Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3899051B2 - Work time calculation system - Google Patents
[go: Go Back, main page]

JP3899051B2 - Work time calculation system - Google Patents

Work time calculation system Download PDF

Info

Publication number
JP3899051B2
JP3899051B2 JP2003138276A JP2003138276A JP3899051B2 JP 3899051 B2 JP3899051 B2 JP 3899051B2 JP 2003138276 A JP2003138276 A JP 2003138276A JP 2003138276 A JP2003138276 A JP 2003138276A JP 3899051 B2 JP3899051 B2 JP 3899051B2
Authority
JP
Japan
Prior art keywords
time
inspection
facility
coefficient
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003138276A
Other languages
Japanese (ja)
Other versions
JP2004341875A (en
Inventor
章哲 安富
幸雄 山▲崎▼
Original Assignee
二幸産業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 二幸産業株式会社 filed Critical 二幸産業株式会社
Priority to JP2003138276A priority Critical patent/JP3899051B2/en
Publication of JP2004341875A publication Critical patent/JP2004341875A/en
Application granted granted Critical
Publication of JP3899051B2 publication Critical patent/JP3899051B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、多種の設備機器を備える施設の維持管理に要する作業時間を算定するための作業時間算定システムに関する。
【0002】
【従来の技術】
ビル、商業・文化施設、駐車場などの各種施設には、受変電設備、空調機器、給排水設備、消防設備など多種多様な設備機器が備えられているが、その機能・性能を維持すべく日常的あるいは定期的に点検、整備、清掃等を行うのが一般的であり、また、このような維持管理業務は、専門の管理会社に委託されることが多い。
【0003】
ところで、維持管理業務を受託する管理会社は、その契約に先立って、施設のオーナー等に見積を提示するのが一般的である。この見積を作成するに際しては、維持管理業務に従事する人員の人数(作業人工)を精度よく推定する必要があるが、このためには施設に装備されている設備機器の点検作業等に要する時間を的確に把握する必要がある。
【0004】
ところが、施設には多種多様な設備機器が装備されており、しかも設備機器ごとにその点検周期や一回の点検に要する時間が異なることから、施設全体を点検等するのに必要な時間を正確に算定するのには、多大な手間と労力とを必要とする。また、施設の点検等に要する時間を正確に算定するためには、施設内を移動する時間や顧客からのクレームに対応するための時間なども考慮しなければならないが、どの程度の時間を見込むかは、結局のところ見積作成者の技量や経験に依存するところが多いため、結果として見積額に差が生じてしまう。
【0005】
なお、工事費等の見積システムについては、従来より数多く提案されているが(例えば、特許文献1参照)、前記した維持管理業務に特有の問題点を解決するものは見当たらない。
【0006】
【特許文献1】
特開2001−32354号公報(全頁)
【0007】
【発明が解決しようとする課題】
そこで、本発明は、多種の設備機器が備えられた施設の維持管理に要する作業時間を迅速かつ的確に算定することができる作業時間算定システムを提供することを課題とする。
【0008】
【課題を解決するための手段】
このような課題を解決するために、請求項1の発明は、施設の維持管理に要する作業時間を算定するための作業時間算定システムであって、多種の設備機器のそれぞれについて、その標準点検周期と単位数量あたりの標準点検時間とを記憶するとともに、施設の用途に応じて定義された用途係数と施設の経年に応じて定義された経年係数とを記憶する記憶手段と、入力手段により数量が入力された設備機器に対応する標準点検周期および標準点検時間を前記記憶手段の中から読み出し、読み出した標準点検周期と標準点検時間とを前記数量に乗ずることで前記設備機器の点検に要する点検時間を演算し、得られた点検時間を前記記憶手段に書き込む点検時間演算手段と、入力手段により入力された複数の用途の床面積を合計して施設の延べ床面積を演算するとともに、前記各用途に対応する用途係数を前記記憶手段の中から選択して読み出し、読み出した各用途係数に、前記施設の延べ床面積に対する前記各用途の床面積の割合を乗じて前記各用途係数を補正するとともに、補正後の値を合計することで複合用途の用途係数を演算し、さらに、入力手段により入力された前記施設の経年に対応する経年係数を前記記憶手段の中から選択して読み出すとともに、読み出した経年係数と前記複合用途の用途係数の逆数とを前記施設の延べ床面積に乗ずることでクレーム対応業務に要するクレーム対応時間を演算し、得られたクレーム対応時間を前記記憶手段に書き込むクレーム対応時間演算手段と、を備えることを特徴とする。
【0009】
かかる作業時間算定システムによると、多種の設備機器のそれぞれについて標準点検周期と単位数量あたりの標準点検時間とが予め記憶されているので、維持管理すべき施設に実際に備えられた設備機器の数量を入力するだけで、施設の維持管理に要する作業時間を迅速かつ的確に算定することができる。なお、「点検時間」には、検査、整備、清掃に要する時間も含まれる。また、「標準点検周期」とは、例えば、日々行う日常点検であれば「一日あたりの点検回数」を意味し、定期に行う定期点検であれば、「月間あるいは年間の点検回数」を意味する。
【0011】
また、本発明に係る作業時間算定システムは、従来経験的に定めていたクレーム対応業務に必要な時間(クレーム対応時間)を、施設の延べ床面積、用途および経年(施設が竣工してからの年数)という客観的な情報から算定するものである。また、「用途係数」は、施設ごとに異なる維持管理の難易度、クレームの発生頻度などを点検時間等に反映させるべく本願発明者によって導入されたものであり、「経年係数」は、施設の老朽化に伴って増減する維持管理の難易度、クレームの発生頻度などを点検時間等に反映させるべく本願発明者によって導入されたものである。そして、かかる作業時間算定システムによると、業務経験の浅い者であっても、容易にかつ的確にクレーム対応時間を算定することが可能となる。
【0012】
請求項の発明は、請求項に記載の作業時間算定システムであって、前記記憶手段に予め記憶された建築巡回係数を読み出し、読み出した建築巡回係数で前記施設の延べ床面積を除すことにより当該施設の建築巡回点検に要する巡回時間を演算し、得られた巡回時間を前記記憶手段に書き込む巡回時間演算手段をさらに備えることを特徴とする。
【0013】
かかる作業時間算定システムは、従来経験的に定めていた建築巡回点検に必要な時間(巡回時間)を施設の延べ床面積という客観的な情報から算定するものであり、これによると、業務経験の浅い者であっても、容易にかつ的確に巡回時間を算定することが可能となる。
【0014】
請求項の発明は、請求項に記載の作業時間算定システムであって、前記記憶手段に記憶された点検時間、クレーム対応時間および巡回時間を読み出し、読み出した点検時間、クレーム対応時間および巡回時間を合算して合計作業時間を演算し、得られた合計作業時間を前記記憶手段に書き込む合計時間演算手段をさらに備えることを特徴とする。
【0015】
かかる作業時間算定システムによると、施設の維持管理に必要な作業時間を容易にかつ的確に算定することができる。
【0016】
請求項の発明は、請求項に記載の作業時間算定システムであって、前記記憶手段は、施設の延べ床面積に応じて定義された移動係数を記憶しており、前記クレーム対応時間演算手段で使用された前記施設の延べ床面積に対応する移動係数を前記記憶手段の中から選択して読み出すとともに、前記記憶手段に記憶された合計作業時間を読み出し、読み出した移動係数と合計作業時間とを乗算してその補正値を演算し、得られた合計作業時間の補正値を前記記憶手段に書き込む第一の補正手段と、をさらに備えることを特徴とする。
【0017】
かかる作業時間算定システムは、合計作業時間演算手段で演算された合計作業時間を、施設の延べ床面積に応じて定義された移動係数により補正するものである。「移動係数」は、施設内を移動するのに必要な時間を点検時間等に反映させるべく本願発明者によって導入されたものであり、これにより、施設の規模によって増減する移動時間を点検時間等に反映させることが可能となる。
【0018】
請求項の発明は、請求項に記載の作業時間算定システムであって、前記記憶手段は、施設に配置される人員の技能レベルに応じて定義された技能レベル係数を記憶しており、力手段により入力された人員の技能レベルに対応する技能レベル係数を前記記憶手段の中から選択して読み出すとともに、前記記憶手段に記憶された合計作業時間の補正値を読み出し、読み出した技能レベル係数と合計作業時間の補正値とを乗算してその補正値を演算する第二の補正手段と、をさらに備えることを特徴とする。
【0019】
かかる作業時間算定システムは、施設の規模や設備機器の種類から画一的に算定された合計作業時間を維持管理業務に従事する人員の技能レベルに応じて補正するものである。「技能レベル係数」は、人員の技能レベルによって点検時間等が増減することを考慮すべく本願発明者によって導入されたものであり、これにより、人員の熟練度を点検時間等に反映させることができる。
【0020】
【発明の実施の形態】
以下、本発明の実施の形態を、添付した図面を参照しつつ詳細に説明する。
【0021】
本実施形態に係る作業時間算定システムは、受変電設備、空調機器、給排水設備、消防設備など多種多様な設備機器を備えたビル、商業・文化施設、駐車場などの各種施設において、その維持管理に要する作業時間を算定するものであり、図1に示すように、記憶装置1、表示装置2、入力装置3および演算処理部4を少なくとも備えるコンピュータから構成されている。また、記憶装置1には、コンピュータを作業時間算定システムとして機能させるための図示しないプログラムが格納されている。
【0022】
なお、本明細書においては、施設の維持管理に要する作業時間のうち、当該施設に装備されている設備機器の点検・整備・清掃に要する時間を「点検時間」と称する。また、「点検時間」は、日常点検に要する時間(以下、「日常点検時間」という)、定期点検に要する時間(以下、「定期点検時間」という)、法定点検に要する時間(以下、「法定点検時間」という)および整備清掃に要する時間(以下、「整備清掃時間」という)を合算したものである。
【0023】
また、施設の外観検査等を目的として実施される建築巡回点検に要する時間を「巡回時間」と称し、顧客等からのクレームの対応に要する時間を「クレーム対応時間」と称する。さらに、事務処理業務に要する時間を「事務処理時間」といい、顧客等とのコミュニケーションに要する時間を「コミュニケーション時間」といい、社員教育に要する時間を「教育時間」という。
【0024】
(記憶装置)
記憶装置1は、半導体メモリや磁気ディスクなどから構成されており、図1に示すように、設備機器ファイル群11、用途係数ファイル12、経年係数ファイル13、移動係数ファイル14、技能レベル係数ファイル15を格納している。すなわち、本実施形態では、記憶装置1が設備機器記憶手段、用途係数記憶手段、経年係数記憶手段、移動係数記憶手段、技能レベル係数記憶手段として機能する。また、図1に示すように、記憶装置1には、施設ファイル16、集計ファイル17、必要人工ファイル18A、人件費ファイル18Bおよび作業費ファイル群19も格納されている。
【0025】
設備機器ファイル群11は、図2に示す日常点検ファイル11A、図3に示す定期点検ファイル11B、図4に示す法定点検ファイル11Cおよび図5に示す整備清掃ファイル11Dとから構成されており、各ファイルには、多種の設備機器について、その標準点検周期と単位数量あたりの標準点検時間とが対応付けて記憶されている。ここで、「標準点検周期」とは、点検を行う頻度をいう。すなわち、一日、一月または一年あたりの点検回数を意味する。また、「標準点検時間」とは、標準的な技能を有する人員が単位数量の設備機器を一回点検するのに要する時間を意味する。
【0026】
日常点検ファイル11Aには、図2に示すように、日常点検を要する設備機器ごとに、その「名称」、「単位数量」、「基準単位」、「標準点検周期」および「標準点検時間」が予め記憶されている。例えば、「受変電設備」の「単位数量」は「1(面)」であり、「標準点検回数」は1日に「3(回)」であり、「標準点検時間」は「1(分)」である。すなわち、「受変電設備」の日常点検は、1面(単位数量)につき1日に3回(標準点検回数)行う必要があり、1回の点検につき1分(標準点検時間)を要する。また、「区分」は、設備機器の種類を示すものである。なお、「数量」は、日常点検をすべき設備機器の実数量を「単位数量」で除した値であり、入力装置3により入力される。また、「個別日常点検時間」は、一の設備機器の日常点検に必要な時間であり、後記する点検時間演算手段41により演算される。
【0027】
定期点検ファイル11Bには、図3に示すように、定期点検を要する設備機器ごとに、その「名称」、「単位数量」、「基準単位」、「標準点検周期」および「標準点検時間」が予め記憶されている。例えば、「受変電設備」の「単位数量」は「1(面)」であり、「標準点検回数」は1年に「12(回)」であり、「標準点検時間」は「5(分)」である。すなわち、「受変電設備」の定期点検は、1面(単位数量)につき1年間に12回(標準点検回数)行う必要があり、1回の点検につき5分(標準点検時間)を要する。また、「区分」は、設備機器の種類を示すものである。なお、「数量」は、定期点検をすべき設備機器の実数量を「単位数量」で除した値であり、入力装置3により入力される。また、「個別定期点検時間」は、一の設備機器の定期点検に必要な時間であり、後記する点検時間演算手段41により演算される。
【0028】
法定点検ファイル11Cには、図4に示すように、法律で点検内容が規定されている設備機器ごとに、その「名称(検査項目)」、「単位数量」、「基準単位」および「標準点検時間」が予め記憶されている。例えば、「受変電設備」の「単位数量」は「100(kVA)」であり、「標準点検回数」は1年に「1(回)」であり、「標準点検時間」は「40(分)」である。すなわち、「受変電設備」の法定検査は、「100(kVA)」(単位数量)につき、1年に「1(回)」(標準点検回数)行う必要があり、1回の点検につき「40(分)」(標準点検時間)を要する。なお、「数量」は、法定点検(検査)をすべき設備機器の実数量を「単位数量」で除した値であり、入力装置3により入力される。また、「個別法定点検時間」は、一の設備機器の法定点検に必要な時間であり、後記する点検時間演算手段41により演算される。
【0029】
整備清掃ファイル11Dには、図5に示すように、整備・清掃を要する設備機器ごとに、その「名称(内容)」、「単位数量」、「基準単位」、「標準点検周期」および「標準点検時間」が予め記憶されている。例えば、「電灯負荷設備(絶縁測定)」の「単位数量」は「1(面)」であり、「標準点検回数」は1年に「1(回)」であり、「標準点検時間」は「15(分)」である。すなわち、「電灯負荷設備」については、1面(単位数量)につき、1年に1回(標準点検回数)の整備(絶縁測定)が必要であり、1回の整備につき15分(標準点検時間)を要する。また、「区分」は、設備機器の種類を示すものである。なお、「数量」は、整備清掃をすべき設備機器の実数量を「単位数量」で除した値であり、入力装置3により入力される。また、「個別整備清掃時間」は、一の設備機器の整備清掃に必要な時間であり、後記する点検時間演算手段41により演算される。
【0030】
用途係数ファイル12には、図6(a)に示すように、施設の用途に応じて定義された用途係数が予め記憶されている。「用途係数」は、施設ごとに異なる維持管理の難易度、クレームの発生頻度などを点検時間等に反映させるべく本願発明者によって導入されたものである。なお、用途係数は、図示の値に限定されることはなく、適宜変更してもよい。
【0031】
経年係数ファイル13には、図6(b)に示すように、施設の経年(施設が竣工してからの年数)に応じて定義された経年係数が予め記憶されている。「経年係数」は、施設の老朽化に伴って増減する維持管理の難易度、クレームの発生頻度などを点検時間等に反映させるべく本願発明者によって導入されたものである。なお、経年係数は、図示の値に限定されることはなく、適宜変更してもよい。
【0032】
移動係数ファイル14には、図6(c)に示すように、施設の延べ床面積に応じて定義された移動係数が予め記憶されている。「移動係数」は、施設内を移動するのに要する時間を点検時間等に反映させるべく本願発明者によって導入されたものである。なお、移動係数は、図示の値に限定されることはなく、適宜変更してもよい。
【0033】
技能レベル係数ファイル15には、図7に示すように、施設に配置される人員の技能レベル(熟練度)に応じて定義された技能レベル係数が予め記憶されている。「技能レベル係数」は、人員の技能レベルによって点検時間等が増減することを考慮すべく本願発明者によって導入されたものである。なお、技能レベル係数は、図示の値に限定されることはなく、適宜変更してもよい。
【0034】
施設ファイル16には、入力装置3から入力された物件情報(施設の名称、用途、経年、延べ床面積)、勤務体制(夜間待機時間)、設備関係業務以外の特殊業務(内容等)、見積用情報(客先の名称、住所、電話番号等)など施設に関する情報(図11参照)が記憶される。
【0035】
集計ファイル17には、図8に示すように、点検時間演算手段41で演算された「点検時間(日常点検時間、定期点検時間、法定点検時間、整備清掃時間)」のほか、巡回時間演算手段43で演算された「巡回時間」、クレーム対応時間演算手段42で演算された「クレーム対応時間」、諸業務時間演算手段44で演算された「事務処理時間」、「コミュニケーション時間」、「教育時間」、入力装置3により入力された「夜間待機時間」および「設備関係業務以外の特殊業務に要する時間」が記憶され、さらに、合計時間演算手段45で演算された「合計作業時間A」、第一の補正手段46Aで演算された合計作業時間の「第一の補正値B1」および「第二の補正値B2」が記憶される。なお、本実施形態では、「一日あたり」の点検時間等と「月あたり」の点検時間等とが集計ファイル17に記憶される。ここで、「夜間待機時間」とは、夜間における監視・待機時間である。また、「設備関係業務以外の特殊業務に要する時間」は、実測値である。
【0036】
必要人工ファイル18Aには、図9(a)に示すように、第一の補正手段46Aで演算された「第二の補正値B2」、必要人工演算手段47により技能レベル係数ファイル15の中から選択された「技能レベル係数」、第二の補正手段46Bで演算された合計作業時間A(図8参照)の「総作業時間(第三の補正値B3)、予め設定された一人あたりの「月間労働時間」と「有給取得時間」、必要人工演算手段47で演算された「作業人工」と「作業人工の補正値」が記憶される。
【0037】
人件費ファイル18Bには、図9(b)に示すように、入力装置3により入力された役職ごとの「人数」、後記する人件費演算手段48により演算された役職ごとの「月単価」および見積金額演算手段49により演算された人件費の「合計金額」が記憶される。
【0038】
作業費ファイル群19は、法定点検に要する作業費(人件費以外の材料費等)の「単価」等が予め記憶されている法定作業費ファイル19A(図10(a)参照)と、設備機器の定期点検に要する保守費(人件費以外の材料費等)の「単価」等が予め記憶されている定期保守費ファイル19Bとから構成されている(図10(b)参照)。
【0039】
(表示装置)
表示装置2(図1参照)は、いわゆるディスプレイ装置であり、維持管理すべき施設の延べ床面積、用途および経年が入力される施設データ入力欄21(図11参照)、設備機器の実際の数量が入力される設備機器数量入力欄22(図12参照)、人員の技能レベルが入力される技能レベル入力欄23(図13(a)参照)および人員の人数が入力される人員数入力欄24(図13(b)参照)等を表示して、各入力欄へのデータの入力を促すとともに、記憶装置1に格納された各種ファイルの内容や後記する演算処理部4で演算された結果を表示するものである。
【0040】
施設データ入力欄21には、図11に示すように、施設の延べ床面積が入力される述べ床面積入力部21a、経年が入力される経年入力部21b、用途が入力される用途入力部21c、夜間の待機時間が入力される夜間待機時間入力部21d、設備関係業務以外の特殊業務内容等が入力される特殊業務入力部21eのほか、施設に関する見積用情報(客先の名称、住所、電話番号等)を入力する入力部が設けられている。
【0041】
設備機器数量入力欄22(22’)には、図12に示すように、設備機器の数量が入力される複数の数量入力部22a(22a’)と、点検実施者(「自社」、「外注」、「検査機関」)が入力される複数の点検者入力部22b(22b’)とが設けられている。なお、点検者入力部22bに「自社」を入力すると、点検時間等の算定に組み入れられ、一方、「外注」あるいは「検査機関」を入力すると、検査内容ごとに予め記憶された立会時間が点検時間等に加算される。
【0042】
また、技能レベル入力欄23には、図13(a)に示すように、人員の技能レベルが入力されるレベル入力部23aが設けられており、人員数入力欄24には、役職ごとにその人数が入力される人数入力部24aが設けられている。
【0043】
なお、図示は省略するが、表示装置2には、施設データ入力欄21、設備機器数量入力欄22、技能レベル入力欄23、人員数入力欄24および前記した各ファイルへリンクするメニューボタンが表示され、このメニューボタンをマウス等で適宜選択することにより、対応する入力欄あるいはファイルが表示されるように構成されている。
【0044】
(入力装置)
入力装置3は、表示装置2に表示される施設データ入力欄21、設備機器数量入力欄22、人員レベル入力欄23および人員数入力欄24等の各入力部に所定のデータを入力するためのものであり、キーボードやマウス等から構成されている。
【0045】
すなわち、本実施形態では、入力装置3が設備機器の実際の数量を入力するための数量入力手段、維持管理すべき施設の延べ床面積、用途および経年を入力するための施設情報入力手段および施設に実際に配置される人員の技能レベルを入力するための人員レベル入力手段として機能する。
【0046】
(演算処理部)
演算処理部4は、図1に示すように、点検時間演算手段41、クレーム対応時間演算手段42、巡回時間演算手段43、諸業務時間演算手段44、合計時間演算手段45、第一の補正手段46A、第二の補正手段46B、必要人工演算手段47、人件費演算手段48および見積金額演算手段49を備えて構成されている。
【0047】
点検時間演算手段41は、入力装置3により入力された各設備機器の数量と設備機器ファイル群11に予め記憶された標準点検周期および標準点検時間とに基づいて設備機器の点検時間(日常点検時間、定期点検時間、法定点検時間、整備清掃時間)を演算するものである。
【0048】
点検時間のうち、日常点検時間は、各設備機器の個別日常点検時間を合算することで得られる。また、個別日常点検時間は、入力装置3により入力された各設備機器の「数量」、日常点検ファイル11A(図2参照)に記憶された「標準点検周期(回/日)」および「標準点検時間(分)」に基づいて、以下の演算式により演算される。
(個別日常点検時間)=(数量)×(標準点検周期)×(標準点検時間)
【0049】
例えば、図2に示すように、「受変電設備」の数量が「74(面)」である場合には、その標準点検周期が「3(回/日)」であり、標準点検周期が「1(分)」であることから、「受変電設備」の個別点検時間は、「222(分/日)」となる。
【0050】
すなわち、点検時間演算手段41は、数量が入力された設備機器について、日常点検ファイル11A(図2参照)の中から対応する「標準点検周期(回/日)」および「標準点検時間(分)」を読み出し、当該読み出した「標準点検周期(回/日)」および「標準点検時間(分)」に基づいて、個別日常点検時間を演算し、さらに、各設備機器の個別日常点検時間を合算して日常点検時間を算出する。なお、個別日常点検時間を単に合算した場合には、日常点検時間の単位は「分/日」となるが、この値を「60」で除せば「時/日」となる。また、一月あたりの日常点検時間を算出する場合には、一月の日数を乗じればよく、一年あたりの日常点検時間を算出する場合には、一月あたりの日常点検時間に「12」を乗じればよい。
【0051】
また、点検時間演算手段41により演算された個別日常点検時間は、日常点検ファイル11A(図2参照)に記憶され、日常点検時間は、集計ファイル17(図8参照)に記憶される。なお、集計ファイル17には、一日あたりの日常点検時間(時/日)と一月あたりの日常点検時間(時/月)とに変換されたものが記憶される。
【0052】
なお、本実施形態では、設備機器の実数量を「単位数量」で除した値を「数量」としたが、実数量を「数量」としてもよい。この場合の個別日常点検時間は、以下の演算式により演算される。
(個別日常点検時間)=(数量)/(単位数量)×(標準点検周期)×(標準点検時間)
【0053】
同様に、点検時間のうち、定期点検時間は、各設備機器の個別定期点検時間を合算することで得られる。また、個別定期点検時間は、入力装置3により入力された各設備機器の実際の「数量」、定期点検ファイル11B(図3参照)に記憶された「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、以下の演算式により演算される。
(個別定期点検時間)=(数量)×(標準点検周期)×(標準点検時間)
【0054】
例えば、図3に示すように、「受変電設備」の数量が「74(面)」である場合には、その標準点検周期が「12(回/年)」であり、標準点検周期が「5(分)」であることから、「受変電設備」の個別点検時間は、「4400(分/年)」となる。
【0055】
すなわち、点検時間演算手段41は、数量が入力された設備機器について、定期点検ファイル11B(図3参照)の中から対応する「標準点検周期(回/年)」および「標準点検時間(分)」を読み出し、当該読み出した「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、個別定期点検時間を演算し、さらに、各設備機器の個別定期点検時間を合算して定期点検時間を算出する。
【0056】
また、点検時間演算手段41により演算された個別定期点検時間は、定期点検ファイル11B(図3参照)に記憶され、定期点検時間は集計ファイル17(図8参照)に記憶される。なお、集計ファイル17には、一日あたりの定期点検時間(時/日)と一月あたりの定期点検時間(時/年)とに変換されたものが書き込まれる。
【0057】
また、点検時間のうち、法定点検時間は、各設備機器の個別法定点検時間を合算することで得られる。また、個別法定点検時間は、入力装置3により入力された各設備機器の「数量」、法定点検ファイル11C(図4参照)に記憶された「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、以下の演算式により演算される。
(個別法定点検時間)=(数量)×(標準点検周期)×(標準点検時間)
【0058】
例えば、図4に示すように、「受変電設備」の数量が「224(kVA)」である場合には、その標準点検周期が「1(回/年)」であり、標準点検周期が「40(分)」であることから、「受変電設備」の個別点検時間は、「8960(分/年)」となる。ちなみに、「受変電設備」の実数量は、「22400(kVA)」である。
【0059】
すなわち、点検時間演算手段41は、数量が入力された設備機器について、法定点検ファイル11C(図4参照)の中から対応する「標準点検周期(回/年)」および「標準点検時間(分)」を読み出し、当該読み出した「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、個別法定点検時間を演算し、さらに、各設備機器の個別法定点検時間を合算して法定点検時間を算出する。
【0060】
また、点検時間演算手段41により演算された個別法定点検時間は、法定点検ファイル11C(図4参照)に記憶され、法定点検時間は集計ファイル17(図8参照)に記憶される。なお、集計ファイル17には、一日あたりの法定点検時間(時/日)と一年あたりの法定点検時間(時/年)とに変換されたものが記憶される。
【0061】
点検時間のうち、整備清掃時間は、各設備機器の個別整備清掃時間を合算することで得られる。また、個別整備清掃時間は、入力装置3により入力された各設備機器の「数量」、整備清掃ファイル11D(図5参照)に記憶された「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、以下の演算式により演算される。
(個別整備清掃時間)=(数量)×(標準点検周期)×(標準点検時間)
【0062】
例えば、図5に示すように、「電灯負荷設備(絶縁測定)」の数量が「278(面)」である場合には、その標準点検周期が「1(回/年)」であり、標準点検周期が「15(分)」であることから、「受変電設備」の個別点検時間は、「4170(分/年)」となる。
【0063】
すなわち、点検時間演算手段41は、数量が入力された設備機器について、整備清掃ファイル11D(図5参照)の中から対応する「標準点検周期(回/年)」および「標準点検時間(分)」を読み出し、当該読み出した「標準点検周期(回/年)」および「標準点検時間(分)」に基づいて、個別整備清掃時間を演算し、さらに、各設備機器の個別整備清掃時間を合算して整備清掃時間を算出する。
【0064】
また、点検時間演算手段41により演算された個別整備清掃時間は、整備清掃ファイル11D(図5参照)に記憶され、整備清掃時間は、集計ファイル17(図8参照)に記憶される。また、集計ファイル17には、一日あたりの整備清掃時間(時/日)と一年あたりの整備清掃時間(時/日)とに変換されたものが記憶される。
【0065】
クレーム対応時間演算手段42は、クレーム対応時間を演算するものであり、入力装置3により入力された施設の用途に基づいて図6(a)に示す用途係数ファイル12の中から対応する用途係数を選択する(読み出す)とともに、入力装置3により入力された経年に基づいて図6(b)に示す経年係数ファイル13の中から対応する経年係数を選択し(読み出し)、選択された用途係数および経年係数と入力装置3により入力された延べ床面積とに基づいてクレーム対応業務に要するクレーム対応時間を演算するものである。また、演算されたクレーム対応時間は、集計ファイル17(図8参照)に記憶される。
【0066】
一日あたりのクレーム対応時間(時)は、以下の演算式により演算することができる。
クレーム対応時間(時/日)=(延べ床面積)/(用途係数)×(経年係数)
【0067】
例えば、施設の延べ床面積が「180000(m2)」、用途が「事務所ビル」、経年が「15年」である場合には、「事務所ビル」に対応する用途係数が「9000」であり(図6(a)参照)、「15年」に対応する経年係数「1.1」であることから(図6(b)参照)、クレーム対応時間(時/日)は「22(時/日)」となる。
【0068】
巡回時間演算手段43は、巡回時間を演算するものであり、施設ファイル16の中から施設の延べ床面積を読み出し、当該読み出した延べ床面積を予め定義された建築巡回係数で除すことにより当該施設の建築巡回点検に要する巡回時間を演算する。例えば、施設の延べ床面積が「180000(m2)」、建築巡回定数を「15000」とすると、建築巡回点検に要する一日あたりの巡回時間は、「12(時/日)」となる。また、演算された巡回時間は、図8に示す集計ファイル17に記憶される。
【0069】
諸業務時間演算手段44は、点検時間演算手段41により演算された点検時間、クレーム対応時間演算手段42により演算されたクレーム対応時間、巡回時間演算手段43により演算された巡回時間、入力装置3から入力される施設に関する情報(延べ床面積、用途、経年等)に基づいて、事務処理時間、コミュニケー教育時間等を演算するものである。すなわち、諸業務時間演算手段44は、集計ファイル17の中からクレーム対応時間、巡回時間を読み出すとともに、施設ファイル16の中から延べ床面積、用途、経年等を読み出し、これらに基づいて事務処理時間、コミュニケーション時間等を演算するものである。また、演算された事務処理時間、コミュニケーション時間および教育時間は、図8に示す集計ファイル17に記憶される。
【0070】
一日あたりの事務処理時間(時/日)は、以下の演算式により演算される。
(事務処理時間)=((点検時間)+(巡回時間))×0.3
なお、単位はいずれも「時/日」であり、「0.3」は定数である。
【0071】
一日あたりの教育時間(時/日)は、以下の算定式により演算される。
(教育時間)=((点検時間)+(巡回時間))×0.05
なお、単位はいずれも「時/日」であり、「0.05」は定数である。
【0072】
一日あたりのコミュニケーション時間(時/日)は、以下の演算式により演算される。
(コミュニケーション時間)=(延べ床面積)/30000
なお、単位はいずれも「時/日」であり、「30000」は、定数である。
【0073】
合計時間演算手段45は、図8に示す集計ファイル17の中から、点検時間(日常点検時間、定期点検時間、法定点検時間、整備清掃時間)、巡回時間、クレーム対応時間、事務処理時間、コミュニケーション時間、教育時間、その他入力装置3により直接入力された夜間待機時間や設備関係業務以外の特殊業務時間を読み出すとともに、これらを合算して合計作業時間Aを算出し、その結果を集計ファイル17に再び記憶する。
【0074】
第一の補正手段46Aは、施設の延べ床面積に基づいて図6(c)に示す移動係数ファイル14の中から対応する移動係数を選択し、選択された移動係数を合計時間演算手段45により演算された合計作業時間Aに乗算してその第一の補正値B1を得るものである(図8参照)。さらに、本実施形態では、第一の補正手段46Aにより、予め定義された余裕係数が第一の補正値B1に乗算され、合計作業時間Aの第二の補正値B2が演算される。余裕係数は、適宜設定することが可能であるが、本実施形態では「1.1」とする。また、第一の補正値B1および第二の補正値B2は、集計ファイル17に記憶される。
【0075】
例えば、施設の延べ床面積が「180000(m2)」である場合には、第一の補正手段46Aにより図6(c)に移動係数ファイル14の中から移動係数として「1.3」が選択され、この移動係数が合計作業時間A「2234.88(時/月)」に乗算され、その結果、第一の補正値B1「2905.34(時/月)」が算出される(図8参照)。さらに、第一の補正値B1に余裕係数「1.1」が乗算され、第二の補正値B2「3195.88(時/月)」が算出される(図8参照)。
【0076】
第二の補正手段46Bは、入力装置3により入力された人員の技能レベルに基づいて図7に示す技能レベル係数ファイル15の中から対応する技能レベル係数を選択し、選択された技能レベル係数を合計作業時間Aの第二の補正値B2(図8参照)にさらに乗算して第三の補正値B3(図9(a)参照)を得るものである。第三の補正値B3は、施設の用途、規模、人員の技能レベル等を反映したものであるため、実際の作業時間に非常に近似した値となる。また、第三の補正値は、必要人工ファイル18A(図9(a)参照)に「総作業時間」として記憶される。
【0077】
例えば、人員の技能レベルが「2.5」である場合には、第二の補正手段46Bにより図7に示す技能レベル係数ファイル15の中から技能レベル係数として「0.95」が選択され、この技能レベル係数が第二の補正値B2(図8参照)に乗算され、その結果、第三の補正値B3「3036.08(時/月)」が算出される(図9(a)参照)。
【0078】
必要人工演算手段47は、第二の補正手段46Bで演算された「総作業時間(合計作業時間Aの第三の補正値B3)」を必要人工ファイル18A(図9(a)参照)に予め記憶された「月間労働時間」で除算して施設の維持管理に必要な作業人工(人数)を得るものである。
【0079】
作業人工は、以下の演算式で演算される。
(作業人工)=(総作業時間)/(月間労働時間)
【0080】
例えば、図9(a)に示すように、一人あたりの月間労働時間が「172(h)」である場合には、第三の補正値B3が「101.20(h/日)」であるから、施設の維持管理に必要な一月あたりの人工は「17.65(人)」となる。
【0081】
また、図9(a)に示す「作業人工の補正値」は、有給取得時間を考慮したものであり、以下の演算式で演算される。
(作業人工の補正値)=(総作業時間)/((月間労働時間)−(有給取得時間))
【0082】
また、必要人工演算手段47で演算された「作業人工」および「作業人工の補正値」は、必要人工ファイル18A(図9(a)参照)に記憶される。
【0083】
人件費演算手段48は、図示は省略するが、人員に支払われる基本給、資格手当、交通費等に基づいて人件費の月単価(図9(b)参照)を役職ごとに演算するものである。すなわち、人件費演算手段48は、入力装置3により入力された基本給、資格手当、交通費、一般管理費乗率、賞与引当率に基づいて各種保険料、賞与引当金、一般管理費等を演算するとともに、これらを合算して人件費の月単価を演算する。また、演算された人件費の月単価は、人件費ファイル18B(図9(b)参照)に記憶される。
【0084】
見積金額演算手段49は、施設に配置される人員の人数、人件費演算手段48により演算された人件費の単価に基づいて人件費の合計金額を演算し、さらに、この人件費の合計金額に作業費ファイル群19に予め記憶された法定定期作業費の単価(図10(a)参照)の合計金額と設備定期保守費の単価(図10(b)参照)の合計金額とを合算して施設の維持管理に要する総費用を演算するものである。
【0085】
また、見積金額演算手段49で演算された人件費の合計金額は、図16に示す見積結果ファイルに「設備管理業務費」として記憶され、法定定期作業費の単価の合計金額および設備定期保守費の単価の合計金額は、それぞれ「法定定期作業費」、「設備定期保守費」として記憶される。また、「設備管理業務費」、「法定定期作業費」および「設備定期保守費」を合算したものは、「総合計」として図16に示す見積結果ファイルに記憶される。なお、「総合計」を算出するに際し、適宜「その他」の費用や「値引き」を考慮しても差し支えない。
【0086】
次に、本実施形態に係る作業時間演算システムの動作を、図15に示すフローチャートを参照しつつ説明する。
【0087】
作業時間演算システムを起動すると、表示装置2に図11に示す施設データ入力欄21が表示されるので(S1)、入力装置3を使用して各入力部に施設に関する情報を入力する(S2)。施設データ入力欄21に入力された各種データは、施設ファイル16に記憶される。
【0088】
例えば、図11に示すように、施設データ入力欄21の述べ床面積入力部21aに施設の延べ床面積「180000(m2)」を、経年入力部21bに経年「15(年)」を、用途入力部21cに施設の用途「事務所ビル」を、夜間待機時間入力部21dに夜間待機時間「16(時/日)」を、設備関係業務以外の特殊業務入力部21eにその内容「散水」およびこれに要する時間「1(時/日)」を入力する。さらに、必要に応じて「物件名」等を入力する。
【0089】
また、施設データ入力欄21に施設の用途、経年および延べ床面積が入力されると、クレーム対応時間演算手段42により図6(a)に示す用途係数ファイル12の中から対応する用途係数が選択されるとともに、図6(b)に示す経年係数ファイル13の中から対応する経年係数が選択され(S3)、この用途係数、経年係数および延べ床面積に基づいてクレーム対応時間が演算され(S4)、この結果が集計ファイル17に記憶される。
【0090】
また、施設の延べ床面積が入力されると、巡回時間演算手段43により巡回時間が演算され(S5)、この結果が集計ファイル17に記憶される。
【0091】
なお、施設の用途として「複合用途」を入力(選択)した場合には、図14に示すように、用途入力欄25が表示される。用途入力欄25には、用途ごとの床面積が入力される複数の床面積入力部25aと、用途が入力される複数の用途入力部25cとが備えられており、用途入力部25cに「用途」を入力すると、図6(a)に示す用途係数ファイル12の中から対応する用途係数が選択される。複合用途の用途係数は、面積按分した各用途の用途係数を合算したものである。すなわち、各用途係数に、施設全体(延べ床面積)に対する当該用途(床面積)の占める割合を乗じたものが、複合用途における当該用途の用途係数となり、これらを合算したものが複合用途の用途係数となる。
【0092】
例えば、図14に示すように、施設の用途が「事務所ビル」と「スーパー」で、その床面積がそれぞれ「90000(m2)」、「30000(m2)」である場合(延べ床面積「120000(=90000+30000)(m2)」)を想定すると、施設全体に対する「事務所ビル」の占める割合が「0.75」で、「スーパー」の占める割合が「0.25」となることから、複合用途における「事務所ビル」の用途係数が「6750(=9000×0.75)」となり、「スーパー」の用途係数が「750(=3000×0.25)」となる。すなわち、複合用途の用途係数は、「7500=6750+750」」となる。
【0093】
次に、表示装置2に図12に示す設備機器数量入力欄22,22’を表示させ(S6)、その数量入力部22a,22a’に入力装置3を使用して施設に備えられている各設備機器の数量を入力する(S7)。設備機器数量入力欄22に入力された「数量」は、設備機器ファイル群11に記憶される。
【0094】
例えば、図12に示すように、「受変電設備」の数量入力部22aには、「74」を入力し、「非常用発電機」の数量入力部22aには、「1」を入力する。また、維持管理すべき施設に備えられていない設備機器(例えば、「常用発電機」や「真空ボイラー」等)の数量入力部22aは空欄にしておく。
【0095】
また、法定点検(検査)が必要な場合は、表示装置2に図12に示す設備機器数量入力欄22’の数量入力部22a’に各設備機器(検査項目)の数量を入力する。例えば、「高圧受変電設備年次点検」の数量入力部22a’には、「224」を入力し、「消防設備点検」の数量入力部22a’には、「115」を入力する。なお、例えば、「害虫防除」等は、設備機器には該当しないが、施設の維持管理に必要な作業であるので、設備機器の場合に準ずることとする。
【0096】
設備機器の数量が入力されると、設備機器ファイル群11に記憶されるとともに、点検時間演算手段41により、点検時間(日常点検時間、定期点検時間、法定点検時間、整備清掃時間)が演算され(S8)、その結果が集計ファイル17に記憶される。
【0097】
点検時間、クレーム対応時間、巡回時間が演算された段階で諸業務時間演算手段44により事務処理時間、コミュニケーション時間および教育時間が演算され(S9)、合計時間演算手段45により合算される(S10)。また、事務処理時間、コミュニケーション時間、教育時間、合計作業時間は、集計ファイル17に記憶される。
【0098】
続いて、第一の補正手段46Aにより図6(c)に示す移動係数ファイル14の中から施設の延べ床面積に対応する移動係数が選択され(S11)、この移動係数が合計時間演算手段45で演算された合計作業時間A(図8参照)に乗算されて第一の補正値B1(図8参照)が算出され、さらに余裕係数が乗算されて第二の補正値B2(図8参照)が算出される(S12)。
【0099】
次に、表示装置2に図13(a)に示す技能レベル入力欄23を表示させ(S13)、そのレベル入力部23aに入力装置3を使用して人員の技能レベルを入力する(S14)。
【0100】
技能レベルが入力されると、第二の補正手段46Bにより図7に示す技能レベル係数ファイル15の中から対応する技能レベル係数が選択され(S15)、この技能レベル係数が第二の補正値B2(図8参照)に乗算されて総作業時間(第三の補正値B3)が演算される(S16)。
【0101】
このように、本実施形態に係る作業時間算定システムによると、多種の設備機器のそれぞれについて標準点検周期と単位数量あたりの標準点検時間とが予め記憶されているので、維持管理すべき施設に実際に備えられた設備機器の数量を入力するだけで、施設の維持管理に要する総作業時間を迅速かつ的確に算定することができる。
【0102】
しかも、従来経験的に定めていた巡回時間やクレーム対応時間等が施設の延べ床面積、用途および経年という客観的な情報から算定されるので、業務経験の浅い者であっても、容易にかつ的確に施設の維持管理に要する総作業時間を算定することができる。
【0103】
さらに、合計作業時間Aの第三の補正値B3(総作業時間)は、施設の規模および人員の技能レベルを反映したものであるため、実際の総作業時間に非常に近似した値となる。
【0104】
また、第二の補正手段46Bにより総作業時間が演算されると、必要人工演算手段47により作業人工(あるいは作業人工の補正値)が演算される。
【0105】
そして、表示装置2に図13(b)に示す人員数入力欄24を表示させ、役職ごとに設けられた人数入力部24aに、その合計が必要人工演算手段47により演算された作業人工と同数になるように適宜な人数を入力すれば、見積金額演算手段49により人件費の合計金額が演算される。この人件費の合計金額は、図16に示す見積結果ファイルに「設備管理業務費」として記憶される。また、見積金額演算手段49により、作業費ファイル群19(図10(a)(b)参照)に予め記憶された法定定期作業費の単価の合計金額および設備定期保守費の単価の合計金額が演算され、それぞれ「法定定期作業費」、「設備定期保守費」として見積結果ファイルに記憶される。
【0106】
すなわち、図16に示す見積結果ファイルの内容が施設のオーナ等に提示すべき「見積書」となる。
【0107】
このように、本実施形態に係る作業時間算定システムによれば、最終的には、維持管理業務の見積金額をも容易に算定することが可能となる。
【0108】
【発明の効果】
本発明の作業時間算定システムによれば、多種の設備機器が備えられた施設の維持管理に要する作業時間を迅速かつ的確に算定することができる。しかも、施設の延べ床面積や経年といった客観的な情報を利用して維持管理に要する作業時間を算定するので、算定者によって結果が異なることがない。
【図面の簡単な説明】
【図1】 本発明の実施形態に係る作業時間算定システムの構成を示すブロック図である。
【図2】 日常点検ファイルの内容を示す図である。
【図3】 定期点検ファイルの内容を示す図である。
【図4】 法定点検ファイルの内容を示す図である。
【図5】 整備清掃ファイルの内容を示す図である。
【図6】 (a)は用途係数ファイルの内容を示す図、(b)は経年係数ファイルの内容を示す図、(c)は移動係数ファイルの内容を示す図である。
【図7】 技能レベル係数ファイルの内容を示す図である。
【図8】 集計ファイルの内容を示す図である。
【図9】 (a)は必要人工ファイルの内容を示す図、(b)は人件費ファイルの内容を示す図である。
【図10】 (a)(b)は作業費ファイル群の内容を示す図である。
【図11】 施設データ入力欄を示す図である。
【図12】 設備機器数量入力欄を示す図である。
【図13】 (a)は技能レベル入力欄を示す図、(b)は人員数入力欄を示す図である。
【図14】 複合用途入力欄を示す図である。
【図15】 作業時間算定システムの動作を示すフローチャートである。
【図16】 見積結果ファイルの内容を示す図である。
【符号の説明】
1 記憶装置
11 設備機器ファイル群
12 用途係数ファイル
13 経年係数ファイル
14 移動係数ファイル
15 技能レベル係数ファイル
16 施設ファイル
17 集計ファイル
18A 必要人工ファイル
18B 人件費ファイル
19 作業費ファイル群
2 表示装置
3 入力装置
4 演算処理部
41 点検時間演算手段
42 クレーム対応時間演算手段
43 巡回時間演算手段
45 合計時間演算手段
46A 第一の補正手段
46B 第二の補正手段
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a work time calculation system for calculating a work time required for maintenance and management of a facility including various types of equipment.
[0002]
[Prior art]
Various facilities such as buildings, commercial / cultural facilities, and parking lots are equipped with a wide variety of equipment such as power receiving / transforming equipment, air conditioning equipment, water supply / drainage equipment, and firefighting equipment. In general, inspection, maintenance, cleaning, etc. are performed regularly or regularly, and such maintenance work is often outsourced to a specialized management company.
[0003]
By the way, a management company entrusted with maintenance work generally presents an estimate to a facility owner or the like prior to the contract. In making this estimate, it is necessary to accurately estimate the number of workers engaged in maintenance work (artificial work). For this purpose, the time required for the inspection work of the equipment installed in the facility is required. It is necessary to accurately grasp
[0004]
However, the facility is equipped with a wide variety of equipment, and the time required for inspection of the entire facility is accurate because the inspection cycle and time required for one inspection differ for each equipment. It takes a great deal of labor and labor to calculate. In addition, in order to accurately calculate the time required for facility inspections, etc., it is necessary to consider the time required to travel within the facility and the time required to respond to customer complaints. In the end, it often depends on the skill and experience of the estimate creator, and as a result, there is a difference in the estimated amount.
[0005]
Many construction cost estimation systems have been proposed in the past (see, for example, Patent Document 1), but there is no system that solves the problems peculiar to the above-described maintenance work.
[0006]
[Patent Document 1]
JP 2001-32354 A (all pages)
[0007]
[Problems to be solved by the invention]
Then, this invention makes it a subject to provide the working time calculation system which can calculate the working time required for the maintenance management of the facility with which various equipment was equipped quickly and accurately.
[0008]
[Means for Solving the Problems]
In order to solve such a problem, the invention of claim 1 is a work time calculation system for calculating the work time required for the maintenance and management of a facility. And standard inspection time per unit quantity Storage means for storing a use coefficient defined according to the use of the facility and an aging coefficient defined according to the age of the facility When, By reading out the standard inspection cycle and standard inspection time corresponding to the equipment whose quantity is input by the input means from the storage means, and multiplying the quantity by the read standard inspection cycle and standard inspection time. Calculate the inspection time required for inspection of the equipment And write the obtained inspection time in the storage means. Inspection time calculation means; The total floor area of the facility is calculated by adding the floor areas of the plurality of uses input by the input means, and the use coefficient corresponding to each use is selected from the storage means, read out, and each read use The coefficient is multiplied by the ratio of the floor area of each application to the total floor area of the facility to correct each application coefficient, and the combined coefficient is calculated by summing the corrected values. The aging coefficient corresponding to the aging of the facility inputted by the input means is selected and read out from the storage means, and the read aging coefficient and the reciprocal of the usage coefficient of the combined use are used as the total floor area of the facility. Claim handling time calculating means for calculating the claim handling time required for the claim handling work by multiplying and writing the obtained claim handling time to the storage means. It is characterized by.
[0009]
According to this work time calculation system, since the standard inspection cycle and the standard inspection time per unit quantity are stored in advance for each of various types of equipment, the quantity of equipment actually provided in the facility to be maintained and managed By simply entering, the work time required for facility maintenance can be calculated quickly and accurately. The “inspection time” includes time required for inspection, maintenance, and cleaning. In addition, “standard inspection cycle” means, for example, “the number of inspections per day” for daily inspections performed daily, and “the number of monthly or annual inspections” for periodic inspections performed regularly. To do.
[0011]
Further, according to the present invention The work time calculation system is an objective method that measures the time required for handling complaints (complaint handling time), which has been determined empirically, as the total floor area, usage, and age of the facility (the number of years since the facility was completed). It is calculated from information. The “use factor” was introduced by the inventor of the present application in order to reflect the difficulty of maintenance management, the frequency of complaints, etc., which varies from facility to facility, in the inspection time, etc. The “aging factor” It was introduced by the present inventor in order to reflect the difficulty of maintenance that increases and decreases with aging, the frequency of occurrence of complaints, etc. in the inspection time and the like. According to such a work time calculation system, even a person with little work experience can easily and accurately calculate the complaint response time.
[0012]
Claim 2 The invention of claim 1 The work time calculation system described in The building circulation coefficient stored in advance in the storage means is read, and the extension of the facility is read with the read building circulation coefficient. Floor space By dividing Calculate the travel time required for building inspection of the facility And write the obtained tour time to the storage means. It further comprises a traveling time calculation means.
[0013]
This work time calculation system calculates the time required for building patrol inspection (travel time), which has been determined empirically, from objective information such as the total floor area of the facility. Even a shallow person can easily and accurately calculate the traveling time.
[0014]
Claim 3 The invention of claim 2 The work time calculation system described in The inspection time, complaint response time and patrol time stored in the storage means were read out and read out. Inspection time , Ku Lame response time and Tour Calculate the total work time by adding the times And write the total work time obtained to the storage means A total time calculating means is further provided.
[0015]
According to this work time calculation system, the work time required for facility maintenance can be calculated easily and accurately.
[0016]
Claim 4 The invention of claim 3 The work time calculation system described in The storage means Memorize the movement coefficient defined according to the total floor area of the facility Of the facility used in the claim response time calculation means Total floor area The transfer coefficient corresponding to From the storage means Select and read, and read and read the total work time stored in the storage means Multiplying the transfer coefficient multiplied by the total work time, The calculated total work time correction value is calculated and written to the storage means. And a first correction means.
[0017]
Such a work time calculation system corrects the total work time calculated by the total work time calculation means with a movement coefficient defined according to the total floor area of the facility. The “movement coefficient” is introduced by the present inventor in order to reflect the time required to move in the facility in the inspection time, etc., and thus the movement time that increases or decreases depending on the scale of the facility is checked. It is possible to reflect on.
[0018]
Claim 5 The invention of claim 4 The work time calculation system described in The storage means Stores skill level coefficients defined according to the skill level of the personnel placed in the facility, Enter To the skill level of personnel entered by force means Corresponding A skill level coefficient is selected from the storage means. And reading the correction value of the total work time stored in the storage means Skill level factor Is multiplied by the total work time correction value to calculate the correction value And a second correction means.
[0019]
This work time calculation system corrects the total work time uniformly calculated from the scale of the facility and the type of equipment according to the skill level of the personnel engaged in the maintenance work. The “skill level coefficient” is introduced by the inventor of the present application in consideration of the increase / decrease of the inspection time and the like depending on the skill level of the personnel. it can.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0021]
The work time calculation system according to the present embodiment is maintained and managed in various facilities such as buildings, commercial / cultural facilities, and parking lots equipped with various equipment such as power receiving / transforming equipment, air conditioning equipment, water supply / drainage equipment, fire fighting equipment, etc. As shown in FIG. 1, it is composed of a computer having at least a storage device 1, a display device 2, an input device 3, and an arithmetic processing unit 4. The storage device 1 stores a program (not shown) for causing the computer to function as a work time calculation system.
[0022]
In the present specification, of the work time required for facility maintenance, the time required for inspection, maintenance, and cleaning of equipment installed in the facility is referred to as “inspection time”. “Inspection time” includes time required for daily inspection (hereinafter referred to as “daily inspection time”), time required for periodic inspection (hereinafter referred to as “periodic inspection time”), time required for legal inspection (hereinafter referred to as “statutory inspection time”). This is the sum of the time required for maintenance and cleaning (hereinafter referred to as “maintenance and cleaning time”).
[0023]
In addition, the time required for the building patrol inspection performed for the purpose of inspecting the appearance of the facility is referred to as “traveling time”, and the time required for handling complaints from customers is referred to as “claim handling time”. Further, the time required for paperwork is called “paperwork time”, the time required for communication with customers and the like is called “communication time”, and the time required for employee training is called “education time”.
[0024]
(Storage device)
The storage device 1 includes a semiconductor memory, a magnetic disk, and the like. As shown in FIG. 1, the storage device file group 11, a usage coefficient file 12, an aging coefficient file 13, a movement coefficient file 14, and a skill level coefficient file 15 are used. Is stored. In other words, in the present embodiment, the storage device 1 functions as equipment device storage means, usage coefficient storage means, aging coefficient storage means, movement coefficient storage means, and skill level coefficient storage means. As shown in FIG. 1, the storage device 1 also stores a facility file 16, a total file 17, a necessary artificial file 18 </ b> A, a labor cost file 18 </ b> B, and a work cost file group 19.
[0025]
The equipment file group 11 includes a daily inspection file 11A shown in FIG. 2, a periodic inspection file 11B shown in FIG. 3, a legal inspection file 11C shown in FIG. 4, and a maintenance cleaning file 11D shown in FIG. The file stores the standard inspection cycle and the standard inspection time per unit quantity in association with each other for various types of equipment. Here, “standard inspection cycle” refers to the frequency of inspection. That is, the number of inspections per day, month or year. The “standard check time” means the time required for a person having standard skills to check a unit quantity of equipment once.
[0026]
In the daily inspection file 11A, as shown in FIG. 2, the “name”, “unit quantity”, “reference unit”, “standard inspection cycle” and “standard inspection time” are shown for each equipment that requires daily inspection. Stored in advance. For example, “unit quantity” of “substation equipment” is “1 (surface)”, “standard inspection frequency” is “3 (times)” per day, and “standard inspection time” is “1 (minute)”. ) ”. That is, the daily inspection of the “substation equipment” needs to be performed three times a day (standard number of inspections) per one surface (unit quantity), and one minute (standard inspection time) is required for each inspection. The “classification” indicates the type of equipment. The “quantity” is a value obtained by dividing the actual quantity of equipment to be inspected daily by the “unit quantity”, and is input by the input device 3. The “individual daily inspection time” is a time necessary for daily inspection of one equipment and is calculated by the inspection time calculating means 41 described later.
[0027]
In the periodic inspection file 11B, as shown in FIG. 3, the “name”, “unit quantity”, “reference unit”, “standard inspection cycle”, and “standard inspection time” for each equipment requiring periodic inspection are shown. Stored in advance. For example, “unit quantity” of “substation equipment” is “1 (surface)”, “standard inspection frequency” is “12 (times)” per year, and “standard inspection time” is “5 (minutes)”. ) ”. That is, the periodic inspection of the “substation equipment” needs to be performed 12 times (standard number of inspections) per year (unit quantity), and 5 minutes (standard inspection time) is required for each inspection. The “classification” indicates the type of equipment. The “quantity” is a value obtained by dividing the actual quantity of equipment to be periodically inspected by the “unit quantity”, and is input by the input device 3. The “individual periodic inspection time” is a time required for the periodic inspection of one equipment and is calculated by the inspection time calculating means 41 described later.
[0028]
In the legal inspection file 11C, as shown in FIG. 4, the “name (inspection item)”, “unit quantity”, “reference unit”, and “standard inspection” for each equipment whose inspection contents are prescribed by law. "Time" is stored in advance. For example, “unit quantity” of “substation equipment” is “100 (kVA)”, “standard inspection frequency” is “1 (time)” per year, and “standard inspection time” is “40 (minutes)”. ) ”. That is, the legal inspection of “substation equipment” must be performed “1 (times)” (standard number of inspections) per year for “100 (kVA)” (unit quantity), and “40 (40) per inspection”. (Minutes) "(standard inspection time). The “quantity” is a value obtained by dividing the actual quantity of equipment to be legally inspected (inspected) by the “unit quantity”, and is input by the input device 3. The “individual legal check time” is a time required for the legal check of one equipment and is calculated by the check time calculating means 41 described later.
[0029]
In the maintenance cleaning file 11D, as shown in FIG. 5, the “name (contents)”, “unit quantity”, “reference unit”, “standard inspection cycle” and “standard” are set for each equipment that requires maintenance and cleaning. “Inspection time” is stored in advance. For example, the “unit quantity” of “light load equipment (insulation measurement)” is “1 (surface)”, “standard inspection frequency” is “1 (time)” per year, and “standard inspection time” is “15 (minutes)”. In other words, for “light load equipment”, maintenance (insulation measurement) is required once a year (standard inspection count) per surface (unit quantity), and 15 minutes (standard inspection time) per maintenance. ). The “classification” indicates the type of equipment. The “quantity” is a value obtained by dividing the actual quantity of equipment to be maintained and cleaned by the “unit quantity”, and is input by the input device 3. The “individual maintenance cleaning time” is a time required for maintenance cleaning of one equipment and is calculated by the inspection time calculation means 41 described later.
[0030]
In the usage coefficient file 12, as shown in FIG. 6A, usage coefficients defined in accordance with the usage of the facility are stored in advance. The “use factor” is introduced by the inventor of the present application in order to reflect the difficulty of maintenance management, the frequency of occurrence of complaints, and the like, which differ for each facility, in the inspection time and the like. Note that the usage coefficient is not limited to the illustrated value, and may be changed as appropriate.
[0031]
In the aging coefficient file 13, as shown in FIG. 6B, an aging coefficient defined in accordance with the aging of the facility (the number of years since the facility was completed) is stored in advance. The “aging coefficient” is introduced by the inventor of the present application in order to reflect in the inspection time the degree of difficulty of maintenance that increases and decreases with the aging of the facility, the occurrence frequency of complaints, and the like. Note that the aging coefficient is not limited to the illustrated value, and may be changed as appropriate.
[0032]
As shown in FIG. 6C, the movement coefficient file 14 stores in advance movement coefficients defined in accordance with the total floor area of the facility. The “movement coefficient” is introduced by the inventor of the present application to reflect the time required for moving in the facility in the inspection time and the like. Note that the movement coefficient is not limited to the illustrated value, and may be changed as appropriate.
[0033]
As shown in FIG. 7, the skill level coefficient file 15 stores in advance skill level coefficients defined in accordance with the skill level (skill level) of the personnel placed in the facility. The “skill level coefficient” is introduced by the inventor of the present application in consideration of increase / decrease in inspection time and the like depending on the skill level of the personnel. The skill level coefficient is not limited to the illustrated value, and may be changed as appropriate.
[0034]
The facility file 16 includes property information (name of facility, usage, age, total floor area), work system (nighttime standby time), special work (contents, etc.) other than equipment-related work, estimate Information related to facilities such as business information (customer name, address, telephone number, etc.) (see FIG. 11) is stored.
[0035]
In the total file 17, as shown in FIG. 8, in addition to the “inspection time (daily inspection time, regular inspection time, legal inspection time, maintenance cleaning time)” calculated by the inspection time calculation means 41, the traveling time calculation means The “travel time” calculated in 43, the “claim response time” calculated in the claim response time calculation means 42, the “paper processing time”, “communication time”, “education time” calculated in the various work time calculation means 44 ”,“ Night standby time ”input by the input device 3 and“ Time required for special work other than equipment related work ”are stored, and“ Total work time A ”calculated by the total time calculation means 45, “First correction value B1” and “second correction value B2” of the total work time calculated by one correction means 46A are stored. In this embodiment, “per day” inspection time and “per month” inspection time and the like are stored in the aggregation file 17. Here, the “nighttime standby time” is a nighttime monitoring / standby time. The “time required for special work other than equipment-related work” is an actual measurement value.
[0036]
As shown in FIG. 9A, the necessary artificial file 18A includes “second correction value B2” calculated by the first correcting means 46A, and the necessary artificial calculating means 47 from the skill level coefficient file 15. The selected “skill level coefficient”, “total work time (third correction value B3) of the total work time A (see FIG. 8) calculated by the second correction means 46B, “Monthly working time”, “paid acquisition time”, “work artificial” calculated by the necessary artificial calculation means 47, and “work artificial correction value” are stored.
[0037]
In the labor cost file 18B, as shown in FIG. 9B, the “number of persons” for each position input by the input device 3, the “monthly unit price” for each position calculated by the labor cost calculating means 48 described later, and The “total amount” of the labor cost calculated by the estimated amount calculation means 49 is stored.
[0038]
The work cost file group 19 includes a legal work cost file 19A (see FIG. 10 (a)) in which “unit price” and the like of work costs (material costs other than personnel costs) required for legal inspection are stored in advance, and equipment and equipment. The periodic maintenance cost file 19B in which the “unit price” of maintenance costs (material costs other than personnel costs, etc.) required for periodic inspection is stored in advance (see FIG. 10B).
[0039]
(Display device)
The display device 2 (see FIG. 1) is a so-called display device, a facility data input column 21 (see FIG. 11) in which the total floor area, usage and age of the facility to be maintained are entered, and the actual quantity of equipment. Is input equipment equipment quantity input field 22 (see FIG. 12), skill level input field 23 (see FIG. 13 (a)) in which the skill level of personnel is input, and number input field 24 in which the number of personnel is input. (See FIG. 13B) and the like are displayed to prompt the input of data in each input field, and the contents of various files stored in the storage device 1 and the results calculated by the arithmetic processing unit 4 to be described later are displayed. To display.
[0040]
In the facility data input field 21, as shown in FIG. 11, a description floor area input unit 21a for inputting the total floor area of the facility, an aged input unit 21b for inputting the aging, and a use input unit 21c for inputting the usage. In addition to the night standby time input unit 21d for inputting the night standby time, the special business input unit 21e for inputting the contents of special work other than the equipment related work, etc., information for estimating the facility (customer name, address, An input unit for inputting a telephone number or the like is provided.
[0041]
In the facility equipment quantity input field 22 (22 ′), as shown in FIG. 12, a plurality of quantity input sections 22a (22a ′) to which the quantity of equipment is entered and the inspector (“in-house”, “outsourcing” ”And“ inspection organization ”) are input, and a plurality of inspector input sections 22b (22b ′) are provided. If “in-house” is entered in the inspector input unit 22b, it is incorporated in the calculation of the inspection time, while if “outsourcing” or “inspection organization” is entered, the pre-stored attendance time for each inspection content is inspected. It is added to time etc.
[0042]
In addition, as shown in FIG. 13A, the skill level input field 23 is provided with a level input unit 23a for inputting the skill level of the personnel. A number input section 24a for inputting the number of persons is provided.
[0043]
Although not shown, the display device 2 displays a facility data input field 21, an equipment / equipment quantity input field 22, a skill level input field 23, a personnel number input field 24, and menu buttons linked to the above-described files. A corresponding input field or file is displayed by appropriately selecting the menu button with a mouse or the like.
[0044]
(Input device)
The input device 3 is used for inputting predetermined data to each input unit such as a facility data input field 21, an equipment / equipment quantity input field 22, a personnel level input field 23, and a staff number input field 24 displayed on the display device 2. It consists of a keyboard and mouse.
[0045]
In other words, in the present embodiment, the input device 3 is a quantity input means for inputting the actual quantity of equipment, a facility information input means and a facility for inputting the total floor area of the facility to be maintained, usage, and aging. It functions as a personnel level input means for inputting the skill level of the personnel that are actually arranged.
[0046]
(Calculation processing part)
As shown in FIG. 1, the arithmetic processing unit 4 includes an inspection time calculating means 41, a complaint handling time calculating means 42, a traveling time calculating means 43, various business time calculating means 44, a total time calculating means 45, and a first correcting means. 46A, second correction means 46B, necessary artificial calculation means 47, labor cost calculation means 48, and estimated amount calculation means 49.
[0047]
The inspection time calculation means 41 is based on the quantity of each equipment device input by the input device 3 and the standard inspection cycle and standard inspection time stored in advance in the equipment device file group 11 (daily inspection time). , Regular inspection time, legal inspection time, maintenance cleaning time).
[0048]
Of the inspection times, the daily inspection time can be obtained by adding the individual daily inspection times for each equipment. In addition, the individual daily inspection time includes “quantity” of each equipment device input by the input device 3, “standard inspection cycle (times / day)” and “standard inspection” stored in the daily inspection file 11A (see FIG. 2). Based on the “hour (minute)”, the calculation is performed by the following calculation formula.
(Individual daily inspection time) = (Quantity) x (Standard inspection cycle) x (Standard inspection time)
[0049]
For example, as shown in FIG. 2, when the quantity of “substation equipment” is “74 (surface)”, the standard inspection cycle is “3 (times / day)”, and the standard inspection cycle is “3 (times / day)”. 1 (minute) ”, the individual inspection time of“ substation equipment ”is“ 222 (minute / day) ”.
[0050]
In other words, the inspection time calculation means 41 has the “standard inspection cycle (times / day)” and “standard inspection time (minutes)” corresponding to the equipment in which the quantity is input from the daily inspection file 11A (see FIG. 2). ”, And the individual daily inspection time is calculated based on the read“ standard inspection cycle (times / day) ”and“ standard inspection time (minutes) ”. To calculate the daily inspection time. When the individual daily inspection times are simply added together, the unit of the daily inspection time is “minute / day”, but when this value is divided by “60”, it becomes “hour / day”. In addition, when calculating the daily inspection time per month, it may be multiplied by the number of days in January. When calculating the daily inspection time per year, the daily inspection time per month is set to “12”. ".
[0051]
The individual daily inspection time calculated by the inspection time calculating means 41 is stored in the daily inspection file 11A (see FIG. 2), and the daily inspection time is stored in the totaling file 17 (see FIG. 8). Note that the total file 17 stores data converted into daily inspection hours per day (hour / day) and daily inspection hours per month (hour / month).
[0052]
In this embodiment, the value obtained by dividing the actual quantity of equipment by the “unit quantity” is set as “quantity”, but the actual quantity may be set as “quantity”. The individual daily inspection time in this case is calculated by the following calculation formula.
(Individual daily inspection time) = (Quantity) / (Unit quantity) x (Standard inspection cycle) x (Standard inspection time)
[0053]
Similarly, out of the inspection times, the periodic inspection time can be obtained by adding the individual periodic inspection times of the respective equipment. In addition, the individual periodic inspection time includes the actual “quantity” of each facility device input by the input device 3, “standard inspection cycle (times / year)” stored in the periodic inspection file 11 B (see FIG. 3), and “ Based on the “standard inspection time (minutes)”, it is calculated by the following calculation formula.
(Individual periodic inspection time) = (Quantity) x (Standard inspection cycle) x (Standard inspection time)
[0054]
For example, as shown in FIG. 3, when the quantity of “substation equipment” is “74 (surface)”, the standard inspection cycle is “12 (times / year)”, and the standard inspection cycle is “ Because it is “5 (min)”, the individual inspection time of “substation equipment” is “4400 (min / year)”.
[0055]
In other words, the inspection time calculation means 41 for the equipment whose quantity has been input, the corresponding “standard inspection cycle (times / year)” and “standard inspection time (minutes)” from the periodic inspection file 11B (see FIG. 3). ”, And the individual periodic inspection time is calculated based on the read“ standard inspection cycle (times / year) ”and“ standard inspection time (minutes) ”. And calculate the regular inspection time.
[0056]
The individual periodic inspection time calculated by the inspection time calculating means 41 is stored in the periodic inspection file 11B (see FIG. 3), and the periodic inspection time is stored in the totaling file 17 (see FIG. 8). In addition, the totalized file 17 is written with data converted into a regular inspection time per day (hour / day) and a regular inspection time per month (hour / year).
[0057]
Of the inspection times, the legal inspection time can be obtained by adding the individual legal inspection times for each equipment. In addition, the individual legal inspection time includes the “quantity” of each facility device input by the input device 3, the “standard inspection cycle (times / year)” and “standard inspection” stored in the legal inspection file 11C (see FIG. 4). Based on the “hour (minute)”, the calculation is performed by the following calculation formula.
(Individual legal inspection time) = (Quantity) x (Standard inspection period) x (Standard inspection time)
[0058]
For example, as shown in FIG. 4, when the quantity of “substation equipment” is “224 (kVA)”, the standard inspection cycle is “1 (times / year)”, and the standard inspection cycle is “ 40 (minutes) ”, the individual inspection time of“ substation equipment ”is“ 8960 (minutes / year) ”. Incidentally, the actual quantity of “substation equipment” is “22400 (kVA)”.
[0059]
In other words, the inspection time calculation means 41 has the “standard inspection cycle (times / year)” and “standard inspection time (minutes)” corresponding to the legally inspected file 11C (see FIG. 4) for the equipment whose quantity is input. ”Is calculated, the individual legal inspection time is calculated based on the read“ standard inspection cycle (times / year) ”and“ standard inspection time (minutes) ”, and the individual legal inspection time of each equipment is added up. And calculate the legal inspection time.
[0060]
The individual legal inspection time calculated by the inspection time calculating means 41 is stored in the legal inspection file 11C (see FIG. 4), and the legal inspection time is stored in the counting file 17 (see FIG. 8). The tabulated file 17 stores data converted into legal inspection time per day (hour / day) and legal inspection time per hour (hour / year).
[0061]
Of the inspection time, the maintenance cleaning time can be obtained by adding up the individual maintenance cleaning times for each equipment. In addition, the individual maintenance cleaning time includes the “quantity” of each facility device input by the input device 3, the “standard inspection cycle (times / year)” and “standard inspection” stored in the maintenance cleaning file 11D (see FIG. 5). Based on the “hour (minute)”, the calculation is performed by the following calculation formula.
(Individual maintenance cleaning time) = (Quantity) x (Standard inspection cycle) x (Standard inspection time)
[0062]
For example, as shown in FIG. 5, when the quantity of “light load equipment (insulation measurement)” is “278 (surface)”, the standard inspection cycle is “1 (times / year)”, and the standard Since the inspection cycle is “15 (minutes)”, the individual inspection time of “substation equipment” is “4170 (minutes / year)”.
[0063]
In other words, the inspection time calculation means 41, for the equipment to which the quantity is input, corresponds to the “standard inspection cycle (times / year)” and “standard inspection time (minutes)” from the maintenance cleaning file 11D (see FIG. 5). ”, And the individual maintenance cleaning time is calculated based on the read“ standard inspection cycle (times / year) ”and“ standard inspection time (minutes) ”. And calculate the maintenance cleaning time.
[0064]
Further, the individual maintenance cleaning time calculated by the inspection time calculating means 41 is stored in the maintenance cleaning file 11D (see FIG. 5), and the maintenance cleaning time is stored in the counting file 17 (see FIG. 8). Also, the totalized file 17 stores data converted into maintenance cleaning time (hour / day) per day and maintenance cleaning time (hour / day) per year.
[0065]
The claim response time calculation means 42 calculates a claim response time, and calculates a corresponding use coefficient from the use coefficient file 12 shown in FIG. 6A based on the use of the facility input by the input device 3. In addition to selecting (reading), a corresponding aging coefficient is selected (reading) from the aging coefficient file 13 shown in FIG. 6B based on the aging input by the input device 3, and the selected use coefficient and aging are selected. Based on the coefficient and the total floor area input by the input device 3, the complaint response time required for the complaint response work is calculated. Further, the calculated complaint response time is stored in the summary file 17 (see FIG. 8).
[0066]
The complaint response time (hour) per day can be calculated by the following calculation formula.
Claim handling time (hours / day) = (total floor area) / (use factor) x (aging factor)
[0067]
For example, the total floor area of the facility is “180,000 (m 2 ) ”, The usage is“ office building ”, and the age is“ 15 years ”, the usage coefficient corresponding to“ office building ”is“ 9000 ”(see FIG. 6A), and“ 15 Since the aging coefficient corresponding to “year” is “1.1” (see FIG. 6B), the complaint response time (hour / day) is “22 (hour / day)”.
[0068]
The traveling time calculation means 43 calculates the traveling time, reads the total floor area of the facility from the facility file 16, and divides the read total floor area by a predefined building traveling coefficient. Calculate the tour time required for the building patrol inspection of the facility. For example, the total floor area of the facility is “180,000 (m 2 ) ”, And assuming that the building patrol constant is“ 15000 ”, the patrol time per day required for the patrol of the building is“ 12 (hours / day) ”. Further, the calculated traveling time is stored in the aggregation file 17 shown in FIG.
[0069]
The various operation time calculation means 44 includes the check time calculated by the check time calculation means 41, the claim response time calculated by the claim response time calculation means 42, the tour time calculated by the tour time calculation means 43, and the input device 3 Based on the information (total floor area, usage, aging, etc.) regarding the input facility, the paperwork processing time, communication education time, etc. are calculated. That is, the various business time calculation means 44 reads the complaint response time and the traveling time from the total file 17, and also reads the total floor area, usage, age, etc. from the facility file 16, and based on these, the business processing time It calculates communication time. Further, the calculated office processing time, communication time, and education time are stored in the total file 17 shown in FIG.
[0070]
The business processing time (hour / day) per day is calculated by the following calculation formula.
(Business processing time) = ((Inspection time) + (Course time)) x 0.3
The unit is “hour / day”, and “0.3” is a constant.
[0071]
The teaching time per day (hour / day) is calculated by the following formula.
(Education time) = ((Inspection time) + (Course time)) x 0.05
The unit is “hour / day”, and “0.05” is a constant.
[0072]
The communication time (hour / day) per day is calculated by the following calculation formula.
(Communication time) = (total floor area) / 30000
The unit is “hour / day”, and “30000” is a constant.
[0073]
The total time calculation means 45 can check the inspection time (daily inspection time, regular inspection time, legal inspection time, maintenance cleaning time), patrol time, complaint response time, paperwork time, communication from the total file 17 shown in FIG. Time, education time, other night standby time directly input by the input device 3 and special work time other than equipment related work are read out, and these are added together to calculate the total work time A, and the result is stored in the summary file 17 Remember again.
[0074]
The first correction means 46A selects a corresponding movement coefficient from the movement coefficient file 14 shown in FIG. 6C based on the total floor area of the facility, and the selected movement coefficient is calculated by the total time calculation means 45. The calculated total work time A is multiplied to obtain the first correction value B1 (see FIG. 8). Furthermore, in the present embodiment, the first correction means 46A multiplies the first correction value B1 by a predefined margin coefficient, and calculates the second correction value B2 of the total work time A. The margin coefficient can be set as appropriate, but is “1.1” in the present embodiment. Further, the first correction value B1 and the second correction value B2 are stored in the aggregation file 17.
[0075]
For example, the total floor area of the facility is “180,000 (m 2 ””, “1.3” is selected as the movement coefficient from the movement coefficient file 14 in FIG. 6C by the first correction means 46A, and this movement coefficient is the total work time A “2234”. .88 (hour / month) ", and as a result, the first correction value B1" 2905.34 (hour / month) "is calculated (see FIG. 8). Further, the first correction value B1 is multiplied by the margin coefficient “1.1” to calculate the second correction value B2 “3195.88 (hour / month)” (see FIG. 8).
[0076]
The second correcting means 46B selects a corresponding skill level coefficient from the skill level coefficient file 15 shown in FIG. 7 based on the skill level of the personnel input by the input device 3, and selects the selected skill level coefficient. The third correction value B3 (see FIG. 9A) is obtained by further multiplying the second correction value B2 (see FIG. 8) of the total work time A. The third correction value B3 reflects the use of the facility, the scale, the skill level of the personnel, and the like, and thus is a value that is very close to the actual work time. The third correction value is stored as “total work time” in the necessary artificial file 18A (see FIG. 9A).
[0077]
For example, when the skill level of the personnel is “2.5”, “0.95” is selected as the skill level coefficient from the skill level coefficient file 15 shown in FIG. This skill level coefficient is multiplied by the second correction value B2 (see FIG. 8), and as a result, a third correction value B3 “3036.08 (hour / month)” is calculated (see FIG. 9A). ).
[0078]
The necessary artificial calculation means 47 previously stores the “total work time (third correction value B3 of the total work time A)” calculated by the second correction means 46B in the required artificial file 18A (see FIG. 9A). Dividing by the memorized “monthly working hours”, the work man-hours (number of people) necessary for facility maintenance are obtained.
[0079]
The work artificial is calculated by the following arithmetic expression.
(Man-made work) = (Total work time) / (Monthly work time)
[0080]
For example, as shown in FIG. 9A, when the monthly working time per person is “172 (h)”, the third correction value B3 is “101.20 (h / day)”. Therefore, the number of man-hours required for maintenance and management of the facility is “17.65 (person)”.
[0081]
Further, the “work artificial correction value” shown in FIG. 9A takes into account the paid acquisition time, and is calculated by the following arithmetic expression.
(Work artificial correction value) = (Total work hours) / ((Monthly work hours)-(Paid acquisition time))
[0082]
The “work artificial” and “work artificial correction value” calculated by the required artificial calculation means 47 are stored in the required artificial file 18A (see FIG. 9A).
[0083]
Although not shown, the labor cost calculation means 48 calculates the monthly unit price of the labor cost (see FIG. 9B) for each position based on the basic salary, qualification allowance, transportation cost, etc. paid to the personnel. . That is, the labor cost calculation means 48 calculates various insurance premiums, bonus allowances, general administrative expenses, etc. based on the basic salary, qualification allowance, transportation expenses, general administrative expense multiplication rate, bonus provision rate inputted by the input device 3 In addition, the monthly unit price of the labor cost is calculated by adding these. Further, the calculated monthly unit cost of the labor cost is stored in the labor cost file 18B (see FIG. 9B).
[0084]
The estimated amount calculation means 49 calculates the total amount of personnel costs based on the number of personnel arranged in the facility and the unit cost of the personnel costs calculated by the personnel cost calculation means 48, and further calculates the total amount of personnel costs. The total amount of legal periodic work costs (see FIG. 10 (a)) stored in the work cost file group 19 in advance and the total price of equipment regular maintenance costs (see FIG. 10 (b)) are added together. The total cost required for facility maintenance is calculated.
[0085]
Further, the total amount of the labor cost calculated by the estimated amount calculation means 49 is stored as “equipment management operation cost” in the estimation result file shown in FIG. 16, and the total amount of the legal regular work cost and the periodic maintenance cost of the facility are stored. Are stored as “statutory periodic work costs” and “equipment regular maintenance costs”, respectively. Further, the sum of “equipment management work cost”, “statutory regular work cost” and “equipment regular maintenance cost” is stored in the estimation result file shown in FIG. 16 as “total”. In calculating the “total”, “other” costs and “discounts” may be taken into consideration as appropriate.
[0086]
Next, the operation of the work time calculation system according to the present embodiment will be described with reference to the flowchart shown in FIG.
[0087]
When the work time calculation system is activated, the facility data input field 21 shown in FIG. 11 is displayed on the display device 2 (S1), and information on the facility is input to each input unit using the input device 3 (S2). . Various data input to the facility data input field 21 are stored in the facility file 16.
[0088]
For example, as shown in FIG. 11, the total floor area “180000 (m 2 ) ”,“ 15 (years) ”in the aged input unit 21b,“ use office building ”in the facility in the application input unit 21c, and“ 16 (hour / day) in the night standby time input unit 21d. ”Is input to the special work input unit 21e other than the equipment related work as“ content watering ”and the time required for this“ 1 (hour / day) ”. Furthermore, “Property name” and the like are input as necessary.
[0089]
When the facility use, aging, and total floor area are entered in the facility data input field 21, the corresponding use coefficient is selected from the use coefficient file 12 shown in FIG. At the same time, a corresponding aging coefficient is selected from the aging coefficient file 13 shown in FIG. 6B (S3), and the complaint response time is calculated based on the use coefficient, the aging coefficient and the total floor area (S4). ) And the result is stored in the summary file 17.
[0090]
When the total floor area of the facility is input, the traveling time calculation means 43 calculates the traveling time (S5), and the result is stored in the total file 17.
[0091]
When “composite usage” is input (selected) as the usage of the facility, a usage input field 25 is displayed as shown in FIG. The application input field 25 includes a plurality of floor area input units 25a for inputting floor areas for each application, and a plurality of application input units 25c for inputting applications. ”Is selected, the corresponding usage coefficient is selected from the usage coefficient file 12 shown in FIG. The application factor for composite applications is the sum of the application factors for each application divided by area. In other words, each usage coefficient multiplied by the ratio of the usage (floor area) to the entire facility (total floor area) is the usage coefficient of the usage in the composite usage. It becomes a coefficient.
[0092]
For example, as shown in FIG. 14, the usage of the facility is “office building” and “supermarket”, and the floor area is “90000 (m 2 ) "," 30000 (m 2 ) ”(Total floor area“ 120,000 (= 90000 + 30000) (m 2 ) ”), The ratio of“ office buildings ”to the entire facility is“ 0.75 ”, and the ratio of“ supermarkets ”is“ 0.25 ”. The usage coefficient of “Super” is “6750 (= 9000 × 0.75)”, and the usage coefficient of “Super” is “750 (= 3000 × 0.25)”. That is, the usage coefficient of the composite usage is “7500 = 6750 + 750”.
[0093]
Next, the equipment device quantity input fields 22 and 22 ′ shown in FIG. 12 are displayed on the display device 2 (S6), and the input devices 3 are used in the quantity input sections 22a and 22a ′, respectively. The quantity of equipment is input (S7). The “quantity” input in the equipment / equipment quantity input field 22 is stored in the equipment / equipment file group 11.
[0094]
For example, as illustrated in FIG. 12, “74” is input to the quantity input unit 22 a of “substation equipment”, and “1” is input to the quantity input unit 22 a of “emergency generator”. In addition, the quantity input unit 22a of equipment (for example, “general generator”, “vacuum boiler”, etc.) not provided in the facility to be maintained is left blank.
[0095]
Further, when legal inspection (inspection) is necessary, the quantity of each equipment (inspection item) is inputted to the display device 2 in the quantity input section 22a ′ of the equipment quantity input column 22 ′ shown in FIG. For example, “224” is input to the quantity input unit 22a ′ for “high-voltage receiving / transforming equipment annual inspection”, and “115” is input to the quantity input unit 22a ′ for “firefighting equipment inspection”. Note that, for example, “pest control” does not correspond to equipment, but it is necessary for maintenance of the facility, so it is applied to equipment.
[0096]
When the quantity of equipment is input, it is stored in the equipment file group 11, and the inspection time calculation means 41 calculates the inspection time (daily inspection time, regular inspection time, legal inspection time, maintenance cleaning time). (S8), the result is stored in the summary file 17.
[0097]
At the stage where the inspection time, the complaint response time, and the traveling time are calculated, the business time, communication time, and education time are calculated by the operation time calculation means 44 (S9), and added together by the total time calculation means 45 (S10). . Also, the paperwork time, communication time, education time, and total work time are stored in the total file 17.
[0098]
Subsequently, the first correction means 46A selects a movement coefficient corresponding to the total floor area of the facility from the movement coefficient file 14 shown in FIG. 6C (S11), and this movement coefficient is used as the total time calculation means 45. The first correction value B1 (see FIG. 8) is calculated by multiplying by the total work time A (see FIG. 8) calculated in step S1, and the second correction value B2 (see FIG. 8) is further multiplied by the margin coefficient. Is calculated (S12).
[0099]
Next, the skill level input field 23 shown in FIG. 13A is displayed on the display device 2 (S13), and the skill level of the personnel is input to the level input unit 23a using the input device 3 (S14).
[0100]
When the skill level is input, the second correction means 46B selects a corresponding skill level coefficient from the skill level coefficient file 15 shown in FIG. 7 (S15), and this skill level coefficient is set to the second correction value B2. The total work time (third correction value B3) is calculated by multiplying (see FIG. 8) (S16).
[0101]
As described above, according to the work time calculation system according to the present embodiment, the standard inspection cycle and the standard inspection time per unit quantity are stored in advance for each of the various types of equipment. It is possible to quickly and accurately calculate the total work time required for facility maintenance by simply inputting the quantity of equipment installed in the facility.
[0102]
Moreover, since the traveling time and complaint handling time, etc. that have been determined empirically, are calculated from objective information such as the total floor area, usage, and aging of the facility, even those with little work experience can easily and Accurately calculate the total work time required for facility maintenance.
[0103]
Furthermore, since the third correction value B3 (total work time) of the total work time A reflects the scale of the facility and the skill level of the personnel, the value is very close to the actual total work time.
[0104]
Further, when the total work time is calculated by the second correction means 46B, the required artificial calculation means 47 calculates the work artificial (or work artificial correction value).
[0105]
Then, the number-of-persons input field 24 shown in FIG. 13B is displayed on the display device 2, and the same number of work artificials calculated by the necessary artificial arithmetic means 47 is displayed in the number-of-persons input unit 24 a provided for each position. If an appropriate number of persons is input so that the following formula is satisfied, the estimated amount calculation means 49 calculates the total amount of personnel expenses. The total amount of the labor cost is stored as “facility management work cost” in the estimation result file shown in FIG. Further, the estimated amount calculation means 49 calculates the total amount of the unit price of the statutory periodic operation cost and the total amount of the unit periodic maintenance cost stored in advance in the operation cost file group 19 (see FIGS. 10A and 10B). It is calculated and stored in the estimation result file as “legal regular operation cost” and “equipment regular maintenance cost”, respectively.
[0106]
That is, the content of the estimation result file shown in FIG. 16 becomes an “estimate” to be presented to the owner of the facility.
[0107]
As described above, according to the working time calculation system according to the present embodiment, finally, it is possible to easily calculate the estimated amount of maintenance work.
[0108]
【The invention's effect】
According to the work time calculation system of the present invention, it is possible to quickly and accurately calculate the work time required to maintain and manage a facility equipped with various types of equipment. In addition, since the work time required for maintenance management is calculated using objective information such as the total floor area of the facility and aging, the result does not differ depending on the calculator.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of a working time calculation system according to an embodiment of the present invention.
FIG. 2 is a diagram showing the contents of a daily inspection file.
FIG. 3 is a diagram showing the contents of a periodic inspection file.
FIG. 4 is a diagram showing the contents of a legal inspection file.
FIG. 5 is a diagram showing the contents of a maintenance cleaning file.
6A is a diagram showing the contents of a usage coefficient file, FIG. 6B is a diagram showing the contents of an aging coefficient file, and FIG. 6C is a diagram showing the contents of a movement coefficient file.
FIG. 7 is a diagram showing the contents of a skill level coefficient file.
FIG. 8 is a diagram showing the contents of a summary file.
9A is a diagram showing the contents of a necessary artificial file, and FIG. 9B is a diagram showing the contents of a labor cost file.
10A and 10B are diagrams showing the contents of a work expense file group. FIG.
FIG. 11 is a diagram showing a facility data input field.
FIG. 12 is a diagram showing a facility equipment quantity input field.
13A is a diagram showing a skill level input field, and FIG. 13B is a diagram showing a number-of-persons input field.
FIG. 14 is a diagram showing a composite usage input field.
FIG. 15 is a flowchart showing the operation of the work time calculation system.
FIG. 16 is a diagram showing the contents of an estimation result file.
[Explanation of symbols]
1 Storage device
11 Equipment file group
12 Usage coefficient file
13 Aging coefficient file
14 Movement coefficient file
15 Skill level coefficient file
16 facility files
17 Total file
18A Artificial file required
18B Personnel cost file
19 Work cost files
2 display devices
3 input devices
4 Arithmetic processing part
41 Inspection time calculation means
42 Claim response time calculation means
43 Travel time calculation means
45 Total time calculation means
46A First correction means
46B Second correction means

Claims (5)

施設の維持管理に要する作業時間を算定するための作業時間算定システムであって、
多種の設備機器のそれぞれについて、その標準点検周期と単位数量あたりの標準点検時間とを記憶するとともに、施設の用途に応じて定義された用途係数と施設の経年に応じて定義された経年係数とを記憶する記憶手段と、
入力手段により数量が入力された設備機器に対応する標準点検周期および標準点検時間を前記記憶手段の中から読み出し、読み出した標準点検周期と標準点検時間とを前記数量に乗ずることで前記設備機器の点検に要する点検時間を演算し、得られた点検時間を前記記憶手段に書き込む点検時間演算手段と、
入力手段により入力された複数の用途の床面積を合計して施設の延べ床面積を演算するとともに、前記各用途に対応する用途係数を前記記憶手段の中から選択して読み出し、読み出した各用途係数に、前記施設の延べ床面積に対する前記各用途の床面積の割合を乗じて前記各用途係数を補正するとともに、補正後の値を合計することで複合用途の用途係数を演算し、さらに、入力手段により入力された前記施設の経年に対応する経年係数を前記記憶手段の中から選択して読み出すとともに、読み出した経年係数と前記複合用途の用途係数の逆数とを前記施設の延べ床面積に乗ずることでクレーム対応業務に要するクレーム対応時間を演算し、得られたクレーム対応時間を前記記憶手段に書き込むクレーム対応時間演算手段と、
を備えることを特徴とする作業時間算定システム。
A work time calculation system for calculating the work time required for facility maintenance,
For each type of equipment, the standard inspection cycle and the standard inspection time per unit quantity are stored , and the use coefficient defined according to the use of the facility and the aging coefficient defined according to the age of the facility Storage means for storing
The standard inspection cycle and the standard inspection time corresponding to the equipment whose quantity is input by the input means are read from the storage means, and the read standard inspection cycle and the standard inspection time are multiplied by the quantity, thereby multiplying the quantity . An inspection time calculating means for calculating an inspection time required for inspection and writing the obtained inspection time in the storage means ;
The total floor area of the facility is calculated by adding the floor areas of the plurality of uses input by the input means, and the use coefficient corresponding to each use is selected from the storage means, read out, and each read use The coefficient is multiplied by the ratio of the floor area of each application to the total floor area of the facility to correct each application coefficient, and the combined coefficient is calculated by summing the corrected values. The aging coefficient corresponding to the aging of the facility inputted by the input means is selected and read out from the storage means, and the read aging coefficient and the reciprocal of the usage coefficient of the combined use are used as the total floor area of the facility. Claim handling time calculating means for calculating the claim handling time required for the claim handling work by multiplying and writing the obtained claim handling time in the storage means;
Work computing system, wherein the obtaining Bei a.
前記記憶手段に予め記憶された建築巡回係数を読み出し、読み出した建築巡回係数で前記施設の延べ床面積を除すことにより当該施設の建築巡回点検に要する巡回時間を演算し、得られた巡回時間を前記記憶手段に書き込む巡回時間演算手段をさらに備えることを特徴とする請求項に記載の作業時間算定システム。 Reading pre-stored building cyclic coefficient in the storage unit, it calculates the cyclic time required for building patrol inspection of the facility by the read architectural cyclic coefficient dividing the rolled base floor area of the facility, resulting cyclic The work time calculation system according to claim 1 , further comprising: a cyclic time calculation unit that writes a time in the storage unit . 前記記憶手段に記憶された点検時間、クレーム対応時間および巡回時間を読み出し、読み出した点検時間、クレーム対応時間および巡回時間を合算して合計作業時間を演算し、得られた合計作業時間を前記記憶手段に書き込む合計時間演算手段をさらに備えることを特徴とする請求項2に記載の作業時間算定システム。 Said memory means checking time stored in read claims response time and cyclic time, read-out inspection time, by summing the click frame response time and Tour times time Total Work and calculated, resulting Total Work The work time calculation system according to claim 2, further comprising a total time calculation means for writing time in the storage means . 前記記憶手段は、施設の延べ床面積に応じて定義された移動係数を記憶しており、
前記クレーム対応時間演算手段で使用された前記施設の延べ床面積に対応する移動係数を前記記憶手段の中から選択して読み出すとともに、前記記憶手段に記憶された合計作業時間を読み出し、読み出した移動係数と合計作業時間とを乗算してその補正値を演算し、得られた合計作業時間の補正値を前記記憶手段に書き込む第一の補正手段と、をさらに備えることを特徴とする請求項に記載の作業時間算定システム。
The storage means stores a movement coefficient defined according to the total floor area of the facility ,
The movement coefficient corresponding to the total floor area of the facility used in the claim response time calculation means is selected and read out from the storage means, and the total work time stored in the storage means is read out and read out . by multiplying the coefficient total work calculates the correction value, claims and first correction means for writing the correction value of the total work time obtained in said storage means, further comprising a three Work time calculation system described in 1.
前記記憶手段は、施設に配置される人員の技能レベルに応じて定義された技能レベル係数を記憶しており、
力手段により入力された人員の技能レベルに対応する技能レベル係数を前記記憶手段の中から選択して読み出すとともに、前記記憶手段に記憶された合計作業時間の補正値を読み出し、読み出した技能レベル係数と合計作業時間の補正値とを乗算してその補正値を演算する第二の補正手段と、をさらに備えることを特徴とする請求項に記載の作業時間算定システム。
The storage means stores a skill level coefficient defined according to the skill level of the personnel placed in the facility,
It reads and selected from the storage means the skill level coefficient corresponding to the skill level of the input persons by input means, reads out the correction value stored Total Work in the storage means, read skill level The work time calculation system according to claim 4 , further comprising second correction means for multiplying the coefficient by a correction value of the total work time and calculating the correction value .
JP2003138276A 2003-05-16 2003-05-16 Work time calculation system Expired - Fee Related JP3899051B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003138276A JP3899051B2 (en) 2003-05-16 2003-05-16 Work time calculation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003138276A JP3899051B2 (en) 2003-05-16 2003-05-16 Work time calculation system

Publications (2)

Publication Number Publication Date
JP2004341875A JP2004341875A (en) 2004-12-02
JP3899051B2 true JP3899051B2 (en) 2007-03-28

Family

ID=33527692

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003138276A Expired - Fee Related JP3899051B2 (en) 2003-05-16 2003-05-16 Work time calculation system

Country Status (1)

Country Link
JP (1) JP3899051B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019092811A1 (en) * 2017-11-08 2019-05-16 三菱電機株式会社 Work evaluation system and work evaluation method
JP7398871B2 (en) * 2019-03-26 2023-12-15 株式会社富士通エフサス Information processing device, work time adjustment method, and work time adjustment program
CN114202552B (en) * 2021-12-29 2024-05-14 海南省林业科学研究院(海南省红树林研究院) Calculation method of labor used for manual cleaning of trifolium

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2708956B2 (en) * 1990-11-27 1998-02-04 株式会社日立製作所 Maintenance patrol work table creation device
JPH064543A (en) * 1992-06-16 1994-01-14 Toshiba Corp Equipment checking schedule preparing device
JPH0997285A (en) * 1995-09-29 1997-04-08 Toshiba Corp Equipment and parts maintenance cycle adjustment system and adjustment method
JPH09120417A (en) * 1995-10-26 1997-05-06 Hitachi Ltd Maintenance work scheduling method and maintenance management support system
JPH103499A (en) * 1996-06-19 1998-01-06 Shiyouhei Fudosan Kk Building maintenance management support system
JPH10301987A (en) * 1997-04-24 1998-11-13 Shiyouhei Fudosan Kk Building maintenance management support system and program recording medium for building maintenance management
JPH10301986A (en) * 1997-04-24 1998-11-13 Shiyouhei Fudosan Kk Building maintenance management supporting system and program recording medium for building maintenance management
JP3138690B2 (en) * 1998-09-17 2001-02-26 エヌイーシーフィールディング株式会社 Preventive maintenance support system
JPH11316783A (en) * 1999-01-28 1999-11-16 Shohei Fudosan Kk Estimate sheet generation support system for construction maintenance management
JP2001052278A (en) * 1999-08-09 2001-02-23 Mitsubishi Electric Building Techno Service Co Ltd System for optimizing maintenance patrol
JP4056032B2 (en) * 1999-10-27 2008-03-05 株式会社東芝 Plant equipment management device
JP2001159916A (en) * 1999-12-02 2001-06-12 Yamatake Sangyo Systems Co Ltd Equipment management aiding system
JP2001256380A (en) * 2000-03-09 2001-09-21 Hitachi Building Systems Co Ltd Elevator maintenance fee calculation system
JP4045074B2 (en) * 2001-01-31 2008-02-13 株式会社日立製作所 Elevator maintenance contract support system
JP2002342412A (en) * 2001-05-21 2002-11-29 Nihon Meccs Co Ltd Maintenance and management plan preparing system for construction equipment
JP3556931B2 (en) * 2001-09-25 2004-08-25 三菱重工業株式会社 Optimal maintenance plan decision system

Also Published As

Publication number Publication date
JP2004341875A (en) 2004-12-02

Similar Documents

Publication Publication Date Title
Cassar Environmental management: guidelines for museums and galleries
Rad Project estimating and cost management
Meade et al. Analysing the impact of the implementation of lean manufacturing strategies on profitability
Umkehrer Heterogenous effects of entering the labor market during a recession—New evidence from Germany
Thanasi Hedonic appraisal of apartments in Tirana
JP3899051B2 (en) Work time calculation system
Winson-Geideman et al. The impact of age on the value of historic homes in a nationally recognized historic district
Earthman et al. School Maintenance and Renovation: Administrator Policies, Practices, & Economics
JP6512730B2 (en) Management plan development support system
Tebin Pricing tenders for construction
Roachanakanan A case study of cost overruns in a Thai condominium project
Cox et al. An application of material requirements planning to higher education
Schottlander How accurate are your estimates?
PRATIWI et al. Characteristics Of The Informal Sector In Denpasar City
Jain et al. CIBSE TM54 energy projections I: A case study using quasi-steady state modelling
O'Connor Automated valuation models by model-building practitioners: Testing hybrid model structure and GIS location adjustments
Bates et al. The market demand characteristics associated with real estate services: Some evidence from a panel data set of MSAs
Ross-Bain The Relationship Between Energy Use and Quality of the Facility Management Function in Small to Medium Enterprises (SMEs)
Salami GREEN LIQUIDATED DAMAGES: DETERMINANTS OF THE OWNER'S RECOVERY MECHANISM
JP2004021565A (en) Detection system of break-even point of building for rent
Gomeseria Building Services Engineering Management
Lanoie et al. Work sharing and productivity: Evidence from a natural experiment
Tulley An Alternative Utility Funding Model For The Department Of The Army
Puckett A Simulation Approach for Evaluating Hedonic Wage Models' Ability to Recover Marginal Value for Risk Reduction
Al-Saleh A program to improve construction productivity in the construction industry in Saudi Arabia

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060913

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061222

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3899051

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130105

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160105

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees