Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3922416B2 - Assembly method of large parts for power plant and its assembly jig - Google Patents
[go: Go Back, main page]

JP3922416B2 - Assembly method of large parts for power plant and its assembly jig - Google Patents

Assembly method of large parts for power plant and its assembly jig Download PDF

Info

Publication number
JP3922416B2
JP3922416B2 JP14160699A JP14160699A JP3922416B2 JP 3922416 B2 JP3922416 B2 JP 3922416B2 JP 14160699 A JP14160699 A JP 14160699A JP 14160699 A JP14160699 A JP 14160699A JP 3922416 B2 JP3922416 B2 JP 3922416B2
Authority
JP
Japan
Prior art keywords
attached
suspended
power plant
pipe
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14160699A
Other languages
Japanese (ja)
Other versions
JP2000329306A (en
Inventor
諭司 高橋
真一郎 竹下
望 二村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Plant Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Plant Technologies Ltd filed Critical Hitachi Plant Technologies Ltd
Priority to JP14160699A priority Critical patent/JP3922416B2/en
Publication of JP2000329306A publication Critical patent/JP2000329306A/en
Application granted granted Critical
Publication of JP3922416B2 publication Critical patent/JP3922416B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は発電所用大形部品の組付施工法およびその組付治具に係り、特に、発電所の蒸気発生装置に用いる大形部品を搬入して、所定の位置に組付けるための施工法およびその組付治具に関する。
【0002】
【従来の技術】
一般に、火力発電所の蒸気発生装置は、図示しないバーナ、火炉、加熱器、および、再熱器等からなっており、大きな建屋内の収納されている。このうち、大きな蒸気発生装置では、火炉中心部に側壁と平行した水冷壁管(分割壁ともいう)を配置したり、火炉上部の放射形加熱器入口部に側壁と平行した多数の板状の水冷壁部を配置して伝熱面積を増加したものがある。この水冷壁管あるいは水冷壁部は、大形部品で構成され、その形状は、平面板状以外に、側面視で、中空の三角形状、台形形状、あるいはD形形状等が用いられている。
【0003】
図10は、大形部品を用いた一例を示す部分構成図であり、図11はその大形部品の組付施工状態を示す図である。また、図12はその施工治具の側面図、および、図13は平面図であり図12のY矢視図である。
【0004】
図10において、天井鉄骨101には、U字形状の第1ペンダントコイル103および第2ペンダントコイル105が所定間隔離間して吊り下げられている。第1ペンダントコイル103および第2ペンダントコイル105は紙面の上下方向に並列した状態で所定間隔離間して多数個が配列されている。第1ペンダントコイル103および第2ペンダントコイル105の上方側には、両者と交差した天井壁管107が地上(FL)と平行で、紙面の上下方向に連続した状態で配列されている。第1ペンダントコイル103と第2ペンダントコイル105との間には、上部スクリーン管109が天井壁管107を貫通して配設されている。上部スクリーン管109は、紙面の上下方向に所定間隔離間して並列した状態で多数本が配列されている。
【0005】
また、第1ペンダントコイル103の下方の近傍には、大形部品の水冷壁管であるノーズパネル111が複数個に分割して配列されている。ノーズパネル111は、側面視で、上方部が中空のほぼ台形形状で形成されている。ノーズパネル111の中央部は、V字形状の第1水冷壁113と、底辺の下部スクリーン管115で構成されている。また、ノーズパネル111の一端部には、ほぼ平板形状の第2水冷壁117が底辺に沿って延長して設けられている。また、ノーズパネル111の他端部で中央部の上側には、下部スクリーン管115が一定の長さで突出している。ノーズパネル111には、中央部の端部に第1吊り金具119(図12および図13に示す)が、また、第2水冷壁117の端部の近傍に第2吊り金具121(図11に示す)が固設されている。下部スクリーン管115は、上部スクリーン管109と同位置に、紙面の上下方向に所定間隔離間して並列した状態で多数本が配列されている。下部スクリーン管115は、上部スクリーン管109に対して後述する組付施工法および組付治具により位置合わせされた後に溶接され、上部スクリーン管109によって接合されている。これにより、下部スクリーン管115に固設されているノーズパネル111は、下部スクリーン管115を介して上部スクリーン管109によって保持されている。
【0006】
分割されたノーズパネル111は、搬入台車123(図7および図11に示す)に搭載されて第1ペンダントコイル103の下方に搬入される。この状態において、第1吊り金具119には、詳細は後述する図12に示す吊治具125が付設されている。吊治具125には、I形鋼よりなる天秤127が回転板145により揺動自在に連結されている。天秤127には、ピン129を介して図示しない大型クレーンの大型フック131に吊揚げられる第1ワイヤ133が取着されている。大型フック131は、図10に示すに示すように、天井壁管107にノーズパネル111を吊揚げるために、臨時に設けられた孔(Hを通して、天井壁管107の上方に配置された図示しない大型クレーンに接続されている。この孔(H)は、ノーズパネル111が分割されているだけの個数だけあけられ、ノーズパネル111が所定の位置に取着されたときに塞がれている。また、天秤127には、後述する図12に示す吊治具125に連結する3本のロッド135が固設されている。第2吊り金具121のシャックル121aには、図示しないクローラクレーンあるいはトラッククレーン等の小型クレーンの小型フック137に吊揚げられる第2ワイヤ139が取着されている。
【0007】
図12において、吊治具125は、2枚のプレート141と、中空パイプ143と、回転板145と、第1ボルト147、および、2本の第2ボルト149a、149bとから構成されている。2枚のプレート141には、一端の下部スクリーン管115側に第1孔141aが、中央部に第2孔141bが、および、他端側に第3孔141cがそれぞれのプレートにあけられている。第1孔141aには、中空パイプ143が同心位置に配設され、2枚のプレート141間により挟み込まれている。第1孔141aおよび中空パイプ143には、第1ボルト147が挿入されて締めつけられ、2枚のプレート141は一体化されている。回転板145は、両端部に第4孔145aおよび第5孔145bがあけられている。回転板145は、2枚のプレート141間に挿入されるとともに、第4孔145aと2枚のプレート141の第2孔141bとが同心位置になるように配設されている。この両者の孔には、第2ボルト149aが挿入され、第2ボルト149aは回転板145を回動自在に支持している。回転板145の第5孔145bには、天秤127の3本のロッド135のいずれかと連結する連結ピン151(図11および図12に示す)が挿入され、連結ピン151を介して吊治具125を揺動自在に吊揚げている。
【0008】
プレート141の第3孔141cには第1吊り金具119を貫通した第2ボルト149bが挿入されて締めつけられている。プレート141は第1吊り金具119を介してノーズパネル111に取着されている。プレート141は、下部スクリーン管115側の一端部に平面部141dを有している。この平面部141dは、下部スクリーン管115に固設されたシャーラグ153に当接されている。これにより、ノーズパネル111は、ノーズパネル111に付設されている第1吊り金具119を介したプレート141と、および、下部スクリーン管115のシャーラグ153に当接した吊治具125のプレート141とで保持されるとともに、吊治具125のプレート141は回転板145に連結している天秤127の3本のロッド135により吊揚げられる。このとき、回転板145の回動中心点Qaは、下部スクリーン管115の中心軸線Paに対して距離Laだけ離間している。
【0009】
上記構成により、次に作動について説明する。
前記したように、分割されたノーズパネル111は、図11に示すように、搬入台車123に搭載されて第1ペンダントコイル103の下方に搬入される。この状態において、第1吊り金具119には、吊治具125を付設する。第2吊り金具121にはシャックル121aが付設されている。大型フック131は、天井壁管107に臨時に設けられた孔(H)を通してノーズパネル111を吊揚げるために天井壁管107の下方に吊り下げられる。大型フック131は、第1ワイヤ133が巻き掛けられるとともに、ピン129を介して天秤127が図示しない大型クレーンの大型フック131に吊り下げられる。天秤127のロッド135は、連結ピン151を介して吊治具125に連結される。これにより、大型フック131は、ノーズパネル111の中央部の他端部の上側に取着された吊治具125を介して、ノーズパネル111に連結される。
【0010】
また、ノーズパネル111の第2水冷壁117の第2吊り金具121には、シャックル121aを介して第2ワイヤ139が取着されている。第2ワイヤ139は小型フック137に巻き掛けられ、小型フック137は屋内に配設された図示しないクローラクレーンあるいはトラッククレーン等の小型クレーンから吊り下げられている。
【0011】
これにより、ノーズパネル111は、中央部の他端部の上側が吊治具125を介して大型フック131に係合し、また、第2水冷壁117の他端部側が第2吊り金具121を介して小型フック137に係合して吊揚げられる。この状態から、大型フック131を更に上方に吊揚げるとともに、小型フック137を下方に吊り下げ、ノーズパネル111を矢印E側に引き起こしていく。ノーズパネル111は、大型フック131により、更に上方に所定量だけ吊揚げられるとともに、上部スクリーン管109の端部の位置に合わせて大型フック131の吊揚げ量およびその吊揚げ位置を調整して、上部スクリーン管109の端部の位置を下部スクリーン管115の端部位置を一致させるようにしている。上部スクリーン管109および下部スクリーン管115の端部位置が一致したら、その端部を溶接して、ノーズパネル111を上部スクリーン管109により保持する。この後に、臨時に設けた孔(H)を塞ぐとともに、天秤127、吊治具125を取り外して次のノーズパネル111を組付ける施工を行っている。
【0012】
【発明が解決しようとする課題】
しかしながら、上記従来の組付施工法および組付治具は、次のような欠点を有している。
(1) 大形部品のノーズパネルを搬入台車から所定の位置に吊揚げるために、天井壁管に大型クレーン用の大型フックが通過する孔を臨時に設けた後、大型フックを天井壁管の下側に配置している。大型フックは天秤を介してノーズパネルを所定の位置に吊揚げ、上部スクリーン管および下部スクリーン管の端部位置を一致させて溶接したら天秤を外し、その後に、大型フックを天井壁管に臨時に設けた孔を通して、大型フックを天井壁管の上側に戻している。この臨時に設けた孔は、ノーズパネルを所定位置に吊揚げた保持した後に、塞ぐ作業が必要になっており、無駄な作業が行われているとともに、作業工数が増大している。
(2) 大形部品のノーズパネルを吊る吊点が3箇所あるため横方向に長い天秤が必要になっている。分割された大形部品のノーズパネルが順次吊揚げられるとき、大型フックを吊るワイヤが天井壁管に臨時に設けた孔を貫通しているため、天秤はクレーンにより横方向に移動出来ない。このため、天秤は一度下に降ろされた後に、他のクレーン等により横方向に移動させている。このために搬出段取り替えに多大な時間がかかり、作業工数が増大している。
(3) 天秤はノーズパネルを取着するときに上部スクリーン管の横に並列に配設されており、上部スクリーン管および下部スクリーン管の端部位置を一致させるときに、誤って上部スクリーン管に衝突させ、上部スクリーン管を曲げる恐れがある。
(4) 吊治具は、回転板を取り付けた治具であるが、回転板の回動中心点と下部スクリーン管の中心軸線との間に距離があるため、大形部品のノーズパネルが回動中心点を支点として回動したとき、天秤の傾き、天秤の回動、あるいは、大型フックの位置等にズレが起こり易く、上部スクリーン管および下部スクリーン管の端部位置を一致させることが困難であり、一致させるために多大な時間がかかり、作業工数が増大している。
【0013】
本発明は、上記従来の問題点に着目し、発電所用大形部品の組付施工法およびその組付治具に係り、特に、天井壁管の下側に吊りジャッキを配設して不要な作業を廃止して作業工数を少なくし、吊治具の回動中心点を横方向に配設された管の中心軸線と一致させ、回動時に上下の管の端部を容易に一致させて作業を容易にする発電所用大形部品の組付施工法およびその組付治具を提供することを目的とする。
【0014】
【課題を解決するための手段】
上記目的を達成するために、本発明に係る発電所用大形部品の組付施工法の第1の発明は、発電所の蒸気発生装置内に配設される天井壁管、ペンダントコイル、あるいは、水冷壁管等の吊り下げられた大形部品を有する発電所用大形部品の組付施工法において、搬送台車により搬入された大形部品の一端側に吊揚用ジャッキを取着し、天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結された吊治具の回動中心と、大形部品に並列に付設された配管との中心軸線とを一致させ、大形部品の他端側に吊りフックを取着して大形部品を一定量吊揚げた後に、吊りフックを下降させて、大形部品の回動により両配管の中心軸線を一致させて、再度吊揚用ジャッキにより吊揚げて一定位置に大形部品を吊り下げる組付施工法である。
【0015】
本発明に係る発電所用大形部品の組付施工法の第2の発明は、発電所の蒸気発生装置内に配設される天井壁管と、天井から吊り下げられペンダントコイルと、および、ペンダントコイルの近傍に配設された水冷壁管等の吊り下げられた大形部品とを有する発電所用大形部品の組付施工法において、搬送台車により搬入された大形部品の一端側に吊揚用ジャッキを取着し、天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結された吊治具の回動中心と、大形部品に並列に付設された配管との中心軸線とを一致させ、かつ、他端側に吊りフックを取着して大形部品を一定量吊揚げた後に、吊りフックを下降させて、大形部品の回動により両配管の中心軸線を一致させた後、両配管を接合して大形部品を吊り下げる組付施工法である。
【0017】
本発明に係る発電所用大形部品の組付治具の発明では、発電所の蒸気発生装置内に配設される天井壁管と、天井から吊り下げられペンダントコイルと、および、ペンダントコイルの近傍に配設された水冷壁管等の吊り下げられた大形部品とを有する発電所用大形部品の組付治具において、天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結されるとともに、大形部品に並列に付設された配管の中心軸線と、大形部品を回動する回動中心点とが一致する吊治具を有する組付治具である。
【0018】
【作用】
上記構成によれば、例えば、火力発電所の蒸気発生装置で大形部品を組付ける場合には、大形部品は搬入台車により建屋内に搬入される。大形部品を吊る吊揚用ジャッキは天井壁管の下側に配設されるとともに、その吊揚用ジャッキの一端は大形部品の一方側に取着し、大形部品の他方側には小型クレーンのフックからのワイヤを取着する。吊揚用ジャッキと小型クレーンの作動により大形部品は搬入台車からペンダントコイルあるいは搬入台車等の干渉物がない部分まで一定量だけ吊揚げられる。大形部品は、吊揚用ジャッキをそのままとしてその位置に保つとともに小型フックを下降させて、吊揚用ジャッキに連結された吊治具により大形部品を回動する。吊揚用ジャッキは天井壁管を貫通した上部スクリーン管に取着され、また、吊揚用ジャッキの伸縮するロッドは大形部品に取着された回動自在の吊治具に連結されているため、大形部品が回動したときには、吊揚用ジャッキを保持した上部スクリーン管と、大形部品に付設された下部スクリーン管との端部位置が確実に一致する。このとき、吊治具は、大形部品を回動する回動中心点が、大形部品に取着された管の配列の中心軸線に一致されているため、上部スクリーン管と下部スクリーン管との端部位置を精度良く一致させることが可能となっている。また、吊揚用ジャッキは、分割されている大形部品の数に合わせて、予め上部スクリーン管に取着されているため、大形クレーン等の操作および作動がなくなり、分割されている大形部品の取着する段取り作業が容易になっている。
【0019】
【発明の実施の形態】
以下に、本発明に係る火力発電所用大形部品の組付施工法およびその組付治具の好ましい実施の形態を添付図面に従って詳細に説明する。
図1は、火力発電所用大形部品の組付治具1の一部斜視図、図2は正面図、図3は一部側面図で図2のW矢視図、図4は一部側面図で図2のV矢視図、図5は一部平面図で図2のU矢視図、および、図6は大形部品の平面図である。図7から図9は、大形部品の組付施工状態を示す図である。なお、従来部品と同一部品には同一符号を付して説明は省略する。
【0020】
図1から図4において、火力発電所用大形部品の組付治具1は、吊揚用ジャッキ部5と、吊治具部7とから構成されている。
図1から図3において、吊揚用ジャッキ部5は、天井壁管107の下方に配置されており、大形部品のノーズパネル111を吊揚げ時には吊揚用ジャッキ部5は後述する吊治具部7に連結される。吊揚用ジャッキ部5は、吊揚用ジャッキ台11と、吊揚用ジャッキ13とから構成されている。吊揚用ジャッキ台11は、一対のみぞ形鋼15a、15bと、一対の平板17a、17bと、第1固定ボルト19と、および、台板20とから構成されている。
【0021】
一対のみぞ形鋼15a、15bは、上部スクリーン管109に固設されたブラケット109dに載せられるとともに、隣合う上部スクリーン管109a、109bを挟んで所定の位置に取着される。
【0022】
一対の平板17a、17bは、一対のみぞ形鋼15a、15bのそれぞれ両端部に第1固定ボルト19により、隣合う上部スクリーン管109a、109bを挟んだ後に取着される。これにより、一対のみぞ形鋼15a、15bはブラケット109dに載せられて隣合う上部スクリーン管109a、109bを挟んだ後には、開かないように固定されている。
【0023】
台板20は、一対のみぞ形鋼15a、15bの上に載せられるとともに、上部スクリーン管109a、109bの間の中央位置に配設されている。また、台板20は、図示しないボルトによりみぞ形鋼15a、15bに固定されている。また、台板20は、吊揚用ジャッキ13を取着しているとともに、一対の平板17a、17bと同様に、一対のみぞ形鋼15a、15bが上部スクリーン管109a、109bを挟んだ後には、開かないように固定している。
【0024】
吊揚用ジャッキ13は、ジャッキ本体21と、ロッド23と、および、ナット25とから構成されている。
ジャッキ本体21は、台板20に取着されるとともに、その内方にはロッド23に連結される図示しないピストンが挿入され油圧を受けて、ロッドを上昇あるいは下降させている。ロッド23は、その上方部23aがジャッキ本体21から突出しているとともに、下方部23bでは回動自在の後述する吊治具部7にナット25で締結されて連結されている。
【0025】
この吊揚用ジャッキ13は、大形部品のノーズパネル111が落下することがないように、本出願人が先に出願した特開平7−309594号公報に示したように、一定量ずつ機械的にロックされながら昇降するアップダウンジャッキでも良く、チェック弁付き油圧シリンダ、あるいは、カウンタバランス弁を用いた油圧シリンダのいずれでも良い。
【0026】
図1、図2、および、図4において、吊治具部7は、回転体支持部31と、回転体部33とから構成されている。この吊治具部7は、分割されたノーズパネル111のそれぞれの各端部に1個ずつ装着され、1個のノーズパネル111に対して2個準備されている。
【0027】
回転体支持部31は、その間に回転体部33を回動自在に支持する第1回転体支持部31aと、および第2回転体支持部31bとからなる。第1回転体支持部31aは下部スクリーン管115aに、また、第2回転体支持部31bは下部スクリーン管115bに付設される。第1回転体支持部31aと第2回転体支持部31bとは、回転体部33を回動自在に支持する後述する回転支持板49が付設されている箇所のみが異なるため、以下では、共通部分については第1回転体支持部31bを用いて説明する。
【0028】
回転体支持部31bは、主として、2枚の支持プレート41と、中空管43と、第1連結プレート45と、第2連結プレート47、回転支持板49、および、第1連結ボルト51とから構成されている。2枚の支持プレート41には、一端の下部スクリーン管115b側に第1連結用ボルト孔41aが、中央部に第2連結用ボルト孔41bが、および、他端側に第3連結用ボルト孔41cが各プレートにあけられている。第1連結用ボルト孔41aには、中空管43が同心位置に配設され、中空管43は2枚の支持プレート41間に挟み込まれている。第1連結用ボルト孔41aおよび中空管43には、第1連結ボルト51が挿入されて締めつけられ、2枚の支持プレート41は一体化されている。また、第1連結プレート45および第2連結プレート47は、2枚の支持プレート41に固設され、2枚の支持プレート41の一体化を強化している。支持プレート41は第1吊り金具119を介してノーズパネル111に取着されている。支持プレート41は、下部スクリーン管115b側の一端部に平面部41dを有している。この平面部41dは、下部スクリーン管115bに固設されたシャーラグ153に当接されている。
【0029】
回転支持板49は、対向する支持プレート41の内側に付設されて、その上方には後述する回転体部33を支持する支持ピン71が挿入される孔49aがあけられている。また、回転支持板49は、連結プレート53により連結され一体化されている。
【0030】
中央部の第2連結用ボルト孔41bには、吊治具部7の回転体部33を支持する第1回転体支持部31aと第2回転体支持部31bとを連結して一体化させる第2連結ボルト55が挿入され第2ナット57で締結されている。
【0031】
また、他端側の第3連結用ボルト孔41cには、第1吊り金具119を貫通した第3連結ボルト59が挿入され第3ナット61で締結されている。第3連結ボルト59は、第1回転体支持部31aと第2回転体支持部31bとを連結して一体化させるとともに、第1吊り金具119を介して吊治具部7をノーズパネル111に連結している。
【0032】
回転体部33は、第1回転体支持部31aと第2回転体支持部31bとに付設された回転支持板49の孔49aに挿入され支持ピン71により保持されている。
回転体部33は、両端に対向して配設される四角形状のプレート73と、プレート73に挿入され、ロッド23が貫通するように所定間隔離間し、面側が対向して配置されるみぞ形鋼75と、みぞ形鋼75の間に固設して配置され支持ピン71を保持する保持プレート77と、および、みぞ形鋼75の下面で中央部に固設され、ロッド23が貫通するロッド孔79aを有するロッド用プレート79とから構成されている。ロッド孔79aはロッド23に対して一定のスキマを有しており、組付けを容易にしている。
【0033】
回転体部33は、支持ピン71を介して第1回転体支持部31aおよび第2回転体支持部31bに回転自在に連結されている。すなわち、ノーズパネル111に固設されている第1回転体支持部31aおよび第2回転体支持部31bは、支持ピン71により回転体部33を回動自在に支持しているとともに、回転体部33を介して吊揚用ジャッキ13のロッド23bに連結され、ノーズパネル111が吊揚用ジャッキ13により吊揚げられるようになっている。このとき、支持ピン71の中心位置Raは、図4に示すように、並列にならべられた下部スクリーン管115の中心軸線Paと一致させている。これにより、吊治具部7は回転体部33が回動することにより、上部スクリーン管109および下部スクリーン管115の端部位置が一致するようになされている。
【0034】
上部スクリーン管109の中心軸線が、下部スクリーン管115の中心軸線Paと一致したら、吊揚用ジャッキ13を縮小することにより、図2に示すように、上部スクリーン管109および下部スクリーン管115の端部を当接することができる。このとき、吊治具部7はノーズパネル111の両端部に各1個が隣接する下部スクリーン管115に取着されており、下部スクリーン管115はノーズパネル111の横方向に直列に配設され、かつ、図6に示すように、この下部スクリーン管115の隣接する両端部に吊治具部7が取着されている。このために、ノーズパネル111は吊治具部7により保持されても横方向に傾くことなく垂直に支持されて上昇する。このため、上部スクリーン管109および下部スクリーン管115の端部は確実に当接することができる。上部スクリーン管109および下部スクリーン管115の端部が当接したら当接部を溶接することにより、上部スクリーン管109は下部スクリーン管115を介して大形部品のノーズパネル111を吊り下げることができる。
【0035】
上記のごとく構成した火力発電所用大形部品の組付治具1による一例であるノーズパネル111の組付施工の実施形態の作用は、次の通りであり、図7から図9を用いて説明する。
(1) 図7において、火力発電所用大形部品の分割されたノーズパネル111は搬入台車123に搭載されて第1ペンダントコイル103の下方に搬入される。この状態において、ノーズパネル111には、両端部のそれぞれの隣接する下部スクリーン管115に組付治具1の吊治具部7が付設されている。また、吊治具部7に対向する所定の上部スクリーン管109には、組付治具1の吊揚用ジャッキ部5が複数個所定の上部スクリーン管109に付設されている。吊治具部7は吊揚用ジャッキ部5のロッド23bにより連結されており、これにより、吊揚用ジャッキ13は、ノーズパネル111の中央部の他端の上側に取着された吊治具部7を介して、ノーズパネル111に連結される。
【0036】
また、ノーズパネル111の第2水冷壁117の第2吊り金具121には、シャックル121aを介して第2ワイヤ139が取着されている。第2ワイヤ139は小型フック137に巻き掛けられ、小型フック137は屋内に配設された図示しないクローラクレーンあるいはトラッククレーン等の小型クレーンから吊り下げられている。
【0037】
これにより、ノーズパネル111は、中央部の他端の上側が吊治具部7を介して吊揚用ジャッキ13に係合し、また、第2水冷壁117の他端部側が第2吊り金具121を介して小型フック137に係合して、吊揚用ジャッキ13と小型フック137の作動によりノーズパネル111は搬入台車123から第1ペンダントコイル103あるいは搬入台車123等の干渉物がない部分まで一定量(Ha)だけ吊揚げられる。
【0038】
(2) 図8において、ノーズパネル111は一定量(Ha)だけ吊揚げられた後(図7の状態)に吊揚用ジャッキ13のロッド23bの縮小を一時停止し、ノーズパネル111に付設されている吊治具部7はその位置を保持しながら、小型フック137を下方に吊り下げ、ノーズパネル111を反時計方向(矢印Ma方向)に回動させて引き起こしていく。ノーズパネル111の回動に伴い、上部スクリーン管109の中心軸線は自動的に下部スクリーン管115の中心軸線Paと一致させるようになされている。すなわち、ノーズパネル111の回動に伴い、下部スクリーン管115の端部が、上部スクリーン管109の端部の軸線上にくるようになっている。
【0039】
(3) 図9において、ノーズパネル111は、吊揚用ジャッキ13のロッド23bを縮小し、更に上方に所定量(Ja)だけ吊揚げられる。このとき、吊揚用ジャッキ13のロッド23bは吊揚用ジャッキ13の上方へロッド23aとして突出量を多くしている。ノーズパネル111の上昇に伴い、上部スクリーン管109の端部は自動的に下部スクリーン管115の端部の位置に一致させるとともに、当接するようになされている。上部スクリーン管109と下部スクリーン管115との端部が当接したら当接部を溶接する。これにより、ノーズパネル111は、上部スクリーン管109と下部スクリーン管115とを介して天井鉄骨101により吊り下げることが行え、大形部品の組付け施工が行われる。
【0040】
【発明の効果】
以上説明したように、本発明は、天井壁管の下側に配設された大形部品を吊る吊揚用ジャッキは、その一端を大形部品の一方側に取着し、他方側を小型クレーンのフックからのワイヤを取着し、吊揚用ジャッキと小型クレーンの作動により大形部品は搬入台車からペンダントコイルあるいは搬入台車等の干渉物がない部分まで一定量だけ吊揚げられた後に、吊揚用ジャッキに連結された吊治具によりその場所で大形部品を回動するため、安全に作業ができる。大形部品が吊治具により回動したときには、吊揚用ジャッキを保持した上部スクリーン管と、大形部品に付設された下部スクリーン管との端部位置の一致が容易になり作業性が向上している。また、吊治具は、大形部品を回動する回動中心点と、大形部品に取着された管の横方向の配列の中心軸線とを一致させているため、大形部品を回動するだけで上部スクリーン管と下部スクリーン管との管中心軸線を確実に一致させることが可能となっているため、作業が容易になるとともに調整作業が不要となるので作業時間を短縮できる。また、吊揚用ジャッキは、分割されている大形部品の数に合わせて、予め上部スクリーン管に取着されているため、大形クレーン等の操作および作動がなくなり、分割されている大形部品の取着する段取り作業が容易になっている。天井壁管の下側に吊りジャッキを配設して、従来のような孔あけ、塞ぎ等の不要な作業が廃止されるので作業工数を少なくすることができる。また、大形部品の組付治具は、確実に作動する吊りジャッキを配設しているために安全性が向上している。
【図面の簡単な説明】
【図1】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部斜視図である。
【図2】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部正面図である。
【図3】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部側面図であり、図2のW矢視図である。
【図4】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部側面図であり、図2のV矢視図である。
【図5】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部平面図であり、図2のU矢視図である。
【図6】本発明の実施形態に係る火力発電所用大形部品の組付治具の一部平面図である。
【図7】本発明の実施形態に係る火力発電所用大形部品の組付施工状態を示す図である。
【図8】本発明の実施形態に係る火力発電所用大形部品の組付施工状態を示す図である。
【図9】本発明の実施形態に係る火力発電所用大形部品の組付施工状態を示す図である。
【図10】従来の火力発電所用大形部品の一例を示す部分構成図である。
【図11】従来の大形部品の組付施工状態を示す図である。
【図12】従来の火力発電所用大形部品の組付施工治具の側面図である。
【図13】従来の火力発電所用大形部品の組付施工治具の平面図であり、図12のY矢視図である。
【符号の説明】
1 火力発電所用大形部品の組付治具
5 吊揚用ジャッキ部
7 吊治具部
11 吊揚用ジャッキ台
13 吊揚用ジャッキ
21 ジャッキ本体
23 ロッド
31 回転体支持部
33 回転体部
49 回転支持板
71 支持ピン
101 天井鉄骨
103 第1ペンダントコイル
105 第2ペンダントコイル
107 天井壁管
109 上部スクリーン管
111 大形部品のノーズパネル
115 下部スクリーン管
121 第2吊り金具
123 搬入台車
137 小型フック
Ra 支持ピンの中心位置
Pa 下部スクリーン管(上部スクリーン管)の中心軸線
[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a method for assembling large parts for a power plant and an assembling jig thereof, and in particular, a method for carrying in large parts used for a steam generator of a power plant and assembling them at a predetermined position. And an assembly jig thereof.
[0002]
[Prior art]
Generally, a steam generator of a thermal power plant includes a burner, a furnace, a heater, a reheater, and the like (not shown) and is housed in a large building. Among these, in a large steam generator, a water-cooled wall pipe (also referred to as a dividing wall) parallel to the side wall is arranged at the center of the furnace, or a large number of plate-like shapes parallel to the side wall at the inlet of the radial heater at the top of the furnace. Some have a water cooling wall to increase the heat transfer area. The water-cooled wall tube or the water-cooled wall portion is composed of large parts, and the shape thereof is a hollow triangular shape, a trapezoidal shape, a D-shaped shape, or the like in a side view in addition to a flat plate shape.
[0003]
FIG. 10 is a partial configuration diagram illustrating an example using a large component, and FIG. 11 is a diagram illustrating an assembly work state of the large component. 12 is a side view of the construction jig, FIG. 13 is a plan view, and is a view taken in the direction of arrow Y in FIG.
[0004]
In FIG. 10, a U-shaped first pendant coil 103 and a second pendant coil 105 are suspended from a ceiling steel frame 101 with a predetermined distance therebetween. A large number of first pendant coils 103 and second pendant coils 105 are arranged at predetermined intervals in a state of being arranged in parallel in the vertical direction of the drawing. Above the first pendant coil 103 and the second pendant coil 105, a ceiling wall tube 107 intersecting with both is arranged in parallel with the ground (FL) and continuous in the vertical direction of the drawing. An upper screen tube 109 is disposed between the first pendant coil 103 and the second pendant coil 105 so as to penetrate the ceiling wall tube 107. A large number of upper screen tubes 109 are arranged in a state of being arranged in parallel at a predetermined interval in the vertical direction of the drawing.
[0005]
Further, a nose panel 111 which is a large-sized water-cooled wall tube is divided into a plurality of parts and arranged in the vicinity below the first pendant coil 103. The nose panel 111 is formed in a substantially trapezoidal shape with a hollow upper portion in a side view. The center portion of the nose panel 111 includes a V-shaped first water cooling wall 113 and a bottom lower screen tube 115. Also, a substantially flat second water cooling wall 117 is provided at one end of the nose panel 111 so as to extend along the bottom side. Further, a lower screen tube 115 protrudes with a certain length on the other end of the nose panel 111 and above the center. The nose panel 111 has a first suspension fitting 119 (shown in FIGS. 12 and 13) at the center end, and a second suspension fitting 121 (shown in FIG. 11) in the vicinity of the end of the second water cooling wall 117. Is shown). A plurality of lower screen tubes 115 are arranged at the same position as the upper screen tube 109 in a state of being arranged in parallel at a predetermined interval in the vertical direction of the drawing. The lower screen tube 115 is welded after being aligned with the upper screen tube 109 by an assembling method and an assembling jig described later, and is joined by the upper screen tube 109. Thus, the nose panel 111 fixed to the lower screen tube 115 is held by the upper screen tube 109 via the lower screen tube 115.
[0006]
The divided nose panel 111 is mounted on a carry-in carriage 123 (shown in FIGS. 7 and 11) and carried below the first pendant coil 103. In this state, the first hanging bracket 119 is provided with a hanging jig 125 shown in FIG. A balance 127 made of I-shaped steel is connected to the hanging jig 125 by a rotating plate 145 so as to be swingable. A first wire 133 suspended from a large hook 131 of a large crane (not shown) is attached to the balance 127 via a pin 129. As shown in FIG. 10, the large hook 131 is provided with a hole (not shown) that is provided above the ceiling wall tube 107 through a temporary hole (H) for lifting the nose panel 111 from the ceiling wall tube 107. The holes (H) are connected to a large crane as many as the nose panel 111 is divided, and are closed when the nose panel 111 is attached at a predetermined position. The balance 127 is fixedly provided with three rods 135 connected to a suspension jig 125 shown in Fig. 12. The shackle 121a of the second suspension fitting 121 has a crawler crane or a truck crane (not shown). A second wire 139 suspended from a small hook 137 of a small crane such as the above is attached.
[0007]
In FIG. 12, the hanging jig 125 includes two plates 141, a hollow pipe 143, a rotating plate 145, a first bolt 147, and two second bolts 149a and 149b. Each of the two plates 141 has a first hole 141a on one end of the lower screen tube 115 side, a second hole 141b on the center, and a third hole 141c on the other end. . A hollow pipe 143 is disposed concentrically in the first hole 141a and is sandwiched between two plates 141. A first bolt 147 is inserted and tightened into the first hole 141a and the hollow pipe 143, and the two plates 141 are integrated. The rotating plate 145 has a fourth hole 145a and a fifth hole 145b at both ends. The rotating plate 145 is inserted between the two plates 141, and is arranged so that the fourth hole 145a and the second hole 141b of the two plates 141 are concentric. A second bolt 149a is inserted into both the holes, and the second bolt 149a supports the rotating plate 145 so as to be rotatable. A connection pin 151 (shown in FIGS. 11 and 12) connected to one of the three rods 135 of the balance 127 is inserted into the fifth hole 145 b of the rotating plate 145, and the hanging jig 125 is connected via the connection pin 151. Is suspended so that it can swing freely.
[0008]
In the third hole 141c of the plate 141, a second bolt 149b penetrating the first suspension fitting 119 is inserted and tightened. The plate 141 is attached to the nose panel 111 via the first suspension fitting 119. The plate 141 has a flat portion 141d at one end on the lower screen tube 115 side. The flat portion 141 d is in contact with a shear lug 153 fixed to the lower screen tube 115. As a result, the nose panel 111 is composed of the plate 141 via the first suspension fitting 119 attached to the nose panel 111 and the plate 141 of the hanging jig 125 in contact with the shear lug 153 of the lower screen tube 115. While being held, the plate 141 of the lifting jig 125 is lifted by the three rods 135 of the balance 127 connected to the rotating plate 145. At this time, the rotation center point Qa of the rotating plate 145 is separated from the central axis Pa of the lower screen tube 115 by a distance La.
[0009]
Next, the operation of the above configuration will be described.
As described above, the divided nose panel 111 is mounted on the carry-in carriage 123 and carried below the first pendant coil 103 as shown in FIG. In this state, a hanging jig 125 is attached to the first hanging bracket 119. A shackle 121 a is attached to the second hanging bracket 121. The large hook 131 is suspended below the ceiling wall tube 107 in order to lift the nose panel 111 through a hole (H) provided temporarily in the ceiling wall tube 107. The first hook 133 is wound around the large hook 131 and the balance 127 is suspended from the large hook 131 of a large crane (not shown) via a pin 129. The rod 135 of the balance 127 is connected to the hanging jig 125 via a connecting pin 151. As a result, the large hook 131 is connected to the nose panel 111 via the hanging jig 125 attached to the upper side of the other end of the central portion of the nose panel 111.
[0010]
A second wire 139 is attached to the second suspension fitting 121 of the second water cooling wall 117 of the nose panel 111 via a shackle 121a. The second wire 139 is wound around a small hook 137, and the small hook 137 is suspended from a small crane such as a crawler crane or a truck crane (not shown) disposed indoors.
[0011]
As a result, the nose panel 111 is engaged with the large hook 131 via the suspension jig 125 on the upper side of the other end of the center portion, and the second suspension fitting 121 is connected to the other end of the second water cooling wall 117. Through which the small hook 137 is engaged and lifted. From this state, the large hook 131 is lifted further upward, the small hook 137 is suspended downward, and the nose panel 111 is raised to the arrow E side. The nose panel 111 is lifted upward by a predetermined amount by the large hook 131, and the lifting amount and the lifting position of the large hook 131 are adjusted according to the position of the end of the upper screen tube 109, The position of the end of the upper screen tube 109 is made to coincide with the position of the end of the lower screen tube 115. When the end positions of the upper screen tube 109 and the lower screen tube 115 coincide, the end portions are welded, and the nose panel 111 is held by the upper screen tube 109. Thereafter, the hole (H) provided temporarily is closed, and the balance 127 and the hanging jig 125 are removed and the next nose panel 111 is assembled.
[0012]
[Problems to be solved by the invention]
However, the above conventional assembling method and assembling jig have the following drawbacks.
(1) In order to suspend the nose panel of a large part from the loading carriage to a predetermined position, after temporarily providing a hole through which the large hook for a large crane passes in the ceiling wall pipe, the large hook is attached to the ceiling wall pipe. Located on the lower side. The large hook lifts the nose panel to a predetermined position via the balance, and when the end positions of the upper screen tube and the lower screen tube are aligned and welded, the balance is removed, and then the large hook is temporarily attached to the ceiling wall tube. The large hook is returned to the upper side of the ceiling wall pipe through the provided hole. The temporary hole is required to be closed after the nose panel is lifted and held at a predetermined position, and wasteful work is being performed and the number of work steps is increased.
(2) Since there are three suspension points for suspending the nose panel of a large component, a balance that is long in the lateral direction is required. When the divided large nose panels are successively lifted, the balance cannot be moved laterally by the crane because the wire for hanging the large hook penetrates the hole provided temporarily in the ceiling wall pipe. For this reason, after the balance is once lowered, it is moved laterally by another crane or the like. For this reason, it takes a lot of time for the carry-out changeover, and the number of work steps is increased.
(3) The balance is arranged in parallel with the upper screen tube when the nose panel is attached. When the end positions of the upper screen tube and the lower screen tube are matched, the balance is accidentally attached to the upper screen tube. There is a risk of bending and bending the upper screen tube.
(4) The hanging jig is a jig to which a rotating plate is attached. However, since there is a distance between the rotation center point of the rotating plate and the central axis of the lower screen tube, the nose panel of a large part is turned. When turning around the center of movement, the balance tends to tilt, the balance rotates, or the position of the large hook easily shifts, making it difficult to match the end positions of the upper and lower screen tubes. Therefore, it takes a lot of time to make them coincide, and the number of work steps is increasing.
[0013]
The present invention pays attention to the above-mentioned conventional problems, and relates to a method for assembling large parts for a power plant and its assembling jig, and in particular, it is not necessary to dispose a suspension jack below the ceiling wall pipe. The work is abolished, the number of work steps is reduced, the center of rotation of the hanging jig is aligned with the center axis of the pipe arranged in the horizontal direction, and the ends of the upper and lower pipes are easily aligned during rotation. An object of the present invention is to provide a method for assembling a large-sized part for a power plant and an assembling jig for facilitating the work.
[0014]
[Means for Solving the Problems]
In order to achieve the above object, a first invention of a large power plant assembly method according to the present invention includes a ceiling wall pipe, a pendant coil, or a pendant coil disposed in a steam generator of a power plant. In the assembly method of large parts for power plants that have large parts that are suspended, such as water-cooled wall pipes, a lifting jack is attached to one end of the large parts that are carried by the transport carriage. A pivot center of a suspension jig connected to a rod of a lifting jack attached to a pipe suspended through a ceiling wall pipe, and a pipe attached in parallel to a large part The center axis of the Attach a hanging hook to the other end and lift a large part by a certain amount, then lower the hanging hook. , Make the central axis of both pipes coincide by turning large parts, This is an assembling method in which a large part is suspended at a certain position by lifting it with a lifting jack again.
[0015]
A second invention of a method for assembling a large-sized part for a power plant according to the present invention is a ceiling wall tube disposed in a steam generator of a power plant, a pendant coil suspended from the ceiling, and a pendant In the assembly method of large parts for power plants having large parts suspended such as water-cooled wall pipes arranged near the coil, the parts are lifted on one end side of the large parts carried by the carriage. Install the jack for A pivot axis of a suspension jig connected to a rod of a lifting jack attached to a pipe suspended through a ceiling wall pipe, and a central axis of a pipe attached in parallel to a large part Match And after attaching a hanging hook to the other end and lifting a large part by a certain amount, lower the hanging hook. , The central axes of both pipes are aligned by turning large parts It is an assembly method that hangs large parts after joining both pipes.
[0017]
In the invention of the large-sized part assembly jig for a power plant according to the present invention, a ceiling wall pipe disposed in the steam generator of the power plant, a pendant coil suspended from the ceiling, and the vicinity of the pendant coil In a large part assembly jig for a power plant having a suspended large part such as a water-cooled wall pipe disposed in Suspended A hanging jig that is connected to the rod of a lifting jack attached to the pipe, and whose center axis of the pipe attached in parallel to the large part coincides with the turning center point for turning the large part. An assembly jig having
[0018]
[Action]
According to the above configuration, for example, when a large part is assembled in the steam generator of the thermal power plant, the large part is carried into the building by the carry-in carriage. A lifting jack for suspending large parts is arranged under the ceiling wall pipe, and one end of the lifting jack is attached to one side of the large part, and the other side of the large part is attached to the other side. Attach the wire from the hook of the small crane. By operating the lifting jack and the small crane, a large part is lifted by a certain amount from the carrying cart to a portion where there is no interference such as a pendant coil or a carrying cart. The large part is kept in its position with the lifting jack as it is, and the small hook is lowered, and the large part is rotated by a hanging jig connected to the lifting jack. The lifting jack is attached to the upper screen tube penetrating the ceiling wall tube, and the telescopic rod of the lifting jack is connected to a rotatable lifting jig attached to a large part. Therefore, when the large component rotates, the end positions of the upper screen tube holding the lifting jack and the lower screen tube attached to the large component are surely matched. At this time, the suspension jig has a center point of rotation for rotating the large part that matches the central axis of the arrangement of the pipes attached to the large part. It is possible to accurately match the end positions of each other. Moreover, since the lifting jack is attached to the upper screen tube in advance according to the number of divided large parts, the operation and operation of a large crane, etc. are eliminated, and the divided large type Setup work to install parts is easy.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of a method for assembling a large-sized part for a thermal power plant and an assembling jig thereof according to the present invention will be described in detail with reference to the accompanying drawings.
1 is a partial perspective view of a large-sized assembly jig 1 for a thermal power plant, FIG. 2 is a front view, FIG. 3 is a partial side view, and is a view from the arrow W in FIG. 2, and FIG. 2 is a partial plan view, FIG. 5 is a partial plan view, FIG. 2 is a U arrow view, and FIG. 6 is a plan view of a large component. FIG. 7 to FIG. 9 are diagrams showing the assembled construction state of large parts. In addition, the same code | symbol is attached | subjected to the same component as a conventional component, and description is abbreviate | omitted.
[0020]
1 to 4, a large-sized assembly jig 1 for a thermal power plant is composed of a lifting jack portion 5 and a hanging jig portion 7.
In FIG. 1 to FIG. 3, the lifting jack portion 5 is disposed below the ceiling wall tube 107, and the lifting jack portion 5 is a lifting jig to be described later when lifting a large nose panel 111. It is connected to part 7. The lifting jack portion 5 is composed of a lifting jack table 11 and a lifting jack 13. The lifting jack table 11 includes a pair of groove steels 15 a and 15 b, a pair of flat plates 17 a and 17 b, a first fixing bolt 19, and a base plate 20.
[0021]
The pair of groove steels 15a and 15b is placed on a bracket 109d fixed to the upper screen tube 109, and is attached at a predetermined position with the adjacent upper screen tubes 109a and 109b interposed therebetween.
[0022]
The pair of flat plates 17a and 17b are attached after the adjacent upper screen tubes 109a and 109b are sandwiched by the first fixing bolts 19 at both ends of the pair of groove steels 15a and 15b. Accordingly, the pair of grooved steels 15a and 15b are fixed so as not to be opened after the adjacent upper screen tubes 109a and 109b are sandwiched between the brackets 109d.
[0023]
The base plate 20 is placed on the pair of grooved steels 15a and 15b, and is disposed at a central position between the upper screen tubes 109a and 109b. The base plate 20 is fixed to the grooved steels 15a and 15b with bolts (not shown). In addition, the base plate 20 has the lifting jack 13 attached thereto and, like the pair of flat plates 17a and 17b, after the pair of groove steels 15a and 15b sandwich the upper screen tubes 109a and 109b. It is fixed not to open.
[0024]
The lifting jack 13 is composed of a jack body 21, a rod 23, and a nut 25.
The jack body 21 is attached to the base plate 20, and a piston (not shown) connected to the rod 23 is inserted into the inside of the jack body 21 and receives the hydraulic pressure to raise or lower the rod. The rod 23 has an upper portion 23a protruding from the jack body 21 and a lower portion 23b connected to a later-described hanging jig portion 7 which is rotatable by a nut 25.
[0025]
As shown in Japanese Patent Application Laid-Open No. 7-309594 previously filed by the present applicant, the lifting jack 13 is mechanically fixed by a certain amount so that the nose panel 111 of a large part does not fall. It may be an up / down jack that moves up and down while being locked, or a hydraulic cylinder with a check valve or a hydraulic cylinder using a counter balance valve.
[0026]
In FIG. 1, FIG. 2, and FIG. 4, the hanging jig part 7 is composed of a rotating body support part 31 and a rotating body part 33. One hanging jig portion 7 is attached to each end portion of the divided nose panel 111, and two suspension jig portions 7 are prepared for one nose panel 111.
[0027]
The rotator support 31 includes a first rotator support 31a and a second rotator support 31b that rotatably support the rotator 33 therebetween. The first rotating body support portion 31a is attached to the lower screen tube 115a, and the second rotating body support portion 31b is attached to the lower screen tube 115b. Since the first rotating body support portion 31a and the second rotating body support portion 31b are different only in a portion where a later-described rotation support plate 49 that rotatably supports the rotating body portion 33 is attached, A part is demonstrated using the 1st rotary body support part 31b.
[0028]
The rotator support 31b mainly includes two support plates 41, a hollow tube 43, a first connection plate 45, a second connection plate 47, a rotation support plate 49, and a first connection bolt 51. It is configured. The two support plates 41 have a first connecting bolt hole 41a on the lower screen tube 115b side at one end, a second connecting bolt hole 41b on the center, and a third connecting bolt hole on the other end side. 41c is opened in each plate. A hollow tube 43 is disposed concentrically in the first connecting bolt hole 41 a, and the hollow tube 43 is sandwiched between two support plates 41. The first connection bolt 51 is inserted into the first connection bolt hole 41 a and the hollow tube 43 and tightened, and the two support plates 41 are integrated. Further, the first connection plate 45 and the second connection plate 47 are fixed to the two support plates 41 to strengthen the integration of the two support plates 41. The support plate 41 is attached to the nose panel 111 via the first suspension fitting 119. The support plate 41 has a flat portion 41d at one end on the lower screen tube 115b side. The flat portion 41d is in contact with a shear lug 153 fixed to the lower screen tube 115b.
[0029]
The rotation support plate 49 is attached to the inside of the opposite support plate 41, and a hole 49 a into which a support pin 71 that supports the rotating body portion 33 described later is inserted is formed above the rotation support plate 49. The rotation support plate 49 is connected and integrated by a connecting plate 53.
[0030]
A first rotating body support portion 31a and a second rotating body support portion 31b that support the rotating body portion 33 of the hanging jig portion 7 are connected to and integrated with the second connecting bolt hole 41b in the center portion. Two connecting bolts 55 are inserted and fastened with a second nut 57.
[0031]
The third connection bolt 59 penetrating the first suspension fitting 119 is inserted into the third connection bolt hole 41 c on the other end side and fastened by the third nut 61. The third connecting bolt 59 connects and integrates the first rotating body support portion 31a and the second rotating body support portion 31b, and the hanging jig portion 7 is connected to the nose panel 111 via the first hanging bracket 119. It is connected.
[0032]
The rotator 33 is inserted into a hole 49 a of a rotation support plate 49 attached to the first rotator support 31 a and the second rotator support 31 b and is held by a support pin 71.
The rotator 33 is disposed in a rectangular plate 73 that is opposed to both ends, and is inserted into the plate 73, spaced apart by a predetermined distance so that the rod 23 penetrates, and a groove shape that is disposed to face the surface side. A steel plate 75, a holding plate 77 that is fixedly disposed between the groove-shaped steel 75 and holds the support pin 71, and a rod that is fixed to the center portion on the lower surface of the groove-shaped steel 75 and penetrates the rod 23 The rod plate 79 has holes 79a. The rod hole 79a has a certain clearance with respect to the rod 23 to facilitate assembly.
[0033]
The rotator 33 is rotatably connected to the first rotator support 31a and the second rotator support 31b via a support pin 71. That is, the first rotating body support portion 31a and the second rotating body support portion 31b fixed to the nose panel 111 rotatably support the rotating body portion 33 by the support pins 71, and the rotating body portion. The nose panel 111 is lifted by the lifting jack 13 by being connected to the rod 23 b of the lifting jack 13 through 33. At this time, the center position Ra of the support pin 71 coincides with the center axis Pa of the lower screen tubes 115 arranged in parallel as shown in FIG. Thereby, the suspension jig portion 7 is configured such that the end portions of the upper screen tube 109 and the lower screen tube 115 coincide with each other when the rotating body portion 33 rotates.
[0034]
When the center axis line of the upper screen tube 109 coincides with the center axis line Pa of the lower screen tube 115, the lifting jack 13 is contracted to end the upper screen tube 109 and the lower screen tube 115 as shown in FIG. The parts can be brought into contact. At this time, the hanging jig portion 7 is attached to the lower screen tube 115 that is adjacent to both ends of the nose panel 111, and the lower screen tube 115 is arranged in series in the lateral direction of the nose panel 111. And as shown in FIG. 6, the suspension jig | tool part 7 is attached to the both ends which this lower screen tube 115 adjoins. For this reason, even if the nose panel 111 is held by the hanging jig part 7, it is supported vertically without rising in the lateral direction. For this reason, the end portions of the upper screen tube 109 and the lower screen tube 115 can reliably contact each other. When the end portions of the upper screen tube 109 and the lower screen tube 115 come into contact with each other, the upper screen tube 109 can suspend the large nose panel 111 via the lower screen tube 115 by welding the contact portions. .
[0035]
The operation of the embodiment of assembling the nose panel 111, which is an example of the large-sized assembly jig 1 for a thermal power plant configured as described above, is as follows, and will be described with reference to FIGS. To do.
(1) In FIG. 7, the divided nose panel 111 of the large component for a thermal power plant is mounted on a carry-in cart 123 and carried below the first pendant coil 103. In this state, the nose panel 111 has the hanging jig portion 7 of the assembling jig 1 attached to the adjacent lower screen tubes 115 at both ends. A plurality of lifting jack portions 5 of the assembling jig 1 are attached to a predetermined upper screen tube 109 on a predetermined upper screen tube 109 facing the hanging jig portion 7. The lifting jig portion 7 is connected by the rod 23b of the lifting jack portion 5 so that the lifting jack 13 is attached to the upper side of the other end of the center portion of the nose panel 111. It is connected to the nose panel 111 via the part 7.
[0036]
A second wire 139 is attached to the second suspension fitting 121 of the second water cooling wall 117 of the nose panel 111 via a shackle 121a. The second wire 139 is wound around a small hook 137, and the small hook 137 is suspended from a small crane such as a crawler crane or a truck crane (not shown) disposed indoors.
[0037]
Thereby, the upper side of the other end of the center portion of the nose panel 111 is engaged with the lifting jack 13 via the hanging jig portion 7, and the other end portion side of the second water cooling wall 117 is the second hanging bracket. 121, the nose panel 111 is engaged with the small hook 137 through the operation of the lifting jack 13 and the small hook 137, and the nose panel 111 moves from the carry-in cart 123 to a portion where there is no interference such as the first pendant coil 103 or the carry-in cart 123. A certain amount (Ha) is suspended.
[0038]
(2) In FIG. 8, after the nose panel 111 is lifted by a certain amount (Ha) (the state of FIG. 7), the contraction of the rod 23b of the lifting jack 13 is temporarily stopped and attached to the nose panel 111. While holding the position, the hanging jig part 7 hangs the small hook 137 downward and causes the nose panel 111 to rotate counterclockwise (arrow Ma direction). As the nose panel 111 rotates, the center axis of the upper screen tube 109 automatically matches the center axis Pa of the lower screen tube 115. That is, as the nose panel 111 rotates, the end of the lower screen tube 115 comes to be on the axis of the end of the upper screen tube 109.
[0039]
(3) In FIG. 9, the nose panel 111 reduces the rod 23b of the lifting jack 13 and is further lifted upward by a predetermined amount (Ja). At this time, the rod 23b of the lifting jack 13 has a larger protruding amount as a rod 23a above the lifting jack 13. As the nose panel 111 is raised, the end of the upper screen tube 109 automatically matches the position of the end of the lower screen tube 115 and comes into contact therewith. When the end portions of the upper screen tube 109 and the lower screen tube 115 come into contact with each other, the contact portions are welded. Thereby, the nose panel 111 can be suspended by the ceiling steel frame 101 via the upper screen tube 109 and the lower screen tube 115, and large parts are assembled.
[0040]
【The invention's effect】
As described above, according to the present invention, a lifting jack for hanging a large part disposed below a ceiling wall pipe has one end attached to one side of the large part and the other side small. After attaching the wire from the hook of the crane and operating the lifting jack and small crane, large parts are lifted by a certain amount from the loading cart to the part where there is no interference such as pendant coil or loading cart, Since the large part is rotated at the place by the lifting jig connected to the lifting jack, the work can be performed safely. When a large part is rotated by a lifting jig, the end position of the upper screen tube holding the lifting jack and the lower screen tube attached to the large part can be easily matched, improving workability. is doing. In addition, the hanging jig matches the rotation center point for rotating the large component with the central axis of the horizontal arrangement of the pipes attached to the large component. Since the tube center axes of the upper screen tube and the lower screen tube can be made to coincide with each other only by moving, the operation is facilitated and the adjustment operation is not required, so that the operation time can be shortened. Moreover, since the lifting jack is attached to the upper screen tube in advance according to the number of divided large parts, the operation and operation of a large crane, etc. are eliminated, and the divided large type Setup work to install parts is easy. A suspension jack is disposed under the ceiling wall pipe, and unnecessary work such as drilling and closing as in the prior art is eliminated, so that the number of work steps can be reduced. In addition, the jig for assembling large parts has improved safety because a suspension jack that operates reliably is provided.
[Brief description of the drawings]
FIG. 1 is a partial perspective view of an assembling jig for a large-sized part for a thermal power plant according to an embodiment of the present invention.
FIG. 2 is a partial front view of an assembling jig for a large-sized component for a thermal power plant according to an embodiment of the present invention.
3 is a partial side view of an assembly jig for a large-sized part for a thermal power plant according to an embodiment of the present invention, and is a view taken in the direction of arrow W in FIG. 2;
4 is a partial side view of an assembling jig for a large-sized component for a thermal power plant according to an embodiment of the present invention, and is a view taken in the direction of arrow V in FIG. 2;
5 is a partial plan view of an assembling jig for a large-sized component for a thermal power plant according to an embodiment of the present invention, and is a view taken in the direction of the arrow U in FIG. 2;
FIG. 6 is a partial plan view of an assembling jig for a large-sized part for a thermal power plant according to an embodiment of the present invention.
FIG. 7 is a diagram showing an assembled construction state of large-sized parts for a thermal power plant according to the embodiment of the present invention.
FIG. 8 is a diagram showing an assembled construction state of large-sized parts for a thermal power plant according to an embodiment of the present invention.
FIG. 9 is a diagram showing an assembled construction state of large components for a thermal power plant according to an embodiment of the present invention.
FIG. 10 is a partial configuration diagram showing an example of a conventional large component for a thermal power plant.
FIG. 11 is a view showing a state of assembly of a conventional large component.
FIG. 12 is a side view of a conventional assembly jig for large parts for a thermal power plant.
13 is a plan view of a conventional assembly jig for large parts for a thermal power plant, and is a view taken in the direction of arrow Y in FIG. 12;
[Explanation of symbols]
1 Assembly jig for large parts for thermal power plant
5 Jack for lifting
7 Suspension jig part
11 Lifting jack stand
13 Lifting jack
21 Jack body
23 Rod
31 Rotating body support
33 Rotating body
49 Rotating support plate
71 Support pin
101 Ceiling steel frame
103 1st pendant coil
105 Second pendant coil
107 Ceiling wall pipe
109 Upper screen tube
111 Nose panel for large parts
115 Lower screen tube
121 Second bracket
123 Carriage
137 Small hook
Ra Support pin center position
Pa Center axis of lower screen tube (upper screen tube)

Claims (3)

発電所の蒸気発生装置内に配設される天井壁管、ペンダントコイル、あるいは、水冷壁管等の吊り下げられた大形部品を有する発電所用大形部品の組付施工法において、
搬送台車により搬入された大形部品の一端側に吊揚用ジャッキを取着し、天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結された吊治具の回動中心と、大形部品に並列に付設された配管との中心軸線とを一致させ、大形部品の他端側に吊りフックを取着して大形部品を一定量吊揚げた後に、吊りフックを下降させて、大形部品の回動により両配管の中心軸線を一致させて、再度吊揚用ジャッキにより吊揚げて一定位置に大形部品を吊り下げることを特徴とする発電所用大形部品の組付施工法。
In the assembly construction method of large parts for power plants that have suspended large parts such as ceiling wall pipes, pendant coils, or water-cooled wall pipes arranged in the steam generator of the power plant,
A suspension jack attached to a rod of a lifting jack attached to a pipe suspended through a ceiling wall pipe by attaching a lifting jack to one end side of a large part carried by a carriage. The center of rotation of the tool and the center axis of the pipe attached in parallel to the large part are aligned, and a hanging hook is attached to the other end of the large part to lift the large part by a certain amount. Later, the hanging hook is lowered, the central axes of both pipes are made to coincide with each other by turning the large parts, and then the large parts are suspended by a lifting jack to suspend the large parts at a fixed position. Assembly method for large-scale parts.
発電所の蒸気発生装置内に配設される天井壁管と、天井から吊り下げられペンダントコイルと、および、ペンダントコイルの近傍に配設された水冷壁管等の吊り下げられた大形部品とを有する発電所用大形部品の組付施工法において、
搬送台車により搬入された大形部品の一端側に吊揚用ジャッキを取着し、天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結された吊治具の回動中心と、大形部品に並列に付設された配管との中心軸線とを一致させ、かつ、他端側に吊りフックを取着して大形部品を一定量吊揚げた後に、吊りフックを下降させて、大形部品の回動により両配管の中心軸線を一致させた後、両配管を接合して大形部品を吊り下げることを特徴とする発電所用大形部品の組付施工法。
A ceiling wall tube disposed in a steam generator of a power plant, a pendant coil suspended from the ceiling, and a suspended large part such as a water-cooled wall tube disposed in the vicinity of the pendant coil; In the assembly method of large parts for power plants having
A suspension jack attached to a rod of a lifting jack attached to a pipe suspended through a ceiling wall pipe by attaching a lifting jack to one end side of a large part carried by a carriage. After aligning the center of rotation of the tool and the central axis of the pipe attached in parallel to the large part, and attaching a hanging hook to the other end side, lifting the large part by a certain amount, Assembly of large parts for a power plant characterized by lowering the hanging hooks and aligning the central axes of both pipes by turning the large parts and then hanging the large parts by joining both pipes Construction method.
発電所の蒸気発生装置内に配設される天井壁管と、天井から吊り下げられペンダントコイルと、および、ペンダントコイルの近傍に配設された水冷壁管等の吊り下げられた大形部品とを有する発電所用大形部品の組付治具において、
天井壁管を貫通して吊り下げられた配管に付設された吊揚用ジャッキのロッドに連結されるとともに、大形部品に並列に付設された配管の中心軸線と、大形部品を回動する回動中心点とが一致する吊治具を有することを特徴とする発電所用大形部品の組付治具。
A ceiling wall tube disposed in the steam generator of the power plant, a pendant coil suspended from the ceiling, and a suspended large part such as a water-cooled wall tube disposed in the vicinity of the pendant coil; In assembly jigs for large parts for power plants having
It is connected to the rod of the lifting jack attached to the pipe suspended through the ceiling wall pipe, and rotates the central part of the pipe attached in parallel to the large part and the large part. A jig for assembling a large-sized part for a power plant, comprising a hanging jig that coincides with a rotation center point.
JP14160699A 1999-05-21 1999-05-21 Assembly method of large parts for power plant and its assembly jig Expired - Fee Related JP3922416B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14160699A JP3922416B2 (en) 1999-05-21 1999-05-21 Assembly method of large parts for power plant and its assembly jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14160699A JP3922416B2 (en) 1999-05-21 1999-05-21 Assembly method of large parts for power plant and its assembly jig

Publications (2)

Publication Number Publication Date
JP2000329306A JP2000329306A (en) 2000-11-30
JP3922416B2 true JP3922416B2 (en) 2007-05-30

Family

ID=15295935

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14160699A Expired - Fee Related JP3922416B2 (en) 1999-05-21 1999-05-21 Assembly method of large parts for power plant and its assembly jig

Country Status (1)

Country Link
JP (1) JP3922416B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4221761B2 (en) 2005-09-30 2009-02-12 株式会社日立プラントテクノロジー Boiler module lifting construction method and lifting device

Also Published As

Publication number Publication date
JP2000329306A (en) 2000-11-30

Similar Documents

Publication Publication Date Title
US8469209B2 (en) Removal apparatus for a torque converter and a starting motor from an auxiliary compartment on a gas turbine
CN215761576U (en) Oil rig blowout preventer hoisting and moving system
JP3922416B2 (en) Assembly method of large parts for power plant and its assembly jig
JPH10102823A (en) Derrick device for replacing arm of power transmission tower and method of replacing arm using this
JP4349604B2 (en) Derrick device for top work of transmission tower
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
JP3973215B2 (en) Steel tower-mounted base bar device and its assembly method
CN118929397A (en) Method for improving installation efficiency of heating surface modules of gas waste heat boiler by using lifting frame
CN217350368U (en) Steel bar hoisting tool for construction
US8474633B2 (en) Methods of removing a torque converter and a starting motor from an auxiliary compartment of a gas turbine
JP2002004635A (en) Device for assembling steel pipe column
CN115448144A (en) Assembled in-row pipeline hoisting device and hoisting method
CN210480628U (en) Rotatory hoist of two-way self-balancing
JPH0762885A (en) Steel post alignment jig device
CN116716936B (en) A quick-change device, method and engineering machinery for bulldozer blades
CN218801976U (en) Hydro-cylinder installation auxiliary fixtures
CN223397370U (en) A lifting device
CN112125171A (en) An economizer hoisting device and hoisting method
JP3620018B2 (en) Pin type coupling device
CN220549920U (en) Steel construction box turning device
CN224132550U (en) Clip type lifting beam for lifting and transporting white body of magnetic levitation vehicle
CN111503618B (en) Tube panel assembly capable of preventing fin from cracking and tube clamp thereof
CN216640300U (en) Jig frame for integrally binding reinforcing steel bars
CN222831797U (en) Connection structure of overhead crane fixture placement frame
CN222768398U (en) Novel assembly bracket

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040908

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061211

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070201

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070214

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140302

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees