JP3910761B2 - Distribution system monitoring device and storage medium storing control procedure thereof - Google Patents
Distribution system monitoring device and storage medium storing control procedure thereof Download PDFInfo
- Publication number
- JP3910761B2 JP3910761B2 JP16653399A JP16653399A JP3910761B2 JP 3910761 B2 JP3910761 B2 JP 3910761B2 JP 16653399 A JP16653399 A JP 16653399A JP 16653399 A JP16653399 A JP 16653399A JP 3910761 B2 JP3910761 B2 JP 3910761B2
- Authority
- JP
- Japan
- Prior art keywords
- section
- load
- analysis
- switch
- accident
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、配電系統の監視を行う配電系統監視装置、及びその制御手順を記憶した記憶媒体に関する。
【0002】
配電系統の監視は、従来から遠方監視制御装置と組み合わされて行われてきている。図37は、従来の配電系統監視装置の構成図を示すものであり、遠方監視制御装置10から入力される配電線の電圧、電流などの監視情報に基づき、現在の系統状態を監視していた。すなわち、遠方監視制御装置10から入力される配電線の電圧、電流などの監視情報と、系統データベース11からの配電系統構成、各区間の契約負荷などの情報に基づいて、区間負荷作成手段12で区間負荷データを作成し、区間負荷データ保存エリア13に保存する。そして、系統監視手段371により、人間系に分かる形に翻訳し、解析結果表示手段19を介して表示装置20に表示していた。
【0003】
しかし、その監視情報に対する解析は、配電系統を構成する各機器の容量超過程度の簡単なものであり、又、各機器の電流超過に関しては、電流値を取り込んだ時点で超過していないかの監視を行なっていた。
【0004】
又、配電系統の高調波監視において、遠方監視制御装置10から入力されるデータにより、高調波計測値のみを監視していた。又、配電系統の電圧監視においては、遠方監視制御装置10から入力されるデータにより、配電線の送出し電圧のみ監視していた。
【0005】
【発明が解決しようとする課題】
従来の配電系統監視装置11においては、遠方監視制御装置10からの情報に対する解析は、配電系統の各機器の容量超過程度の簡単なものであった為、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否等の解析を行えないでいた。そのため、台風等の大災害時の人的配置や、事前の系統切替などは、人間系の直観的な判断に委ねられていた。
【0006】
又、従来は電流超過時点あるいは、融通計算時点で各機器の電流超過のチェックを行っており、その時点にならないと電流超過に関しては、状況が判断できなかった。そのため、事前に電流超過の予測に対する対策を行うことができなかった。
【0007】
又、配電系統の高調波監視、配電系統の電圧監視は、遠方監視制御装置10から入力されるデータにより高調波計測値のみの監視、配電線の送出し電圧のみの監視に留まっており、計測結果のみの実態把握的な管理を行っていた。このため、高調波発生機器を有する顧客情報と関連を持たせた解析は行えず、また、現在の区間電圧解析、末端電圧降下及びフェランチ効果による電圧上昇の解析は行えず、これらの関連付けは人間系の判断に委ねられていた。
【0008】
このような点に鑑みて、本発明は、現在の負荷状況に対して、事故発生時の健全停電区間に対する送電の可否等の解析を行い、事故発生時への対応や、事前の系統切替などを可能にするとともに、高調波発生機器を有する顧客情報と関連を持たせた解析、現在の区間電圧解析、末端電圧降下及びフェランチ効果による電圧上昇の解析などを、系統構成と関連づけて行い、的確な指示を行える配電系統監視装置、およびそのための計算機制御プログラム、すなわち制御手順を記憶した記憶媒体を提供することを目的とする。
【0009】
【課題を解決するための手段】
本発明の請求項1に係る配電系統監視装置は、配電系統を構成する各機器の容量や接続状態を記憶する系統データベースと、この系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手段と、事故発生時に、機器の切替操作により事故区間以外の区間への送電手順が作成可能となる可能性のある事故発生区間を抽出する解析対象系統抽出手段と、この解析対象系統抽出手段により抽出された区間を記憶する解析対象系統データベースと、この解析対象系統データベースに記憶される各区間に対して、前記区間負荷作成手段により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手段と、この系統解析手段による解析結果データを表示装置に表示する解析結果表示手段とを備えることを特徴とする。
【0010】
この配電系統監視装置によれば、系統データベースを参照し、遠方監視制御装置から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データとして作成するとともに、事故発生時に事故区間以外の健全停電区間への送電手順が作成可能となる可能性のある事故発生区間を抽出し、解析対象区間とする。この各区間に対して、区間負荷データに基づいて、送電手順の作成可否を解析し、その解析結果を表示装置に表示する。従って、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否が事前に判明するから、大災害時の人員の配置や、あるいは事前の系統切換などが行えるようになる。
【0011】
本発明の請求項2に係る配電系統監視装置は、配電系統を構成する各機器の容量や接続状態を記憶する系統データベースと、この系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手段と、表示装置より操作員が任意に事故区間を設定し、事故区間設定データに保存する事故区間設定手段と、事故区間設定データに記憶される事故区間に対して、区間負荷作成手段により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手段と、この解析結果データを前記表示装置に表示する解析結果表示手段とを備えることを特徴とする。
【0012】
この配電系統監視装置によれば、系統データベースを参照し、遠方監視制御装置から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データとして作成するとともに、表示装置よりオペレータが任意に設定した事故区間に対して、電圧条件と電流条件を満たした送電手順の作成可否を解析し、表示する。従って、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否が、オペレータの意図した区間について確認できるから、この解析結果に基づいて、台風などの大災害時の人員の配置や、あるいは事前の系統切換などが行えるようになり、配電系統の監視、運用に極めて有効である。
【0031】
本発明の請求項3に係るコンピュータ読み取り可能な記憶媒体は、配電系統を構成する各機器の容量や接続状態を記憶する系統データベースと、解析対象系統データベースと、解析結果データを表示する表示装置とを有する配電系統監視装置の制御手順を記憶した記憶媒体であって、前記系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手順と、事故発生時に、機器の切替操作により事故区間以外の区間への送電手順が作成可能となる可能性のある事故発生区間を抽出する解析対象系統抽出手順と、この解析対象系統抽出手順で抽出された各区間に対して、前記区間負荷作成手順により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手順と、この系統解析手順による解析結果データを前記表示装置に表示する解析結果表示手順とをコンピュータに実行させるためのプログラムを記憶したことを特徴とする。
【0032】
この記憶媒体によれば、計算機を利用した配電系統監視装置において、系統データベースを参照し、遠方監視制御装置から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データとして作成するとともに、事故発生時に事故区間以外の健全停電区間への送電手順が作成可能となる可能性のある事故発生区間を抽出し、解析対象区間とする。この各区間に対して、区間負荷データに基づいて、送電手順の作成可否を解析し、その解析結果を表示装置に表示する。従って、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否、大災害時の人員の配置や、あるいは事前の系統切換などが行えるようになる。
【0033】
【発明の実施の形態】
以下、本発明の実施例について、図を参照して説明する。
【0034】
図1は本発明の第1の実施例に係る配電系統監視装置11の構成図である。図1の配電系統監視装置11は、配電系統を構成する変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する区間負荷作成手段12と、事故発生時に、機器の切替操作により事故区間以外の健全停電区間への送電手順が作成可能となる可能性のある事故発生区間を抽出する解析対象系統抽出手段15と、この解析対象系統抽出手段15により抽出された区間を記憶する解析対象系統データベース16と、この解析対象系統データベース16に記憶される各区間に対して、前記区間負荷作成手段12により作成された区間負荷に基づいて、電圧条件と電流条件を満たした送電手順の作成可否を解析し、その解析結果を解析結果データ保存エリア18に保存する系統解析手段17と、前記解析結果データ保存エリア18の解析結果データを表示装置20に表示する解析結果表示手段19を有している。
【0035】
なお、区間負荷データ保存エリア13は、区間負荷データを記憶する手段を意味し、また解析結果データ保存エリア18は解析結果データを記憶する手段を意味する。この表現方法は、本実施例に限らず他の実施例においても同様であり、本明細書を通して同様に使用される。
【0036】
そして、区間負荷作成手段12は、遠方監視制御装置10から定周期に入力される各配電線の負荷データを受け取る。そして、区間負荷作成手段12は、系統データベース14を参照し、当該配電線に所属する区間の標準負荷を取り出し、配電線の負荷データをその標準負荷で按分し、区間負荷データ保存エリア13に保存する。
【0037】
解析対象系統抽出手段15は、解析対象となる区間を抽出し、解析対象系統データベース16に保存する。ここで、解析対象となる区間とは、系統上で複数の供給経路を取りうる区間であり、系統上で連系点の無い行きっぱなしの枝状の区間を除いた区間群のこと、つまり複数の供給経路を取り得る区間のことを意味する。
【0038】
その解析対象とする系統の概念図を図2に示す。この図において、FCBは配電線の給電遮断器であり、この給電遮断器FCBの負荷データ(電圧、電流など)が計測されて遠方監視制御装置10から配電系統監視装置11に送られる。図中、SW1〜SW8は常閉型の区分開閉器であり、SWt1は他回線との連系用に設けられている常開型の区分開閉器である。そしてこの図において、太線で示す区間が解析対象区間(すなわち、系統上で複数の供給経路を取りうる区間)であり、細線で示す区間が解析対象外の区間(系統上で連系点の無い行きっぱなしの枝状の区間)である。
【0039】
解析対象区間の抽出アルゴリズムが図3に示されており、まず、配電線リストアップ処理S301で、系統データベース14に含まれる全系統の配電線を求める。
【0040】
そのリストアップされた全ての配電線について、順次以下の処理を繰り返す(S302)。
【0041】
すなわち、全連系開閉器リストアップ処理S303では、当該配電線の連系開閉器を系統データベース14から求める。図4にそのアルゴリズムを示す。系統データベース14から、当該配電線の給電遮断器FCBを求め(S401)、この給電遮断器FCBの負荷側区間を求める(S402)。その後、負荷側区間が無くなるまで(S403)、次の処理を繰り返す。区間の負荷側開閉器を求め(S404)、この負荷側開閉器が連系開閉器SWt1ならば、連系開閉器SWt1として格納し(S405)、そうでなければ次の検索先である負荷側開閉器の負荷側区間を求める(S406)。このようにして、全連系開閉器SWtをリストアップする。
【0042】
次に、連系開閉器SWtが求まった後、各連系開閉器毎に供給経路検索処理(S304)を行い、供給経路上にある区間群をリストアップし、解析対象の区間として解析対象系統データベース16に保存する(S305)。
【0043】
次に、系統解析手段17は、解析対象系統データベース16に保存された区間群に対して、図5に示すアルゴリズムで、事故発生時の供給手順の作成可否を解析する。すなわち、解析対象系統データベース16に保存される全区間に対して、以下の処理を行う(S501)。当該解析対象区間を、仮に事故区間に設定し、その負荷側を停電区間とした系統状態を作成し(S502)、融通手順を作成する(S503)。この融通手順の作成処理については、図105に融通手順作成処理の入出力の概念図で示すように、この系統状態データ保存エリア61と、区間負荷データ保存エリア13及び系統データベース14とを参照して、融通のための手順作成処理1052を施して、融通手順結果を得る(1053)。このようにして得られた融通手順結果を保存する(S504)。なお、融通のための手順作成処理1052としては、種々の手法が採用できるが、例えば特開平5−199656号公報、特開平6−189454号公報などに開示されている手法にて、行うことができる。
【0044】
この融通手順の作成処理の結果から融通手順の作成可否が判明する。この事故発生時の供給手順の作成可否が、系統の強さ、弱さを示すことになる。
【0045】
この解析結果を知らしめるために、解析結果表示手段19は、解析結果データ保存エリア18の解析結果データを表示装置20に表形式で表示したり、また、系統データベース14に含まれる地図情報を基に、融通不能が発生する区間を融通できる区間と色を変えて配電線路図上に表示する。
【0046】
これらの配電系統監視装置の制御は、特に図示していないが、コンピュータにより達成されるものであり、そのための制御プログラムは記憶媒体に記憶される。ここで、記憶媒体としては、コンピュータに接続されるメモリや、コンピュータに内蔵される各種のメモリとすることができ、いずれもコンピュータ読み取り可能な記憶媒体を意味する。
【0047】
この実施例によれば、系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成するとともに、事故発生時に事故区間以外の健全停電区間への送電手順が作成可能となる可能性のある事故発生区間を抽出15し、解析対象系統16とする。この各区間に対して、区間負荷データ保存エリア13の区間負荷データに基づいて、電圧条件と電流条件を満たした送電手順の作成可否を解析17し、その解析結果を表示装置20に表示する。従って、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否が事前に判明するから、台風などの大災害時の人員の配置や、あるいは事前の系統切換などが行えるようになり、配電系統の監視、運用に極めて有効である。
【0048】
図7は本発明の第2の実施例に係る配電系統監視装置11の構成図である。図7の配電系統監視装置11は、配電系統を構成する変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する区間負荷作成手段12と、表示装置20よりオペレータが任意に設定した事故区間を事故区間設定データ保存エリア22に保存する事故区間設定手段21と、事故区間設定データ保存エリア22に記憶された事故区間に対して、前記区間負荷作成手段12により設定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順の作成可否を解析し、その解析結果を解析結果データ保存エリア18に保存する系統解析手段17と、前記解析結果データ保存エリア18の解析結果データを表示装置20に表示する解析結果表示手段19を有している。
【0049】
区間負荷作成手段12は、遠方監視制御装置10から定周期に入力される各配電線の負荷データを受け取る。区間負荷作成手段12は、系統データベース14を参照し、当該配電線に所属する区間の標準負荷を取り出し、配電線の負荷データをその標準負荷で按分し、区間負荷データ保存エリア13に保存する。事故区間設定手段21は、表示装置20よりオペレータが任意に設定した事故区間(任意の数の区間でよい)を事故区間設定データ保存エリア22に保存する。系統解析手段17は、事故区間設定データ保存エリア22に保存された事故区間に対して、図8に示すアルゴリズムで、系統の強さ、すなわち事故発生時の供給手順の作成可否を解析する。
【0050】
図8において、まず、事故区間設定データ保存エリア22に保存された事故区間と、その負荷側を停電区間とした系統状態を作成する(S801)。この系統状態と、区間負荷データ保存エリア13を参照して、融通手順を作成する(S802)。融通手順の作成方法については、前掲の特開平5−199656号公報、特開平6−189454号公報などに開示されている手法にて、またはそれと同等の機能を有する手法にて行う。
【0051】
この融通手順の作成処理の結果、融通手順の作成可否が判明する。図9に、融通手順作成処理の入出力の概念図を示す(なお、前述の図105と同様であるので、説明を省略する)。その融通手順の作成処理の結果を、解析結果データ18に保存する(S803)。解析結果表示手段19は、解析結果データ保存エリア18の解析結果データを表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、融通不能が発生する区間と、発生しない区間を色分けして配電線路図上に表示する。
【0052】
この実施例によれば、系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する。そして、表示装置20よりオペレータが任意に設定した事故区間を事故区間設定データ保存エリア22に保存し、この事故区間に対して、設定した区間負荷12に基づいて、電圧条件と電流条件を満たした送電手順の作成可否を解析17する。その解析結果データを解析結果データ保存エリア18に保存すると共に、表示装置20に表示する。従って、現在負荷に対する系統の強度、すなわち、事故発生時の健全停電区間に対する送電の可否が、オペレータの意図した区間について確認できるから、この解析結果に基づいて、台風などの大災害時の人員の配置や、あるいは事前の系統切換などが行えるようになり、配電系統の監視、運用に極めて有効である。
【0053】
図10は本発明の第3の実施例に係る配電系統監視装置11の構成図である。図10において配電系統監視装置11は、遠方監視制御装置10と接続されており、遠方監視制御装置10から配電線の高調波測定値が入力される。そして、配電系統を構成する変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の各機器の容量や接続状態を記憶する系統データベース14と、配電系統上に存在する高調波発生機器を有する顧客の高調波関連機器情報を記憶する顧客高調波関連機器情報データベース33と、この系統データベース14と顧客高調波関連機器情報データベース33とを参照し、遠方監視制御装置10から入力される配電線の高調波測定値から、配電線に所属する各区間の高調波測定値を区間毎高調波情報データ保存エリア32に作成する区間毎高調波情報作成手段31と、前記区間毎高調波情報データ保存エリア32と前記系統データベース14及び前記顧客高調波関連機器情報データベース33とから、系統データベース14に記憶される各区間の現在の高調波情報を解析する高調波解析手段34と、この高調波解析手段34により作成された解析結果データを表示装置20に表示する解析結果表示手段19とを有している。
【0054】
区間毎高調波情報作成手段31は、遠方監視制御装置10から定周期に入力される各配電線の高調波測定値データを受け取り、系統データベース14および顧客高調波関連機器情報データベース33を参照し、区間毎の高調波情報を区間毎高調波情報データ保存エリア32に保存する。
【0055】
高調波解析手段34は、区間毎高調波情報データ保存エリア32に保存されている区間毎高調波情報データを受け、この区間毎高調波情報データを、系統データベース14に記憶される各区間の現在の系統構成上定まる高調波基準値と比較する。そして、区間毎高調波情報データが運用上の基準値の範囲内か判断し、基準値の範囲外の場合は、解析結果データ保存エリア18に保存する。そして、この解析結果データ保存エリア18の解析結果データを、解析対象とする系統の概念図上に、顧客高調波関連機器情報と共に、表示装置20に表示する。
【0056】
この高調波解析手段34のアルゴリズムを図11の高調波情報解析処理フローチャートに示し、解析対象となる系統の概念図を図12に示す。
【0057】
まず、図12において、FCBは配電線の給電遮断器であり、この給電遮断器FCBの高調波データが計測されて遠方監視制御装置10から配電系統監視装置11に送られる。図中、SW1〜SW10は常閉型の区分開閉器であり、特に二重四角で表示されているSWは解析単位区間を示している。この解析単位区間は必要に応じて任意に決められるものであるが、以下の説明では単に区間として表現する。また、SWt1は他回線との連系用に設けられている常開型の区分開閉器である。そして、HCは高調波発生機器所有顧客を示している。
【0058】
さて、高調波情報解析処理フローチャート図11において、配電線リストアップ処理(S1101)で、系統データベース14に含まれる全系統の配電線数を求める。そして、全配電線数分以下の処理を繰り返す(S1102)。すなわち、
【0059】
系統データベース14から、当該配電線の所属開閉器/区間を取り出し、区間を求める(S1103)。次に、全ての区間について所属する開閉器数分、所属する開閉器情報に基づく高調波の基準値と区間毎高調波情報データ保存エリア32の区間毎高調波情報データとを用いて比較し、区間毎高調波情報データが運用上の基準値の範囲内か判断する(S1104)(S1105)。この比較・判断の結果、基準値の範囲外の場合は、この結果と計測値データを解析結果データ保存エリア18に保存する(S1106)。
【0060】
そして、顧客高調波関連機器情報データベース33を用いて、区間毎の解析結果データ保存エリア18へ区間毎顧客高調波関連機器情報を保存する(S1107)。そして、この解析結果データ保存エリア18の解析結果データを、解析対象とする系統の概念図(図12)上に、顧客高調波関連機器情報Hcと共に、表示装置20に表示する。この場合の表示態様としては、さらに解析結果データを表示装置20に表形式で表示してもよいし、また、運用上の基準波からの差に応じて区間を色分けして配電線路図上に表示することができる。。
【0061】
この実施例によれば、区間毎高調波情報作成手段31は、遠方監視制御装置10から定周期に入力される各配電線の高調波測定値データを受け取り、系統データベース14および顧客高調波関連機器情報データベース33を参照し、区間毎の高調波情報を区間毎高調波情報データ保存エリア32に保存する。そして、高調波解析手段34により、区間毎高調波情報データ保存エリア32の区間毎高調波情報データを、系統データベース14に記憶される各区間の現在の系統構成上定まる高調波基準値と比較する。そして、区間毎高調波情報データが運用上の基準値の範囲内か判断し、そして、この解析結果データ保存エリア18の解析結果を、解析対象とする系統の概念図上に、顧客高調波関連機器情報と共に、表示装置20に表示する。従って、配電系統の高調波監視において、遠方監視制御装置10から入力されるデータにより、単に高調波計測値のみを監視するのでなく、系統構成と高調波発生機器を有する顧客情報との関連を持たせた解析を行い、その解析結果に基づいて的確な対処を取ることができる。
【0062】
図13は本発明の第4の実施例に係る配電系統監視装置11の構成図である。図13において配電系統監視装置11は、変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する区間負荷作成手段12と、遠方監視制御装置10から入力される配電線に所属する主要区間の電圧を区間電圧データ保存エリア42に記憶する区間電圧作成手段41と、系統データベース14の系統構成と区間電圧データ保存エリア42の区間電圧データから、現在の各区間電圧を解析する区間電圧解析手段43と、この区間電圧解析手段43により作成された区間電圧を保存する区間電圧解析データ保存エリア44と、この区間電圧解析データ保存エリア44の区間電圧解析データを表示装置20に表示する区間電圧解析表示手段45を有している。
【0063】
区間負荷作成手段12は、遠方監視制御装置10から定周期に入力される各配電線の負荷データを受け取る。区間負荷データ12は、系統データベース14を参照し、当該配電線に所属する区間の標準負荷を取り出し、配電線の負荷データをその標準負荷で按分し、区間負荷データ保存エリア13に保存する。
【0064】
区間電圧作成手段41は、遠方監視制御装置10から定周期に入力される各配電線の主要開閉器の電圧データを受け取り、区間電圧データ保存エリア42に保存する。ここで、配電線の主要開閉器とは、系統上の幹線が分岐する地点のうち分岐後の負荷が比較的大きい地点の各線路方向第1番目の開閉器、異回線との連系開閉器、及び電圧調整器設置地点の前後の開閉器などを意味する。
【0065】
この区間電圧解析手段43のアルゴリズムを図14の区間電圧解析処理フローチャートを参照して説明する。
【0066】
まず、配電線リストアップ処理S1401で、系統データベース14に含まれる全系統の配電線数を求める。その全ての配電線について以下の処理を繰り返す(S1402)。すなわち、系統データベース14から、当該配電線の開閉器/区間を求め(S1403)、全ての区間について電源側の開閉器を検索し、区間電圧データ保存エリア42に格納された区間のうち最も近い区間をその開閉器の所属区間ブロックとする(S1404)。
【0067】
区間ブロック単位に所属する区間の区間インピーダンスを系統データベース14から取り出し、区間負荷データ保存エリア13と区間電圧データ保存エリア42を参照して、各区間の末端電圧を以下の式で算出する(S1406)。求める末端電圧をV、開閉器の計測電圧をV0、各末端までの経路における負荷側区間に1〜Nと番号を付けて、負荷側区間の通過電流をIi、負荷側区間のインピーダンスをRiとすると、
V= V0−Σ(Ii×Ri)、但しiは1〜N、ΣはIi×Riの総和
を表す。
この式における負荷側区間の通過電流Iiとは、当該区間の負荷側区間の区間負荷データ(アンペア)の総和のことである。
【0068】
このように算出した末端区間電圧を区間電圧解析データ保存エリア44に保存し(S1407)、この処理を区間ブロック数分繰り返す(S1405)。
【0069】
区間電圧解析表示手段45は、以上のようにして得られた区間電圧解析データ保存エリア44の区間電圧解析データを表示装置20に、表形式で表示する。また、系統データベース14に含まれる地図情報をもとに、区間電圧の運用基準電圧からの差により区間を色分けして配電線路図上に常に表示する。
【0070】
この実施例によれば、系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する一方、遠方監視制御装置10から入力される配電線に所属する主要区間の電圧データ42を得る。そして、系統データベース14の系統構成と区間電圧データ保存エリア42の区間電圧データから、現在の各区間電圧を解析43し、表示装置20に表示する。従って、遠方監視制御装置10から入力されるデータによる電圧監視のみでなく、現在の負荷状況、主要点の電圧、系統構成をも考慮して、各区間の電圧を運用基準電圧と比較監視することが出来、配電系統の監視、運用に極めて有効である。
【0071】
図15は本発明の第5の実施例に係る配電系統監視装置11の構成図である。図15において配電系統監視装置11は、変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から当該配電線に所属する各区間の負荷、各開閉器の通過電流を負荷データ保存エリア52に保存する負荷データ保存手段51と、この負荷データ保存エリア52と系統データベース14をもとに各機器の負荷状態を解析し、解析結果データ保存エリア18に保存する負荷解析手段53と、この解析結果データ保存エリア18の解析結果データを表示装置20に表示する解析結果表示手段19を有し、現在の系統の負荷に対する各機器の電気的な容量の余裕度を常に表示する。
【0072】
負荷データ保存手段51は、遠方監視制御装置10から定周期に入力される各配電線及び開閉器の負荷データを受け取り、負荷データ保存エリア52に保存する。負荷データは図16に示すように構成される。この負荷データ保存エリア52の更新は、負荷の変化があったもののみ更新し、更新したデータは、更新フラグをセットする。
【0073】
負荷解析手段53は、系統データベース14と負荷データ保存エリア52の更新されたデータから、機器毎に許容負荷をチェックし、その結果を解析結果データ保存エリア18に保存する。この負荷解析は図17のフローチャートに示されるように、当該配電線の機器数分(配電線、開閉器など)について、負荷データの更新があったか否かを更新フラグに基づいて判断し(S1702)、負荷データの更新があったものについて予備力計算を行う(S1703)。この予備力計算はその機器の許容負荷値と現在負荷値との差として計算され、この予備力の解析結果は図18に示されるような形式で時系列(時刻、日、月毎)データとして保存される(S1704)。
【0074】
また、解析結果表示手段19は、解析結果データ保存エリア18の解析結果データを基に、解析結果を表示装置20に表示する。表示の態様としては、図19に示されるように系統図への機器毎の予備力表示(例、60A、など)、予備力に応じた色替え、グラフ表示による機器毎の時系列による表示などを行うことができる。
【0075】
この実施例によれば、系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から当該配電線に所属する各区間の負荷、各開閉器の通過電流を負荷データ保存エリア52に保存し、この負荷データ保存エリア52と系統データベース14をもとに各機器の負荷状態を解析し、解析結果データ保存エリア18に予備力(=許容負荷値−現在負荷値)を得、現在の系統の負荷に対する各機器の電気的な容量の余裕度を常に表示する。従って、遠方監視制御装置10から入力されるデータによる監視のみでなく、現在の負荷状況と系統構成をも考慮して予備力を的確に把握することができるから、配電系統の監視、運用に極めて有効である。
【0076】
図20は本発明の第6の実施例に係る配電系統監視装置11の構成図である。図20において配電系統監視装置11は、変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する区間負荷作成手段12と、配電系統において連系開閉器のない枝区間群とこの枝区間群への送電手順が作成不可となる事故発生区間を抽出する解析対象系統抽出手段15と、この解析対象系統抽出手段15により抽出された区間を記憶する解析対象系統データベース16と、解析対象系統データベース16に記憶された連系開閉器の無い枝区間群に対して、区間負荷データ保存エリア13の区間負荷がある一定の基準を定めた負荷量以上となり、事故発生時に重大な供給支障となるかどうかを判定し、解析結果データ保存エリア18に保存する系統解析手段17と、解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有し、配電系統運用上、連系開閉器が無い枝区間群において一定の負荷以上になる場合、事故発生により送電出来なくなる枝区間群と事故区間を表示する機能を有している。
【0077】
区間負荷作成手段12は、遠方監視制御装置10から定周期に入力される各配電線の負荷データを受け取り、かつ系統データベース14を参照し、当該配電線に所属する区間の標準負荷を取り出し、配電線の負荷データをその標準負荷で按分し、区間負荷データ保存エリア13に保存する。
【0078】
解析対象系統抽出手段15は、解析対象となる区間を抽出し、解析対象系統データベース16に保存する。ここで、解析対象となる区間とは、系統上で事故発生時に機器の切替操作により事故区間以外の枝区間群への送電手順が作成不可となる事故発生区間と、枝区間群を意味する。その解析対象とする系統の概念図を図21に示し、図中の破線で示す区間が事故発生区間で、太線で示す区間が枝区間群であり、細線で示す区間が解析対象外の区間である。なお、SW1〜SW8は常閉の区分開閉器を示し、SWt1は他回線との連系用の常開の区分開閉器である。
【0079】
さて、解析対象系統抽出手段15のアルゴリズムを図22の解析対象系統抽出処理フローチャートを参照して説明する。
【0080】
まず、配電線リストアップ処理S2201で、系統データベース14に含まれる全系統の配電線数を求める。その全ての配電線について、以下の処理を繰り返す(S2202)。
【0081】
配電線に所属する開閉器及び区間を系統データベース14より求め(S2203)、その開閉器数分以下の処理を行う(S2204)。当該開閉器が連系開閉器であった場合(S2205),当該開閉器の供給経路検索検索を実施する(S2206)。供給経路としてリストアップ(図21の区間1,2,6,7,8が該当)された区間以外を、枝区間群(図21の区間3,4,5,9が該当)とする(S2207)。
【0082】
次に、枝区間群を停電させる事故区間を求める。供給経路の区間数分、以下の処理を行なう(S2208)。当該区間の系統データベース14の接続情報を参照し(S2209)、負荷側に枝区間群がある場合、当該区間を事故発生区間(図21の区間2,6が該当)とする(S2211)。このようにして(S2207)、(S2211)で求めた枝区間群と、事故発生区間を解析対象データベース16に保存する(S2212)。
【0083】
次に、系統解析手段17は図23に示す手順にて解析系統対象データベース16に保存される全ての事故発生区間(区間2,6)に対して、以下の処理を行う(S2301)。当該区間(区間2)を、仮に事故区間に設定し、その負荷側を停電区間とした系統状態を作成し,当該区間の負荷側停電区間群を求める(S2302)。負荷側停電区間に連系開閉器SWt1が接続されている場合(S2303)、区間負荷データ保存エリア13を参照して負荷側停電区間の区間負荷の総和を求め、算出した負荷量の総和がある一定の基準を定めた負荷量条件以上となる区間を抽出する(S2304)。その結果を、解析結果データ保存エリア18に保存する(S2305)。
【0084】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、解析結果データ保存エリア18における枝区間と事故発生区間を配電線路図上に常に表示する。
【0085】
この実施例によれば、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成し、配電系統において連系開閉器のない枝区間群とこの枝区間群への送電手順が作成不可となる事故発生区間を抽出15する。この解析対象系統抽出手段15により抽出された区間を記憶16し、記憶された連系開閉器の無い枝区間群に対して、区間負荷データ保存エリア13の区間負荷がある一定の基準を定めた負荷量以上となり、事故発生時に重大な供給支障となるかどうかを解析17する。この解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有している。従って、配電系統運用上、連系開閉器が無い枝区間群において一定の負荷以上になる場合、事故発生により送電出来なくなる枝区間群と事故区間を表示するから、現在の負荷状況と系統構成をも考慮して予備力を的確に把握することができ、配電系統の監視、運用に極めて有効である。
【0086】
図24は本発明の第7の実施例に係る配電系統監視装置11の構成図である。図24において配電系統監視装置11は、変電所,バンク,配電線,高圧線,開閉器,電圧調整器等の配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成する区間負荷作成手段12と、想定した事故発生区間を表示装置20よりオペレータが任意に設定し、事故区間設定データ保存エリア22に保存する事故区間設定手段21と、連系開閉器のない枝区間群を抽出する解析対象系統抽出手段15と、解析対象系統抽出手段15により抽出された枝区間群と事故区間設定データ保存エリア22の事故区間を記憶する解析対象系統データベース16と、解析対象系統データベース16に記憶された連系開閉器の無い枝区間群に対して、区間負荷データ保存エリア13の区間負荷がある一定の基準を定めた負荷量以上となり、事故発生時に重大な供給支障となるかどうかを判定し、解析結果データ保存エリア18に保存する系統解析手段17と、解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有し、配電系統運用上、連系開閉器が無い枝区間群で一定の負荷以上になった場合、事故発生により送電出来なくなる枝区間群と任意に想定した事故区間を表示する。
【0087】
区間負荷作成手段12は、遠方監視制御装置10から定周期に入力される各配電線の負荷データを受け取り、系統データベース14を参照し、当該配電線に所属する区間の標準負荷を取り出し、配電線の負荷データをその標準負荷で按分し、区間負荷データ保存エリア13に保存する。
【0088】
事故区間設定手段21は表示装置20よりオペレータが任意に想定した事故区間を事故区間設定データ保存エリア22に保存する。
【0089】
解析対象系統抽出手段15は、系統データベース14と想定した事故区間を保存する事故区間設定データ保存エリア22をもとに解析対象となる区間を抽出し、解析対象系統データベース16に保存する。ここで、解析対象となる区間とは、想定した事故区間で事故が発生したときに機器の切替操作により事故区間以外の枝区間群への送電手順が作成不可となる枝区間群を意味する。その解析対象とする系統の概念図は前述の図21に示したものと同じである。
【0090】
解析対象系統抽出手段15のアルゴリズムを図25に示す。まず、配電線リストアップ処理S2501で、系統データベース14に含まれる全系統の配電線から事故区間設定データ保存エリア22の想定した事故区間が所属する配電線を求める。求めた配電線に所属する全ての開閉器及び区間を系統データベース14より求める(S2502)。その全ての開閉器について、以下の処理を行う(S2503)。
【0091】
当該開閉器が連系開閉器であった場合(S2504),当該開閉器の供給経路検索検索を実施する(S2505)。供給経路としてリストアップ(図21の区間1,2,6,7,8が該当)された区間以外を、枝区間群(図21の区間3,4,5,9が該当)とする(S2506)。
【0092】
次に、枝区間群を停電させる事故区間を求める。供給経路の区間数分、以下の処理を行なう(S2507)。当該区間の系統データベース14の接続情報を参照し(S2508)、負荷側に枝区間群がある場合(S2509)、当該区間(図21の区間2,6が該当)が事故区間設定データ保存エリア22の想定した事故区間である場合(S2510)、供給経路検索にて検出された区間以外を枝区間群とする処理(S2506)で求めた枝区間群と、想定した事故区間を解析対象データベース16に保存する(S2511)。
【0093】
次に、系統解析手段17は図26に示す手順にて解析系統対象データベース16に保存される想定した事故区間を仮に事故区間に設定し、その負荷側を停電区間とした系統状態を作成し,当該区間の負荷側停電区間群を求める(S2601)。
【0094】
負荷側停電区間に連系開閉器が接続されている場合(S2602)、区間負荷データ保存エリア13を参照して負荷側停電区間の区間負荷の総和を求め、算出した負荷量の総和がある一定の基準を定めた負荷量条件以上となる区間を抽出する(S2603)。その結果を、解析結果データ保存エリア18に保存する(S2604)。
【0095】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、解析結果データ保存エリア18における枝区間と想定した事故区間を配電線路図上に表示する。
【0096】
この実施例によれば、この系統データベース14を参照し、遠方監視制御装置10から入力される配電線の負荷から、配電線に所属する各区間の負荷を区間負荷データ保存エリア13に作成し、想定した事故発生区間を表示装置20よりオペレータが任意に設定し、事故区間設定データ保存エリア22に保存すると共に、連系開閉器のない枝区間群を抽出15する。そして、連系開閉器の無い枝区間群に対して、区間負荷データ保存エリア13の区間負荷がある一定の基準を定めた負荷量以上となり、事故発生時に重大な供給支障となるかどうかを判定し、解析結果データ保存エリア18に保存し、表示装置20に表示する。従って、オペレータが任意に設定した事故区間に基づいて、連系開閉器が無い枝区間群において一定の負荷以上になる場合、事故発生により送電出来なくなる枝区間群と事故区間を表示するから、現在の負荷状況と系統構成をも考慮して予備力を的確に把握することができ、配電系統の監視、運用に極めて有効である。
【0097】
図27は本発明の第8の実施例に係る配電系統監視装置11の構成図である。図27において配電系統監視装置11は、各開閉器の標準入切状態を含む、配電系統を構成する各機器(変電所,バンク,配電線,高圧線,開閉器,電圧調整器等)の容量や接続状態を記憶する系統データベース14と、系統データベース14より各配電線同士を連系する標準状態で切状態の連系開閉器を抽出し、その連系開閉器の両端区間を供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンク間の連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する系統解析手段17と、この解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有する。
【0098】
系統解析手段17は、解析対象となる開閉器を抽出し、解析結果データ保存エリア18に保存する。ここで、解析対象となる開閉器とは、系統上で配電線同士を連系させる標準切状態の開閉器かつ当該開閉器の両端供給配電線の所属配電線及び変電所を求め,両端の供給バンクが異なる開閉器である。その解析対象とする系統の概念図を図28に示す。図28において、系統状態は標準の運用状態であり、SW1〜SW7が常閉の区分開閉器であり、SWt1及びSWt2が常開の連系開閉器であり、この連系開閉器SWt1,SWt2が解析対象開閉器である。
【0099】
系統解析手段17における抽出アルゴリズムを図29の解析対象系統抽出処理フローチャートに示す。
【0100】
まず、配電線リストアップ処理(S2901)で、系統データベース14に含まれる全系統の配電線数を求める。その配電線数分以下の処理を繰り返す(S2902)。配電線に所属する開閉器及び区間を系統データベース14より求める(S2903)。その開閉器数分以下の処理を行う(S2904)。当該開閉器が連系開閉器であった場合,当該開閉器両端の供給経路を検索し供給配電線を求める(S2905)。該当連系開閉器の両端の供給配電線所属バンクの上位系統が異なる場合,解析結果データ保存エリア18に保存する(S2906)。
【0101】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、配電線路図上に解析結果データ保存エリア18に含まれる開閉器を色を変えて表示する。
【0102】
この実施例によれば、系統データベース14より各配電線同士を連系する標準状態で切状態の連系開閉器を抽出し、その連系開閉器の両端区間を供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンク間の連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する。そして、この解析結果データ保存エリア18の解析結果に基づいて、各連系開閉器が異バンク間のものであるかどうかを表示装置20に表示する。従って、常時は開放されている連系開閉器の投入時の影響を把握することができ、配電系統の監視、運用に極めて有効である。
【0103】
図30は本発明の第9の実施例に係る配電系統監視装置11の構成図である。図30において、各開閉器の標準入切状態を含む、配電系統を構成する各機器(変電所,バンク,配電線,高圧線,開閉器,電圧調整器等)の容量や接続状態を記憶する系統データベース14と、オペレータが表示装置20から設定した連系開閉器を連系開閉器設定データ保存エリア92に保存する連系開閉器設定手段91と、系統データベース14より各配電線同士を連系する標準状態で切状態の連系開閉器を抽出し、その抽出した連系開閉器と連系開閉器設定データ保存エリア92に保存された連系開閉器が同一なとき、連系開閉器の両端区間を供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する系統解析手段17と、解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有する。
【0104】
系統解析手段17は、オペレータが表示装置20から設定し、連系開閉器設定データ保存エリア92に保存されている連系開閉器が解析対象となるか否かを判断し、解析対象ならば当該連系開閉器を解析結果データ保存エリア18に保存する。ここで、解析対象となる開閉器とは、系統上で配電線どうしを連系させる標準切状態の開閉器かつ当該開閉器の両端供給配電線の所属配電線及び変電所を求め,両端の供給バンクが異なる開閉器である。その解析対象とする系統の概念図は前述の図28と同じである。
【0105】
系統解析手段17における抽出アルゴリズムを図31の解析対象系統抽出処理フローチャートに示す。
【0106】
まず、配電線リストアップ処理(S3101)で、系統データベース14に含まれる全系統の配電線数を求める。その配電線数分以下の処理を繰り返す(S3102)。配電線に所属する開閉器及び区間を系統データベース14より求める(S3103)。その開閉器数分以下の処理を行う(S3104)。当該開閉器が連系開閉器設定データ保存エリア92に保存する連系開閉器であった場合,当該開閉器両端の供給経路を検索し供給配電線を求める(S3105)。該当連系開閉器の両端の供給配電線所属バンクの上位系統が異なる場合,解析結果データ保存エリア18に保存する(S3106)。
【0107】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、配電線路図上に解析結果データ保存エリア18に含まれる開閉器を色を変えて表示する。
【0108】
この実施例によれば、オペレータが表示装置20から設定した連系開閉器を連系開閉器設定データ保存エリア92に保存91する。系統データベース14より各配電線同士を連系する標準状態で切状態の連系開閉器を抽出し、その抽出した連系開閉器と連系開閉器設定データ保存エリア92に保存された連系開閉器が同一なとき、連系開閉器の両端区間を供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する。そしてこの解析結果データ保存エリア18の解析結果に基づいて、各連系開閉器が異バンク間のものであるかどうかを表示装置20に表示する。従って、オペレータが任意に設定した連系開閉器が異バンク間のものであるかどうかを表示するから、常時は開放されている連系開閉器の投入時の影響を把握することができ、配電系統の監視、運用に極めて有効である。
【0109】
図32は本発明の第10の実施例に係る配電系統監視装置11の構成図である。同図において、配電系統監視装置11は、遠方監視制御装置10と接続されており、遠方監視制御装置10から入力される開閉器情報から、開閉器現在入切状態データを作成し開閉器現在入切状態データ保存エリア102に保存する開閉器現在入切状態作成手段101と、配電系統を構成する各機器(変電所,バンク,配電線,高圧線,開閉器,電圧調整器等)の容量や接続状態を記憶する系統データベース14と、系統データベース14と開閉器現在入切状態データ保存エリア102より各配電線同士を連系する現在切状態の連系開閉器を抽出し、その連系開閉器の両端区間に供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する系統解析手段17と、解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19を有している。
【0110】
系統解析手段17は、解析対象となる開閉器を抽出し、解析結果データ保存エリア18に保存する。ここで、解析対象となる開閉器とは、系統上で配電線同士を連系させる現在「切」状態の開閉器かつ当該開閉器の両端供給配電線の所属配電線及び変電所を求め,両端の供給バンクあるいは変電所が異なる開閉器である。その解析対象とする系統の概念図を図33に示す。図33において、SW1〜SW7が常閉の区分開閉器であり、SWt1〜SWt3が常開の連系開閉器である。この図では、常閉開閉器SW7が開放状態、常開の連系開閉器SWt3が閉成状態にあり、この常閉開閉器SW7と連系開閉器SWt3が解析対象開閉器である。なお、図中、解析対象開閉器が太線で示され、解析対象外の開閉器が細線で示されている。
【0111】
系統解析手段の抽出アルゴリズムを図34の解析対象系統抽出処理フローチャートに示す。
【0112】
まず、配電線リストアップ処理S3401で、系統データベース14に含まれる全系統の配電線数を求める。その全ての配電線について、以下の処理を繰り返す(S3402)。配電線所属開閉器及び区間を系統データベース14より求める(S3403)。その開閉器数分以下の処理を行う(S3404)。当該開閉器が現在切開閉器であった場合,当該開閉器両端の供給経路を検索し供給配電線を求める(S3405)。該当連系開閉器の両端の供給配電線所属バンクの上位系統が異なる場合,解析結果データ保存エリア18に保存する(S3406)。
【0113】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、配電線路図上に解析結果データ保存エリア18に含まれる開閉器を色を変えて表示する。
【0114】
この実施例によれば、遠方監視制御装置10から入力される開閉器情報から、開閉器現在入切状態データを作成し、開閉器現在入切状態データ保存エリア102に記憶する。そして、配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と開閉器現在入切状態データ保存エリア102より各配電線同士を連系する現在切状態の連系開閉器を抽出し、その連系開閉器の両端区間に供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する。そして、この解析結果データ保存エリア18の解析結果に基づいて、各連系開閉器が異バンクとの連系開閉器かどうかを表示装置20に表示する。従って、切状態開閉器の投入時の影響を把握することができ、配電系統の監視、運用に極めて有効である。
【0115】
図35は本発明の第11の実施例に係る配電系統監視装置11の構成図である。図35において配電系統監視装置11は、遠方監視制御装置10と接続されており、遠方監視制御装置10から入力される開閉器情報から、開閉器現在入切状態データを作成する開閉器現在入切状態作成手段101と、開閉器の現在入切状態を記憶する開閉器現在入切状態データ保存エリア102と、配電系統を構成する各機器(変電所,バンク,配電線,高圧線,開閉器,電圧調整器等)の容量や接続状態を記憶する系統データベース14と、オペレータが表示装置20から設定した連系開閉器を連系開閉器設定データ保存エリア92に保存する連系開閉器設定手段91と、系統データベース14と開閉器現在入切状態データ保存エリア102より各配電線同士を連系する現在切状態の連系開閉器を抽出し、抽出した連系開閉器が連系開閉器設定データ保存エリア92に保存されている連系開閉器と同一なとき、連系開閉器の両端区間に供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する系統解析手段17と、解析結果データ保存エリア18の解析結果を表示装置20に表示する解析結果表示手段19とを有している。
【0116】
系統解析手段17は、オペレータが表示装置20から設定し、連系開閉器設定データ保存エリア92に保存されている連系開閉器が解析対象か否かを判断し、解析対象ならば当該連系開閉器を解析結果データ保存エリア18に保存する。ここで、解析対象となる開閉器とは、系統上で配電線同士を連系させる現在「切」状態の開閉器かつ当該開閉器の両端供給配電線の所属配電線及び変電所を求め,両端の供給バンクあるいは変電所が異なる開閉器である。その解析対象とする系統の概念図は前述の図33に示したものと同じである。
【0117】
系統解析手段の抽出アルゴリズムを図36の解析対象系統抽出処理フローチャートに示す。
【0118】
まず、配電線リストアップ処理S3601で、系統データベース14に含まれる全系統の配電線数を求める。その全ての配電線について、以下の処理を繰り返す(S3602)。配電線所属開閉器及び区間を系統データベース14より求める(S3603)。その開閉器数分以下の処理を行う(S3604)。当該開閉器が連系開閉器設定データ保存エリア92に保存されている連系開閉器でしかも現在切開閉器であった場合,当該開閉器両端の供給経路を検索し供給配電線を求める(S3605)。該当連系開閉器の両端の供給配電線所属バンクの上位系統が異なる場合,解析結果データ保存エリア18に保存する(S3606)。
【0119】
解析結果表示手段19は、解析結果データ保存エリア18の解析結果を表示装置20に表形式で表示する。また、系統データベース14に含まれる地図情報を元に、配電線路図上に解析結果データ18に含まれる開閉器を色を変えて表示する。
【0120】
この実施例によれば、遠方監視制御装置10から入力される開閉器情報から、開閉器現在入切状態データを作成し、開閉器現在入切状態データ保存エリア102に記憶し、また、配電系統を構成する各機器の容量や接続状態を記憶する系統データベース14と、オペレータが表示装置20から設定した連系開閉器を連系開閉器設定データ保存エリア92に保存する。そして、系統データベース14と開閉器現在入切状態データ保存エリア102より各配電線同士を連系する現在切状態の連系開閉器を抽出し、抽出した連系開閉器が連系開閉器設定データ保存エリア92に保存されている連系開閉器と同一なとき、連系開閉器の両端区間に供給する各配電線の所属バンクの上位系統を検索し、各配電線の連系開閉器毎に当該連系開閉器が異バンクとの連系開閉器かどうかをチェックし、解析結果データ保存エリア18に保存する。そして、この解析結果データ保存エリア18の解析結果に基づいて、各連系開閉器が異バンクとの連系開閉器かどうかを表示装置20に表示する。従って、オペレータが任意に設定した、切状態開閉器の投入時の影響を把握することができ、配電系統の監視、運用に極めて有効である。
【0121】
【発明の効果】
請求項1記載の配電系統監視装置によれば、事故発生により大規模な停電事故になる区間を操作員に事故発生以前に通知することが可能となり、台風等の大規模災害時の効率的な人的配置や、効率的な設備増強工事の設計の支援が可能となる。
【0122】
請求項2記載の配電系統監視装置によれば、操作員が任意に設定した事故区間に対する健全停電区間の発生を事前に確認することができる。これにより事故発生時の健全停電区間発生の防止及び効率的な設備増強工事の設計の支援が可能となる。
【0132】
請求項3記載の配電系統監視装置の制御手順を記録した記録媒体によれば、事故発生により大規模な停電事故になる区間を操作員に事故発生以前に通知することが可能となり、台風等の大規模災害時の効率的な人的配置や、効率的な設備増強工事の設計の支援が可能となる。
【図面の簡単な説明】
【図1】本発明の第1の実施例に係る配電系統監視装置の構成図。
【図2】解析対象系統の概念図。
【図3】解析対象区間抽出処理フローチャート。
【図4】全連系開閉器リストアップ処理。
【図5】系統解析手段のアルゴリズム。
【図6】手順作成処理の概念図。
【図7】本発明の第2の実施例に係る配電系統監視装置の構成図。
【図8】系統解析手段のアルゴリズム。
【図9】手順作成処理の概念図。
【図10】本発明の第3の実施例に係る配電系統監視装置の構成図。
【図11】高調波情報解析処理フローチャート。
【図12】解析対象系統の概念図。
【図13】本発明の第4の実施例に係る配電系統監視装置の構成図。
【図14】区間電圧解析処理フローチャート。
【図15】本発明の第5の実施例に係る配電系統監視装置の構成図。
【図16】負荷データ構成図。
【図17】負荷解析手段処理フローチャート。
【図18】解析結果データ構成図。
【図19】系統図への予備力表示例図。
【図20】本発明の第6の実施例に係る配電系統監視装置の構成図。
【図21】解析対象系統の概念図。
【図22】解析対象系統抽出処理フローチャート。
【図23】系統解析手段のアルゴリズム。
【図24】本発明の第7の実施例に係る配電系統監視装置の構成図。
【図25】解析対象抽出処理フローチャート。
【図26】系統解析手段のアルゴリズム。
【図27】本発明の第8の実施例に係る配電系統監視装置の構成図。
【図28】解析対象系統の概念図。
【図29】解析対象系統抽出処理フローチャート。
【図30】本発明の第9の実施例に係る配電系統監視装置の構成図。
【図31】解析対象系統抽出処理フローチャート。
【図32】本発明の第10の実施例に係る配電系統監視装置の構成図。
【図33】解析対象系統の概念図。
【図34】解析対象系統抽出処理フローチャート。
【図35】本発明の第11の実施例に係る配電系統監視装置の構成図。
【図36】解析対象系統抽出処理フローチャート。
【図37】従来の配電系統監視装置の構成図。
【符号の説明】
10 遠方監視制御装置
11 配電系統監視装置
12 区間負荷作成手段
13 区間負荷データ保存エリア
14 系統データベース
15 解析対象系統抽出手段
16 解析対象系統データベース
17 系統解析手段
18 解析結果データ保存エリア
19 解析結果表示手段
20 表示装置
21 事故区間設定手段
22 事故区間設定データ保存エリア
31 区間毎高調波情報作成手段
32 区間毎高調波情報データ保存エリア
33 顧客高調波関連機器情報データベース
34 高調波解析手段
41 区間電圧作成手段
42 区間電圧データ保存エリア
43 区間電圧解析手段
44 区間電圧解析データ保存エリア
45 区間電圧解析表示手段
51 負荷データ保存手段
52 負荷データ保存エリア
53 負荷解析手段
61 系統状態データ保存エリア
91 連系開閉器設定手段
92 連系開閉器設定データ保存エリア
101 開閉器現在入切状態作成手段
102 開閉器現在入切状態データ保存エリア
371 系統監視手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power distribution system monitoring apparatus that monitors a power distribution system, and a storage medium that stores a control procedure thereof.
[0002]
The monitoring of the power distribution system has been conventionally performed in combination with a remote monitoring control device. FIG. 37 shows a configuration diagram of a conventional distribution system monitoring device, which monitors the current system state based on monitoring information such as the voltage and current of the distribution line input from the remote
[0003]
However, the analysis of the monitoring information is as simple as the capacity of each device that makes up the power distribution system, and the current excess of each device has not exceeded when the current value is taken in. We were monitoring.
[0004]
Further, in the harmonic monitoring of the distribution system, only the harmonic measurement value is monitored by the data input from the remote
[0005]
[Problems to be solved by the invention]
In the conventional power distribution
[0006]
Conventionally, the current excess of each device is checked at the time of current excess or at the time of interchange calculation. If it is not at that time, the situation regarding current excess cannot be determined. Therefore, it was not possible to take measures against the prediction of excess current in advance.
[0007]
Moreover, the harmonic monitoring of the distribution system and the voltage monitoring of the distribution system are limited to monitoring only the harmonic measurement value and monitoring only the distribution voltage of the distribution line based on the data input from the remote
[0008]
In view of such points, the present invention analyzes the current load situation, such as whether power transmission is possible for a healthy power outage section when an accident occurs, and responds to the occurrence of an accident, prior system switching, etc. Analyzes related to customer information with harmonic generators, current section voltage analysis, terminal voltage drop, and voltage rise analysis due to the Ferrant effect, etc. are performed in association with the system configuration. An object of the present invention is to provide a power distribution system monitoring apparatus capable of issuing various instructions and a computer control program therefor, that is, a storage medium storing a control procedure.
[0009]
[Means for Solving the Problems]
The distribution system monitoring apparatus according to
[0010]
According to this distribution system monitoring device, with reference to the system database, the load of each section belonging to the distribution line is created as section load data from the load of the distribution line input from the remote monitoring control device, and at the time of the occurrence of an accident An accident occurrence section that may be able to create a power transmission procedure to a healthy power outage section other than the accident section is extracted and set as an analysis target section. For each section, whether or not a power transmission procedure can be created is analyzed based on section load data, and the analysis result is displayed on the display device. Accordingly, the strength of the system with respect to the current load, that is, whether or not the power can be transmitted to the healthy power outage section at the time of the accident is known in advance.
[0011]
The distribution system monitoring device according to
[0012]
According to this distribution system monitoring device, the load of each section belonging to the distribution line is created as section load data from the load of the distribution line input from the remote monitoring control device with reference to the system database, and from the display device Analyzes and displays whether or not a power transmission procedure that satisfies the voltage and current conditions can be created for an accident section arbitrarily set by the operator. Therefore, the strength of the system with respect to the current load, that is, whether or not the power transmission to the healthy power outage section at the time of the accident can be confirmed for the section intended by the operator. Arrangement or advance system switching can be performed, which is extremely effective for monitoring and operation of the distribution system.
[0031]
Of the present invention Claim 3 A computer-readable storage medium according to the present invention is a distribution system monitoring apparatus having a system database that stores the capacity and connection state of each device constituting the distribution system, an analysis target system database, and a display device that displays analysis result data In accordance with the system configuration data of the system database, the load of each section belonging to the distribution line is set as section load data from the load of the distribution line input from the remote monitoring control device according to the system configuration data of the system database. Section load creation procedure to be created, analysis target system extraction procedure to extract an accident occurrence section that may be able to create a power transmission procedure to sections other than the accident section by switching the equipment when an accident occurs, and this analysis For each section extracted in the target system extraction procedure, based on the section load assumed by the section load creation procedure, the voltage condition Determine whether a power transmission procedure that satisfies the current conditions can be created, save the analysis result data as a system analysis procedure, and execute the analysis result display procedure for displaying the analysis result data based on this system analysis procedure on the display device. A program for storing the program is stored.
[0032]
According to this storage medium, in the distribution system monitoring device using a computer, the load of each section belonging to the distribution line is calculated from the load of the distribution line input from the remote monitoring control device by referring to the system database. As an analysis target section, an accident occurrence section that may be able to create a power transmission procedure to a healthy power outage section other than the accident section when an accident occurs is extracted. For each section, whether or not a power transmission procedure can be created is analyzed based on section load data, and the analysis result is displayed on the display device. Accordingly, the strength of the system with respect to the current load, that is, whether or not power can be transmitted to the healthy power outage section at the time of the accident, personnel assignment at the time of a major disaster, or prior system switching can be performed.
[0033]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0034]
FIG. 1 is a configuration diagram of a distribution
[0035]
The section load
[0036]
Then, the section
[0037]
The analysis target system extraction means 15 extracts a section to be analyzed and stores it in the analysis
[0038]
A conceptual diagram of the system to be analyzed is shown in FIG. In this figure, FCB is a power supply circuit breaker of the distribution line. Load data (voltage, current, etc.) of this power supply circuit breaker FCB is measured and sent from the remote
[0039]
FIG. 3 shows an algorithm for extracting an analysis target section. First, distribution lines of all systems included in the
[0040]
The following processes are sequentially repeated for all the distribution lines listed (S302).
[0041]
That is, in the all interconnection switch list-up process S303, the interconnection switch of the distribution line is obtained from the
[0042]
Next, after the interconnection switch SWt is obtained, the supply route search process (S304) is performed for each interconnection switch, the group of sections on the supply route is listed, and the analysis target system is set as the analysis target section. Save in the database 16 (S305).
[0043]
Next, the system analysis means 17 analyzes whether or not a supply procedure can be created when an accident occurs, using the algorithm shown in FIG. 5 for the section group stored in the analysis
[0044]
Whether or not the interchange procedure can be created is determined from the result of the interchange procedure creation process. Whether or not a supply procedure can be created in the event of an accident indicates the strength and weakness of the system.
[0045]
In order to make the analysis result known, the analysis result display means 19 displays the analysis result data in the analysis result
[0046]
Control of these distribution system monitoring devices is achieved by a computer (not shown), and a control program for the control is stored in a storage medium. Here, the storage medium may be a memory connected to the computer or various types of memory built in the computer, all of which mean a computer-readable storage medium.
[0047]
According to this embodiment, referring to the
[0048]
FIG. 7 is a configuration diagram of the distribution
[0049]
The section
[0050]
In FIG. 8, first, an accident section stored in the accident section setting
[0051]
As a result of the process for creating the accommodation procedure, it is determined whether the accommodation procedure can be created. FIG. 9 shows a conceptual diagram of input / output of the accommodation procedure creation process (the description is omitted because it is similar to FIG. 105 described above). The result of the accommodation procedure creation processing is stored in the analysis result data 18 (S803). The analysis result display means 19 displays the analysis result data in the analysis result
[0052]
According to this embodiment, the load of each section belonging to the distribution line is created in the section load
[0053]
FIG. 10 is a configuration diagram of a power distribution
[0054]
The section-specific harmonic
[0055]
The harmonic analysis means 34 receives the section-specific harmonic information data stored in the section-specific harmonic information
[0056]
The algorithm of the harmonic analysis means 34 is shown in the harmonic information analysis processing flowchart of FIG. 11, and a conceptual diagram of the system to be analyzed is shown in FIG.
[0057]
First, in FIG. 12, FCB is a power supply circuit breaker of the distribution line, and harmonic data of this power supply circuit breaker FCB is measured and sent from the remote
[0058]
In the harmonic information analysis processing flowchart of FIG. 11, the number of distribution lines in all the systems included in the
[0059]
The assigned switch / section of the distribution line is extracted from the
[0060]
Then, using the customer harmonic related device information database 33, the customer harmonic related device information for each section is stored in the analysis result
[0061]
According to this embodiment, the per-section harmonic
[0062]
FIG. 13 is a configuration diagram of a power distribution
[0063]
The section
[0064]
The section voltage creation means 41 receives the voltage data of the main switch of each distribution line inputted from the remote
[0065]
The algorithm of this section voltage analysis means 43 is demonstrated with reference to the section voltage analysis process flowchart of FIG.
[0066]
First, in the distribution line listing process S1401, the number of distribution lines in all the systems included in the
[0067]
The section impedance of the section belonging to the section block unit is taken out from the
V = V0−Σ (Ii × Ri), where i is 1 to N and Σ is the sum of Ii × Ri
Represents.
The passing current Ii in the load side section in this equation is the sum of the section load data (amperes) in the load side section of the section.
[0068]
The terminal voltage calculated in this way is stored in the section voltage analysis data storage area 44 (S1407), and this process is repeated for the number of section blocks (S1405).
[0069]
The section voltage analysis display means 45 displays the section voltage analysis data in the section voltage analysis
[0070]
According to this embodiment, while referring to the
[0071]
FIG. 15 is a configuration diagram of a power distribution
[0072]
The load
[0073]
The
[0074]
The analysis result display means 19 displays the analysis result on the
[0075]
According to this embodiment, referring to the
[0076]
FIG. 20 is a configuration diagram of a distribution
[0077]
The section
[0078]
The analysis target system extraction means 15 extracts a section to be analyzed and stores it in the analysis
[0079]
Now, the algorithm of the analysis target system extraction means 15 will be described with reference to the analysis target system extraction processing flowchart of FIG.
[0080]
First, in the distribution line list-up process S2201, the number of distribution lines in all the systems included in the
[0081]
The switches and sections belonging to the distribution lines are obtained from the system database 14 (S2203), and the processing for the number of switches is performed (S2204). When the switch is a connected switch (S2205), a supply route search search for the switch is performed (S2206). The sections other than the sections listed as supply routes (corresponding to
[0082]
Next, an accident section that causes a power failure in the branch section group is obtained. The following processing is performed for the number of sections of the supply path (S2208). The connection information of the
[0083]
Next, the system analysis means 17 performs the following processing for all accident occurrence sections (
[0084]
The analysis result display means 19 displays the analysis results in the analysis result
[0085]
According to this embodiment, with reference to the
[0086]
FIG. 24 is a configuration diagram of the power distribution
[0087]
The section
[0088]
The accident section setting means 21 stores the accident section arbitrarily assumed by the operator from the
[0089]
The analysis target system extraction means 15 extracts a section to be analyzed based on the accident section setting
[0090]
The algorithm of the analysis target system extraction means 15 is shown in FIG. First, in the distribution line list-up process S2501, the distribution line to which the accident section assumed in the accident section setting
[0091]
If the switch is a connected switch (S2504), a supply route search search for the switch is performed (S2505). Other than the sections listed as supply routes (
[0092]
Next, an accident section that causes a power failure in the branch section group is obtained. The following processing is performed for the number of sections of the supply path (S2507). The connection information of the
[0093]
Next, the system analysis means 17 sets the assumed accident section stored in the analysis
[0094]
When the interconnection switch is connected to the load side power outage section (S2602), the sum of the section loads in the load side power outage section is obtained with reference to the section load
[0095]
The analysis result display means 19 displays the analysis results in the analysis result
[0096]
According to this embodiment, with reference to the
[0097]
FIG. 27 is a configuration diagram of the power distribution
[0098]
The system analysis means 17 extracts the switch to be analyzed and stores it in the analysis result
[0099]
The extraction algorithm in the system analysis means 17 is shown in the analysis target system extraction processing flowchart of FIG.
[0100]
First, in the distribution line list-up process (S2901), the number of distribution lines in all systems included in the
[0101]
The analysis result display means 19 displays the analysis results in the analysis result
[0102]
According to this embodiment, the distribution switch in the disconnected state is extracted from the
[0103]
FIG. 30 is a configuration diagram of the power distribution
[0104]
The system analysis means 17 determines whether or not the interconnection switch set by the operator from the
[0105]
The extraction algorithm in the system analysis means 17 is shown in the analysis target system extraction processing flowchart of FIG.
[0106]
First, in the distribution line listing process (S3101), the number of distribution lines in all systems included in the
[0107]
The analysis result display means 19 displays the analysis results in the analysis result
[0108]
According to this embodiment, the linked switch set by the operator from the
[0109]
FIG. 32 is a configuration diagram of the power distribution
[0110]
The system analysis means 17 extracts the switch to be analyzed and stores it in the analysis result
[0111]
The extraction algorithm of the system analysis means is shown in the analysis target system extraction processing flowchart of FIG.
[0112]
First, in the distribution line listing process S3401, the number of distribution lines in all the systems included in the
[0113]
The analysis result display means 19 displays the analysis results in the analysis result
[0114]
According to this embodiment, the switch current on / off state data is created from the switch information input from the remote
[0115]
FIG. 35 is a configuration diagram of the power distribution
[0116]
The system analysis means 17 determines whether or not the interconnection switch set by the operator from the
[0117]
The extraction algorithm of the system analysis means is shown in the analysis target system extraction processing flowchart of FIG.
[0118]
First, in the distribution line listing process S3601, the number of distribution lines in all the systems included in the
[0119]
The analysis result display means 19 displays the analysis results in the analysis result
[0120]
According to this embodiment, the switch current on / off state data is created from the switch information inputted from the remote
[0121]
【The invention's effect】
According to the distribution system monitoring device of
[0122]
According to the distribution system monitoring device of the second aspect, it is possible to confirm in advance the occurrence of a healthy power outage section for the accident section arbitrarily set by the operator. As a result, it is possible to prevent the occurrence of a sound power outage section at the time of an accident and to support the design of an efficient facility expansion work.
[0132]
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a distribution system monitoring apparatus according to a first embodiment of the present invention.
FIG. 2 is a conceptual diagram of a system to be analyzed.
FIG. 3 is an analysis target section extraction processing flowchart.
FIG. 4 is a list-up process for all interconnected switches.
FIG. 5 shows an algorithm of the system analysis means.
FIG. 6 is a conceptual diagram of procedure creation processing.
FIG. 7 is a configuration diagram of a distribution system monitoring apparatus according to a second embodiment of the present invention.
FIG. 8 shows an algorithm of the system analysis means.
FIG. 9 is a conceptual diagram of procedure creation processing.
FIG. 10 is a configuration diagram of a distribution system monitoring apparatus according to a third embodiment of the present invention.
FIG. 11 is a flowchart of harmonic information analysis processing.
FIG. 12 is a conceptual diagram of a system to be analyzed.
FIG. 13 is a configuration diagram of a distribution system monitoring apparatus according to a fourth embodiment of the present invention.
FIG. 14 is a section voltage analysis process flowchart;
FIG. 15 is a configuration diagram of a distribution system monitoring apparatus according to a fifth embodiment of the present invention.
FIG. 16 is a load data configuration diagram.
FIG. 17 is a processing flowchart of load analysis means.
FIG. 18 is an analysis result data configuration diagram.
FIG. 19 is a diagram showing a reserve power display example on the system diagram.
FIG. 20 is a configuration diagram of a distribution system monitoring apparatus according to a sixth embodiment of the present invention.
FIG. 21 is a conceptual diagram of a system to be analyzed.
FIG. 22 is an analysis target system extraction process flowchart;
FIG. 23 shows an algorithm of system analysis means.
FIG. 24 is a configuration diagram of a distribution system monitoring apparatus according to a seventh embodiment of the present invention.
FIG. 25 is an analysis target extraction process flowchart;
FIG. 26 shows an algorithm of system analysis means.
FIG. 27 is a configuration diagram of a distribution system monitoring apparatus according to an eighth embodiment of the present invention.
FIG. 28 is a conceptual diagram of an analysis target system.
FIG. 29 is an analysis target system extraction process flowchart;
FIG. 30 is a configuration diagram of a power distribution system monitoring apparatus according to a ninth embodiment of the present invention.
FIG. 31 is an analysis target system extraction process flowchart;
FIG. 32 is a configuration diagram of a power distribution system monitoring apparatus according to a tenth embodiment of the present invention.
FIG. 33 is a conceptual diagram of an analysis target system.
FIG. 34 is an analysis target system extraction process flowchart;
FIG. 35 is a configuration diagram of a power distribution system monitoring apparatus according to an eleventh embodiment of the present invention.
FIG. 36 is an analysis target system extraction process flowchart;
FIG. 37 is a configuration diagram of a conventional distribution system monitoring apparatus.
[Explanation of symbols]
10 Remote monitoring and control device
11 Distribution system monitoring device
12 Section load creation means
13 Section load data storage area
14 System database
15 Analysis target system extraction means
16 Analysis system database
17 System analysis means
18 Analysis result data storage area
19 Analysis result display means
20 Display device
21 Accident section setting means
22 Accident section setting data storage area
31 Harmonic information creation means for each section
32 Harmonic information data storage area for each section
33 Customer Harmonic Related Equipment Information Database
34 Harmonic analysis means
41 Section voltage creation means
42 Section voltage data storage area
43 Section voltage analysis means
44 Section voltage analysis data storage area
45 Section voltage analysis display means
51 Load data storage means
52 Load data storage area
53 Load analysis means
61 System state data storage area
91 Interconnection switch setting means
92 Linked switch setting data storage area
101 Switch current on / off state creation means
102 Switch ON / OFF state data storage area
371 System monitoring means
Claims (3)
この系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手段と、
事故発生時に、機器の切替操作により事故区間以外の区間への送電手順が作成可能となる可能性のある事故発生区間を抽出する解析対象系統抽出手段と、
この解析対象系統抽出手段により抽出された区間を記憶する解析対象系統データベースと、
この解析対象系統データベースに記憶される各区間に対して、前記区間負荷作成手段により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手段と、
この系統解析手段による解析結果データを表示装置に表示する解析結果表示手段とを備えることを特徴とする配電系統監視装置。A system database that stores the capacity and connection status of each device constituting the power distribution system;
According to the system configuration data of this system database, from the load of the distribution line input from the remote monitoring control device, section load creation means for creating the load of each section belonging to the distribution line as section load data,
An analysis target system extracting means for extracting an accident occurrence section that may be able to create a power transmission procedure to a section other than the accident section by an operation of switching devices when an accident occurs;
An analysis target system database for storing the section extracted by the analysis target system extraction means;
For each section stored in this analysis target system database, it is determined whether a power transmission procedure satisfying the voltage condition and the current condition can be created based on the section load assumed by the section load creating means, and analysis result data System analysis means to save as,
A distribution system monitoring apparatus comprising: analysis result display means for displaying analysis result data by the system analysis means on a display device.
この系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手段と、
表示装置より操作員が任意に事故区間を設定し、事故区間設定データに保存する事故区間設定手段と、
事故区間設定データに記憶される事故区間に対して、区間負荷作成手段により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手段と、
この解析結果データを前記表示装置に表示する解析結果表示手段とを備えることを特徴とする配電系統監視装置。A system database that stores the capacity and connection status of each device constituting the power distribution system;
According to the system configuration data of this system database, from the load of the distribution line input from the remote monitoring control device, section load creation means for creating the load of each section belonging to the distribution line as section load data,
Accident section setting means for the operator to arbitrarily set the accident section from the display device and save it in the accident section setting data,
For the accident section stored in the accident section setting data, determine whether a power transmission procedure that satisfies the voltage and current conditions can be created based on the section load assumed by the section load creation means, and save it as analysis result data System analysis means to
A distribution system monitoring device comprising: analysis result display means for displaying the analysis result data on the display device.
解析対象系統データベースと、
解析結果データを表示する表示装置とを有する配電系統監視装置の制御手順を記憶した記憶媒体であって、前記系統データベースの系統構成データに従って、遠方監視制御装置から入力される配電線の負荷から、当該配電線に所属する各区間の負荷を区間負荷データとして作成する区間負荷作成手順と、
事故発生時に、機器の切替操作により事故区間以外の区間への送電手順が作成可能となる可能性のある事故発生区間を抽出する解析対象系統抽出手順と、
この解析対象系統抽出手順で抽出された各区間に対して、前記区間負荷作成手順により想定した区間負荷に基づいて、電圧条件と電流条件を満たした送電手順が作成可能かを判断し、解析結果データとして保存する系統解析手順と、
この系統解析手順による解析結果データを前記表示装置に表示する解析結果表示手順とをコンピュータに実行させるためのプログラムを記憶したコンピュータ読み取り可能な記憶媒体。A system database that stores the capacity and connection status of each device constituting the power distribution system;
Analysis system database,
A storage medium storing a control procedure of a distribution system monitoring device having a display device that displays analysis result data, and according to the system configuration data of the system database, from the load of the distribution line input from the remote monitoring control device, Section load creation procedure for creating the load of each section belonging to the distribution line as section load data,
In the event of an accident, an analysis target system extraction procedure for extracting an accident occurrence section that may be able to create a power transmission procedure to a section other than the accident section by switching the device,
For each section extracted in this analysis target system extraction procedure, it is determined whether a power transmission procedure satisfying the voltage condition and the current condition can be created based on the section load assumed by the section load creation procedure, and the analysis result Phylogenetic analysis procedure to save as data,
A computer-readable storage medium storing a program for causing a computer to execute an analysis result display procedure for displaying analysis result data by the system analysis procedure on the display device.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16653399A JP3910761B2 (en) | 1999-06-14 | 1999-06-14 | Distribution system monitoring device and storage medium storing control procedure thereof |
| JP2006207465A JP4377895B2 (en) | 1999-06-14 | 2006-07-31 | Distribution system monitoring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16653399A JP3910761B2 (en) | 1999-06-14 | 1999-06-14 | Distribution system monitoring device and storage medium storing control procedure thereof |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2006207465A Division JP4377895B2 (en) | 1999-06-14 | 2006-07-31 | Distribution system monitoring device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000358327A JP2000358327A (en) | 2000-12-26 |
| JP3910761B2 true JP3910761B2 (en) | 2007-04-25 |
Family
ID=62144925
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16653399A Expired - Lifetime JP3910761B2 (en) | 1999-06-14 | 1999-06-14 | Distribution system monitoring device and storage medium storing control procedure thereof |
| JP2006207465A Expired - Lifetime JP4377895B2 (en) | 1999-06-14 | 2006-07-31 | Distribution system monitoring device |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2006207465A Expired - Lifetime JP4377895B2 (en) | 1999-06-14 | 2006-07-31 | Distribution system monitoring device |
Country Status (1)
| Country | Link |
|---|---|
| JP (2) | JP3910761B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105548782A (en) * | 2016-02-22 | 2016-05-04 | 成都振中电气有限公司 | Full-automatic power distribution system |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5112124B2 (en) * | 2008-03-14 | 2013-01-09 | 株式会社東芝 | Power distribution system operation device |
| KR101274167B1 (en) * | 2011-11-24 | 2013-06-13 | 한전케이디엔주식회사 | Emergency Load Control System in Distribution Line and Control Method of the Same |
| JP5953119B2 (en) * | 2012-05-24 | 2016-07-20 | 株式会社日立製作所 | Equipment arrangement support device, equipment arrangement support method, and power supply system |
| KR101366761B1 (en) * | 2012-07-19 | 2014-02-25 | 한전케이디엔주식회사 | System for discriminating underground service conductor using harnonics and method thereof |
| KR101677843B1 (en) * | 2015-04-17 | 2016-11-18 | 엘에스산전 주식회사 | Communication System |
| JP6440608B2 (en) * | 2015-10-26 | 2018-12-19 | 三菱電機株式会社 | Centralized voltage control device and centralized voltage control method |
| JP6946069B2 (en) * | 2017-06-15 | 2021-10-06 | 株式会社東芝 | Electric power related information collection and display system |
| CN113489147A (en) * | 2021-06-29 | 2021-10-08 | 海南电网有限责任公司 | Harmonic monitoring system |
-
1999
- 1999-06-14 JP JP16653399A patent/JP3910761B2/en not_active Expired - Lifetime
-
2006
- 2006-07-31 JP JP2006207465A patent/JP4377895B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105548782A (en) * | 2016-02-22 | 2016-05-04 | 成都振中电气有限公司 | Full-automatic power distribution system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2006333699A (en) | 2006-12-07 |
| JP4377895B2 (en) | 2009-12-02 |
| JP2000358327A (en) | 2000-12-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN114429092B (en) | Digital twin-based relay protection equipment digital simulation system | |
| EP0853368B1 (en) | Electric power control system | |
| US6845301B2 (en) | System for protecting and controlling substation main circuit components | |
| Yongli et al. | An expert system for power systems fault analysis | |
| JP3910761B2 (en) | Distribution system monitoring device and storage medium storing control procedure thereof | |
| McDonald et al. | Alarm processing and fault diagnosis using knowledge based systems for transmission and distribution network control | |
| EP2262074A1 (en) | Protection lockout in substation automation | |
| CN106067658B (en) | Parameterize Separation control equipment and/or the method and apparatus for protecting equipment | |
| CN108963995B (en) | Regional differential protection device and method for power distribution network to react to phase-to-phase fault | |
| Su et al. | Performance evaluation of multiagent systems for navy shipboard power system restoration | |
| CN105051998B (en) | Communication between domains in industrial control system | |
| Deliyannides et al. | Design criteria for an integrated microprocessor-based substation protection and control system | |
| EP1348970B1 (en) | Check for plausibility of current transformers in substations | |
| KR102908022B1 (en) | Method and system for automatic recovery of substation failure using scada system transmission information | |
| Sachdev et al. | Topology detection for adaptive protection of distribution networks | |
| EP2186178B1 (en) | Protective device for protecting an electrotechnical unit and method for the operation thereof | |
| Swarup et al. | Computerized data acquisition for power system automation | |
| KR102815315B1 (en) | Method and apparatus for diagnosing power quality of power distribution panel based on automatic construction of artificial neural network | |
| Booth et al. | Enhanced power system control and management via intelligent substations | |
| JP2000270499A (en) | How to display power system information | |
| US20250293505A1 (en) | Testing system for distributed power delivery protection or control system | |
| CN108226722A (en) | Insulated monitoring method, apparatus and system | |
| JP2778741B2 (en) | Power system accident recovery support device | |
| CN113742016A (en) | Alarm signal display method and device and storage medium | |
| JP2644243B2 (en) | Shutdown adjustment calculation method for power system equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040806 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20050323 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20050324 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20050822 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20050822 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060524 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060530 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060731 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070123 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070125 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 3910761 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100202 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110202 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120202 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120202 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130202 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140202 Year of fee payment: 7 |
|
| EXPY | Cancellation because of completion of term |