JP3939259B2 - Cable core switching test device - Google Patents
Cable core switching test device Download PDFInfo
- Publication number
- JP3939259B2 JP3939259B2 JP2003056792A JP2003056792A JP3939259B2 JP 3939259 B2 JP3939259 B2 JP 3939259B2 JP 2003056792 A JP2003056792 A JP 2003056792A JP 2003056792 A JP2003056792 A JP 2003056792A JP 3939259 B2 JP3939259 B2 JP 3939259B2
- Authority
- JP
- Japan
- Prior art keywords
- circuit
- terminal
- test
- core
- external terminals
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、通信ケーブル(信号ケーブル)の駅間切替え、或いは中間切替えなど、通信ケーブルの切替(更新)において行われる、既設ケーブル心線(回線)の導通試験による心線の確認(心線確認又は確認試験ともいう)や、新設ケーブル心線の導通試験(心線確認)、導体抵抗試験、絶縁抵抗試験などのケーブル心線の切替に好適なケーブル心線切替試験装置に関する。
【0002】
【従来の技術】
従来、通信ケーブルの寿命等に基づくその切替に使用される、ケーブル心線切替試験装置というものはなかった。このため、従来の通信ケーブルの寿命等に基づくその切替(更新)作業は次のように行なわれていた。図10を参照して説明する。
例えば鉄道のC駅(以下、C機器室(配線盤)又は単にCという)とD駅(以下、D機器室(配線盤)又は単にDという)間を結ぶ通信ケーブル50Pについて、その通信ケーブルの中間におけるA接続点(以下、Aという)とB接続点(以下、Bという)の間の既設ケーブルP1を新設ケーブルP2に切替える(取替える)場合で説明する。
【0003】
この切替に際しては、切替前にA、B、C、Dの各点(各場所)にそれぞれ作業者を配置し、通話試験の後、予めサグリ線の確認等の切替前作業をする。A、B、C、Dの各点における切替前作業、準備内容はそれぞれ次のようである。ただし、C機器室が測定(試験確認)側で、D機器室が、追い出し(線番確認)側とする。なお、作業の進行に当っては、配置された各作業者相互間で打合せ回線を利用して、通話試験の後、作業内容を打合せ確認しながら実施する。
【0004】
(A、B点での切替前作業、準備内容)
1 通話試験:打合せ回線にモニター及びヘッドホンを接続し、他の各点との通話試験を行う。
2 サグリ線の確認試験:アナログテスターATの(−)側テスト棒をクリップなどで、作業者間において予め決定してあるサグリ線(50L2)に接続する。そして、A、D点間と、B、D点間で、それぞれサグリ線の確認試験を行い、切替の準備する。なお、このサグリ線の確認試験においては、それぞれ予め決めてある他の未使用線(例えば、モニターライン)を利用し、それにアナログテスターATの(+)側の端子を接触させることで行うのであるが、このときD点(追い出し側)では後述するよう、サグリ線とその他の未使用線(例えば、モニターライン)との間でループをとって導通させる。
【0005】
(C点(測定側)での切替前作業、準備内容)
1 通話試験:打合せ回線にモニター及びヘッドホンを接続し、他の各点との通話試験を行う。
2 サグリ線の確認試験:導通試験用のアナログテスターATの(−)側テスト棒をクリップなどで、作業者間において予め決定してある、サグリ線(50L2)の端子に接続する。そして、C、D点間で、サグリ線の確認試験を行い、切替の準備する。このサグリ線の確認試験では、予め決めてある他の未使用線の端子を利用する点は、前記A、B点での内容と同様である。
3 新設ケーブルへの切替後に、導体抵抗を測定するためのデジタルテスター及び絶縁抵抗を測定するための絶縁抵抗計を用意しておく。
【0006】
(D点(追い出し側)での作業、準備内容)
1 通話試験:打合せ回線にモニター及びヘッドホンを接続し、他の各点との通話試験を行う。
2 サグリ線の確認試験:サグリ線用クリップコード(以下、クリップコードともいう)SCの一方を予め決定してあるサグリ線(50L2)端子に接続し、各点とのサグリ線の確認試験を行う。この各点とのサグリ線の確認試験では、予め決めてある他の未使用線の端子にクリップコードの他方を接触させる。
【0007】
以上のようにして、各点で切替前の作業、準備(さぐり線の確認など)を実施する。そして、その切替前作業、準備を実施した後、次のようにして切替作業にかかる。
【0008】
(切替作業)
1 C点及びD点のそれぞれの切替回線の心線切り分け端子(配線端子)において、ケーブルをオープンにし、無負荷、無電圧の状態にする。なお、C点では、アナログテスターATの−側テスト棒は、サグリ線(50L2)の端子に接続してある。また、D点では、クリップコードSCの一方端子がサグリ線(50L2)端子に接続してある。
2 C機器室、D機器室間で、切り替えるべき既設のケーブル心線の線番及び1L1、1L2の確認(心線の導通試験)を、C点、D点の作業者が打合せしつつ実施する。
D点の作業者は、サグリ線のクリップコードSCの他方端子を該当線番の端子(1L1)に当接する。一方、C点の作業者は、アナログテスターATの+側テスト棒を、該当線番の端子(1L1)に当接する。そして、心線の確認試験(導通試験)をする。この確認は、C点でアナログテスターATの針の振れを見ることによる。
次に対(ペア)をなす他方のケーブル心線1L2について、同様にしてC、D間での導通試験をする。
3 次に、A、D間で、ケーブル心線の線番及び1L1、1L2の確認(心線の導通試験)をする。
A点での作業は、アナログテスターATの+側テスト棒を、該当線番の心線(1L1)に当接し、導通を確認する。この確認のとき、D点の作業者は、サグリ線のクリップコードSCの他方端子を該当線番の端子(1L1)に当接する。
次に対をなす他方のケーブル心線1L2について、同様にしてA、D間での導通試験をする。
4 そして、B、D間でも、ケーブル心線の線番及び1L1、1L2の確認(心線の導通試験)をする。
B点での作業は、アナログテスターATの+側テスト棒を、該当線番の心線(1L1)に当接し、導通を確認する。この確認のときも、D点の作業者は、前と同様にサグリ線のクリップコードSCの他方端子を該当線番の端子(1L1)に当接する。
次に対をなす他方のケーブル心線1L2について、同様にしてB、D間での導通試験をする。
5 A点及びB点で、導通試験した既設のケーブル(1L1、1L2のA、B間)を切断する。
6 切断したA、B間のケーブル(1L1、1L2)を捨てる。そして、残存させる、C点寄り部位の端と、D点寄り部位の端との間に、新設ケーブル(1L1、1L2)を配置して、その各心線の各端と接続し、新設ケーブルP2に切替える。
【0009】
このようにして既設ケーブルP1を新設ケーブルP2に切替た後は、新設ケーブルの心線(1L1、1L2)について、導通試験、導体抵抗試験、絶縁抵抗試験を次々と実施する。その切替後の作業手順は次のようである。
【0010】
(1 導通試験)
1 C機器室、D機器室間で、ケーブル心線の線番及び1L1、1L2の確認をする。
D点の作業者は、サグリ線のクリップコードSCの他方端子を該当線番の端子(1L1)に当接する。一方、C点の作業者は、アナログテスターATの+側テスト棒を、該当線番の端子(1L1)に当接する。そして、心線の確認試験(導通試験)をする。
その後、1L2についても、同様にしてその導通試験をする。
(2 導体抵抗測定試験)
2 C、D間で導体抵抗の測定。
D点の作業者は、クリップコードSCの各端子を、該当線番1L1、1L2の各端子に当接する。一方、C点の作業者は、デジタルテスター(図示せず)の+、−の各端子を、該当線番1L1、1L2の各端子に当接する。そして、1L1、1L2の導体抵抗値を読み記録する。
(3 絶縁抵抗測定)
3 C点において(C点の作業者は)、1L1−E(アース)間、1L2−E間、1L1−1L2間の絶縁抵抗を測定する。
1L1−E間の絶縁抵抗は、図示しないが、絶縁抵抗計のアースコードをC機器室のアース端子に接続し、ラインコードを該当端子の1L1に当接し、1L1−E間の抵抗値を記録する。
1L2−E間の絶縁抵抗は、絶縁抵抗計のアースコードをC機器室のアース端子に接続し、ラインコードを該当端子の1L2に当接し、1L2−E間の抵抗値を記録する。
1L1−1L2間の絶縁抵抗は、絶縁抵抗計のアースコードを該当端子の1L1に当接し、ラインコードを該当端子の1L2に当接し、1L1−1L2間の抵抗値を記録する。
【0011】
4 C点において絶縁抵抗測定をし終えた後は、アース用クリップコードを該当線番端子1L1、1L2のそれぞれに当接して、心線に帯電した電荷をアースに逃がす。
5 C点及びD点で、切り分け端子を元の状態に戻し、接続通信装置間での試験を行い、正常を確認する。
こうして、1回線(1L1、1L2)分の切り替え作業、及び切り替え作業後の導通試験、導体抵抗測定試験、絶縁抵抗測定等を終了する。
そして、この後は、ケーブルの回線数(2L1、2L2から、切替対象のケーブル線番、例えば50L1、50L2まで)分、上記したようにして、既設ケーブルの心線の確認試験(導通試験)及び新設ケーブルの心線の導通試験等を順次実施していた。
【0012】
【発明が解決しようとする課題】
このように、従来のケーブルの切替作業においては、既設ケーブルP1の心線の導通試験(確認試験)を、そして新設ケーブルP2の心線の導通試験等を行う必要があり、そのケーブルの切替作業は、とくにC点、D点において極めて煩雑なものとなっていた。すなわち、ケーブルの対をなす心線又は1本の心線ごと、C点における作業者は、C機器室の各端子に対し、各試験機器(アナログテスターAT等)の各端子の接触、或いは分離を繰り返さないといけない。またD点における作業者も、切り替え作業前の導通試験、切り替え作業後の導通試験、導体抵抗試験において、D機器室の端子間で試験に必要な導通を得るため、その各端子にクリップコードSCの端子の接触、分離を繰り返さないといけない。
【0013】
このように、従来のケーブルの切替作業においては、その切り替え作業前と後において、各試験に対応して、C、D両機器室における作業者は連絡を取りながら頻繁に各試験機器のリード端子や、クリップコードの端子による、配線端子への接触、分離を繰り返さないといけないなど、その作業は極めて面倒なものとされていた。しかも、通信ケーブルの切替えは、限られた時間内で誤りなく行うことが必要であるため、各作業者においては、極めて緊張を強いられる大変な作業となっていた。
【0014】
加えて、ケーブル心線の数は、数十、或いは百以上にも及ぶことがあり、その場合には、C、D両機器室においてその数の配線端子が縦列する形となる。一方、作業者において、試験機器のリード端子や、クリップコードの端子を、機器室における配線端子へ接触、分離を繰り返す際には、その接触をさせるべき配線端子、つまり既に接触をさせた配線端子の次に位置する同端子を目で追って確認していた。このため、外観上の差異のない配線端子相互間で、試験済みのものや未試験のもの、或いは未試験のものでも本来試験すべきものを飛ばしてしまうなどの感違いを招き易く、これが誤試験を発生させ、円滑な作業の進行を阻害することもあった。その結果、誤った無駄な作業を繰り返すなど、従来のケーブルの切替においては、その作業時間が長くなり、その作業コストの増大を招いていた。
【0015】
本発明は、こうした問題点に鑑みてなされたもので、従来におけるこうしたケーブルの切り替え前、後における、ケーブル心線切替試験の格段の簡易迅速化を図ることのできるケーブル心線切替試験装置を提供することを目的としてなされたものである。
【0016】
【課題を解決するための手段】
上記の目的を達成するための請求項1に記載のケーブル心線切替試験装置は、試験対象をなすケーブルの一対をなす心線(L1、L2)に接続可能の2つの心線接続端子(T1、T2)と、1つのサグリ線接続端子(ST)と、導通試験器接続用の2つの外部端子(TM1、TM2)と、導体抵抗測定器接続用の2つの外部端子(TM3、TM4)と、絶縁抵抗計接続用の2つの外部端子(TM5、TM6)と、アース接続用の1つのアース接続用外部端子(TM7)と、
前記サグリ線接続端子(ST)と前記導通試験器接続用の外部端子のうちの一方(TM1)とを接続した回路と、
3回路で各回路とも少なくとも9接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有するロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と前記2つの心線接続端子のうちの一方(T1)とを接続した回路と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子と前記2つの心線接続端子のうちの他方(T2)とを接続した回路と、該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM1、TM2)に導通試験器の各端子を接続し、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記2つの心線接続端子(T1、T2)に試験対象のケーブルの心線(L1、L2)を接続した際において、前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する9の接点の切替により、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
9 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
前記1〜9の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置である。
【0017】
本発明のケーブル心線切替試験装置によれば、上記の構成を有するため、ケーブルの切替において、これを測定側に配置する。そして、2つの外部端子TM1、TM2に導通試験器の各端子を接続し、2つの外部端子TM3、TM4に導体抵抗測定器の各端子を接続し、ほかの2つの外部端子TM5、TM6に絶縁抵抗計の各端子を接続するとともに、1つのアース接続用外部端子TM7をアースに接続するとともに、サグリ線接続端子STにサグリ線を接続しておく。ここで、導通試験器にはアナログテスターを用い、導体抵抗測定器にはデジタルテスターを用いるのがよいが、導通試験器にその導体抵抗測定器を用いることも可能である。そして、2の心線接続端子T1、T2のそれぞれに、切替えるべき対をなす心線L1、L2を配線接続する。しかして、上記したC点で使用する場合には、前記2〜4の回路においては、追出し側(D点)で、試験に対応する導通をとることに合わせて、C点では、試験項目切替スイッチRSWを切替えることのみで、前記2〜9の異なる試験回路を形成するため、2本の心線L1、L2について、簡易、迅速に切替試験を行うことができる。前記試験項目切替スイッチRSWにおいて、第1〜第3回路用セレクタRSW1〜RSW3の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有するロータリースイッチにおいては、3段の各回路とも少なくとも9接点(9の固定端子)を有するもので、1つのツマミを回して、3つの可動切片(可動端子)が同時に動き、3つ同時に9接点が切替わる。
【0018】
請求項2に記載のケーブル心線切替試験装置は、試験対象をなすケーブルの二対をなす心線(1L1、1L2、2L1、2L2)に接続可能の4つの心線接続端子(T1〜T4)と、1つのサグリ線接続端子(ST)と、導通試験器接続用の2つの外部端子(TM1、TM2)と、導体抵抗測定器接続用の2つの外部端子(TM3、TM4)と、絶縁抵抗計接続用の2つの外部端子(TM5、TM6)と、アース接続用の1つのアース接続用外部端子(TM7)と、
前記サグリ線接続端子(ST)と前記導通試験器接続用の外部端子のうちの一方(TM1)とを接続した回路と、
3回路で各回路とも少なくとも9接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有するロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子とに、前記4の心線接続端子(T1〜T4)に接続された心線(1L1、1L2、2L1、2L2)のうち、各一対をなす2心線をそれぞれ、2回路で2接点を有する心線切替スイッチ(SW21)を介して接続した回路と、
該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM1、TM2)に導通試験器の各端子を接続し、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記4の心線接続端子(T1〜T4)に試験対象のケーブルの複数の対をなす心線(1L1、1L2、2L1、2L2)を接続した際において、
前記心線切替スイッチ(SW21)の切替によって、試験対象のケーブルのうちから選択した一対の心線を、前記試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と第2回路用セレクタ(RSW2)の端子とに接続し、
その状態の下で、
前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する9の接点の切替により、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
9 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
前記1〜9の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置である。
【0019】
請求項1は、2つの心線つまり一対のケーブル単位で試験をするものであるが、請求項2は、二対のケーブル単位を予め心線接続端子に接続しておき、心線切替スイッチを切替えることで、一対をなす2心線単位で試験対象をなす心線の切替えをできるようにしたものである。
【0020】
請求項2に記載のケーブル心線切替試験装置は、前記心線接続端子(T1、T2…)の数を4とし、該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子とに、前記4の心線接続端子(T1〜T4)に接続された心線(1L1、1L2、2L1、2L2)のうち、各一対をなす2心線をそれぞれ、2回路で2接点を有する心線切替スイッチ(SW21)を介して接続した回路としたケーブル心線切替試験装置である。ケーブル心線切替は、2対の1カッド(4心線)単位で行うのが、切替えの進行上好ましく、請求項2のものはその要請に合わせたものである。2回路で3以上(心線の対(ペア)をなす数分)の接点を有する心線切替スイッチとしてはロータリースイッチを用いるのが普通であるが、請求項2に記載のケーブル心線切替試験装置では、2回路2接点のスライドスイッチ(又はトグルスイッチ)を用いればよい。
【0021】
請求項1又は2に記載の発明によれば、通常の試験項目の進行にしたがって試験作業を進めることができる。このとき、前記したように、5と9の回路に、「心線L1、L2に帯電した電荷をアースへ逃がすための回路」、を設定したことにより、絶縁抵抗試験において印加される電圧で帯電した電荷を常にアースに逃がすことができるため便利である。すなわち、前記ロータリースイッチが、ストッパーなしで回転自在とされているものであっても確実に、心線L1、L2に帯電した電荷をアースへ逃がすことができる。
【0022】
請求項3に記載の発明は、2つの外部端子(TM1、TM2)に導通試験器の各端子を接続し、2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続して、導通試験器、導体抵抗測定器及び絶縁抵抗計を備えてなる、請求項1又は2のいずれか1項に記載のケーブル心線切替試験装置である。
【0023】
ケーブルの切替え試験では、通常、導通試験には導通試験器、導体抵抗測定には導体抵抗測定器、及び絶縁抵抗の測定には絶縁抵抗計が用いられるため、これらを備えたものとしておけば、別途、これらを準備する手間を要しないため、作業の簡易化が図られる。
【0024】
請求項4に記載の発明は、試験対象をなすケーブルの一対をなす心線(L1、L2)に接続可能の2つの心線接続端子(T1、T2)と、1つのサグリ線接続端子(ST)と、導体抵抗測定器接続用の2つの外部端子(TM3、TM4)と、絶縁抵抗計接続用の2つの外部端子(TM5、TM6)と、アース接続用の1つのアース接続用外部端子(TM7)と、
前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM3)とを接続した回路と、
3回路で各回路とも少なくとも8接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有し、しかも、接点8からツマミがターンオーバーして接点1に切替わることのないストッパー付きのロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と前記2つの心線接続端子のうちの一方(T1)とを接続した回路と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子と前記2つの心線接続端子のうちの他方(T2)とを接続した回路と、該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記2つの心線接続端子(T1、T2)に試験対象のケーブルの心線(L1、L2)を接続した際において、前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する8接点の切替えにより、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
前記1〜8の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置である。
【0025】
本発明の請求項4に記載のケーブル心線切替試験装置は、請求項1のケーブル心線切替試験装置(以下、単に装置ともいう)における、4つ外部端子(TM1〜TM4)のうち、TM1、TM2を省略してTM3、TM4の2つにするとともに、試験項目切替スイッチRSWについては3回路で8接点以上のものとして、構成の簡素化を図ったものである。すなわち、このような請求項4に記載の装置においては、これを測定側に配置し、2つの外部端子TM3、TM4に、導通試験と導体抵抗測定を兼ねることのできる導体抵抗測定器の各端子を接続するようにした点を除き、装置の各外部端子に関しては請求項1に記載の装置におけるものと同じである。そして、上記したC点で使用する場合にも、前記2〜4の回路においては、追出し側(D点)で、試験に対応する導通をとることに合わせて、C点では、試験項目切替スイッチRSWを切替えることのみで、前記2〜8の異なる試験回路を形成できるものであり、請求項1に記載の装置におけるものと本質的な相違はない。
【0026】
ただし、請求項4に記載のケーブル心線切替試験装置では、導通試験と導体抵抗測定とを兼用できる導体抵抗測定器を用いることとしたため、使用計器を減らすことができる。
【0027】
請求項5に記載の発明は、請求項4に記載のケーブル心線切替試験装置において、
2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続して、導体抵抗測定器及び絶縁抵抗計を備えてなるケーブル心線切替試験装置である。
【0028】
請求項6に記載の発明は、請求項4又は5のいずれか1項に記載のケーブル心線切替試験装置において、
前記導体抵抗測定器接続用の外部端子を、(TM3、TM4)の2つに代えて、(TM1、TM2、TM3、TM4)の4つ設け、
前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM3)とを接続した回路に代えて、前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM1)とを接続した回路を設け、
測定側において、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続するのに代えて、前記2つの外部端子(TM1、TM2)に導体抵抗測定器である導通試験器の各端子を接続するとともに、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、
さらに、前記試験項目切替スイッチ(RSW)の各接点を、オープン、又は外部端子(TM3〜TM6)のうちのいずれかに配線接続することに代えて、該各接点を、オープン、又は外部端子(TM2〜TM6)のうちのいずれかに配線接続した構成を有するケーブル心線切替試験装置である。
【0029】
請求項4又は5においては、導通試験と導体抵抗測定を、導体抵抗測定器を用いることとしたため、計器は1つですむが、導体抵抗測定器にデジタルテスターを用いる場合には、導通試験が非効率的となるし、アナログテスターを用いる場合には、導体抵抗測定の精度が低下する。このものでは、前記2つの外部端子(TM1、TM2)に導通試験器として、アナログテスターの各端子を接続することで、導通試験を効率的に実施できるし、別の2つの外部端子(TM3、TM4)に導体抵抗測定器としてデジタルテスターの各端子を接続することで、導体抵抗測定の精度を高めることができる。
【0030】
【発明の実施の形態】
本発明に係るケーブル心線切替試験装置の第1の実施の形態について、図1及び図2を参照して詳細に説明する。図1は、心線切替試験装置101の回路図であり、試験対象をなすケーブル(測定ケーブル)の一対をなす心線(LINE L1,L2)に接続可能の2つの心線接続端子T1、T2と、1つのサグリ線接続端子STと、導通試験器(本形態ではアナログテスターAT)接続用の2つの外部端子TM1、TM2と、導体抵抗測定器(本形態ではデジタルテスターDT)接続用の2つの外部端子TM3、TM4と、絶縁抵抗計(ME)接続用の2つの外部端子TM5、TM6と、アース接続用の1つのアース接続用外部端子TM7の、各外部接続端子を備えている。このうち、サグリ線接続端子STと導通試験器接続用の外部端子のうちの一方TM1とは配線接続されている。
【0031】
一方、図中、RSWは、試験項目切替スイッチであり、3回路でその各回路とも9接点(固定端子)を有するもので、第1〜第3の3つの回路をもつように3段に重ねられたロータリースイッチを使用している。この試験項目切替スイッチRSWは、装置外部の操作部にあるツマミ10を回すことで、第1〜第3回路用セレクタ(可動切片)RSW1、RSW2、RSW3の全部が同時に動いてその3回路における各々の9の接点(1〜9)において同時に切替わる構成を有している。なお、市販の12接点のものでもよく、その場合には第1接点(固定端子)〜第9接点(固定端子)1〜9を用いるのが好ましい。
【0032】
本形態では、試験項目切替スイッチRSWの第1回路用セレクタRSW1の端子と、心線接続端子T1とが配線接続され、該試験項目切替スイッチRSWの第2回路用セレクタRSW2の端子と、心線接続端子T2とが配線接続されている。そして、試験項目切替スイッチ(以下、ロータリースイッチとも言う)RSWの第3回路用セレクタRSW3の端子とアース接続用外部端子TM7とが配線接続されている。
【0033】
そして、ロータリースイッチRSWの第1〜第3回路用セレクタRSW1、2、3(以下、単にセレクタ1、2、3ともいう)に対応する各接点(固定端子1〜9)は、オープン、又はTM2〜TM6のうちのいずれかに次のように配線接続されている(図1参照)。
【0034】
すなわち、接点(固定端子)1は、セレクタ1、2、3のいずれに対応するものもオープン(配線接続なし)とされている。
接点2については、セレクタ1に対応するものが導通試験器接続用の外部端子TM2に配線接続され、セレクタ2、3に対応するものがオープンとされている。
【0035】
接点3については、セレクタ1、3に対応するものがオープンとされ、セレクタ2に対応するものが導通試験器接続用の外部端子TM2に配線接続されている。
【0036】
接点4については、セレクタ1に対応するものが導体抵抗測定器接続用の外部端子TM3に配線接続され、セレクタ2に対応するものが、導体抵抗測定器接続用の外部端子TM4に配線接続され、セレクタ3に対応するものがオープンとされている。
【0037】
接点5については、セレクタ1、2、3に対応する各接点5相互間が配線接続されている。
【0038】
接点6については、セレクタ1に対応するものが絶縁抵抗計接続用の外部端子TM5と配線接続され、セレクタ2に対応するものがオープンとされ、セレクタ3に対応するものが絶縁抵抗計接続用の外部端子TM6に配線接続されている。
【0039】
接点7については、セレクタ1に対応するものがオープンとされ、セレクタ2に対応するものが絶縁抵抗計接続用の外部端子TM5に配線接続され、セレクタ3に対応するものが絶縁抵抗計接続用の外部端子TM6に配線接続されている。
【0040】
接点8については、セレクタ1に対応するものが絶縁抵抗計接続用の外部端子TM5に配線接続され、セレクタ2に対応するものが絶縁抵抗計接続用の外部端子TM6に配線接続され、セレクタ3に対応するものがオープンとされている。
【0041】
接点9については、セレクタ1、2、3に対応する各接点9相互間が配線接続されている。また、接点5相互間とも配線接続されている。
【0042】
このような構成のケーブル心線切替試験装置101は、これを測定側(図10におけるC駅)に配置し、外部端子TM1、TM2に導通試験器としてアナログテスターATの各端子を接続し、外部端子TM3、TM4に導体抵抗測定器としてデジタルテスターDTの各端子を接続する。そして、外部端子TM5、TM6に絶縁抵抗計MEの各端子を接続し、アース接続用外部端子TM7をアースに接続する。しかして、上記したように、既設のケーブル(1L1、1L2…50L1、50L2)から新設ケーブルへの切り替えに当っては次のようにその作業が行われる。すなわち、各点で切替前の作業、準備(さぐり線の確認など)を実施した後、次のようにして切替作業にかかる。
【0043】
すなわち、図10において、C点及びD点のそれぞれの切替回線の心線切り分け端子(配線端子)において、ケーブルをオープンにし、無負荷、無電圧の状態にする。なお、D点では、クリップコードSCの一方端子がサグリ線50L2の端子に接続してある。
【0044】
本形態のケーブル心線切替試験装置(以下、試験装置ともいう)101においては、上記した構成により、サグリ線接続端子STにサグリ線50L2を接続するとともに、対をなす2の心線接続端子T1、T2に試験対象のケーブルの心線1L1、1L2を接続し、そして、ツマミ10を回して、ロータリースイッチRSWの3回路における接点(固定端子)を、接点1から接点9に同時に、順次切替える。これにより、次のようにそれぞれの試験、測定のための回路が構成される。ただし、接点2〜接点4に切替える際には、D点(追出し側)では、クリップコードSCで対応する導通をとる。すなわち、ロータリースイッチRSWを接点1のOFFから切替えると、接点2では、心線1L1(単にL1ともいう)−サグリ線の導通試験のための回路、接点3では、心線L2(単にL2ともいう)−サグリ線の導通試験のための回路、接点4では、心線L1−L2の導体抵抗測定試験のための回路、となる。そして、接点5では、心線L1、L2いずれもアースに接続される。接点6では、心線L1−アース間の絶縁抵抗試験のための回路、接点7では、心線L2−アース間の絶縁抵抗試験のための回路、接点8では、心線L1−L2間の絶縁抵抗試験のための回路が形成される。そして、接点9では、心線L1、L2いずれもアースに接続される。
【0045】
しかして、既設ケーブルの導通試験では、D点(追出し側)で、サグリ線50L2と心線L1間の導通をとりつつ、C点(測定側)で、ロータリースイッチRSWを、そのツマミ10を回して、接点1のOFFから接点2に切替える。すると、心線L1−サグリ線の導通試験のための回路が形成されるため、作業者は、アナログテスターATにおける針の振れを確認するだけで、心線L1の導通試験ができる。続いて、D点(追出し側)で、サグリ線50L2と心線L2との導通をとりつつ、C点(測定側)で、ロータリースイッチRSWをそのツマミ10を回して、接点2から接点3に切替える。すると、心線L2−サグリ線の導通試験のための回路が形成されるため、作業者は、アナログテスターATにおける針の振れを確認するだけで、心線L2の導通試験ができる。
【0046】
次に、A、D間、B、D間でも、従来のように、ケーブル心線の線番及びL1、L2の確認(導通試験)をし、A点及びB点で、導通試験した既設のケーブル(L1、L2のA、B間)を切断する。そして、新設ケーブル(L1、L2)に切替える。このようにして既設ケーブルを新設ケーブルに切替た後は、新設ケーブルの心線(L1、L2)について、まず導通試験をする。この導通試験に当っては、前記した既設ケーブルの導通試験と全く同様にして実施できる。すなわち、D点(追出し側)で、サグリ線50L2と心線L1との導通をとりつつ、試験装置のロータリースイッチRSWを接点1のOFFから接点2に切替えることで、作業者は、アナログテスターATにおける針の振れを確認するだけで、心線L1の導通試験ができる。そして、D点(追出し側)で、サグリ線と心線L2との導通をとりつつ、接点2から接点3に切替えることで、作業者は、アナログテスターATにおける針の振れを確認するだけで、心線L2の導通試験ができる。
【0047】
そして、D点(追出し側)で、心線L1、L2間の導通をとりつつ、C点(測定側)で、ロータリースイッチRSWを接点3から接点4に切替える。こうして、作業者は、デジタルテスターDTにおける導体抵抗値を確認、記録することで、導体抵抗試験ができる。
【0048】
さらに、C点(測定側)で、ロータリースイッチRSWを接点4から接点5に切替えると、心線L1、L2ともにアースに接続されるが、その後、ロータリースイッチRSWを接点5から接点6に切替え、絶縁抵抗計MEを確認することで、心線L1−E(アース)の間の絶縁抵抗試験ができる。そして、ロータリースイッチRSWを接点6から接点7に切替え、絶縁抵抗計MEを確認することで、心線L2−Eの間の絶縁抵抗試験ができる。さらに、ロータリースイッチRSWを接点7から接点8に切替え、絶縁抵抗計MEを確認することで、心線L1−L2間の絶縁抵抗試験ができる。その後、ロータリースイッチRSWを接点8から接点9に切替えると、心線L1、L2ともにアースに接続されるため、絶縁抵抗試験で心線L1、L2に帯電した電荷はアースに逃がされる。また、心線L1−L2間の絶縁抵抗試験の後、ロータリースイッチRSWを接点8から、接点7、接点6、そして接点5に切り替えることでも、心線L1、L2ともにアースに接続されるため、絶縁抵抗試験で心線L1、L2に帯電した電荷はアースに逃がされる。なお、その後は、C点及びD点で、切り分け端子を元の状態に戻し、接続通信装置間での試験を行い、正常を確認する。
【0049】
かくして、1L1、1L2について、既設ケーブルを新設ケーブルに切替えた後は、2L1、2L2について、同様に導通試験、導体抵抗測定試験、絶縁抵抗測定等を行い、以下次々と、対をなす2本の心線づつ既設ケーブルを新設ケーブルに切替える。
【0050】
このように、本実施の形態の試験装置101を用いれば、C点では、既設ケーブルを新設ケーブルに切替えるのに先立ち、本試験装置の各外部端子に各試験機器等の接続をするとともに、心線接続端子T1、T2と、切替えるケーブルの心線L1、L2に連なる端子とを接続した後は、ロータリースイッチRSWを、そのツマミ10を回転させて順次、接点を切替え、各試験器、測定器を確認するだけで所定の測定ができる。すなわち、本試験装置101によれば、測定側において、各試験のための回路構成が、従来のように、各テスターの各端子を端子台の各端子に、接触、分離を繰り返す煩雑な作業が不要となるため、簡単、迅速にその作業ができる。その結果、試験、測定時間の短縮化が可能となるとともに、誤試験の回避も図られる。加えて、絶縁抵抗試験により帯電した電荷を確実にアースに逃がすことができる。
【0051】
さて次に、図3及び図4を参照して本発明の第2の実施の形態にかかる試験装置201について説明する。ただし、前記形態と本質的に相違する点はないので、同一の部位には同一の符号を付し、相違点を中心に説明する。すなわち、前記形態のものは、心線接続端子を2つとし、それらをそれぞれ、ロータリースイッチRSWの第1回路用セレクタRSW1の端子と、第2回路用セレクタRSW2の端子とにそれぞれ直接、配線接続した回路のものとしたのに対し、次の点が相違する。
【0052】
すなわち、この形態の試験装置201においては、心線接続端子を4つとし、図3上の心線接続端子T1、T2に、一対の心線(1L1、1L2)を、図3下の心線接続端子T3、T4に、別の一対の心線(2L1、2L2)を接続するように構成されている。そして、この一対の心線ごとが、2回路で2接点を有する心線切替スイッチSW21を介して、ロータリースイッチRSWの第1回路用セレクタRSW1の端子と、第2回路用セレクタRSW2の端子とにそれぞれ接続されるように構成されている。すなわち、定位においては、心線接続端子T1、T2に接続された、一対の心線(1L1、1L2)が、ロータリースイッチRSWの第1回路用セレクタRSW1の端子(可動端子)と、第2回路用セレクタRSW2の端子(可動端子)とにそれぞれ接続され、心線切替スイッチSW21の切替えにより、心線接続端子T3、T4に接続された、一対の心線(2L1、2L2)が、ロータリースイッチRSWの第1回路用セレクタRSW1の端子と、第2回路用セレクタRSW2の端子とにそれぞれ接続されるように設定されている。
【0053】
本形態では、2つの対(ペア)をなす心線つまり、4本の心線をなす1カッドの心線を予め、心線接続端子T1〜T4に接続しておき、心線切替スイッチSW21が定位の状態の下で、まず、一対の心線(1L1、1L2)について、前記形態におけるのと同様にして試験を行う。その後、心線切替スイッチSW21を定位から切替えて、別の一対の心線(2L1、2L2)について、前記形態におけるのと同様にして試験を行う。
【0054】
すなわち、本形態では、心線接続端子を4つとし、心線接続端子T1〜T4とロータリースイッチRSWまでの回路途中に、心線切替スイッチ(ライン切替スイッチ)SW21を設けたものである。これにより、前記形態では、2本の心線つまり一対(Pair)単位で、試験を繰返し行うものであったのに対し、このものは、2対の4心線(1カッド)単位で、試験を繰返し行うことができる。
【0055】
なお、心線切替スイッチは、2接点ではスライドスイッチ(又はトグルスイッチ)が好ましい。
【0056】
なお、例えば心線接続端子を4つにする場合において、前記形態では心線切替スイッチを設けたものとしたが、本発明では、導通試験器、導体抵抗測定器、絶縁抵抗計を、各々もう1台用意し、かつ、図1に示した回路、及び試験項目切替スイッチRSWを2つ組み合わせることで、2対の心線について同時に試験できる。すなわち、図1の回路を含む構成を2つ用意し、一方のものの外部端子T1、T2には、1L1、1L2を接続し、他方のものの外部端子T1、T2をT3、T4として2L1、2L2を接続し、上記した、3回路で各回路とも9接点を有する試験項目切替スイッチRSWであるロータリースイッチを2段重ねしたものとして、それぞれの第1〜第3回路用セレクタ(可動切片)RSW1〜RSW3が全部同時に動くものとするのである。すなわち、3回路で各回路とも9接点を有するロータリースイッチを2段重ねしたものとして、6回路で各回路とも9接点を有するロータリースイッチを用いたものである。この場合、アナログテスター、デジタルテスター、絶縁抵抗計がそれぞれ2台必要となるが、心線接続端子は、4つとなるから、2対をなす4本の心線(1L1、1L2、2L1、2L2)を接続することで、その4本について半分の時間で試験をすることができる。
【0057】
また、本発明の試験装置の試験項目切替スイッチにおいては、最低9接点あれば足りるのであって、これを超える接点数があれば、オープンにしておけばよい。
【0058】
さらに、ロータリースイッチが、ツマミ10が接点8からターンオーバーせず、接点7側にしか回転しないもの(接点8でストッパー付きのもの)である場合には、8接点のロータリースイッチを用いることもできる。つまり、上記の各形態に用いた形式のロータリースイッチにおける接点9がないものを用いることができる。
【0059】
また、上記の各形態のケーブル心線切替試験装置101、201においては、導通試験器、導体抵抗測定器及び絶縁抵抗計は、別途、用意し、導通試験器の各端子を外部端子TM1、TM2に接続し、導体抵抗測定器の各端子を外部端子TM3、TM4に接続し、絶縁抵抗計の各端子を外部端子TM5、TM6に接続したものとしたが、これら導通試験器、導体抵抗測定器及び絶縁抵抗計が予め、このように接続されていてもよい。予め、このような試験器等が接続されている試験装置においては、別途、このような試験器等を用意する必要がなくなる一方、用意されていないものでは、従来使用していた試験器等を用いることで、試験装置の低コスト化が図られる。
【0060】
次に、本発明とは別の第1の参考例について、図5の装置の回路図に基づいて説明する。ただし、この装置301は、図1の実施形態の構成を簡略化したものであるため、その相違点を中心として説明し、同一の部位には、同一の符号を付し、適宜その説明を省略する。以下、他の参考例および実施の形態の説明においても同様とする。
【0061】
図5の回路で示した装置301は、図1の実施形態における外部端子TM1、TM2を無くして、TM3、TM4が、導通試験と導体抵抗測定を兼ねる導体抵抗測定器(本参考例ではデジタルテスターDT)接続用の2つの外部端子とされている。そして、サグリ線接続端子STと外部端子のうちの一方TM3とが配線接続されている。
【0062】
また試験項目切替えスイッチRSWについては、3回路でその各回路とも6接点(固定端子)を有するものとされ、3つの回路をもつように3段に重ねられたロータリースイッチが例示されている。この試験項目切替スイッチRSWは、上記各形態におけるのと同様に、外部のツマミ(図示せず)を回すことで、第1〜第3回路用セレクタ(可動切片)RSW1、RSW2、RSW3の全部が同時に動いてその3回路における各々の6の接点(1〜6)が同時に切替わる構成を有している。
【0063】
そして、ロータリースイッチRSWの第1〜第3回路用セレクタRSW1、2、3(以下、単にセレクタ1、2、3ともいう)に対応する各接点(固定端子1〜6)は、オープン、又はTM3〜TM6のうちのいずれかに次のように配線接続されている。
【0064】
すなわち、接点(固定端子)1については、セレクタ1に対応するものが外部端子TM4に配線接続され、セレクタ2、3に対応するものがオープンとされている。接点2については、セレクタ1、3に対応するものがオープンとされ、セレクタ2に対応するものが外部端子TM4に配線接続されている。接点3については、セレクタ1に対応するものが外部端子TM3に配線接続され、セレクタ2に対応するものが外部端子TM4に配線接続され、セレクタ3に対応するものがオープンとされている。
【0065】
そして、接点4については、セレクタ1に対応するものが外部端子TM5に配線接続され、セレクタ2に対応するものがオープンとされ、セレクタ3に対応するものが外部端子TM6に配線接続されている。接点5については、セレクタ1に対応するものがオープンとされ、セレクタ2に対応するものが外部端子TM5に配線接続され、セレクタ3に対応するものが外部端子TM6に配線接続されている。接点6については、セレクタ1に対応するものが外部端子TM5に配線接続され、セレクタ2に対応するものが外部端子TM6に配線接続され、セレクタ3に対応するものがオープンとされている。
【0066】
このような構成のケーブル心線切替試験装置301は、これを測定側(図10におけるC駅)に配置し、外部端子TM3、TM4に、導通試験及び導体抵抗測定を兼ねる導体抵抗測定器である、例えばデジタルテスターDTの各端子を接続する。そして、外部端子TM5、TM6に絶縁抵抗計MEの各端子を接続し、アース接続用外部端子TM7をアースに接続する。しかして、既設のケーブル(1L1、1L2…50L1、50L2)から新設ケーブルへの切り替えに当っては上記したのと略同様にして、その作業を行なうことができる。
【0067】
すなわち、本参考例のケーブル心線切替試験装置301においても、サグリ線接続端子STにサグリ線50L2を接続するとともに、対(ペア)をなす2の心線接続端子T1、T2に試験対象のケーブルの心線1L1、1L2を接続し、そして、ロータリースイッチRSWの3回路における接点(固定端子)を、接点1から接点6に同時に順次切替えることで、その試験、測定ができる。すなわち、ロータリースイッチRSWの各セレクタが接点1に接続されているときは、心線1L1(以下単にL1ともいう)−サグリ線の導通試験のための回路、そして、順次切替えられ、接点2では、心線1L2(以下単にL2ともいう)−サグリ線の導通試験のための回路、接点3では、心線L1−L2の導体抵抗測定試験のための回路、となる。そして、接点4では、心線L1−アース間の絶縁抵抗試験のための回路、接点5では、心線L2−アース間の絶縁抵抗試験のための回路、接点6では、心線L1−L2間の絶縁抵抗試験のための回路が形成される。こうして、形成された各回路を用いることで、簡易に、試験、或いは測定ができる。ただし、接点1〜接点3に切替える際には、図10におけるD点(追出し側)で、クリップコードSCで対応する導通をとることは同じである。
【0068】
なお、本参考例のケーブル心線切替試験装置301では、導通試験と導体抵抗測定とを兼用できる導体抵抗測定器(デジタルテスターDT)を用いることとしたため、使用計器を減らすことができる。一方で、上記の各絶縁抵抗試験を実施した後において、心線L1、心線L2に帯電した電荷をアースに逃がす回路が、上記の形態の装置のようには形成できないので、別途アース線を接触(又は接続)することでアースに逃がすことになる。
【0069】
また、図10中のA又はB点において、AD間、又はBD間の導通試験(50L2(さぐり線)と1L1(心線)との導通試験)をするときにおいて、本装置301がC点に接続されており、それに導体抵抗測定器が接続されていると、D点における上記した接続がなくとも、その計器の内部配線により、A又はB点において導通が確認されてしまうために誤検査を招くことになる。このため、AD間、又はBD間の導通試験のときは、C点における本装置301の外部端子に接続されている導体抵抗測定器を分離しておくことを要する。
【0070】
さて次ぎに、本発明とは別の第2の参考例について、図6で示した装置401の回路図に基づいて説明する。ただし、このものは、図5の参考例の改良とでもいうべきものであるため、同一の部位には、同一の符号を付し、その相違点のみ説明する。
【0071】
すなわち、本参考例のケーブル心線切替試験装置401は、前記参考例において、2つの心線接続端子(T1、T2)のそれぞれを、常時はオフ回路を構成するアース用開閉スイッチ(押しボタンスイッチ)SW41を介在させてアース端子(TM7)に接続している。また、前記参考例における心線接続端子(T1)と、ロータリースイッチRSWの第1回路用セレクタRSW1の端子との間と、前記参考例における心線接続端子(T2)と、ロータリースイッチRSWの第2回路用セレクタRSW2の端子との間に、回路開閉スイッチSW42が設けられている。
【0072】
これにより本参考例では、アース用開閉スイッチSW41をオン作動する(閉とする)ことで、心線L1、心線L2に帯電した電荷をアースに逃がすことができる構成とされている。また、回路開閉スイッチSW42を開とすることで、2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、ほかの2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続した際においても、心線接続端子(T1)とサグリ線接続端子(ST)との間、及び心線接続端子(T2)とサグリ線接続端子(ST)との間に、導体抵抗測定器内の配線を介して導通を保持させないようにできる。
【0073】
次ぎに、本発明とは別の第3の参考例について、図7の装置の回路図に基づいて説明する。ただし、この回路図で示した装置501は、図5、6の参考例の改良とでもいうべきものであるため、同一の部位には、同一の符号を付し、その相違点のみ説明する。
【0074】
すなわち、この装置501は、図5の装置における試験項目切替スイッチ(RSW)を、3回路で各回路とも7接点を有するものとし、増えた1接点を利用し、試験項目切替スイッチ(RSW)の切替えにより、心線L1、心線L2に帯電した電荷をアースに逃がす回路を形成できるようにしたものである。すなわち、本参考例では、ロータリースイッチRSWの第1〜第3回路用セレクタRSW1、2、3に対応する各接点(固定端子1〜7)のうち、その接点1〜3については、図5の装置における試験項目切替スイッチ(RSW)の接点1〜3と同様に配線接続又はオープンにしている。そして、各セレクタRSW1、2、3に対応する各接点(固定端子1〜7)のうち、接点5〜7については、図5の装置における各セレクタRSW1、2、3に対応する各接点(固定端子4〜6)に対応させて配線接続又はオープンとしている。そして、本参考例における各セレクタRSW1、2、3に対応する接点4の相互間を配線接続している。なお、図6に示したのと同様に、回路開閉スイッチSW42が設けられているため、これを開とすることで、上記した誤検査の防止ができるようにされている。
【0075】
これにより、本参考例の装置501では、図5の装置におけるのと同様の回路が形成される。その上に、ロータリースイッチ(RSW)のツマミを正転して、接点1から7に向けて切替え、いずれかの絶縁抵抗試験のための回路を形成した後、ツマミを逆転させて導通試験或いは導体抵抗測定のための回路の形成に切替えられる前には、各セレクタの端子が接点4に接続される。これにより、絶縁抵抗試験において心線に帯電した電荷をアースへ逃がすための回路が形成されるため、アース用開閉スイッチを別途に設けることなく、その逃がし作業ができる。
【0076】
次ぎに、本発明とは別の第4の参考例について、図8の装置の回路図に基づいて説明する。ただし、このものも、図5、6の参考例の改良とでもいうべきものであるため、同一の部位には、同一の符号を付し、その相違点のみ説明する。
【0077】
すなわち、この装置601は、図5の装置における試験項目切替スイッチ(RSW)を、3回路で各回路とも7接点を有するものとし、増えた1接点を利用し、試験項目切替スイッチ(RSW)の切替えにより、いずれの試験、又は測定回路でもない、OFFとする回路を形成できるようにしたものである。すなわち、本参考例では、各回路の接点1〜7のうち、接点1をオープンとしておき、各回路の接点2〜7を、それぞれ図5の装置における接点1〜6に対応させて配線接続又はオープンとしたものである。
【0078】
これにより、本参考例の装置601では、図5の装置におけるのと同様の試験の回路が形成されるとともに、いずれの試験、又は測定回路でもない、OFFの回路が形成される。したがって、装置601が図10におけるC点に接続されている場合においても、試験項目切替スイッチ(RSW)の切替えにより、セレクタを接点1としておくことで、装置はOFFに保持されるため、図10中におけるA又はB点において心線接続端子(T1)とサグリ線接続端子(ST)との間、及び心線接続端子(T2)とサグリ線接続端子(ST)との間の導通が計器内の配線を介して保持されることを容易に防止できる。なお、この回路において、図6中に示したのと同様に、2つの心線接続端子(T1、T2)のそれぞれを、常時はオフ回路を構成するアース用開閉スイッチ(押しボタンスイッチ)SW41を介在させてアース端子(TM7)に接続しておけば、その押しボタン操作で、絶縁抵抗試験において心線に帯電した電荷をアースへ逃がすことができる。
【0079】
図9は、本発明の第3の実施の形態(請求項4及び5に係る装置)の装置の回路図を示している。この装置701は、試験項目切替スイッチ(RSW)を、3回路で各回路とも8接点を有するものとして、上記した参考例(第3、第4の参考例)における効果を併せ持つようにしたものである。したがって、同一の部位には、同一の符号を付し、その相違点のみ説明する。
【0080】
すなわち、このものは、図7、8の装置における試験項目切替スイッチ(RSW)を、3回路で各回路とも8接点を有するものとし、増えた2接点を利用し、試験項目切替スイッチ(RSW)の切替えにより、心線L1、心線L2に帯電した電荷をアースに逃がす回路を形成できるようにするとともに、いずれの試験、又は測定回路でもない、OFFとする回路を形成できるようにしたものである。すなわち、本形態では、各セレクタ1〜3に対応する各接点1〜8のうち、各接点1〜4を、図8の装置における接点1〜4と同様の配線接続又はオープンとしている。そして、本形態における接点5〜8を、図7の装置における接点4〜7に対応させて配線接続又はオープンとしている。これにより、本形態では、上記した第3、第4の参考例の効果を併せ持つことができる。
【0081】
しかも、本形態では、試験項目切替スイッチ(RSW)をロータリースイッチとし、その連続する各接点1〜8への切替えにより、1 OFF、2 心線L1−サグリ線の導通試験のための回路、3 心線L2−サグリ線の導通試験のための回路、4 心線L1−L2の導体抵抗測定試験のための回路、5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、6 心線L1−アース間の絶縁抵抗試験のための回路、7 心線L2−アース間の絶縁抵抗試験のための回路、8 心線L1−L2間の絶縁抵抗試験のための回路、が順次形成できるので極めて使い勝手がよい。ロータリースイッチが、接点1〜8の範囲(間)でのみで、正転、又は逆転できるツマミのあるもので、接点8からツマミがターンオーバーして接点1に切替わることのない(ストッパー付き)ものである。すなわち、このようなストッパ付きのロータリースイッチを用いる場合には、接点が8ある試験項目切替スイッチを用いれば十分である。
【0082】
また、この装置においても、2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続して、予め導体抵抗測定器及び絶縁抵抗計を備えてなるものとしておくのが使い易さの点からして好ましい。
【0083】
なお、図6〜9においては、導通試験と導体抵抗測定とを、装置における2つの外部端子(TM3、TM4)に1つの導体抵抗測定器の各端子を接続することとしたため、計器は1つですむが、デジタルテスターを用いる場合には、導通試験が非効率的となるし、アナログテスターを用いる場合には、導体抵抗測定の精度が低下する。本発明においては、図9に示した装置のように、試験項目切替スイッチにおける各セレクタの接点の数が、6〜8のものである場合においても、図1〜4に示した実施の形態のように、導通試験と導体抵抗測定のために4つの外部端子(TM1〜TM4)を設けてあるものとするのが好ましい。
【0084】
すなわち、請求項6に記載したように、請求項4又は5のいずれか1項に記載のケーブル心線切替試験装置において、前記導体抵抗測定器接続用の外部端子を、(TM3、TM4)の2つに代えて、(TM1、TM2、TM3、TM4)の4つ設け、
前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM3)とを接続した回路に代えて、前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM1)とを接続した回路を設け、
測定側において、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続するのに代えて、前記2つの外部端子(TM1、TM2)に導体抵抗測定器である導通試験器の各端子を接続するとともに、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、
さらに、前記試験項目切替スイッチ(RSW)の各接点を、オープン、又は外部端子(TM3〜TM6)のうちのいずれかに配線接続することに代えて、該各接点を、オープン、又は外部端子(TM2〜TM6)のうちのいずれかに配線接続した構成を有するケーブル心線切替試験装置である。例えば、図9に示した、各回路とも8接点を有する試験項目切替スイッチ(RSW)を使用する場合には、図1において、接点9を省略したものとなる。
【0085】
さらに、請求項4〜6のいずれか1項に記載のケーブル心線切替試験装置においても、心線接続端子は、2対のものとすることができる。そして、このときは、図3に示したように、心線切替えスイッチSW21を設け、切替えるようにすればよい。
【0086】
なお、本発明において、導通試験器、導体抵抗測定器は、適宜のものを用いればよい。本発明は、前記各形態のものに限定されるものではなく、その要旨を逸脱しない範囲において適宜に設計変更して具体化できる。中間切替えにおいて説明したが、駅間で切替える場合にも使用できる。通信ケーブル、信号ケーブルに限定されることなく、一般回線(ケーブル)の切替えにも適用できる。
【0087】
【発明の効果】
以上の説明から明らかなように本発明のケーブル心線切替試験装置によれば、通信ケーブルや信号ケーブルの切替えにおいて、測定側において、各試験のための回路構成が簡単、迅速にできる。その結果、試験、測定時間の短縮化が可能となるとともに、誤試験の回避も図られる。
【図面の簡単な説明】
【図1】 本発明の試験装置の第1の実施の形態を説明する回路図。
【図2】 図1の試験装置の端子及びロータリースイッチ等(操作部)の配置を示す概略構成姿図。
【図3】 本発明の試験装置の第2の実施の形態を説明する回路図。
【図4】 図3の試験装置の端子及びロータリースイッチ等(操作部)の配置を示す概略構成姿図。
【図5】 本発明とは別の試験装置の第1の参考例を説明する回路図。
【図6】 本発明とは別の試験装置の第2の参考例を説明する回路図。
【図7】 本発明とは別の試験装置の第3の参考例を説明する回路図。
【図8】 本発明とは別の試験装置の第4の参考例を説明する回路図。
【図9】 本発明の試験装置の第3の実施の形態を説明する回路図。
【図10】 従来の駅間におけるケーブルの中間切替え作業を説明する概略構成図。
【符号の説明】
L1、L2、1L1、1L2、2L1、2L2 心線
T1〜T4 心線接続端子
ST サグリ線接続端子
TM1、TM2 通試験器接続用の2つの外部端子
TM3、TM4 導体抵抗測定器接続用の2つの外部端子
TM5、TM6 絶縁抵抗計接続用の2つの外部端子
TM7 アース接続用の1つのアース接続用外部端子
RSW 試験項目切替スイッチ
RSW1 第1回路用セレクタ
RSW2 第2回路用セレクタ
RSW3 第3回路用セレクタ
AT 導通試験器
DT 導体抵抗測定器
ME 絶縁抵抗計
SW21 心線切替スイッチ
SW41 アース用開閉スイッチ
SW42 回路開閉スイッチ
101、201、301、401、501、601、701 ケーブル心線切替試験装置[0001]
BACKGROUND OF THE INVENTION
The present invention confirms a core wire (core wire confirmation) by a continuity test of an existing cable core wire (line), which is performed in switching (updating) of a communication cable, such as switching between stations of a communication cable (signal cable) or intermediate switching. The present invention also relates to a cable core wire switching test apparatus suitable for switching of cable core wires, such as a continuity test (core wire check) of a newly installed cable core, a conductor resistance test, and an insulation resistance test.
[0002]
[Prior art]
Conventionally, there has been no cable core wire switching test device used for switching based on the life of a communication cable. For this reason, the switching (updating) work based on the life of a conventional communication cable or the like has been performed as follows. This will be described with reference to FIG.
For example, for a communication cable 50P that connects between a railway station C (hereinafter referred to as C equipment room (wiring board) or simply C) and a D station (hereinafter referred to as D equipment room (wiring board) or simply D), the communication cable The case where the existing cable P1 between the A connection point (hereinafter referred to as A) and the B connection point (hereinafter referred to as B) in the middle is switched (replaced) to the new cable P2 will be described.
[0003]
In this switching, an operator is arranged at each of points A, B, C, and D (each place) before switching, and after the call test, pre-switching work such as confirmation of the sagging line is performed in advance. The pre-switching operation and preparation contents at points A, B, C, and D are as follows. However, the C equipment room is on the measurement (test confirmation) side, and the D equipment room is on the eviction (wire number confirmation) side. In the progress of the work, it is carried out while confirming the work contents after a call test using a meeting line between the arranged workers.
[0004]
(Pre-switch work at points A and B, preparation details)
1Call test: Connect a monitor and headphones to the meeting line, and conduct a call test with other points.
2Sacrificial wire confirmation test: The (−) side test bar of the analog tester AT is connected to the sagging wire (50L2) that has been determined in advance by the operator with a clip or the like. Then, a check test for sagging lines is performed between points A and D and between points B and D, respectively, and preparation for switching is performed. In addition, this sacrificial wire confirmation test is performed by using another unused wire (for example, a monitor line) determined in advance and contacting the (+) side terminal of the analog tester AT. However, at this point D (displacement side), as will be described later, a loop is established between the sagging line and another unused line (for example, a monitor line) to establish conduction.
[0005]
(Pre-switch work at point C (measurement side), preparation details)
1Call test: Connect a monitor and headphones to the meeting line, and conduct a call test with other points.
2Sacrificial wire confirmation test: The (−) side test bar of the analog tester AT for continuity test is connected with a clip or the like to the terminal of the sagging wire (50L2), which has been determined in advance among workers. Then, a check test for sagging lines is performed between points C and D, and preparation for switching is performed. In this sacrificial wire confirmation test, the point of using the other unused wire terminals determined in advance is the same as the contents at the points A and B.
3After switching to the new cable, a digital tester for measuring conductor resistance and an insulation resistance meter for measuring insulation resistance are prepared.
[0006]
(Work at point D (push-out side), preparation details)
1Call test: Connect a monitor and headphones to the meeting line, and conduct a call test with other points.
2Sacrifice line confirmation test: One of the sacrifice line clip cords (hereinafter also referred to as clip cords) SC is connected to a predetermined sacrifice line (50L2) terminal, and a sacrifice line confirmation test with each point is performed. In the confirmation test of the sagging line with each point, the other end of the clip cord is brought into contact with a terminal of another predetermined unused line.
[0007]
As described above, the pre-switching work and preparation (confirmation of search lines, etc.) are performed at each point. After the pre-switching work and preparation are performed, the switching work is performed as follows.
[0008]
(Switching work)
1The cable is opened at the core line separating terminal (wiring terminal) of each switching line at the point C and the point D, so that there is no load and no voltage. At point C, the negative test bar of the analog tester AT is connected to the terminal of the sagging wire (50L2). Further, at point D, one terminal of the clip cord SC is connected to the sagging wire (50L2) terminal.
2Between the C equipment room and the D equipment room, the wire numbers of the existing cable cores to be switched and the confirmation of the 1L1 and 1L2 (core wire continuity test) are performed while the operators at the points C and D meet.
The operator at point D abuts the other terminal of the clip cord SC of the sacrificial wire to the terminal (1L1) of the corresponding wire number. On the other hand, the operator at point C abuts the + side test bar of the analog tester AT on the terminal (1L1) of the corresponding wire number. Then, a confirmation test (continuity test) of the core wire is performed. This confirmation is made by observing the needle swing of the analog tester AT at point C.
Next, the continuity test between C and D is similarly performed on the other cable core wire 1L2 forming a pair.
3Next, between A and D, the cable core wire numbers and 1L1 and 1L2 are confirmed (conductor continuity test).
In the operation at point A, the + side test bar of the analog tester AT is brought into contact with the core wire (1L1) of the corresponding wire number to confirm conduction. At the time of this confirmation, the operator at point D abuts the other terminal of the clip cord SC of the sacrificial wire with the terminal (1L1) of the corresponding wire number.
Next, the continuity test between A and D is similarly performed on the other cable core wire 1L2 forming a pair.
4And between B and D, the number of the cable core wire and the confirmation of 1L1, 1L2 (conductivity test of the core wire) are performed.
In the operation at point B, the + side test bar of the analog tester AT is brought into contact with the core wire (1L1) of the corresponding wire number to confirm conduction. Also at the time of this confirmation, the operator at point D abuts the other terminal of the clip cord SC of the sacrificial wire to the terminal (1L1) of the corresponding wire number as before.
Next, the continuity test between B and D is similarly performed on the other cable core wire 1L2 forming a pair.
5At the points A and B, the existing cable (between A and B of 1L1, 1L2) subjected to the continuity test is cut.
6Discard the cut cables (1L1, 1L2) between A and B. Then, the new cables (1L1, 1L2) are arranged between the end of the part near the point C and the end of the part near the point D, and are connected to the ends of the core wires, and the new cable P2 Switch to.
[0009]
After the existing cable P1 is switched to the new cable P2 in this way, a continuity test, a conductor resistance test, and an insulation resistance test are successively performed on the core wires (1L1, 1L2) of the new cable. The work procedure after the switching is as follows.
[0010]
(1Continuity test)
1Check the cable core number and 1L1, 1L2 between the C equipment room and D equipment room.
The operator at point D abuts the other terminal of the clip cord SC of the sacrificial wire to the terminal (1L1) of the corresponding wire number. On the other hand, the operator at point C abuts the + side test bar of the analog tester AT on the terminal (1L1) of the corresponding wire number. Then, a confirmation test (continuity test) of the core wire is performed.
Thereafter, the continuity test is similarly performed for 1L2.
(2Conductor resistance measurement test)
2Measurement of conductor resistance between C and D.
The operator at point D abuts each terminal of the clip cord SC on each terminal of the corresponding wire numbers 1L1 and 1L2. On the other hand, the operator at point C abuts the terminals of + and − of the digital tester (not shown) on the terminals of the corresponding wire numbers 1L1 and 1L2. Then, the conductor resistance values of 1L1 and 1L2 are read and recorded.
(3Insulation resistance measurement)
3At point C (the operator at point C) measures the insulation resistance between 1L1-E (earth), 1L2-E, and 1L1-1L2.
Although the insulation resistance between 1L1 and E is not shown, connect the earth cord of the insulation resistance meter to the earth terminal of the C equipment room, abut the line cord against 1L1 of the corresponding terminal, and record the resistance value between 1L1 and E To do.
For the insulation resistance between 1L2 and E, connect the earth cord of the insulation resistance meter to the earth terminal of the C equipment room, abut the line cord against 1L2 of the corresponding terminal, and record the resistance value between 1L2 and E.
For the insulation resistance between 1L1-1L2, the ground code of the insulation resistance meter is brought into contact with 1L1 of the corresponding terminal, the line code is brought into contact with 1L2 of the corresponding terminal, and the resistance value between 1L1-1L2 is recorded.
[0011]
4After completing the insulation resistance measurement at the point C, the grounding clip cord is brought into contact with each of the corresponding wire number terminals 1L1, 1L2, and the electric charge charged in the core wire is released to the ground.
5At point C and point D, the separation terminal is returned to the original state, a test is performed between the connected communication devices, and normality is confirmed.
Thus, the switching work for one line (1L1, 1L2), the continuity test after the switching work, the conductor resistance measurement test, the insulation resistance measurement, and the like are completed.
Thereafter, as described above, the number of cable lines (from 2L1 and 2L2 to the cable number to be switched, for example, 50L1 and 50L2), as described above, a confirmation test (continuity test) of the cores of existing cables and Conducted tests such as the continuity test of the core of the new cable.
[0012]
[Problems to be solved by the invention]
As described above, in the conventional cable switching work, it is necessary to perform the continuity test (confirmation test) of the core of the existing cable P1, and the continuity test of the core of the new cable P2, and the cable switching work. In particular, the points C and D were extremely complicated. That is, for each core wire or one core wire forming a cable pair, the operator at point C makes contact with or separates each terminal of each test device (analog tester AT, etc.) from each terminal in the C device room. Must be repeated. In addition, in order to obtain the continuity necessary for the test between the terminals in the D equipment room in the continuity test before the switching work, the continuity test after the switching work, and the conductor resistance test, the operator at the point D also attaches the clip cord SC to each terminal. The contact and separation of the terminals must be repeated.
[0013]
Thus, in the conventional cable switching work, before and after the switching work, the workers in both the C and D equipment rooms frequently contact each test equipment lead terminal in correspondence with each test. In addition, such work has been extremely troublesome, such as having to repeatedly contact and separate the wiring terminals with clip cord terminals. In addition, since it is necessary to switch the communication cable without error within a limited time, it has been a very difficult task for each worker.
[0014]
In addition, the number of cable cores may reach several tens or even one hundred or more, and in that case, the number of wiring terminals in the C and D equipment rooms are arranged in series. On the other hand, when the operator repeatedly contacts and separates the lead terminal of the test equipment or the terminal of the clip cord with the wiring terminal in the equipment room, the wiring terminal to be contacted, that is, the wiring terminal that has already been contacted I was checking the terminal located next to it. For this reason, it is easy to cause misunderstandings between wiring terminals with no difference in appearance, such as skipping tested or untested items, or untested items that should be tested, which is a false test. In some cases, preventing the progress of smooth work. As a result, in the conventional cable switching such as repeated erroneous wasteful work, the work time becomes long and the work cost increases.
[0015]
The present invention has been made in view of such problems, and provides a cable core wire switching test apparatus capable of greatly simplifying and speeding up the cable core wire switching test before and after switching such a cable in the prior art. It was made for the purpose of doing.
[0016]
[Means for Solving the Problems]
In order to achieve the above object, a cable core wire switching test apparatus according to
A circuit in which the sacrificial wire connection terminal (ST) and one of the external terminals for connecting the continuity tester (TM1) are connected;
Each of the three circuits has at least nine contacts, and all of the first to third circuit selectors (RSW1, RSW2, RSW3) are moved at the same time so that the contacts in the three circuits are switched simultaneously.A test consisting of a rotary switch withAn item changeover switch (RSW);
A circuit in which the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) is connected to one of the two core wire connection terminals (T1), and the test item changeover switch (RSW) A circuit in which the terminal of the second circuit selector (RSW2) and the other of the two core wire connection terminals (T2) are connected, and the third circuit selector (RSW3) of the test item changeover switch (RSW) A circuit connecting the terminal and the external terminal for ground connection (TM7),
On the measurement side,
Each terminal of a continuity tester is connected to the two external terminals (TM1, TM2), each terminal of a conductor resistance measuring device is connected to the two external terminals (TM3, TM4), and the two external terminals (TM5 , TM6) and each terminal of the insulation resistance meter, and the one ground connection external terminal (TM7) is connected to the ground,
When connecting the sagging wire to the sacrificial wire connecting terminal (ST) and connecting the core wires (L1, L2) of the cable to be tested to the two core wire connecting terminals (T1, T2), the test item Switch the contacts in the three circuits of the changeover switch (RSW) simultaneously, and2 to 4 circuitsBy taking corresponding continuity on the expulsion side,
Then, by switching 9 consecutive contacts in the test item changeover switch (RSW),
1OFF,
2A circuit for continuity test of the core L1-Sagre,
3Circuit for continuity test of the core L2-sagline,
4Circuit for conductor resistance measurement test of the cores L1-L2;
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
9 A circuit for releasing charges charged in the core wires L1 and L2 to the ground,
Each of the
[0017]
According to the cable core wire switching test apparatus of the present invention, since it has the above-described configuration, it is arranged on the measurement side when switching cables. Then, each terminal of the continuity tester is connected to the two external terminals TM1 and TM2, each terminal of the conductor resistance measuring instrument is connected to the two external terminals TM3 and TM4, and insulated from the other two external terminals TM5 and TM6. Each terminal of the ohmmeter is connected, one ground connection external terminal TM7 is connected to the ground, and a sagging wire is connected to the sagging wire connecting terminal ST. Here, an analog tester is preferably used for the continuity tester, and a digital tester is preferably used for the conductor resistance measuring device, but it is also possible to use the conductor resistance measuring device for the continuity testing device. Then, the core wires L1 and L2 forming a pair to be switched are connected to the two core wire connection terminals T1 and T2, respectively. Therefore, when using the above point C,In the
[0018]
The cable core wire switching test device according to
A circuit in which the sacrificial wire connection terminal (ST) and one of the external terminals for connecting the continuity tester (TM1) are connected;
Each of the three circuits has at least nine contacts, and all of the first to third circuit selectors (RSW1, RSW2, RSW3) are moved at the same time so that the contacts in the three circuits are switched simultaneously.A test consisting of a rotary switch withAn item changeover switch (RSW);
To the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) and the terminal of the second circuit selector (RSW2) of the test item changeover switch (RSW),4 core wiresConnecting terminal(T1-T4)Connected to the core wire (1L1,1L2, 2L1, 2L2)Of each pair of 2 core wires,2 contactsA circuit connected via a core wire changeover switch (SW21) having
A circuit connecting the terminal of the third circuit selector (RSW3) of the test item changeover switch (RSW) and the ground connection external terminal (TM7);
On the measurement side,
Each terminal of a continuity tester is connected to the two external terminals (TM1, TM2), each terminal of a conductor resistance measuring device is connected to the two external terminals (TM3, TM4), and the two external terminals (TM5 , TM6) and each terminal of the insulation resistance meter, and the one ground connection external terminal (TM7) is connected to the ground,
While connecting a sagging wire to the sagging wire connecting terminal (ST),4 aboveCore wire connection terminal(T1-T4)The core wires (1L1,1L2, 2L1, 2L2)When connecting
By switching the core wire switch (SW21), a pair of core wires selected from the cables to be tested are connected to the terminal of the first circuit selector (RSW1) of the test item switch (RSW) and the second circuit. Connected to the terminal of the selector (RSW2),
Under that condition,
The contact points in the three circuits of the test item changeover switch (RSW) are simultaneously switched, and the following2 to 4 circuitsBy taking corresponding continuity on the expulsion side,
Then, by switching 9 consecutive contacts in the test item changeover switch (RSW),
1OFF,
2A circuit for continuity test of the core L1-Sagre,
3Circuit for continuity test of the core L2-sagline,
4Circuit for conductor resistance measurement test of the cores L1-L2;
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
9 A circuit for releasing charges charged in the core wires L1 and L2 to the ground,
Each of the
[0019]
In the first aspect, the test is performed in units of two core wires, that is, a pair of cables.Is two pairsBy connecting the cable unit to the core connection terminal in advance and switching the core switch, the cores to be tested can be switched in units of a pair of two cores.It is.
[0020]
Claim 2In the cable core wire switching test apparatus, the number of the core wire connection terminals (T1, T2,...) Is 4, the terminals of the first circuit selector (RSW1) of the test item selector switch (RSW), and the test items. Among the core wires (1L1, 1L2, 2L1, 2L2) connected to the four core wire connection terminals (T1 to T4) to the terminal of the second circuit selector (RSW2) of the changeover switch (RSW), A circuit in which a pair of two core wires is connected via a core wire changeover switch (SW21) having two contacts in two circuits.CableIt is a core wire switching test device. The cable core switching is preferably performed in units of two pairs of one quad (four cores) in terms of switching,Claim 2Is tailored to that request. Normally, a rotary switch is used as a core wire changeover switch having a contact of 3 or more (a few minutes to form a pair of core wires) in two circuits.Claim 2In this cable core wire switching test apparatus, a slide switch (or toggle switch) having two circuits and two contacts may be used.
[0021]
[0022]
Claim 3In the invention, each terminal of the continuity tester is connected to two external terminals (TM1, TM2), each terminal of the conductor resistance measuring device is connected to two external terminals (TM3, TM4), and two external terminals ( TM5, TM6) each terminal of an insulation resistance meter is connected, and a continuity tester, a conductor resistance measurement device, and an insulation resistance meter are
[0023]
In the cable switching test, a continuity test is usually used for a continuity test, a conductor resistance measurement device for measurement of conductor resistance, and an insulation resistance meter for measurement of insulation resistance. Since there is no need to prepare these separately, the work can be simplified.
[0024]
Claim 4The present invention includes two core wire connection terminals (T1, T2) connectable to a pair of core wires (L1, L2) of a test object, one sacrificial wire connection terminal (ST), and a conductor resistance. Two external terminals (TM3, TM4) for connecting a measuring instrument, two external terminals (TM5, TM6) for connecting an insulation ohmmeter, and one external terminal for ground connection (TM7) for ground connection,
A circuit in which the sacrificial wire connecting terminal (ST) and one of the external terminals for connecting the conductor resistance measuring instrument (TM3) are connected;
3 circuits with each circuitAt least 8 contactsAnd all of the first to third circuit selectors (RSW1, RSW2, RSW3) are moved simultaneously, and the respective contacts in the three circuits are switched simultaneously.A test consisting of a rotary switch with a stopper that prevents the knob from turning over from
A circuit in which the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) is connected to one of the two core wire connection terminals (T1), and the test item changeover switch (RSW) A circuit in which the terminal of the second circuit selector (RSW2) and the other of the two core wire connection terminals (T2) are connected, and the third circuit selector (RSW3) of the test item changeover switch (RSW) A circuit connecting the terminal and the external terminal for ground connection (TM7),
On the measurement side,
Each terminal of a conductor resistance measuring instrument is connected to the two external terminals (TM3, TM4), each terminal of an insulation resistance meter is connected to the two external terminals (TM5, TM6), and the one ground connection Connect the external terminal (TM7) to ground,
When connecting the sagging wire to the sacrificial wire connecting terminal (ST) and connecting the core wires (L1, L2) of the cable to be tested to the two core wire connecting terminals (T1, T2), the test item Switch the contacts in the three circuits of the changeover switch (RSW) simultaneously, and2 to 4 circuitsBy taking corresponding continuity on the expulsion side,
Then, by switching eight consecutive contacts in the test item changeover switch (RSW),
1 OFF,
2A circuit for continuity test of the core L1-Sagre,
3Circuit for continuity test of the core L2-sagline,
4Circuit for conductor resistance measurement test of the cores L1-L2;
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
Each of the
[0025]
Of the present inventionClaim 4Among the four external terminals (TM1 to TM4) in the cable core wire switching test device (hereinafter also referred to simply as “device”) of
[0026]
However,Claim 4In the described cable core wire switching test device, a conductor resistance measuring instrument that can be used for both the continuity test and conductor resistance measurement is used.it can.
[0027]
Claim 5The invention ofClaim 4In the cable core wire switching test device,
Conductor resistance measuring instrument and insulation ohmmeter are connected to two external terminals (TM3, TM4) and each terminal of insulation ohmmeter is connected to two external terminals (TM5, TM6). Is a cable core wire switching test apparatus.
[0028]
Claim 6The described
In place of the two (TM3, TM4) external terminals for connecting the conductor resistance measuring instrument, four (TM1, TM2, TM3, TM4) are provided,
Instead of the circuit connecting the sagging wire connection terminal (ST) and one of the external terminals for connecting the conductor resistance measuring instrument (TM3), the sagging wire connecting terminal (ST) and the conductor resistance measuring instrument connection Providing a circuit connected to one of the external terminals (TM1),
On the measurement side, instead of connecting each terminal of the conductor resistance measuring device to the two external terminals (TM3, TM4), a continuity tester which is a conductor resistance measuring device to the two external terminals (TM1, TM2) And connecting each terminal of the conductor resistance measuring instrument to the two external terminals (TM3, TM4),
Further, each contact of the test item changeover switch (RSW) is opened, or instead of being connected to any one of the external terminals (TM3 to TM6), the respective contacts are opened or external terminals ( It is a cable core wire switching test device having a configuration in which wiring connection is made to any one of TM2 to TM6).
[0029]
[0030]
DETAILED DESCRIPTION OF THE INVENTION
A first embodiment of a cable core wire switching test apparatus according to the present invention will be described in detail with reference to FIG. 1 and FIG. FIG. 1 is a circuit diagram of a core wire switching
[0031]
On the other hand, in the figure, RSW is a test item changeover switch, and each circuit has 9 contacts (fixed terminals) in 3 circuits.Have the firstUses rotary switches stacked in three stages so as to have the third three circuits. The test item changeover switch RSW is configured such that all the first to third circuit selectors (movable segments) RSW1, RSW2, and RSW3 are moved simultaneously by turning the
[0032]
In this embodiment, the terminal of the first circuit selector RSW1 of the test item changeover switch RSW and the core wire connection terminal T1 are connected by wire, and the terminal of the second circuit selector RSW2 of the test item changeover switch RSW is connected to the core wire. The connection terminal T2 is connected by wiring. The terminal of the third circuit selector RSW3 of the test item changeover switch (hereinafter also referred to as a rotary switch) RSW and the ground connection external terminal TM7 are connected by wiring.
[0033]
The contacts (fixed
[0034]
That is, the contact (fixed terminal) 1 corresponding to any of the
As for the
[0035]
As for the
[0036]
As for the
[0037]
As for the
[0038]
As for the
[0039]
As for the
[0040]
As for the
[0041]
As for the
[0042]
The cable core wire switching
[0043]
That is, in FIG. 10, the cable is opened at the core wire separating terminals (wiring terminals) of the switching lines at the points C and D, respectively, so that there is no load and no voltage. At point D, one terminal of the clip cord SC is connected to the terminal of the sagittal wire 50L2.
[0044]
In the cable core wire switching test apparatus (hereinafter also referred to as a test apparatus) 101 according to the present embodiment, the sacrificial wire 50L2 is connected to the sagging wire connecting terminal ST and the two core wire connecting terminals T1 forming a pair have the above-described configuration. , T2 are connected to the cores 1L1 and 1L2 of the cable to be tested, and the
[0045]
Therefore, in the continuity test of the existing cable, the rotary switch RSW is turned at the point C (measurement side) while the continuity is established between the sagging wire 50L2 and the core wire L1 at the point D (extraction side). Thus, the
[0046]
Next, between A and D, between B and D, as in the past, the cable core wire numbers and L1 and L2 were confirmed (continuity test), and the continuity test was performed at points A and B. Cut the cable (between A and B of L1 and L2). And it switches to a new cable (L1, L2). After the existing cable is switched to the new cable in this way, the continuity test is first performed on the core wires (L1, L2) of the new cable. This continuity test can be performed in exactly the same manner as the continuity test of the existing cable. That is, the operator switches the analog switch tester AT by switching the rotary switch RSW of the test apparatus from OFF of the
[0047]
The rotary switch RSW is switched from the
[0048]
Further, when the rotary switch RSW is switched from the
[0049]
Thus, after switching the existing cable to the new cable for 1L1, 1L2, the continuity test, the conductor resistance measurement test, the insulation resistance measurement, etc. are similarly performed on 2L1, 2L2, and two pairs that make a pair one after another. Switch existing cables for each core wire to new cables.
[0050]
As described above, when the
[0051]
Next, a
[0052]
That is, in the
[0053]
In this embodiment, two pairs of core wires, that is, one quad core wire forming four core wires, is connected in advance to the core wire connection terminals T1 to T4, and the core wire changeover switch SW21 is Under the orientation state, first, a pair of core wires (1L1, 1L2) are tested in the same manner as in the above embodiment. Thereafter, the core wire changeover switch SW21 is switched from the localization, and another pair of core wires (2L1, 2L2) is tested in the same manner as in the above embodiment.
[0054]
That is, in this embodiment, the number of the core wire connection terminals is four, and the core wire changeover switch (line changeover switch) SW21 is provided in the middle of the circuit from the core wire connection terminals T1 to T4 and the rotary switch RSW. Thus, in the above embodiment, the test is repeatedly performed in two cores, that is, in a pair (Pair) unit, whereas this test is performed in units of two pairs of four cores (1 quad). Can be repeated.
[0055]
HeartThe changeover switch is preferably a slide switch (or a toggle switch) with two contacts.
[0056]
For example, in the case where the number of the core wire connection terminals is four, the core wire changeover switch is provided in the above embodiment. However, in the present invention, each of the continuity tester, the conductor resistance measuring device, and the insulation resistance meter is already provided. By preparing one unit and combining the circuit shown in FIG. 1 and two test item changeover switches RSW, two pairs of core wires can be tested simultaneously. That is, two configurations including the circuit of FIG. 1 are prepared, 1L1 and 1L2 are connected to one of the external terminals T1 and T2, and 2L1 and 2L2 are defined as T3 and T4 of the other external terminals T1 and T2. As a result of connecting two rotary switches as test item changeover switches RSW having three contacts in each of the three circuits, the first to third circuit selectors (movable segments) RSW1 to RSW3 are connected. All move at the same time. In other words, the rotary switch having 9 contacts in each circuit in 3 circuits is stacked in two stages, and the rotary switch having 9 contacts in each circuit is used in 6 circuits. In this case, two analog testers, digital testers, and insulation resistance meters are required, but since there are four core connection terminals, there are four pairs of core wires (1L1, 1L2, 2L1, 2L2). By connecting, you can test the four of them in half timeit can.
[0057]
In addition, the present inventionIn the test item change-over switch of the test apparatus, it is sufficient to have at least nine contacts, and if there are more contacts than this, it may be left open.
[0058]
Furthermore, when the rotary switch is one that does not turn over from the
[0059]
Moreover, in the cable core wire switching
[0060]
Next, a first reference example different from the present inventionA description will be given based on the circuit diagram of the apparatus shown in FIG. However, since this
[0061]
The
[0062]
The test item changeover switch RSW has three circuits, each of which has six contacts (fixed terminals), and illustrates a rotary switch that is stacked in three stages so as to have three circuits. As in the above-described embodiments, the test item changeover switch RSW is configured so that all of the first to third circuit selectors (movable segments) RSW1, RSW2, and RSW3 are turned by turning an external knob (not shown). It has a configuration in which the six contacts (1 to 6) in the three circuits are simultaneously switched and simultaneously switched.
[0063]
The contacts (fixed
[0064]
That is, as for the contact (fixed terminal) 1, the one corresponding to the
[0065]
As for the
[0066]
The cable core wire switching
[0067]
That is,Of this reference exampleAlso in the cable core wire switching
[0068]
In addition,Of this reference exampleIn the cable core wire switching
[0069]
In addition, at the point A or B in FIG. 10, when conducting a continuity test between ADs or between BDs (a continuity test between 50L2 (scouring line) and 1L1 (core line)), the
[0070]
NowNext, a second reference example different from the present inventionA description will be given based on the circuit diagram of the
[0071]
That is,Of this reference exampleThe cable core wire switching
[0072]
ThisIn this reference exampleThen, by turning on (closing) the earth opening / closing switch SW41, electric charges charged in the core wires L1 and L2 can be released to the ground. Further, by opening the circuit open / close switch SW42, each terminal of the conductor resistance measuring instrument is connected to the two external terminals (TM3, TM4), and the insulation resistance meter is connected to the other two external terminals (TM5, TM6). Even when each terminal is connected, a conductor is connected between the core wire connection terminal (T1) and the sacrificial wire connection terminal (ST) and between the core wire connection terminal (T2) and the sagging wire connection terminal (ST). It is possible to prevent the continuity from being maintained through the wiring in the resistance measuring instrument.
[0073]
Next, a third reference example different from the present inventionA description will be given based on the circuit diagram of the apparatus shown in FIG. However, the
[0074]
That is, this
[0075]
ThisOf this reference exampleIn the
[0076]
Next, a fourth reference example different from the present inventionA description will be given based on the circuit diagram of the apparatus shown in FIG. However, this is also shown in FIGS.Improvement of reference examplesTherefore, the same parts are denoted by the same reference numerals, and only the differences will be described.
[0077]
That is, this
[0078]
ThisOf this reference exampleIn the
[0079]
FIG. 9 shows an apparatus according to a third embodiment of the present invention (apparatus according to
[0080]
That is, in this apparatus, the test item changeover switch (RSW) in the apparatus of FIGS. 7 and 8 is assumed to have 8 contacts in each circuit in 3 circuits, and the test item changeover switch (RSW) using the increased 2 contacts. By switching the circuit, it is possible to form a circuit that releases the electric charges charged in the core wire L1 and the core wire L2 to the ground and to form a circuit that is not a test or measurement circuit and is turned off. is there. In other words, in the present embodiment, among the
[0081]
Moreover, in this embodiment, the test item changeover switch (RSW) is a rotary switch, and by switching to each of the
[0082]
Also in this device, each terminal of the conductor resistance measuring device is connected to the two external terminals (TM3, TM4), and each terminal of the insulation resistance meter is connected to the two external terminals (TM5, TM6). From the viewpoint of ease of use, it is preferable to provide a conductor resistance measuring instrument and an insulation resistance meter.
[0083]
6 to 9, the continuity test and the conductor resistance measurement are performed by connecting each terminal of one conductor resistance measuring instrument to two external terminals (TM3, TM4) in the apparatus. However, when a digital tester is used, the continuity test becomes inefficient, and when an analog tester is used, the accuracy of conductor resistance measurement is reduced.In the present invention, FIG.Even when the number of contacts of each selector in the test item changeover switch is 6 to 8 as in the apparatus shown, the continuity test and the conductor resistance are the same as in the embodiment shown in FIGS. It is preferable that four external terminals (TM1 to TM4) are provided for measurement.
[0084]
That is,
Instead of the circuit connecting the sagging wire connection terminal (ST) and one of the external terminals for connecting the conductor resistance measuring instrument (TM3), the sagging wire connecting terminal (ST) and the conductor resistance measuring instrument connection Providing a circuit connected to one of the external terminals (TM1),
On the measurement side, instead of connecting each terminal of the conductor resistance measuring device to the two external terminals (TM3, TM4), a continuity tester which is a conductor resistance measuring device to the two external terminals (TM1, TM2) And connecting each terminal of the conductor resistance measuring instrument to the two external terminals (TM3, TM4),
Further, each contact of the test item changeover switch (RSW) is opened, or instead of being connected to any one of the external terminals (TM3 to TM6), the respective contacts are opened or external terminals ( It is a cable core wire switching test device having a configuration in which wiring connection is made to any one of TM2 to TM6). For example, when the test item changeover switch (RSW) having 8 contacts in each circuit shown in FIG. 9 is used, the
[0085]
further,Any one of Claims 4-6Also in the cable core wire switching test device described in 1.Are two pairsIt can be. At this time, as shown in FIG. 3, a core wire changeover switch SW21 may be provided and switched.
[0086]
In the present invention, appropriate continuity testers and conductor resistance measuring devices may be used. The present invention is not limited to the above-described embodiments, and can be embodied by appropriately modifying the design without departing from the scope of the invention. Although described in the intermediate switching, it can also be used when switching between stations. The present invention is not limited to communication cables and signal cables, and can be applied to switching of general lines (cables).
[0087]
【The invention's effect】
As is apparent from the above description, according to the cable core wire switching test apparatus of the present invention, the circuit configuration for each test can be easily and quickly performed on the measurement side when switching between communication cables and signal cables. As a result, the test and measurement time can be shortened, and erroneous tests can be avoided.
[Brief description of the drawings]
FIG. 1 is a circuit diagram for explaining a first embodiment of a test apparatus of the present invention.
2 is a schematic configuration diagram showing an arrangement of terminals, rotary switches, and the like (operation unit) of the test apparatus of FIG. 1;
FIG. 3 is a circuit diagram illustrating a second embodiment of the test apparatus of the present invention.
4 is a schematic configuration diagram showing the arrangement of terminals, rotary switches, and the like (operation unit) of the test apparatus in FIG. 3;
[Figure 5]First reference example of a test apparatus different from the present inventionFIG.
[Fig. 6]Second reference example of a test apparatus different from the present inventionFIG.
[Fig. 7]Third reference example of a test apparatus different from the present inventionFIG.
[Fig. 8]Fourth reference example of a test apparatus different from the present inventionFIG.
FIG. 9 shows a test apparatus according to the present invention.Third implementationThe circuit diagram explaining the form of.
FIG. 10 is a schematic configuration diagram illustrating a conventional intermediate cable switching operation between stations.
[Explanation of symbols]
L1, L2, 1L1, 1L2, 2L1, 2L2
T1-T4 core connection terminal
ST Sagre wire connection terminal
TM1, TM2 Two external terminals for connecting to a tester
TM3, TM4 Two external terminals for connecting conductor resistance measuring instruments
TM5, TM6 Two external terminals for connecting insulation resistance meters
TM7 One external terminal for ground connection for ground connection
RSW test item switch
RSW1 first circuit selector
RSW2 Second circuit selector
RSW3 Third circuit selector
AT continuity tester
DT conductor resistance measuring instrument
ME Insulation resistance meter
SW21 Core switch
SW41 Earth open / close switch
SW42 Circuit open / close switch
101, 201, 301, 401, 501, 601, 701 Cable core wire switching test device
Claims (6)
前記サグリ線接続端子(ST)と前記導通試験器接続用の外部端子のうちの一方(TM1)とを接続した回路と、
3回路で各回路とも少なくとも9接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有するロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と前記2つの心線接続端子のうちの一方(T1)とを接続した回路と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子と前記2つの心線接続端子のうちの他方(T2)とを接続した回路と、該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM1、TM2)に導通試験器の各端子を接続し、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記2つの心線接続端子(T1、T2)に試験対象のケーブルの心線(L1、L2)を接続した際において、前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する9の接点の切替により、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
9 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
前記1〜9の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置。Two core wire connection terminals (T1, T2) connectable to a pair of core wires (L1, L2) of a cable to be tested, one sacrificial wire connection terminal (ST), and a continuity tester connection Two external terminals (TM1, TM2), two external terminals (TM3, TM4) for connecting a conductor resistance measuring instrument, two external terminals (TM5, TM6) for connecting an insulation resistance meter, and a ground connection One external terminal (TM7) for ground connection;
A circuit in which the sacrificial wire connection terminal (ST) and one of the external terminals for connecting the continuity tester (TM1) are connected;
From a rotary switch having a configuration in which each circuit has at least nine contacts in three circuits, and all of the first to third circuit selectors (RSW1, RSW2, RSW3) are moved simultaneously and the respective contacts in the three circuits are switched simultaneously. A test item changeover switch (RSW),
A circuit in which the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) is connected to one of the two core wire connection terminals (T1), and the test item changeover switch (RSW) A circuit in which the terminal of the second circuit selector (RSW2) and the other of the two core wire connection terminals (T2) are connected, and the third circuit selector (RSW3) of the test item changeover switch (RSW) A circuit connecting the terminal and the external terminal for ground connection (TM7),
On the measurement side,
Each terminal of a continuity tester is connected to the two external terminals (TM1, TM2), each terminal of a conductor resistance measuring device is connected to the two external terminals (TM3, TM4), and the two external terminals (TM5 , TM6) and each terminal of the insulation resistance meter, and the one ground connection external terminal (TM7) is connected to the ground,
When connecting the sagging wire to the sacrificial wire connecting terminal (ST) and connecting the core wires (L1, L2) of the cable to be tested to the two core wire connecting terminals (T1, T2), the test item By simultaneously switching each contact in the three circuits of the changeover switch (RSW), and taking the corresponding conduction on the eviction side in the following 2 to 4 circuits ,
Then, by switching 9 consecutive contacts in the test item changeover switch (RSW),
1 OFF,
Circuit for continuity test of 2- core wire L1-Sagri wire,
Circuit for continuity test of 3- core L2-Sagre wire,
Circuit for conductor resistance measurement test of the 4- core wires L1-L2,
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
9 A circuit for releasing charges charged in the core wires L1 and L2 to the ground,
A cable core wire switching test apparatus, wherein each of the circuits 1 to 9 is set to be sequentially formed .
前記サグリ線接続端子(ST)と前記導通試験器接続用の外部端子のうちの一方(TM1)とを接続した回路と、
3回路で各回路とも少なくとも9接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有するロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子とに、前記4の心線接続端子(T1〜T4)に接続された心線(1L1、1L2、2L1、2L2)のうち、各一対をなす2心線をそれぞれ、2回路で2接点を有する心線切替スイッチ(SW21)を介して接続した回路と、
該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM1、TM2)に導通試験器の各端子を接続し、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記4の心線接続端子(T1〜T4)に試験対象のケーブルの複数の対をなす心線(1L1、1L2、2L1、2L2)を接続した際において、
前記心線切替スイッチ(SW21)の切替によって、試験対象のケーブルのうちから選択した一対の心線を、前記試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と第2回路用セレクタ(RSW2)の端子とに接続し、
その状態の下で、
前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する9の接点の切替により、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
9 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
前記1〜9の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置。Conduction between four core wire connection terminals (T1 to T4) connectable to two pairs of core wires (1L1, 1L2, 2L1, 2L2) of the test object and one sacrificial wire connection terminal (ST) Two external terminals (TM1, TM2) for connecting a tester, two external terminals (TM3, TM4) for connecting a conductor resistance measuring instrument, and two external terminals (TM5, TM6) for connecting an insulation resistance meter One ground connection external terminal (TM7) for ground connection;
A circuit in which the sacrificial wire connection terminal (ST) and one of the external terminals for connecting the continuity tester (TM1) are connected;
From a rotary switch having a configuration in which each circuit has at least nine contacts in three circuits, and all of the first to third circuit selectors (RSW1, RSW2, RSW3) are moved simultaneously and the respective contacts in the three circuits are switched simultaneously. A test item changeover switch (RSW),
The four core wire connection terminals are connected to the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) and the terminal of the second circuit selector (RSW2) of the test item changeover switch (RSW). Among the core wires (1L1, 1L2, 2L1, 2L2) connected to (T1 to T4) , each pair of two core wires is connected via a core wire changeover switch (SW21) having two contacts in two circuits. Connected circuit,
A circuit connecting the terminal of the third circuit selector (RSW3) of the test item changeover switch (RSW) and the ground connection external terminal (TM7);
On the measurement side,
Each terminal of a continuity tester is connected to the two external terminals (TM1, TM2), each terminal of a conductor resistance measuring device is connected to the two external terminals (TM3, TM4), and the two external terminals (TM5 , TM6) and each terminal of the insulation resistance meter, and the one ground connection external terminal (TM7) is connected to the ground,
Core wires (1L1, 1L2, 2L1, 2L2) that connect a plurality of pairs of cables to be tested to the four core wire connection terminals (T1 to T4) while connecting the sacri wire to the sacrificial wire connection terminal (ST ) When connecting
By switching the core wire switch (SW21), a pair of core wires selected from the cables to be tested are connected to the terminal of the first circuit selector (RSW1) of the test item switch (RSW) and the second circuit. Connected to the terminal of the selector (RSW2),
Under that condition,
By simultaneously switching each contact in the three circuits of the test item changeover switch (RSW), and taking the corresponding conduction on the eviction side in the following two to four circuits ,
Then, by switching 9 consecutive contacts in the test item changeover switch (RSW),
1 OFF,
Circuit for continuity test of 2- core wire L1-Sagri wire,
Circuit for continuity test of 3- core L2-Sagre wire,
Circuit for conductor resistance measurement test of the 4- core wires L1-L2,
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
9 A circuit for releasing charges charged in the core wires L1 and L2 to the ground,
A cable core wire switching test apparatus, wherein each of the circuits 1 to 9 is set to be sequentially formed .
前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM3)とを接続した回路と、
3回路で各回路とも少なくとも8接点を有し、第1〜第3回路用セレクタ(RSW1、RSW2、RSW3)の全部が同時に動いてその3回路における各接点が同時に切替わる構成を有し、しかも、接点8からツマミがターンオーバーして接点1に切替わることのないストッパー付きのロータリースイッチからなる試験項目切替スイッチ(RSW)と、
該試験項目切替スイッチ(RSW)の第1回路用セレクタ(RSW1)の端子と前記2つの心線接続端子のうちの一方(T1)とを接続した回路と、該試験項目切替スイッチ(RSW)の第2回路用セレクタ(RSW2)の端子と前記2つの心線接続端子のうちの他方(T2)とを接続した回路と、該試験項目切替スイッチ(RSW)の第3回路用セレクタ(RSW3)の端子と前記アース接続用外部端子(TM7)とを接続した回路とを備え、
測定側において、
前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、前記2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続するとともに、前記1つのアース接続用外部端子(TM7)をアースに接続し、
前記サグリ線接続端子(ST)にサグリ線を接続するとともに、前記2つの心線接続端子(T1、T2)に試験対象のケーブルの心線(L1、L2)を接続した際において、前記試験項目切替スイッチ(RSW)の3回路における各接点を同時に切替え、しかも以下の2〜4の回路において追出し側で対応する導通をとることによって、
そして、前記試験項目切替スイッチ(RSW)における連続する8接点の切替えにより、
1 OFF、
2 心線L1−サグリ線の導通試験のための回路、
3 心線L2−サグリ線の導通試験のための回路、
4 心線L1−L2の導体抵抗測定試験のための回路、
5 心線L1、L2に帯電した電荷をアースへ逃がすための回路、
6 心線L1−アース間の絶縁抵抗試験のための回路、
7 心線L2−アース間の絶縁抵抗試験のための回路、
8 心線L1−L2間の絶縁抵抗試験のための回路、
前記1〜8の各回路が順次、形成される設定とされていることを特徴とするケーブル心線切替試験装置。Two conductor connection terminals (T1, T2) connectable to a pair of conductors (L1, L2) of the cable to be tested, one sacrificial wire connection terminal (ST), and conductor resistance measuring instrument connection Two external terminals (TM3, TM4), two external terminals (TM5, TM6) for connecting an insulation resistance meter, and one ground connecting external terminal (TM7) for ground connection,
A circuit in which the sacrificial wire connection terminal (ST) and one of the external terminals for connecting the conductor resistance measuring device (TM3) are connected;
In each circuit 3 circuit has at least 8 contacts, each contact in the third circuit first through third circuit selector (RSW1, RSW2, RSW3) all are moved simultaneously has a switched configuration simultaneously, moreover A test item changeover switch (RSW) composed of a rotary switch with a stopper that does not turn over to the contact 1 when the knob is turned over from the contact 8 ;
A circuit in which the terminal of the first circuit selector (RSW1) of the test item changeover switch (RSW) is connected to one of the two core wire connection terminals (T1), and the test item changeover switch (RSW) A circuit in which the terminal of the second circuit selector (RSW2) and the other of the two core wire connection terminals (T2) are connected, and the third circuit selector (RSW3) of the test item changeover switch (RSW) A circuit connecting the terminal and the external terminal for ground connection (TM7),
On the measurement side,
Each terminal of a conductor resistance measuring instrument is connected to the two external terminals (TM3, TM4), each terminal of an insulation resistance meter is connected to the two external terminals (TM5, TM6), and the one ground connection Connect the external terminal (TM7) to ground,
When connecting the sagging wire to the sacrificial wire connecting terminal (ST) and connecting the core wires (L1, L2) of the cable to be tested to the two core wire connecting terminals (T1, T2), the test item By simultaneously switching each contact in the three circuits of the changeover switch (RSW), and taking the corresponding conduction on the eviction side in the following 2 to 4 circuits ,
Then, by switching eight consecutive contacts in the test item changeover switch (RSW),
1 OFF,
Circuit for continuity test of 2- core wire L1-Sagri wire,
Circuit for continuity test of 3- core L2-Sagre wire,
Circuit for conductor resistance measurement test of the 4- core wires L1-L2,
5 A circuit for escaping the electric charges charged in the cores L1 and L2 to the ground,
6 Circuit for insulation resistance test between core L1 and ground,
7 Circuit for insulation resistance test between core L2 and ground,
8 Circuit for insulation resistance test between the cores L1 and L2,
A cable core wire switching test device, wherein the circuits 1 to 8 are sequentially formed .
2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、2つの外部端子(TM5、TM6)に絶縁抵抗計の各端子を接続して、導体抵抗測定器及び絶縁抵抗計を備えてなるケーブル心線切替試験装置。 In the cable core wire switching test device according to claim 4 ,
Conductor resistance measuring instrument and insulation ohmmeter are connected to two external terminals (TM3, TM4) and each terminal of insulation ohmmeter is connected to two external terminals (TM5, TM6). A cable core wire switching test device comprising:
前記導体抵抗測定器接続用の外部端子を、(TM3、TM4)の2つに代えて、(TM1、TM2、TM3、TM4)の4つ設け、
前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM3)とを接続した回路に代えて、前記サグリ線接続端子(ST)と前記導体抵抗測定器接続用の外部端子のうちの一方(TM1)とを接続した回路を設け、
測定側において、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続するのに代えて、前記2つの外部端子(TM1、TM2)に導体抵抗測定器である導通試験器の各端子を接続するとともに、前記2つの外部端子(TM3、TM4)に導体抵抗測定器の各端子を接続し、
さらに、前記試験項目切替スイッチ(RSW)の各接点を、オープン、又は外部端子(TM3〜TM6)のうちのいずれかに配線接続することに代えて、該各接点を、オープン、又は外部端子(TM2〜TM6)のうちのいずれかに配線接続した構成を有するケーブル心線切替試験装置。 In the cable core wire switching test device according to any one of claims 4 and 5 ,
In place of the two (TM3, TM4) external terminals for connecting the conductor resistance measuring instrument, four (TM1, TM2, TM3, TM4) are provided,
Instead of the circuit connecting the sagging wire connection terminal (ST) and one of the external terminals for connecting the conductor resistance measuring instrument (TM3), the sagging wire connecting terminal (ST) and the conductor resistance measuring instrument connection Providing a circuit connected to one of the external terminals (TM1)
On the measurement side, instead of connecting each terminal of the conductor resistance measuring device to the two external terminals (TM3, TM4), a continuity tester which is a conductor resistance measuring device to the two external terminals (TM1, TM2) And connecting each terminal of the conductor resistance measuring instrument to the two external terminals (TM3, TM4),
Further, each contact of the test item changeover switch (RSW) is opened, or instead of being connected to any one of the external terminals (TM3 to TM6), the respective contacts are opened or external terminals ( A cable core wire switching test apparatus having a configuration in which the wiring connection is made to any one of TM2 to TM6).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003056792A JP3939259B2 (en) | 2002-03-15 | 2003-03-04 | Cable core switching test device |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002-73219 | 2002-03-15 | ||
| JP2002073219 | 2002-03-15 | ||
| JP2003056792A JP3939259B2 (en) | 2002-03-15 | 2003-03-04 | Cable core switching test device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003337154A JP2003337154A (en) | 2003-11-28 |
| JP3939259B2 true JP3939259B2 (en) | 2007-07-04 |
Family
ID=29714253
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003056792A Expired - Fee Related JP3939259B2 (en) | 2002-03-15 | 2003-03-04 | Cable core switching test device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3939259B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101250438B1 (en) | 2008-11-25 | 2013-04-04 | 최성일 | Underground earthing installation method from the ground terminal box to the ground copper plate or ground cooper coating rod for ground condition measurement of corrosion situation and underground wire connecting damage situation. |
| JP7206998B2 (en) * | 2019-02-21 | 2023-01-18 | 中国電力株式会社 | Wiring switch and insulation resistance measuring device |
| JP7282836B2 (en) * | 2021-07-15 | 2023-05-29 | 株式会社エステック | Wiring unit, wiring system, and method for checking defective insulation section |
-
2003
- 2003-03-04 JP JP2003056792A patent/JP3939259B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003337154A (en) | 2003-11-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4015200A (en) | Multiconductor cable testing apparatus | |
| US3528104A (en) | Bridge circuit methods of and apparatus for testing and locating faults in electrical circuits | |
| JP2005062050A (en) | Signal multicore cable tester | |
| JP3939259B2 (en) | Cable core switching test device | |
| JPH0868821A (en) | Continuity tester for multiple electric wires | |
| US2869076A (en) | Apparatus for testing a plurality of circuits | |
| CN111208410A (en) | Voltage and current source test circuit and test method | |
| CA1172697A (en) | Switching equipment for testing apparatus | |
| RU2569911C2 (en) | Automated control and diagnostic system of electrical circuits of complex technical products | |
| JPH10170571A (en) | Conduction state of wiring equipment, and insulation resistance measuring device | |
| US7388366B2 (en) | Test system connection system with triaxial cables | |
| US2635135A (en) | Apparatus for testing multiconductor cables | |
| US754402A (en) | Fault-locator for electric cables. | |
| US20070046302A1 (en) | Apparatus for testing electric cables | |
| JPH04503105A (en) | Electrical circuit testing | |
| CN119716655B (en) | Cable performance testing device and method and electronic equipment | |
| CN112466487A (en) | Rod position signal simulation device of nuclear power control rod and control method thereof | |
| JPS6141974A (en) | Testing device of multiconductor cable | |
| JPH04151566A (en) | Calibrating method for dc testing apparatus | |
| CN115892117B (en) | Inlet current simulator device and pre-commissioning method | |
| JPH09505145A (en) | Equipment for electrical testing of electrical connection elements | |
| CN114002567A (en) | Rapid one-key test system and method for insulation performance | |
| USRE31728E (en) | Test set | |
| JP2767296B2 (en) | Cable connection tester | |
| CN112285420A (en) | Rapid resistance value measuring method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040316 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060808 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060815 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061016 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070320 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070327 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |