JP3925424B2 - Continuous hot dipping method - Google Patents
Continuous hot dipping method Download PDFInfo
- Publication number
- JP3925424B2 JP3925424B2 JP2003039162A JP2003039162A JP3925424B2 JP 3925424 B2 JP3925424 B2 JP 3925424B2 JP 2003039162 A JP2003039162 A JP 2003039162A JP 2003039162 A JP2003039162 A JP 2003039162A JP 3925424 B2 JP3925424 B2 JP 3925424B2
- Authority
- JP
- Japan
- Prior art keywords
- bath
- support roll
- roll
- amount
- steel strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Coating With Molten Metal (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、例えば鋼帯の連続溶融金属めっき方法に関する。
【0002】
【従来の技術】
鋼帯に連続して溶融金属のめっきを施す方法としては、例えば図4に示すように、めっき槽1内の溶融金属2中にスナウト(図示せず)を介して斜め下方に導入された鋼帯Sをシンクロール3によって上方に方向転換した後、めっき槽1内でロール軸の高さを相互にずらせて配置した上方浴中サポートロール4と下方浴中サポートロール5との間に挟み込みながら通過させ、次いで、めっき槽1の上方位置で溶融金属の付着した鋼帯Sにガスワイピングノズル6からガスを吹き付けて溶融金属の付着量を制御するようにしたものが知られている。なお、図中符号7は鋼帯Sをめっき槽1上に引き上げるための浴上サポートロールである。また、ガスワイピングノズル6の位置には、鋼帯エッジ部でのエッジオーバーコート(付着量過多)やスプラッシュ欠陥等の発生を防止するために、バッフルプレート8が鋼帯Sの幅方向の両側に近接配置されている。
【0003】
ところで、ガスワイピングにより溶融金属の付着量を鋼帯Sの全面に亘って均一に制御するためには、ガスワイピング位置での鋼帯Sが適正なパスラインを通過することが要求される。
このような要求に応える技術として、従来においては、シンクロール3と浴上サポートロール7との位置から決定される基準パスラインLa(通常、シンクロール3の周面における鉛直の接線方向に沿うライン)から上方浴中サポートロール4の周面までの距離をオフセット量Xaとした場合に、ガスワイピング位置での鋼帯Sのパスラインが基準パスラインLaに一致するオフセット量Xaを鋼帯Sの板厚の関数F(t)を基に設定して上方浴中サポートロール4の位置を調整するようにした連続溶融金属めっき方法が提案されている(例えば特許文献1参照)。
【0004】
【特許文献1】
特開2000−239821号公報
【0005】
【発明が解決しようとする課題】
上記特許文献1に記載の連続溶融金属めっき方法においては、板厚の関数F(t)は、設備仕様、並びにシンクロール3及び両浴中サポートロール4,5のロール径やロール配置により影響を受けるため、操業データの解析により決定する必要があるが、浴中のロールは1週間〜1カ月毎に交換するため、設備をオンラインするときの各ロールの設置精度、寸法測定精度、浴中ロールの支持部材であるサポートハンガー9等の熱変形により、操業データの解析により決定した関数F(t)が実際には誤差が大きい。
【0006】
即ち、サポートロールハンガー9は浴面の変動により熱膨張量が変化し、シンクロール3や両浴中サポートロール4,5は操業後の亜鉛付着物等の除去程度の差により径が変化するため、サポートロールハンガー9の熱膨張量、両浴中サポートロール4,5の形状(径)、シンクロール3の形状(径)が設置する毎に全く同一とは限らず、適正な関数F(t)が設置する毎に変わってしまう。
【0007】
このため、関数F(t)を一定にしたままだと、ガスワイピング位置での鋼帯Sに対して、適正なパスラインを通過させることが困難となる。この結果、鋼帯Sの基準パスラインLaからのずれによるエッジオーバーコート、スプラッシュ欠陥、付着量の表裏差が生じたり、また、ガスワイピングにより溶融金属の付着量を鋼帯Sの全面に亘って均一に制御することができなくなる。
【0008】
更に、ガスワイピングノズル6の上方に配置された浴上サポートロール7はガスワイピング位置での鋼帯Sのパスラインに大きな影響を与えるが、製造する鋼帯Sの種類によっては浴上サポートロール7で鋼帯Sをピンチせずに開放することがあるため、該開放時には関数F(t)が適正か否かにかかわらず鋼帯Sが適正なパスラインからずれてしまうことになる。
【0009】
本発明はこのような不都合を解消するためになされたものであり、帯板がワイピング位置を通過する際に、浴上サポートロールの状態にかかわらず適正なパスライン位置を保ちながら平坦に通板できる連続溶融めっき方法を提供することを目的とする。
【0010】
【課題を解決するための手段】
上記目的を達成するために、請求項1に係る発明は、めっき槽に導いた帯板をシンクロールを介して上方に方向転換した後、前記めっき槽内でロール軸の高さを相互にずらせて配置した上方浴中サポートロールと下方浴中サポートロールとの間に挟み込みながら通過させ、その後、前記めっき槽の上方位置でワイピングを施すようにした連続溶融めっき方法において、
前記めっき槽内に前記シンクロール、前記上方浴中サポートロール及び前記下方浴中サポートロールを設置した後、既知の板厚の帯板を通板させて該帯板の前記ワイピング位置における基準パスラインからのずれ量を確認しながら前記上方浴中サポートロールの位置を調整することにより、該ずれ量を適正範囲内に修正して前記上方浴中サポートロールの位置の初期設定を行い、その後の操業にあたっては、予め前記ワイピング位置の上方に配置された浴上サポートロールのピンチ状態及び開放状態毎に区別して定められた前記反り状態が適正範囲内となる帯板の板厚変化量と前記上方浴中サポートロール位置変更量との関係を基に、通板する帯板の板厚変化量及び前記浴上サポートロールの状態に応じて前記上方浴中サポートロールの位置を調整することを特徴とする。
【0011】
【発明の実施の形態】
以下、本発明の実施の形態の一例を図を参照して説明する。図1は本発明の実施の形態の一例である連続溶融金属めっき方法を実施する設備の概略図、図2は上方浴中サポートロールの位置調整を説明するための説明図、図3はガスワイピング位置で鋼帯が適正パスライン(基準パスライン)に沿うときの上方浴中サポートロールの位置変更量ΔFと板厚変化量Δtとの関係を浴上サポートロールのピンチ状態及び開放状態毎に示した図である。
【0012】
本発明の実施の形態の一例である連続溶融金属めっき方法は、図1及び図2に示すように、めっき槽11内の溶融金属12中にスナウト10を介して斜め下方に導入された鋼帯Sをシンクロール13によって上方に方向転換した後、めっき槽11内でロール軸の高さを相互にずらせて配置した上方浴中サポートロール14と下方浴中サポートロール15との間に挟み込みんだ状態で浴上サポートロール17を介してめっき槽11上に引き上げて通板し、次いで、めっき槽11の上方位置で溶融金属の付着した鋼帯Sにガスワイピングノズル16からガスを吹き付けて溶融金属の付着量を制御するようにしたものである。なお、ガスワイピングノズル16の位置には、バッフルプレート18が鋼帯Sの幅方向の両側に近接配置されている。また、図1中符号19は上方浴中サポートロール14及び下方浴中サポートロール15の支持部材としてのサポートハンガーである。
【0013】
ここで、この実施の形態では、操業を行うに際し、まず、めっき槽11内にシンクロール13、上方浴中サポートロール14及び下方浴中サポートロール15を設置した後、既知の板厚の鋼帯Sを通板させて該鋼帯Sの前記ガスワイピング位置における基準パスラインLa(シンクロール13と浴上サポートロール17との位置から決定されるパスラインで、通常、シンクロール13の周面における鉛直の接線方向に沿うライン)からのずれ量を確認しながら上方浴中サポートロール14の基準パスラインLaに対する垂直方向の位置を調整することにより、該ずれ量を適正範囲内に修正し、該上方浴中サポートロール14の位置の初期設定を行う。
【0014】
そして、その後の操業にあたっては、予め浴上サポートロール17のピンチ状態及び開放状態毎にオンライン実験等により定められた、前記ずれ量が適正範囲内(例えば前記ずれ量=0:ガスワイピング位置での鋼帯Sのパスラインと基準パスラインLaとが一致)となる鋼帯Sの板厚変化量Δtと上方浴中サポートロール14の基準パスラインLaの垂直方向に対する位置変更量ΔFとの関係を基に、通板する鋼帯Sの板厚変化量Δt及び浴上サポートロール17の状態(ピンチ状態、開放状態)に応じて上方浴中サポートロール14の基準パスラインLaに対する垂直方向の位置を調整する。
【0015】
図3に、オンライン実験により測定して得られたガスワイピング位置で鋼帯Sが適正パスライン(基準パスラインLa)に沿うときの上方浴中サポートロール14の位置変更量ΔFと板厚変化量Δtとの関係を浴上サポートロール17のピンチ状態と開放状態とに分けて示す。
図3から、浴上サポートロール17がピンチ状態の場合は、上方浴中サポートロール14の位置変更量ΔFと板厚変化量Δtとの関係が、ΔF=−6.1×Δtとなり、浴上サポートロール17が開放状態の場合は、上方浴中サポートロール14の位置変更量ΔFと板厚変化量Δtとの関係が、ΔF=−7.6×Δtとなり、いずれの場合も図のΔF=0、Δt=0が上述した初期設定となる。なお、これらの関係は、設備仕様等で決まる。また、板厚変化量Δtは板厚自体よりも変動が小さいため、ΔFの大きなずれも発生しないで済む。
【0016】
このようにこの実施の形態では、めっき槽11内にシンクロール13、両浴中サポートロール14,15を設置した後、既知の板厚の鋼帯Sを通板させ、このときにガスワイピング位置での鋼帯Sのずれ量を適正範囲内に修正して上浴中サポートロール14の位置の初期設定を行い、その後の操業にあたっては、予め浴上サポートロール17のピンチ状態及び開放状態毎に定められた前記ずれ量が適正範囲内となる鋼帯Sの板厚変化量Δtと上浴中サポートロール14の位置変更量ΔFとの関係を基に、通板する鋼帯Sの板厚変化量Δt及び浴上サポートロール17の状態に応じて上浴中サポートロール14の位置を調整するようにしているので、浴中ロール交換時に設備をオンラインする際の各浴中ロールの設置精度、寸法測定精度、サポートハンガー19の熱変形等による誤差を吸収して、鋼帯Sがガスワイピング位置を通過する際に、浴上サポートロール17の状態にかかわらず適正なパスライン位置を保ちながら平坦に通板でき、この結果、エッジオーバーコート、スプラッシュ欠陥、付着量の表裏差、溶融金属の幅方向の付着分布のばらつきを大幅に抑制することができる。
【0017】
【実施例】
図1及び図2に示した連続溶融めっき設備を用いて、鋼帯Sに溶融金属めっきを施す際に、本発明法に従って、めっき槽l1にシンクロール13、両浴中サポートロール14,15を設置した直後に、既知の板厚(基準板厚=0.8mm)の鋼帯Sを通板しつつ上浴中サポートロール14の位置を調整して、ガスワイピングノズル16位置における鋼帯Sのパスラインからのずれ量を適正範囲に修正した。そのときの上方浴中サポートロール14の位置を基準位置として初期設定した。
【0018】
その後に、幅1300mm、板厚0.8〜1.0mmの鋼帯Sを3000m通板するにあたり、板厚変化量△t、すなわち、通板する鋼帯Sの板厚と前記基準板厚との板厚差及び浴上サポートロール17の状態(ピンチ状態、開放状態)に基づき、上方浴中サポートロール14の位置を調整した。上方浴中サポートロール14の前記基準位置からの位置変更量ΔFは、浴上サポートロール17がピンチ状態のときは、
ΔF(mm)=−6.1×△t(mm)
とし、浴上サポートロール17が開放状態のときは、
ΔF(mm)=−7.6×△t(mm)
とした。
【0019】
なお、通板する鋼帯Sの板厚はオンラインで板厚計により実測して求め、この実測値と、近接スイッチにより検出した浴上サポートロール17の状態に基づいて上記△Fを制御するようにした。また、通板にあたっては、溶融金属の付着量の目標値を40g/m2 として溶融金属めっきを施した。
また、比較のために、従来法として、めっき槽11にシンクロール13、両浴中サポートロール14,15を設置した後、上方浴中サポートロール14の位置を予め設定された板厚の関数F(t)を基に調整するようにして、同じぐ幅1300mm、板厚0.8〜1mmの鋼帯Sを3000m通板し、溶融金属の付着量の目標値は40g/m2 として溶融金属めっきを施した。
【0020】
それぞれの場合について、連続溶融めっき設備の出側で溶融金属の付着量を測定した。付着量の測定は、鋼帯Sの表面と裏面それぞれについて、鋼帯Sの幅方向に30点測定して表面と裏面とでの付着量差の平均値を求めた。そして、この測定を鋼帯Sの長さ100mあたりに1回の頻度で行った。
従来法に従った場合には、溶融金属の付着量差の平均値が6.4g/m2 であり、これに対して、本発明法に従った場合には、溶融金属の付着量差の平均値が2.5g/m2 であった。したがって、本発明法によれば、溶融金属の表面と裏面との付着量差の平均値を従来法に比べて約60%低減できることが判る。
【0021】
【発明の効果】
上記の説明から明らかなように、本発明によれば、帯板がワイピング位置を通過する際に、浴上サポートロールの状態にかかわらず適正なパスライン位置を保ちながら平坦に通板できるので、エッジオーバーコート、スプラッシュ欠陥、付着量の表裏差、溶融金属の幅方向の付着分布のばらつきを大幅に抑制することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態の一例である連続溶融金属めっき方法を実施する設備の概略図である。
【図2】上方浴中サポートロールの位置調整を説明するための説明図である。
【図3】ガスワイピング位置で鋼帯が適正パスライン(基準パスライン)に沿うときの上方浴中サポートロールの位置変更量ΔFと板厚変化量Δtとの関係を浴上サポートロールのピンチ状態及び開放状態毎に示したグラフ図である。
【図4】従来の連続溶融金属めっき方法を説明するための設備概略図である。
【符号の説明】
S…鋼帯(帯板)
11…めっき槽
13…シンクロール
14…上方浴中サポートロール
15…下方浴中サポートロール
16…ガスワイピングノズル
17…浴上サポートロール
La…基準パスライン
Δt…板厚変化量
ΔF…上方浴中サポートロール位置変更量[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a continuous molten metal plating method for steel strip, for example.
[0002]
[Prior art]
For example, as shown in FIG. 4, steel that is introduced obliquely downward into the
[0003]
By the way, in order to uniformly control the adhesion amount of the molten metal over the entire surface of the steel strip S by gas wiping, the steel strip S at the gas wiping position is required to pass through an appropriate pass line.
As a technology that meets such a requirement, conventionally, a reference pass line La (usually a line along a vertical tangential direction on the peripheral surface of the
[0004]
[Patent Document 1]
Japanese Patent Laid-Open No. 2000-239821
[Problems to be solved by the invention]
In the continuous molten metal plating method described in
[0006]
That is, the
[0007]
For this reason, if the function F (t) is kept constant, it becomes difficult to pass an appropriate pass line through the steel strip S at the gas wiping position. As a result, edge overcoat due to deviation of the steel strip S from the reference pass line La, splash defects, and difference in the amount of adhesion occur, or the amount of molten metal deposited over the entire surface of the steel strip S by gas wiping. It becomes impossible to control uniformly.
[0008]
Furthermore, the on-bath support roll 7 disposed above the
[0009]
The present invention has been made to eliminate such inconveniences, and when the strip passes through the wiping position, it passes flatly while maintaining an appropriate pass line position regardless of the state of the support roll on the bath. It aims at providing the continuous hot dipping method which can be performed.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, according to the first aspect of the present invention, the direction of the strip plate led to the plating tank is changed upward through the sink roll, and then the height of the roll shaft is shifted in the plating tank. In the continuous hot dipping method in which it is allowed to pass between the support roll in the upper bath and the support roll in the lower bath that are disposed in the upper bath, and then wiped at the upper position of the plating tank,
After the sink roll, the upper bath support roll and the lower bath support roll are installed in the plating tank, a band plate having a known plate thickness is passed through the reference pass line at the wiping position of the band plate. By adjusting the position of the support roll in the upper bath while confirming the amount of deviation from the upper bath, the position of the support roll in the upper bath is initially set by correcting the amount of deviation within the appropriate range, and the subsequent operation In this case, the amount of change in the thickness of the strip and the upper bath in which the warped state determined separately for each of the pinch state and the open state of the on-bath support roll disposed in advance above the wiping position is within an appropriate range. The position of the support roll in the upper bath according to the thickness change amount of the strip to be passed and the state of the support roll on the bath based on the relationship with the change amount of the middle support roll position And adjusting.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an example of an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a schematic view of equipment for performing a continuous molten metal plating method as an example of an embodiment of the present invention, FIG. 2 is an explanatory view for explaining the position adjustment of a support roll in an upper bath, and FIG. 3 is a gas wiping Shows the relationship between the position change amount ΔF and the plate thickness change amount Δt of the support roll in the upper bath when the steel strip is along the appropriate pass line (reference pass line) at each position for each pinch state and open state of the support roll on the bath It is a figure.
[0012]
As shown in FIGS. 1 and 2, a continuous molten metal plating method as an example of an embodiment of the present invention is a steel strip introduced obliquely downward through a
[0013]
Here, in this embodiment, when the operation is performed, first, after installing the
[0014]
In the subsequent operation, the deviation amount determined in advance by an on-line experiment or the like for each pinch state and open state of the
[0015]
FIG. 3 shows the position change amount ΔF and the plate thickness change amount of the
From FIG. 3, when the on-
[0016]
Thus, in this embodiment, after installing the
[0017]
【Example】
1 and FIG. 2, when the steel strip S is subjected to hot metal plating, the
[0018]
Thereafter, in passing a steel strip S having a width of 1300 mm and a thickness of 0.8 to 1.0 mm through 3000 m, the thickness change Δt, that is, the thickness of the steel strip S to be passed and the reference thickness The position of the
ΔF (mm) = − 6.1 × Δt (mm)
When the
ΔF (mm) = − 7.6 × Δt (mm)
It was.
[0019]
In addition, the thickness of the steel strip S to be passed is obtained by online measurement using a thickness gauge, and the above ΔF is controlled based on this measured value and the state of the on-
For comparison, as a conventional method, after installing the
[0020]
In each case, the adhesion amount of the molten metal was measured on the exit side of the continuous hot dipping plating equipment. The adhesion amount was measured by measuring 30 points in the width direction of the steel strip S for each of the front and back surfaces of the steel strip S, and obtaining the average value of the difference in adhesion amount between the front and back surfaces. And this measurement was performed once per 100 m length of the steel strip S.
When the conventional method is followed, the average value of the difference in the adhesion amount of the molten metal is 6.4 g / m 2. On the other hand, when the method according to the present invention is followed, the difference in the adhesion amount of the molten metal. The average value was 2.5 g / m 2 . Therefore, according to the method of the present invention, it can be seen that the average value of the difference in the amount of adhesion between the front and back surfaces of the molten metal can be reduced by about 60% compared to the conventional method.
[0021]
【The invention's effect】
As apparent from the above description, according to the present invention, when the strip passes through the wiping position, it can be passed flat while maintaining an appropriate pass line position regardless of the state of the support roll on the bath. Edge overcoat, splash defects, difference in adhesion amount, and variation in adhesion distribution in the width direction of molten metal can be greatly suppressed.
[Brief description of the drawings]
FIG. 1 is a schematic view of equipment for performing a continuous molten metal plating method as an example of an embodiment of the present invention.
FIG. 2 is an explanatory diagram for explaining position adjustment of a support roll in an upper bath.
FIG. 3 shows the relationship between the position change amount ΔF and the plate thickness change amount Δt of the support roll in the upper bath when the steel strip follows the appropriate pass line (reference pass line) at the gas wiping position, and the pinch state of the support roll on the bath It is the graph shown for every open state.
FIG. 4 is a schematic diagram of equipment for explaining a conventional continuous molten metal plating method.
[Explanation of symbols]
S ... Steel strip (strip)
DESCRIPTION OF
Claims (1)
前記めっき槽内に前記シンクロール、前記上方浴中サポートロール及び前記下方浴中サポートロールを設置した後、既知の板厚の帯板を通板させて該帯板の前記ワイピング位置における基準パスラインからのずれ量を確認しながら前記上方浴中サポートロールの位置を調整することにより、該ずれ量を適正範囲内に修正して前記上方浴中サポートロールの位置の初期設定を行い、その後の操業にあたっては、予め前記ワイピング位置の上方に配置された浴上サポートロールのピンチ状態及び開放状態毎に区別して定められた前記反り状態が適正範囲内となる帯板の板厚変化量と前記上方浴中サポートロール位置変更量との関係を基に、通板する帯板の板厚変化量及び前記浴上サポートロールの状態に応じて前記上方浴中サポートロールの位置を調整することを特徴とする連続溶融めっき方法。After the direction of the strip led to the plating tank is changed upward via the sink roll, the support roll in the upper bath and the support roll in the lower bath arranged in the plating tank with the heights of the roll shafts being shifted from each other. In the continuous hot-dip plating method in which the wiping is performed at the upper position of the plating tank, while passing between them,
After the sink roll, the upper bath support roll and the lower bath support roll are installed in the plating tank, a band plate having a known plate thickness is passed through the reference pass line at the wiping position of the band plate. By adjusting the position of the support roll in the upper bath while confirming the amount of deviation from the upper bath, the position of the support roll in the upper bath is initially set by correcting the amount of deviation within the appropriate range, and the subsequent operation In this case, the amount of change in the thickness of the strip and the upper bath in which the warped state determined separately for each of the pinch state and the open state of the on-bath support roll disposed in advance above the wiping position is within an appropriate range. The position of the support roll in the upper bath according to the thickness change amount of the strip to be passed and the state of the support roll on the bath based on the relationship with the change amount of the middle support roll position METHOD continuous hot dipping, characterized in that the adjusting.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003039162A JP3925424B2 (en) | 2003-02-18 | 2003-02-18 | Continuous hot dipping method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003039162A JP3925424B2 (en) | 2003-02-18 | 2003-02-18 | Continuous hot dipping method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004250718A JP2004250718A (en) | 2004-09-09 |
| JP3925424B2 true JP3925424B2 (en) | 2007-06-06 |
Family
ID=33023408
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003039162A Expired - Fee Related JP3925424B2 (en) | 2003-02-18 | 2003-02-18 | Continuous hot dipping method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3925424B2 (en) |
-
2003
- 2003-02-18 JP JP2003039162A patent/JP3925424B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004250718A (en) | 2004-09-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11685984B2 (en) | Method for controlling a coating weight uniformity in industrial galvanizing lines | |
| CN110809633B (en) | Hot dip coating apparatus and hot dip coating method | |
| JP3925424B2 (en) | Continuous hot dipping method | |
| JP4507681B2 (en) | Temperature control method for plating bath for hot dip galvanized steel sheet | |
| JP2009275243A (en) | Method for measuring mass of plated film per unit area on hot-dip metal-plated steel sheet, and device for measuring mass of plated film per unit area | |
| JP3876829B2 (en) | Continuous hot dipping method | |
| JPH08199323A (en) | Apparatus and method for controlling coating amount of hot-dipped steel sheet | |
| JP3111857B2 (en) | Shape control method for hot-dip coated steel sheet | |
| JP5131010B2 (en) | Continuous molten metal plating system and plating method | |
| JPH0525604A (en) | Alloying controller for hot dip coating equipment | |
| JP5015055B2 (en) | Plating adhesion amount control apparatus, control method thereof, and computer program in continuous molten metal plating line | |
| JPH09302453A (en) | Method for controlling amount of hot-dip galvanized steel sheet | |
| JP6303581B2 (en) | Wiping device | |
| JP3096166B2 (en) | Plating equipment for continuous hot metal plating line | |
| KR100443145B1 (en) | Method for estimating the curvature of strip on the top of zinc bath and system thereof | |
| JP2000192214A (en) | Coating weight measuring device | |
| JP2000199043A (en) | Method for correcting coating weight of steel strip, method for detecting warpage, and method for straightening | |
| JP2000239821A (en) | Continuous hot metal plating method for steel strip | |
| JPH07126824A (en) | Method for manufacturing hot-dip galvanized steel sheet | |
| JP2009275242A (en) | Method for manufacturing hot-dip metal-plated steel sheet, and manufacturing apparatus therefor | |
| JP3719226B2 (en) | Method for producing a metal plate with good plate profile | |
| JPH06299311A (en) | Warpage correcting device and correcting method for strip in continuous hot dip metal coating equipment | |
| JP3755492B2 (en) | Alloyed hot-dip galvanized steel sheet and method for producing the same | |
| JPH07268588A (en) | How to control the amount of plated metal | |
| JP3535131B2 (en) | Manufacturing method of hot dip galvanized steel strip |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051026 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070125 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070206 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070219 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100309 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110309 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |