JP3909466B2
JP3909466B2 JP2001319808A JP2001319808A JP3909466B2 JP 3909466 B2 JP3909466 B2 JP 3909466B2 JP 2001319808 A JP2001319808 A JP 2001319808A JP 2001319808 A JP2001319808 A JP 2001319808A JP 3909466 B2 JP3909466 B2 JP 3909466B2
Authority
JP
Japan
Prior art keywords
steam
turbine
pressure turbine
condenser
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001319808A
Other languages
Japanese (ja)
Other versions
JP2003120212A (en
Inventor
雅昭 富沢
英敏 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2001319808A priority Critical patent/JP3909466B2/en
Publication of JP2003120212A publication Critical patent/JP2003120212A/en
Application granted granted Critical
Publication of JP3909466B2 publication Critical patent/JP3909466B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Turbines (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、蒸気タービンの運転方法に係り、特に、発電機の駆動軸に連結された複数のタービンの負荷が遮断されたときに、タービンの回転速度の上昇を抑制するための運転を行うに好適な蒸気タービンの運転方法に関する。
【0002】
【従来の技術】
発電プラントにおいては、蒸気発生器と復水器とを結ぶ流体流路中に配置された高圧タービンと中圧タービン及び低圧タービンをそれぞれ発電機の駆動軸に連結し、各タービンによって発電機を回転駆動するシステムが採用されている。
【0003】
この種のシステムにおいては、発電機に接続された電力系統などで事故が発生したときに、タービンの負荷を遮断することが行われている。タービンの負荷が遮断されたときに、そのままタービンによって発電機を回転駆動すると、タービンの回転数が上昇し、タービンが破損する恐れがあるため、タービンの負荷が遮断されたときにはタービンの最大速度上昇率を低減する手法が採用されている。
【0004】
例えば、タービンの負荷が遮断されたときに、ボイラと高圧タービンとの間に配置された蒸気加減弁および再熱器と中圧タービンとの間に配置されたインターセプト弁を極力早く閉止し、各タービンに流入する蒸気量を低減したり、蒸気タービンと高圧タービンとを結ぶ配管、インターセプト弁と中圧タービンとを結ぶ配管および中圧タービンと低圧タービンとを結ぶ配管の長さをそれぞれ短くして、各配管の体積を極力小さくし、各配管に残留する蒸気の量を低減することで、蒸気タービンを過速する蒸気の量を少なくすることが行われている。
【0005】
しかし、蒸気加減弁およびインターセプト弁の閉止速度を上げるにも、機械の摩擦や慣性を考慮すると、ほぼ極限の状態にあり、これ以上閉止速度を上げることは困難である。
【0006】
また、蒸気加減弁と高圧タービンとを結ぶ配管、インターセプト弁と中圧タービンとを結ぶ配管および中圧タービンと低圧タービンとを結ぶ配管の体積を極力小さくするにしても、配置上の制約により、各配管の長さを短くすることは困難である。
【0007】
一方、蒸気タービンの翼長を短縮したり、蒸気タービンのロータ径を短縮したりして、蒸気タービンのコストを低減することが行われているが、同じ出力を発生する蒸気タービンを比較した場合、蒸気タービンの翼長およびロータ径の短縮によって慣性重量が小さくなったものは、コスト低減には寄与するが、タービンの負荷が遮断されたときには、慣性重量が小さくなった分、タービンの回転数が過度に上昇することになる。
【0008】
そこで、タービンに流入する蒸気の量を低減するために、例えば、特開昭5146602号公報、特開昭55−146204号公報、特開昭61−55303号公報に記載されているように、高圧タービンに流入する蒸気を復水器に排出するようにしたものが提案されている。
【0009】
【発明が解決しようとする課題】
従来技術においは、タービンの負荷遮断後、蒸気タービンに流入する蒸気の量を低減するために、蒸気加減弁を閉止するとともに、高圧タービンに流入する蒸気を復水器に排出するようにしているため、高圧タービンに流入する蒸気の量を低減することができ、蒸気タービンの速度が上昇するのを抑制することができる。
【0010】
しかし、蒸気タービンの回転速度を抑制するために、タービンの負荷遮断後、蒸気加減弁を閉止するとともに、高圧タービンに流入する蒸気を復水器に排出するだけでは、蒸気タービンの回転速度の上昇を抑制するには十分ではない。
【0011】
本発明の課題は、単一のタービンに流入する蒸気の量のみを低減するときよりも、蒸気タービンの回転速度の上昇をより抑制することができる蒸気タービンの運転方法を提供することにある。
【0012】
【課題を解決するための手段】
前記課題を解決するために、本発明は、蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する複数のタービンの負荷が遮断されたときに、前記複数のタービンのうち少なくとも前記発電機の回転数に対する影響の大きいタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、前記制御弁下流側の蒸気を前記復水器へ排出する蒸気タービンの運転方法を採用したものである。
【0013】
前記蒸気タービンの運転方法を採用するに際しては、前記制御弁下流のタービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出することができる。
【0014】
また、本発明は、蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する複数のタービンの負荷が遮断されたときに、前記複数のタービンのうちいずれかのタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、前記複数のタービンにそれぞれ流入する蒸気を前記復水器へ排出する蒸気タービンの運転方法を採用したものである。
【0015】
この場合、前記複数のタービンにそれぞれ設けられた抽気管から蒸気を抽気して前記復水器へ排出することができる。
【0016】
前記各蒸気タービンの運転方法を採用するに際しては、前記複数のタービンのうち低圧側のタービンの最終段より前側に、前記低圧側のタービンに流入する蒸気よりも圧力の高い蒸気を導入することができる。
【0017】
また、本発明は、蒸気タービンとして、高圧タービンと中圧タービンおよび低圧タービンを有するシステムにおいて、蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する高圧タービン、中圧タービンおよび低圧タービンの負荷が遮断されたときに、前記高圧タービンに流入する蒸気の量を制御する蒸気加減弁を閉止するとともに、前記蒸気加減弁下流側の蒸気を前記復水器へ排出し、前記高圧タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出する蒸気タービンの運転方法を採用したものである。
【0018】
高圧タービンと中圧タービンおよび低圧タービンを有するシステムにおいて、蒸気タービンの負荷が遮断されたときに、中圧タービンに流入する蒸気の量を制御するインターセプト弁を閉止するとともに、前記インターセプト弁下流側の蒸気を復水器へ排出し、前記中圧蒸気タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出するか、あるいは、前記中圧タービン下流側の蒸気を前記復水器へ排出し、前記低圧タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出したりする方法を採用することができる。
【0019】
蒸気タービンとして、高圧タービンと中圧タービンおよび低圧タービンを有するシステムにおいて、前記低圧タービンの最終段より前側に、前記低圧タービンに流入する蒸気よりも圧力の高い蒸気を導入する運転方法を採用することができる。
【0020】
前記した手段によれば、複数のタービンのうち少なくとも発電機の回転数に対する影響、例えば、回転数の上昇に対して影響の大きいタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、制御弁下流側の蒸気を復水器へ排出するようにしているため、単一のタービンに流入する蒸気のみを復水器に排出するときよりも、タービン全体の仕事量を低減することができ、負荷遮断後の最大速度到達回転数を低く抑えることが可能になる。
【0021】
また、タービンに流入する蒸気の量を制御する制御弁を閉止するとともに、複数のタービンにそれぞれ流入する蒸気を復水器へ排出するようにしているため、単一のタービンに流入する蒸気を復水器に排出するときよりも、タービン全体の仕事量を低減することができるとともに、蒸気タービンの回転速度の上昇を抑制することができ、負荷遮断後の最大速度到達回転数を低く抑えることが可能になる。
【0022】
また、タービンに設けられた抽気管から蒸気を抽気して復水器へ排出したり、低圧側のタービンの最終段より前側に、低圧側のタービンに流入する蒸気よりも圧力の高い蒸気を導入することで、タービン間の差圧を減少させてタービンの仕事量を低減させることができるため、蒸気タービンの回転速度の上昇をより抑制することができる。
【0023】
また、高圧タービンと中圧タービンおよび低圧タービンを有するシステムにおいては、負荷遮断後に、蒸気加減弁を閉止するとともに、蒸気加減弁下流側の蒸気を復水器へ排出し、高圧タービンの抽気管から蒸気を抽気して復水器へ排出したり、インターセプト弁を閉止するとともに、インターセプト弁下流側の蒸気を復水器へ排出し、中圧タービンの抽気管から蒸気を抽気して復水器へ排出したり、あるいは中圧タービン下流側の蒸気を復水器へ排出し、低圧タービンの抽気管から蒸気を抽気して復水器へ排出したりすることで、単一のタービンに流入する蒸気の量を低減するときよりも、蒸気タービン全体の仕事量を低減することができるとともに、蒸気タービンの回転速度の上昇を抑制することができ、負荷遮断後の最大速度到達回転数を低く抑えることが可能になる。
【0024】
さらに、低圧タービンの最終段より前側に、低圧タービンに流入する蒸気よりも圧力が高い蒸気を導入することで、蒸気タービン全体の仕事量をより低減することができ、蒸気タービンの回転速度の上昇をより抑制することができる。
【0025】
【発明の実施の形態】
以下、本発明の一実施形態を図面に基づいて説明する。図1は本発明が適用された発電プラントの系統図である。図1において、発電プラントは、ボイラ10、高圧タービン12、中圧タービン14、ダブルフローの低圧タービン16、発電機18、復水器20を備えており、高圧タービン12、中圧タービン14、低圧タービン16は蒸気タービンとして、ボイラ10と復水器20とを結ぶ流体流路中に配置されているとともに、発電機18の駆動軸22に連結されている。
【0026】
蒸気発生器としてのボイラ10内には再熱器24が収納されており、ボイラ10は配管26を介して高圧タービン12の入口側に接続されている。高圧タービン12の出口側は配管28を介してボイラ10の再熱器24に接続されている。再熱器24は配管30を介して中圧タービン14の入口側に接続され、中圧タービン14の出口側は配管32を介して低圧タービン16の入口側に接続されている。
【0027】
配管26の管路途中には蒸気加減弁34が設置され、配管30の管路途中にはインタセプト弁36が設置されている。蒸気加減弁34は高圧タービン12に流入する蒸気の量を制御するための制御弁として、インタセプト弁36は中圧タービン14に流入する蒸気の量を制御する制御弁として構成されている。配管26の蒸気加減弁34下流側には、配管26から分岐した配管38が接続され、配管30のインタセプト弁36下流側には、配管30から分岐した配管40が接続され、配管32には、配管32から分岐した配管42が接続されており、各配管38、40、42はそれぞれ復水器20に接続されている。各配管38、40、42の管路途中には各配管を開閉するダンプ弁44、46、48が配置されている。
【0028】
また、配管28の管路途中には、配管28から分岐した配管50が接続されており、配管50は復水器20に接続されている。この配管50の管路途中には、ベンチレータ弁52が設置されている。このベンチレータ弁52は、インタセプト弁36が全閉(閉止)されたときに、蒸気加減弁34下流側からインタセプト弁36までの間に閉じ込められた蒸気によって高圧タービン12に風損が生じ、この風損によってタービン翼が加熱されるのを抑制するために設けられている。すなわち、インタセプト弁36の全閉時に、ベンチレータ弁52を開くことで、タービン翼が加熱されるの抑制するようになっている。
【0029】
蒸気加減弁34、インタセプト弁36、ダンプ弁44、46、48、ベンチレータ弁52の開閉動作を制御するために制御装置54が設けられている。制御装置54は、発電機18の電流を監視し、系統事故時など蒸気タービンの負荷が遮断されたときには、発電機18の電流を基に負荷が遮断されたことを検知し、負荷遮断に伴って蒸気加減弁34、インターセプト弁36を全閉状態に制御するとともにダンプ弁44、46、48を全開状態に制御するように構成されている。
【0030】
上記構成において、蒸気タービンを駆動するための蒸気は、ボイラ10によって生成され、ボイラ10から発生した蒸気は蒸気加減弁34を介して高圧タービン12に導入され、導入された蒸気によって高圧タービン12が仕事をし、高圧タービン12で仕事をした蒸気は再熱器24に流入する。このとき高圧タービン12に流入する蒸気の量は蒸気加減弁34の開度により、発電機18の負荷に見合った蒸気量に制御される。
【0031】
再熱器24に流入した蒸気は再熱器24で加熱され、加熱された蒸気は、通常、運転中は全開状態に保持されているインタセプト弁36を通過して中圧タービン14に流入する。中圧タービン14に流入した蒸気は中圧タービン14で仕事をしたあと、配管32を通過したあと、低圧タービン16に流入し、低圧タービン16で仕事をし、最終的には復水器20に流入する。蒸気が各タービンに流入して仕事をすることで、発電機18が回転駆動され、発電機18は、例えば、50Hzの電力系統では定格3000rpmで回転する。なお、通常時には、ダンプ弁44、46、48は全閉状態にある。
【0032】
発電機18に接続された電力系統などで事故が発生し、蒸気タービンの負荷が遮断されたときには、蒸気加減弁34、インタセプト弁36が全閉状態に制御される。この場合、蒸気加減弁34、インタセプト弁36のみを全閉状態としたのでは、蒸気加減弁34下流側およびインタセプト弁36下流側に残留する蒸気によって蒸気タービンの回転速度が上昇することになる。
【0033】
例えば、高圧タービン12に着目すると、図2に示すように、負荷遮断後、蒸気加減弁34を全閉状態に制御しても、高圧タービン12に流入する蒸気によって蒸気タービンの回転速度を上昇させるエネルギーには、負荷遮断時に、既に蒸気加減弁34下流側にある蒸気量Q1に起因するエネルギーと、負荷遮断後、蒸気加減弁34を急速に全閉状態(閉止状態)としても、この全閉状態となるまでの時間遅れにより、高圧タービン12に流入する蒸気の量Qcvに起因するエネルギーがある。これらのエネルギーは次の(1)式で表され、この過速に寄与するエネルギーUOhによって蒸気タービンの回転速度が上昇する。
【0034】
UOh=ΔSh×(Qcv+Q1)・・・(1)
ここで、
UOh=負荷遮断後、高圧タービン12に与えられ、高圧タービンの過速に寄与するエネルギー
Qcv=負荷遮断後、蒸気加減弁34が全閉状態になるまでの時間遅れによって高圧タービン12に流入する蒸気の量
Q1=負荷遮断時、既に蒸気加減弁34の下流側に残留する蒸気の量
ΔSh=高圧タービン12の入口側と出口側との差圧により決定される熱落差そこで、本実施形態においては、UOhを低減するために、蒸気加減弁34を全閉状態にするとともに、ダンプ弁44を全開状態に制御することとしている。
【0035】
具体的には、図3(a)に示すように、負荷遮断に伴って、蒸気加減弁34を全閉状態に制御するとともに、ダンプ弁44を全開状態に制御する。このような制御を行うと、破線で示すように、ダンプ弁44を全開状態とすることで、蒸気加減弁34が全閉状態となるまでに、高圧タービン12に流入する蒸気を復水器20に排出することができ、高圧タービン12に流入する蒸気の量を低減することができる。これに対して、ダンプ弁44を全開状態にしないときには実線で示すように、蒸気加減弁34を全閉状態にしたあとも蒸気タービン12に流入する蒸気の量が存在することになる。
【0036】
すなわち、従来、図3(b)に示すように、負荷遮断後、蒸気加減弁が閉じ始めた瞬間には、蒸気加減弁下流側に、定格状態の蒸気流れがあるため、蒸気加減弁が閉じ始めたあと、ある時間遅れT後に蒸気量が減少している。
【0037】
これに対して、本実施形態によれば、図3(a)に示すように、負荷遮断後、蒸気加減弁34を全閉状態に制御するとともに、ダンプ弁44を全開状態にして、蒸気加減弁34下流側の蒸気を瞬間に抜き出すようにしているため、負荷遮断後、蒸気加減弁34下流側の蒸気の量が急激に減少し始め、結果的には、負荷遮断後、高圧タービン12に流入する蒸気の量を低減することができる。
【0038】
上述したことを考慮し、本実施形態においては、蒸気タービンの負荷遮断後、蒸気加減弁34、インタセプト弁36を全閉状態に制御するとともに、ダンプ弁44、46、48を全開状態に制御し、蒸気加減弁34下流側、インタセプト弁36下流側、中圧タービン14下流側の蒸気を復水器20に排出することとしている。
【0039】
蒸気タービンの負荷遮断後、蒸気加減弁34、インタセプト弁36を全閉状態に制御するとともに、ダンプ弁44、46、48を全開状態に制御し、蒸気加減弁34下流側、インタセプト弁36下流側、中圧タービン14下流側の蒸気を復水器20に排出する制御を行うことで、高圧タービン12、中圧タービン14、低圧タービン16に流入する蒸気の量を低減することができるとともに、蒸気タービン全体の仕事量を減らすことができ、蒸気タービンの回転速度の上昇を抑制し、負荷遮断後の最大速度到達回転数を低く抑えることが可能になる。
【0040】
本実施形態においては、蒸気タービンの負荷遮断後、蒸気加減弁34、インタセプト弁36を全閉状態に制御するとともに、ダンプ弁44、46、48を全開状態に制御することについて述べたが、全てのダンプ弁を全開状態にする代わりに、発電機18の回転数の上昇に対する影響の大きいタービンに流入する蒸気の量を制御する制御弁、例えば、インタセプト弁36を閉止(全閉)するとともに、蒸気加減弁34を閉止し、ダンプ弁44、46を全開状態に制御することによっても、単一のタービンに流入する蒸気のみを復水器に排出するときよりは、蒸気タービン全体の仕事量を低減することができる。
【0041】
特に、蒸気タービン12、中圧タービン14、低圧タービン16の仕事量をそれぞれ30:30:40とした場合、蒸気加減弁34、インタセプト弁36を全閉状態にするとともにダンプ弁44、46を全開状態に制御することで、蒸気タービン全体の仕事量を低減することができる。
【0042】
また、中圧タービン14と低圧タービン16とが一体となったタービンを用いたときには、蒸気タービン34とインタセプト弁36を全閉状態にするとともにダンプ弁44、46を全開状態に制御することで、蒸気タービン全体の仕事量を低減することができる。
【0043】
また、高圧タービン12、中圧タービン14、低圧タービン16にそれぞれ抽気管が設けられているときには、各抽気管から蒸気を抽気して復水器20へ排出することで蒸気タービン全体の仕事量をより低減することができる。
【0044】
さらに、低圧タービン16の最終段の翼より前側に、低圧タービン16に流入する蒸気よりも圧力の高い蒸気、例えば、インタセプト弁36下流側の蒸気を導入することで、中圧タービン14・低圧タービン16間の差圧を低くし、蒸気タービン全体の仕事量をより低減することができる。
【0045】
【発明の効果】
以上説明したように、本発明によれば、複数のタービンのうち少なくとも発電機の回転数に対して影響数の大きいタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、制御弁下流側の蒸気を復水器へ排出するようにしているため、単一のタービンに流入する蒸気のみを復水器に排出するときよりも、タービン全体の仕事量を低減することができ、負荷遮断後の最大速度到達回転数を低く抑えることが可能になる。
【図面の簡単な説明】
【図1】本発明が適用された発電プラントの系統図である。
【図2】負荷遮断後に高圧タービンに作用するエネルギーを説明するための図である。
【図3】負荷遮断後タービンに流入する蒸気の量を説明するための図であって、(a)は本発明に係る特性図、(b)は従来の特性図である。
【符号の説明】
10 ボイラ
12 高圧タービン
14 中圧タービン
16 低圧タービン
18 発電機
20 復水器
24 再熱器
34 蒸気加減弁
36 インタセプト弁
44、46、48 ダンプ弁
54 制御装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for operating a steam turbine, and in particular, to perform an operation for suppressing an increase in turbine rotational speed when loads of a plurality of turbines connected to a drive shaft of a generator are interrupted. The present invention relates to a method for operating a preferred steam turbine.
[0002]
[Prior art]
In power plants, and connected to the drive shaft of the steam generator and condenser respectively generator high pressure turbine and the intermediate pressure turbine and low pressure turbine disposed in the fluid flow path connecting a generator by the turbine A rotational drive system is adopted.
[0003]
In this type of system, when an accident occurs in an electric power system or the like connected to a generator, the load on the turbine is cut off. If the generator is driven to rotate by the turbine when the turbine load is interrupted, the turbine speed increases and the turbine may be damaged. When the turbine load is interrupted, the maximum turbine speed increases. A technique for reducing the rate is employed.
[0004]
For example, when the load on the turbine is cut off, the steam control valve disposed between the boiler and the high pressure turbine and the intercept valve disposed between the reheater and the intermediate pressure turbine are closed as soon as possible. Reduce the amount of steam flowing into the turbine, shorten the length of piping connecting the steam turbine and the high-pressure turbine, piping connecting the intercept valve and the intermediate-pressure turbine, and piping connecting the intermediate-pressure turbine and the low-pressure turbine. The volume of each pipe is reduced as much as possible to reduce the amount of steam remaining in each pipe, thereby reducing the amount of steam that overspeeds the steam turbine.
[0005]
However, even when the closing speeds of the steam control valve and the intercept valve are increased, considering the friction and inertia of the machine, it is almost in an extreme state, and it is difficult to increase the closing speed any more.
[0006]
Even if the volume of the pipe connecting the steam control valve and the high pressure turbine, the pipe connecting the intercept valve and the intermediate pressure turbine, and the pipe connecting the intermediate pressure turbine and the low pressure turbine is made as small as possible, It is difficult to shorten the length of each pipe.
[0007]
On the other hand, the steam turbine cost is reduced by shortening the blade length of the steam turbine or shortening the rotor diameter of the steam turbine, but when comparing steam turbines that generate the same output The reduction in the inertia weight due to the shortening of the blade length and the rotor diameter of the steam turbine contributes to the cost reduction. However, when the turbine load is cut off, the inertia weight is reduced to reduce the rotation speed of the turbine. Will rise excessively.
[0008]
Therefore, in order to reduce the amount of steam flowing into the turbine, for example, as described in JP-A-5146602, JP-A-55-146204, and JP-A-61-55303, a high pressure is used. A system in which steam flowing into a turbine is discharged to a condenser has been proposed.
[0009]
[Problems to be solved by the invention]
In the prior art, in order to reduce the amount of steam flowing into the steam turbine after shutting off the turbine load, the steam control valve is closed and the steam flowing into the high-pressure turbine is discharged to the condenser. Therefore, the amount of steam flowing into the high-pressure turbine can be reduced, and the increase in the speed of the steam turbine can be suppressed.
[0010]
However, in order to suppress the rotation speed of the steam turbine, it is possible to increase the rotation speed of the steam turbine only by closing the steam control valve after shutting off the turbine load and discharging the steam flowing into the high pressure turbine to the condenser. Is not enough to suppress.
[0011]
The subject of this invention is providing the operating method of the steam turbine which can suppress the raise of the rotational speed of a steam turbine more than when reducing only the quantity of the steam which flows in into a single turbine.
[0012]
[Means for Solving the Problems]
In order to solve the above problems, the present invention provides a plurality of turbines when loads of a plurality of turbines arranged in a fluid passage connecting a steam generator and a condenser and driving a generator are interrupted. Of the steam turbine that closes a control valve that controls the amount of steam that flows into the turbine that has a large influence on the rotational speed of the generator, and that discharges steam on the downstream side of the control valve to the condenser Is adopted.
[0013]
When adopting the operation method of the steam turbine, steam can be extracted from an extraction pipe provided in a turbine downstream of the control valve and discharged to the condenser.
[0014]
In addition, the present invention provides a turbine that is arranged in a fluid passage that connects a steam generator and a condenser, and when a load of the plurality of turbines that drive the generator is interrupted, A steam turbine operating method is employed in which the control valve for controlling the amount of steam flowing into the turbine is closed and the steam flowing into each of the plurality of turbines is discharged to the condenser.
[0015]
In this case, steam can be extracted from the extraction pipes provided in each of the plurality of turbines and discharged to the condenser.
[0016]
When employing the operation method of each steam turbine, steam having a pressure higher than that of the steam flowing into the low-pressure side turbine may be introduced before the final stage of the low-pressure side turbine among the plurality of turbines. it can.
[0017]
The present invention also provides a high-pressure turbine that drives a generator by being arranged in a fluid passage connecting a steam generator and a condenser in a system having a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine as a steam turbine. When the load of the pressure turbine and the low pressure turbine is interrupted, the steam control valve for controlling the amount of steam flowing into the high pressure turbine is closed and the steam downstream of the steam control valve is discharged to the condenser. The operation method of the steam turbine which extracts steam from the extraction pipe provided in the high-pressure turbine and discharges it to the condenser is adopted.
[0018]
In a system having a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine, when the steam turbine load is interrupted, the intercept valve that controls the amount of steam flowing into the intermediate-pressure turbine is closed, and the downstream side of the intercept valve Steam is discharged to a condenser, and steam is extracted from a bleed pipe provided in the intermediate pressure steam turbine and discharged to the condenser, or steam on the downstream side of the intermediate pressure turbine is discharged to the condenser It is possible to employ a method in which steam is extracted from an extraction pipe provided in the low-pressure turbine and discharged to the condenser.
[0019]
In a system having a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine as the steam turbine, an operation method is adopted in which steam having a pressure higher than that of the steam flowing into the low-pressure turbine is introduced before the final stage of the low-pressure turbine. Can do.
[0020]
According to the above-described means, while closing the control valve for controlling the amount of steam flowing into the turbine having a large influence on the increase in the rotational speed, for example, the influence on the rotational speed of the generator among the plurality of turbines, Since the steam on the downstream side of the control valve is discharged to the condenser, the work of the entire turbine can be reduced compared to when only the steam flowing into a single turbine is discharged to the condenser. It becomes possible to keep the maximum speed reaching rotation speed after the load is cut off low.
[0021]
In addition, the control valve for controlling the amount of steam flowing into the turbine is closed and the steam flowing into each of the turbines is discharged to the condenser, so that the steam flowing into the single turbine is recovered. The amount of work of the entire turbine can be reduced and the increase in the rotational speed of the steam turbine can be suppressed, and the maximum speed reaching rotational speed after the load is interrupted can be kept lower than when discharging to the water vessel. It becomes possible.
[0022]
In addition, steam is extracted from the extraction pipe provided in the turbine and discharged to the condenser, or steam higher in pressure than steam flowing into the low-pressure turbine is introduced before the final stage of the low-pressure turbine. As a result, the differential pressure between the turbines can be reduced to reduce the amount of work of the turbine, so that an increase in the rotational speed of the steam turbine can be further suppressed.
[0023]
In a system having a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine, after shutting off the load, the steam control valve is closed and the steam on the downstream side of the steam control valve is discharged to the condenser. Steam is extracted and discharged to the condenser, the intercept valve is closed, the steam on the downstream side of the intercept valve is discharged to the condenser, and steam is extracted from the extraction pipe of the medium-pressure turbine to the condenser. Steam that flows into a single turbine by discharging the steam downstream from the intermediate pressure turbine to the condenser, extracting steam from the extraction pipe of the low-pressure turbine, and discharging it to the condenser The amount of work of the entire steam turbine can be reduced and the increase in the rotation speed of the steam turbine can be suppressed, and the maximum speed reaching rotation after the load is cut off. It is possible to suppress the low.
[0024]
Furthermore, by introducing steam having a higher pressure than the steam flowing into the low-pressure turbine before the final stage of the low-pressure turbine, the work of the entire steam turbine can be further reduced, and the rotation speed of the steam turbine is increased. Can be further suppressed.
[0025]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a system diagram of a power plant to which the present invention is applied. 1, the power plant includes a boiler 10, a high-pressure turbine 12, an intermediate-pressure turbine 14, a double-flow low-pressure turbine 16, a generator 18, and a condenser 20. The high-pressure turbine 12, the intermediate-pressure turbine 14, and the low-pressure turbine The turbine 16 is disposed as a steam turbine in a fluid flow path connecting the boiler 10 and the condenser 20, and is connected to a drive shaft 22 of the generator 18.
[0026]
A reheater 24 is accommodated in the boiler 10 as a steam generator, and the boiler 10 is connected to the inlet side of the high-pressure turbine 12 via a pipe 26. The outlet side of the high pressure turbine 12 is connected to the reheater 24 of the boiler 10 via a pipe 28. The reheater 24 is connected to the inlet side of the intermediate pressure turbine 14 via a pipe 30, and the outlet side of the intermediate pressure turbine 14 is connected to the inlet side of the low pressure turbine 16 via a pipe 32.
[0027]
A steam control valve 34 is installed in the middle of the pipe 26, and an intercept valve 36 is installed in the middle of the pipe 30. The steam control valve 34 is configured as a control valve for controlling the amount of steam flowing into the high pressure turbine 12, and the intercept valve 36 is configured as a control valve for controlling the amount of steam flowing into the intermediate pressure turbine 14. A pipe 38 branched from the pipe 26 is connected to the downstream side of the steam control valve 34 of the pipe 26, and a pipe 40 branched from the pipe 30 is connected to the downstream side of the intercept valve 36 of the pipe 30. A pipe 42 branched from the pipe 32 is connected, and each pipe 38, 40, 42 is connected to the condenser 20. Dump valves 44, 46, and 48 for opening and closing the pipes are arranged in the middle of the pipes of the pipes 38, 40, and 42.
[0028]
Further, a pipe 50 branched from the pipe 28 is connected in the middle of the pipe 28, and the pipe 50 is connected to the condenser 20. A ventilator valve 52 is installed in the middle of the pipe 50. When the intercept valve 36 is fully closed (closed), the ventilator valve 52 causes wind damage to the high-pressure turbine 12 due to steam confined between the downstream side of the steam control valve 34 and the intercept valve 36. It is provided to prevent the turbine blades from being heated by the damage. That is, the turbine blades are prevented from being heated by opening the ventilator valve 52 when the intercept valve 36 is fully closed.
[0029]
A control device 54 is provided to control the opening / closing operation of the steam control valve 34, the intercept valve 36, the dump valves 44, 46 and 48, and the ventilator valve 52. The control device 54 monitors the current of the generator 18, and when the load of the steam turbine is interrupted, such as during a system fault, detects that the load is interrupted based on the current of the generator 18, and accompanies the load interruption. Thus, the steam control valve 34 and the intercept valve 36 are controlled to be fully closed, and the dump valves 44, 46 and 48 are controlled to be fully open.
[0030]
In the above configuration, the steam for driving the steam turbine is generated by the boiler 10, the steam generated from the boiler 10 is introduced into the high-pressure turbine 12 via the steam control valve 34, and the introduced steam causes the high-pressure turbine 12 to The steam that has worked and worked in the high-pressure turbine 12 flows into the reheater 24. At this time, the amount of steam flowing into the high-pressure turbine 12 is controlled to the amount of steam commensurate with the load of the generator 18 by the opening of the steam control valve 34.
[0031]
The steam flowing into the reheater 24 is heated by the reheater 24, and the heated steam normally flows into the intermediate pressure turbine 14 through the intercept valve 36 that is kept fully open during operation. The steam that has flowed into the intermediate pressure turbine 14 works in the intermediate pressure turbine 14, passes through the pipe 32, then flows into the low pressure turbine 16, and works in the low pressure turbine 16, and finally enters the condenser 20. Inflow. As the steam flows into each turbine and works, the generator 18 is rotationally driven. For example, the generator 18 rotates at a rated speed of 3000 rpm in a 50 Hz power system. In normal times, the dump valves 44, 46, 48 are fully closed.
[0032]
When an accident occurs in the power system connected to the generator 18 and the load of the steam turbine is cut off, the steam control valve 34 and the intercept valve 36 are controlled to be fully closed. In this case, if only the steam control valve 34 and the intercept valve 36 are fully closed, the rotation speed of the steam turbine is increased by the steam remaining on the steam control valve 34 downstream side and the intercept valve 36 downstream side.
[0033]
For example, when focusing on the high-pressure turbine 12, as shown in FIG. 2, even if the steam control valve 34 is controlled to be fully closed after the load is cut off, the rotation speed of the steam turbine is increased by the steam flowing into the high-pressure turbine 12. As for the energy, when the load is shut off, the energy resulting from the steam amount Q1 already downstream of the steam control valve 34 and the steam control valve 34 after the load is shut off, even if the steam control valve 34 is rapidly fully closed (closed state). There is energy due to the amount of steam Qcv flowing into the high-pressure turbine 12 due to the time delay until the state is reached. These energies are expressed by the following equation (1), and the rotational speed of the steam turbine is increased by the energy UOh contributing to this overspeed.
[0034]
UOh = ΔSh × (Qcv + Q1) (1)
here,
UOh = Energy Qcv given to the high-pressure turbine 12 after the load is interrupted and contributing to the overspeed of the high-pressure turbine = Steam flowing into the high-pressure turbine 12 due to a time delay until the steam control valve 34 is fully closed after the load is interrupted Amount Q1 = amount of steam remaining on the downstream side of the steam control valve 34 when the load is shut off ΔSh = a heat drop determined by a differential pressure between the inlet side and the outlet side of the high-pressure turbine 12 In the present embodiment, In order to reduce UOh, the steam control valve 34 is fully closed and the dump valve 44 is controlled to be fully open.
[0035]
Specifically, as shown in FIG. 3 (a), the steam control valve 34 is controlled to a fully closed state and the dump valve 44 is controlled to a fully open state as the load is interrupted. When such control is performed, as shown by a broken line, the dump valve 44 is fully opened, so that the steam flowing into the high-pressure turbine 12 is allowed to flow into the condenser 20 until the steam control valve 34 is fully closed. The amount of steam flowing into the high-pressure turbine 12 can be reduced. In contrast, when the dump valve 44 is not fully opened, the amount of steam flowing into the steam turbine 12 exists even after the steam control valve 34 is fully closed, as shown by the solid line.
[0036]
That is, conventionally, as shown in FIG. 3B, at the moment when the steam control valve starts to close after the load is cut off, the steam control valve is closed because there is a steam flow in the rated state downstream of the steam control valve. After starting, the steam amount decreases after a certain time delay T.
[0037]
In contrast, according to the present embodiment, as shown in FIG. 3A, after the load is interrupted, the steam control valve 34 is controlled to a fully closed state, and the dump valve 44 is fully opened to control the steam. Since the steam on the downstream side of the valve 34 is extracted instantaneously, after the load is shut off, the amount of steam on the downstream side of the steam control valve 34 starts to rapidly decrease. As a result, after the load is shut off, The amount of inflowing steam can be reduced.
[0038]
In consideration of the above, in the present embodiment, after the steam turbine load is cut off, the steam control valve 34 and the intercept valve 36 are controlled to be fully closed, and the dump valves 44, 46, and 48 are controlled to be fully open. The steam on the downstream side of the steam control valve 34, the downstream side of the intercept valve 36, and the downstream side of the intermediate pressure turbine 14 is discharged to the condenser 20.
[0039]
After shutting off the load of the steam turbine, the steam control valve 34 and the intercept valve 36 are controlled to be fully closed, and the dump valves 44, 46, and 48 are controlled to be fully open so that the steam control valve 34 downstream side and the intercept valve 36 downstream side are controlled. By controlling the discharge of the steam on the downstream side of the intermediate pressure turbine 14 to the condenser 20, the amount of steam flowing into the high pressure turbine 12, the intermediate pressure turbine 14, and the low pressure turbine 16 can be reduced, and the steam The work of the entire turbine can be reduced, the increase in the rotation speed of the steam turbine can be suppressed, and the maximum speed reaching rotation speed after the load is interrupted can be suppressed low.
[0040]
In the present embodiment, the steam control valve 34 and the intercept valve 36 are controlled to be fully closed and the dump valves 44, 46, and 48 are controlled to be fully open after the load of the steam turbine is interrupted. Instead of fully opening the dump valve, the control valve for controlling the amount of steam flowing into the turbine having a large influence on the increase in the rotational speed of the generator 18, for example, the intercept valve 36 is closed (fully closed), Even when the steam control valve 34 is closed and the dump valves 44 and 46 are controlled to be fully open, the work of the entire steam turbine can be reduced as compared with the case where only the steam flowing into the single turbine is discharged to the condenser. Can be reduced.
[0041]
In particular, when the work loads of the steam turbine 12, the intermediate pressure turbine 14, and the low pressure turbine 16 are 30:30:40, respectively, the steam control valve 34 and the intercept valve 36 are fully closed and the dump valves 44 and 46 are fully opened. By controlling the state, the work amount of the entire steam turbine can be reduced.
[0042]
When a turbine in which the intermediate pressure turbine 14 and the low pressure turbine 16 are integrated is used, the steam turbine 34 and the intercept valve 36 are fully closed and the dump valves 44 and 46 are controlled to be fully open. The work of the entire steam turbine can be reduced.
[0043]
Further, when each of the high pressure turbine 12, the intermediate pressure turbine 14, and the low pressure turbine 16 is provided with an extraction pipe, steam is extracted from each extraction pipe and discharged to the condenser 20 to reduce the work of the entire steam turbine. It can be further reduced.
[0044]
Further, by introducing steam having a pressure higher than that of the steam flowing into the low-pressure turbine 16, for example, steam downstream of the intercept valve 36, into the front side of the final stage blades of the low-pressure turbine 16, the intermediate-pressure turbine 14 and the low-pressure turbine The differential pressure between 16 can be lowered, and the work of the entire steam turbine can be further reduced.
[0045]
【The invention's effect】
As described above, according to the present invention, the control valve that controls the amount of steam flowing into the turbine having a large influence on the rotational speed of at least the generator among the plurality of turbines is closed and the control valve downstream Since the steam on the side is discharged to the condenser, the work of the entire turbine can be reduced compared to when only the steam flowing into a single turbine is discharged to the condenser. It becomes possible to keep the maximum speed at a later maximum speed low.
[Brief description of the drawings]
FIG. 1 is a system diagram of a power plant to which the present invention is applied.
FIG. 2 is a diagram for explaining energy acting on a high-pressure turbine after load interruption.
FIGS. 3A and 3B are diagrams for explaining the amount of steam flowing into the turbine after the load is cut off, in which FIG. 3A is a characteristic diagram according to the present invention, and FIG. 3B is a conventional characteristic diagram;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Boiler 12 High pressure turbine 14 Medium pressure turbine 16 Low pressure turbine 18 Generator 20 Condenser 24 Reheater 34 Steam control valve 36 Intercept valve 44, 46, 48 Dump valve 54 Control apparatus

Claims (7)

蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する複数のタービンの負荷が遮断されたときに、前記複数のタービンのうち少なくとも前記発電機の回転数に対する影響の大きいタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、前記制御弁下流側の蒸気を前記復水器へ排出し、低圧側のタービンの最終段より前側に、前記低圧側のタービンに流入する蒸気よりも圧力の高い蒸気を導入することを特徴とする蒸気タービンの運転方法。When loads of a plurality of turbines arranged in a fluid passage connecting a steam generator and a condenser to drive a generator are interrupted, an influence on at least the rotation speed of the generator among the plurality of turbines is reduced. The control valve for controlling the amount of steam flowing into the large turbine is closed, the steam on the downstream side of the control valve is discharged to the condenser, and the turbine on the low pressure side is placed in front of the final stage of the low pressure side turbine. A steam turbine operating method, wherein steam having a pressure higher than that of the steam flowing into the steam is introduced . 請求項1に記載の蒸気タービンの運転方法において、前記制御弁下流のタービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出することを特徴とする蒸気タービンの運転方法。  2. The steam turbine operating method according to claim 1, wherein steam is extracted from an extraction pipe provided in a turbine downstream of the control valve and discharged to the condenser. 蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する複数のタービンの負荷が遮断されたときに、前記複数のタービンのうちいずれかのタービンに流入する蒸気の量を制御する制御弁を閉止するとともに、前記複数のタービンにそれぞれ流入する蒸気を前記復水器へ排出し、低圧側のタービンの最終段より前側に、前記低圧側のタービンに流入する蒸気よりも圧力の高い蒸気を導入することを特徴とする蒸気タービンの運転方法。The amount of steam that flows into any of the plurality of turbines when the loads of the plurality of turbines that are arranged in the fluid passage connecting the steam generator and the condenser and drive the generator are interrupted And the steam that flows into each of the plurality of turbines is discharged to the condenser, before the final stage of the low-pressure side turbine, and more than the steam that flows into the low-pressure side turbine. A steam turbine operating method characterized by introducing steam at high pressure . 請求項3に記載の蒸気タービンの運転方法において、前記複数のタービンにそれぞれ設けられた抽気管から蒸気を抽気して前記復水器へ排出することを特徴とする蒸気タービンの運転方法。  4. The steam turbine operating method according to claim 3, wherein steam is extracted from an extraction pipe provided in each of the plurality of turbines and discharged to the condenser. 蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する高圧タービン、中圧タービンおよび低圧タービンの負荷が遮断されたときに、前記高圧タービンに流入する蒸気の量を制御する蒸気加減弁を閉止するとともに、前記蒸気加減弁下流側の蒸気を前記復水器へ排出し、前記高圧タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出し、前記低圧タービンの最終段より前側に、前記低圧タービンに流入する蒸気よりも圧力の高い蒸気を導入することを特徴とする蒸気タービンの運転方法。The amount of steam that flows into the high-pressure turbine when the loads of the high-pressure turbine, medium-pressure turbine, and low-pressure turbine that are disposed in the fluid passage connecting the steam generator and the condenser and drive the generator are interrupted. Closing the steam control valve to be controlled, discharging steam on the downstream side of the steam control valve to the condenser, extracting steam from an extraction pipe provided in the high-pressure turbine, and discharging the steam to the condenser ; A steam turbine operating method , wherein steam having a pressure higher than steam flowing into the low-pressure turbine is introduced to a front side of a final stage of the low-pressure turbine . 蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する高圧タービン、中圧タービンおよび低圧タービンの負荷が遮断されたときに、前記中圧タービンに流入する蒸気の量を制御するインタセプト弁を閉止するとともに、前記インタセプト弁下流側の蒸気を前記復水器へ排出し、前記中圧タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出し、前記低圧タービンの最終段より前側に、前記低圧タービンに流入する蒸気よりも圧力の高い蒸気を導入することを特徴とする蒸気タービンの運転方法。The amount of steam that flows into the intermediate pressure turbine when the load of the high pressure turbine, the intermediate pressure turbine, and the low pressure turbine that are disposed in the fluid passage connecting the steam generator and the condenser and drives the generator is interrupted Closing the intercept valve for controlling the steam, discharging the steam downstream of the intercept valve to the condenser, extracting the steam from a bleed pipe provided in the intermediate pressure turbine and discharging it to the condenser , A steam turbine operating method , wherein steam having a pressure higher than steam flowing into the low-pressure turbine is introduced to a front side of a final stage of the low-pressure turbine . 蒸気発生器と復水器とを結ぶ流体通路中に配置されて発電機を駆動する高圧タービン、中圧タービンおよび低圧タービンの負荷が遮断されたときに、前記中圧タービン下流側の蒸気を前記復水器へ排出し、前記低圧タービンに設けられた抽気管から蒸気を抽気して前記復水器へ排出し、前記低圧タービンの最終段より前側に、前記低圧タービンに流入する蒸気よりも圧力の高い蒸気を導入することを特徴とする蒸気タービンの運転方法。When the load of the high-pressure turbine, the intermediate-pressure turbine, and the low-pressure turbine that are arranged in the fluid passage connecting the steam generator and the condenser and drives the generator is interrupted, the steam on the downstream side of the intermediate-pressure turbine is Discharge to the condenser, extract steam from an extraction pipe provided in the low-pressure turbine, and discharge the steam to the condenser. The pressure before the final stage of the low-pressure turbine is higher than the steam flowing into the low-pressure turbine. A method for operating a steam turbine, characterized by introducing high steam .
JP2001319808A 2001-10-17 2001-10-17 Steam turbine operation method Expired - Fee Related JP3909466B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001319808A JP3909466B2 (en) 2001-10-17 2001-10-17 Steam turbine operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001319808A JP3909466B2 (en) 2001-10-17 2001-10-17 Steam turbine operation method

Publications (2)

Publication Number Publication Date
JP2003120212A JP2003120212A (en) 2003-04-23
JP3909466B2 true JP3909466B2 (en) 2007-04-25

Family

ID=19137309

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001319808A Expired - Fee Related JP3909466B2 (en) 2001-10-17 2001-10-17 Steam turbine operation method

Country Status (1)

Country Link
JP (1) JP3909466B2 (en)

Also Published As

Publication number Publication date
JP2003120212A (en) 2003-04-23

Similar Documents

Publication Publication Date Title
US10655543B2 (en) Gas turbine, combined cycle plant, and activation method of gas turbine
US11053861B2 (en) Overspeed protection system and method
EP0908603B1 (en) Single shaft combined cycle plant
KR102520288B1 (en) Steam turbine plant and its cooling method
JPWO1997049903A1 (en) Single-shaft combined cycle plant and its operating method
JP2523518B2 (en) How to start a steam turbine plant by starting a high pressure turbine
JP3909466B2 (en) Steam turbine operation method
JP5178575B2 (en) Power plant water supply apparatus and control method
EP3619404B1 (en) Systems and methods for dynamic balancing of steam turbine rotor thrust
JP4693360B2 (en) Turbomachine safety equipment and power generation equipment
JP4141780B2 (en) Pump turbine and its operation control method
JP3703872B2 (en) gas turbine
JP3165619B2 (en) Thermal stress reduction operation method of steam turbine in single shaft combined cycle
JP2008101494A (en) Low pressure steam turbine system and control method
JP2001090507A (en) Power plant
JP2008075526A (en) Low pressure steam turbine system and control method
KR101708991B1 (en) Turbine system and operation method thereof
WO2015052810A1 (en) Solar heat turbine system, and device and method for controlling said system
JP7825768B1 (en) Gas turbine control method and gas turbine
JPS6157471B2 (en)
JP2006274805A (en) Control system for top pressure recovery turbine
JPH09280072A (en) Air / steam cooling gas turbine system
JP2945770B2 (en) Hydraulic machine and its starting and control method
EP3936701A1 (en) Turbine power generation concept
JPH02271004A (en) Low pressure turbine bypass valve controller

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060808

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061010

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061219

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070112

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100202

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110202

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120202

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130202

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130202

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees