JP3913647B2 - Falling bridge and floating prevention structure in cable-stayed bridge - Google Patents
Falling bridge and floating prevention structure in cable-stayed bridge Download PDFInfo
- Publication number
- JP3913647B2 JP3913647B2 JP2002257203A JP2002257203A JP3913647B2 JP 3913647 B2 JP3913647 B2 JP 3913647B2 JP 2002257203 A JP2002257203 A JP 2002257203A JP 2002257203 A JP2002257203 A JP 2002257203A JP 3913647 B2 JP3913647 B2 JP 3913647B2
- Authority
- JP
- Japan
- Prior art keywords
- cable
- bridge
- falling
- girder
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本願発明は、斜張橋における落橋および浮き上がり防止構造、すなわち、斜張橋の端支点部において橋桁が橋台から落下することおよび浮き上がることを防止するための構造に関するものである。
【0002】
なお本願明細書において、「斜張橋」の概念には、通常の斜張橋のみならず、エクストラドーズド橋も含まれるものとする。
【0003】
【従来の技術】
斜張橋は吊り構造のため、大規模地震時には、その端支点部において橋桁に上揚力が発生しやすい。そして、この上揚力が大きい場合には、橋桁が橋台から浮き上がってしまうおそれがある。したがって、斜張橋の端支点部には浮き上がり防止構造を設けることが望ましい。
【0004】
ところで橋梁の端支点部には、落橋を防止するための落橋防止構造が設けられることが多い。例えば「特許文献1」には、端横桁と橋台の胸壁とを連結する連結部材を備えた落橋防止構造が記載されている。
【0005】
このような落橋防止構造が設けられている場合には、浮き上がり防止効果を多少は期待することができるが、その連結部材は橋軸方向に延びているので、斜張橋の端支点部に作用する大きな上揚力に抵抗させることは困難である。
【0006】
これに対し、浮き上がり防止構造として、連結部材を鉛直方向に延びるように配置して端横桁と橋台の竪壁部とを連結する構成を採用すれば、斜張橋の端支点部に作用する大きな上揚力に抵抗させることが可能となる。
【0007】
【特許文献1】
特開2001−64914号公報(第3頁、図1)
【発明が解決しようとする課題】
しかしながら、このようにした場合には、落橋防止構造とは別に浮き上がり防止構造を設ける必要があるので、その施工に手間が掛かってしまい、また鋼材重量も大きくなってしまう、という問題がある。
【0008】
特に、端横桁は、外ケーブルの定着等を行うために構造が煩雑となりやすいので、落橋防止構造および浮き上がり防止構造の設置スペースを確保することが容易でなく、その施工も面倒なものとなってしまう、という問題がある。
【0009】
本願発明は、このような事情に鑑みてなされたものであって、斜張橋の端支点部における落橋防止および浮き上がり防止を、鋼材重量を大きくすることなくかつ簡易な施工で実現することができる、斜張橋における落橋および浮き上がり防止構造を提供することを目的とするものである。
【0010】
【課題を解決するための手段】
本願発明は、所定の耐震ケーブルを用いるとともに、その挿通配置構造に工夫を施すことにより、上記目的達成を図るようにしたものである。
【0011】
すなわち、本願発明に係る斜張橋における落橋および浮き上がり防止構造は、
斜張橋の端支点部において橋桁が橋台から落下することおよび浮き上がることを防止するための構造であって、
上記橋桁の端横桁内に、中間部が略円弧状に湾曲したケーブル挿通孔が、該ケーブル挿通孔の両端部を上記端横桁の下面および橋軸方向外面に開口させるようにして形成されており、
このケーブル挿通孔に、所定の耐震ケーブルが挿通配置されており、
この耐震ケーブルの一端部が上記橋台の竪壁部に定着されるとともに、該耐震ケーブルの他端部が上記橋台の胸壁部に定着されている、ことを特徴とするものである。
【0012】
上記「ケーブル挿通孔」は、中間部が略円弧状に湾曲しており、かつ両端部が端横桁の下面および橋軸方向外面に開口したものであれば、その断面形状あるいは端横桁内における形成位置や形成個数等の具体的構成は特に限定されるものではない。
【0013】
上記「所定の耐震ケーブル」は、橋桁の落下および浮き上がりを防止するのに十分な引張強度を有するものであれば、その材質や断面形状等の具体的構成は特に限定されるものではない。
【0014】
【発明の作用効果】
上記構成に示すように、本願発明に係る斜張橋における落橋および浮き上がり防止構造は、橋桁の端横桁内に、中間部が略円弧状に湾曲したケーブル挿通孔が、その両端部を端横桁の下面および橋軸方向外面に開口させるようにして形成されており、そして、このケーブル挿通孔には耐震ケーブルが挿通配置されており、その一端部が橋台の竪壁部に定着されるとともにその他端部が橋台の胸壁部に定着されているので、次のような作用効果を得ることができる。
【0015】
すなわち、落橋の原因となる、橋桁を橋軸方向内方へ相対変位させる外力に対しては、耐震ケーブルの他端部が定着された胸壁部の反力によって抵抗させることができ、また、浮き上がりの原因となる、橋桁に作用する上揚力に対しては、耐震ケーブルの一端部が定着された竪壁部の反力によって抵抗させることができる。
【0016】
そして、このように端横桁内に耐震ケーブルを挿通配置するだけで、落橋防止機能と浮き上がり防止機能とを同時に得ることができるので、落橋防止構造と浮き上がり防止構造とを別々に設けるようにした場合に比して、施工の簡素化を図ることができ、また鋼材重量を低減することができる。
【0017】
このように本願発明によれば、斜張橋の端支点部における落橋防止および浮き上がり防止を、鋼材重量を大きくすることなくかつ簡易な施工で実現することができる。そしてこれにより施工コストを削減することができる。
【0018】
上記構成において、耐震ケーブルを、竪壁部に一端部が定着されるとともに端横桁の橋軸方向外面に他端部が定着された第1ケーブルと、この第1ケーブルの他端部に一端部が接続固定されるとともに胸壁部の橋軸方向外面に他端部が定着された第2ケーブルとからなる構成とすれば、第1ケーブルの施工を完了させた後に第2ケーブルの施工を行うことができるので、耐震ケーブルの取り扱いが容易となり、これにより施工性を一層向上させることができる。
【0019】
上記構成において、ケーブル挿通孔の具体的構成が特に限定されないことは上述したとおりであるが、ケーブル挿通孔における端横桁の下面近傍部位を、該端横桁の下面へ向けて橋軸方向両側に広がるように形成すれば、橋桁が橋軸方向にある程度相対変位した場合においても、耐震ケーブルが端横桁と竪壁部との剪断作用あるいは該耐震ケーブルと端横桁との干渉作用によって損傷してしまうおそれをなくすことができる。
【0020】
また上記構成において、ケーブル挿通孔の中間部を、端横桁内に埋設された金属管で構成すれば、耐震ケーブルからケーブル挿通孔の壁面に作用する荷重の大半を金属管によって受けることできるので、耐震ケーブルに対する挿通支持強度を高めることができる。しかも、このように構成することにより、予めケーブル挿通孔内に耐震ケーブルを挿通配置した状態で、端横桁のコンクリート打設を行うことができ、これにより施工性をさらに向上させることができる。
【0021】
この場合において、金属管を、橋軸直交方向に2分割された半割り管が互いに接合されてなる構成とすれば、耐震ケーブルの両端部がその間の一般部よりも大径で形成されている場合においても、その一般部を半割り管で両側から挟んだ状態で接合することにより、耐震ケーブルを容易に金属管内に挿通させることができる。
【0022】
また、金属管における下端開口部の内周面に、弾性リングが装着された構成とすれば、橋桁が橋軸方向にある程度相対変位した場合においても、耐震ケーブルが金属管の下端開口部と当接して損傷しやすくなってしまうのを未然に防止することができる。
【0023】
【発明の実施の形態】
以下、図面を用いて、本願発明の実施の形態について説明する。
【0024】
図1は、本願発明の一実施形態に係る斜張橋における落橋および浮き上がり防止構造を示す、橋軸直交断面図であり、図2は、図1のII-II 線断面詳細図である。なお、図1は、図2のI-I 線の位置における断面図である。
【0025】
これらの図に示すように、実施形態に係る落橋および浮き上がり防止構造は、斜張橋10の端支点部において橋桁14が橋台16から落下することおよび浮き上がることを防止するための構造である。
【0026】
図1に示すように、橋桁14は、その端支点部に位置する端横桁18において、1対の免震支承12を介して橋台16に支持されている。これら各免震支承12は、端横桁18の下面18aと橋台16の竪壁部16の上面16aとに挟まれるようにして配置されている。
【0027】
両免震支承12の間には、橋桁14が橋台16に対して橋軸直交方向に変位するのを防止するための構造が設けられている。すなわち、端横桁18の下面18aにおける橋軸直交方向中央部には、下方へ突出する位置ずれ防止用突起部18bが形成されている。また、橋台16の竪壁部16Aの上面16aには、1対の位置ずれ防止用突起部16bが、位置ずれ防止用突起部18bを橋軸直交方向両側から挟むようにして形成されている。なお、端横桁18の橋軸直交方向中央部における防止用突起部18bの上方部位には、マンホール18cが形成されている。
【0028】
本実施形態に係る落橋および浮き上がり防止構造は、端横桁18の4箇所に形成されたケーブル挿通孔20の各々に耐震ケーブル22が挿通配置されてなっている。これら4つのケーブル挿通孔20は、1対の位置ずれ防止用突起部16bの各々の位置に2つずつ設けられている。
【0029】
図2に示すように、各ケーブル挿通孔20は、その中間部が略円弧状に湾曲するように形成されており、その両端部が端横桁18の下面18aおよび橋軸方向外面18dに開口するように形成されている。
【0030】
これら各ケーブル挿通孔20に挿通配置された耐震ケーブル22は、その一端部22aが橋台16の竪壁部16Aに定着されるとともに、その他端部22bが橋台の胸壁部16Bに定着されている。その際、これら各耐震ケーブル22は、第1ケーブル22Aと第2ケーブル22Bとが直列配置で互いに接続固定されてなっている。図3は、第1ケーブル22Aの施工が完了し、第2ケーブル22Bの施工がまだ行われていない状態を示す図である。
【0031】
図3にも示すように、第1ケーブル22Aは、その一端部22Aaが竪壁部16Aに定着されるとともに、その他端部22Abが端横桁18の橋軸方向外面18dに定着された構成となっている。一方、第2ケーブル22Bは、その一端部22Baが第1ケーブル22Aの他端部22Abに接続固定されるとともに、その他端部22Bbが胸壁部16Bの橋軸方向外面16cに定着されている。
【0032】
ケーブル挿通孔20の中間部は、端横桁18内に埋設された金属管24で構成されている。
【0033】
この金属管24は、4分の1円弧状に湾曲するように形成された鋼製部材であって、橋軸直交方向に2分割された半割り管24A、24Bが複数のボルト26により互いに接合されてなっている。そして、この金属管24における下端開口部24aの内周面には、クロロプレンスポンジ製の弾性リング28が装着されている。
【0034】
金属管24の下端開口部24aの下方には、該下端開口部24aに連結されるようにして端横桁18の下面18aまで延びる鋼製の箱抜き部材30が設けられている。この箱抜き部材30は、矩形の水平断面を有するとともに台形の側断面を有している。そしてこれにより、ケーブル挿通孔20における端横桁18の下面近傍部位は、該端横桁18の下面18aへ向けて橋軸方向両側に広がるように形成されている。
【0035】
一方、金属管24の上端開口部の橋軸方向外方には、該上端開口部に連結されるようにして端横桁18の橋軸方向外面18dまで延びる鋼管付アンカープレート32が設けられている。
【0036】
そして、これら金属管24、箱抜き部材30および鋼管付アンカープレート32を直列に配置した状態で端横桁18のコンクリート打設を行うことにより、ケーブル挿通孔20が形成されるようになっている。その際、金属管24の周囲には補強スパイラル鉄筋34が埋設されるとともに、鋼管付アンカープレート32の周囲には補強鉄筋36が埋設されるようになっている。また、このコンクリート打設は、ケーブル挿通孔20に予め第1ケーブル22Aを挿通配置した状態で行われるようになっている。
【0037】
第1ケーブル22Aは、比較的長尺に形成されており、その各端部22Aa、22Abはネジ山付きの鋼製マンションで構成されている。一方、第2ケーブル22Bは、比較的短尺に形成されており、その各端部22Ba、22Bbもネジ山付きの鋼製マンションで構成されている。
【0038】
竪壁部16Aにおける金属管24の下端開口部24aの下方位置には、竪壁部16A(の位置ずれ防止用突起部16b)の上面16aに開口するトランペットシース38と、このトランペットシース38に連結されるように配置された鋼管付アンカープレート40と、この鋼管付アンカープレート40の下端部に固定されたナット42と、このナット42を覆うようにして鋼管付アンカープレート40に固定された鋼製キャップ44とが、鉛直方向に延びるように配置された状態で埋設されており、さらに鋼管付アンカープレート40の周囲には補強鉄筋46が埋設されている。
【0039】
そして、第1ケーブル22Aの一端部22Aaにおける竪壁部16Aへの定着は、第1ケーブル22Aの一端部22Aaを、トランペットシース38を介して鋼管付アンカープレート40に挿入し、ナット42にネジ締め固定することにより行われるようになっている。
【0040】
一方、第1ケーブル22Aの他端部22Abにおける端横桁18の橋軸方向外面18dへの定着は、この橋軸方向外面18dから突出する第1ケーブル22Aの他端部22Abにナット48を取り付けて、このナット48を鋼管付アンカープレート32にネジ締め固定することにより行われるようになっている。
【0041】
胸壁部16Bにおける鋼管付アンカープレート32の橋軸方向外方位置には、胸壁部16Bの橋軸方向内面に開口するトランペットシース52と、このトランペットシース52に連結されるように配置されたガイドパイプ54とが、橋軸方向に延びるように配置された状態で埋設されており、さらにガイドパイプ54の周囲には補強鉄筋56が埋設されている。
【0042】
そして、第2ケーブル22Bの一端部22Baにおける第1ケーブル22Aの他端部22Abへの接続固定は、内周面にネジ山が形成された接続具58を、第1ケーブル22Aの他端部22Abと第2ケーブル22Bの一端部22Baとにネジ締めすることにより行われるようになっている。なお、端横桁18と胸壁部16Bとの間には、耐震ケーブル22を覆う伸縮シース50が設けられている。
【0043】
一方、第2ケーブル22Bの他端部22Bbにおける胸壁部16Bへの定着は、第2ケーブル22Bの他端部22Bbを、トランペットシース52を介してガイドパイプ54に挿入して胸壁部16Bの橋軸方向外面16cから突出させ、この他端部22Bbに、スプリング60を介してナット62を取り付けて、このナット62を橋軸方向外面16cにネジ締め固定することにより行われるようになっている。その際、スプリング60と胸壁部16Bとの間には、緩衝パッキンおよび支圧板からなる緩衝具64が介装され、またスプリング60とナット62との間には止めプレート66が介装されるようになっている。そして、胸壁部16Bの橋軸方向外面16cには、第2ケーブル22Bの他端部22Bbを覆う鋼製キャップ68が取り付けられている。
【0044】
図4は、橋桁14が橋台16に対して橋軸方向内方へ変位した状態を示す図である。
【0045】
図示のように、橋桁14が橋軸方向内方へ相対変位すると、耐震ケーブル22の第2ケーブル22Bには、上記相対変位に伴う引張荷重が作用するが、この引張荷重はスプリング60の弾性圧縮変形により吸収される。
【0046】
一方、耐震ケーブル22の第1ケーブル22Aは、橋桁14が橋軸方向内方へ相対変位すると、金属管24における下端開口部24aと鋼管付アンカープレート40との間の部分が、鉛直方向に対して傾斜した状態になるので、該第1ケーブル22Aにも引張荷重が作用する。その際、第1ケーブル22Aの他端部22Abに取り付けられたナット48が端横桁18の橋軸方向外面18dに当接しているので、第1ケーブル22Aに作用する引張荷重はスプリング60の弾性圧縮変形によって吸収されることはないが、このとき第1ケーブル22Aに作用する引張荷重は比較的小さいので別段支障が生じることはない。
【0047】
橋桁14が橋台16に対して橋軸方向内方へさらに変位してスプリング60の弾性圧縮変形量が限界に達すると、耐震ケーブル22の全長にわたって大きな引張荷重が作用する。その際、胸壁部16Bの反力によって橋桁14のそれ以上の変位が規制され、これにより橋桁14の橋台16からの落下が未然に防止される。
【0048】
上述したように、橋桁14の橋軸方向内方への相対変位により、第1ケーブル22Aは、金属管24における下端開口部24aと鋼管付アンカープレート40との間の部分が鉛直方向に対して傾斜した状態になるが、ケーブル挿通孔20における端横桁18の下面近傍部位は、箱抜き部材30によって端横桁18の下面18aへ向けて橋軸方向両側に広がるように形成されているので、第1ケーブル22Aが箱抜き部材30と干渉して損傷してしまうおそれはなく、また、第1ケーブル22Aが端横桁18と竪壁部16Aとの剪断作用によって損傷してしまうおそれもない。しかも、金属管24における下端開口部24aの内周面には弾性リング28が装着されているので、第1ケーブル22Aが金属管24の下端開口部24aと当接して損傷してしまうおそれもない。
【0049】
また、このように第1ケーブル22Aが鉛直方向に対して傾斜しても、竪壁部16Aに設けられたトランペットシース38により、第1ケーブル22Aと竪壁部16Aとの当接は所定長にわたって行われるので、第1ケーブル22Aが竪壁部16Aとの干渉により損傷してしまうおそれもない。
【0050】
一方、橋桁14に上揚力が作用したときには、第1ケーブル22Aに大きな引張荷重が作用し、その一端部22Aaが定着された竪壁部16Aの反力によって橋桁14の浮き上がりが規制される。このとき、橋桁14が上方へ多少変位しても、胸壁部16Bに設けられたトランペットシース52により、第2ケーブル22Bと胸壁部16Bとの間にはクリアランスが確保されるので、第2ケーブル22Bが胸壁部16Bとの干渉により損傷してしまうおそれはない。
【0051】
以上詳述したように、本実施形態においては、橋桁14の端横桁18内に、中間部が略円弧状に湾曲したケーブル挿通孔20が、その両端部を端横桁18の下面18aおよび橋軸方向外面18dに開口させるようにして形成されており、そして、このケーブル挿通孔20には耐震ケーブル22が挿通配置されており、その一端部22aが橋台16の竪壁部16Aに定着されるとともにその他端部22bが橋台16の胸壁部16Bに定着されているので、次のような作用効果を得ることができる。
【0052】
すなわち、落橋の原因となる、橋桁14を橋軸方向内方へ相対変位させる外力に対しては、耐震ケーブル22の他端部22bが定着された胸壁部16Bの反力によって抵抗させることができ、また、浮き上がりの原因となる、橋桁14に作用する上揚力に対しては、耐震ケーブル22の一端部22aが定着された竪壁部16Aの反力によって抵抗させることができる。
【0053】
そして、このように端横桁18内に耐震ケーブル22を挿通配置するだけで、落橋防止機能と浮き上がり防止機能とを同時に得ることができるので、落橋防止構造と浮き上がり防止構造とを別々に設けるようにした場合に比して、施工の簡素化を図ることができ、また鋼材重量を低減することができる。そしてこれにより施工コストを削減することができる。
【0054】
特に本実施形態においては、耐震ケーブル22が、竪壁部16Aに一端部22Aaが定着されるとともに端横桁18の橋軸方向外面18dに他端部22Abが定着された第1ケーブル22Aと、この第1ケーブル22Aの他端部22Abに一端部22Bが接続固定されるとともに胸壁部16Bの橋軸方向外面16Baに他端部22Bbが定着された第2ケーブル22Bとからなっているので、第1ケーブル22Aの施工を完了させた後に第2ケーブル22Bの施工を行うことができる。したがって耐震ケーブル22の取り扱いが容易となり、これにより施工性を一層向上させることができる。
【0055】
本実施形態においては、ケーブル挿通孔20における端横桁18の下面近傍部位が、箱抜き部材30によって端横桁18の下面18aへ向けて橋軸方向両側に広がるように形成されているので、橋桁14が橋軸方向にある程度相対変位した場合においても、耐震ケーブル22が端横桁18と竪壁部16Aとの剪断作用あるいは該耐震ケーブル22と端横桁18との干渉作用によって損傷してしまうおそれをなくすことができる。
【0056】
また本実施形態においては、ケーブル挿通孔20の中間部が、端横桁18内に埋設された金属管24で構成されているので、耐震ケーブル22からケーブル挿通孔20の壁面に作用する荷重の大半を金属管24によって受けることでき、これにより耐震ケーブル22に対する挿通支持強度を高めることができる。しかも、このように構成することにより、予めケーブル挿通孔20内に耐震ケーブル22を挿通配置した状態で、端横桁18のコンクリート打設を行うことができ、これにより施工性をさらに向上させることができる。
【0057】
この金属管24は、橋軸直交方向に2分割された半割り管24A、24Bが互いに接合されてなっているので、第1ケーブル22Aの両端部22Aa、22Abがその間の一般部よりも大径で形成されているにもかかわらず、その一般部を半割り管24A、24Bで両側から挟んだ状態で接合することにより、第1ケーブル22Aを金属管24内に挿通させることができる。
【0058】
また、金属管24における下端開口部24aの内周面には、弾性リング28が装着されているので、橋桁14が橋軸方向にある程度相対変位した場合においても、耐震ケーブル22が金属管24の下端開口部24aと当接して損傷しやすくなってしまうのを未然に防止することができる。
【0059】
なお本実施形態においては、耐震ケーブル22が、施工性をより高める観点から、第1ケーブル22Aと第2ケーブル22Bとが接続固定された構成となっているが、これを1本のケーブルで構成するようにしてもよいことはもちろんである。
【図面の簡単な説明】
【図1】本願発明の一実施形態に係る斜張橋における落橋および浮き上がり防止構造を示す、橋軸直交断面図
【図2】図1のII-II 線断面詳細図
【図3】上記落橋および浮き上がり防止構造を、第1ケーブルの施工が完了し、第2ケーブルの施工がまだ行われていない状態で示す、図2と同様の図
【図4】上記落橋および浮き上がり防止構造を、橋桁が橋軸方向内方へ相対変位した状態で示す、図2と同様の図
【符号の説明】
10 斜張橋
12 免震支承
14 橋桁
16 橋台
16A 竪壁部
16B 胸壁部
16a 上面
16b 位置ずれ防止用突起部
16c 橋軸方向外面
18 端横桁
18a 下面
18b 位置ずれ防止用突起部
18c マンホール
18d 橋軸方向外面
20 ケーブル挿通孔
22 耐震ケーブル
22A 第1ケーブル
22B 第2ケーブル
22a、22Aa、22Aa 一端部
22b、22Ab、22Bb 他端部
24 金属管
24A、24B 半割り管
24a 下端開口部
26 ボルト
28 弾性リング
30 箱抜き部材
32、40 鋼管付アンカープレート
34 補強スパイラル鉄筋
36、46、56 補強鉄筋
38、52 トランペットシース
42、48、62 ナット
44、68 鋼製キャップ
50 伸縮シース
54 ガイドパイプ
58 接続具
60 スプリング
64 緩衝具
66 止めプレート[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a falling bridge and a floating prevention structure in a cable-stayed bridge, that is, a structure for preventing the bridge girder from falling off the abutment and floating at the end fulcrum portion of the cable-stayed bridge.
[0002]
In the present specification, the concept of “cable stayed bridge” includes not only ordinary cable stayed bridges but also extradosed bridges.
[0003]
[Prior art]
The cable-stayed bridge is a suspended structure, so when a large-scale earthquake occurs, it is easy for lift force to occur at the bridge girder at the end fulcrum. When the lifting force is large, the bridge girder may be lifted from the abutment. Therefore, it is desirable to provide a floating prevention structure at the end fulcrum portion of the cable-stayed bridge.
[0004]
By the way, the end fulcrum portion of the bridge is often provided with a fall prevention structure for preventing a fall bridge. For example, “Patent Document 1” describes a falling bridge prevention structure including a connecting member that connects an end cross beam and a chest wall of an abutment.
[0005]
When such a fall-bridge prevention structure is provided, it is possible to expect a little lift-up prevention effect, but the connecting member extends in the bridge axis direction, so that it acts on the end fulcrum of the cable-stayed bridge. It is difficult to resist the large uplift force.
[0006]
On the other hand, if the structure that connects the end cross girder and the abutment wall is adopted as a structure to prevent the lift from extending in the vertical direction, it acts on the end fulcrum of the cable-stayed bridge. It is possible to resist a large lifting force.
[0007]
[Patent Document 1]
JP 2001-64914 A (page 3, FIG. 1)
[Problems to be solved by the invention]
However, in this case, there is a problem that it is necessary to provide a lifting prevention structure separately from the falling bridge prevention structure, which requires troublesome construction and increases the weight of the steel material.
[0008]
In particular, the structure of the end cross girders is likely to be complicated due to the fixing of the outer cable, etc., so it is not easy to secure the installation space for the falling bridge prevention structure and the lifting prevention structure, and the construction thereof becomes troublesome. There is a problem that.
[0009]
The present invention has been made in view of such circumstances, and can prevent the falling bridge and the floating prevention at the end fulcrum of the cable-stayed bridge without increasing the weight of the steel material and by simple construction. An object of the present invention is to provide a structure for preventing falling and lifting of cable-stayed bridges.
[0010]
[Means for Solving the Problems]
In the present invention, a predetermined seismic cable is used and the insertion and arrangement structure is devised to achieve the above object.
[0011]
That is, the falling bridge and the floating prevention structure in the cable stayed bridge according to the present invention are:
A structure for preventing the bridge girder from falling off the abutment and floating at the end fulcrum of the cable stayed bridge,
A cable insertion hole whose middle part is curved in a substantially arc shape is formed in the end cross girder of the bridge girder so that both ends of the cable insertion hole are opened to the lower surface of the end cross girder and the outer surface in the bridge axial direction. And
A predetermined seismic cable is inserted into this cable insertion hole,
One end of the seismic cable is fixed to the abutment wall of the abutment, and the other end of the seismic cable is fixed to the chest wall of the abutment.
[0012]
The above-mentioned “cable insertion hole” has a cross-sectional shape or an inside of the end cross beam as long as the middle portion is curved in a substantially arc shape and both ends are open to the lower surface of the end cross beam and the outer surface in the bridge axis direction. There are no particular restrictions on the specific configuration such as the formation position and the number of formations.
[0013]
As long as the “predetermined earthquake resistant cable” has sufficient tensile strength to prevent the bridge girder from dropping and lifting, the specific configuration such as the material and the cross-sectional shape thereof is not particularly limited.
[0014]
[Effects of the invention]
As shown in the above configuration, in the cable-stayed bridge according to the present invention, the falling bridge and the floating prevention structure include a cable insertion hole whose middle portion is curved in a substantially arc shape in the end girder of the bridge girder. It is formed so as to open to the lower surface of the girder and the outer surface in the bridge axial direction, and an earthquake-resistant cable is inserted into this cable insertion hole, and one end of the cable is fixed to the wall of the abutment Since the other end is fixed to the chest wall of the abutment, the following effects can be obtained.
[0015]
That is, the external force that causes the bridge girder to be displaced relatively inward in the axial direction of the bridge can be resisted by the reaction force of the chest wall to which the other end of the seismic cable is anchored. It is possible to resist the lifting force acting on the bridge girder that is caused by the reaction force of the anchor wall portion to which one end of the earthquake-resistant cable is fixed.
[0016]
And, just by inserting and arranging the earthquake-resistant cable in the end cross girder in this way, it is possible to obtain the fall prevention function and the rise prevention function at the same time, so the fall prevention structure and the rise prevention structure are provided separately. As compared with the case, the construction can be simplified and the weight of the steel material can be reduced.
[0017]
As described above, according to the present invention, it is possible to prevent the falling bridge and the floating prevention at the end fulcrum portion of the cable-stayed bridge without increasing the weight of the steel material and by simple construction. And thereby, construction cost can be reduced.
[0018]
In the above-described configuration, the seismic cable includes a first cable having one end fixed to the anchor wall and the other end fixed to the outer surface of the end cross beam in the bridge axis direction, and one end to the other end of the first cable. If the second cable having the other end fixed to the outer surface in the bridge axis direction of the chest wall portion is connected and fixed, the second cable is installed after the first cable is completed. Therefore, the handling of the earthquake-resistant cable becomes easy, and thereby the workability can be further improved.
[0019]
In the above configuration, the specific configuration of the cable insertion hole is not particularly limited, as described above, but the portion near the lower surface of the end cross beam in the cable insertion hole faces both sides in the bridge axis direction toward the lower surface of the end cross beam. If the bridge girder is formed so as to spread out, even if the bridge girder is relatively displaced in the direction of the bridge axis, the seismic cable is damaged by the shearing action between the end cross girder and the anchor wall or by the interference action between the seismic cable and the end cross girder The risk of doing so can be eliminated.
[0020]
Also, in the above configuration, if the middle part of the cable insertion hole is made of a metal tube embedded in the end cross beam, most of the load acting on the wall surface of the cable insertion hole can be received from the earthquake resistant cable by the metal tube. In addition, the insertion support strength for the earthquake resistant cable can be increased. In addition, by configuring in this way, it is possible to perform the concrete placement of the end cross girders in a state in which the earthquake-proof cable is inserted and disposed in the cable insertion hole in advance, and thereby the workability can be further improved.
[0021]
In this case, if the metal pipe has a structure in which the half pipes divided into two in the direction perpendicular to the bridge axis are joined to each other, both ends of the earthquake-resistant cable are formed with a larger diameter than the general part therebetween. Even in such a case, the seismic cable can be easily inserted into the metal pipe by joining the general part with the half pipe sandwiched from both sides.
[0022]
In addition, if the elastic ring is attached to the inner peripheral surface of the lower end opening of the metal pipe, the seismic cable contacts the lower end opening of the metal pipe even when the bridge girder is displaced to some extent in the direction of the bridge axis. It is possible to prevent the contact and easy damage.
[0023]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0024]
FIG. 1 is a cross-sectional view orthogonal to a bridge axis showing a falling bridge and a floating prevention structure in a cable-stayed bridge according to an embodiment of the present invention, and FIG. 2 is a detailed cross-sectional view taken along the line II-II in FIG. 1 is a cross-sectional view taken along the line II in FIG.
[0025]
As shown in these drawings, the falling bridge and the floating prevention structure according to the embodiment is a structure for preventing the
[0026]
As shown in FIG. 1, the
[0027]
A structure for preventing the
[0028]
In the falling bridge and the floating prevention structure according to the present embodiment, the earthquake-
[0029]
As shown in FIG. 2, each
[0030]
One
[0031]
As shown in FIG. 3, the
[0032]
An intermediate portion of the
[0033]
The
[0034]
Below the
[0035]
On the other hand, an
[0036]
And the
[0037]
The
[0038]
A
[0039]
The fixing of the
[0040]
On the other hand, fixing the
[0041]
A
[0042]
Then, the connection and fixing of the
[0043]
On the other hand, fixing to the
[0044]
FIG. 4 is a diagram illustrating a state in which the
[0045]
As shown in the figure, when the
[0046]
On the other hand, in the
[0047]
When the
[0048]
As described above, due to the relative displacement of the
[0049]
Even if the
[0050]
On the other hand, when a lifting force is applied to the
[0051]
As described in detail above, in the present embodiment, the
[0052]
In other words, the external force that causes the
[0053]
And, since the anti-falling bridge function and the anti-lifting function can be obtained at the same time simply by inserting the
[0054]
In particular, in this embodiment, the
[0055]
In the present embodiment, the portion near the lower surface of the
[0056]
Moreover, in this embodiment, since the intermediate part of the
[0057]
Since the
[0058]
Since the
[0059]
In the present embodiment, the
[Brief description of the drawings]
FIG. 1 is a cross-sectional view orthogonal to a bridge axis showing a falling bridge and a floating prevention structure in a cable-stayed bridge according to an embodiment of the present invention. FIG. 2 is a detailed sectional view taken along line II-II in FIG. Fig. 4 is a view similar to Fig. 2 showing the lifting prevention structure when the construction of the first cable has been completed and the construction of the second cable has not yet been performed. The same figure as Fig. 2 showing the relative displacement inward in the axial direction.
DESCRIPTION OF
Claims (6)
上記橋桁の端横桁内に、中間部が略円弧状に湾曲したケーブル挿通孔が、該ケーブル挿通孔の両端部を上記端横桁の下面および橋軸方向外面に開口させるようにして形成されており、
このケーブル挿通孔に、所定の耐震ケーブルが挿通配置されており、
この耐震ケーブルの一端部が上記橋台の竪壁部に定着されるとともに、該耐震ケーブルの他端部が上記橋台の胸壁部に定着されている、ことを特徴とする斜張橋における落橋および浮き上がり防止構造。A structure for preventing the bridge girder from falling off the abutment and floating at the end fulcrum of the cable stayed bridge,
A cable insertion hole whose middle part is curved in a substantially arc shape is formed in the end cross girder of the bridge girder so that both ends of the cable insertion hole are opened to the lower surface of the end cross girder and the outer surface in the bridge axial direction. And
A predetermined seismic cable is inserted into this cable insertion hole,
One end of the seismic cable is anchored to the abutment wall of the abutment, and the other end of the seismic cable is anchored to the chest wall of the abutment. Prevention structure.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002257203A JP3913647B2 (en) | 2002-09-02 | 2002-09-02 | Falling bridge and floating prevention structure in cable-stayed bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002257203A JP3913647B2 (en) | 2002-09-02 | 2002-09-02 | Falling bridge and floating prevention structure in cable-stayed bridge |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004092269A JP2004092269A (en) | 2004-03-25 |
| JP3913647B2 true JP3913647B2 (en) | 2007-05-09 |
Family
ID=32062157
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002257203A Expired - Lifetime JP3913647B2 (en) | 2002-09-02 | 2002-09-02 | Falling bridge and floating prevention structure in cable-stayed bridge |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3913647B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5415204B2 (en) * | 2009-09-29 | 2014-02-12 | 神鋼鋼線工業株式会社 | Bridge movement restraining device and movement restraining method |
| JP6586037B2 (en) * | 2016-03-17 | 2019-10-02 | 株式会社ピーエス三菱 | Primary cable mantle in suspended floor bridge |
| CN106193052B (en) * | 2016-09-06 | 2018-02-06 | 中铁二十四局集团南昌铁路工程有限公司 | The anti-fracture landing safeties of Brace in Deep Footing Groove beam |
| JP7141588B2 (en) * | 2018-09-20 | 2022-09-26 | 株式会社川金コアテック | Bridge fall prevention device |
| CN111560841B (en) * | 2020-06-08 | 2021-07-27 | 中国地震局工程力学研究所 | An embedded buffer energy-consuming bridge beam fall prevention device |
| CN111945548A (en) * | 2020-08-19 | 2020-11-17 | 温州砼程维禹科技有限公司 | Single-column pier bridge anti-overturning beam falling device |
-
2002
- 2002-09-02 JP JP2002257203A patent/JP3913647B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004092269A (en) | 2004-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101160390B1 (en) | Ductility Increasing Shear wall system | |
| US10934734B1 (en) | Damped reinforced joint for beam-column connection | |
| JP5415204B2 (en) | Bridge movement restraining device and movement restraining method | |
| JP3913647B2 (en) | Falling bridge and floating prevention structure in cable-stayed bridge | |
| JP2004285737A (en) | Construction method of steel tower foundation using concrete constrained joint members | |
| JP2009228296A (en) | Seismic strengthening method for bridge | |
| JP5210337B2 (en) | Buildings using vertical seismic control PC structural members with seismic prestress | |
| JP2007239306A (en) | Attaching the seismic isolation damper | |
| JP3455644B2 (en) | Pile foundation structure | |
| JP2014020071A (en) | Seismic strengthening method for reinforced-concrete anchor part of steel bridge pier | |
| US5660007A (en) | Stiffness decoupler for base isolation of structures | |
| JP2001311314A (en) | Existing building seismic isolation method | |
| JP3882633B2 (en) | Steel pipe damper and rocking foundation structure using the same | |
| KR102192782B1 (en) | Seismic isolation rubber pad for micro-pile and construction method of micro-pile using the same | |
| JP6122740B2 (en) | Seismic reinforcement structure | |
| KR101341847B1 (en) | Seismic reinforce device structure for bridge and construction method | |
| JP3899625B2 (en) | Anchor isolation structure and its isolation method | |
| JP6359370B2 (en) | Seismic reinforcement device for bridges | |
| KR101781544B1 (en) | Rahmem bridge of seismic performanceusing prestressed using crossbeam | |
| KR101059465B1 (en) | Cast-in-placement pile with protective connection structure of coated steel pipe and composite structure of steel pipe | |
| JP2010047933A (en) | Damping reinforcement frame | |
| KR101955477B1 (en) | Shear reinforcement bridge supporting apparatus and construction method thereof | |
| JP2005082995A (en) | Pile head joint structure | |
| CN110318568B (en) | Self-resetting assembly type truss structure | |
| KR102556423B1 (en) | Lead-inserted seismic isolation bearing with improved negative reaction force |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050325 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061206 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070130 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070131 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3913647 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100209 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130209 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160209 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |