JP3913615B2 - Construction method - Google Patents
Construction method Download PDFInfo
- Publication number
- JP3913615B2 JP3913615B2 JP2002165927A JP2002165927A JP3913615B2 JP 3913615 B2 JP3913615 B2 JP 3913615B2 JP 2002165927 A JP2002165927 A JP 2002165927A JP 2002165927 A JP2002165927 A JP 2002165927A JP 3913615 B2 JP3913615 B2 JP 3913615B2
- Authority
- JP
- Japan
- Prior art keywords
- reaction force
- construction method
- pump unit
- jack
- control value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、施工方法に関し、特に送出機構と、けん引機構とを併用してなる施工方法に適用して好適なものである。
【0002】
【従来の技術】
従来、例えば高架橋等を施工する際、工事桁上で構造物である橋桁を順次繋ぎ合わせ、この繋ぎ合わせた橋桁を送出機構である後方台車や、けん引機構であるけん引装置等を用いて橋脚へと送り出し、施工していた。
【0003】
【発明が解決しようとする課題】
ところが、近年、施工する対象物(例えば高架橋)が大型化してきていることから、重量が大きく、その送り出し長が長い橋桁等を、後方台車やけん引装置のみで送り出す場合、以下のような問題点があった。
【0004】
後方台車は、橋桁を送り出す方向(以下、これを推進方向と称する)へのガイド機能を備えていないため、送り出す橋桁の送り出し長が長い場合、この橋桁を安定して送り出すのが困難であった。
【0005】
また、けん引装置は、送り出す橋桁の重量が大きくなるほど、装置そのものが大型となり、橋脚等の既設構造物を大規模に補強しなければならない問題があった。
【0006】
上述した問題点を解決する一つの方法として、後方台車と、けん引装置とを併用して橋桁を送り出す施工方法が提案されているものの、後方台車の橋桁を送り出す力(以下、これを推進力と称する)の方が、けん引装置の推進力よりも大きいことから、当該けん引装置で用いる、構造物と、その送り出し先の目的地となる橋桁との間に設けられるガイド部材(例えばワイヤやケーブル等)がたるみ易くなるため、このたるみを修正する工程分、作業が煩雑になる未だ不十分な問題があった。
【0007】
本発明は、上述したような問題点に鑑みてなされたもので、作業効率を格段と向上させ、安定した送り出しを行い得るとともに、既設構造物の補強を最小限に抑えることができる施工方法を実現することを目的とする。
【0008】
【課題を解決するための手段】
かかる課題を解決するため本発明においては、以下の手段を採用した。
請求項1に記載の施工方法は、複数の着脱部材で軌条を交互に着脱を繰り返しながら推進する後方台車、各橋脚上部に設けられた送出装置、及びけん引装置を併用して構造物を送り出す施工方法において、上記後方台車及び各装置を駆動するそれぞれのポンプユニットの油圧により算出される反力が、設計反力を基準として定められる上限および下限値を有する管理値以内となるよう反力を自動管理することを特徴としている。
【0009】
上述した施工方法によれば、けん引機構に用いるガイド部材の張力を検出し、この張力を所定状態に保持しながら、構造物をけん引機構と、送出機構とによって送り出すようにしたことから、ガイド部材のたるみを未然に防止して、このたるみを修正する工程を省略する分、施工作業を簡略化することができる。また、送出機構と、けん引機構とを併用して構造物を送り出すため、この構造物の重量を送出機構と、けん引機構とに分担することができる。
【0010】
しかも、請求項2に記載の発明は、請求項 1 に記載する後方台車、送出装置及びけん引装置を駆動する各ポンプユニットの反力の自動管理が、各ポンプユニットの油圧により算出される反力が上記管理値以内の場合には、反力補正することなく、また上記管理値以内でなくかつ上限および下限値を有する制御値以内の場合には、自動で反力補正し、さらに上記制御値以内でない場合には、手動で反力補正するために各ポンプユニットを非常停止し、各ポンプユニットの油圧により算出される反力が上記管理値以内となるように制御することを特徴としている。
【0011】
また、請求項3に記載の発明は、請求項1又は請求項2に記載のけん引装置が、中空シリンダジャッキと、水平ジャッキとを具え、上記けん引装置に用いるガイド部材を、上記中空シリンダジャッキと上記水平ジャッキとによって、交互にたぐることを特徴としている。この施工方法によれば、けん引機構が、中空シリンダジャッキと、水平ジャッキとによって、ガイド部材を交互にたぐることにより、このガイド部材に導かれて構造物をガイドするため、当該構造物を正確な方向に送り出すことができる。
【0012】
【発明の実施の形態】
以下、図面に基づき、本発明における一実施の形態について詳述する。
【0013】
図1は、本発明に係る施工方法の一実施の形態を示す概略全体構成図である。図1において、1は構造物である橋桁を示し、工事桁2上で順次つなぎ合わされた後、送出機構である後方台車3と、けん引機構であるけん引装置4とによって、既設構造物である橋脚P1、P2、P3、P4、P5、P6、P7・・・上を推進方向に向かって順次送り出されるようになされている。
【0014】
また、各橋脚P1〜P7上には、送出装置5が設けられており、後方台車3と、けん引装置4とによって送り出される橋桁1の推進力を補うようになされている。
【0015】
実際上、けん引装置4は中空シリンダジャッキ4aと、水平ジャッキ4bとを有している。そして、橋桁1と、この橋桁1を送り出す目的地となる例えば橋脚P7との間に張られたガイド部材としてのワイヤWを、中空シリンダジャッキ4aと、水平ジャッキ4bとによって交互にたぐるようになされている。これにより、けん引装置4は、ワイヤWに導かれて橋桁1をガイドするため、この橋桁1を正確な方向に送り出すことができる。
【0016】
なお、本実施の形態においては、ガイド部材としてワイヤWを用いるようにした場合について述べるが、本発明はこれに限らず、ガイド部材としては、例えばケーブルを用いてもよく、送り出す構造物と、その目的地となる橋桁との間に設けられるものであれば、この他、種々のものを広く適用することができることは言うまでもない。
【0017】
また、後方台車3は、図2(a)〜(c)に示すように、ベース30と、進行方向に対して伸縮自在な前方ジャッキ31Aおよび後方ジャッキ31Bと、クランプ動作の可動自在な前方ジャッキ32Aおよび後方ジャッキ32B等を備えている。そして、送り出す橋桁1(図示せず)をベース30上に積載し、前方ジャッキ31Aおよび後方ジャッキ31Bを縮めた状態で、先ず、図2(a)に示すように、前方ジャッキ32Aをレール33から開放状態にするとともに、後方ジャッキ32Bをレール33に対してクランプ状態にする。
【0018】
次に、図2(b)に示すように、前方ジャッキ31Aおよび後方ジャッキ31Bを伸ばした後、図2(c)に示すように、前方ジャッキ32Aをレール33に対してクランプ状態にするとともに、後方ジャッキ32Bを開放状態にして、前方ジャッキ31Aおよび後方ジャッキ31Bを縮める。
【0019】
このようにして、この後方台車3は、ベース30上に積載した橋桁1(図示せず)を、図中矢示する進行方向に推進させ得るようになされている。このとき、この後方台車3は、前方ジャッキ32Aおよび後方ジャッキ32Bにより、橋桁1の推進に伴って移動しながら、この橋桁1を送り出すため、橋桁1が推進する毎に後方台車3の設置位置を移動させる手間を省いて、橋桁1をスムーズにかつ連続的に推進させることができる。
【0020】
そして、これら後方台車3、けん引装置4および送出装置5は、それぞれ近傍に設けられた対応する後方台車用ポンプユニット3A、けん引装置用ポンプユニット4Aおよび送出装置用ポンプユニット5Aによって駆動され、これら各ポンプユニット3A、4A、5Aは、それぞれ制御システム部6によって、ローカルユニット7を介して制御されている。
【0021】
この制御システム部6は、後述する図3に示すように、反力管理システムとしての油圧系統中央制御部6Aと、反力計測システムとしての構造解析部6Bとからなり、各ポンプユニット3A、4A、5Aからローカルユニット7を介して与えられる後方台車3、けん引装置4および送出装置5の反力を、予め設定されている理想的解析値としての設計反力と比較して、規定する管理値範囲内となるように管理している。
【0022】
また、制御システム部6は、例えば橋桁1の後端部に設けられる距離測定器8Aが、橋脚P1上に設置される送り出し量計測用の反射板8Bにレーザ等を反射させて計測した計測結果を、ローカルユニット7を介して得ることにより、後方台車3やけん引装置4によって送り出した橋桁1の送り出し量を監視している。
【0023】
油圧系統中央制御部6Aは、図3に示すように、各ポンプユニット3A、4A、5Aにローカルユニット7を介して指示を与えるためのパーソナルコンピュータ60A1、60A2・・・60An(以下、これを単にパソコン60A1、60A2・・・60Anと称する)と、各ローカルユニット7から対応するポンプユニット3A、4A、5Aの反力や、橋桁1の送り出し量計測結果等を与えられるパソコン61A1、61A2・・・61Anとを有しており、構造解析部6Bは、パソコン6B1、6B2・・・6Bnを有している。
【0024】
この油圧系統中央制御部6Aは、パソコン61A1〜61Anによって、各ポンプユニット3A、4A、5Aからローカルユニット7を介して与えられる反力と理想的な解析値からなる設計反力とを常時対比させることにより管理値範囲を設定する。また、油圧系統中央制御部6Aは、距離測定器8Aからローカルユニット7を介して与えられる橋桁1の送り出し量等を監視する。
【0025】
また、油圧系統中央制御部6Aは、各ポンプユニット3A、4A、5Aから与えられる反力のうち、設計反力と比較して管理値範囲(この実施の場合、例えば設計反力を基準とした±5〔%〕を管理可能範囲、±20〔%〕を制御可能範囲とする)外である反力が存在する場合、パソコン60A1〜60Anによって、対応するポンプユニット3A、4A、5Aにローカルユニット7を介して、送出装置5の高さや、後方台車3およびけん引装置4の推進力等の補正を指示する制御信号を送り、この反力を自動的に調整する。
【0026】
但し、各ポンプユニット3A、4A、5Aから与えられる反力のうち、制御可能範囲を超した反力が存在する場合、詳しくは後述するが、パソコン60A1〜60Anによって、後方台車3およびけん引装置4のポンプユニット3A、4Aに非常停止を指示する制御信号が、対応するローカルユニット7を介して与えられ、手動による補正作業が行われるようになされている。
【0027】
構造解析部6Bは、パソコン6B1〜6Bnによって、各ポンプユニット3A、4A、5Aからローカルユニット7を介して与えられた反力と、設計反力とを比較し、解析することで、そのときの状態と傾向を把握し、刻々と変化する状況の判断を行うようになされている。また、この解析結果は、特に、上述した非常停止による手動制御時に、反力の補正を行う最適値を解析するために用いられる。
【0028】
実際上、このような各ポンプユニット3A、4A、5Aの反力の補正は、油圧系統中央制御部6Aのパソコン60A1〜60Anによって、図4に示す反力補正処理手順RT1を実行することにより行われる。すなわち、油圧系統中央制御部6Aのパソコン60A1〜60Anは、各ポンプユニット3A、4A、5Aから対応するローカルユニット7を介して反力が与えられると、図4に示す反力補正処理手順RT1をステップSP1から開始し、続くステップSP2において、各ポンプユニット3A、4A、5Aから与えられた反力が、管理可能範囲の限界値(以下、これを管理限界値と称する)以内か否かを判断する。
【0029】
このステップSP2において肯定結果が得られると、パソコン60A1〜60Anは、次のステップSP3に進んで、反力の補正を行うことなく自動で送り出しを続行させた後、ステップSP2に戻り、再び各ポンプユニット3A、4A、5Aから反力が与えられるまで待機する。
【0030】
一方、ステップSP2において否定結果が得られると、パソコン60A1〜60Anは、ステップSP4に進み、この各ポンプユニット3A、4A、5Aから与えられた反力が、制御可能範囲の限界値(以下、これを制御限界値と称する)以内か否かを判断する。
【0031】
このステップSP4において肯定結果が得られると、パソコン60A1〜60Anは、続くステップSP5に進んで、自動で反力を補正しながら自動で送り出しを続行させた後、ステップSP2に戻り、再び各ポンプユニット3A、4A、5Aから反力が与えられるまで待機する。このステップSP5における反力の補正は、構造解析部6Bのパソコン6B1〜6Bnとは連携しない簡易な補正である。
【0032】
一方、ステップSP4において否定結果が得られると、パソコン60A1〜60Anは、ステップSP6に進み、各ポンプユニット3A、4A、5Aを自動で非常停止させ、オペレータが手動で反力の補正を行えるように、各ポンプユニット3A、4A、5Aの運転モードを切り換え、オペレータの手動による補正が終了した後、ステップSP2に戻り、再び各ポンプユニット3A、4A、5Aから反力が与えられるまで待機する。このステップSP6における反力の補正は、構造解析部6Bのパソコン6B1〜6Bnと連携する高度な補正である。
【0033】
すなわち、オペレータの手動による反力の補正は、構造解析部6Bのパソコン6B1〜6Bnによる解析の結果得られた、そのときの状況における最適な補正値に基づいて、オペレータが直接、各ポンプユニット3A、4A、5Aを操作して行うものである。
【0034】
このようにして、油圧系統中央制御部6Aのパソコン60A1〜60Anは、ステップSP1−SP2−SP3、ステップSP1−SP2−SP4−SP5またはステップSP1−SP2−SP4−SP6のルーチンを繰り返すことにより、各ポンプユニット3A、4A、5Aの反力が、管理限界値以内の場合には、補正することなく、また管理限界値以上制御限界値以内の場合には、自動で補正し、さらに制御限界値を超した場合には、各ポンプユニット3A、4A、5Aを非常停止させて手動で補正するようにし、これら各ポンプユニット3A、4A、5Aの反力が規定する管理値範囲内の値になるように自動的に管理している。
【0035】
これにより、各ポンプユニット3A、4A、5Aの反力が管理値範囲内の値になるようにシステム制御することから、後方台車3とけん引装置4との推進動作を同期させることができるため、これら後方台車3とけん引装置4とを橋桁1に対して最適な送り出し状況に保ち、けん引装置4のワイヤWがたるむのを容易に防止することができる。そして、このワイヤWのたるみを修正する作業を省くことができる分、作業効率を格段と向上させるとともに、このワイヤWの張力を所定状態に保ちながら、橋桁1の進行方向をガイドして、この橋桁1を安定して送り出すことができる。
【0036】
また、後方台車3と、けん引装置4とを併用することから、既設構造物である橋脚P1〜P7の補強を最小限に抑えることができ、コストを削減することができる。
【0037】
さらに、この施工方法によれば、後方台車3とけん引装置4とを、油圧系統中央制御部6Aと構造解析部6Bとによって制御することにより、後方台車3とけん引装置4の状態を把握して構造物を推進させるため、これら後方台車3とけん引装置4における橋桁1の送り出し状況を、最適な状態に保つことができる。
【0038】
さらに、この施工方法によれば、油圧系統中央制御部6Aが予め各反力の規定値を設定し、常時、連続的に各反力の計測値と、これら反力の理想的解析値とを対比させて各反力が規定値内になるように自動的に調整することから、後方台車3の反力とけん引装置4の反力とが規定値内におさまるため、これら後方台車3とけん引装置4の推進動作を同期させることができ、けん引装置4のワイヤWがたるむのを容易に防止することができる。
【0039】
なお、上述した本実施の形態においては、各ポンプユニット3A、4A、5Aから与えられる反力の規定値として、設計反力を基準とした±5〔%〕を管理範囲、±20〔%〕を制御範囲とするようにした場合について述べたが、本発明はこれに限らず、要は構造物を安定して送り出すことができれば、規定値としては、この他種々の数値を用いることがきる。この際、本実施の形態のように、規定値を2段階に分けて設定することにより、反力をより正確に補正することができる利点を得ることができる。
【0040】
【発明の効果】
上述のように本発明によれば、施工方法において、けん引機構に用いるガイド部材の張力を検出し、この張力を所定状態に保持しながら、構造物をけん引機構と、送出機構とによって送り出すようにしたことから、ガイド部材のたるみを未然に防止して、このたるみを修正する工程を省略する分、施工作業を簡略化することができ、かくして作業効率を格段と向上させ、安定した送り出しを行い得る施工方法を実現することができる。これに加えてこの施工方法では、構造物を送り出す推進力を、送出機構とけん引機構とに分担できる分、これら送出機構や、けん引機構を設置する既設構造物の補強を最小限に抑えることができる。
【0041】
しかも、この施工方法によれば、けん引機構が、中空シリンダジャッキと、水平ジャッキとによって、ガイド部材を交互にたぐることにより、このガイド部材に導かれて構造物をガイドするため、当該構造物を正確な方向に送り出すことができる。
【0042】
また、この施工方法によれば、送出機構が、軌条を挟み込みながら推進する後方台車でなることにより、構造物の推進に伴って移動しながら、この構造物を送り出すため、構造物が推進する毎に後方台車の設置位置を移動させる手間を省き、構造物をスムーズにかつ連続的に推進させることができる。
【図面の簡単な説明】
【図1】 本発明の施工方法にかかる一実施の形態を示す概略全体構成図である。
【図2】 後方台車における進行動作の説明に供する概略構成図である。
【図3】 制御システム部の全体構成図である。
【図4】 反力補正処理手順を示すフローチャートである。
【符号の説明】
1 橋桁(構造物)
3 後方台車(送出機構)
31A 前方ジャッキ
31B 後方ジャッキ
32A 前方ジャッキ
32B 後方ジャッキ
4 けん引装置(けん引機構)
4a 中空シリンダジャッキ
4b 水平ジャッキ
W ワイヤ(ガイド部材)
5 送出装置
6 制御システム部
6A 油圧系統中央制御部
6B 構造解析部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a construction method, and is particularly suitable for application to a construction method in which a delivery mechanism and a traction mechanism are used in combination.
[0002]
[Prior art]
Conventionally, when constructing a viaduct, for example, the bridge girder, which is a structure, is sequentially connected on the construction girder and the bridge girder is connected to the pier using a rear carriage as a sending mechanism or a towing device as a towing mechanism. It was sent out and construction was done.
[0003]
[Problems to be solved by the invention]
However, since the objects to be constructed (for example, viaducts) have become larger in recent years, the following problems are encountered when sending a bridge girder, etc. that is heavy and has a long feeding length with only a rear carriage or a towing device. was there.
[0004]
Since the rear carriage does not have a guide function in the direction of sending out the bridge girder (hereinafter referred to as the propulsion direction), it is difficult to send out the bridge girder stably when the delivery length of the bridge girder is long. .
[0005]
Further, the towing apparatus has a problem that the larger the weight of the bridge girder to be sent out, the larger the apparatus itself becomes, and it is necessary to reinforce existing structures such as bridge piers on a large scale.
[0006]
As one method for solving the above-mentioned problems, although a construction method for sending out a bridge girder using a rear carriage and a towing device has been proposed, the force for sending out the bridge girder of the rear carriage (hereinafter referred to as propulsive force). Is larger than the propulsive force of the towing device, so that a guide member (for example, a wire or cable) provided between the structure used in the towing device and the bridge girder serving as the destination of the destination is used. ) Is easy to sag, and there is still an insufficient problem that the work becomes complicated by the process of correcting this sag.
[0007]
The present invention has been made in view of the above-described problems, and is a construction method that can significantly improve work efficiency, perform stable feeding, and can minimize reinforcement of existing structures. It aims to be realized.
[0008]
[Means for Solving the Problems]
In order to solve this problem, the present invention employs the following means.
The construction method according to claim 1 is a construction in which a structure is sent out by using a rear carriage that repeatedly pushes and removes a rail alternately with a plurality of attaching and detaching members, a feeding device provided on each bridge pier, and a towing device. In the method, the reaction force is automatically adjusted so that the reaction force calculated by the hydraulic pressure of each of the rear carriage and each pump unit that drives each device is within a control value having an upper limit and a lower limit value determined based on the design reaction force. It is characterized by management .
[0009]
According to the construction method described above, the tension of the guide member used in the traction mechanism is detected, and the structure is sent out by the traction mechanism and the delivery mechanism while maintaining this tension in a predetermined state. The construction work can be simplified by preventing the sagging and omitting the process of correcting the sagging. In addition, since the structure is sent out using both the delivery mechanism and the traction mechanism, the weight of the structure can be shared between the delivery mechanism and the traction mechanism.
[0010]
Moreover, the reaction force is the invention described in
[0011]
According to a third aspect of the present invention, the traction device according to the first or second aspect includes a hollow cylinder jack and a horizontal jack, and the guide member used for the traction device is the hollow cylinder jack. It is characterized by alternating with the horizontal jack. According to this construction method, the towing mechanism guides the structure by guiding the guide member alternately by hollow cylinder jacks and horizontal jacks, thereby guiding the structure accurately. Can be sent out in the direction.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
[0013]
FIG. 1 is a schematic overall configuration diagram showing an embodiment of a construction method according to the present invention. In FIG. 1, reference numeral 1 denotes a bridge girder which is a structure, and after being sequentially joined together on a
[0014]
Further, a
[0015]
In practice, the
[0016]
In the present embodiment, the case where the wire W is used as the guide member will be described, but the present invention is not limited thereto, and for example, a cable may be used as the guide member. Needless to say, various other things can be widely applied as long as they are provided between the bridge girder and the destination.
[0017]
Further, as shown in FIGS. 2A to 2C, the
[0018]
Next, as shown in FIG. 2 (b), after extending the
[0019]
In this way, the
[0020]
The
[0021]
As shown in FIG. 3 to be described later, the
[0022]
In addition, the
[0023]
As shown in FIG. 3, the hydraulic system
[0024]
The hydraulic system
[0025]
Moreover, the hydraulic system
[0026]
However, when there is a reaction force that exceeds the controllable range among the reaction forces applied from the
[0027]
The
[0028]
In practice, the reaction force of each
[0029]
If an affirmative result is obtained in this step SP2, the personal computers 60A1 to 60An proceed to the next step SP3 to continue the automatic delivery without correcting the reaction force, and then return to step SP2 and again each pump. Wait until reaction force is applied from the
[0030]
On the other hand, if a negative result is obtained in step SP2, the personal computers 60A1 to 60An proceed to step SP4, in which the reaction force given from each of the
[0031]
If an affirmative result is obtained in step SP4, the personal computers 60A1 to 60An proceed to step SP5 to continue the automatic feed while automatically correcting the reaction force, and then return to step SP2 and again each pump unit. Wait until reaction force is applied from 3A, 4A, 5A. The correction of the reaction force in step SP5 is a simple correction that does not cooperate with the personal computers 6B1 to 6Bn of the
[0032]
On the other hand, if a negative result is obtained in step SP4, the personal computers 60A1 to 60An proceed to step SP6 to automatically stop each
[0033]
That is, the operator manually corrects the reaction force based on the optimum correction value in the current situation obtained as a result of analysis by the personal computers 6B1 to 6Bn of the
[0034]
In this manner, the personal computers 60A1 to 60An of the hydraulic system
[0035]
Thereby, since the system control is performed so that the reaction force of each
[0036]
Further, since the
[0037]
Further, according to this construction method, the
[0038]
Furthermore, according to this construction method, the hydraulic system
[0039]
In the above-described embodiment, the prescribed value of the reaction force given from each
[0040]
【The invention's effect】
As described above, according to the present invention, in the construction method, the tension of the guide member used for the traction mechanism is detected, and the structure is sent out by the traction mechanism and the delivery mechanism while maintaining the tension in a predetermined state. As a result, sagging of the guide member can be prevented in advance, and the construction work can be simplified as much as the process of correcting this sagging is omitted, thus greatly improving work efficiency and performing stable feeding. The construction method to obtain can be realized. In addition to this, this construction method can minimize the reinforcement of the sending mechanism and the existing structure where the towing mechanism is installed, because the propulsive force for sending the structure can be shared between the sending mechanism and the towing mechanism. it can.
[0041]
Moreover, according to this construction method, the towing mechanism guides the structure by being guided by the guide member by alternately pulling the guide member by the hollow cylinder jack and the horizontal jack. Can be sent in the correct direction.
[0042]
In addition, according to this construction method, since the delivery mechanism is a rear carriage that is propelled while sandwiching the rail, the structure is fed out while moving along with the propulsion of the structure. Thus, it is possible to smoothly and continuously propel the structure without having to move the installation position of the rear carriage.
[Brief description of the drawings]
FIG. 1 is a schematic overall configuration diagram showing an embodiment according to a construction method of the present invention.
FIG. 2 is a schematic configuration diagram for explaining a traveling operation in a rear carriage.
FIG. 3 is an overall configuration diagram of a control system unit.
FIG. 4 is a flowchart showing a reaction force correction processing procedure.
[Explanation of symbols]
1 Bridge girder (structure)
3 Rear carriage (sending mechanism)
4a
5 Sending
Claims (3)
上記後方台車及び各装置を駆動するそれぞれのポンプユニットの油圧により算出される反力が、設計反力を基準として定められる上限および下限値を有する管理値以内となるよう反力を自動管理することを特徴とする施工方法。 In the construction method of sending out the structure by using the rear carriage that repeatedly pushes and removes the rail alternately with a plurality of detachable members, the feeding device provided on the upper part of each pier, and the towing device ,
The reaction force is automatically managed so that the reaction force calculated by the hydraulic pressure of each of the rear carriage and each pump unit that drives each device is within a control value having an upper limit and a lower limit value determined based on the design reaction force. A construction method characterized by
各ポンプユニットの油圧により算出される反力が上記管理値以内の場合には、反力補正することなく、
また上記管理値以内でなくかつ上限および下限値を有する制御値以内の場合には、自動で反力補正し、
さらに上記制御値以内でない場合には、手動で反力補正するために各ポンプユニットを非常停止し、
各ポンプユニットの油圧により算出される反力が上記管理値以内となるように制御することを特徴とする施工方法。 Automatic management of reaction force of each pump unit that drives the rear carriage, the delivery device, and the towing device according to claim 1 .
If the reaction force calculated by the hydraulic pressure of each pump unit is within the above control value, without correcting the reaction force,
In addition, when it is not within the control value and within the control value having the upper limit and the lower limit value, the reaction force is automatically corrected,
If it is not within the control value, emergency stop each pump unit to manually correct the reaction force.
A construction method characterized by controlling the reaction force calculated by the hydraulic pressure of each pump unit to be within the control value .
上記けん引装置に用いるガイド部材を、上記中空シリンダジャッキと上記水平ジャッキとによって、交互にたぐることを特徴とする施工方法。 The towing device according to claim 1 or 2 comprises a hollow cylinder jack and a horizontal jack,
A construction method characterized in that guide members used in the traction device are alternately wound by the hollow cylinder jack and the horizontal jack.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002165927A JP3913615B2 (en) | 2002-06-06 | 2002-06-06 | Construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002165927A JP3913615B2 (en) | 2002-06-06 | 2002-06-06 | Construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005015998A JP2005015998A (en) | 2005-01-20 |
| JP3913615B2 true JP3913615B2 (en) | 2007-05-09 |
Family
ID=34179441
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002165927A Expired - Lifetime JP3913615B2 (en) | 2002-06-06 | 2002-06-06 | Construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3913615B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4861892B2 (en) * | 2007-05-15 | 2012-01-25 | 盟和工業株式会社 | Gap widening adjusting device and jack for widening adjustment used in the gage widening adjusting device |
| JP2010013881A (en) * | 2008-07-05 | 2010-01-21 | Otaki Jack Kk | Construction moving method using jack devices, and construction moving work system |
| CN114657893B (en) * | 2022-04-26 | 2024-06-25 | 中交一公局集团有限公司 | A single synchronous tensioning device for inclined cables based on spatial special shapes |
-
2002
- 2002-06-06 JP JP2002165927A patent/JP3913615B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2005015998A (en) | 2005-01-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6382437B1 (en) | Crane apparatus | |
| US8166596B2 (en) | Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same | |
| JP4962252B2 (en) | Bridge erection method and erection device | |
| CN114057115B (en) | Split type cable-mounted crane and construction method | |
| CN110761201B (en) | A kind of steel approach bridge jacking equipment and construction method using the same | |
| CN114232488B (en) | Method for erecting main girder of large-span cable-stayed bridge | |
| JP3913615B2 (en) | Construction method | |
| CN110184893A (en) | A kind of mounting device and arch rib construction method for Butterfly Arch Bridge arch rib | |
| JP2009185564A (en) | Sending-off method of bridge | |
| JP2005139831A (en) | Bridge erection method and bridge erection device | |
| JPH08209629A (en) | Overhanging type construction device for bridge | |
| JP2015068055A (en) | Girder block installation device and girder block installation method | |
| KR102907566B1 (en) | the in-hole type self-operating docking device of the ship | |
| CN117602519A (en) | A steel truss girder segment lifting device and lifting method for a steel truss girder cable-stayed bridge | |
| CN114703755B (en) | Continuous beam bridge cantilever end intercommunication temporary channel system and method | |
| CN114453821A (en) | Deviation-rectifying fastening device for butt welding of steel structure | |
| CN111910531B (en) | Bridge erecting method | |
| CN114517451A (en) | Swinging type hanging basket dismantling method | |
| CN114232487A (en) | Construction system for erecting main beam of large-span cable-stayed bridge | |
| CN222833514U (en) | Cable production cutting device | |
| CN114197329B (en) | Main girder erection method | |
| CN220433435U (en) | Pouring equipment for folding sections of asynchronous hanging basket | |
| CN120945805B (en) | Crane for bridge deck construction and construction method thereof | |
| JP7776075B2 (en) | Cutting device and method for assembling the same | |
| CN115928581B (en) | Steel web positioning and adjusting device and positioning method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20051215 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20051215 |
|
| RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20060509 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060704 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060831 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20060908 |
|
| RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20060922 |
|
| TRDD | Decision of grant or rejection written | ||
| RD03 | Notification of appointment of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7423 Effective date: 20061027 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20061027 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070123 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070131 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3913615 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100209 Year of fee payment: 3 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100209 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120209 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120209 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130209 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140209 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |