Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3890486B2 - Manufacturing method and manufacturing apparatus for slab deck in building structure - Google Patents
[go: Go Back, main page]

JP3890486B2 - Manufacturing method and manufacturing apparatus for slab deck in building structure - Google Patents

Manufacturing method and manufacturing apparatus for slab deck in building structure Download PDF

Info

Publication number
JP3890486B2
JP3890486B2 JP19057797A JP19057797A JP3890486B2 JP 3890486 B2 JP3890486 B2 JP 3890486B2 JP 19057797 A JP19057797 A JP 19057797A JP 19057797 A JP19057797 A JP 19057797A JP 3890486 B2 JP3890486 B2 JP 3890486B2
Authority
JP
Japan
Prior art keywords
muscle
truss
lattice
welding
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP19057797A
Other languages
Japanese (ja)
Other versions
JPH1122090A (en
Inventor
知彦 武満
浩二 下山
Original Assignee
アスカ株式会社
岡山新晃工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アスカ株式会社, 岡山新晃工業株式会社 filed Critical アスカ株式会社
Priority to JP19057797A priority Critical patent/JP3890486B2/en
Publication of JPH1122090A publication Critical patent/JPH1122090A/en
Application granted granted Critical
Publication of JP3890486B2 publication Critical patent/JP3890486B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、複層建築物の鉄筋コンクリート製の構造体におけるスラブを構成するデッキの製造方法と、この製造方法を好適に実施し得る製造装置に関するものである。
【0002】
【従来の技術】
ビルディングやマンション等の複層建築物における床(一般に「スラブ」と称する)は、鉄筋を配設した後に型枠を固定保持してコンクリートを打設して形成する鉄筋コンクリート製のスラブの他に、所要寸法に形成した金属板に別途成形した曲折鉄筋(トラス筋)を溶接して構成される「デッキ」を配設した合成スラブとがある。この合成スラブは、前記デッキを梁や柱間に架設して前記サポートで金属板を保持し、この状態でコンクリートを打設するものである。これによれば、鉄筋の配設作業を大幅に省略し得ると共に、デッキにおける金属板がスラブの下端面に位置するのでコンクリート打設時における型枠の設置作業も省略され、更には該デッキ自体が剛性を有するのでコンクリートの完全な硬化を待たずに前記サポートを取り除くことも可能となり、建築物の建設工事に係る作業の大幅な合理化と工期短縮を図り得る利点がある。
【0003】
前記建築物は、建設用地の広さや形状および使用目的に合わせて設計,施工されるものであるから、各建築物毎にスラブの面積および形状が異なっている。また一つの建築物においても、各階毎にスラブの面積および形状が異なる場合が多い。従って前記デッキは、当該の建築物において配設されるスラブの広さや形状に合わせて前記金属板の形状を成形する必要があると共に、該スラブの厚さに合わせてトラス筋の高さを設定する必要がある。
【0004】
【発明が解決しようとする課題】
ところで前記デッキは、その製造工程の完全自動化が非常に難しいとされて、従来は前記金属板やトラス筋を専用の加工センションで別々に成形し、完成したこれら金属板とトラス筋を更に組立てて製品とする方法が採られており、その製造に多くの作業員を必要としていた。すなわち、前記金属板の成形工程や、鉄筋の曲折成形工程等は、所要の専用機械を利用した機械化が図り得るとしても、成形された金属板やトラス筋の所定位置への搬送作業、該金属板に対するトラス筋のセット作業、および完成したデッキの搬送作業等は、専ら作業員に依存するものとなっていた。従って、デッキの組立て作業の合理化に伴う生産効率の向上や生産コストの低減、および製品の品質の向上および安定化等を図り得ない欠点があった。
【0005】
またデッキは、前述した如く、どの建築物における何階のどの部分という如く製造時に配設位置が予め決定されており、この配設位置に応じて全長や全幅および形状を適宜変更しながら製造する必要があるから、略単品生産に近い生産方式で対応しなければならない。しかるに従来の製造形態では、同一形状およびサイズのデッキのみを対象とした単一形状の大量生産には適しているが、形状,サイズの異なる複数種類のデッキを対象とした多種少量生産には対応し得ない。しかもデッキは、その全長や全幅および重量が相当なものとなるので、前もって生産して生産工場や建物現場に一時的に保管することも不可能であるから、建物現場の工事進行に合わせて指定された日時に合わせて順次生産し、リアルタイムでデッキを納入することが要求される。しかるに従来のデッキ製造形態では、この建物現場の進行に合わせてフレキシブルにデッキを生産することが困難であり、場合によってはデッキの生産が間に合わずに建設工事の進行に影響を及ぼしてしまう問題点もあった。
【0006】
【発明の目的】
この発明は、前述した欠点に鑑み、これを好適に解決するべく提案されたものであって、コンクリート製の構造体を構成する合成スラブに実施されるデッキの製造工程を完全自動化して、少量多種に及ぶデッキの生産に好適に対応し得るようにすることで、該デッキの生産コストの低減および製造時間の短縮を図って建築物の工事現場の需用に対するフレキシブルな生産を可能としたデッキの製造方法と、これを好適に実施する製造装置を提供することを目的とする。
【0007】
【課題を解決するための手段】
前記課題を克服し、所期の目的を好適に達成するため、本発明に係る建築構造体におけるスラブ用デッキの製造方法は、
長尺の線材を上端筋切断機に向けて給材し、この上端筋切断機により該線材を所要寸法で切断して上端筋を成形し、
別の長尺の線材をラチス筋自動成形機に向けて給材し、該成形機のチャックで挟持しながら所要長さ分だけ押出す毎に、線材のパスラインに対する直交方向から該線材に押圧部材を押当てて折曲すると共に、前記上端筋の長さ寸法に応じた寸法で切断することで、第1曲折部および第2曲折部を交互に有するラチス筋を成形し、
前記上端筋切断機および前記ラチス筋自動成形機の下流側に配設したラチス筋搬送装置により、前記ラチス筋自動成形機で成形した前記ラチス筋を前記上端筋切断機で成形した前記上端筋の上へ移載し、前記ラチス筋における第2曲折部の端部側に前記上端筋を添わせた状態で、これらラチス筋と上端筋とをトラス筋自動成形機に向けて搬送し、
前記ラチス筋搬送装置から前記トラス筋自動成形機へ搬送された前記ラチス筋の第2曲折部に上端筋を該トラス筋自動成形機の溶接ユニットで溶接結合すると共に、前記ラチス筋の各第1曲折部を屈曲ユニットで搬送ラインに対する直交方向へ交互に押圧することにより、上端筋が溶接されたラチス筋が千鳥状に屈曲したトラス筋を成形した後に、該トラス筋を上下逆転して上端筋が上になるようにして払出し、
また、所要幅の金属板をロール成形機に向けて給材し、その幅方向に所要間隔で離間して長手方向の全長に亘って平行に延在する少なくとも一対のリブを一体的に立設したリブ付き金属板を別途成形し、
上下逆転した前記トラス筋における前記第1曲折部を、トラス筋搬送装置のクランプ片により側方から押圧し、前記ラチス筋を弾性的に把持しながら前記リブ付き金属板の上方へ搬送して、 前記トラス筋の交互に離間する方向に折曲されている第1曲折部をリブ間に内接させ
前記リブ間へトラス筋を弾力的に固定した前記リブ付き金属板を、溶接手段を備えた鉄板−トラス筋溶接機へ搬送し、該溶接手段で該トラス筋の各第1曲折部と対応するリブとを溶接結合し、
前記リブとトラス筋との結合が完了した前記リブ付き金属板を、端部材ローダ部および端部材溶接部を備えた端部材溶接機へ搬送し、前記端部材ローダ部でトラス筋の前後端部に別途成形した端部材をセットして、前記端部材溶接部で端部材の下端部と前記リブおよび該端部材の上端部とトラス筋とを溶接結合することによりデッキを製造することを特徴とする。
【0008】
同じく前記課題を克服し、所期の目的を好適に達成するため、本発明に係る建築構造体におけるスラブ用デッキの製造装置は、
長尺の線材の給材部所要位置に配設され、給材される該線材のパスラインに対して直交方向へスライド移動する切断刃具を備え、該切断刃具により線材を切断して所要長の上端筋を成形する上端筋切断機と、
前記上端筋切断機に並設され、給材される長尺の線材を矯正する矯正部と、この矯正部から延出した該線材を挟持するチャックと、前記矯正部とチャックとの間に配設され、前記線材のパスラインに対する直交方向へ移動して線材を折曲する押圧部材とを備え、この押圧部材の押圧により第1曲折部および第2曲折部を交互に有するラチス筋を成形するラチス筋自動成形機と、
前記上端筋切断機および前記ラチス筋自動成形機の下流側に配設され、該ラチス筋自動成形機から搬送されたラチス筋を、該上端筋切断機から搬送された前記上端筋上へ移載するラチス筋搬送装置と、
前記ラチス筋搬送装置の下流側に配設され、前記上端筋と前記ラチス筋の第2曲折部とを溶接結合する溶接ユニットと、該ラチス筋の第1曲折部を搬送ラインに対する直交方向へ交互に屈曲成形する屈曲ユニットとを備え、これら溶接ユニットおよび屈曲ユニットにより上端筋とラチス筋とを溶接結合したトラス筋を成形する成形部と、該成形部で成形された前記トラス筋を上下反転して上端筋を上にした状態で払出す払出部とから構成されるトラス筋自動成形機と、
前記上端筋切断機およびラチス筋自動成形機に並設され、上流側から給材される金属板に、その幅方向に所要間隔で離間して長手方向の全長に亘って平行に延在する少なくとも一対のリブを一体的に立設した所要長のリブ付き金属板を成形するロール成形機と、
前記トラス筋自動成形機の下流側に配設され、前記トラス筋におけるラチス筋の前記第1曲折部に対応するクランプ片を備え、前記トラス筋を側方から押圧するよう前記クランプ片を互いに近接させることで該トラス筋を弾性変形させた状態で把持すると共に、前記リブ付き金属板の両リブ間にトラス筋を到来させた後に押圧を解除して、前記第1曲折部が対応するリブに内接した状態で前記トラス筋をリブ付き金属板に弾力的に固定させるトラス筋搬送装置と、
前記トラス筋搬送装置とロール成形機の下流側に配設され、前記リブ付き金属板のリブとトラス筋の第1曲折部とを溶接結合する溶接手段を備えた鉄板−トラス筋溶接機と、
前記鉄板−トラス筋溶接機の下流側に配設され、別途成形した端部材を前記トラス筋の前後端部にセットする端部材ローダ部と、セットされた端部材の下端部と前記リブおよび該端部材の上端部とトラス筋を夫々溶接結合する端部材溶接部とを備えた端部材溶接機とから構成されることを特徴とする。
【0009】
【発明の実施の形態】
次に、本発明に係る建築構造体におけるスラブ用デッキの製造方法および製造装置につき、好適な実施例を挙げ、添付図面を参照しながら、以下説明する。なお本実施例では、図59に示すように、上端筋40とラチス筋76からなる3本のトラス筋130と、リブ209a,209bを有するリブ付き鉄板(リブ付き金属板)208から構成されるデッキDの製造方法と、これを実施する製造装置につき説明する。このデッキDは、前述すると共に図60に示すように、建築構造体における梁や柱間に架設して使用に供されるものであり、また図61に示すように、配設される部位のスラブSの厚さに合わせて高さ寸法の異なる3種類のトラス筋130が用意され、更には前記鉄板208の全長の異なるものが規格化されているが、本実施例の製造装置では高さや長さ寸法の異なる全てのデッキDを製造し得るようになっている。
【0010】
図1は、本発明の建築構造体におけるスラブ用デッキの製造方法を好適に実施するに際して使用される装置の構成を概略的に示すもので、このデッキ製造組立ライン9は、上端筋給材部14とラチス筋給材部15および鉄板給材部16からなる給材ステーション10と、トラス筋自動成形機17,鉄板−トラス筋スポット溶接機18,端部材スポット溶接機19,滑止めスポット溶接機20およびスリッタ21等からなる加工組立ステーション11とから基本的に構成されている。また、前記加工組立ステーション11の下流側には、完成したデッキDの検査を行なう検査ステーション12と、反転機22や梱包機23等からなる搬出ステーション13が配設されている。
【0011】
(上端筋給材部の構成について)
前記上端筋給材部14は、図2および図6等に示すように、投入コンベヤ26,上端筋切断機27,引出コンベヤ28,上端筋搬送装置29および上端筋搬送コンベヤ30等から構成されている。図2は、長尺の鉄筋(線材)25を給材するための前記投入コンベヤ26と上端筋切断機27および引出コンベヤ28を概略で示す平面図であって、該投入コンベヤ26および引出コンベヤ28には、チェン等で連繋された複数のローラ31が給材ライン方向へ所要間隔毎に配設され、これらローラ31は図示しない駆動手段により回転駆動されるようになっている。また前記各ローラ31には、図4に示すように、コンベヤの幅方向に並列した合計10個の案内溝31aが凹設されており、10本の鉄筋25を並列状態で同時に給材し得るようになっている。
【0012】
(上端筋切断機)
図3は、前記上端筋切断機27を概略で示す側面図であって、前記投入コンベヤ26と引出コンベヤ28との間に配設される鉄筋整列部32を挟んで支柱33,33が立設され、これら支柱33間に水平姿勢で架設されたフレーム34の中央下部に、切断刃具35が垂下状態に配設されている。このフレーム34は、前記支柱33,33に沿って昇降可能に配設されており、図示しない油圧駆動手段により下降移動すると、前記切断刃具35が前記鉄筋整列部32へ臨むよう設定されている。従って、前記投入コンベヤ26から鉄筋整列部32を介して引出コンベヤ28へ給送された各鉄筋25は、前記フレーム34に連動して下降移動する切断刃具35により、該鉄筋整列部32に位置した部位で切断される。なお切断刃具35の側方には、前記フレーム34から垂下状態に配設された鉄筋押え36が備え付けられており、該切断刃具35による鉄筋25の切断時に該鉄筋25を上方から押圧するようになっている。
【0013】
(バックゲージ)
前記引出コンベヤ28の側方には、図2に示すように、該引出コンベヤ28に平行に配設されたレール37,37上を往復動可能なバックゲージ38が配設されており、このバックゲージ38から側方へ延出した当接板39が、引出コンベヤ28の上面に臨んでいる。すなわち、投入コンベヤ26から給材される長尺の鉄筋25は、前記上端筋切断機27の鉄筋整列部32を通過して引出コンベヤ28上を下流側へ移動し、その先端部が前記当接板39に当接して停止するようになる。従って、前記バックゲージ38をレール37に沿って移動させれば、当接板39と切断刃具35との間隔(距離)が変位することから、所要位置に停止保持させたバックゲージ38に鉄筋25を当接させた状態で切断すれば、所要長の上端筋40が得られると共に全長の異なる上端筋40も容易に成形し得る。なお、図59に示すデッキDは、2m〜5mまでの製品長さのものが例えば5mm間隔毎に規格化されており、上端筋40は夫々のデッキDの全長に応じた長さ寸法に切断される。
【0014】
(上端筋払出し機構)
図4および図5は、前記引出コンベヤ28に具備された上端筋払出し機構41を概略で示すものであって、前記ローラ31の下方に配設された複数基の流体圧シリンダ42のロッド42aに連結した支持部材43に、揺動板44が回動可能に枢支されている。この揺動板44は、流体圧シリンダ42の作動前においてはばね65により水平状態に保持され、該流体圧シリンダ42をロッド42aが前進する方向へ作動させると、水平状態に保持されたまま上方へ移動してローラ31に載置された各上端筋40を押上げるようになる。また揺動板44の下部側方には、規制板46を貫通して下端部にナット45aを螺着した作動棒45が垂下状態に配設されており、該揺動板44が所要の高さ位置まで上昇すると、該ナット45aが規制板46に当接するようになっている(図5(a)参照)。ところが前記流体圧シリンダ42は、ナット45aが規制板46に当接した後も更にロッド42aが前進するように設定されているので、この結果として揺動板44は、前記ばね65の引張力に反して側方へ傾動するようになる(図5(b)参照)。従って、揺動板44に押上げられた前記上端筋40は、該揺動板44上を側方へ向かって滑落し、引出コンベヤ28の側方に配設した前記上端筋搬送装置29における上端筋移載部47へ払い出される。
【0015】
(上端筋搬送装置について)
上端筋搬送装置29は、図6および図7に示すように、前記引出コンベヤ28の側方に配設され、前記上端筋払出し機構41により払い出された上端筋40を、3本づつ把持して3基の上端筋搬送コンベヤ30A,30B,30Cへ1本づつ移載するものであって、前記上端筋移載部47と上端筋搬送部48とから構成される。上端筋移載部47は、図8に示すように、流体圧シリンダ49により上下動可能な2基の第1載置板50と、スプロケット52,52間に掛装されてモータ53により駆動されるチェンコンベヤ51とが、所要角度の傾斜状態で階段状に配設されている。そして、このチェンコンベヤ51の側方には、第2載置板54および昇降ロッド55が配設されると共に、更にこの第2載置板54の側方には、3本の上端筋40を所要間隔で載置し得る載置台56が配設されている。前記昇降ロッド55は、第2載置板54に一時的にストックされた上端筋40のうちの一本を保持して、前記載置台56における第1保持溝56aへ移載させるためのものである。また載置台56には、上下動および往復動が可能で所謂「ブロックモーション」を行なう可動台57が具備されており、前記昇降ロッド55により第1保持溝56aに載置された上端筋40を第2保持溝56bへ、第2保持溝56bおよび第1保持溝56aへ載置された上端筋40を第3保持溝56cおよび第2保持溝56bへ順次移載し得るようになっている。すなわち、前記引出コンベヤ28から排出された上端筋40は、前記第1載置板50,50、チェンコンベヤ51および第2載置板54を介して載置台56へ移載される。
【0016】
前記上端筋搬送部48は、図6および図7に示すように、上端筋搬送コンベヤ30(30A,30B,30C)の上方と前記上端筋移載部47の上方間を往復移動する移動フレーム58と、この移動フレーム58の下部に垂下状態に配設された3基の把持チャック59a,59b,59cとから構成される。前記移動フレーム58は、前記上端筋搬送コンベヤ30と直交する方向に平行に延在する水平フレーム60,60に敷設されたレール61,61に配設され、モータ62により往復移動するようになっている。前記各把持チャック59a,59b,59cは、図9に示すように、下端に配設された把持爪63,63が互いに近接することにより上端筋40を把持し得るようになっている。また各把持チャック59a,59b,59cは、移動フレーム58に配設された流体圧シリンダ64により上下動が可能に配設されると共に、前記載置台56における各保持溝56a,56b,56cと同一間隔に配設されているので、図8に示すように、これら保持溝56a,56b,56cに載置された各上端筋40を同時に把持し得る。そして、第1把持チャック59aに把持された上端筋40は第1上端筋搬送コンベヤ30Aへ移載され、第2把持チャック59bに把持された上端筋40は第2上端筋搬送コンベヤ30Bへ移載されると共に、第3把持チャック59cに把持された上端筋40は第3上端筋搬送コンベヤ30Cへ移載されるように制御される。なお、各上端筋搬送コンベヤ30A,30B,30Cの下流側には、図10および図12に示すように、後述する上端筋・ラチス筋搬送コンベヤ110A,110B,110Cが配設されていると共に、各上端筋搬送コンベヤ30A,30B,30Cの間には、後述するラチス筋搬送コンベヤ73A,73Bが延在している(図6および図7に2点鎖線で示す)。
【0017】
(ラチス筋給材部の構成について)
ラチス筋給材部15は、図10に示すように、自動線台71の鉄筋供給方向の下流側に配設されたラチス筋自動成形機72と、この成形機72の下流側に配設されたラチス筋搬送コンベヤ73とで形成される合計3組のラチス筋成形ライン70A,70B,70Cと、各ラチス筋搬送コンベヤ73A,73B,73Cの下流側に配設されたラチス筋搬送装置74とから構成されている。各ラチス筋成形ライン70A,70B,70Cは、前記ラチス筋搬送コンベヤ73A,73B,73Cの全長が若干異なる以外はその基本構成は全く同一であるので、図10における上方に配設した第1ラチス筋成形ライン70Aのみを説明し、中央および下方に配設した第2および第3ラチス筋成形ライン70B,70Cについては、同一の符号を付して詳細な説明は省略する。
【0018】
(ラチス筋自動成形機について)
ラチス筋自動成形機72は、前記自動線台71から引出された線材75を、順次折曲加工して所要長のラチス筋76を自動的に成形するものであって、図11に基本的な構成を概略で示すように、既に実用化されている公知の成形機である。ラチス筋自動成形機72における上流側には、送りロール77と矯正器78とからなる矯正部79が具備され、前記自動線台71から引出された線材75は、この矯正部79を通過することにより巻回時の巻き癖を矯正されるようになっている。また前記矯正部79の下流側には、先端に線材75を挟持するチャック81を備えた保持体80が、油圧サーボ等の駆動手段82に連結された状態でスライド移動可能に配設されており、該チャック81で線材75を保持して該駆動手段82を制御することにより、押出される該線材75を移動しながら保持し得るようになっている。なお前記保持体80には、例えば磁気や光等を利用した位置検出手段83が配設されており、該保持体80のスライド量(線材75の押込み量)を正確に検出し得るようになっている。
【0019】
前記矯正部79と保持体80との間には、該矯正部79から引出された線材75を折曲加工する成形部84が配設されている。この成形部84は、図示しないフレーム等に一端部が枢支された第1レバー片85と、この第1レバー片85の揺動端85aに一端部が枢支されると共に他端部に押圧部材87が配設された第2レバー片86と、図示しないフレーム等にボトム側が固定されると共にロッド88aの先端部が前記第1レバー片85の略中央部に連結された油圧シリンダ88とから構成されている。また、前記押圧部材87と線材75を挟んだ対向位置には、上面が凹設された金型部材89が配設されており、曲折した線材75を当て受けるようになっている。従って、前記油圧シリンダ88をロッド88aが前進するように制御すれば、第1レバー片85の揺動下に押圧部材87が線材75に当接した状態で押し下げられ、その結果として該線材75が前記金型部材89に当接するまで折曲成形される。なお前記金型部材89は、その配設位置を適宜変更し得るようになっており、前記トラス筋130の高さ寸法を前提として曲折成形される線材75の曲折量を調整し得るようになっている。
【0020】
前記金型部材89の側方には、図示しない駆動手段によりスライド移動する切断刃90が配設されており、所要回数の折曲加工が完了した後に前進して線材75を前記矯正部79の下流端で切断することにより、前記上端筋40の長さ寸法に応じた全長のラチス筋76を成形するようになっている。このように構成されたラチス筋自動成形機72で成形されたラチス筋76は、図11に示すように、前記押圧部材87が当接して形成された第1曲折部76aと、前記チャック81がクランプして該第1曲折部76aの形成により成形された第2曲折部76bとが、所要間隔をおいて交互に形成される。なお第2曲折部76bは、前記チャック81がクランプするために、その先端に若干の直線部が形成される。
【0021】
(ラチス筋搬送コンベヤについて)
前記第1ラチス筋搬送コンベヤ73Aは、図10に示すように、ラチス筋自動成形機72の下流側から前記上端筋搬送装置29の下を通ってラチス筋搬送装置74の下方まで延在しており、該ラチス筋自動成形機72で成形されてラチス筋76を、ラチス筋搬送装置74の下方まで搬送するようになっている。このラチス筋搬送コンベヤ73Aは、図16に示すように、チェーン等で連繋された複数のローラ91が給材ライン方向へ所要間隔毎に配設され、このローラ91は図示しない駆動手段により回転駆動されるようになっている。なおラチス筋76は、図12および図16に示すように、搬送コンベヤ73Aの下流側に向かって第1曲折部76aを右側に、第2曲折部76bを左側に指向させた状態で搬送されるようになっている。
【0022】
(ラチス筋払出し機構)
また、ラチス筋搬送コンベヤ73Aにおいて、前記ラチス筋搬送装置74の下方に延在する部分には、図12,図15および図16に示すように、ラチス筋76を押上げて側方へ払い出すラチス筋払出し機構92と、払い出されたラチス筋76を掛止した状態で一時的に保持するラチス筋保持部93とが配設されている。このラチス筋払出し機構92は、前記ローラ91の下方に配設された複数基の流体圧シリンダ94のロッド94aに、その上端面が所要角度の傾斜面95aに形成された押上げ台95を配設して構成されている。すなわち、ラチス筋搬送コンベヤ73Aのローラ91上に横倒し状態で搬送されて停止したラチス筋76は、前記流体圧シリンダ94をロッド94aが前進する方向へ制御することにより、前記押上げ台95の傾斜面95a上に載置された状態で押上げられ、その直後に該傾斜面95aを滑落して前記ラチス筋保持部93へ落下するようになる。
【0023】
(ラチス筋保持部について)
前記ラチス筋保持部93は、図15および図16に示すように前記ラチス筋搬送コンベヤ73Aの下流側に向かって該コンベヤ73Aの左側端部に配設され、前記押上げ台95上を滑落したラチス筋76を掛止状態で保持する受板96,96と、この受板96,96に掛止されたラチス筋76を押上げるシリンダ97とからなる複数個の保持台98が、該搬送コンベヤ73Aの長手方向に所要間隔毎に配設されている。各保持台98における前記受板96,96は、前記押上げ台95の傾斜面95aと略同一角度で下方へ傾斜した第1掛止部96aと、この第1掛止部96aの先端上方に第2掛止部96bを有する略L字形であって、前記ラチス筋76の第1曲折部76a,76aの間隔Lの2倍の間隔をおいた位置に、L形部材99により平行に延出した状態で配設されている。そして各保持台98は、図16に示すように、搬送コンベヤ73A上に停止したラチス筋76の第1曲折部76aと受板96,96とが整合する位置に取着されている。従って、前記押上げ台95の傾斜面95aを滑落したラチス筋76は、第1曲折部76aが前記受板96の第1掛止部96aに整合することにより、図15に示すように、この第1曲折部76aを該第1掛止部96aに掛止した状態で保持される。
【0024】
前記受板96,96の先端間に架設された板材100の略中央には、ロッド97aの先端に昇降台101を配設した前記シリンダ97が配設されており、後述のラチス筋搬送装置74における掛止チャック103にラチス筋76を移載する際に作動する。すなわちシリンダ97は、図15に示すように、常にはロッド97aを前進させた状態で待機しており、該ロッド97aを後退させるように制御すると、昇降台101がその最先端に掛止されたラチス筋76を引っかけながら上昇し、押上げられた当該ラチス筋76を前記第2掛止部96bに移載するようになる。
【0025】
(ラチス筋搬送装置について)
ラチス筋搬送装置74は、図12および図13に示すように、前記3基の上端筋・ラチス筋搬送コンベヤ110A,110B,110Cおよび3基のラチス筋搬送コンベヤ73A,73B,73Cの下流部上方に配設され、前記ラチス筋保持部93に掛止されたラチス筋76を、各上端筋・ラチス筋搬送コンベヤ110A,110B,110Cに待機している上端筋40上へ移載するものであって、往復移動する移動フレーム102と、この移動フレーム102の下部に垂下状態に配設された掛止チャック103とからなる3基の移載部104A,104B,104Cで構成される。各移載部104A,104B,104Cは、その基本構成が全く同一であるので、ここでは第1移載部104Aについてのみ説明することとし、第2移載部104Bおよび第3移載部104Cについては同一の符号を付して説明は省略する。
【0026】
移動フレーム102は、前記ラチス筋搬送コンベヤ73Aと直交する方向に平行に延在する水平フレーム105,105上にレール106,106に配設され、第1流体圧シリンダ107により、該ラチス筋搬送コンベヤ73Aと上端筋・ラチス筋搬送コンベヤ110Aの上方間を往復移動するようになっている。また前記掛止チャック103は、図14に示すように、前記移動フレーム102に配設された第2流体圧シリンダ108のロッド108aに懸吊された昇降杆109の下面に所要間隔毎に配設され(実施例では5基)、図17に示すように、下端に配設された掛止爪103aが互いに近接することによりラチス筋76の第1曲折部76aを掛止し得るようになっている。すなわち、移動フレーム102をラチス筋搬送コンベヤ73Aの上方に移動させて掛止チャック103を下降移動させれば、該掛止チャック103の掛止爪103aが、前記ラチス筋保持部93における第2掛止部96bに掛止されたラチス筋76の第1曲折部76aに整合するよう設定されている。
【0027】
前述のように構成されたラチス筋搬送装置74にあっては、図13および図18に示すように、第1移載部104Aが前記第1ラチス筋搬送コンベヤ73Aのラチス筋76を第1上端筋・ラチス筋搬送コンベヤ110Aへ移載し、第2移載部104Bが前記第2ラチス筋搬送コンベヤ73Bのラチス筋76を第2上端筋・ラチス筋搬送コンベヤ110Bへ移載すると共に、第3移載部104Cが前記第3ラチス筋搬送コンベヤ73Cのラチス筋76を第3上端筋・ラチス筋搬送コンベヤ110Cへ移載する。
【0028】
(上端筋・ラチス筋搬送コンベヤについて)
前記3列の上端筋・ラチス筋搬送コンベヤ110A,110B,110Cは、その基本構成が全く同一であって、図18および図19に示すように、モータ111にチェン112で連繋された複数個のローラ113が所要間隔毎に配設され、また下流端には、後述するトラス筋自動成形機17へ上端筋40およびラチス筋76を給送するための送りローラ114が配設されている。すなわち前記ローラ113は、図19に示すように、円周端面に保持溝113aが凹設されており、上端筋搬送コンベヤ30から搬送される上端筋40と、上方から載置されるラチス筋76の第2曲折部76bを好適に保持するようになっている。なお、前記ローラ113の上方には、固定ガイド部材115と、このガイド部材115に近接・離間する移動ガイド部材116が配設され、上端筋40の上方に載置されたラチス筋76を両側から挟み込んで姿勢保持するようになっている。
【0029】
前記送りローラ114は、図20に示すように、フレームに立設された第1支軸117に枢支される従動ローラ118と、スライド移動可能な移動フレームに立設された第2支軸119に枢支されてチェン121を介してモータ122に連繋される駆動ローラ120を有している。そして、従動ローラ118に対して駆動ローラ120を近接移動させて上端筋40に載置されたラチス筋76を挟圧し、この状態で該駆動ローラ120をモータ122で回転駆動させることにより、該ラチス筋76がトラス筋自動成形機17へ給送される。また上端筋40は、前記モータ122と同期的に回転駆動する前記モータ111で前記ローラ113を回転駆動させることにより、トラス筋自動成形機17へ給送される。なお、各上端筋・ラチス筋搬送コンベヤ110A,110B,110Cの下流端部には、図18に示すようにストッパ124が配設されており、上端筋40およびラチス筋76の給送を制御すると共に両者40,76の先端を整合し得るようになっている。
【0030】
(トラス筋自動成形機について)
前記各上端筋・ラチス筋搬送コンベヤ110A,110B,110Cの下流には、図21および図22に示すように、前記上端筋40およびラチス筋76で構成されるトラス筋130を形成するトラス筋自動成形機17(17A,17B,17C)が、3基並列状態に配設されている。これらトラス筋自動成形機17A,17B,17Cは、上端筋40とラチス筋76とを接合する溶接ユニット133およびラチス筋76をトラス筋130の全長方向と直交する方向へ千鳥状に屈曲成形する屈曲ユニット134とを具備した成形部131と、成形完了後のトラス筋130を後述の第1トラス筋搬送装置165へ移載する払出部132とから構成されている。なお、3基のトラス筋自動成形機17A,17B,17Cは全く同一の装置であるので、第1トラス筋自動成形機17Aについてのみ説明する。
【0031】
(成形部について)
第1トラス筋自動成形機17Aにおける成形部131は、図21および図22に示すように、ベース135に敷設されたレール137上をスライド移動する第1移動フレーム136が、搬送ラインの下流側に向かって左側に配設されると共に、レール139上をスライド移動する第2移動フレーム138が、該搬送ラインの右側に配設され、両移動フレーム136,138は搬送ラインを挟んで互いに近接・離間し得るようになっている。各移動フレーム136,138の上部には、搬送ラインに沿って延在するラチス筋76用のガイドレール140A,140Bが配設されており、各フレーム136,138が相対的に近接した際には、該ラチス筋76を両側から挟み込むようになっている。そして搬送ラインの下方には、上下動可能な支持台141に回転自在に枢支されたフリーローラ142が、搬送ラインに沿って直列に合計5個配設されており、前記上端筋・ラチス筋搬送コンベヤ110Aから搬送される上端筋40およびラチス筋76の第2曲折部76bを保持するようになっている。また、前記第2移動フレーム138およびベース135には、流体圧シリンダ143のロッド143aに連結されて上端筋40とラチス筋76の第2曲折部76bを側方から押えるラチス筋押え144,144が対向的に配設され、各流体圧シリンダ143,143を制御することで、該ラチス筋押え144,144を近接・離間し得るようになっている。
【0032】
(溶接ユニットについて)
前記溶接ユニット133は、図21〜図24に示すように、搬送ラインに沿って合計10基が直列に配設されており、各溶接ユニット133は、図示しない架台に配設されたシリンダ146のロッド146aから搬送ラインに向かって垂下状態に配設される第1電極147と、搬送ラインの下方に配設されて該第1電極147と対向状態に立設された第2電極148とからなり、固定された第2電極148に対し第1電極147が近接・離間移動し得るようになっている。すなわち各溶接ユニット133は、ラチス筋76の各第2曲折部76b,76bの間隔Lと同一間隔毎に配設されており、搬送されて所定位置に停止した上端筋40に前記第2電極148が接触すると共に、ラチス筋76の第2曲折部76bに前記第1電極147が近接して接触することにより、これら上端筋40とラチス筋76とをスポット溶接するようになる。
【0033】
(屈曲ユニットについて)
前記屈曲ユニット134は、前記溶接ユニット133により接合された上端筋40とラチス筋76により形成されたトラス筋130において、上方へ突出した該ラチス筋76の各第1曲折部76aを搬送ラインと直交する方向へ交互に押付けることで、該第1曲折部76aを千鳥状に屈曲成形するためのものである。この屈曲ユニット134は、図21および図22に示すように、前記第1移動フレーム136の上面に、搬送ラインに沿って並設された4基の第1屈曲機構149と5基の第2屈曲機構150とから構成される。すなわち、第1屈曲機構149はラチス筋76の第1曲折部76a,76aの間隔Lに対し2倍の間隔毎に並設されると共に、第2屈曲機構150も該第1屈曲機構149と同一の間隔毎に配設され、従って第1屈曲機構149と第2屈曲機構150とは、ラチス筋76の各第1曲折部76aに対応し得る間隔で交互に配設されている。
【0034】
前記第1屈曲機構149は、前記第1移動フレーム136に固定された第1流体圧シリンダ151のロッド151aに、先端部152aを搬送ラインに指向させた略T字形の第1押圧部材152を配設して構成され、該シリンダ151は常にはロッド151aを後退させた状態で停止している。そして、この流体圧シリンダ151をロッド151aが前進するように制御すると、図25に示すように、前記第1押圧部材152は先端部152aが搬送ラインを越えた位置まで前進するよう設定されており、ラチス筋76の第1曲折部76aを側方へ押し付けて屈曲させるようになる。なお、第1移動フレーム136に固定された前記ガイドレール140Aにおいて、各第1押圧部材152の先端152aが対応する位置には、該押圧部材152の通過を許容する切欠140aが形成してある。
【0035】
前記第2屈曲機構150は、前記第1移動フレーム136に固定された第2流体圧シリンダ153のロッド153aに、搬送ラインの上方から反対側まで延出した第2押圧部材154を配設し、更にこの第2押圧部材154の先端に垂直下方を指向した棒状の係止部材155を配設して構成され、該シリンダ153は常にはロッド153aを前進させた状態で停止している。そして、この流体圧シリンダ153をロッド153aが後退するように制御すると、図25に示すように、該第2押圧部材154の後退と共に該係止部材155が搬送ラインを越えた位置まで移動するよう設定されており、ラチス筋76の第1曲折部76aを側方へ引き付けて屈曲させるようになる。なお、前記第2移動フレーム138に固定された前記ガイドレール140Bにおいて、各係止部材155が対応する位置には、該係止部材155の通過を許容する切欠140bが形成してある。
【0036】
従って、前記溶接ユニット133により溶接工程の終了後に、前記屈曲ユニット134における第1屈曲機構149および第2屈曲機構150とを同時に作動制御すれば、ラチス筋76は搬送ライン下流に向かって、該第1屈曲機構149で第1曲折部76aを右側に、第2屈曲機構150で第1曲折部76aを左側に夫々屈曲され、全体として千鳥状に成形される。なお、第1屈曲機構149および第2屈曲機構150の作動に先立って各移動フレーム136,138が相互に離間し、ラチス筋76の第1曲折部76aは、ガイドレール140A,140Bで両側から保持された状態で屈曲成形される。また、この屈曲成形工程は前記溶接工程と同時に実施されるので、ラチス筋76の各第2曲折部76bは、該溶接工程に係る溶接熱により極めて容易に屈曲され得る状態となっており、前記流体圧シリンダ151,153は小型小出力タイプで対応し得る。
【0037】
(払出部について)
前記成形部131の下流側に延在する払出部132は、図26および図27に示すように、該払出部132に延在するガイドレール156に沿って往復移動するチャック157が配設され、トラス筋130の先端を保持しながら適宜移動する。また、このガイド156の側方には、所要間隔をおいて先端を水平下方に延出した傾斜状態のトラス筋掛止台158が所要間隔毎に配設されており、前記成形部131における溶接工程および屈曲工程を完了したトラス筋130は、前記チャック157の保持が解除されると、上下反転して上端筋40を上にした状態で、このトラス筋掛止台158における掛止棒159に掛止されるようになっている。また、このトラス筋掛止台158の近傍には、該トラス筋掛止台158に掛止されたトラス筋130を上昇移動させるエレベータ160が配設されており、図28に示すように、該トラス筋130を後述の第1トラス筋搬送装置165へ移載するようになっている。すなわち前記エレベータ160は、垂直に立設した支柱161に沿ってスライド移動が可能な載置台162が配設されており、前記トラス筋掛止台158に掛止されたトラス筋130を、掛止した状態で押上げるものである。
【0038】
(第1トラス筋搬送装置について)
図28は、第1トラス筋搬送装置165を概略で示す側面図であって、この第1トラス筋搬送装置165は、前記3基のトラス筋自動成形機17A,17B,17Cにおいて形成された各トラス筋130を、後述するピッチ送りシャトル170へ移載するものである。前記各トラス筋自動成形機17A,17B,17Cの払出部132の上方と前記ピッチ送りシャトル170の上方間に、該払出部132と直交すると共に水平かつ平行に延在する固定フレーム166,166が配設され、この固定フレーム166,166に配設されたレール167上を往復動自在な移動フレーム168に、上下動可能な3基の把持チャック169a,169b,169cが垂下状態に配設されている。これら把持チャック169a,169b,169cは、図29に示すように、前記ピッチ送りシャトル170における各保持溝171a,171b,171cと同一間隔に配設されており、第1把持チャック169aは第1トラス筋自動成形機17Aで形成されたトラス筋130を把持し、第2把持チャック169bは第2トラス筋自動成形機17Bで形成されたトラス筋130を把持すると共に、第3把持チャック169cは第3トラス筋自動成形機17Cで形成されたトラス筋130を把持するようになっている。そして、各把持チャック169a,169b,169cに把持された3本のトラス筋130は、ピッチ送りシャトル170の第1保持溝171a,第2保持溝171bおよび第3保持溝171cへ載置される。なお、各把持チャック169a,169b,169cは、図9に示した上端筋搬送装置29における把持チャック59と、基本的に同一に構成されている。
【0039】
(ピッチ送りシャトルについて)
前記ピッチ送りシャトル170は、図29に示すように、前記第1トラス筋搬送装置165から移載されたトラス筋130を、後述するリブ付き鉄板(リブ付き金属板)208へセットするピッチで順次送るための装置である。このピッチ送りシャトル170は、図29および図31に示すように、移載されるトラス筋130の長手方向へ所要間隔毎に固定される複数の第1載置台171と、各第1載置台171の間に位置して上下動および往復動が可能に配設される第2載置台172と、前記第1載置台171に載置された3本のトラス筋130を上方へ押上げる昇降台173とから構成されている。固定フレーム174に取着される前記第1載置台171には、合計9個の保持溝171a〜171iが等間隔に形成してあり、前述したように、前記第1トラス筋搬送装置165の把持チャック169a,169b,169cに把持された3本のトラス筋130は、第1保持溝171a,第2保持溝171bおよび第3保持溝171cに載置される。
【0040】
前記第2載置台172は、図30に示すように、前記第1載置台171の各保持溝171a〜171iの間隔と同一間隔に合計6個の溝172a〜172fが形成されており、第1流体圧シリンダ175のロッド175aに連結されてレール176上を往復移動する架台177の上部に固定されている。また、前記レール176が固定される第2フレーム178は、図31に示すように、第2流体圧シリンダ179のロッド179aに連結したテーパ部材180がレール181上を往復移動する際に、該テーパ部材180のテーパ面180a上をローラ182が転動する結果として上下動するようになっている。従って前記第2載置台172は、前記第1流体圧シリンダ175および第2流体圧シリンダ179を適宜制御することにより所謂「ブロックモーション」を行なうようになり、第1載置台171上に載置されたトラス筋130を、図29において右から左方向へ向かって順次移載することができる。すなわち、第1保持溝171a,第2保持溝171bおよび第3保持溝171cに載置されたトラス筋130は、第4保持溝171d,第5保持溝171eおよび第6保持溝171fに移載され、次いで前記第1トラス筋搬送装置165により次のトラス筋130が第1保持溝171a,第2保持溝171bおよび第3保持溝171cに載置されると、前者の3本のトラス筋130は第7保持溝171g,第8保持溝171hおよび第9保持溝171iに、後者の3本のトラス筋130は第4保持溝171d,第5保持溝171eおよび第6保持溝171fへ同時に移載される。
【0041】
また前記昇降台173は、前記第1載置台171における第7保持溝171g,第8保持溝171hおよび第9保持溝171iに載置された3本のトラス筋130を上方へ押上げ、これらトラス筋130を後述する第2トラス筋搬送装置186へ移載させるものである。この昇降台173は、図32に示すように、第3流体圧シリンダ183により昇降移動が可能に配設されており、該昇降台173の上部にはトラス筋130の下方突出部(ラチス筋76の第1曲折部76a)を保持する保持部材184が配設されている。従って、前記第3流体圧シリンダ183をロッド183aが延出する方向へ制御することにより昇降台173が上方へ移動し、この際に第7保持溝171g,第8保持溝171hおよび第9保持溝171iに載置された3本のトラス筋130は、各保持部材185に載置された状態で押上げられる。
【0042】
(第2トラス筋搬送装置について)
第2トラス筋搬送装置186は、図33に示すように、前記ピッチ送りシャトル170の昇降台173に載置された3本のトラス筋130を同時に把持し、リブ付き鉄板搬送コンベヤ207上に待機している後述のリブ付鉄板208へセットするものである。ピッチ送りシャトル170の上方とリブ付き鉄板搬送コンベヤ207の上方間には、水平かつ平行に延在する固定フレーム187,187が配設され、この固定フレーム187,187の上面に敷設されたレール188上には、モータ190により往復動自在な移動フレーム189が配設されている。この移動フレーム189には、流体圧シリンダ192により水平姿勢で上下動する昇降杆191が配設され、この昇降杆191の下部に3列のトラス筋把持部193,193,193が配設されている。また、各トラス筋把持部193には、図34,図35および図37に示すように、トラス筋130におけるラチス筋76の第1曲折部76aに対応するクランプ片195,195を備えた複数基のクランプ機構部194が、前記昇降杆191の長手方向に所要間隔毎に配設されている。
【0043】
前記クランプ機構部194は、図35および図36に示すように、所要間隔をおいて垂下立設した支持板196,196の下端間に、支持軸197,197が水平かつ平行に架設され、前記クランプ片195を下端部に備えた把持片198,198が、各支持軸197,197に回動可能に枢支されている。各把持片198の上端部は、上方から垂下状態に配設された流体圧シリンダ199のロッド199aと、連結部材200を介して連結されている。従って、前記流体圧シリンダ199をロッド199aが後退(上昇)するように制御すると、前記各クランプ片195,195が互いに離間するように把持片198,198が回動し(図36に2点鎖線で示す)、またロッド199aが前進(下降)するように制御すると、各クランプ片195,195が互いに近接するように把持片198,198が回動する。すなわち第2トラス筋搬送装置186は、トラス筋130がラチス筋76を千鳥状に拡開した状態に成形してあるので、図36に示すように、前記流体圧シリンダ199によりクランプ片195,195を互いに近接させることにより、各トラス筋130を側方から押圧して弾性変形させた状態で把持するものである。なお各クランプ機構部194には、図38に図示した把持チャック201が配設されており、把持片201a,201aの近接によってトラス筋130における上端筋40とラチス筋76の第2曲折部76bとを把持するようになっている。
【0044】
そして、図34および図36に示すように、各トラス筋把持部193,193,193により押圧された状態で把持された3本のトラス筋130は、図33に示すように、リブ付き鉄板搬送コンベヤ207上で待機しているリブ付き鉄板208の上面に移載される。このリブ付き鉄板208には、図41に示すように、幅方向に所要間隔で離間して対向したリブ209a,209bを対とした3組(合計6個)のリブが、該鉄板208の全長に亘って立設されており、夫々のリブ209a,209b間に1本のトラス筋130が対応的に配設されるようになっている。夫々のリブ209a,209bの間隔Rは、前記トラス筋130におけるラチス筋76の横方向への拡開寸法より若干小さく設定されており、図39(a)に示すように、トラス筋130を前記トラス筋把持部193により押圧した状態でリブ209a,209b間に到来させた後に、図39(b)に示すように、該トラス筋把持部193による押圧を解除すると、該トラス筋130は元の状態に復帰しながら各リブ209a,209bの内側面に当接するようになり、各トラス筋130とリブ付き鉄板208とが弾力的に固定した状態に保持される。
【0045】
(鉄板給材部について)
鉄板給材部16は、図40に示すように、アンコイラ204の下流に配設されるロール成形機205と、アキュームコンベヤ206および前記第2トラス筋搬送装置186の下方へ延在するリブ付き鉄板搬送コンベヤ207とから構成される。前記ロール成形機205は、アンコイラ204から送られる薄肉の鉄板(金属板)を、図41に示すようなリブ209a,209bを有するリブ付き鉄板208に成形するものであり、既に実用化されている公知の装置であるので詳細な説明は省略する。前記ロール成形機205で成形されたリブ付き鉄板208は、前記アキュームコンベヤ206で側方へ移送され、リブ付き鉄板搬送コンベヤ207で第2トラス筋搬送装置186の下方に搬送された後に所定位置で停止し、前記トラス筋130の装着のために待機する。なお、図41に示すように、前記リブ付き鉄板208において、長手方向の一側端部には端部を単に上方へ折曲げて成形される第1連結部208aと、他側端部には端部を上方へ折曲げて更に下方へ折返して成形され、該第1連結部208aと係合し得る第2連結部208bが形成されており、隣接するリブ付き鉄板208同志を並列状態で連結し得るようになっている。
【0046】
(鉄板−トラス筋 スポット溶接機について)
図42は、前記リブ付き鉄板208のリブ209a,209bと、このリブ付き鉄板208に弾力的に固定した状態でセットされたトラス筋130とを溶接するための鉄板−トラス筋スポット溶接機(鉄板−トラス筋溶接機)18を概略で示す正面図であり、図43は、このスポット溶接機18の側面図である。この鉄板−トラス筋スポット溶接機18は、第1搬送コンベヤ211を挟んで立設する支柱213の上部に固定される架台214に対し、昇降フレーム215が流体圧シリンダ216により上下動可能に配設され、この昇降フレーム215の下方には、合計30個の溶接ガン(溶接手段)218を垂下立設した溶接ユニット217が配設されている。前記溶接ガン218には、トラス筋130におけるラチス筋76の第1曲折部76aと、この第1曲折部76aと接触しているリブ209a,209bとを、両側外方から互いに近接して挟持する電極219,219が配設されている。なお、前記架台214の上部にはトランス220が配設されていると共に、溶接ユニット217の上流端および下流端には、該溶接ユニット217の下降移動に連動して下方へ移動し、鉄板208を押圧する押圧装置221,221が配設されている。
【0047】
前記第1搬送コンベヤ211と、その下流側に配設された第2搬送コンベヤ212の両側下部には、所要間隔で水平に延在するレール222,222が敷設され、リブ付き鉄板208の前端部をクランプして該リブ付き鉄板208を搬送する第1送り装置223と、リブ付き鉄板208の両側端部をクランプして該リブ付き鉄板208を搬送する第2送り装置224とが、該レール222,222上を往復移動可能に配設されている。第1送り装置223は、前記レール222,222上を移動する第1移動フレーム225上に、前記搬送コンベヤ211を挟んた対向位置に支柱226,226が立設され、流体圧シリンダ228に連結されてクランプ部材229が配設された倒立コ字形の昇降杆227が、この支柱226,226に垂直に配設されたレール230,230に沿って昇降可能に配設されている。すなわち第1送り装置223は、図42に示すように、第1搬送コンベヤ211と第2搬送コンベヤ212との間に画成された空間部に移動した状態において、前記昇降杆227をコンベヤの搬送レベルより下方まで下降移動し得るようになっている。なお、前記第1移動フレーム225上に配設された第1モータ231のギア232と、前記レール222に沿って延在するラック状のギア233とが常に噛合しており、前記第1送り装置223は、該第1モータ231の駆動によって前記溶接ユニット217の下部を往復移動する。
【0048】
前記第2送り装置224は、前記レール222,222上を移動する第2移動フレーム234上に、前記第2搬送コンベヤ212を挟んだ対向位置に支柱235,235が立設され、この支柱235,235から水平後方へ延出した水平杆235aの先端にクランプ部材236が配設されている。そして、前記第2移動フレーム234上に配設された第2モータ237のギア238と、前記レール222に沿って延在するラック状のギア233とが常に噛合しており、前記第2送り装置224は、該第2モータ237の駆動によって前記溶接ユニット217の下流端部と、第2搬送コンベヤ212の略中央部との間を往復移動するようになっている。なお第1搬送コンベヤ211には、基準側固定ガイド239と、この基準側固定ガイド239に対して近接・離間し得る巾決めガイド240とが配設されており、溶接ユニット217による溶接工程時にリブ付き鉄板208の幅方向への位置決めをなすようになっている。また第1搬送コンベヤ211における前記溶接ユニット217の中央下部に相当する位置には、該コンベヤ211の上方へ垂直に突出する突上棒241が配設されており、溶接ユニット217の下方で停止した鉄板208の上流部および下流部を前記押圧装置221,221で上方から押圧すると共に、該鉄板208の中央下面を該突上棒241で下から押圧することにより、該鉄板208に所要の反り(「むくり」という)を与えるようになっている。すなわちデッキDは、図60(b)に示す如く、建築構造体の所定位置に配設すると自重で長手方向の中央部が下方へ撓んでしまうので、鉄板208を中央を予め上方へ反らせた状態でトラス筋130を溶接することにより、所定位置に配設した際に適宜撓んで略水平状態となる。更に、鉄板−トラス筋スポット溶接機18の下流には、図1に示すように、短辺矯正機269が配設してあり、リブ付き鉄板208の幅方向への反りや曲がり等を矯正するようになっている。
【0049】
(端部材スポット溶接機について)
図44は、端部材スポット溶接機(端部材溶接機)19を概略で示す正面図であり、リブ付き鉄板208に溶接されたトラス筋130の両端部を補強するために、図46に示すように、別途加工成形されたV字形の端部材242をセットして、該端部材242とトラス筋130、該端部材242とリブ付き鉄板208のリブ209a,209bとを溶接するためのものである。この端部材スポット溶接機19は、搬送コンベヤ243の下流端側にフレーム244に固定された第1溶接ユニット245と、該フレーム244に水平に延在するレール246上をコンベヤ243の上流端側と下流端側との間で移動可能に配設される第2溶接ユニット247とから構成されている。これら第1溶接ユニット245と第2溶接ユニット247とは、各構成部材の配設方向が対称的になっているものの、その基本構成は同一であるので、該第2溶接ユニット247のみを説明し、第1溶接ユニット245については、同一の符号を付して説明は省略する。なお、前記フレーム244の下流側における所要位置には、図44に示すようにストッパ装置248が配設されており、搬送コンベヤ243で搬送されたリブ付き鉄板208を所定位置で停止させ得るようになっている。
【0050】
前記第2溶接ユニット247は、図44に示すように、端部材242をトラス筋130の端部にセットする端部材ローダ部249と、セットされた端部材242をトラス筋130およびリブ付き鉄板208に溶接する端部材溶接部250とから構成されている。この端部材ローダ部249は、傾動可能に配設されて端部材成形機(図示せず)で別途加工成形された前記端部材242を直列状態でストックする3列のストック板251と、これらストック板251から仮置台253に該端部材242を移載するローダチャック252と、前後進可能な前記仮置台253と、この仮置台253に載置された端部材242をトラス筋130の端部にセットするチャックスタンド254とから構成されている。
【0051】
前記端部材溶接部250は、図45に示すように、架台255の上部内側に搬送ラインに対する直交方向へ水平に延在するレール256に懸吊支持され、スライドシリンダ258により該レール256に沿って移動可能な移動フレーム257の下方に、ダブルピンチャーガン259とコンタクトガン260およびスタッドガン261が配設されている。ダブルピンチャーガン259には、前記移動フレーム257に配設された第1昇降シリンダ263のロッド263a先端で水平にスライドするスライドシリンダ264の下部に、所要の傾斜角度で取付けられており、その先端部に2個の電極262が所要間隔をおいて並設されている。すなわち、前記第1昇降シリンダ263およびスライドシリンダ264を適宜制御することにより、ダブルピンチャーガン259は図45に2点鎖線で示すように、電極262を端部材242の下端部242bとリブ付き鉄板208のリブ209a(209b)に接触するように設定されており、所謂「ダイレクト溶接方式」を利用して該下端部242bとリブ209a(209b)とを溶接するようになっている。
【0052】
前記コンタクトガン260は、前記移動フレーム257に配設された第2昇降シリンダ265のロッド265a先端に、所要角度を付した垂下状態で配設されており、該第2昇降シリンダ265をロッド265aが前進するよう制御することにより、先端の電極266がトラス筋130の端部130aに接触するよう設定されている。また前記スタッドガン261は、前記移動フレーム257に配設された第3昇降シリンダ267のロッド267a先端に垂下状態に配設され、該第3昇降シリンダ267をロッド267aが前進するよう制御することにより、先端の電極268が端部材242の上端242aに当接するよう設定されている。すなわち、前記第2昇降シリンダ265および第3昇降シリンダ267とを適宜制御して、コンタクトガン260の電極266およびスタッドガン261の電極268とを、トラス筋130の端部130aおよび端部材242の上端242aに接触させることにより、所謂「インダイレクト溶接方式」を利用して該トラス筋130と端部材242とを溶接するようになっている。
【0053】
(滑止め部材スポット溶接機について)
図47は、滑止めスポット溶接機(滑止め溶接機)20を概略で示す正面図であり、リブ付き鉄板208の両端部に、図49に示すように別途曲折成形されたL字形の滑止め部材270をセットして溶接するためのものである。この滑止めスポット溶接機20は、搬送コンベヤ271の下流端側にフレーム272に固定された第1溶接ユニット273と、該フレーム272に水平に延在するレール274上を搬送コンベヤ271の上流端側と下流端側との間で移動可能に配設される第2溶接ユニット275とから構成されている。これら第1溶接ユニット273と第2溶接ユニット275とは、各構成部材の配設方向が対称的になっているものの、その基本構成は同一であるので、該第2溶接ユニット275のみを説明し、第1溶接ユニット273については、同一の符号を付して説明は省略する。
【0054】
前記第2溶接ユニット275は、図48に示すように、前記レール274上を移動する移動フレーム276に支軸277を介して回動可能な溶接機本体278が配設されており、この溶接機本体278は、前記移動フレーム276に固定された流体圧シリンダ279のロッド279aに連結されて、鉛直状態と所要角度の傾斜状態との間で揺動可能となっている。この溶接機本体278には、垂直下方へ立設した上部電極280と、コ字形アーム282を介して垂直上方へ立設した下部電極281とが、同一軸線上に配設されており、図示しない駆動手段より、互いに近接および離間が可能となっている。
【0055】
前記滑止め部材270は、図示しないパーツフィーダにより、リブ付き鉄板208の前後端部の所要位置に位置決めセットされ、この状態で前記流体圧シリンダ279をロッド279aが後退する方向へ制御することにより、前記溶接機本体278が鉛直状態に回動変位し、上下の電極280,281が滑止め部材270の上下に位置するようになる。この状態で、上下の電極280,281を互いに近接移動させ、滑止め部材270およびリブ付き鉄板208に接触させて通電することにより、該滑止め部材270がリブ付き鉄板208に溶接される。
【0056】
なお、前記滑止め部材270の装着を必要としないデッキDに関しては、この滑止めスポット溶接機20を通過するように制御される。
【0057】
(スリッタについて)
図50は、スリッタ21を概略で示す正面図であって、このスリッタ21は、搬送されてくるデッキDのリブ付き鉄板208を任意の位置で切断して、幅寸法の異なるデッキDを製作する際に使用に供されるものであるが、この切断加工を必要としないデッキDはそのまま通過するようになっている。上下に切断刃285,286を備えたスリッタ21は、架台287に固定されて前記滑止めスポット溶接機20に接続した上流側の第1搬送コンベヤ288と、架台289に固定されて後述の検査ステーション12に接続する下流側の第2搬送コンベヤ290との間に位置して、ベース体291に対して搬送ラインと直交する方向へスライド移動が可能に配設されている。また、前記第1搬送コンベヤ288の中間部および第2搬送コンベヤ290の下流端部には、タイミングベルト293,293を介してモータ294に連繋した駆動ローラ292が配設されており、デッキDのリブ付き鉄板208は、これら駆動ローラ292と自在回転可能に配設された案内ローラ295との間に挟圧されながら搬送される。
【0058】
前記スリッタ21は、図50および図51に示すように、図示しない駆動手段により前記ベース体291にスライド移動が可能な矩形枠体状のフレーム296に前記切断刃285,286が配設され、このフレーム296の内部をデッキDが通過するようになっている。下切断刃286は、前記フレーム296に固定された下支持台297に軸支された回転軸298の端部に装着され、該回転軸298に連繋したモータ299より回転するようになっている。また上切断刃285は、流体圧シリンダ301により前記フレーム296に対して昇降可能な上支持台300に軸支された回転軸302の端部に固定され、自在回転が可能に配設されている。また上切断刃285は、ハンドル303を回動操作することにより、前記下切断刃286に対する配設位置を微調整し得るようになっている。なお上支持台300には、所要の傾斜角度が付されている。
【0059】
前述のように構成されたスリッタ21を、図示しない駆動手段で所要位置にスライド移動させて固定すると、上下の切断刃285,286が給送ラインに臨むようになるので、第1搬送コンベヤ288上を幅方向への位置決めがなされた状態で搬送されるデッキDのリブ付き鉄板208が、所定位置で切断されながら第2搬送コンベヤ290側へ送られる。
【0060】
(検査ステーションについて)
図52は、前記スリッタ21の下流側に配設された検査ステーション12および搬出ステーション13の一部を概略で示す平面図であって、この検査ステーション12には、残材払出し装置306および検査台307等が配設されている。搬送コンベヤ308の上流端(図52における左側)は、前記スリッタ21における第2搬送コンベヤ290の下流端に接続しており、全ての工程を終了した各デッキDは、この搬送コンベヤ308に搬送されてストッパ309に当接した状態で停止する。またこの搬送コンベヤ308には、所要間隔毎に位置した5本のベルト体からなるクロスコンベヤ310が直交した状態で配設されていると共に、図53に示すように、該搬送コンベヤ308は図示しない昇降装置により上下動するようになっている。すなわち搬送コンベヤ308は、その上昇時においては前記クロスコンベヤ310より上方に延出すると共に、下降時においては該クロスコンベヤ310より下方へ退避するようになっている。従って、上流側から搬送されるデッキDは、上昇位置に延出した前記搬送コンベヤ308上を移動して停止し、その後に該搬送コンベヤ308が下降することによりクロスコンベヤ310上に載置された状態となる。
【0061】
(クロスコンベヤについて)
前記クロスコンベヤ310は、前記搬送コンベヤ308の両側に配設された検査台307および後述の反転機22との間に延在した状態に配設されており、搬送コンベヤ308から移載されたデッキDを、前記検査台307または反転機22側へ適宜選択的に移送するためのものである。すなわち、デッキDの検査をする場合には、前記クロスコンベヤ310を検査台307側へ回転駆動させ、当該デッキDを該検査台307側へ移動して所要の検査をし、検査終了後にクロスコンベヤ310を前と逆方向へ回転駆動させれば、デッキDは反転機22側へ給送される。また、デッキDの検査をしない場合には、クロスコンベヤ310を反転機22側へ回転駆動させて、デッキDを直接該反転機22側へ移送する。なお検査台307には、完成したデッキDの寸法や、鉄板208とトラス筋130との溶接状態、ラチス筋76と上端筋40との溶接状態等を検査するための各種機器が設備されている。
【0062】
(残材払出し装置について)
前記搬送コンベヤ308の上方に配設される残材払出し装置306には、図52および図53に示すように、前記スリッタ21により切断加工されたデッキDを掛止するデッキ退避機構311が具備されている。すなわち、このデッキ退避機構311は、製品としてのデッキDを掛止チャック312によって掛止して上昇させることで、クロスコンベヤ310上に載置されたままの残材を、該クロスコンベヤ310の回転駆動下に、前記検査台307の側方に配設されたパレット313へ払出し得るようにするものである。なお、残材の払出し後は、掛止した前記デッキDを再びクロスコンベヤ310上へ載置させる。
【0063】
(搬出ステーションについて)
前記搬出ステーション13は、図1および図52に示すように、前記反転機22,デッキ移載装置324および梱包機23等から構成されており、前記検査ステーション12を通過したデッキDを、適宜段積みした状態で梱包した後に完成品ストックヤードへ搬出する。
【0064】
(反転機について)
図54は、前記反転機22を概略で示す側面図であって、図52および図53に示すように、前記クロスコンベヤ310の側方に配設されている。この反転機22は、前記クロスコンベヤ310から給送されたデッキDを、必要に応じて表裏反転するための装置で、支柱315,315間に回動可能に架設されてタイミングベルト319を介してモータ320に連繋した回動軸316と、この回動軸316に固定されて該回動軸316の軸方向と直交した方向へ延出した複数の旋回棒317と、反転されたデッキDを載置する載置台318とから基本的に構成されている。すなわち旋回棒317は、前記回動軸316に連繋したモータ320を駆動制御することにより、前記クロスコンベヤ310側へ水平に延出した第1姿勢と、前記載置台318の上方へ水平に延出した第2姿勢との間を旋回するようになっており、クロスコンベヤ310の下流端で一時停止したデッキDを、表裏反転させた状態で載置台318に移載することができる。
【0065】
前記旋回棒317には、図54に示すように、電磁石または空気の吸引ノズル等の吸着装置321が具備されており、デッキDを適宜吸着保持した状態で反転するようになっている。なお反転機22の側方には、図52または図54に示すように、インクジェットプリンタ322が配設されており、クロスコンベヤ310の下流端に停止しているデッキDにおけるリブ付き鉄板208の所要位置に、デッキNOや納入先および配設位置等の各種情報データを印刷するようになっている。
【0066】
(デッキ移載装置について)
デッキ移載装置324は、図53に示すように、前記クロスコンベヤ310の下流端で停止した完成デッキDまたは前記反転機22で反転された完成デッキDを、該反転機22の側方に延在する搬出コンベヤ325に移載して、順次段積みするためのものである。前記反転機22の上方と搬出コンベヤ325の上方間には、水平かつ平行に延在する固定フレーム326,326が配設され、この固定フレーム326,326の上面に敷設されたレール327上には、図示しない駆動手段により往復動自在な移動フレーム328が配設されている。この移動フレーム328には、流体圧シリンダ329により上下動可能な昇降杆330が配設され、この昇降杆330の下部にデッキDを掛止保持するための第1掛止部331および第2掛止部332が配設されている。
【0067】
前記第1掛止部331は、図53および図55に示すように、前記クロスコンベヤ310の下流端に停止しているデッキD、すなわち前記反転機22により反転されないデッキDを掛止するためのものである。この第1掛止部331は、前記昇降杆330に配設された第1昇降シリンダ333のロッド333aに垂下状態に配設された支持板334,334間に支持軸335が架設され、この支持軸335に回動可能に枢支された掛止チャック336,336の各上端が、流体圧シリンダ337のボトム側337bおよびロッド337aに夫々連結されて構成されている。すなわち、流体圧シリンダ337をロッド337aが前進するように制御すると、各把持チャック336,336の下端同志が互いに近接するようになるので、図55(a)に示すように、トラス筋130における上端筋40を掛止した状態でデッキDを引上げることが可能となる。
【0068】
前記第2掛止部332は、図53および図56に示すように、前記反転機22の載置台318に反転された状態で載置されたデッキDを掛止するためのものである。この第2掛止部332は、前記昇降杆330に配設された第2昇降シリンダ338のロッド338aに懸吊された支持体339の前後に、シリンダ340によりスライド移動する第1掛止爪341と、シリンダ342により回動する第2掛止爪343とが配設されている。すなわち、これらシリンダ340,342を適宜制御することにより、各掛止爪341,343が反転したデッキDにおけるリブ付き鉄板208の両側端部に係止し、該デッキDを引上げることが可能となる。
【0069】
従って、このように構成したデッキ移載装置324では、先ずクロスコンベヤ310の下流端に停止した反転していないデッキDを、第1掛止部331で掛止して搬出コンベヤ325上へ移載する。そして、クロスコンベヤ310に給送されてきた次のデッキDが、反転機22により反転されて載置台318への載置が完了すると、反転された当該のデッキDを、第2掛止部332で掛止して搬出コンベヤ325上に移載されている前記デッキDの上方に載置する。これらの動作を反復することにより、図53に示すように、複数のデッキDを搬出コンベヤ325上に段積み状態で載置することができる。なお、図55(b)に示すように、第1掛止部331が作動する際は、第2掛止部332は上昇してデッキDとの干渉が防止されると共に、図56(b)に示すように、第2掛止部332が作動する際は、第1掛止部331は上昇してデッキDとの干渉が防止されるようになっている。
【0070】
前記搬出コンベヤ325の下流側には、図1に示すように、既知の梱包機23が配設されており、段積み状態で搬送されたデッキDにバンド掛けを行なって梱包するようになっている。
【0071】
【実施例の作用】
製品としてのデッキDは、全長および全幅およびトラス筋の高さの各寸法が異なる複数種類に形成されるが、寸法が異なってもその基本構成は同一であって、図59に示すように、幅方向に所要間隔で離間したリブ209a,209bを形成したリブ付き鉄板208と、各リブ209a,209b間に配設されるトラス筋130から構成され、この各トラス筋130は上端筋40とラチス筋76とから構成されている。また、リブ付き鉄板208に取着されたトラス筋130の両側端部にはV字形の端部材242が溶接され、必要に応じて該鉄板208の両側端部には滑止め部材270を溶接したり、リブ付き鉄板208を切断して幅寸法の異なるデッキDも製造される。前述のように構成された製造装置に係るデッキ製造組立ライン9は、前記デッキDの製造および組立てを完全自動化したものであるから、次にこのデッキ製造組立ライン9により実施される本発明に係る建物構造体におけるスラブ用デッキの製造方法につき、図58および図59をもとに説明する。
【0072】
(上端筋の成形および給材)
上端筋40は、図2〜図9に示すように、投入コンベヤ26,上端筋切断機27,引出コンベヤ28,上端筋搬送装置29および上端筋搬送コンベヤ30等から構成される上端筋給材部14から給材される。すなわち、投入コンベヤ26および引出コンベヤ28の回転駆動下に、線材ストッカから取出した10本の鉄筋(線材)25を、該投入コンベヤ26の上流側から並列した状態で投入し、上端筋切断機27の鉄筋整列部32を介して引出コンベヤ28へ送り込む。引出コンベヤ28に前進した各鉄筋25は、投入作業に先立って所定位置に移動調整して停止保持させたバックゲージ38の当接板39に当接して停止する。そして、前記上端筋切断機27を駆動制御して切断刃具35を下降移動することにより、各鉄筋25を鉄筋整列部32において切断し、所要長の上端筋40を成形する。切断して得られた各上端筋40は、引出コンベヤ28に配設した上端筋払出し機構41の作動下に、該引出コンベヤ28の側方に配設した上端筋搬送装置29の上端筋移載部47へ払い出す。なお、上端筋40の長さを変更する場合は、前記バックゲージ38を所定位置へ移動して、当接板39と切断刃具35の距離を変位させればよい。
【0073】
前記上端筋搬送装置29では、前記引出コンベヤ28から払い出した上端筋40を、上端筋移載部47における第1載置板50,50および第2載置板54において一時的にストックし、適宜タイミングでストックした上端筋40のうちの3本ずつを載置台56へ載置する。この載置台56に載置した3本の上端筋40を、上端筋搬送部48における把持チャック59a,59b,59cで1本ずつ同時に把持し、第1把持チャック59aで把持した上端筋40を第1上端筋搬送コンベヤ30Aへ移載し、第2把持チャック59bで把持した上端筋40を第2上端筋搬送コンベヤ30Bへ移載すると共に、第3把持チャック59cで把持した上端筋40を第3上端筋搬送コンベヤ30Cへ移載する。
【0074】
上端筋搬送コンベヤ30Aに移載した上端筋40は、該コンベヤ30Aの回転駆動下に、下流側に配設した上端筋・ラチス筋搬送コンベヤ110Aへ移載され、ストッパ124により所定位置で停止して待機する。また、上端筋搬送コンベヤ30Bに移載した上端筋40は、該コンベヤ30Bの駆動下に下流側に配設した上端筋・ラチス筋搬送コンベヤ110Bへ移載され、ストッパ124により所定位置で停止して待機すると共に、上端筋搬送コンベヤ30Cに移載した上端筋40は、該コンベヤ30Cの駆動下に下流側に配設した上端筋・ラチス筋搬送コンベヤ110Cへ移載され、ストッパ124により所定位置で停止して待機する。
【0075】
(ラチス筋の成形および給材)
ラチス筋76は、図10〜図17に示すように、自動線台71の鉄筋供給方向の下流側に配設されたラチス筋自動成形機72と、この成形機72の下流側に配設されたラチス筋搬送コンベヤ73とで形成される合計3組のラチス筋成形ライン70A,70B,70Cと、各ラチス筋搬送コンベヤ73A,73B,73Cの下流側に配設されたラチス筋搬送装置74とから構成されたラチス筋給材部15で3本同時に成形および給材される。すなわち、第1ラチス筋成形ライン70Aでは、自動線台71から引出された線材75を、ラチス筋自動成形機72で順次折曲加工して所要長のラチス筋76を成形し、第1ラチス筋搬送コンベヤ73Aでラチス筋搬送装置74側へ搬送する。また第2ラチス筋成形ライン70Bでは、別の自動線台71から引出された線材75を、ラチス筋自動成形機72で順次折曲加工して所要長のラチス筋76を成形し、第2ラチス筋搬送コンベヤ73Bでラチス筋搬送装置74側へ搬送する。更に第3ラチス筋成形ライン70Cでは、別の自動線台71から引出された線材75を、ラチス筋自動成形機72で順次折曲加工して所要長のラチス筋76を成形し、第3ラチス筋搬送コンベヤ73Cでラチス筋搬送装置74側へ搬送する。
【0076】
各ラチス筋搬送コンベヤ73A,73B,73Cでは、搬送されたラチス筋76を、ラチス筋払出し機構92の作動下にラチス筋保持部93へ移載し、更にこのラチス筋保持部93では、第1掛止部96aに掛止された該ラチス筋76を、シリンダシリンダ97の作動下に第2掛止部96bへ移載する。そして、各ラチス筋搬送コンベヤ73A,73B,73Cの第2掛止部96bに掛止されたラチス筋76を、ラチス筋搬送装置74における各移載部104A,104B,104Cの掛止チャック103で掛止保持し、前記上端筋・ラチス筋搬送コンベヤ110A,110B,110Cへ移載する。すなわち、第1移載部104Aの掛止チャック103で掛止したラチス筋76は、第1上端筋・ラチス筋搬送コンベヤ110Aに待機している上端筋40へ載置し、第2移載部104Bの掛止チャック103で掛止したラチス筋76は、第2上端筋・ラチス筋搬送コンベヤ110Bに待機している上端筋40へ載置すると共に、第3移載部104Cの掛止チャック103で掛止したラチス筋76は、第3上端筋・ラチス筋搬送コンベヤ110Cに待機している上端筋40へ載置する。
【0077】
(上端筋とラチス筋とのスポット溶接および屈曲成形)
前記各上端筋・ラチス筋搬送コンベヤ110A,110B,110Cに移載した各上端筋40およびラチス筋76は、図18〜図20に示すように、ローラ113および送りローラ114をモータ111およびモータ122で回転駆動することにより、各トラス筋自動成形機17A,17B,17Cへ搬送する。
【0078】
各トラス筋自動成形機17A,17B,17Cでは、図21〜図27に示すように、搬送ラインの下方に配設したフリーローラ142を上昇させて搬送する上端筋40およびラチス筋76を案内し、該上端筋40およびラチス筋76が所定位置に停止したら該フリーローラ142を下降させ、チャック157で保持すると共にラチス筋押え144,144を近接して保持する。次に図24に示す如く、ガイドレール140Aおよびガイドレール140Bを相互に離間させると共に、第2屈曲機構150を作動させて第2押圧部材155を搬送ラインを越えて移動させることにより、ラチス筋76をガイドレール140A側へ傾斜させ、この状態で該ラチス筋76を保持する。そして溶接工程として、所定位置に停止した上端筋40およびラチス筋76に対し、溶接ユニット133における第1電極147と第2電極148とを相互に近接することにより、該上端筋40とラチス筋76の第2曲折部76bを接合する。またこの溶接工程と同時に行なう屈曲工程として、屈曲ユニット134における第1屈曲機構149を作動することにより、前記第2屈曲機構150の第2押圧部材155に保持された第1曲折部76aはその位置に固定されると共に、第1屈曲機構149の第1押圧部材152に押圧された第1曲折部76aが搬送ラインを越えて反対側へ変形し、この結果として該ラチス筋76を千鳥状に拡開成形する。前記溶接工程および屈曲工程を数回行なって成形が完了した各トラス筋130は、夫々の払出部132で上下反転した状態でトラス筋掛止台158に掛止された後に、エレべータ160で上昇移動する。
【0079】
各トラス筋自動成形機17A,17B,17Cで成形された後に、エレベータ160で上昇移動して待機している各トラス筋130は、図28に示すように、第1トラス筋搬送装置165における3基の把持チャック169a,169b,169cで順次把持され、ピッチ送りシャトル170における保持溝171a,171b,171cに移載される。すなわち、第1把持チャック169aは第1トラス筋自動成形機17Aで形成したトラス筋130を把持し、第2把持チャック169bは第2トラス筋自動成形機17Bで形成したトラス筋130を把持すると共に、第3把持チャック169cは第3トラス筋自動成形機17Cで形成したトラス筋130を把持する。
【0080】
ピッチ送りシャトル170における第1載置台171の第1保持溝171a,第2保持溝171bおよび第3保持溝171cに移載したトラス筋130は、図29〜図32に示すように、第2載置台172の上下動および往復動のもとに、第4保持溝171d,第5保持溝171eおよび第6保持溝171fヘ移載され、更に第7保持溝171g,第8保持溝171hおよび第9保持溝171iへ順次移載される。この第7保持溝171g,第8保持溝171hおよび第9保持溝171iへ載置したトラス筋130は、昇降台173の上昇移動下に、各保持部材185に載置された状態で上昇する。
【0081】
(リブ付き鉄板の成形および給材)
また図40に示すように、アンコイラ204から給材される鉄板を、下流に配設したロール成形機205で3対のリブ209a,209bを有するリブ付き鉄板208として成形し、アキュームコンベヤ206およびリブ付き鉄板搬送コンベヤ207により、前記リブ付き鉄板208を前記第2トラス筋搬送装置186の下方における所定位置に搬送し、トラス筋130の装着セットのために待機させる。
【0082】
一方、前記ピッチ送りシャトル170の昇降台173に載置されて上昇した3本のトラス筋130を、図33〜図39に示すように、第2トラス筋搬送装置186における3列のトラス筋把持部193で同時に把持し、前記リブ付き鉄板208へ移載する。この第2トラス筋搬送装置186は、ラチス筋76を千鳥状に成形した各トラス筋130を、各トラス筋把持部193で側方から押圧して弾性変形させた状態で把持し、リブ付き鉄板208における各リブ209a,209b間に到来させた後に押圧を解除することで、トラス筋130の復元力を利用して該トラス筋130とリブ付き鉄板208とを弾力的に固定した状態に保持させる。
【0083】
(鉄板とトラス筋とのスポット溶接)
リブ付き鉄板208に対する3本のトラス筋130の弾力的な固定が完了したら、該リブ付き鉄板208を鉄板−トラス筋スポット溶接機18へ搬送する。この鉄板−トラス筋スポット溶接機18では、図42および図43に示すように、先ず第1送り装置223を第1搬送コンベヤ211の上流側へ移動させ、上流から搬送されてくるリブ付き鉄板208の前端部をクランプ部材229でクランプした後に、該第1送り装置223を下流側へ移動させてリブ付き鉄板208を溶接ユニット部217の下方に位置決めする。また、押圧装置211,211により鉄板208の上流部および下流部における上面を上方から押圧すると共に、突上棒241により該鉄板208の中央部下面を下方から押圧して、該鉄板208に所定の反りを与える。そして、流体圧シリンダ216を制御して溶接ユニット217を下降移動させ、各溶接ガン218の電極219,219をラチス筋76の第1曲折部76aとリブ209a,209bとに夫々接触させ、通電することで該第1曲折部76aとリブ209a,209bとを溶接する。そして、この溶接作業が完了したら溶接ユニット217を上昇移動させ、第2送り装置224のクランプ部材236で鉄板208の側端部をクランプすると共に前記第1送り装置223を下降させ、該第2送り装置236を第2搬送コンベヤ212の下流側へ移動させて鉄板208を所要距離だけ搬送した後に、再び前記溶接ユニット217を下降移動させて前述同様の溶接作業を行なう。これを数回反復することにより、ラチス筋76の全ての第1曲折部76aとリブ209a,209bとの溶接が完了する。
【0084】
(端部材のスポット溶接)
前記鉄板208と各トラス筋130のスポット溶接が完了したデッキDは、鉄板−トラス筋筋スポット溶接機18の下流側に配設した端部材スポット溶接機19へ搬送される。この端部材スポット溶接機19では、図44〜図46に示すように、ストッパ装置248により搬送コンベヤ243上の所定位置にデッキDを停止させる。次に、第2溶接ユニット247を所定位置まで移動させると共に、第1溶接ユニット245および該第2溶接ユニット247のストック板251に、別途成形した端部材242をセットしておく。そして、各溶接ユニット245,247における端部材ローダ部249を駆動することにより、ストック板251にセットされた端部材242を、ローダチャック252で仮置台253に載置した後に、チャックスタンド254により各トラス筋130の端部にセットする。
【0085】
次に、第1昇降シリンダ263およびスライドシリンダ264を適宜制御して、ダブルピンチャーガン259の電極262を端部材242の下端部242bとリブ付き鉄板208のリブ209a(209b)に接触させて通電することにより、該下端部242bとリブ209a(209b)とを溶接する。また、第2昇降シリンダ265および第3昇降シリンダ267とを適宜制御して、コンタクトガン260の電極266およびスタッドガン261の電極268とを、トラス筋130の端部130aおよび端部材242の上端242aに接触させて通電することにより、該トラス筋130と端部材242とを溶接する。なお、図1および図57に示すように、端部材スポット溶接機18の上流端に短辺矯正機269が配設されており、前記端部材242の溶接に先立って、デッキDにおける鉄板208の幅方向の反りを矯正するようになっている。
【0086】
(滑止め部材のスポット溶接)
前記端部材242のスポット溶接が完了したデッキDにおいて、滑止め部材270を取着するものは、前記端部材スポット溶接機19の下流側に配設した滑止めスポット溶接機20へ搬送される。この滑止めスポット溶接機20では、図47〜図49に示すように、図示しないストッパ装置により搬送コンベヤ271上の所定位置にデッキDを停止させる。そして、第2溶接ユニット275を所定位置まで移動させると共に、第1溶接ユニット273および該第2溶接ユニット275に配設した図示しないパーツフィーダにより、リブ付き鉄板208の端部所要位置に滑止め部材270をセットする。
【0087】
次に、流体圧シリンダ279をロッド279aが後退する方向へ制御して、溶接機本体278を鉛直状態に回動変位させ、上下の電極280,281を滑止め部材270の上下に位置させる。そして、上下の電極280,281を互いに近接移動させ、滑止め部材270およびリブ付き鉄板208に接触した状態で通電することにより、該滑止め部材270をリブ付き鉄板208に溶接する。なお、この滑止め部材270の装着を必要としないデッキDは、この滑止めスポット溶接機20を通過するよう制御する。
【0088】
(デッキの切断)
リブ付き鉄板208を切断加工をするデッキDは、前記滑止めスポット溶接機20の下流側に配設したスリッタ21へ搬送される。このスリッタ21では、図50および図51に示すように、搬送されてくるデッキDのリブ付き鉄板208を任意の位置で切断して、幅寸法の異なるデッキDを製作する。すなわち、フレーム296を図示しない駆動手段によりスライド移動させ、上下の切断刃285,286を給送ラインの所要位置に臨ませれば、第1搬送コンベヤ288上を幅方向への位置決めがなされた状態で搬送されるデッキDのリブ付き鉄板208が、所定位置で切断されながら第2搬送コンベヤ290側へ送られる。なお、スリッタ21による切断加工を行わないデッキDは、当該デッキDの通過に際しては前記切断刃285,286を搬送ラインから退避させる。
【0089】
(検査および搬出)
前記スリッタ21を通過した滑止め部材付きのデッキDおよび前記滑止めスポット溶接機20を通過して切断加工されたデッキDは、図52〜図56に示すように、共に搬送コンベヤ308に搬送されてストッパ309に当接した状態で停止した後、該搬送コンベヤ308と直交したクロスコンベヤ310に移載させる。そして、搬送されたデッキDを検査する場合には、クロスコンベヤ310で該デッキDを検査台307側へ移動させる。検査後のデッキDおよび検査をしないデッキDは、前記クロスコンベヤ310を回転駆動させて、反転機22側へ搬送する。
【0090】
なお、前記スリッタ21により切断加工したデッキDに関しては、残材と共に前記搬送コンベヤ308に搬送されて停止した後に、残材払出し装置306の掛止チャック312で掛止して上昇させる。次に、クロスコンベヤ310上に載置されたままの残材を、該クロスコンベヤ310の回転駆動下に、前記検査台307の側方に配設されたパレット313へ払い出す。そして掛止した前記デッキDは、残材の払出しの完了後に、再びクロスコンベヤ310上へ載置して、反転機22側へ搬送する。
【0091】
前記デッキDが、クロスコンベヤ310の下流側に一時的に停止すると、該クロスコンベヤ310の側方に配設したインクジェットプリンタ322により、リブ付き鉄板208の所要位置に、デッキNOや納入先および配置位置等の各種情報データを印刷する。
【0092】
前記インクジェット322による所定の印刷が完了したら、デッキ移載装置324の第1掛止部331および第2掛止部332でデッキDを掛止し、搬出コンベヤ325へ移動する。すなわち、クロスコンベヤ310により最初に搬送されてきたデッキDは、反転機22による反転操作をせずに前記第1掛止部331で掛止し、前記搬出コンベヤ325へ移載する。そして、前記クロスコンベヤ310により搬送されてきた2番目のデッキDは、前記反転機22により表裏反転して載置台318に反転状態で載置し、このデッキDを前記第2掛止部332で掛止して前記搬出コンベヤ325に載置した最初のデッキDの上に重ねた状態に載置する。次に、前記クロスコンベヤ310により搬送されてきた3番目のデッキDは、反転機22による反転操作をせずに前記第1掛止部331で掛止し、前記搬出コンベヤ325に載置した2番目のデッキDの上に重ねた状態に載置する。更に、前記クロスコンベヤ310により搬送されてきた4番目のデッキDは、前記反転機22により表裏反転して載置台318に反転状態で載置し、このデッキDを前記第2掛止部332で掛止して前記搬出コンベヤ325に載置した3番目のデッキDの上に重ねた状態に載置する。前述の工程を繰返すことにより、デッキDを表裏交互に段積みすることができる。
【0093】
前記搬出コンベヤ325上に段積みした所定数のデッキDは、該搬出コンベヤ325の下流側に配設した梱包機23に送り、所要のバンド掛けを行なって梱包した後に、完成品ストックヤードへ搬出する。
【0094】
【発明の効果】
以上に説明した如く、本発明に係る建物構造体におけるスラブ用デッキの製造方法によれば、デッキの基本構成部材である上端筋,ラチス筋およびリブ付き鉄板の各部材の成形工程を完全に自動的に行なうことができ、更に上端筋とラチス筋の溶接工程,形成されたトラス筋の屈曲工程,トラス筋とリブ付き鉄板の溶接工程および端部材等の各種付属部品の溶接工程等に関しても自動的に行ない得るようになった。従って、デッキの製造に係る生産コストの低減を図り得ると共に、各種サイズのデッキを正確かつ迅速に製造することができ、建設現場の工事進行にフレキシブルに対応し得る極めて有益な効果を奏する。
【0095】
また、本発明に係る建物構造体におけるスラブ用デッキの製造装置によれば、デッキの基本構成部材である上端筋,ラチス筋およびリブ付き鉄板の各部材の成形工程を完全自動化することはもとより、上端筋とラチス筋の溶接工程,形成されたトラス筋の屈曲工程,トラス筋とリブ付き鉄板の溶接工程および端部材等の各種付属部品の溶接工程等の完全な自動化が可能となった。しかも完全自動化により、高品質のデッキを製造し得ると共に不良品の発生等を含む品質のばらつき等が解消され、更には寸法の異なるデッキも容易に対応して製造し得る等の利点もある。
【図面の簡単な説明】
【図1】本発明の好適な実施例に係る建物構造体におけるスラブ用デッキの製造装置の概略構成図である。
【図2】実施例のデッキの製造装置において、上端筋給材部における投入コンベヤ,上端筋切断機および引出コンベヤを概略で示す平面図である。
【図3】上端筋切断機を概略で示す側面図である。
【図4】引出コンベヤに配設された上端筋払出し機構を示す側面図である。
【図5】上端筋払出し機構が作動して上端筋を押上げ、傾動した揺動板から上端筋が払い出される状態を示す説明図である。
【図6】上端筋搬送装置の平面図である。
【図7】上端筋搬送装置の側面図である。
【図8】上端筋搬送装置における上端筋移載部の構成を概略で示す側面図である。
【図9】上端筋搬送装置における上端筋搬送部の把持チャックを概略で示す側面図および正面図である。
【図10】ラチス筋給材部における自動線台,ラチス筋自動成形機,ラチス筋搬送コンベヤおよびラチス筋搬送装置を概略で示す平面図である。
【図11】ラチス筋自動成形機の概略構成図である。
【図12】ラチス筋搬送装置の平面図である。
【図13】ラチス筋搬送装置の側面図である。
【図14】ラチス筋搬送装置の正面図である。
【図15】ラチス筋搬送コンベヤに配設されたラチス筋払出し機構およびラチス筋保持部を示す側面図である。
【図16】ラチス筋搬送コンベヤに配設されたラチス筋払出し機構およびラチス筋保持部を示す平面図である。
【図17】ラチス筋搬送装置における各移載部の掛止チャックを概略で示す側面図および正面図である。
【図18】上端筋・ラチス筋搬送コンベヤ上にラチス筋を移載する状態を示す説明図である。
【図19】上端筋・ラチス筋搬送コンベヤの側面図である。
【図20】上端筋・ラチス筋搬送コンベヤの下流端に配設した送りローラ部の側面図である。
【図21】トラス筋自動成形機の成形部を概略で示す側面図である。
【図22】トラス筋自動成形機の成形部を概略で示す平面図である。
【図23】トラス筋自動成形機における成形部に配設した溶接ユニットを作動状態で示す説明図である。
【図24】トラス筋自動成形機における成形部を、溶接ユニットの作動状態で示す側面図である。
【図25】トラス筋自動成形機における成形部を、屈曲ユニットの作動状態で示す側面図である。
【図26】トラス筋自動成形機の払出部を概略で示す平面図である。
【図27】トラス筋自動成形機の払出部を概略で示す側面図である。
【図28】第1トラス筋搬送装置を概略で示す側面図である。
【図29】ピッチ送りシャトルを概略で示す側面図である。
【図30】ピッチ送りシャトルにおける第2載置台の作動形態を示す動作説明図である。
【図31】ピッチ送りシャトルを一部省略して示す正面図である。
【図32】ピッチ送りシャトルにおける昇降台の動作説明図である。
【図33】第2トラス筋搬送装置を概略で示す側面図である。
【図34】第2トラス筋搬送装置を概略で示す正面図である。
【図35】第2トラス筋搬送装置のトラス筋把持部におけるクランプ機構部を示す正面図である。
【図36】第2トラス筋搬送装置のトラス筋把持部におけるクランプ機構部の構成および作動形態を示す説明図である。
【図37】第2トラス筋搬送装置のトラス筋把持部におけるクランプ機構部の底面図である。
【図38】第2トラス筋搬送装置のトラス筋把持部に配設した把持チャックを示す側面図である。
【図39】クランプ機構部がトラス筋を押圧した状態と押圧を解除した状態とを示す説明図である。
【図40】鉄板給材部におけるロール成形機,アキュームコンベヤおよびリブ付き鉄板搬送コンベヤを概略で示す平面図である。
【図41】ロール成形機により成形されたリブ付き鉄板を概略で示す斜視図である。
【図42】鉄板−トラス筋スポット溶接機を概略で示す正面図である。
【図43】鉄板−トラス筋スポット溶接機における溶接ユニットを概略で示す側面図である。
【図44】端部材スポット溶接機を概略で示す正面図である。
【図45】端部材スポット溶接機における端部材溶接部を概略で示す説明図である。
【図46】端部材をデッキのトラス筋に装着する状態を概略で示す斜視図である。
【図47】滑止めスポット溶接機を概略で示す正面図である。
【図48】滑止めスポット溶接機における溶接機本体を概略で示す説明図である。
【図49】滑止め部材をリブ付き鉄板に装着する状態を概略で示す斜視図である。
【図50】スリッタを概略で示す正面図である。
【図51】スリッタにおける切断刃を配設したフレームを概略で示す側面図である。
【図52】検査ステーションおよび搬出ステーションの一部を概略で示す平面図である。
【図53】検査ステーションおよび搬出ステーションを概略で示す側面図である。
【図54】反転機を概略で示す側面図である。
【図55】デッキ移載装置における第1掛止部の動作説明図である。
【図56】デッキ移載装置における第2掛止部の動作説明図である。
【図57】デッキの製造工程を示すフローチャート図である。
【図58】デッキの製造過程を概略で示す説明図である。
【図59】完成したデッキの概略斜視図である。
【図60】デッキの使用状態を示す建築構造体のスラブ部分の断面図である。
【図61】トラス筋の高さ寸法の異なるデッキの使用状態を概略で示すスラブの側断面図である。
【符号の説明】
17 トラス筋自動成形機
18 鉄板−トラス筋スポット溶接機(鉄板−トラス筋溶接機)
19 端部材スポット溶接機(端部材溶接機)
20 滑止めスポット溶接機(滑止め溶接機)
21 スリッタ
25 鉄筋(線材)
27 上端筋切断機
35 切断刃具
40 上端筋
72 ラチス筋自動成形機
74 ラチス筋搬送装置
75 線材
76 ラチス筋
76a 第1曲折部
76b 第2曲折部
79 矯正部
81 チャック
87 押圧部材
130 トラス筋
131 成形部
132 払出部
133 溶接ユニット
134 屈曲ユニット
186 トラス筋搬送装置
195 クランプ片
205 ロール成形機
208 リブ付き鉄板(リブ付き金属板)
209a,209b リブ
218 溶接ガン(溶接手段)
242 端部材
242a 上端部
242b 下端部
249 端部材ローダ部
250 端部材溶接部
270 滑止め部材
278 溶接機本体
285 上切断刃(切断刃)
286 下切断刃(切断刃)
D デッキ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for manufacturing a deck constituting a slab in a reinforced concrete structure of a multi-layer building, and a manufacturing apparatus capable of suitably carrying out this manufacturing method.
[0002]
[Prior art]
In addition to slabs made of reinforced concrete, floors in multi-layered buildings such as buildings and condominiums (generally called `` slabs '') are formed by placing and holding concrete after placing rebars and placing concrete. There is a composite slab in which a “deck” configured by welding a bent reinforcing bar (truss bar) separately formed on a metal plate having a required dimension is provided. In this composite slab, the deck is installed between beams and columns, the metal plate is held by the support, and concrete is placed in this state. According to this, the arrangement work of the reinforcing bars can be largely omitted, and since the metal plate in the deck is located on the lower end surface of the slab, the installation work of the formwork at the time of placing the concrete is also omitted. Since it has rigidity, it is possible to remove the support without waiting for complete hardening of the concrete, and there is an advantage that the work related to the construction work of the building can be greatly rationalized and the work period can be shortened.
[0003]
Since the building is designed and constructed according to the size and shape of the construction site and the purpose of use, the area and shape of the slab differ for each building. Even in a single building, the area and shape of the slab often differ from floor to floor. Therefore, it is necessary to form the metal plate according to the width and shape of the slab disposed in the building, and set the height of the truss bars according to the thickness of the slab. There is a need to.
[0004]
[Problems to be solved by the invention]
By the way, it is said that it is very difficult to fully automate the manufacturing process of the deck. Conventionally, the metal plates and truss bars are separately formed with a dedicated processing centric, and the completed metal plates and truss bars are further assembled. The method of making it into a product was adopted, and many workers were required for its production. That is, the metal plate forming process, the reinforcing bar bending forming process, and the like can be carried out using a required dedicated machine, but the formed metal plate or the truss bar is transported to a predetermined position, the metal The work of setting the truss bars on the board and the work of transporting the completed deck depend exclusively on the workers. Therefore, there have been drawbacks in that it is impossible to improve production efficiency, reduce production costs, and improve and stabilize product quality associated with rationalization of the assembly work of the deck.
[0005]
In addition, as described above, the deck is pre-determined at the time of manufacturing, such as which part of which floor in which building, and is manufactured while appropriately changing the overall length, overall width, and shape according to this layout position. Since it is necessary, it must be handled by a production method that is almost similar to single-item production. However, the conventional manufacturing method is suitable for mass production of a single shape only for decks of the same shape and size, but it can be used for multi-volume production of multiple types of decks with different shapes and sizes. I can't. Moreover, because the deck has a considerable length, width and weight, it is impossible to produce it in advance and temporarily store it in the production factory or building site. It is required to produce sequentially according to the date and time delivered and deliver the deck in real time. However, in the conventional deck manufacturing mode, it is difficult to produce the deck flexibly in accordance with the progress of the building site, and in some cases, the production of the deck is not in time, and the progress of the construction work is affected. There was also.
[0006]
OBJECT OF THE INVENTION
In view of the above-mentioned drawbacks, the present invention has been proposed to suitably solve the above-described drawbacks. The deck manufacturing process carried out on a synthetic slab constituting a concrete structure is fully automated, and a small amount is obtained. A deck that can flexibly meet the demands of the construction site of the building by reducing the production cost of the deck and shortening the manufacturing time by making it possible to suitably cope with the production of a wide variety of decks. It is an object of the present invention to provide a manufacturing method and a manufacturing apparatus that suitably executes the manufacturing method.
[0007]
[Means for Solving the Problems]
  In order to overcome the above-mentioned problems and achieve the desired purpose suitably, the manufacturing method of the deck for slab in the building structure according to the present invention,
  Feed the long wire toward the upper end bar cutter, cut the wire with the required dimension with this upper bar cutter, and mold the upper bar,
  Each time a different length of wire is fed toward the lattice forming automatic molding machine and pushed by the required length while being held by the chuck of the molding machine, it is pressed against the wire from the direction orthogonal to the pass line of the wire. While pressing and bending the member, by cutting with a dimension according to the length dimension of the upper end muscle, to form a lattice muscle having alternately the first bent portion and the second bent portion,
  The lattice of the upper muscle formed by the upper muscle cutting machine is formed by the lattice muscle conveying device provided on the downstream side of the upper muscle cutting machine and the lattice muscle automatic molding machine. Transferred to the top,In the state where the upper end muscle is attached to the end side of the second bent portion of the lattice muscle.,theseLattice and upper end muscles are transported toward the truss reinforcement automatic molding machine,
  It was conveyed from the lattice reinforcement device to the truss reinforcement automatic molding machineLattice muscleIn the second bend ofThe top streakOf the truss muscle automatic molding machineBy welding and joining with a welding unit, by alternately pressing each first bent portion of the lattice muscle in a direction orthogonal to the conveyance line with a bending unit,The top bar is weldedLattice muscles are formed in a staggered truss shapeAfter that, the truss muscle is turned upside down and the upper end is turned up,
  Further, a metal plate having a required width is fed toward the roll forming machine, and at least a pair of ribs extending in parallel over the entire length in the longitudinal direction and spaced apart at a required interval in the width direction are integrally provided upright. Separately molded metal plate with ribs,
  The first bent portion of the truss muscle that is turned upside down is pressed from the side by the clamp piece of the truss muscle transport device, and is conveyed above the ribbed metal plate while elastically gripping the lattice muscle, First bent portions that are bent in the direction of alternately separating the truss bars are inscribed between the ribs.,
  Truss bars between the ribsElastically fixedThe ribbed metal plate, Transported to an iron plate-truss bar welding machine equipped with welding means,Of the truss muscleWelding each first bent part and the corresponding rib,
  The rib-attached metal plate in which the coupling between the rib and the truss bar has been completed is conveyed to an end member welding machine having an end member loader unit and an end member welding unit, and the front and rear ends of the truss bar at the end member loader unit A deck is manufactured by setting a separately formed end member and welding-connecting the lower end portion of the end member to the rib and the upper end portion of the end member to the truss bar at the end member welded portion. To do.
[0008]
  Similarly, in order to overcome the above-mentioned problems and achieve the desired purpose suitably, a manufacturing apparatus for a slab deck in a building structure according to the present invention,
  A cutting blade is provided at a required position of the long wire rod and is slid in a direction orthogonal to the pass line of the wire to be fed, and the wire rod is cut by the cutting blade to obtain the required length. An upper end cutting machine for forming the upper end;
  A straightening section that is arranged in parallel with the upper end muscle cutting machine and straightens the long wire to be fed, a chuck that clamps the wire extending from the straightening section, and a gap between the straightening section and the chuck. And a pressing member that bends the wire by moving in a direction orthogonal to the pass line of the wire, and forming a lattice line having alternately the first bent portion and the second bent portion by pressing of the pressing member. Lattice muscle automatic molding machine,
  The lattice muscle, which is disposed on the downstream side of the upper end muscle cutting machine and the lattice muscle automatic molding machine, is transferred onto the upper end muscle conveyed from the upper end muscle cutting machine. Lattice muscle transport device to
  SaidLattice muscle transport deviceA welding unit that is disposed on the downstream side of the welding line and welds and joins the upper end bars and the second bent portions of the lattice bars, and a bent portion that alternately bends the first bent portions of the lattice bars in a direction orthogonal to the conveying line. A truss bar which is formed by welding and joining the upper bar and the lattice bar by the welding unit and the bending unit.It is composed of a forming part and a payout part that pays out in a state where the truss bars formed by the forming part are turned upside down and the upper end bars are turned up.Truss muscle automatic molding machine,
  At least extending parallel to the entire length in the longitudinal direction, spaced in parallel with the metal plate fed from the upstream side and spaced apart at a required interval, provided in parallel to the upper end rebar cutting machine and the lattice rebar automatic forming machine. A roll forming machine for forming a ribbed metal plate having a required length integrally formed with a pair of ribs;
  A clamp piece disposed on the downstream side of the truss muscle automatic molding machine and corresponding to the first bent portion of the lattice muscle in the truss muscle, the clamp pieces being close to each other so as to press the truss muscle from the side. The truss bars are gripped in an elastically deformed state, and the pressure is released after the truss bars arrive between the ribs of the ribbed metal plate. A truss bar transportation device that elastically fixes the truss bar to a ribbed metal plate in an inscribed state;
  SaidTruss reinforcement deviceAnd placed downstream of the roll forming machine,in frontAn iron plate-truss bar welding machine provided with welding means for welding and joining the rib of the ribbed metal plate and the first bent portion of the truss bar;
  An end member loader portion which is disposed on the downstream side of the iron plate-truss bar welding machine and sets separately formed end members at front and rear end portions of the truss bar, a lower end portion of the set end member, the rib, and the rib It is comprised from the end member welding machine provided with the upper end part of an end member, and the end member welding part which each joins a truss reinforcement by welding.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Next, a preferred embodiment of the manufacturing method and the manufacturing apparatus of the slab deck in the building structure according to the present invention will be described below with reference to the accompanying drawings. In this embodiment, as shown in FIG. 59, it is composed of three truss bars 130 including upper end bars 40 and lattice bars 76, and a ribbed iron plate (ribbed metal plate) 208 having ribs 209a and 209b. A manufacturing method of the deck D and a manufacturing apparatus that implements the method will be described. As described above and as shown in FIG. 60, this deck D is used by being laid between beams and columns in a building structure, and as shown in FIG. Three types of truss bars 130 having different height dimensions are prepared in accordance with the thickness of the slab S, and further, the iron plate 208 having a different total length is standardized. All decks D having different length dimensions can be manufactured.
[0010]
FIG. 1 schematically shows a configuration of an apparatus used when a method for manufacturing a slab deck in a building structure according to the present invention is suitably carried out. 14, a supply station 10 comprising a lattice reinforcing member 15 and a steel plate supplier 16, an automatic truss rebar forming machine 17, an iron plate-truss spot welding machine 18, an end member spot welding machine 19, and a non-slip spot welding machine. 20 and a processing / assembling station 11 including a slitter 21 and the like. Further, an inspection station 12 for inspecting the completed deck D and a carry-out station 13 including a reversing machine 22 and a packing machine 23 are disposed on the downstream side of the processing / assembling station 11.
[0011]
(Regarding the configuration of the top muscle feed section)
As shown in FIGS. 2 and 6, etc., the upper end bar feeder 14 is composed of an input conveyor 26, an upper bar cutter 27, a drawer conveyor 28, an upper bar conveyor 29, an upper bar conveyor 30, and the like. Yes. FIG. 2 is a plan view schematically showing the input conveyor 26 for feeding a long rebar (wire material) 25, an upper end bar cutter 27 and a drawer conveyor 28, and the input conveyor 26 and the drawer conveyor 28. A plurality of rollers 31 connected by a chain or the like are arranged at a required interval in the feed line direction, and these rollers 31 are rotationally driven by a driving means (not shown). Further, as shown in FIG. 4, each of the rollers 31 is provided with a total of ten guide grooves 31a arranged in parallel in the width direction of the conveyor, so that ten reinforcing bars 25 can be simultaneously fed in a parallel state. It is like that.
[0012]
(Upper muscle cutting machine)
FIG. 3 is a side view schematically showing the upper end bar cutting machine 27, and supports 33 and 33 are erected with a reinforcing bar alignment portion 32 disposed between the input conveyor 26 and the drawer conveyor 28 interposed therebetween. In addition, a cutting blade 35 is disposed in a suspended state at a lower center portion of a frame 34 installed in a horizontal posture between the support columns 33. The frame 34 is arranged so as to be movable up and down along the columns 33 and 33, and is set so that the cutting blade tool 35 faces the reinforcing bar alignment portion 32 when the frame 34 is moved downward by a hydraulic driving means (not shown). Accordingly, each reinforcing bar 25 fed from the input conveyor 26 to the pull-out conveyor 28 via the reinforcing bar aligning portion 32 is positioned in the reinforcing bar aligning portion 32 by the cutting blade 35 moving downward in conjunction with the frame 34. It is cut at the site. In addition, a reinforcing bar presser 36 disposed in a suspended state from the frame 34 is provided on the side of the cutting blade 35 so that the reinforcing bar 25 is pressed from above when the reinforcing bar 25 is cut by the cutting blade 35. It has become.
[0013]
(Back gauge)
As shown in FIG. 2, a back gauge 38 that can reciprocate on rails 37 disposed in parallel to the drawer conveyor 28 is disposed on the side of the drawer conveyor 28. A contact plate 39 extending laterally from the gauge 38 faces the upper surface of the drawer conveyor 28. That is, the long rebar 25 fed from the input conveyor 26 passes through the rebar alignment section 32 of the upper end bar cutting machine 27 and moves downstream on the draw-out conveyor 28, and the tip thereof contacts the abutment. It comes into contact with the plate 39 and stops. Accordingly, if the back gauge 38 is moved along the rail 37, the distance (distance) between the contact plate 39 and the cutting blade 35 is displaced. If the cutting is performed in a state in which the upper end bars 40 are in contact with each other, the upper end bars 40 having a required length can be obtained and the upper end bars 40 having different lengths can be easily formed. In addition, the deck D shown in FIG. 59 has a product length of 2 m to 5 m and is standardized at intervals of 5 mm, for example, and the upper end stripe 40 is cut into a length dimension corresponding to the total length of each deck D. Is done.
[0014]
(Upper streak payout mechanism)
FIGS. 4 and 5 schematically show an upper end bar feeding mechanism 41 provided on the drawer conveyor 28, and the rod 42 a of a plurality of fluid pressure cylinders 42 disposed below the roller 31. A swing plate 44 is pivotally supported by the connected support member 43 so as to be rotatable. The rocking plate 44 is held in a horizontal state by a spring 65 before the operation of the fluid pressure cylinder 42. When the fluid pressure cylinder 42 is operated in a direction in which the rod 42a moves forward, the rocking plate 44 is kept in a horizontal state and is moved upward. The upper end bars 40 placed on the rollers 31 are pushed up. Further, on the lower side of the swing plate 44, an operating rod 45 penetrating the regulating plate 46 and screwed with a nut 45a at the lower end is disposed in a suspended state, and the swing plate 44 has a required height. When raised to this position, the nut 45a comes into contact with the restricting plate 46 (see FIG. 5A). However, since the fluid pressure cylinder 42 is set so that the rod 42a moves forward even after the nut 45a abuts against the regulating plate 46, as a result, the swing plate 44 is subjected to the tensile force of the spring 65. On the other hand, it tilts to the side (see FIG. 5B). Therefore, the upper end bar 40 pushed up by the swing plate 44 slides sideways on the swing plate 44, and the upper end of the upper end bar transport device 29 disposed on the side of the drawer conveyor 28. It is paid out to the muscle transfer section 47.
[0015]
(About the top bar feeder)
As shown in FIGS. 6 and 7, the upper bar feeder 29 is disposed on the side of the drawer conveyor 28, and grips the upper bar 40 discharged by the upper bar feeder mechanism 41 three by three. Are transferred one by one to the three upper bar conveyors 30A, 30B, and 30C, and are composed of the upper bar transfer part 47 and the upper bar transfer part 48. As shown in FIG. 8, the upper end muscle transfer portion 47 is mounted between two first placement plates 50 that can be moved up and down by a fluid pressure cylinder 49 and sprockets 52 and 52, and is driven by a motor 53. The chain conveyor 51 is arranged in a stepped manner in a tilted state with a required angle. A second placement plate 54 and an elevating rod 55 are disposed on the side of the chain conveyor 51, and three upper end bars 40 are provided on the side of the second placement plate 54. A mounting table 56 that can be mounted at a required interval is provided. The lifting rod 55 is for holding one of the upper end bars 40 temporarily stocked on the second mounting plate 54 and transferring it to the first holding groove 56 a in the mounting table 56. is there. Further, the mounting table 56 is provided with a movable table 57 that can move up and down and reciprocate so as to perform a so-called “block motion”, and the upper reinforcement 40 mounted on the first holding groove 56 a by the lifting rod 55. The upper end bars 40 placed on the second holding groove 56b and the first holding groove 56a can be sequentially transferred to the second holding groove 56b and the second holding groove 56b. That is, the upper streak 40 discharged from the drawer conveyor 28 is transferred to the mounting table 56 via the first mounting plates 50 and 50, the chain conveyor 51 and the second mounting plate 54.
[0016]
As shown in FIG. 6 and FIG. 7, the upper end bar conveyor 48 has a moving frame 58 that reciprocates between the upper bar conveyor 30 (30A, 30B, 30C) and the upper bar transfer unit 47. And three gripping chucks 59a, 59b, 59c disposed in a suspended state below the moving frame 58. The moving frame 58 is disposed on rails 61, 61 laid on horizontal frames 60, 60 extending in parallel to the direction perpendicular to the upper-end line conveyor 30, and is reciprocated by a motor 62. Yes. As shown in FIG. 9, the gripping chucks 59a, 59b, 59c can grip the upper end muscle 40 when the gripping claws 63, 63 disposed at the lower end approach each other. The gripping chucks 59a, 59b, 59c are arranged to be movable up and down by a fluid pressure cylinder 64 arranged on the moving frame 58, and are the same as the holding grooves 56a, 56b, 56c in the mounting table 56 described above. Since they are arranged at intervals, as shown in FIG. 8, the upper end muscles 40 placed in the holding grooves 56a, 56b, and 56c can be grasped simultaneously. The upper bar 40 gripped by the first grip chuck 59a is transferred to the first upper bar conveyor 30A, and the upper bar 40 gripped by the second grip chuck 59b is transferred to the second upper bar conveyor 30B. At the same time, the upper end bars 40 held by the third holding chuck 59c are controlled so as to be transferred to the third upper end line conveyor 30C. In addition, as shown in FIGS. 10 and 12, upper end / lattice streak conveyors 110 </ b> A, 110 </ b> B, 110 </ b> C, which will be described later, are disposed on the downstream side of each upper streak transport conveyor 30 </ b> A, 30 </ b> B, 30 </ b> C, Lattice streak transport conveyors 73A and 73B, which will be described later, extend between the respective top streak transport conveyors 30A, 30B, and 30C (shown by two-dot chain lines in FIGS. 6 and 7).
[0017]
(About the structure of the Lattice muscle supply section)
As shown in FIG. 10, the lattice reinforcing material supply portion 15 is disposed on the downstream side of the automatic reinforcer 72 in the reinforcing bar supply direction and on the downstream side of the forming machine 72. A total of three sets of lattice forming lines 70A, 70B, and 70C formed by the lattice feed conveyor 73, and a lattice feed device 74 disposed on the downstream side of each of the lattice feed conveyors 73A, 73B, and 73C. It is composed of Each lattice forming line 70A, 70B, 70C has the same basic configuration except that the overall length of the lattice conveying conveyors 73A, 73B, 73C is slightly different. Therefore, the first lattice arranged above in FIG. Only the line forming line 70A will be described, and the second and third lattice line forming lines 70B and 70C arranged at the center and below will be assigned the same reference numerals and detailed description thereof will be omitted.
[0018]
(About Lattice Muscle Automatic Molding Machine)
Lattice streak automatic forming machine 72 automatically forms a required length of lattice streak 76 by sequentially bending the wire rod 75 drawn out from the automatic wire stand 71. FIG. As the structure is schematically shown, it is a known molding machine that has already been put into practical use. On the upstream side of the lattice muscle automatic forming machine 72, a straightening portion 79 including a feed roll 77 and a straightening device 78 is provided, and the wire rod 75 drawn out from the automatic wire stand 71 passes through the straightening portion 79. This makes it possible to correct the curl when winding. Further, on the downstream side of the straightening portion 79, a holding body 80 provided with a chuck 81 for holding the wire 75 at the tip is disposed so as to be slidable while being connected to a driving means 82 such as a hydraulic servo. By holding the wire 75 with the chuck 81 and controlling the driving means 82, the extruded wire 75 can be held while being moved. The holding body 80 is provided with position detecting means 83 using, for example, magnetism or light, so that the sliding amount of the holding body 80 (the pushing amount of the wire 75) can be accurately detected. ing.
[0019]
Between the straightening part 79 and the holding body 80, a molding part 84 for bending the wire 75 drawn from the straightening part 79 is disposed. The molded portion 84 has a first lever piece 85 whose one end is pivotally supported by a frame or the like (not shown), and one end is pivotally supported by the swinging end 85a of the first lever piece 85 and pressed to the other end. A second lever piece 86 provided with a member 87, and a hydraulic cylinder 88 whose bottom side is fixed to a frame or the like (not shown) and whose tip end of the rod 88a is connected to a substantially central portion of the first lever piece 85. It is configured. In addition, a mold member 89 having a concave upper surface is disposed at a position facing the pressing member 87 and the wire 75 so as to receive the bent wire 75. Therefore, if the hydraulic cylinder 88 is controlled so that the rod 88a moves forward, the pressing member 87 is pushed down while the first lever piece 85 is swung in contact with the wire 75. As a result, the wire 75 is Bending is performed until the mold member 89 abuts. The arrangement position of the mold member 89 can be changed as appropriate, and the bending amount of the wire 75 to be bent can be adjusted on the premise of the height dimension of the truss bar 130. ing.
[0020]
A cutting blade 90 that is slid by a driving means (not shown) is disposed on the side of the mold member 89. The cutting blade 90 moves forward after the required number of bending processes are completed, and the wire 75 is moved to the correction portion 79. By cutting at the downstream end, a full-length lattice 76 corresponding to the length dimension of the upper end 40 is formed. As shown in FIG. 11, the lattice 76 formed by the automatic lattice forming machine 72 configured as described above includes a first bent portion 76 a formed by contacting the pressing member 87, and the chuck 81. The second bent portions 76b formed by clamping and forming the first bent portions 76a are alternately formed at a required interval. The second bent portion 76b is formed with a slight linear portion at the tip thereof because the chuck 81 is clamped.
[0021]
(About Lattice Muscle Conveyor)
As shown in FIG. 10, the first lattice reinforcing conveyor 73 </ b> A extends from the downstream side of the lattice automatic forming machine 72 to the lower side of the lattice reinforcing apparatus 74 through the lower end conveying apparatus 29. The lattice muscle 76 formed by the lattice muscle automatic molding machine 72 is conveyed to the lower side of the lattice muscle conveying device 74. As shown in FIG. 16, in this lattice conveying conveyor 73A, a plurality of rollers 91 linked by a chain or the like are arranged at a required interval in the feed line direction, and this roller 91 is driven to rotate by a driving means (not shown). It has come to be. As shown in FIGS. 12 and 16, the lattice 76 is conveyed toward the downstream side of the conveying conveyor 73A with the first bent portion 76a directed to the right side and the second bent portion 76b directed to the left side. It is like that.
[0022]
(Lattice muscle payout mechanism)
Further, in the lattice reinforcing conveyor 73A, a portion extending below the lattice conveying device 74 is pushed up to the side by pushing up the lattice 76 as shown in FIGS. A lattice muscle payout mechanism 92 and a lattice muscle holding portion 93 that temporarily holds the lattice lattice 76 that has been paid out while being hooked are provided. In the lattice stripe payout mechanism 92, a push-up base 95 having an upper end surface formed on an inclined surface 95a having a required angle is arranged on rods 94a of a plurality of fluid pressure cylinders 94 disposed below the roller 91. It is configured. That is, the lattice 76 that has been transported and stopped on the roller 91 of the lattice conveyor 73A is controlled by moving the fluid pressure cylinder 94 in the direction in which the rod 94a moves forward, thereby inclining the push-up table 95. It is pushed up while being placed on the surface 95a, and immediately after that, it slides down the inclined surface 95a and falls to the lattice muscle holding portion 93.
[0023]
(About the lattice muscle holding part)
As shown in FIGS. 15 and 16, the lattice holding section 93 is disposed at the left end of the conveyor 73A toward the downstream side of the lattice conveying conveyor 73A and slides down on the push-up table 95. A plurality of holding bases 98 each including a receiving plate 96, 96 for holding the lattice muscle 76 in a hooked state and a cylinder 97 for pushing up the lattice muscle 76 hooked on the receiving plate 96, 96 are provided on the conveyor. It is arranged at a required interval in the longitudinal direction of 73A. The receiving plates 96, 96 in each holding base 98 are provided with a first hooking portion 96a inclined downward at substantially the same angle as the inclined surface 95a of the push-up base 95, and above the tip of the first hooking portion 96a. The L-shaped member 99 has a substantially L-shape having a second latching portion 96b, and is extended in parallel by an L-shaped member 99 at a position that is twice as long as the interval L between the first bent portions 76a and 76a of the lattice muscle 76. It is arranged in the state. And each holding stand 98 is attached to the position where the 1st bending part 76a of the lattice stripe 76 stopped on the conveyance conveyor 73A and the receiving plates 96 and 96 align, as shown in FIG. Accordingly, the lattice muscle 76 that has slid down the inclined surface 95a of the push-up base 95 has the first bent portion 76a aligned with the first hooking portion 96a of the backing plate 96, as shown in FIG. The first bent portion 76a is held in a state of being hooked on the first hook portion 96a.
[0024]
The cylinder 97 having the lifting platform 101 disposed at the distal end of the rod 97a is disposed substantially at the center of the plate member 100 laid between the distal ends of the receiving plates 96, 96, and a lattice muscle conveying device 74 described later. It operates when the lattice muscle 76 is transferred to the latch chuck 103 in FIG. That is, as shown in FIG. 15, the cylinder 97 always stands by in a state where the rod 97a is moved forward, and when the rod 97a is controlled to move backward, the lifting platform 101 is hooked at its forefront. The lattice muscle 76 rises while hooking the lattice muscle 76, and the raised lattice muscle 76 is transferred to the second hooking portion 96b.
[0025]
(About Lattice Muscle Transfer Device)
As shown in FIGS. 12 and 13, the lattice reinforcing device 74 is provided above the three upper end / lattice conveying conveyors 110A, 110B, 110C and the downstream of the three lattice reinforcing conveyors 73A, 73B, 73C. The lattice muscle 76 that is disposed on the lattice muscle holding portion 93 is transferred onto the upper edge muscle 40 that is waiting on each of the upper muscle / lattice muscle conveyors 110A, 110B, and 110C. The moving frame 102 is configured to include three transfer portions 104A, 104B, and 104C, each of which includes a moving frame 102 that reciprocates and a latch chuck 103 that is suspended below the moving frame 102. Since the basic configurations of the transfer units 104A, 104B, and 104C are exactly the same, only the first transfer unit 104A will be described here, and the second transfer unit 104B and the third transfer unit 104C will be described. Are denoted by the same reference numerals and description thereof is omitted.
[0026]
The moving frame 102 is disposed on rails 106, 106 on horizontal frames 105, 105 extending in parallel to a direction orthogonal to the lattice reinforcing conveyor 73A. 73A and the upper end / lattice streak conveyor 110A are reciprocated between the upper part and the upper part / lattice streak conveyor 110A. Further, as shown in FIG. 14, the latch chuck 103 is disposed at a required interval on the lower surface of the lifting rod 109 suspended from the rod 108a of the second fluid pressure cylinder 108 disposed on the moving frame 102. 17 (5 in the embodiment), as shown in FIG. 17, the first bent portion 76a of the lattice muscle 76 can be hooked by the hooking claws 103a arranged at the lower end approaching each other. Yes. That is, when the moving frame 102 is moved above the lattice feed conveyor 73A and the latching chuck 103 is moved downward, the latching claw 103a of the latching chuck 103 is moved to the second latching portion 93 in the lattice muscle holding portion 93. It is set so as to be aligned with the first bent portion 76a of the lattice muscle 76 hooked on the stopper portion 96b.
[0027]
In the lattice feed device 74 configured as described above, as shown in FIGS. 13 and 18, the first transfer section 104A moves the lattice 76 of the first lattice feed conveyor 73A to the first upper end. The second transfer unit 104B transfers the lattice 76 of the second lattice-feeding conveyor 73B to the second upper-end / lattice-conveying conveyor 110B, and third The transfer unit 104C transfers the lattice 76 of the third lattice transfer conveyor 73C to the third upper end / lattice transfer conveyor 110C.
[0028]
(Upper and Lattice Muscle Conveyors)
The three rows of upper-end / lattice-line conveyors 110A, 110B, and 110C have the same basic configuration, and as shown in FIGS. 18 and 19, a plurality of motors 111 connected to a chain 112 are connected. A roller 113 is disposed at every required interval, and a feed roller 114 is disposed at the downstream end for feeding the upper end bar 40 and the lattice bar 76 to a truss bar automatic molding machine 17 described later. That is, as shown in FIG. 19, the roller 113 has a holding groove 113 a formed in a circumferential end surface, and has an upper end bar 40 conveyed from the upper end bar conveyor 30 and a lattice bar 76 placed from above. The second bent portion 76b is suitably held. Above the roller 113, a fixed guide member 115 and a moving guide member 116 that is close to and away from the guide member 115 are disposed, and the lattice muscle 76 placed above the upper end muscle 40 is provided from both sides. It is designed to hold the posture.
[0029]
As shown in FIG. 20, the feed roller 114 includes a driven roller 118 that is pivotally supported by a first support shaft 117 that is erected on the frame, and a second support shaft 119 that is erected on a movable frame that is slidable. The driving roller 120 is pivotally supported by the motor 122 and linked to the motor 122 via the chain 121. Then, the drive roller 120 is moved close to the driven roller 118 to pinch the lattice stripe 76 placed on the upper end stripe 40, and the drive roller 120 is driven to rotate by the motor 122 in this state. The muscle 76 is fed to the truss automatic machine 17. Further, the upper end bar 40 is fed to the truss bar automatic molding machine 17 by rotating the roller 113 by the motor 111 that rotates in synchronization with the motor 122. As shown in FIG. 18, a stopper 124 is disposed at the downstream end of each upper end / lattice conveyor 110A, 110B, 110C to control the feeding of the upper end 40 and the lattice 76. At the same time, the tips of both 40 and 76 can be aligned.
[0030]
(About Truss Automatic Machine)
As shown in FIG. 21 and FIG. 22, truss muscle automatic forming truss muscle 130 composed of the upper edge muscle 40 and the lattice muscle 76 is provided downstream of each of the upper edge / lattice muscle conveyors 110A, 110B, 110C. Three molding machines 17 (17A, 17B, 17C) are arranged in parallel. These automatic truss reinforcement molding machines 17A, 17B, and 17C are formed by bending and forming a welding unit 133 that joins the upper end reinforcement 40 and the lattice reinforcement 76 and the lattice reinforcement 76 in a zigzag manner in a direction orthogonal to the full length direction of the truss reinforcement 130. The molding unit 131 includes a unit 134, and a payout unit 132 that transfers the truss bar 130 after molding to a first truss bar transportation device 165 described later. Since the three truss reinforcement automatic molding machines 17A, 17B, and 17C are identical devices, only the first truss reinforcement automatic molding machine 17A will be described.
[0031]
(About molding part)
As shown in FIGS. 21 and 22, the molding unit 131 in the first truss reinforcement automatic molding machine 17A has a first moving frame 136 that slides on a rail 137 laid on the base 135 on the downstream side of the conveyance line. A second moving frame 138 that slides on the rail 139 is disposed on the right side of the transport line, and both the moving frames 136 and 138 are close to and separated from each other across the transport line. It has come to be able to do. Guide rails 140A and 140B for the lattice muscle 76 extending along the conveyance line are disposed on the upper portions of the moving frames 136 and 138. When the frames 136 and 138 are relatively close to each other, The lattice muscle 76 is sandwiched from both sides. A total of five free rollers 142 rotatably supported on a support base 141 that can move up and down are arranged in series along the transport line below the transport line. The upper end line 40 and the second bent part 76b of the lattice line 76 conveyed from the conveyor 110A are held. Also, the second moving frame 138 and the base 135 are connected to the rod 143a of the fluid pressure cylinder 143 and have lattice muscle pressers 144 and 144 that press the upper end muscle 40 and the second bent portion 76b of the lattice muscle 76 from the side. The lattice muscle pressers 144 and 144 can be arranged close to and away from each other by controlling the fluid pressure cylinders 143 and 143 so as to face each other.
[0032]
(About the welding unit)
As shown in FIGS. 21 to 24, a total of ten welding units 133 are arranged in series along the transport line, and each welding unit 133 has a cylinder 146 arranged on a gantry (not shown). The first electrode 147 is disposed in a suspended state from the rod 146a toward the conveyance line, and the second electrode 148 is disposed below the conveyance line so as to be opposed to the first electrode 147. The first electrode 147 can move toward and away from the fixed second electrode 148. That is, each welding unit 133 is disposed at the same interval as the interval L between the second bent portions 76b, 76b of the lattice 76, and the second electrode 148 is disposed on the upper end reinforcement 40 which is conveyed and stopped at a predetermined position. When the first electrode 147 comes into close contact with the second bent portion 76b of the lattice 76, the upper end muscle 40 and the lattice 76 are spot-welded.
[0033]
(About the bending unit)
In the bending unit 134, in the truss muscle 130 formed by the upper end muscle 40 and the lattice muscle 76 joined by the welding unit 133, each first bent portion 76a of the lattice muscle 76 protruding upward is orthogonal to the conveyance line. The first bent portions 76a are bent and formed in a zigzag manner by alternately pressing in the direction to be performed. As shown in FIGS. 21 and 22, the bending unit 134 includes four first bending mechanisms 149 and five second bending members arranged in parallel along the transport line on the upper surface of the first moving frame 136. And a mechanism 150. That is, the first bending mechanism 149 is arranged in parallel at intervals of twice the interval L between the first bending portions 76a and 76a of the lattice muscle 76, and the second bending mechanism 150 is also the same as the first bending mechanism 149. Accordingly, the first bending mechanism 149 and the second bending mechanism 150 are alternately arranged at intervals that can correspond to the first bent portions 76 a of the lattice muscle 76.
[0034]
In the first bending mechanism 149, a substantially T-shaped first pressing member 152 having a distal end portion 152a directed to the transport line is arranged on the rod 151a of the first fluid pressure cylinder 151 fixed to the first moving frame 136. The cylinder 151 is always stopped with the rod 151a retracted. When the fluid pressure cylinder 151 is controlled so that the rod 151a moves forward, as shown in FIG. 25, the first pressing member 152 is set so that the tip end portion 152a moves forward to a position beyond the conveying line. The first bent portion 76a of the lattice muscle 76 is pressed to the side to bend. In the guide rail 140 </ b> A fixed to the first moving frame 136, a notch 140 a that allows the passage of the pressing member 152 is formed at a position corresponding to the tip 152 a of each first pressing member 152.
[0035]
The second bending mechanism 150 is provided with a second pressing member 154 extending from the upper side of the conveying line to the opposite side on the rod 153a of the second fluid pressure cylinder 153 fixed to the first moving frame 136. Further, a rod-shaped locking member 155 oriented vertically downward is arranged at the tip of the second pressing member 154, and the cylinder 153 is always stopped with the rod 153a advanced. Then, when the fluid pressure cylinder 153 is controlled so that the rod 153a moves backward, as shown in FIG. 25, the locking member 155 moves to a position beyond the conveying line as the second pressing member 154 moves backward. The first bent portion 76a of the lattice muscle 76 is set to be bent laterally. In the guide rail 140B fixed to the second moving frame 138, a notch 140b that allows passage of the locking member 155 is formed at a position corresponding to each locking member 155.
[0036]
Therefore, if the first bending mechanism 149 and the second bending mechanism 150 in the bending unit 134 are simultaneously controlled after the welding process is completed by the welding unit 133, the lattice muscle 76 moves toward the downstream of the conveying line. The first bent portion 76a is bent to the right side by the first bending mechanism 149, and the first bent portion 76a is bent to the left side by the second bending mechanism 150, respectively. Prior to the operation of the first bending mechanism 149 and the second bending mechanism 150, the moving frames 136 and 138 are separated from each other, and the first bent portion 76a of the lattice muscle 76 is held from both sides by the guide rails 140A and 140B. In this state, it is bent. In addition, since the bending process is performed simultaneously with the welding process, each second bent portion 76b of the lattice 76 is in a state that can be bent very easily by the welding heat according to the welding process, The fluid pressure cylinders 151 and 153 can be a small and small output type.
[0037]
(About the withdrawal section)
As shown in FIGS. 26 and 27, the payout portion 132 extending downstream of the molding portion 131 is provided with a chuck 157 that reciprocates along a guide rail 156 extending to the payout portion 132. It moves appropriately while holding the tip of the truss muscle 130. In addition, on the side of the guide 156, an inclined truss bar suspension table 158 with the tip extending horizontally downward at a required interval is disposed at each required interval, and welding at the forming portion 131 is performed. When the holding of the chuck 157 is released, the truss bar 130 that has completed the process and the bending process is turned upside down and the upper bar 40 is turned upward, It is designed to be hooked. In addition, an elevator 160 that moves up and down the truss bar 130 that is hooked on the truss bar base 158 is disposed in the vicinity of the truss bar base 158. As shown in FIG. The truss bar 130 is transferred to a first truss bar conveyor 165 described later. That is, the elevator 160 is provided with a mounting table 162 that is slidable along a vertical column 161, and the truss bar 130 that is hooked on the truss bar base 158 is hooked. It will be pushed up in the state.
[0038]
(About the first truss reinforcement device)
FIG. 28 is a side view schematically showing the first truss reinforcement device 165. The first truss reinforcement device 165 is formed by each of the three truss reinforcement automatic forming machines 17A, 17B, and 17C. The truss bar 130 is transferred to a pitch feed shuttle 170 described later. Fixed frames 166 and 166 extending perpendicularly to the payout portion 132 and extending horizontally and parallelly above the payout portion 132 and the pitch feed shuttle 170 of each of the truss reinforcement automatic molding machines 17A, 17B, and 17C. Three gripping chucks 169a, 169b, and 169c that are movable up and down are disposed in a suspended state on a moving frame 168 that can reciprocate on rails 167 disposed on the fixed frames 166 and 166. Yes. As shown in FIG. 29, the gripping chucks 169a, 169b, and 169c are disposed at the same intervals as the holding grooves 171a, 171b, and 171c in the pitch feed shuttle 170, and the first gripping chuck 169a is the first truss. The truss muscle 130 formed by the automatic muscle forming machine 17A is held, the second holding chuck 169b holds the truss muscle 130 formed by the second automatic truss muscle forming machine 17B, and the third holding chuck 169c is the third holding chuck 169c. The truss reinforcement 130 formed by the truss reinforcement automatic molding machine 17C is gripped. The three truss bars 130 gripped by the gripping chucks 169a, 169b, and 169c are placed in the first holding groove 171a, the second holding groove 171b, and the third holding groove 171c of the pitch feed shuttle 170. The gripping chucks 169a, 169b, and 169c are basically configured in the same manner as the gripping chuck 59 in the upper-end muscle conveying device 29 shown in FIG.
[0039]
(About the pitch feed shuttle)
As shown in FIG. 29, the pitch feed shuttle 170 sequentially moves the truss bars 130 transferred from the first truss bar feeder 165 to a ribbed iron plate (ribbed metal plate) 208 described later in order. It is a device for sending. As shown in FIGS. 29 and 31, the pitch feed shuttle 170 includes a plurality of first mounting tables 171 that are fixed at a required interval in the longitudinal direction of the truss bars 130 to be transferred, and each first mounting table 171. A second mounting table 172 disposed between the first mounting table 171 and the up / down table 173 that pushes up the three truss bars 130 mounted on the first mounting table 171 upward. It consists of and. The first mounting table 171 attached to the fixed frame 174 has a total of nine holding grooves 171a to 171i formed at equal intervals. As described above, the first mounting table 171 holds the first truss muscle transfer device 165. The three truss bars 130 held by the chucks 169a, 169b, and 169c are placed in the first holding groove 171a, the second holding groove 171b, and the third holding groove 171c.
[0040]
As shown in FIG. 30, the second mounting table 172 has a total of six grooves 172 a to 172 f formed at the same intervals as the holding grooves 171 a to 171 i of the first mounting table 171. It is connected to the rod 175 a of the fluid pressure cylinder 175 and is fixed to the upper part of the mount 177 that reciprocates on the rail 176. In addition, as shown in FIG. 31, the second frame 178 to which the rail 176 is fixed is tapered when the taper member 180 connected to the rod 179a of the second fluid pressure cylinder 179 reciprocates on the rail 181. As a result of the roller 182 rolling on the tapered surface 180a of the member 180, it moves up and down. Therefore, the second mounting table 172 performs a so-called “block motion” by appropriately controlling the first fluid pressure cylinder 175 and the second fluid pressure cylinder 179, and is mounted on the first mounting table 171. The truss bars 130 can be sequentially transferred from right to left in FIG. That is, the truss bars 130 placed in the first holding groove 171a, the second holding groove 171b, and the third holding groove 171c are transferred to the fourth holding groove 171d, the fifth holding groove 171e, and the sixth holding groove 171f. Then, when the next truss bar 130 is placed in the first holding groove 171a, the second holding groove 171b, and the third holding groove 171c by the first truss bar conveying device 165, the former three truss bars 130 are The latter three truss bars 130 are simultaneously transferred to the fourth holding groove 171d, the fifth holding groove 171e and the sixth holding groove 171f in the seventh holding groove 171g, the eighth holding groove 171h and the ninth holding groove 171i. The
[0041]
The lifting platform 173 pushes up the three truss bars 130 placed in the seventh holding groove 171g, the eighth holding groove 171h and the ninth holding groove 171i of the first mounting table 171 upward, and these truss The rebar 130 is transferred to a second truss rebar transport device 186 described later. As shown in FIG. 32, the lifting platform 173 is arranged so as to be movable up and down by a third fluid pressure cylinder 183. A downward projecting portion of the truss bar 130 (lattice muscle 76) is provided above the lifting platform 173. A holding member 184 is provided for holding the first bent portion 76a). Accordingly, the lifting platform 173 moves upward by controlling the third fluid pressure cylinder 183 in the direction in which the rod 183a extends. At this time, the seventh holding groove 171g, the eighth holding groove 171h, and the ninth holding groove The three truss bars 130 placed on 171i are pushed up while being placed on the holding members 185.
[0042]
(About the 2nd truss reinforcement device)
As shown in FIG. 33, the second truss bar conveyor 186 simultaneously holds the three truss bars 130 mounted on the lifting platform 173 of the pitch feed shuttle 170 and stands by on the ribbed iron plate conveyor 207. It is set to a later-described ribbed iron plate 208. Between the upper side of the pitch feed shuttle 170 and the upper side of the ribbed iron plate conveyor 207, fixed frames 187 and 187 extending in parallel with each other are disposed, and rails 188 laid on the upper surfaces of the fixed frames 187 and 187. A moving frame 189 that can be reciprocated by a motor 190 is disposed above. The moving frame 189 is provided with an elevating rod 191 that moves up and down in a horizontal posture by a fluid pressure cylinder 192, and three rows of truss muscle gripping portions 193, 193, 193 are arranged below the elevating rod 191. Yes. Each truss muscle gripping portion 193 includes a plurality of clamp pieces 195 and 195 each having a clamp piece 195 and 195 corresponding to the first bent portion 76a of the lattice muscle 76 in the truss muscle 130, as shown in FIGS. The clamp mechanism portion 194 is arranged at a required interval in the longitudinal direction of the lifting rod 191.
[0043]
As shown in FIGS. 35 and 36, the clamp mechanism portion 194 includes support shafts 197 and 197 that are horizontally and parallelly installed between lower ends of support plates 196 and 196 that are vertically suspended at a predetermined interval. Grip pieces 198 and 198 each having a clamp piece 195 at the lower end are pivotally supported by the support shafts 197 and 197. An upper end portion of each gripping piece 198 is connected to a rod 199a of a fluid pressure cylinder 199 disposed in a suspended state from above via a connecting member 200. Accordingly, when the fluid pressure cylinder 199 is controlled so that the rod 199a is retracted (raised), the grip pieces 198 and 198 are rotated so that the clamp pieces 195 and 195 are separated from each other (see the two-dot chain line in FIG. 36). When the rod 199a is controlled to move forward (lower), the grip pieces 198 and 198 are rotated so that the clamp pieces 195 and 195 are close to each other. That is, in the second truss bar conveying device 186, the truss bar 130 is formed in a state in which the lattice bar 76 is expanded in a staggered manner, and therefore, as shown in FIG. By moving the truss bars close to each other, the truss bars 130 are pressed from the side and are gripped in an elastically deformed state. Each clamp mechanism portion 194 is provided with a gripping chuck 201 shown in FIG. 38, and the upper end muscle 40 of the truss muscle 130 and the second bent portion 76b of the lattice muscle 76 by the proximity of the gripping pieces 201a and 201a. Is to be gripped.
[0044]
As shown in FIG. 34 and FIG. 36, the three truss bars 130 held by the truss bar holding portions 193, 193, 193 are transported as shown in FIG. Transferred to the upper surface of the ribbed iron plate 208 waiting on the conveyor 207. As shown in FIG. 41, the ribbed iron plate 208 includes three pairs (total of six) of ribs 209a and 209b facing each other at a predetermined interval in the width direction. The truss bars 130 are arranged correspondingly between the ribs 209a and 209b. The interval R between the ribs 209a and 209b is set slightly smaller than the laterally expanded dimension of the lattice muscle 76 in the truss muscle 130, and as shown in FIG. When the truss muscle gripping portion 193 is pressed between the ribs 209a and 209b and the pressing by the truss muscle gripping portion 193 is released as shown in FIG. The ribs 209a and 209b come into contact with the inner surfaces of the ribs 209a and 209b while returning to the state, and the truss bars 130 and the ribbed iron plate 208 are held in an elastically fixed state.
[0045]
(About the iron plate supply department)
As shown in FIG. 40, the iron plate material supply unit 16 includes a roll forming machine 205 disposed downstream of the uncoiler 204, an accumulator 206, and a ribbed iron plate extending below the second truss bar feeder 186. It comprises a conveyor 207. The roll forming machine 205 forms a thin steel plate (metal plate) sent from the uncoiler 204 into a ribbed iron plate 208 having ribs 209a and 209b as shown in FIG. 41, and has already been put into practical use. Since it is a known device, detailed description thereof is omitted. The ribbed iron plate 208 formed by the roll forming machine 205 is transferred to the side by the accumulator conveyor 206 and is transported below the second truss bar conveyor 186 by the ribbed iron plate conveyor 207 at a predetermined position. Stop and wait for the truss muscle 130 to be attached. As shown in FIG. 41, in the ribbed iron plate 208, a first connecting portion 208a formed by simply bending the end portion upward at one side end portion in the longitudinal direction, and the other end portion at the other end portion. A second connecting portion 208b that can be engaged with the first connecting portion 208a is formed by bending the end portion upward and then turning downward, and the adjacent ribbed iron plates 208 are connected in parallel. It has come to be able to do.
[0046]
(About iron plate-truss bar spot welder)
42 shows an iron plate-truss bar spot welder (iron plate) for welding the ribs 209a and 209b of the ribbed iron plate 208 and the truss bars 130 set in a state of being elastically fixed to the ribbed iron plate 208. FIG. FIG. 43 is a front view schematically showing the truss reinforcement welding machine 18, and FIG. 43 is a side view of the spot welding machine 18. In this iron plate-truss bar spot welder 18, an elevating frame 215 is arranged to be movable up and down by a fluid pressure cylinder 216 with respect to a stand 214 fixed to an upper portion of a column 213 erected with the first conveyor 211 interposed therebetween. A welding unit 217 in which a total of 30 welding guns (welding means) 218 are suspended is disposed below the elevating frame 215. The welding gun 218 holds the first bent portion 76a of the lattice 76 in the truss bar 130 and the ribs 209a and 209b in contact with the first bent portion 76a in close proximity to each other from the outside. Electrodes 219 and 219 are provided. A transformer 220 is disposed on the top of the pedestal 214, and the upstream and downstream ends of the welding unit 217 move downward in conjunction with the downward movement of the welding unit 217. Pressing devices 221 and 221 for pressing are provided.
[0047]
Rails 222, 222 extending horizontally at a required interval are laid on the lower portions of both sides of the first conveyor 211 and the second conveyor 212 disposed downstream thereof, and the front end of the ribbed iron plate 208 The first feeding device 223 that clamps the ribbed iron plate 208 and conveys the ribbed iron plate 208 and the second feeding device 224 that clamps both end portions of the ribbed iron plate 208 and conveys the ribbed iron plate 208. , 222 can be moved back and forth. In the first feeding device 223, support columns 226 and 226 are erected on a first moving frame 225 that moves on the rails 222 and 222 at opposite positions sandwiching the conveyor 211, and are connected to a fluid pressure cylinder 228. An inverted U-shaped lifting rod 227 having a clamp member 229 disposed thereon is disposed so as to be movable up and down along rails 230, 230 disposed perpendicular to the columns 226, 226. That is, as shown in FIG. 42, the first feeding device 223 moves the lifting / lowering rod 227 to the conveyor in a state where the first feeding device 223 has moved to the space defined between the first conveying conveyor 211 and the second conveying conveyor 212. It can move down below the level. The gear 232 of the first motor 231 disposed on the first moving frame 225 and the rack-like gear 233 extending along the rail 222 are always meshed, and the first feeding device 223 reciprocates under the welding unit 217 by driving the first motor 231.
[0048]
In the second feeding device 224, support columns 235, 235 are provided upright on a second moving frame 234 that moves on the rails 222, 222 at opposed positions sandwiching the second transport conveyor 212. A clamp member 236 is disposed at the tip of a horizontal rod 235a that extends horizontally from 235. The gear 238 of the second motor 237 disposed on the second moving frame 234 and the rack-like gear 233 extending along the rail 222 are always meshed, and the second feeding device The second motor 237 is driven to reciprocate between the downstream end of the welding unit 217 and the substantially central portion of the second conveyor 212 by driving the second motor 237. The first conveyor 211 is provided with a reference-side fixed guide 239 and a width determining guide 240 that can be moved toward and away from the reference-side fixed guide 239. The attached iron plate 208 is positioned in the width direction. Further, at the position corresponding to the center lower portion of the welding unit 217 in the first transporting conveyor 211, a protruding bar 241 that protrudes vertically above the conveyor 211 is disposed and stopped below the welding unit 217. The upstream and downstream portions of the iron plate 208 are pressed from above by the pressing devices 221 and 221, and the center lower surface of the iron plate 208 is pressed from below by the protrusion rod 241, thereby causing the iron plate 208 to have a required warpage ( It is supposed to give "spinning". That is, as shown in FIG. 60 (b), when the deck D is disposed at a predetermined position of the building structure, the center part in the longitudinal direction is bent downward by its own weight. When the truss bars 130 are welded with each other, when the truss bars 130 are disposed at predetermined positions, the truss bars 130 are appropriately bent and become substantially horizontal. Further, as shown in FIG. 1, a short side straightening machine 269 is disposed downstream of the iron plate-truss spot welding machine 18 to correct warping or bending of the ribbed iron plate 208 in the width direction. It is like that.
[0049]
(About end member spot welder)
FIG. 44 is a front view schematically showing an end member spot welder (end member welder) 19, as shown in FIG. 46 in order to reinforce both ends of the truss bar 130 welded to the ribbed iron plate 208. A V-shaped end member 242 separately processed and molded is set, and the end member 242 and the truss bar 130, and the end member 242 and the ribs 209a and 209b of the ribbed iron plate 208 are welded. . The end member spot welder 19 includes a first welding unit 245 fixed to the frame 244 on the downstream end side of the transport conveyor 243, and an upstream end side of the conveyor 243 on a rail 246 extending horizontally to the frame 244. The second welding unit 247 is arranged to be movable between the downstream end side. Although the first welding unit 245 and the second welding unit 247 are symmetrical in arrangement direction of the constituent members, the basic configuration is the same, so only the second welding unit 247 will be described. The first welding unit 245 is denoted by the same reference numeral and description thereof is omitted. As shown in FIG. 44, a stopper device 248 is disposed at a required position downstream of the frame 244 so that the ribbed iron plate 208 conveyed by the conveyor 243 can be stopped at a predetermined position. It has become.
[0050]
As shown in FIG. 44, the second welding unit 247 includes an end member loader 249 for setting the end member 242 to the end of the truss bar 130, and the set end member 242 for the truss bar 130 and the ribbed iron plate 208. It is comprised from the end member welding part 250 welded to. The end member loader portion 249 includes three rows of stock plates 251 that stock the end members 242 arranged in a tiltable manner and separately processed and formed by an end member molding machine (not shown) in series. A loader chuck 252 for transferring the end member 242 from the plate 251 to the temporary table 253, the temporary table 253 capable of moving back and forth, and the end member 242 mounted on the temporary table 253 at the end of the truss bar 130. The chuck stand 254 is set.
[0051]
As shown in FIG. 45, the end member welded portion 250 is suspended and supported by a rail 256 extending horizontally in the direction perpendicular to the conveying line on the inner side of the pedestal 255, and along the rail 256 by a slide cylinder 258. A double pin charger gun 259, a contact gun 260, and a stud gun 261 are disposed below the movable moving frame 257. The double pincher gun 259 is attached to the lower part of the slide cylinder 264 that slides horizontally at the tip of the rod 263a of the first elevating cylinder 263 disposed on the moving frame 257, and has its tip portion Two electrodes 262 are arranged in parallel at a required interval. That is, by appropriately controlling the first elevating cylinder 263 and the slide cylinder 264, the double pin charger gun 259 has the electrode 262, the lower end portion 242b of the end member 242 and the ribbed iron plate 208 as shown by a two-dot chain line in FIG. These ribs 209a (209b) are set in contact with each other, and the lower end portion 242b and the ribs 209a (209b) are welded using a so-called “direct welding method”.
[0052]
The contact gun 260 is disposed in a suspended state with a required angle at the tip of the rod 265a of the second lifting cylinder 265 disposed on the moving frame 257, and the rod 265a is attached to the second lifting cylinder 265. The tip electrode 266 is set to contact the end portion 130a of the truss muscle 130 by controlling to advance. The stud gun 261 is disposed in a suspended state at the tip of the rod 267a of the third elevating cylinder 267 disposed on the moving frame 257, and the third elevating cylinder 267 is controlled so that the rod 267a moves forward. The tip electrode 268 is set to contact the upper end 242a of the end member 242. That is, the second elevating cylinder 265 and the third elevating cylinder 267 are appropriately controlled so that the electrode 266 of the contact gun 260 and the electrode 268 of the stud gun 261 are connected to the end 130 a of the truss bar 130 and the upper end of the end member 242. By making contact with 242a, the truss bar 130 and the end member 242 are welded using a so-called “indirect welding method”.
[0053]
(Non-slip member spot welder)
47 is a front view schematically showing a non-slip spot welder (non-slip welder) 20, and an L-shaped non-slip which is separately bent as shown in FIG. 49 at both ends of the ribbed iron plate 208. The member 270 is set and welded. This non-slip spot welder 20 includes a first welding unit 273 fixed to a frame 272 on the downstream end side of the conveyor 271 and an upstream end side of the conveyor 271 on a rail 274 that extends horizontally to the frame 272. And a second welding unit 275 disposed so as to be movable between the downstream end side and the downstream end side. Although the first welding unit 273 and the second welding unit 275 are symmetrical in the arrangement direction of the constituent members, the basic configuration is the same, so only the second welding unit 275 will be described. The first welding unit 273 is denoted by the same reference numeral and description thereof is omitted.
[0054]
As shown in FIG. 48, the second welding unit 275 is provided with a welding machine body 278 that can be rotated via a support shaft 277 on a moving frame 276 that moves on the rail 274. The main body 278 is connected to a rod 279a of a fluid pressure cylinder 279 fixed to the moving frame 276, and can swing between a vertical state and an inclined state at a required angle. In this welding machine main body 278, an upper electrode 280 erected vertically downward and a lower electrode 281 erected vertically upward via a U-shaped arm 282 are disposed on the same axis, not shown. The drive means can approach and separate from each other.
[0055]
The non-slip member 270 is positioned and set at a required position at the front and rear ends of the ribbed iron plate 208 by a parts feeder (not shown), and in this state, the fluid pressure cylinder 279 is controlled in the direction in which the rod 279a moves backward. The welder body 278 is pivotally displaced in the vertical state, and the upper and lower electrodes 280 and 281 are positioned above and below the non-slip member 270. In this state, the upper and lower electrodes 280 and 281 are moved close to each other, brought into contact with the anti-slip member 270 and the ribbed iron plate 208 and energized, whereby the anti-slip member 270 is welded to the ribbed iron plate 208.
[0056]
The deck D that does not require the mounting of the anti-slip member 270 is controlled so as to pass through the anti-slip spot welder 20.
[0057]
(About slitter)
FIG. 50 is a front view schematically showing the slitter 21. The slitter 21 cuts the ribbed iron plate 208 of the deck D being conveyed at an arbitrary position to produce the deck D having different width dimensions. The deck D, which is used for the occasion, but does not require cutting, passes through as it is. A slitter 21 provided with cutting blades 285 and 286 on the upper and lower sides is fixed to a frame 287 and connected to the non-slip spot welder 20 on the upstream side of the first transfer conveyor 288, and fixed to the frame 289 to be described later. 12 is located between the second transport conveyor 290 on the downstream side and connected to the base body 291 so as to be slidable in a direction perpendicular to the transport line. In addition, a driving roller 292 connected to a motor 294 via timing belts 293 and 293 is disposed at an intermediate portion of the first conveying conveyor 288 and a downstream end portion of the second conveying conveyor 290, and the deck D The ribbed iron plate 208 is conveyed while being pinched between the drive roller 292 and a guide roller 295 arranged to be freely rotatable.
[0058]
As shown in FIGS. 50 and 51, the slitter 21 is provided with the cutting blades 285, 286 on a rectangular frame-like frame 296 that can be slid to the base body 291 by a driving means (not shown). The deck D passes through the inside of the frame 296. The lower cutting blade 286 is attached to the end of a rotary shaft 298 that is pivotally supported by a lower support base 297 fixed to the frame 296, and is rotated by a motor 299 that is linked to the rotary shaft 298. Further, the upper cutting blade 285 is fixed to the end portion of the rotating shaft 302 supported by the upper support base 300 that can be moved up and down with respect to the frame 296 by the fluid pressure cylinder 301, and is arranged to be freely rotatable. . The upper cutting blade 285 can finely adjust the position of the upper cutting blade 285 relative to the lower cutting blade 286 by rotating the handle 303. The upper support base 300 has a required inclination angle.
[0059]
When the slitter 21 configured as described above is slid and fixed to a required position by a driving means (not shown), the upper and lower cutting blades 285 and 286 come to face the feeding line. The ribbed iron plate 208 of the deck D that is transported in a state where the positioning in the width direction is performed is sent to the second transport conveyor 290 side while being cut at a predetermined position.
[0060]
(About inspection station)
FIG. 52 is a plan view schematically showing a part of the inspection station 12 and the unloading station 13 disposed on the downstream side of the slitter 21. The inspection station 12 includes a remaining material discharging device 306 and an inspection table. 307 etc. are arranged. The upstream end (left side in FIG. 52) of the transfer conveyor 308 is connected to the downstream end of the second transfer conveyor 290 in the slitter 21, and each deck D that has completed all the steps is transferred to the transfer conveyor 308. And stop in contact with the stopper 309. In addition, a cross conveyor 310 composed of five belt bodies positioned at every required interval is arranged on the transport conveyor 308 in an orthogonal state. As shown in FIG. 53, the transport conveyor 308 is not shown. It is moved up and down by a lifting device. That is, the transport conveyor 308 extends upward from the cross conveyor 310 when it is raised, and retreats downward from the cross conveyor 310 when it is lowered. Accordingly, the deck D transported from the upstream side is stopped by moving on the transport conveyor 308 extending to the raised position, and then the transport conveyor 308 is lowered to be placed on the cross conveyor 310. It becomes a state.
[0061]
(About the cross conveyor)
The cross conveyor 310 is disposed in a state extending between the inspection table 307 disposed on both sides of the transport conveyor 308 and the reversing machine 22 described later, and the deck transferred from the transport conveyor 308. This is for selectively transferring D appropriately to the inspection table 307 or the reversing machine 22 side. That is, when inspecting the deck D, the cross conveyor 310 is driven to rotate to the inspection table 307 side, the deck D is moved to the inspection table 307 side, the required inspection is performed, and the cross conveyor after the inspection is completed. If 310 is rotated in the reverse direction, the deck D is fed to the reversing machine 22 side. When the deck D is not inspected, the cross conveyor 310 is rotated to the reversing machine 22 side, and the deck D is directly transferred to the reversing machine 22 side. The inspection table 307 is equipped with various devices for inspecting the dimensions of the completed deck D, the welding state between the iron plate 208 and the truss bar 130, the welding state between the lattice bar 76 and the upper bar 40, and the like. .
[0062]
(About the remaining material dispensing device)
As shown in FIGS. 52 and 53, the remaining material discharging device 306 disposed above the conveyor 308 is provided with a deck retraction mechanism 311 for hooking the deck D cut by the slitter 21. ing. In other words, the deck retraction mechanism 311 holds the deck D as a product by the latching chuck 312 and raises it so that the remaining material placed on the cross conveyor 310 is rotated by the cross conveyor 310. Under the drive, the pallet 313 disposed on the side of the inspection table 307 can be paid out. After the remaining material is dispensed, the hooked deck D is placed on the cross conveyor 310 again.
[0063]
(About the unloading station)
As shown in FIGS. 1 and 52, the carry-out station 13 is composed of the reversing machine 22, the deck transfer device 324, the packing machine 23, and the like, and the deck D that has passed through the inspection station 12 is appropriately disposed. After packing in a stacked state, it is carried out to the finished product stock yard.
[0064]
(About reversing machine)
54 is a side view schematically showing the reversing machine 22, and as shown in FIGS. 52 and 53, the reversing machine 22 is disposed on the side of the cross conveyor 310. FIG. The reversing machine 22 is a device for reversing the front and back of the deck D fed from the cross conveyor 310 as necessary. The reversing machine 22 is rotatably mounted between the support columns 315 and 315 via a timing belt 319. A rotating shaft 316 connected to the motor 320, a plurality of rotating rods 317 fixed to the rotating shaft 316 and extending in a direction orthogonal to the axial direction of the rotating shaft 316, and an inverted deck D are mounted. It is basically composed of a mounting table 318 to be placed. That is, the swivel bar 317 is driven to control the motor 320 connected to the rotation shaft 316, and thereby horizontally extends to the cross conveyor 310 side and to the upper side of the mounting table 318. The deck D that has been temporarily stopped at the downstream end of the cross conveyor 310 can be transferred to the mounting table 318 in a state where the front and back are reversed.
[0065]
As shown in FIG. 54, the swivel bar 317 is provided with an adsorption device 321 such as an electromagnet or an air suction nozzle, and is reversed with the deck D being appropriately adsorbed and held. As shown in FIG. 52 or 54, an ink jet printer 322 is disposed on the side of the reversing machine 22, and the required iron plate 208 with ribs in the deck D stopped at the downstream end of the cross conveyor 310 is required. Various information data such as a deck number, a delivery destination, and an arrangement position are printed at the position.
[0066]
(Deck transfer device)
As shown in FIG. 53, the deck transfer device 324 extends the completed deck D stopped at the downstream end of the cross conveyor 310 or the completed deck D reversed by the reversing machine 22 to the side of the reversing machine 22. It is for transferring to an existing carry-out conveyor 325 and stacking sequentially. Between the upper side of the reversing machine 22 and the upper side of the carry-out conveyor 325, fixed frames 326, 326 extending horizontally and in parallel are arranged, and on the rails 327 laid on the upper surfaces of the fixed frames 326, 326, A moving frame 328 that can be reciprocated by a driving means (not shown) is disposed. The moving frame 328 is provided with an elevating rod 330 that can be moved up and down by a fluid pressure cylinder 329, and a first latching portion 331 and a second hanging portion for latching and holding the deck D at the lower portion of the elevating rod 330. A stop 332 is provided.
[0067]
As shown in FIGS. 53 and 55, the first hooking portion 331 is used to hook the deck D stopped at the downstream end of the cross conveyor 310, that is, the deck D that is not reversed by the reversing machine 22. Is. The first hooking portion 331 includes a support shaft 335 provided between support plates 334 and 334 provided in a suspended state on a rod 333 a of a first elevating cylinder 333 provided on the elevating rod 330. The upper ends of the latching chucks 336 and 336 that are pivotally supported by the shaft 335 are connected to the bottom side 337b of the fluid pressure cylinder 337 and the rod 337a, respectively. That is, when the fluid pressure cylinder 337 is controlled so that the rod 337a moves forward, the lower ends of the gripping chucks 336 and 336 come close to each other, so that the upper end of the truss muscle 130 as shown in FIG. It is possible to pull up the deck D while the line 40 is hooked.
[0068]
As shown in FIGS. 53 and 56, the second hooking portion 332 is for hooking the deck D placed in a reversed state on the placing table 318 of the reversing machine 22. The second latching portion 332 is a first latching claw 341 that is slidably moved by the cylinder 340 before and after the support 339 suspended from the rod 338 a of the second lifting cylinder 338 disposed in the lifting rod 330. And the 2nd latching claw 343 rotated by the cylinder 342 is arrange | positioned. That is, by appropriately controlling the cylinders 340 and 342, the hooking claws 341 and 343 can be locked to both side ends of the ribbed iron plate 208 in the inverted deck D, and the deck D can be pulled up. Become.
[0069]
Therefore, in the deck transfer device 324 configured as described above, the non-inverted deck D first stopped at the downstream end of the cross conveyor 310 is hooked by the first hooking portion 331 and transferred onto the carry-out conveyor 325. To do. Then, when the next deck D fed to the cross conveyor 310 is reversed by the reversing machine 22 and the placement on the placement table 318 is completed, the reversed deck D is moved to the second hooking portion 332. And is placed above the deck D transferred on the carry-out conveyor 325. By repeating these operations, a plurality of decks D can be placed in a stacked state on the carry-out conveyor 325 as shown in FIG. As shown in FIG. 55 (b), when the first hooking portion 331 operates, the second hooking portion 332 rises to prevent interference with the deck D, and FIG. 56 (b). As shown, when the second hooking portion 332 operates, the first hooking portion 331 rises to prevent interference with the deck D.
[0070]
As shown in FIG. 1, a known packing machine 23 is disposed on the downstream side of the carry-out conveyor 325, and the deck D transported in a stacked state is banded and packed. Yes.
[0071]
[Effect of the embodiment]
The deck D as a product is formed in a plurality of types having different dimensions for the overall length, the entire width, and the height of the truss bar, but the basic configuration is the same even if the dimensions are different, as shown in FIG. The ribbed iron plate 208 is formed with ribs 209a and 209b spaced apart at a required interval in the width direction, and the truss bars 130 are arranged between the ribs 209a and 209b. It is composed of a muscle 76. Further, V-shaped end members 242 are welded to both end portions of the truss bar 130 attached to the ribbed iron plate 208, and anti-slip members 270 are welded to both end portions of the iron plate 208 as necessary. Or the iron plate 208 with a rib is cut | disconnected, and the deck D from which a width dimension differs is also manufactured. Since the deck manufacturing / assembly line 9 relating to the manufacturing apparatus configured as described above is a fully automated manufacturing and assembly of the deck D, the deck manufacturing / assembling line 9 according to the present invention is performed next. A method for manufacturing a slab deck in a building structure will be described with reference to FIGS.
[0072]
(Forming and feeding the top bar)
As shown in FIGS. 2 to 9, the upper bar 40 is composed of a feeding conveyor 26, an upper bar cutter 27, a drawer conveyor 28, an upper bar conveyor 29, an upper bar conveyor 30, and the like. 14 is supplied. That is, 10 reinforcing bars (wires) 25 taken out from the wire stocker are placed in parallel from the upstream side of the feeding conveyor 26 under the rotational drive of the feeding conveyor 26 and the drawing conveyor 28, and the upper end bar cutting machine 27. Are fed into the drawer conveyor 28 through the reinforcing bar alignment portion 32. Each reinforcing bar 25 that has advanced to the drawer conveyor 28 comes into contact with a contact plate 39 of the back gauge 38 that is moved and adjusted to a predetermined position prior to the loading operation, and stops. Then, by drivingly controlling the upper end bar cutting machine 27 and moving the cutting blade 35 downward, each reinforcing bar 25 is cut at the reinforcing bar aligning portion 32 to form the upper end bar 40 having a required length. Each upper bar 40 obtained by cutting is transferred to the upper bar of the upper bar feeder 29 arranged on the side of the drawer conveyor 28 under the operation of the upper bar feeding mechanism 41 arranged on the drawer conveyor 28. Pay out to Department 47. When changing the length of the upper end bar 40, the distance between the contact plate 39 and the cutting blade 35 may be displaced by moving the back gauge 38 to a predetermined position.
[0073]
In the upper bar feeder 29, the upper bar 40 discharged from the drawer conveyor 28 is temporarily stocked on the first mounting plates 50 and 50 and the second mounting plate 54 in the upper bar transfer section 47, and appropriately. Three of the top muscles 40 stocked at the timing are placed on the placement table 56. The three upper muscles 40 placed on the mounting table 56 are simultaneously grasped one by one by the gripping chucks 59a, 59b, 59c in the upper muscle feeding part 48, and the upper muscles 40 gripped by the first gripping chuck 59a are The upper end muscle 40 transferred to the first upper end bark conveyor 30A and transferred by the second gripper chuck 59b to the second upper end barb conveyor 30B, and the upper end barr 40 gripped by the third gripper chuck 59c is transferred to the third upper bar bar 40c. It is transferred to the upper bar conveyor 30C.
[0074]
The upper bar 40 transferred to the upper bar conveyor 30A is transferred to the upper bar / lattice bar conveyor 110A arranged on the downstream side under the rotation of the conveyor 30A, and stopped at a predetermined position by the stopper 124. And wait. Further, the upper bar 40 transferred to the upper bar conveyor 30B is transferred to the upper bar / lattice bar conveyor 110B disposed downstream of the conveyor 30B and stopped at a predetermined position by the stopper 124. The upper bar 40 transferred to the upper bar conveyor 30C is transferred to the upper bar / lattice bar conveyor 110C disposed on the downstream side under the driving of the conveyor 30C, and is moved to a predetermined position by the stopper 124. Stop at and wait.
[0075]
(Lattice forming and feeding)
As shown in FIGS. 10 to 17, the lattice 76 is disposed on the downstream side of the automatic lathe 72 in the reinforcing bar supply direction and on the downstream side of the forming machine 72. A total of three sets of lattice forming lines 70A, 70B, and 70C formed by the lattice feed conveyor 73, and a lattice feed device 74 disposed on the downstream side of each of the lattice feed conveyors 73A, 73B, and 73C. Three are simultaneously formed and supplied by the lattice reinforcing material supply portion 15 constituted by the following. That is, in the first lattice forming line 70A, the wire rod 75 drawn out from the automatic line stand 71 is sequentially bent by the lattice forming machine 72 to form the required length of the lattice 76, and the first lattice reinforcing line 70A is formed. It conveys to the lattice-strain conveying apparatus 74 side with the conveyance conveyor 73A. Further, in the second lattice forming line 70B, the wire 75 drawn from another automatic wire stand 71 is sequentially bent by a lattice automatic forming machine 72 to form a required length of the lattice 76, and the second lattice 76 is formed. It is transported to the lattice streak transport device 74 side by the streak transport conveyor 73B. Further, in the third lattice forming line 70C, the wire rod 75 drawn out from another automatic wire stand 71 is sequentially bent by a lattice automatic forming machine 72 to form a required length of the lattice 76, and the third lattice 76 is formed. It is transported to the lattice streak transport device 74 side by the streak transport conveyor 73C.
[0076]
In each lattice feed conveyor 73A, 73B, 73C, the conveyed lattice 76 is transferred to the lattice holding part 93 under the operation of the lattice releasing mechanism 92, and the lattice holding part 93 further includes a first one. The lattice muscle 76 latched by the latching portion 96 a is transferred to the second latching portion 96 b under the operation of the cylinder cylinder 97. Then, the lattice 76 that is hooked on the second hook 96b of each of the lattice feed conveyors 73A, 73B, and 73C is transferred to the latch chuck 103 of each transfer portion 104A, 104B, and 104C in the lattice feed device 74. The hook is held and transferred to the upper end / lattice streak conveyor 110A, 110B, 110C. That is, the lattice muscle 76 latched by the latch chuck 103 of the first transfer unit 104A is placed on the upper end muscle 40 waiting on the first upper end muscle / lattice muscle conveyor 110A, and the second transfer unit. The lattice muscle 76 latched by the latch chuck 103 of 104B is placed on the upper end muscle 40 waiting on the second upper muscle / lattice muscle conveyor 110B, and the latch chuck 103 of the third transfer section 104C. The lattice muscle 76 latched in step 3 is placed on the upper end muscle 40 waiting on the third upper end muscle / lattice muscle conveyor 110C.
[0077]
(Spot welding and bending of upper and lower bars)
As shown in FIGS. 18 to 20, each of the upper end bars 40 and the lattice bars 76 transferred to the upper end / lattice line conveyors 110 </ b> A, 110 </ b> B, 110 </ b> C is provided with a motor 111 and a motor 122. Rotate and drive to each truss automatic molding machine 17A, 17B, 17C.
[0078]
In each truss automatic molding machine 17A, 17B, 17C, as shown in FIG. 21 to FIG. 27, the upper end bar 40 and the lattice bar 76 that are transported by raising the free roller 142 disposed below the transport line are guided. When the upper end bar 40 and the lattice bar 76 stop at predetermined positions, the free roller 142 is lowered and held by the chuck 157 and the lattice bar pressers 144 and 144 are held close to each other. Next, as shown in FIG. 24, the guide rail 140A and the guide rail 140B are separated from each other, and the second bending mechanism 150 is operated to move the second pressing member 155 beyond the conveying line, whereby the lattice muscle 76 is obtained. Is tilted toward the guide rail 140A, and the lattice muscle 76 is held in this state. Then, as the welding process, the upper electrode 40 and the lattice muscle 76 that are stopped at predetermined positions are brought close to each other by bringing the first electrode 147 and the second electrode 148 in the welding unit 133 close to each other. The second bent portion 76b is joined. Further, as a bending step performed simultaneously with the welding step, the first bending portion 76a held by the second pressing member 155 of the second bending mechanism 150 is moved to the position by operating the first bending mechanism 149 in the bending unit 134. The first bent portion 76a pressed by the first pressing member 152 of the first bending mechanism 149 is deformed to the opposite side beyond the conveying line, and as a result, the lattice muscle 76 is expanded in a staggered manner. Open molding. The truss bars 130, which have been formed by performing the welding process and the bending process several times, are hooked on the truss bar holding base 158 in a state where the truss bars are turned upside down at the respective payout portions 132, and then the elevator 160 To move up.
[0079]
After being formed by each truss reinforcement automatic molding machine 17A, 17B, and 17C, each truss reinforcement 130 that has been lifted and moved by the elevator 160 and is standing by 3 in the first truss reinforcement conveyor 165, as shown in FIG. The gripping chucks 169a, 169b, and 169c are sequentially gripped and transferred to the holding grooves 171a, 171b, and 171c of the pitch feed shuttle 170. That is, the first gripping chuck 169a grips the truss muscle 130 formed by the first truss muscle automatic molding machine 17A, and the second gripping chuck 169b grips the truss muscle 130 formed by the second truss muscle automatic molding machine 17B. The third gripping chuck 169c grips the truss bar 130 formed by the third truss bar automatic molding machine 17C.
[0080]
As shown in FIGS. 29 to 32, the truss bar 130 transferred to the first holding groove 171a, the second holding groove 171b, and the third holding groove 171c of the first mounting table 171 in the pitch feed shuttle 170 is second mounted. It is transferred to the fourth holding groove 171d, the fifth holding groove 171e, and the sixth holding groove 171f under the vertical movement and reciprocation of the mounting table 172, and further, the seventh holding groove 171g, the eighth holding groove 171h, and the ninth It is sequentially transferred to the holding groove 171i. The truss bars 130 placed in the seventh holding groove 171g, the eighth holding groove 171h, and the ninth holding groove 171i are raised while being placed on the holding members 185 while the lifting platform 173 is moved up.
[0081]
(Forming and supplying steel plates with ribs)
As shown in FIG. 40, an iron plate fed from the uncoiler 204 is formed as a ribbed iron plate 208 having three pairs of ribs 209a and 209b by a roll forming machine 205 disposed downstream, and an accumulator 206 and ribs are formed. The ribbed iron plate 208 is conveyed to a predetermined position below the second truss bar conveying device 186 by the iron plate conveying conveyor 207, and is placed on standby for the truss bar 130 mounting set.
[0082]
On the other hand, as shown in FIGS. 33 to 39, the three truss muscles gripped by the second truss muscle transporting device 186 are moved to the three truss bars 130 that have been raised on the lifting platform 173 of the pitch feed shuttle 170. At the same time, the portion 193 is gripped and transferred to the ribbed iron plate 208. The second truss bar conveyor 186 grips each truss bar 130 formed by forming the lattice bars 76 in a staggered manner while being elastically deformed by pressing each truss bar gripping portion 193 from the side. By releasing the pressure after reaching between the ribs 209a and 209b in 208, the truss bar 130 and the iron plate 208 with ribs are held in an elastically fixed state by using the restoring force of the truss bar 130. .
[0083]
(Spot welding of iron plate and truss bar)
When the elastic fixing of the three truss bars 130 to the ribbed iron plate 208 is completed, the ribbed iron plate 208 is transported to the iron plate-truss spot welding machine 18. In this iron plate-truss spot welding machine 18, as shown in FIGS. 42 and 43, first, the first feeding device 223 is moved to the upstream side of the first conveyor 211, and the ribbed iron plate 208 conveyed from the upstream side. After the front end portion is clamped by the clamp member 229, the first feeder 223 is moved to the downstream side to position the ribbed iron plate 208 below the welding unit portion 217. Further, the upper surfaces of the upstream portion and the downstream portion of the iron plate 208 are pressed from above by the pressing devices 211, 211, and the lower surface of the central portion of the iron plate 208 is pressed from below by the protruding rod 241, so Give warpage. Then, the fluid pressure cylinder 216 is controlled to move the welding unit 217 downward, and the electrodes 219 and 219 of each welding gun 218 are brought into contact with the first bent portion 76a of the lattice 76 and the ribs 209a and 209b, respectively. Thus, the first bent portion 76a and the ribs 209a and 209b are welded. When this welding operation is completed, the welding unit 217 is moved up, the side member of the iron plate 208 is clamped by the clamp member 236 of the second feeding device 224, and the first feeding device 223 is lowered, and the second feeding is performed. After the apparatus 236 is moved to the downstream side of the second conveyor 212 to convey the iron plate 208 by a required distance, the welding unit 217 is moved down again to perform the same welding operation as described above. By repeating this several times, the welding of all the first bent portions 76a of the lattice muscle 76 and the ribs 209a and 209b is completed.
[0084]
(Spot welding of end members)
The deck D on which the spot welding of the iron plate 208 and each truss bar 130 has been completed is conveyed to the end member spot welder 19 disposed on the downstream side of the iron plate-truss bar spot welder 18. In the end member spot welder 19, the deck D is stopped at a predetermined position on the conveyor 243 by the stopper device 248 as shown in FIGS. Next, the second welding unit 247 is moved to a predetermined position, and the separately formed end member 242 is set on the first welding unit 245 and the stock plate 251 of the second welding unit 247. Then, by driving the end member loader portion 249 in each welding unit 245, 247, the end member 242 set on the stock plate 251 is placed on the temporary placement table 253 by the loader chuck 252, and then the chuck stand 254 is used to Set at the end of truss muscle 130.
[0085]
Next, the first elevating cylinder 263 and the slide cylinder 264 are appropriately controlled so that the electrode 262 of the double pin charger gun 259 is brought into contact with the lower end portion 242b of the end member 242 and the rib 209a (209b) of the ribbed iron plate 208 to energize. As a result, the lower end 242b and the rib 209a (209b) are welded. Further, the second elevating cylinder 265 and the third elevating cylinder 267 are appropriately controlled so that the electrode 266 of the contact gun 260 and the electrode 268 of the stud gun 261 are connected to the end portion 130a of the truss bar 130 and the upper end 242a of the end member 242. The truss bar 130 and the end member 242 are welded by contacting and energizing. As shown in FIGS. 1 and 57, a short side straightening machine 269 is disposed at the upstream end of the end member spot welder 18, and prior to the welding of the end member 242, the iron plate 208 in the deck D is fixed. The warp in the width direction is corrected.
[0086]
(Spot welding of non-slip members)
In the deck D in which spot welding of the end member 242 is completed, what is attached to the anti-slip member 270 is conveyed to the anti-slip spot welder 20 disposed on the downstream side of the end member spot welder 19. In the non-slip spot welder 20, as shown in FIGS. 47 to 49, the deck D is stopped at a predetermined position on the transport conveyor 271 by a stopper device (not shown). Then, the second welding unit 275 is moved to a predetermined position, and the non-slip member is moved to the required position at the end of the ribbed iron plate 208 by the first welding unit 273 and the part feeder (not shown) disposed in the second welding unit 275. 270 is set.
[0087]
Next, the fluid pressure cylinder 279 is controlled in the direction in which the rod 279a is retracted, and the welding machine body 278 is rotationally displaced in the vertical state, so that the upper and lower electrodes 280 and 281 are positioned above and below the non-slip member 270. The upper and lower electrodes 280 and 281 are moved close to each other and energized while being in contact with the anti-slip member 270 and the ribbed iron plate 208, thereby welding the anti-slip member 270 to the ribbed iron plate 208. The deck D that does not require mounting of the anti-slip member 270 is controlled to pass through the anti-slip spot welder 20.
[0088]
(Deck cutting)
The deck D for cutting the ribbed iron plate 208 is conveyed to a slitter 21 disposed on the downstream side of the non-slip spot welder 20. In this slitter 21, as shown in FIG. 50 and FIG. 51, the ribbed iron plate 208 of the deck D being conveyed is cut at an arbitrary position, and the deck D having different width dimensions is manufactured. That is, when the frame 296 is slid by a driving means (not shown) and the upper and lower cutting blades 285 and 286 are brought to the required positions on the feeding line, the first conveying conveyor 288 is positioned in the width direction. The ribbed iron plate 208 of the deck D that is transported in step S1 is sent to the second transport conveyor 290 side while being cut at a predetermined position. The deck D that is not cut by the slitter 21 retracts the cutting blades 285 and 286 from the transport line when the deck D passes through.
[0089]
(Inspection and removal)
The deck D with the anti-slip member that has passed through the slitter 21 and the deck D that has been cut through the anti-slip spot welder 20 are both conveyed to the conveyor 308 as shown in FIGS. After stopping in a state of being in contact with the stopper 309, it is transferred to the cross conveyor 310 orthogonal to the transport conveyor 308. When inspecting the transported deck D, the deck D is moved to the inspection table 307 side by the cross conveyor 310. The deck D after the inspection and the deck D that is not inspected are driven to rotate the cross conveyor 310 and conveyed to the reversing machine 22 side.
[0090]
Note that the deck D cut by the slitter 21 is conveyed to the conveyor 308 together with the remaining material and stopped, and then is latched and raised by the retaining chuck 312 of the remaining material discharging device 306. Next, the remaining material that has been placed on the cross conveyor 310 is delivered to a pallet 313 disposed on the side of the inspection table 307 under the rotational drive of the cross conveyor 310. Then, the hooked deck D is placed on the cross conveyor 310 again after the remaining material is dispensed, and conveyed to the reversing machine 22 side.
[0091]
When the deck D is temporarily stopped on the downstream side of the cross conveyor 310, an ink jet printer 322 disposed on the side of the cross conveyor 310 causes the deck NO, delivery destination, and arrangement to be provided at a required position of the ribbed iron plate 208. Print various information data such as position.
[0092]
When predetermined printing by the inkjet 322 is completed, the deck D is hooked by the first hooking portion 331 and the second hooking portion 332 of the deck transfer device 324 and moved to the carry-out conveyor 325. That is, the deck D first transported by the cross conveyor 310 is latched by the first latching portion 331 without being reversed by the reversing machine 22 and transferred to the carry-out conveyor 325. Then, the second deck D transported by the cross conveyor 310 is inverted by the reversing machine 22 and placed on the placing table 318 in an inverted state, and this deck D is placed by the second hooking portion 332. It is placed on the first deck D that is hooked and placed on the carry-out conveyor 325. Next, the third deck D transported by the cross conveyor 310 is hooked by the first hooking portion 331 without being reversed by the reversing machine 22 and placed on the carry-out conveyor 325. Place it on top of the second deck D. Further, the fourth deck D transported by the cross conveyor 310 is reversed by the reversing machine 22 and placed on the placing table 318 in a reversed state, and this deck D is placed by the second hooking portion 332. It is placed in a state of being overlaid on the third deck D that is hooked and placed on the carry-out conveyor 325. By repeating the above-described steps, the decks D can be alternately stacked.
[0093]
A predetermined number of decks D stacked on the carry-out conveyor 325 are sent to a packing machine 23 disposed on the downstream side of the carry-out conveyor 325, and after necessary banding and packing, they are carried out to a finished product stock yard. To do.
[0094]
【The invention's effect】
As described above, according to the method for manufacturing a deck for a slab in a building structure according to the present invention, the forming process of each member of the upper end reinforcement, the lattice reinforcement, and the ribbed iron plate, which are the basic components of the deck, is completely automated. In addition, the welding process of the upper and lower bars, the bending process of the formed truss bars, the welding process of the truss bars and ribbed iron plate, and the welding process of various accessories such as end members are also automated. You can do it. Therefore, it is possible to reduce the production cost related to the manufacture of the deck, and it is possible to manufacture the decks of various sizes accurately and quickly, and there is an extremely beneficial effect that can flexibly cope with the progress of the construction on the construction site.
[0095]
Further, according to the apparatus for manufacturing a slab deck in a building structure according to the present invention, not only is it possible to fully automate the molding process of each member of the upper end reinforcement, the lattice reinforcement and the ribbed iron plate, which are basic components of the deck, It has become possible to fully automate the welding process of the upper and lower bars, the bending process of the formed truss bars, the welding process of the truss bars and ribbed iron plates, and the welding process of various accessories such as end members. In addition, the full automation can produce a high-quality deck, eliminate quality variations including the occurrence of defective products, etc., and can also easily produce decks with different dimensions.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of an apparatus for manufacturing a slab deck in a building structure according to a preferred embodiment of the present invention.
FIG. 2 is a plan view schematically showing an input conveyor, an upper bar cutter, and a drawer conveyor in the upper bar feeder in the deck manufacturing apparatus of the embodiment.
FIG. 3 is a side view schematically showing an upper end muscle cutting machine.
FIG. 4 is a side view showing an upper end stripe payout mechanism disposed on the drawer conveyor.
FIG. 5 is an explanatory diagram showing a state in which the upper end muscle is paid out from the tilted swinging plate by operating the upper end stripe dispensing mechanism to push up the upper end reinforcement.
FIG. 6 is a plan view of the upper end streak conveying device.
FIG. 7 is a side view of the upper streak conveying device.
FIG. 8 is a side view schematically showing the configuration of an upper bar transfer portion in the upper bar conveyor apparatus.
FIGS. 9A and 9B are a side view and a front view schematically showing a gripping chuck of an upper muscle conveyance unit in the upper muscle conveyance device. FIGS.
FIG. 10 is a plan view schematically showing an automatic cable platform, a lattice muscle automatic forming machine, a lattice muscle conveying conveyor, and a lattice muscle conveying device in a lattice muscle feeding portion.
FIG. 11 is a schematic configuration diagram of a lattice muscle automatic molding machine.
FIG. 12 is a plan view of a lattice muscle transport device.
FIG. 13 is a side view of the lattice muscle transport device.
FIG. 14 is a front view of the lattice muscle transport device.
FIG. 15 is a side view showing a lattice stripe payout mechanism and a lattice reinforcement holding portion disposed on the lattice reinforcement conveyor.
FIG. 16 is a plan view showing a lattice stripe payout mechanism and a lattice reinforcement holder disposed on the lattice reinforcement conveyor;
FIGS. 17A and 17B are a side view and a front view schematically showing a latch chuck of each transfer portion in the lattice muscle transport apparatus. FIGS.
FIG. 18 is an explanatory diagram showing a state in which a lattice is transferred onto the upper end / lattice-conveying conveyor.
FIG. 19 is a side view of the upper-end / lattice-line conveyor.
FIG. 20 is a side view of a feed roller portion disposed at the downstream end of the upper end / lattice line conveyor.
FIG. 21 is a side view schematically showing a forming portion of the truss reinforcement automatic forming machine.
FIG. 22 is a plan view schematically showing a forming portion of the truss reinforcement automatic forming machine.
FIG. 23 is an explanatory view showing the welding unit disposed in the forming portion in the truss reinforcement automatic forming machine in an operating state.
FIG. 24 is a side view showing a forming part in the truss reinforcement automatic forming machine in an operating state of the welding unit.
FIG. 25 is a side view showing a forming portion in the truss reinforcement automatic forming machine in an operating state of the bending unit.
FIG. 26 is a plan view schematically showing a payout portion of the truss reinforcement automatic molding machine.
FIG. 27 is a side view schematically showing a payout portion of the truss reinforcement automatic molding machine.
FIG. 28 is a side view schematically showing the first truss reinforcement device.
FIG. 29 is a side view schematically showing a pitch feed shuttle.
FIG. 30 is an operation explanatory diagram showing an operation mode of the second mounting table in the pitch feed shuttle.
FIG. 31 is a front view showing a part of the pitch feed shuttle.
FIG. 32 is an explanatory diagram of the operation of the lifting platform in the pitch feed shuttle.
FIG. 33 is a side view schematically showing a second truss reinforcement device.
FIG. 34 is a front view schematically showing a second truss reinforcement device.
FIG. 35 is a front view showing a clamp mechanism portion in the truss bar gripping portion of the second truss bar conveyor device.
FIG. 36 is an explanatory diagram showing the configuration and operation mode of the clamp mechanism in the truss bar gripping part of the second truss bar transport device.
FIG. 37 is a bottom view of the clamp mechanism in the truss bar gripping part of the second truss bar transport device.
FIG. 38 is a side view showing a gripping chuck disposed in a truss bar gripping portion of the second truss bar transport device.
FIG. 39 is an explanatory diagram showing a state in which the clamp mechanism presses the truss bars and a state in which the press is released.
FIG. 40 is a plan view schematically showing a roll forming machine, an accumulator conveyor, and a ribbed iron plate conveyor in an iron plate feeding section.
FIG. 41 is a perspective view schematically showing a ribbed iron plate formed by a roll forming machine.
FIG. 42 is a front view schematically showing an iron plate-truss spot welding machine.
FIG. 43 is a side view schematically showing a welding unit in the iron plate-truss spot welding machine.
44 is a front view schematically showing an end member spot welder. FIG.
FIG. 45 is an explanatory view schematically showing an end member welded portion in an end member spot welder.
FIG. 46 is a perspective view schematically showing a state in which the end member is attached to the truss bar of the deck.
FIG. 47 is a front view schematically showing a non-slip spot welder.
FIG. 48 is an explanatory view schematically showing a welder body in a non-slip spot welder.
FIG. 49 is a perspective view schematically showing a state in which the non-slip member is attached to the ribbed iron plate.
FIG. 50 is a front view schematically showing a slitter.
FIG. 51 is a side view schematically showing a frame in which a cutting blade in a slitter is disposed.
FIG. 52 is a plan view schematically showing a part of the inspection station and the carry-out station.
FIG. 53 is a side view schematically showing an inspection station and a carry-out station.
FIG. 54 is a side view schematically showing a reversing machine.
FIG. 55 is an operation explanatory diagram of the first hooking portion in the deck transfer device.
FIG. 56 is an operation explanatory diagram of a second hooking portion in the deck transfer device.
FIG. 57 is a flowchart showing a manufacturing process of a deck.
FIG. 58 is an explanatory diagram schematically showing a manufacturing process of a deck.
FIG. 59 is a schematic perspective view of a completed deck.
FIG. 60 is a cross-sectional view of the slab portion of the building structure showing the usage state of the deck.
FIG. 61 is a side sectional view of a slab schematically showing a use state of decks having different truss bar height dimensions.
[Explanation of symbols]
  17 Truss automatic machine
  18 Iron plate-Truss bar spot welder (Iron plate-Truss bar welder)
  19 End member spot welder (end member welder)
  20 Non-slip spot welder (Non-slip welder)
  21 Slitter
  25 Rebar (Wire)
  27 Upper end muscle cutting machine
  35 Cutting blade
  40 Top muscle
  72 Lattice muscle automatic molding machine
  74 Lattice muscle transport device
  75 Wire
  76 Lattice muscle
  76a First turn part
  76b Second bend
  79 Correction Department
  81 chuck
  87 Pressing member
  130 truss muscle
  131 Molding part
  132 Dispensing department
  133 Welding unit
  134 Bending unit
  186 truss reinforcement device
  195 Clamp piece
  205 roll forming machine
  208 Iron plate with ribs (metal plate with ribs)
  209a, 209b rib
  218 Welding gun (welding means)
  242 End member
  242a Upper end
  242b Lower end
  249 End member loader section
  250 Welded end member
  270 Non-slip member
  278 Welder body
      285 Upper cutting blade (cutting blade)
  286 Lower cutting blade (cutting blade)
  D deck

Claims (7)

長尺の線材(25)を上端筋切断機(27)に向けて給材し、この上端筋切断機(27)により該線材(25)を所要寸法で切断して上端筋(40)を成形し、
別の長尺の線材(75)をラチス筋自動成形機(72)に向けて給材し、該成形機(72)のチャック(81)で挟持しながら所要長さ分だけ押出す毎に、線材(75)のパスラインに対する直交方向から該線材(75)に押圧部材(87)を押当てて折曲すると共に、前記上端筋(40)の長さ寸法に応じた寸法で切断することで、第1曲折部(76a)および第2曲折部(76b)を交互に有するラチス筋(76)を成形し、
前記上端筋切断機 (27) および前記ラチス筋自動成形機 (72) の下流側に配設したラチス筋搬送装置 (74) により、前記ラチス筋自動成形機 (72) で成形した前記ラチス筋 (76) を前記上端筋切断機 (40) で成形した前記上端筋 (40) の上へ移載し、前記ラチス筋(76)における第2曲折部(76b)の端部側に前記上端筋(40)を添わせた状態で、これらラチス筋(76)と上端筋(40)とをトラス筋自動成形機(17)に向けて搬送し、
前記ラチス筋搬送装置 (74) から前記トラス筋自動成形機 (17) へ搬送された前記ラチス筋(76)の第2曲折部 (76b) 上端筋(40)を該トラス筋自動成形機 (17) 溶接ユニット(133)で溶接結合すると共に、前記ラチス筋(76)の各第1曲折部(76a)を屈曲ユニット(134)で搬送ラインに対する直交方向へ交互に押圧することにより、上端筋 (40) が溶接されたラチス筋(76)が千鳥状に屈曲したトラス筋(130)を成形した後に、該トラス筋 (130) を上下逆転して上端筋 (40) が上になるようにして払出し、
また、所要幅の金属板をロール成形機(205)に向けて給材し、その幅方向に所要間隔で離間して長手方向の全長に亘って平行に延在する少なくとも一対のリブ(209a,209b)を一体的に立設したリブ付き金属板(208)を別途成形し、
上下逆転した前記トラス筋 (130) における前記第1曲折部 (76b) を、トラス筋搬送装置 (186) のクランプ片 (195,195) により側方から押圧し、前記ラチス筋 (72) を弾性的に把持しながら前記リブ付き金属板 (208) の上方へ搬送して、 前記トラス筋(130)の交互に離間する方向に折曲されている第1曲折部(76a)をリブ(209a,209b)間に内接させ
前記リブ (209a,209b) 間へトラス筋 (130) 弾力的に固定した前記リブ付き金属板 (208) 、溶接手段(218)を備えた鉄板−トラス筋溶接機(18)へ搬送し、該溶接手段(218)で該トラス筋 (130) 各第1曲折部(76a)と対応するリブ(209a,209b)とを溶接結合し、
前記リブ(209a,209b)とトラス筋(130)との結合が完了した前記リブ付き金属板(208)を、端部材ローダ部(249)および端部材溶接部(250)を備えた端部材溶接機(19)へ搬送し、前記端部材ローダ部(249)でトラス筋(130)の前後端部に別途成形した端部材(242)をセットして、前記端部材溶接部(250)で端部材(242)の下端部(242b)と前記リブ(209a,209b)および該端部材(242)の上端部(242a)とトラス筋(130)とを溶接結合することによりデッキ(D)を製造する
ことを特徴とする建築構造体におけるスラブ用デッキの製造方法。
Feed the long wire (25) toward the upper end bar cutting machine (27), and cut the wire (25) with the required dimensions by this upper bar cutting machine (27) to form the upper bar (40) And
Supplying another long wire rod (75) toward the lattice muscle automatic molding machine (72), and extruding only the required length while being held by the chuck (81) of the molding machine (72), By pressing and bending the pressing member (87) against the wire (75) from the direction orthogonal to the pass line of the wire (75), and cutting with a dimension according to the length dimension of the upper end line (40) , Forming a lattice (76) having alternating first and second bent portions (76a) and (76b),
The upper muscle cutting machine (27) and the lattice muscle automatic molding machine by lattice muscle conveying apparatus disposed on the downstream side of (72) (74), said lattice muscle molded with the lattice muscle automatic molding machine (72) ( 76) is transferred onto the upper end bars (40) formed by the upper end bar cutter (40) , and the upper end bars (76b) on the end side of the second bent part (76b) of the lattice bars (76). 40) , with these lattice muscles (76) and upper end muscles (40) conveyed toward the truss reinforcement automatic molding machine (17),
The lattice muscle feeder (74) said truss muscle automatic molding machine from (17) said lattice muscle that has been transported to the (76) second bent portion (76 b) at the upper end muscle (40) of said truss muscle automatic molding machine ( 17) is welded bond welding unit (133) for, by pressing alternately the direction perpendicular to the conveying line at the first bent portion each (76a) of the bending unit (134) of the lattice muscle (76), an upper end after forming the muscle (40) truss muscle lattice muscle welded (76) is bent in a zigzag shape (the 130), so that the truss muscle (130) to upside down upper muscle (40) is at the top To pay out,
Further, a metal plate having a required width is fed toward the roll forming machine (205), and at least a pair of ribs (209a, 209a, 209b) is integrally molded with a ribbed metal plate (208) separately,
The first bent portion (76b) of the truss muscle (130) turned upside down is pressed from the side by the clamp pieces (195, 195) of the truss muscle transport device (186 ) to elastically push the lattice muscle (72). The first bent portion (76a) bent in the direction of alternately separating the truss bars (130) is conveyed to the upper side of the ribbed metal plate (208) while gripping the ribs (209a, 209b). is inscribed in between,
The ribbed metal plate (208) in which the truss bar (130) is elastically fixed between the ribs (209a, 209b ) is conveyed to an iron plate-truss bar welding machine (18) provided with welding means (218). the first bent portion each of said truss muscle by said welding means (218) (130) (76a ) and the corresponding ribs (209a, 209 b) and the welded bond,
The rib-attached metal plate (208) in which the coupling between the ribs (209a, 209b) and the truss bar (130) has been completed is an end member welding including an end member loader portion (249) and an end member welding portion (250). The end member (242) separately formed on the front and rear end portions of the truss bar (130) by the end member loader portion (249) is set in the end member loader portion (249), and the end member weld portion (250) is used to The deck (D) is manufactured by welding the lower end (242b) of the member (242) and the ribs (209a, 209b) and the upper end (242a) of the end member (242) and the truss bar (130). A method for manufacturing a deck for a slab in a building structure.
前記ラチス筋(76)と上端筋(40)とを溶接ユニット(133)で溶接結合すると同時に、この溶接に際して発生する溶接熱を利用してラチス筋(76)の各第1曲折部(76a)を屈曲ユニット(134)で搬送ラインに対する直交方向へ交互に押圧することにより、該ラチス筋(76)が千鳥状に屈曲したトラス筋(130)を成形する請求項1記載の建築構造体におけるスラブ用デッキの製造方法。  The lattice bars (76) and upper end bars (40) are welded together by a welding unit (133), and at the same time, the first bent portions (76a) of the lattice bars (76) are utilized by utilizing the welding heat generated during the welding. The slab in the building structure according to claim 1, wherein the lattice muscle (76) is formed into a staggered bend truss (130) by alternately pressing the wire in a direction orthogonal to the conveying line by the bending unit (134). Manufacturing method for decks. 前記端部材(242)の溶接を完了したデッキ(D)を滑止め溶接機(20)へ搬送し、別途成形した滑止め部材(270)をリブ付き金属板(208)の前後端にセットして、該溶接機(20)で滑止め部材(270)をリブ付き金属板(208)に溶接することにより、滑止め部材(270)を取着したデッキ(D)を製造する請求項1または2記載の建築構造体におけるスラブ用デッキの製造方法。The deck (D) where welding of the end member (242) is completed is conveyed to the anti-slip welder (20), and the non-slip member (270) formed separately is set on the front and rear ends of the ribbed metal plate (208). Te, by welding anti-slip member (270) to the ribbed metal plate (208) in said welder (20), according to claim 1 or preparing a deck (D) obtained by attaching the anti-slip member (270) The manufacturing method of the deck for slabs in the building structure of 2 description. 前記端部材(242)の溶接を完了したデッキ(D)をスリッタ(21)へ搬送し、該デッキ(D)の搬送ラインの所定位置に該スリッタ(21)の切断刃(285,286)を移動調整して、リブ付き金属板(208)を幅方向における所要位置で切断することにより、幅寸法の異なるデッキ(D)を製造する請求項1〜3の何れか一項に記載の建築構造体におけるスラブ用デッキの製造方法。The deck (D) where welding of the end member (242) is completed is transported to the slitter (21), and the cutting blades (285, 286) of the slitter (21) are moved and adjusted to a predetermined position on the transport line of the deck (D). In the building structure according to any one of claims 1 to 3, the deck (D) having different width dimensions is manufactured by cutting the ribbed metal plate (208) at a required position in the width direction. A method of manufacturing a slab deck. 長尺の線材(25)の給材部所要位置に配設され、給材される該線材(25)のパスラインに対して直交方向へスライド移動する切断刃具(35)を備え、該切断刃具(35)により線材(25)を切断して所要長の上端筋(40)を成形する上端筋切断機(27)と、
前記上端筋切断機(27)に並設され、給材される長尺の線材(75)を矯正する矯正部(79)と、この矯正部(79)から延出した該線材(75)を挟持するチャック(81)と、前記矯正部(79)とチャック(81)との間に配設され、前記線材(75)のパスラインに対する直交方向へ移動して線材(75)を折曲する押圧部材(87)とを備え、この押圧部材(87)の押圧により第1曲折部(76a)および第2曲折部(76b)を交互に有するラチス筋(76)を成形するラチス筋自動成形機(72)と、
前記上端筋切断機 (27) および前記ラチス筋自動成形機 (72) の下流側に配設され、該ラチス筋自動成形機 (72) から搬送されたラチス筋 (76) を、該上端筋切断機 (27) から搬送された前記上端筋 (40) 上へ移載するラチス筋搬送装置 (74) と、
前記ラチス筋搬送装置 (74)の下流側に配設され、前記上端筋(40)と前記ラチス筋(76)の第2曲折部(76b)とを溶接結合する溶接ユニット(133)と、該ラチス筋(76)の第1曲折部(76a)を搬送ラインに対する直交方向へ交互に屈曲成形する屈曲ユニット(134)とを備え、これら溶接ユニット(133)および屈曲ユニット(134)により上端筋(40)とラチス筋(76)とを溶接結合したトラス筋(130)を成形する成形部 (131) と、該成形部 (131) で成形された前記トラス筋 (130) を上下反転して上端筋 (40) を上にした状態で払出す払出部 (132) とから構成されるトラス筋自動成形機(17)と、
前記上端筋切断機(27)およびラチス筋自動成形機(72)に並設され、上流側から給材される金属板に、その幅方向に所要間隔で離間して長手方向の全長に亘って平行に延在する少なくとも一対のリブ(209a,209b)を一体的に立設した所要長のリブ付き金属板(208)を成形するロール成形機(205)と、
前記トラス筋自動成形機 (17) の下流側に配設され、前記トラス筋 (130) におけるラチス筋 (76) の前記第1曲折部 (76a) に対応するクランプ片 (195,195) を備え、前記トラス筋 (130) を側方から押圧するよう前記クランプ片 (195,195) を互いに近接させることで該トラス筋 (130) を弾性変形させた状態で把持すると共に、前記リブ付き金属板 (208) の両リブ (209a,209b) 間にトラス筋 (130) を到来させた後に押圧を解除して、前記第1曲折部 (76a) が対応するリブ (209a,209b) に内接した状態で前記トラス筋 (130) をリブ付き金属板 (208) に弾力的に固定させるトラス筋搬送装置 (186) と、
前記トラス筋搬送装置 (186)とロール成形機(205)の下流側に配設され、前記リブ付き金属板(208)のリブ(209a,209b)とトラス筋(130)の第1曲折部(76a)とを溶接結合する溶接手段(218)を備えた鉄板−トラス筋溶接機(18)と、
前記鉄板−トラス筋溶接機(18)の下流側に配設され、別途成形した端部材(242)を前記トラス筋(130)の前後端部にセットする端部材ローダ部(249,249)と、セットされた端部材(242)の下端部(242b)と前記リブ(209a,209b)および該端部材(242)の上端部(242a)とトラス筋(130)を夫々溶接結合する端部材溶接部(250,250)とを備えた端部材溶接機(19)とから構成される
ことを特徴とする建築構造体におけるスラブ用デッキの製造装置。
A cutting blade (35) disposed at a required position of the feeding portion of the long wire (25) and slidably moved in a direction orthogonal to the pass line of the wire (25) to be fed, the cutting blade An upper end bar cutter (27) that cuts the wire (25) by (35) to form the upper end bar (40) of the required length;
A straightening part (79) for correcting a long wire rod (75) to be fed in parallel to the upper end muscle cutting machine (27), and the wire rod (75) extending from the straightening portion (79). It is disposed between the chuck (81) to be sandwiched, the straightening part (79) and the chuck (81), and moves in a direction orthogonal to the pass line of the wire (75) to bend the wire (75). Lattice muscle automatic molding machine comprising a pressing member (87) and forming a lattice muscle (76) having first bent portions (76a) and second bent portions (76b) alternately by pressing of the pressing member (87) (72)
Disposed downstream of the upper muscle cutting machine (27) and the lattice muscle automatic molding machine (72), lattice muscle conveyed from the lattice muscle automatic molding machine (72) to (76), upper end muscle cutting Lattice muscle transport device (74) to be transferred onto the upper muscle (40) transported from the machine (27) ,
A welding unit (133) disposed on the downstream side of the lattice reinforcement conveying device (74 ) and welding and joining the upper end reinforcement (40) and the second bent portion (76b) of the lattice reinforcement (76); A bending unit (134) that alternately bends the first bent portion (76a) of the lattice line (76) in a direction orthogonal to the conveyance line, and the welding unit (133) and the bending unit (134) provide upper end reinforcement ( 40) and lattice muscle (76) and a molding unit for molding the welded truss muscle (130) and the (131), said truss muscle molded with the molded part (131) to (130) upside down upper end An automatic truss rebar forming machine (17) composed of a payout unit (132) for paying out the streak (40) in an upward state ;
The metal plate fed in parallel to the upper end line cutting machine (27) and the lattice line automatic forming machine (72) is spaced from the upstream side by a predetermined interval in the width direction over the entire length in the longitudinal direction. A roll forming machine (205) for forming a ribbed metal plate (208) having a required length integrally formed with at least a pair of ribs (209a, 209b) extending in parallel;
A clamp piece (195, 195) disposed on the downstream side of the truss muscle automatic molding machine (17 ) and corresponding to the first bent portion (76a) of the lattice muscle (76) in the truss muscle (130) , while gripping truss muscle (130) of the clamp piece to push from the side (195, 195) said truss muscle by the brought closer to each other (130) in an elastically deformed state, the ribbed metal plate (208) After the truss bars (130) arrive between the ribs (209a, 209b) , the pressure is released, and the truss is in contact with the ribs (209a, 209b) corresponding to the first bent portions (76a). muscle (130) truss muscle conveying device for resiliently secured to ribbed metal plate (208) of the (186),
Disposed on the downstream side of the truss muscle feeder (186) and the roll forming machine (205), before Symbol ribbed metal plate (208) ribs (209a, 209 b) and the first bent portion of the truss muscle (130) An iron plate-truss bar welding machine (18) provided with a welding means (218) for welding and joining (76a);
End member loader part (249,249) disposed on the downstream side of the iron plate-truss bar welding machine (18) and set separately formed end members (242) at the front and rear end parts of the truss bar (130), and set End member welded portions (242b) and the ribs (209a, 209b) of the end member (242) and the end member welded portion for welding and joining the upper end portion (242a) of the end member (242) and the truss bar (130), respectively. 250, 250) and an end member welding machine (19) provided with an end member welding machine (19).
前記端部材溶接機(19)の下流側に、別途成形した滑止め部材(270)をリブ付き金属板(208)の前後端に溶接結合する溶接機本体(278,278)を備えた滑止め溶接機(20)を配設した請求項5記載の建築構造体におけるスラブ用デッキの製造装置。  Non-slip welder provided with a welder body (278, 278) on the downstream side of the end member welder (19) for welding and joining separately formed non-slip members (270) to the front and rear ends of the ribbed metal plate (208) The manufacturing apparatus of the deck for slabs in the building structure of Claim 5 which arrange | positioned (20). 前記端部材溶接機(19)の下流側に、該端部材溶接機 (19) から搬送されリブ付き金属板(208)を幅方向の所要位置で切断する切断刃(285,286)を備えたスリッタ(21)が配設される請求項5または6記載の建築構造体におけるスラブ用デッキの製造装置。Downstream of said end member welder (19), ribbed metal plate which is conveyed from the end member welder (19) to (208), comprising a cutting blade for cutting at a predetermined position in the width direction (285, 286) The apparatus for manufacturing a slab deck in a building structure according to claim 5 or 6, wherein a slitter (21) is provided.
JP19057797A 1997-06-30 1997-06-30 Manufacturing method and manufacturing apparatus for slab deck in building structure Expired - Fee Related JP3890486B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19057797A JP3890486B2 (en) 1997-06-30 1997-06-30 Manufacturing method and manufacturing apparatus for slab deck in building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19057797A JP3890486B2 (en) 1997-06-30 1997-06-30 Manufacturing method and manufacturing apparatus for slab deck in building structure

Publications (2)

Publication Number Publication Date
JPH1122090A JPH1122090A (en) 1999-01-26
JP3890486B2 true JP3890486B2 (en) 2007-03-07

Family

ID=16260383

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19057797A Expired - Fee Related JP3890486B2 (en) 1997-06-30 1997-06-30 Manufacturing method and manufacturing apparatus for slab deck in building structure

Country Status (1)

Country Link
JP (1) JP3890486B2 (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6644535B2 (en) * 2001-05-18 2003-11-11 Massachusetts Institute Of Technology Truss core sandwich panels and methods for making same
KR100428657B1 (en) * 2001-05-19 2004-04-27 박화진 The welding equipment of panel for reinforced concrete slab
JP3659918B2 (en) * 2001-12-28 2005-06-15 太郎 河西 Floor slab structural material
KR100615939B1 (en) 2004-10-18 2006-08-28 정기환 Forming and Lamination System for Deck Plates for Concrete Slabs
KR100642282B1 (en) * 2004-10-18 2006-11-03 정기환 Alternating Stacker of Deck Panel
KR100666598B1 (en) 2004-12-23 2007-01-09 정기환 Deck Plate and Truss Girder Loading System for Concrete Slab
KR100590288B1 (en) 2004-12-31 2006-06-19 정기환 Crank welding device for truss girder deck plates for reinforced concrete slabs
KR101072122B1 (en) 2009-09-02 2011-10-10 김기술 Reversal of the deck plate transfer device
CN104384937B (en) * 2014-09-23 2016-11-30 阿博建材(昆山)有限公司 A kind of plane girder welding production line
CN105345319B (en) * 2015-12-22 2018-05-11 武汉汉光钢品建设工程有限公司 Automatic steel bar template truss production line
KR101873304B1 (en) * 2017-09-05 2018-08-17 (주)신화웰텍 Auto welding system for rack with high precision
CN108655750A (en) * 2018-08-02 2018-10-16 唐山开元特种焊接设备有限公司 Plate unit intelligent welding production line
CN113878274A (en) * 2021-11-16 2022-01-04 浙江精工钢结构集团有限公司 Welding equipment for support ribs of steel bar truss
CN113909918B (en) * 2021-11-25 2022-08-30 河北华洋精工机械制造有限公司 Production line for steel bar truss floor bearing plate
CN115647521A (en) * 2022-10-25 2023-01-31 建科机械(天津)股份有限公司 Disassembly-free automatic truss welding production line
CN116175171B (en) * 2022-12-29 2023-08-22 中交第二航务工程局有限公司 Automatic installation robot system for tower column drag hook rib
CN118544007B (en) * 2024-05-16 2024-11-01 浙江大东吴钢构制造有限公司 A truss welding device convenient for fixing
WO2024260177A1 (en) * 2024-05-16 2024-12-26 芜湖职业技术学院 Automatic welding apparatus for steel bar truss in superposed plate

Also Published As

Publication number Publication date
JPH1122090A (en) 1999-01-26

Similar Documents

Publication Publication Date Title
JP3890486B2 (en) Manufacturing method and manufacturing apparatus for slab deck in building structure
JP3947852B2 (en) Transport device
JP4214323B2 (en) Truss bar manufacturing equipment
CN112192223A (en) Production line for steel bar truss floor bearing plate
KR100261137B1 (en) Manufacturing device for deformed rebar welded wire mesh for construction and civil engineering
JPH04220184A (en) Device for coupling at least 2 sheets with at least 1 welding seam formed by laser beam welding device
JP3345436B2 (en) Plant for selecting and bending rebar for construction work
KR20250022172A (en) Method and system for switching workpieces
JP2000169018A (en) Device for reloading sheet pile on first pallet onto second pallet
KR102754041B1 (en) Automatic welding system for shortening the tact time of safety steps for ladders and production method based on it
CN214109509U (en) A kind of steel truss floor deck production equipment
CN112317986B (en) A control system for a fully automatic steel truss floor deck production line
KR100590288B1 (en) Crank welding device for truss girder deck plates for reinforced concrete slabs
US6886251B1 (en) Beam fabrication system
CN216633140U (en) Full-automatic forming production line for steel bar sheet
JP3767870B2 (en) Corrugated rebar mat manufacturing equipment
JP2794097B2 (en) Large steel structure manufacturing equipment and plate-like part positioning equipment in the equipment
JPH08243763A (en) Method and device for automatically welding bar arrangement
KR102558541B1 (en) Manufacturing apparatus for shear reinforcement assembly of dual anchorage for construction
JPH06126363A (en) Device for manufacturing assembly reinforcing bar
JPH09254128A (en) Reinforced mat automatic assembling apparatus
JPH0764427B2 (en) Stacking equipment for drying wood
US3800404A (en) Plate production system with low level bundling, stacking, and transport
JP2518140Y2 (en) Automatic bar arrangement system
JP2004344967A (en) Automatic welding equipment for joint core of steel column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040412

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060307

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060613

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061024

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061121

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121215

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131215

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees