc.) during maintenance of the equipment database, during testing, or when the equipment database with abnormal test results is erroneously written and updated in the online equipment database, or after testing It has a function to interlock the user's erroneous operation so as not to accidentally change the equipment database determined for online use.
[0003]
[Problems to be solved by the invention]
However, in the above prior art, the subject management of a plurality of maintenance facility databases possessed by the maintenance computer has not been studied.
According to a general equipment data subject management method, there is a method of having all equipment data for each subject, but there is a problem that enormous memory capacity is required as the number of subjects increases and equipment data increases. .
In addition, there is no problem when multiple subjects are arranged in time series, but the operation switching date is changed and the subject time-series order is changed, and it is necessary to change the equipment data before the latest subject. In that case, since then, the equipment data of the subject must be changed to the latest, and there is a problem that it takes a lot of time to change the equipment data.
[0004]
It is an object of the present invention to create maintenance equipment data of a plurality of subjects without depending on time series in a power system distributed monitoring control system in which additions and changes of equipment are frequently performed, and efficiently subject with a small memory capacity. It is an object of the present invention to provide a power system distributed monitoring and control device that can be managed.
[0005]
[Means for Solving the Problems]
In order to solve the above problems, a distributed power system system composed of a plurality of computers, and the maintenance equipment database includes changes between the master data currently in operation and the subjects that are units of maintenance. The maintenance computer has a subject management function unit that manages each subject in the maintenance equipment database, an equipment data change function part that changes maintenance equipment data, and a maintenance equipment. An equipment database expansion function section for expanding data for online use and an equipment database switching function section for switching the online equipment database of each computer are provided.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a configuration diagram of a power system distributed monitoring and control apparatus according to an embodiment of the present invention, which simulates a dual system main computers A and B that execute monitoring control in a power system online and an online operation (simulation). ) Shows an example of a system (a power system monitoring and control computer system) including a test computer C and a maintenance computer D that maintains an equipment database (hereinafter, abbreviated as equipment DB).
In FIG. 1, the main computers A and B and the test computer C are
Further, the maintenance computer D includes an online equipment DB 401 used as an expansion area for updating the
The prerequisites for this system are as follows.
(1) The main computers A and B form a dual system. The main computers A and B already have the facility DBs stored in the online facility DBs 101 and 201, and the online facility DBs 101 and 201 are exactly the same. Content.
(2) The main computer A is operating an online operation as a master system, while the main computer B is offline and is a slave system of the main computer A.
(3) The test computer C performs a simulation test of the online work using the online facility DB 301 and a simulation test of the online DB itself.
[0007]
Next, an example of the configuration of the subject information table 405 provided in the maintenance computer D is shown in FIG.
The subject information table 405 includes a transition state (subject state column 407) of the maintenance facility DB 402 for each subject and an operation
The
[0008]
Here, the procedure by the general equipment database switching method in said structure and the subject state of each step are demonstrated using FIG.
Here, since it takes time and efficiency to re-create all equipment DBs first, the equipment data of the designated subject in the
Next, the facility DB
It is determined whether or not there is a problem in the online equipment DB 301 updated by the simulation test by the test computer C (S15). As a result, if there is a problem (that is, “No”), the maintenance is performed again. Redo from the step (S11) of changing the
On the other hand, when there is no problem in the test in the above step (S15) (that is, in the case of “Yes”), the
Next, the main computer B is set offline and the main computer A is set online (S18), and the equipment DB
With the above procedure, the updating and switching of the equipment DB is completed << the
[0009]
Next, subject management in the maintenance computer D, which is a feature of the present invention, will be described.
The
As shown in FIGS. 1 and 5, the
The
The definition of each date is shown below.
(The date is YYMMDD (YY: year, MM: month, DD: day), and the year indicates the last two digits of the year.)
-Creation date: Date of switching the subject that created the data (If any subject is valid, the minimum number of valid dates = 000000)
-Deletion date: The switching date of the subject from which the data was deleted (if any subject is valid, the maximum number of valid dates = 999999)
Data in each
Inequality: creation date ≦ operation switching date <deletion date Here, ◯ indicates data extracted with the subject, and X indicates data not extracted with the subject.
[0010]
A method for changing the
The subject
The equipment data change
The subject
[0011]
A system diagram example of each subject in the
[0012]
FIG. 7 is a system diagram example with subject number = 1 currently in operation (operation switching date = 2002/02/04), and FIG. 8 shows the
[0013]
9 is a system diagram example of subject number = 2 (switching: operation switching date = 2002/03/04) in which CB4 in FIG. 7 (subject number = 1: in operation) is changed to CB4 ′. Indicates the
[0014]
FIG. 11 is a system diagram example of subject number = 3 (tested: operation switching date = 2002/04/08) obtained by adding LS61, CB6, and LS62 to FIG. 9 (subject number = 2: switching).
[0015]
FIG. 13 is a system diagram example of subject number = 4 (during testing: operation switching date = 2002/05/06) obtained by deleting LS51, CB5, and LS52 from FIG. 11 (subject number = 3: tested).
[0016]
FIG. 15 shows a change in the time series, and subject number = 5 (under test: operation switching date = 2002/04/15) obtained by adding LS71, CB7, and LS72 to FIG. 11 (subject number = 3: tested). FIG. 16 shows the
At this time, since the equipment data before the latest subject (subject number = 4: operation switching date = 2002/05/06) has changed, the operation switching date is subject number = 5 (operation switching date = 2002/04). The subject status of subject number = 4 (under test: operation switching date = 2002/05/06) after / 15) returns to being created.
[0017]
FIG. 17 shows that the equipment data before the latest subject (subject number = 4: operation switching date = 2002/05/06) with the subject number = 5 (operation switching date = 2002/04/15) in FIG. 15 has changed. FIG. 18 is a system diagram example displaying the latest subject (subject number = 4: creating: operation switching date = 2002/05/06), and FIG. 18 shows the
Here, unlike the system diagram example of the subject number = 4 (under test) in FIG. 13, the difference data LS71, CB7 added to the
[0018]
Next, transition examples of master data and difference data in the
(1) The difference data of creation date ≦ operation switching date is set as master data.
Note that the creation date = 000000.
(2) Delete master data of deletion date ≦ operation switching date.
FIG. 19 shows the
FIG. 20 shows the
FIG. 21 shows the
FIG. 22 shows the
[0019]
【The invention's effect】
As described above, according to the present invention, maintenance of power system equipment data of a power system distributed monitoring and control system in which equipment is frequently added or changed without depending on time series of maintenance equipment data of multiple subjects. Even if there is a change in the equipment data before the latest subject, the changes are reflected in the equipment data of the subject from then on to the latest without any special processing, and there is little memory. The subject can be managed efficiently with the capacity.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a power system distributed monitoring and control apparatus according to an embodiment of the present invention. FIG. 2 is an example of a configuration of a subject information table 405 possessed by a maintenance computer of the present invention. FIG. 4 is a flow chart for explaining the procedure according to the present invention. FIG. 4 shows an example of the configuration of the
FIG. 6 is a flowchart for explaining a method for changing a maintenance facility database according to the present invention. FIG. 7 is a system diagram example with subject number = 1 (in operation: operation switching date = 2002/02/04) according to the present invention. Structure of
A, B ... main computer, C ... test computer, D ... maintenance computer, 11, 21, 31 ... equipment DB switching function part, 41 ... subject management function part, 42 ... equipment data change function part, 43 ... equipment DB deployment function , 44 ... equipment DB switching function section, 51 ... data input / output device, 101, 201, 301, 401 ... online equipment DB, 402 ... maintenance equipment DB, 403 ... equipment data before change, 404 ... equipment data after
Claims (3)
前記メンテナンス用設備データベースには、現在運用中のマスターデータとメンテナンスの単位である各件名間での変更分の差分データに分けて保有すると共に、前記メンテナンス計算機には、前記メンテナンス用設備データベースの各件名を管理する件名管理機能部と、メンテナンス用設備データの変更を行う設備データ変更機能部と、メンテナンス用の設備データをオンライン用に展開する設備データベース展開機能部と、各計算機のオンライン用設備データベースを切替える設備データベース切替機能部とを設けたことを特徴とする電力系統分散監視制御装置。A power system distributed computer system composed of a plurality of computers for maintaining at least two main computers each having an on-line facility database storing facility data, and the on-line facility database of the main computer A maintenance computer having a maintenance equipment database, and an on-line equipment database, and a test computer for switching to the online equipment database created by the maintenance computer and performing a simulation test of the online equipment database. In the power system distributed monitoring and control system,
In the maintenance equipment database, the master data that is currently in operation and the difference data for each change that is a unit of maintenance are separately stored and held in the maintenance computer. A subject management function for managing the subject, an equipment data change function for changing maintenance equipment data, an equipment database development function for developing maintenance equipment data online, and an online equipment database for each computer And a facility database switching function unit for switching between power systems.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002290743A JP3887751B2 (en) | 2002-10-03 | 2002-10-03 | Power system distributed monitoring and control system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002290743A JP3887751B2 (en) | 2002-10-03 | 2002-10-03 | Power system distributed monitoring and control system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004129401A JP2004129401A (en) | 2004-04-22 |
| JP3887751B2 true JP3887751B2 (en) | 2007-02-28 |
Family
ID=32282520
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002290743A Expired - Fee Related JP3887751B2 (en) | 2002-10-03 | 2002-10-03 | Power system distributed monitoring and control system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3887751B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4623743B2 (en) * | 2007-01-10 | 2011-02-02 | 中国電力株式会社 | Distributed supervisory control system and data update method for supervisory control system |
| JP5537073B2 (en) * | 2009-06-17 | 2014-07-02 | 株式会社東芝 | Power system monitoring and control system |
| JP5436971B2 (en) * | 2009-08-17 | 2014-03-05 | 株式会社日立製作所 | Power system equipment data management method |
| JP5420575B2 (en) * | 2011-02-09 | 2014-02-19 | 中国電力株式会社 | Supervisory control system |
| JP6053320B2 (en) * | 2012-05-16 | 2016-12-27 | 三菱電機株式会社 | Training simulator for power system equipment |
| CN103019956B (en) * | 2012-10-23 | 2015-11-25 | 北京奇虎科技有限公司 | A kind of to data cached method of operating and device |
| CN104636084B (en) * | 2015-01-21 | 2016-04-27 | 广东电网有限责任公司电力科学研究院 | A kind of apparatus and method of the large data of electric power being carried out to distributed store |
| CN107579870B (en) * | 2017-07-10 | 2020-08-07 | 国网浙江省电力公司台州供电公司 | Simulation device for scheduling master station |
-
2002
- 2002-10-03 JP JP2002290743A patent/JP3887751B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004129401A (en) | 2004-04-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3887751B2 (en) | Power system distributed monitoring and control system | |
| JPH04139544A (en) | Data restoring method | |
| CN114268083B (en) | Power supply recovery method, device, electronic device and storage medium | |
| JP6836530B2 (en) | Computer system and system configuration management method | |
| JP3933792B2 (en) | 3D layout design support device | |
| WO2018199012A1 (en) | Monitoring control system | |
| JP5420575B2 (en) | Supervisory control system | |
| CN110716828A (en) | Real-time database backup method | |
| CN109492051A (en) | A kind of pipe network data synchronous method and device | |
| Ramanathan et al. | The hybrid model: a novel approach for transitioning from the bus-branch/planning to the node-breaker/operation system model | |
| JP4911959B2 (en) | Distributed monitoring and control system | |
| JP2647154B2 (en) | Power distribution system simulation test equipment | |
| JPH05346882A (en) | Data management system | |
| Allan et al. | Reliability evaluation of distribution systems using graphic-based interactive computational methods | |
| JPH05204737A (en) | Database maintenance method | |
| JPH06165378A (en) | System restoration operation procedure creation system | |
| CN115098516B (en) | A data processing method and system for describing the evolution process of power system | |
| JPH0793200A (en) | File managing system | |
| JPH0991182A (en) | Method and device for managing data base | |
| KR970000677B1 (en) | How to handle history information table saturation during program patch execution in all electronic switch | |
| JPH09140058A (en) | Work power failure operation procedure creation method and power distribution automation device in power distribution system | |
| JP4667966B2 (en) | Graphic information management system | |
| JPS60144116A (en) | Power system simulator | |
| Allan et al. | An Integrated Data Base and Reliability Assessment of Electrical Distribution Systems | |
| JP2002034152A (en) | Substation equipment management equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20040329 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050317 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061011 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20061107 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20061115 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101208 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101208 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111208 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111208 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121208 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131208 Year of fee payment: 7 |
|
| LAPS | Cancellation because of no payment of annual fees |