Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3901469B2 - Control method of shield jack in shield machine - Google Patents
[go: Go Back, main page]

JP3901469B2 - Control method of shield jack in shield machine - Google Patents

Control method of shield jack in shield machine Download PDF

Info

Publication number
JP3901469B2
JP3901469B2 JP2001134763A JP2001134763A JP3901469B2 JP 3901469 B2 JP3901469 B2 JP 3901469B2 JP 2001134763 A JP2001134763 A JP 2001134763A JP 2001134763 A JP2001134763 A JP 2001134763A JP 3901469 B2 JP3901469 B2 JP 3901469B2
Authority
JP
Japan
Prior art keywords
shield
jack
pressing force
shield jack
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001134763A
Other languages
Japanese (ja)
Other versions
JP2002327590A (en
Inventor
泰治 花岡
裕司 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP2001134763A priority Critical patent/JP3901469B2/en
Publication of JP2002327590A publication Critical patent/JP2002327590A/en
Application granted granted Critical
Publication of JP3901469B2 publication Critical patent/JP3901469B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、シールド掘進機におけるシールドジャッキの制御方法に関する。
【0002】
【従来の技術】
シールド掘進機により、トンネルを掘削する場合には、シールド本体の後部内周面に所定間隔おきに多数配置されているシールドジャッキにより、その後方に配置されたセグメントを押すことにより、シールド本体が前進させられている。
【0003】
従来、シールドジャッキによりシールド本体を前進させる場合、前進に際して選択されたシールドジャッキには高圧油が供給されて押圧動作が行われるとともに、残りのシールドジャッキについては低圧油が供給されて、単に、セグメントに追従する追従動作にされていた。
【0004】
【発明が解決しようとする課題】
従来のシールドジャッキの制御方法によると、掘進中に、方向修正などの作業が発生すると、セグメントに対するシールドジャッキの押当て位置がずれることになるが、選択された全てのシールドジャッキには押圧力が発生しており、この状態では、押当て位置がずれにくくなり、したがってセグメントに過大なずれ力が作用し、セグメントおよびシールドジャッキに破損が発生する場合があった。
【0005】
そこで、本発明は、トンネル掘削時に、セグメント、シールドジャッキ等にずれ力による破損が発生するのを防止し得るシールド掘進機におけるシールドジャッキの制御方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
上記課題を解決するために、本発明のシールド掘進機におけるシールドジャッキの制御方法は、シールド本体の後部内周面に沿って所定間隔おきに配置された複数個のシールドジャッキの制御方法であって、
推進用に選択されて押圧力が発生されているシールドジャッキを、1個ずつ順番に所定時間間隔でもって、または複数個ずつ順番に所定時間間隔でもって、その押圧力を小さくなしまたは押圧動作を停止させる方法である。
【0007】
また、本発明の他のシールド掘進機におけるシールドジャッキの制御方法は、シールド本体の後部内周面に沿って所定間隔おきに配置された複数個のシールドジャッキの制御方法であって、
推進用に選択されて押圧力が発生されているシールドジャッキを、1個ずつ順番に所定時間間隔でもって、または複数個ずつ順番に所定時間間隔でもって、その押圧力を小さくなしまたは押圧動作を停止させていく際に、その反対側に位置するシールドジャッキについても、上記シールドジャッキと同時にまたは交互に、押圧力を小さくなしまたは押圧動作を停止させる方法である。
【0008】
上記の各制御方法によると、シールドジャッキによる押圧力が、1個ずつまたは複数個ずつ順番に、一時的に、小さくまたは停止されるため、セグメントに対して押圧力が均等に付加されていない場合に、シールドジャッキとセグメントとの間に生じるずれ力が解放される。
【0009】
【発明の実施の形態】
以下、本発明の実施の形態におけるシールド掘進機におけるシールドジャッキの制御方法を、図1〜図4に基づき説明する。
【0010】
まず、シールド掘進機の概略構成について説明する。
図1および図2に示すように、このシールド掘進機のシールド本体1の後部内周面には、シールドジャッキ2が所定間隔でもって、多数、例えば24個配置されるとともに、このシールド掘進機には、上記シールドジャッキ2に押圧力を発生させてシールド本体1に推進力を与えるための油圧装置が具備されている。
【0011】
図3に示すように、この油圧装置3は、油タンク11と、この油タンク11と上記各シールドジャッキ2との間に設けられるとともに油圧ポンプ12に接続されて高圧油を供給する油供給管13と、同じくシールドジャッキ2と油圧タンク11との間に設けられた油戻り管14と、これら油供給管13および油戻り管14の途中に設けられたシールドジャッキ操作用の操作弁(油路切換用の4ポート3位置式の電磁切換弁が用いられる)15と、上記油供給管13と各シールドジャッキ2のヘッド側とに亘って接続された各油供給側枝管13aにそれぞれ設けられたヘッド側選択弁(油路のオン・オフを行う2ポート2位置式の電磁切換弁が用いられる)16と、同じく油戻り管14と各シールドジャッキ2のロッド側とに亘って接続された各油戻り側枝管14aにそれぞれ設けられたロッド側選択弁(油路のオン・オフを行う2ポート2位置式の電磁切換弁が用いられる)17と、油供給管13の操作弁15より下流側部分と各油供給側枝管13aの選択弁15より下流側部分とに亘って接続されるとともに途中に減圧弁18および追従用切換弁(油路のオン・オフを行う2ポート2位置式の電磁切換弁が用いられる)19が設けられて低圧油を供給するための低圧油供給管20と、同じく油供給管13の操作弁15より下流側部分とこの操作弁15より下流側の油戻り管14とに亘って接続されるとともに途中にリリーフ弁21が設けられた油逃がし管22とから構成されている。
【0012】
なお、低圧油供給管20と各油供給側枝管13aとの接続部分には、低圧油供給管20側の低圧油だけを油供給側枝管13a側に流すための逆止弁23がそれぞれ設けられており、またその他必要な箇所に逆止弁が設けられている。また、図3中、24はアンロード回路である。
【0013】
そして、少なくとも、上記各操作弁15、各選択弁16,17および追従用切換弁19を制御するための制御装置(図示せず)が具備されている。
次に、上記構成におけるシールドジャッキの制御方法を、図2および図4に基づき説明する。
【0014】
シールド本体1を直進させる場合には、全てのシールドジャッキ2に等しい押圧力を発生させて、セグメントSからの反力により、シールド本体1が前進(推進)されて掘削が行われる。この場合、シールドジャッキ2のロッド部とセグメントSとの接触部分でのずれが生じないため、特に、問題は生じない。
【0015】
ところで、シールド本体1の方向を例えば左側に変える場合には、図2の斜線にて示すように、右側半分(なお、説明を明確にするために、右側のシールドジャッキに押圧力を発生させるとともに、左側のシールドジャッキを追従用として説明するが、実際には、方向の変更度合いに応じて、選択されるシールドジャッキの数および位置について、その都度、決定されるものである)のシールドジャッキ2に押圧力が発生される。
【0016】
この時、制御装置により、上側から下側に向って配置されたシールドジャッキ2(NO.1〜NO.12)に供給されている高圧油の供給が順次一時的に停止される。すなわち、各シールドジャッキ2のヘッド側選択弁16のオン・オフ操作が、図4のタイムチャートに示すように、順番に、所定のインターバルをおいて、所定時間(数秒程度)づつだけオフ状態にされる。勿論、所定時間経過後は、オン状態に戻される。なお、ヘッド側選択弁16がオフ状態にされている間は、追従用切換弁19がオン状態にされて低圧油供給管20から低圧油が供給されて、セグメントSに小さい押圧力でもって押している追従状態にされている。
【0017】
このように、セグメントSを押圧しているシールドジャッキ2が、順番に、所定時間づつ(所定時間間隔でもって)その押圧力が小さくされて、すなわち押圧力が解除されて低圧の追従状態にされるため、セグメントSとシールドジャッキ2のロッド部との間に発生しているずれ力が解放され、したがってセグメントSおよびシールドジャッキ2側に損傷が発生するのを防止することができる。なお、同じ掘進動作が続く限り、選択されたシールドジャッキ2への高圧油の供給の一時停止の一連の動作が繰り返し行われる。
【0018】
ところで、上記実施の形態においては、方向を変えるために選択されたシールドジャッキ2についてだけ、押圧力を解除するように説明したが、その制御対象を全てのシールドジャッキ2としてもよい。
【0019】
この場合、例えば右側の上方に位置する1番目のシールドジャッキ2(NO.1)の押圧力を最初に解除した後、その反対側に位置する13番目のシールドジャッキ2(NO.13)の押圧力を解除し、次に2番目のシールドジャッキ2(NO.2)の押圧力を解除した後、その反対側に位置する14番目のシールドジャッキ2(NO.14)の押圧力を解除し、次に3番目、15番目のシールドジャッキ2というように、順次、残りのシールドジャッキ2について、上記と同じ制御を続けるようにしてもよい。
【0020】
このようにすれば、選択されたシールドジャッキ2群に対してだけ、押圧力の解除を行う場合に比べて、全部のシールドジャッキ2を対象にして、順番に、且つその反対側に位置するシールドジャッキの押圧力を解除していく方が、制御手順(制御ロジック)が簡単になる。また、シールド本体の姿勢変化への影響も抑えることができる。
【0021】
また、上記実施の形態においては、選択されているシールドジャッキ2の押圧力を解除した際に、低圧油が供給されて追従状態にされているが、ヘッド側選択弁16およびロッド側選択弁17とを共にオフ状態にして、完全に油の供給を停止させて、すなわち押圧動作を停止させるようにしてもよい。このように、押圧動作を停止すると、シールドジャッキ2のロッド部を、セグメントSから完全に離すことができる。
【0022】
さらに、上記実施の形態においては、シールドジャッキ2を1個ずつ順番に、その押圧力を、小さくまたは停止させるように説明したが、例えばシールドジャッキ2を複数個ずつ、順番に、その押圧力を、小さくまたは停止させることもできる。
【0023】
【発明の効果】
以上のように本発明のシールドジャッキの制御方法によると、シールドジャッキによる押圧力が、1個ずつまたは複数個ずつ、順番に、所定時間間隔でもって、小さくまたは停止されるため、セグメントに対して押圧力が均等に付加されていない場合に、シールドジャッキとセグメントとの間に生じるずれ力が解放され、したがってセグメント、シールドジャッキ等に損傷が発生するのを防止することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態におけるシールド掘進機の要部概略断面図である。
【図2】同シールド掘進機におけるシールドジャッキの配置状態を示す背面図である。
【図3】同シールド掘進機におけるシールドジャッキの油圧回路図である。
【図4】同シールドジャッキに対するヘッド側選択弁の作動タイムチャートである。
【符号の説明】
1 シールド本体
2 シールドジャッキ
13 油供給管
13a 油供給側枝管
14 油戻り管
14a 油戻り側枝管
15 操作弁
16 ヘッド側選択弁
17 ロッド側選択弁
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for controlling a shield jack in a shield machine.
[0002]
[Prior art]
When excavating a tunnel with a shield machine, the shield body moves forward by pushing a segment placed behind it with a number of shield jacks arranged at predetermined intervals on the rear inner peripheral surface of the shield body. It has been made.
[0003]
Conventionally, when a shield main body is advanced by a shield jack, high pressure oil is supplied to the shield jack selected for advancement and pressing operation is performed, and the remaining shield jack is supplied with low pressure oil, and is simply segmented. It was made to follow operation to follow.
[0004]
[Problems to be solved by the invention]
According to the conventional shield jack control method, if work such as direction correction occurs during excavation, the pressing position of the shield jack with respect to the segment will shift, but the pressing force is applied to all the selected shield jacks. In this state, the pressing position is difficult to shift, and therefore an excessive displacement force acts on the segment, and the segment and the shield jack may be damaged.
[0005]
Accordingly, an object of the present invention is to provide a method for controlling a shield jack in a shield machine capable of preventing a segment, a shield jack, and the like from being damaged due to a displacement force during tunnel excavation.
[0006]
[Means for Solving the Problems]
In order to solve the above problems, a shield jack control method in the shield machine of the present invention is a control method for a plurality of shield jacks arranged at predetermined intervals along the rear inner peripheral surface of the shield body. ,
Shield jack pressing force is selected to propulsion is generated, with a predetermined time interval one by one, or one by plural with a predetermined time interval, the No pressing force smaller or pressing action It is a method to stop.
[0007]
Further, the shield jack control method in another shield machine of the present invention is a control method of a plurality of shield jacks arranged at predetermined intervals along the rear inner peripheral surface of the shield body,
Shield jack pressing force is selected to propulsion is generated, with a predetermined time interval one by one, or one by plural with a predetermined time interval, the No pressing force smaller or pressing action when going to stop, for the shield jacks located on the opposite side, at the same time or alternately with the shield jack is a method for stopping the small or without pressing action of the pressing force.
[0008]
According to each control method above, the pressing force by the shield jack is temporarily reduced or stopped one by one or several at a time, so the pressing force is not evenly applied to the segment In addition, the shifting force generated between the shield jack and the segment is released.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the control method of the shield jack in the shield machine in embodiment of this invention is demonstrated based on FIGS.
[0010]
First, a schematic configuration of the shield machine will be described.
As shown in FIG. 1 and FIG. 2, a large number, for example, 24 of shield jacks 2 are arranged at a predetermined interval on the rear inner peripheral surface of the shield main body 1 of the shield machine. Is provided with a hydraulic device for generating a pressing force on the shield jack 2 to apply a propulsive force to the shield body 1.
[0011]
As shown in FIG. 3, the hydraulic device 3 includes an oil tank 11 and an oil supply pipe that is provided between the oil tank 11 and each shield jack 2 and is connected to the hydraulic pump 12 to supply high-pressure oil. 13, an oil return pipe 14 provided between the shield jack 2 and the hydraulic tank 11, and an operation valve for operating a shield jack (oil path) provided in the middle of the oil supply pipe 13 and the oil return pipe 14. A four-port, three-position electromagnetic switching valve for switching) 15 and oil supply side branch pipes 13a connected across the oil supply pipe 13 and the head side of each shield jack 2 respectively. A head-side selection valve (a 2-port 2-position electromagnetic switching valve that turns the oil passage on and off is used) 16 is connected across the oil return pipe 14 and the rod side of each shield jack 2. A rod-side selection valve (a 2-port 2-position electromagnetic switching valve for turning on / off the oil passage) 17 provided on each of the oil return side branch pipes 14a and a downstream side of the operation valve 15 of the oil supply pipe 13 And a pressure reducing valve 18 and a follow-up switching valve (a two-port, two-position type electromagnetic valve for turning on / off the oil passage) and connected to the portion and a portion downstream of the selection valve 15 of each oil supply side branch pipe 13a. 19 is provided and a low-pressure oil supply pipe 20 for supplying low-pressure oil, a portion downstream of the operation valve 15 of the oil supply pipe 13 and an oil return pipe downstream of the operation valve 15. 14 and an oil relief pipe 22 provided with a relief valve 21 in the middle.
[0012]
In addition, a check valve 23 for flowing only the low-pressure oil on the low-pressure oil supply pipe 20 side to the oil supply-side branch pipe 13a side is provided at a connection portion between the low-pressure oil supply pipe 20 and each oil supply-side branch pipe 13a. In addition, check valves are provided where necessary. In FIG. 3, reference numeral 24 denotes an unload circuit.
[0013]
At least a control device (not shown) for controlling each operation valve 15, each selection valve 16, 17 and follow-up switching valve 19 is provided.
Next, a method for controlling the shield jack in the above configuration will be described with reference to FIGS.
[0014]
When the shield main body 1 is moved straight, a pressing force equal to all the shield jacks 2 is generated, and the shield main body 1 is advanced (promoted) by the reaction force from the segment S to perform excavation. In this case, no problem occurs because there is no displacement at the contact portion between the rod portion of the shield jack 2 and the segment S.
[0015]
By the way, when the direction of the shield body 1 is changed to, for example, the left side, as shown by the oblique lines in FIG. 2, the right half (for the sake of clarity, a pressing force is generated on the right shield jack. The left-hand shield jack will be described as a follow-up, but in practice, the number and position of the shield jacks to be selected are determined each time according to the direction change degree). A pressing force is generated.
[0016]
At this time, the supply of the high-pressure oil supplied to the shield jacks 2 (NO. 1 to NO. 12) arranged from the upper side to the lower side is temporarily stopped by the control device. That is, the on / off operation of the head side selection valve 16 of each shield jack 2 is turned off for a predetermined time (several seconds) in order at predetermined intervals, as shown in the time chart of FIG. Is done. Of course, after a predetermined time has elapsed, the state is returned to the on state. While the head side selection valve 16 is in the off state, the follow-up switching valve 19 is turned on and the low pressure oil is supplied from the low pressure oil supply pipe 20 and pushed to the segment S with a small pressing force. There is a tracking state.
[0017]
In this way, the shield jack 2 pressing the segment S is reduced in order by a predetermined time (with a predetermined time interval), that is, the pressing force is released, and the low pressure follow-up state is achieved. Therefore, the displacement force generated between the segment S and the rod portion of the shield jack 2 is released, and therefore damage can be prevented from occurring on the segment S and shield jack 2 side. As long as the same excavation operation continues, a series of operations for temporarily stopping the supply of high-pressure oil to the selected shield jack 2 is repeated.
[0018]
By the way, in the said embodiment, although demonstrated so that pressing force might be cancelled | released only about the shield jack 2 selected in order to change a direction, it is good also considering all the shield jacks 2 as the control object.
[0019]
In this case, for example, after first releasing the pressing force of the first shield jack 2 (NO.1) positioned on the upper right side, the pressing of the thirteenth shield jack 2 (NO.13) positioned on the opposite side is released. After releasing the pressure and then releasing the pressing force of the second shield jack 2 (NO.2), the pressing force of the 14th shield jack 2 (NO.14) located on the opposite side is released, Next, the same control as described above may be continued for the remaining shield jacks 2 in order, such as the third and fifteenth shield jacks 2.
[0020]
In this way, compared to the case where the pressing force is released only for the selected group of shield jacks 2, the shields that are positioned in order and on the opposite side of all the shield jacks 2 are targeted. The control procedure (control logic) is simplified by releasing the jack pressing force. Moreover, the influence on the attitude | position change of a shield main body can also be suppressed.
[0021]
Further, in the above embodiment, when the pressing force of the selected shield jack 2 is released, the low pressure oil is supplied and the tracking state is maintained. However, the head side selection valve 16 and the rod side selection valve 17 are in the following state. And the oil supply may be completely stopped, that is, the pressing operation may be stopped. Thus, when the pressing operation is stopped, the rod portion of the shield jack 2 can be completely separated from the segment S.
[0022]
Furthermore, in the above-described embodiment, the shield jacks 2 have been described so that the pressing force is reduced or stopped one by one in order . For example, the plurality of shield jacks 2 are sequentially increased in the pressing force. It can be small or stopped.
[0023]
【The invention's effect】
As described above, according to the control method of the shield jack of the present invention, the pressing force by the shield jack is reduced or stopped one by one or plural at a predetermined time interval. When the pressing force is not evenly applied, the displacement force generated between the shield jack and the segment is released, and therefore it is possible to prevent the segment, the shield jack and the like from being damaged.
[Brief description of the drawings]
FIG. 1 is a schematic sectional view of a main part of a shield machine according to an embodiment of the present invention.
FIG. 2 is a rear view showing an arrangement state of shield jacks in the shield machine.
FIG. 3 is a hydraulic circuit diagram of a shield jack in the shield machine.
FIG. 4 is an operation time chart of a head side selection valve with respect to the shield jack.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Shield body 2 Shield jack 13 Oil supply pipe 13a Oil supply side branch pipe 14 Oil return pipe 14a Oil return side branch pipe 15 Operation valve 16 Head side selection valve 17 Rod side selection valve

Claims (2)

シールド本体の後部内周面に沿って所定間隔おきに配置された複数個のシールドジャッキの制御方法であって、
推進用に選択されて押圧力が発生されているシールドジャッキを、1個ずつ順番に所定時間間隔でもって、または複数個ずつ順番に所定時間間隔でもって、その押圧力を小さくなしまたは押圧動作を停止させることを特徴とするシールド掘進機におけるシールドジャッキの制御方法。
A control method for a plurality of shield jacks arranged at predetermined intervals along the rear inner peripheral surface of the shield body,
Shield jack pressing force is selected to propulsion is generated, with a predetermined time interval one by one, or one by plural with a predetermined time interval, the No pressing force smaller or pressing action A method for controlling a shield jack in a shield machine, wherein the shield jack is stopped.
シールド本体の後部内周面に沿って所定間隔おきに配置された複数個のシールドジャッキの制御方法であって、
推進用に選択されて押圧力が発生されているシールドジャッキを、1個ずつ順番に所定時間間隔でもって、または複数個ずつ順番に所定時間間隔でもって、その押圧力を小さくなしまたは押圧動作を停止させていく際に、その反対側に位置するシールドジャッキについても、上記シールドジャッキと同時にまたは交互に、押圧力を小さくなしまたは押圧動作を停止させることを特徴とするシールド掘進機におけるシールドジャッキの制御方法。
A control method for a plurality of shield jacks arranged at predetermined intervals along the rear inner peripheral surface of the shield body,
Shield jack pressing force is selected to propulsion is generated, with a predetermined time interval one by one, or one by plural with a predetermined time interval, the No pressing force smaller or pressing action when going to stop, for the shield jacks located on the opposite side, at the same time or alternately with the shield jack of shield jacks in the shield machine is characterized in that stopping the small or without pressing action of the pressing force Control method.
JP2001134763A 2001-05-02 2001-05-02 Control method of shield jack in shield machine Expired - Fee Related JP3901469B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001134763A JP3901469B2 (en) 2001-05-02 2001-05-02 Control method of shield jack in shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001134763A JP3901469B2 (en) 2001-05-02 2001-05-02 Control method of shield jack in shield machine

Publications (2)

Publication Number Publication Date
JP2002327590A JP2002327590A (en) 2002-11-15
JP3901469B2 true JP3901469B2 (en) 2007-04-04

Family

ID=18982378

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001134763A Expired - Fee Related JP3901469B2 (en) 2001-05-02 2001-05-02 Control method of shield jack in shield machine

Country Status (1)

Country Link
JP (1) JP3901469B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7348856B2 (en) * 2020-02-14 2023-09-21 地中空間開発株式会社 tunnel boring machine
JP7308005B2 (en) * 2020-03-18 2023-07-13 株式会社奥村組 Tunnel construction method by shield construction method

Also Published As

Publication number Publication date
JP2002327590A (en) 2002-11-15

Similar Documents

Publication Publication Date Title
US10604915B2 (en) Hydraulic system and hydraulic control method for construction machine
US6176083B1 (en) Apparatus and method for controlling displacement of steering pump for work vehicle
US9523184B2 (en) Hybrid excavator having a system for reducing actuator shock
JP3742632B2 (en) Boom cylinder merging hydraulic circuit with float function
CA1040511A (en) Dual pump hydraulic control system with predetermined flow crossover provision
JP3901469B2 (en) Control method of shield jack in shield machine
JPS6351909B2 (en)
JP4879551B2 (en) Boom energy regeneration device and energy regeneration device for work machines
KR960041765A (en) Hydraulic control device
JPS5933754B2 (en) shield tunneling machine
EP1889976A4 (en) Hydraulic circuit structure of work vehicle
JPS5821006A (en) Hydraulic circuit
JPS6394811A (en) Injection hydraulic pressure circuit of injection molder
JP3628675B2 (en) Switching valve with regenerative function for arm
JPH06264473A (en) Switching valve having regeneration function for arm
JPS5938445B2 (en) hydraulic circuit
KR200153466Y1 (en) Wheel loader's auxiliary hydraulic system
JP3231236B2 (en) Control device for jack device in shield machine
JPH0634444Y2 (en) Hydraulic circuit of hydraulic excavator
JPH075283Y2 (en) Warm-up circuit of hydraulic working machine
JPH041156B2 (en)
CN113494492B (en) Hydraulic system for preventing karst cave from being blocked and drilling trolley
JPH078633Y2 (en) Hydraulic circuit of shield machine automatic direction control device
JP3840292B2 (en) Jack control device and jack control method for shield machine
JP2524531Y2 (en) Mold opening and closing circuit of injection molding machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040402

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060711

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060808

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061226

R151 Written notification of patent or utility model registration

Ref document number: 3901469

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110112

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110112

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120112

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130112

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140112

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees