Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3955403B2 - Shimizu reduction tower and discharge facility using the same - Google Patents
[go: Go Back, main page]

JP3955403B2 - Shimizu reduction tower and discharge facility using the same - Google Patents

Shimizu reduction tower and discharge facility using the same Download PDF

Info

Publication number
JP3955403B2
JP3955403B2 JP35339498A JP35339498A JP3955403B2 JP 3955403 B2 JP3955403 B2 JP 3955403B2 JP 35339498 A JP35339498 A JP 35339498A JP 35339498 A JP35339498 A JP 35339498A JP 3955403 B2 JP3955403 B2 JP 3955403B2
Authority
JP
Japan
Prior art keywords
fresh water
tower
water
reducing
intake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP35339498A
Other languages
Japanese (ja)
Other versions
JP2000178943A (en
Inventor
耕三 上出
Original Assignee
株式会社丸島アクアシステム
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社丸島アクアシステム filed Critical 株式会社丸島アクアシステム
Priority to JP35339498A priority Critical patent/JP3955403B2/en
Publication of JP2000178943A publication Critical patent/JP2000178943A/en
Application granted granted Critical
Publication of JP3955403B2 publication Critical patent/JP3955403B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)
  • Barrages (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、取水塔から表層取水された水に対して清水を混合する清水減勢塔及びそれを用いた放流設備に関するものである。
【0002】
【従来の技術】
従来、ダム選択取水設備においては、常時はダム湖表層の水を取水して放流し、洪水時には濁水を放流するというように任意の標高の水を放流することができるようになっている。しかしながら洪水後においても濁水の放流が長期に亘るとダム下流側の環境を汚染することになり好ましくない。
【0003】
これを解消する目的で、ダム湖上流の河川に副ダムを構築し、その副ダムから取水した清水を導水パイプで取水塔まで案内し、濁水と混合させて放流水の濁度を低下させようとする試みがなされている。
【0004】
【発明が解決しようとする課題】
しかしながら、副ダムと取水塔とを導水パイプで接続し、取水塔の頂部から清水を直接導入する方法では、取水塔内の水位が低下した場合に、取水塔頂部から清水が高速で落下することになり、取水塔内に設けられているゲート等を破損する恐れがある。
【0005】
一方、導水パイプを例えばダムの湖底に這わし、取水塔下部に設けられている放流管に合流させることにより清水を濁水と混合する方法では、清水の供給量を調節するための流量調節弁をダムの最下部に配置しなければならず、ダム内にその流量調節弁を設置するスペースを確保しなければならない。また、仮に設置が可能であってもその維持管理が困難であるという問題がある。
【0006】
本発明は以上のような従来の放流水浄化方法における課題を考慮してなされたものであり、取水塔内の水位に影響されずに清水を安全に取水塔に導入して濁水と混合することができる清水減勢塔及びそれを用いた放流設備を提供するものである。
【0007】
【課題を解決するための手段】
本発明の清水減勢塔は、取水塔によって表層取水された水に対して外部から清水を混合する清水減勢塔であって、該清水減勢塔が、塔上部に外部から清水を導入する清水導入路を有し、塔下部にその導入された清水を取水塔下部に送り出す清水導出路を有し、塔内に、清水導入路から導入された清水を高低差を利用して清水導出路に導きつつ減勢させる減勢手段を形成してなることを要旨とする。
【0008】
上記清水減勢塔を筒体で構成した本発明において、減勢手段は、塔内周壁に螺旋状に固定された螺旋階段で構成することができる。また、減勢手段は、塔内壁に固定された折返し階段から構成することができる。さらにまた、減勢手段は、対向する塔内壁に千鳥配置で突出されたプレートから構成することができる。
【0009】
本発明の放流設備は、上記いずれかの構成を有する清水減勢塔と、清水を取水するために河川上流に設けられる堰と、清水減勢塔と堰の取水部とを連通する連通路と、該連通路における清水減勢塔寄りに設けられ、清水減勢塔に導入する清水の供給量を調節する清水供給量調節手段とを備えてなることを要旨とする。
【0010】
上記放流設備において、清水供給量調節手段は、堰の取水部から取水された清水を貯留する水槽と、その水槽内に貯留された清水の放出量を調節する調節ゲートとから構成することができる。
【0011】
本発明の清水減勢塔に従えば、清水減勢塔の上部から清水が導入されると、導入された清水は、塔の高低差を利用して塔内を清水導出路に向けて流れ、減勢手段によって勢いが減衰された後、清水導出路から取水塔内に送り出される。それにより、取水塔内の水位に影響されず清水を安全な状態で取水塔に導入し、その内部に貯留されている濁水と混合することができる。
【0012】
本発明の放流設備に従えば、河川上流に設けられている堰から遠距離の連通路を介して送られる清水を、一旦、清水供給量調節手段の水槽に蓄えるため、連通路の圧力変動を考慮する必要がなく、従って連通路の設計自由度を高めることができる。
【0013】
【発明の実施の形態】
以下、図面に示した実施の形態に基づいて本発明を詳細に説明する。
【0014】
図1は、本発明に係る清水減勢塔が適用される放流設備の構成を示したものである。
【0015】
同図において、ダム湖1のダム本体2には、湖水から表層取水を行うための取水塔3が設けられており、その取水塔3と平行して円筒状の清水減勢塔4が立設されている。取水塔3は、常時はダム湖1の表層水を取水して放流し、洪水時には濁水を放流するようになっている。
【0016】
ダム湖1に流れる河川5の上流には上流取水堰6が設けられており、この上流取水堰6から取水された清水は、連通路7を介して清水減勢塔4に導入されるようになっている。なお、連通路7には中継水槽8が介設されており、中継水槽8と清水減勢塔4との間の連通路7aには制水バルブ9が備えられている。
【0017】
次に、上記清水減勢塔4の構成を図2を参照しながら詳しく説明する。図2(a)は清水減勢塔4の正面図を示し、同図(b)はその側面図を示す。
【0018】
図2において、清水減勢塔4は、例えば洪水後においてダム湖1から濁水を取水したときに、上流取水堰6から取水した清水をその濁水に混合して濁りを少なくするように構成されている。
【0019】
この清水減勢塔4は、取水塔3近傍に立設される鋼製の筒塔から構成されており、その塔上部に連通路7aの端部が接続され清水導入路10を形成している。一方、塔下部には清水減勢塔4内に導入された清水を取水塔3下部の貯水部3aに送り出すための清水導出路11が設けられている。
【0020】
清水減勢塔4内には、塔の筒軸方向に(本実施形態では垂直方向に)支柱12が設けられており、その支柱12を中心軸として螺旋状に減勢用螺旋階段13が設けられている。なお、上記支柱12及び減勢用螺旋階段13は減勢手段とみなすことができる。また、清水が確実に減勢用螺旋階段13上を流れて螺旋状に降下するように、減勢用螺旋階段13の外周側は塔内壁に固定され、且つ減勢用螺旋階段13の各ステップは垂直方向の板で接続されている。
【0021】
上記清水減勢塔4の頂部にはマンホール4aが備えられており、清水減勢塔4を点検する場合に、作業者がそのマンホール4aを開き、減勢用螺旋階段13上に降りることができるようになっている。
【0022】
また、清水減勢塔4の上部には、下向きエルボに構成された給排気管4bが備えられている。この給排気管4bは清水減勢塔4内を大気と連通させるためのものであり、導水直後には排気を行うべく、また、水流降下によって空気が連行され清水減勢塔4内が減圧される場合には塔内に給気を行うようになっている。
【0023】
取水塔3内には多段式可動ゲート3a,3b,3cが配設されており、変動するダム湖1の水位、具体的には最高水位WL1〜最低水位WL2に応じて湖水の表層からスクリーン3eを介して取水を行うようになっている。そして、上記ゲートをオーバーフローして取水塔3内に取水された濁水は、貯水部3aに貯留される。
【0024】
一方、清水減勢塔4の上部から導入された清水は位置エネルギを有しており、清水導入路10から清水導出路11に向けて降下しようとするが、上記した減勢用螺旋階段13上を流れる際に多数の階段形状が流れに対して抵抗として働くため、清水の流れの勢いが減衰され、減勢された清水が清水導出管11に到達することになる。
【0025】
このようにして減勢された清水は清水導出管11を介して取水塔3内に供給され、貯留部3aに貯留されている濁水と混合される。清水の混合によって濁度が低下した放流水は、放流管14から放流される。なお、図中、符号15はダム躯体、15aはダム軸を示している。
【0026】
また、図3は図1のA−A矢視図であり、清水減勢塔4と取水塔3との配置を示したものである。
【0027】
同図において、清水導入管7より導入される清水は、制水バルブ9を介してダム軸15aから所定距離離れた清水減勢塔4の上部に導入される。制水バルブ9は、清水減勢塔4の保守点検をする場合に清水導入管7を閉じるためのものである。
【0028】
清水減勢塔4内では塔の周壁及びその周壁に取付られた減勢用螺旋階段13に沿って清水が渦巻き状に流れ降下していく。
【0029】
図4は図1のB−B矢視図であり、清水減勢塔4の清水導出管11と取水塔3の貯水部3aとの配置を示したものである。
【0030】
同図において、清水減勢塔4の下部に備えられた清水導出管11は、エルボを構成し、取水塔3の下部に形成されている貯水部3aに連通しており、その清水導出管11は取水塔3の外壁に取り付られた支持部材16によって支持されている。
【0031】
図5は本発明に係る清水減勢塔の他の実施形態を示したものである。同図に示す清水減勢塔10はコンクリート製筒体からなり、その内部に減勢用折返し階段11を形成している。この構成では、清水導入路としてのダクト状の清水通路12から導入された清水は、減勢用折返し階段11に沿って流れながらジグザクに降下していき、減勢用折返し階段11上を流れる際に多数の階段形状が流れに対して抵抗として働くため、清水の勢いが減衰される。減勢された清水は、清水減勢塔10下部に設けられた清水導出路(図示しない)に到達して取水塔3に送り出される。
【0032】
図6は本発明に係る清水減勢塔のさらに他の実施形態を示したものである。同図に示す清水減勢塔20はコンクリート製筒体からなり、その内部の対向内壁に減勢板21,22,23,24…を千鳥に多数形成している。各減勢板の先端には上向き鉤状に折り曲げられた堰21a,22a,23a,24a…が形成されている。
【0033】
この構成では、清水導入路としてのダクト状の清水通路30から導入された清水は、最上段の減勢板21の堰21aをオーバーフローして次段の減勢板22上に落下し、その堰22aをオーバーフローしてさらに次段の減勢板23上に落下し、この動作を繰り返しながら降下していく。多数の減勢板は抵抗として働くため、降下していく清水の勢いが減衰され、減勢された清水は、清水減勢塔20下部に設けられた清水導出路(図示しない)に到達し、取水塔3に送り出される。
【0034】
なお、本発明の放流設備においては、連通路7における清水減勢塔4寄りに中継水槽8を設けることが好ましい。すなわち、上流取水堰6からダム本体2までの距離は数キロmに及ぶことがあり、連通路7に何ら流量調節手段を備えていないと、連通路7の形状や勾配等によって管内流速が変化することになり、清水減勢塔4に至るまでの管路設計が困難になるという問題が起こる。
【0035】
そこで、本実施形態では連通路7の途中に中継水槽8を設け、上流取水堰6から取水される清水の圧力を調整するようにしている。
【0036】
図7(a)及び(b)は上記中継水槽8の構成を示す平面図及び正面図である。
【0037】
中継水槽8はコンクリート製ボックス等からなり、中継水槽8から上流側の連通路7と中継水槽8から下流側の連通路7aとは、高低差が設けられている。
【0038】
下流側連通路7aが接続されている壁8aには昇降動作する調整ゲート40が設けられており、中継水槽8内に貯留された清水の放出量を調節することができるようになっている。また、中継水槽8の側壁8bには、必要に応じて取水することができるように取水管41が設けられている。なお、8cは上蓋である。
【0039】
連通路7の経路途中に上記構成を有する中継水槽8を設け、流量を調節した清水を清水減勢塔4に導入するように構成すれば、河川上流に設けられている堰から遠距離の連通路7を介して送られる清水が、一旦、水槽内に蓄えられるため、連通路7の圧力変動を考慮する必要がなく、従って連通路7の設計自由度を高めることができる。
【0040】
また、上流取水堰6は通常、河川のかなり上流の険しい場所に設けられるため、上流取水堰6に流量調節手段を設けたとしても日常の管理が極めて困難になる。その点、清水減勢塔4に近い部位の連通路7に中継水槽8を設ければ、日常の管理も極めて容易になる。
【0041】
上記実施形態では、既存のダムに適用することができるように、清水減勢塔を取水塔と平行して別に立設したが、新規に建設されるダム設備においては、取水塔内に、上記構成を有する清水減勢塔を予め内蔵させることもできる。
【0042】
また、本発明において、減勢手段は、上記実施形態ではメンテナンスを行う上で都合が良いように螺旋階段、折返し階段等で構成したが、これに限らず、清水を取水塔上部から直接落下させずに減勢することができるものであれば、任意の形状の減勢手段を使用することができる。
【0043】
【発明の効果】
以上説明したことから明らかなように、本発明の清水減勢塔によれば、減勢手段によって勢いを減衰させた清水が取水塔内に導入されるため、取水塔内の水位に影響されず清水を安全な状態で取水塔に導入し、その内部に貯留されている例えば濁水と混合することができる。
【0044】
本発明の放流設備に従えば、河川上流に設けられている堰から遠距離の連通路を介して送られる清水を、一旦、清水供給量調節手段の水槽に蓄えるため、連通路の圧力変動を考慮する必要がなく、従って河川上流側から遠距離で連通路を設ける場合にその管路の設計自由度が高められるという長所を有する。
【図面の簡単な説明】
【図1】本発明の清水減勢塔が適用される放流設備を示す平面図である。
【図2】本発明の清水減勢塔の構成を示す説明図であり、(a)は正面図、(b)は側面図である。
【図3】図2のA−A矢視図である。
【図4】図2のB−B矢視図である。
【図5】本発明に係る清水減勢塔の他の実施形態を示す要部斜視図である。
【図6】本発明に係る清水減勢塔のさらに他の実施形態を示す要部斜視図である。
【図7】本発明の放流設備における中継水槽の構成を示す説明図であり、(a)は平面図、(b)は正面図である。
【符号の説明】
1 ダム湖
2 ダム本体
3 取水塔
4 清水減勢塔
5 河川
6 上流取水堰
7 連通路
8 中継水槽
9 制水バルブ
10 清水導入路
11 清水導出路
13 減勢用螺旋階段
14 放流管
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a fresh water reducing tower that mixes fresh water with water taken from the surface of a water intake tower, and a discharge facility using the same.
[0002]
[Prior art]
Conventionally, in a dam selective intake facility, water at an arbitrary altitude can be discharged such that water on the surface of a dam lake is taken and discharged at all times, and muddy water is discharged in the event of a flood. However, if the discharge of muddy water continues for a long time even after the flood, the environment on the downstream side of the dam is contaminated.
[0003]
In order to solve this problem, build a secondary dam in the river upstream of the dam lake, guide the fresh water taken from the secondary dam to the intake tower with a water conduit, and mix it with muddy water to reduce the turbidity of the discharged water. Attempts have been made.
[0004]
[Problems to be solved by the invention]
However, in the method of connecting the sub dam and the intake tower with a water conduit and introducing fresh water directly from the top of the intake tower, when the water level in the intake tower drops, the fresh water falls from the top of the intake tower at high speed. This may damage the gate and the like provided in the intake tower.
[0005]
On the other hand, in a method in which fresh water is mixed with muddy water by, for example, passing a water pipe to the bottom of a dam lake and joining a discharge pipe provided at the lower part of the intake tower, a flow control valve for adjusting the supply amount of fresh water is provided. It must be placed at the bottom of the dam, and a space for installing the flow control valve in the dam must be secured. Moreover, even if it can be installed, there is a problem that its maintenance is difficult.
[0006]
The present invention has been made in consideration of the above problems in the conventional effluent water purification method, and clean water can be safely introduced into the intake tower and mixed with muddy water without being affected by the water level in the intake tower. It is intended to provide a fresh water reduction tower and a discharge facility using the same.
[0007]
[Means for Solving the Problems]
The fresh water reducing tower of the present invention is a fresh water reducing tower that mixes fresh water from the outside with water taken from the surface by the intake tower, and the fresh water reducing tower introduces fresh water from the outside to the upper part of the tower. It has a fresh water introduction path, and a fresh water lead-out path for sending the introduced fresh water to the lower part of the water tower at the bottom of the tower, and the fresh water introduced from the fresh water introduction path in the tower using the height difference The gist of the present invention is to form a depressurizing means for deenergizing while leading to the above.
[0008]
In the present invention in which the fresh water reducing tower is constituted by a cylindrical body, the reducing means can be constituted by a spiral staircase fixed in a spiral manner on the inner wall of the tower. Further, the deenergizing means can be constituted by a folded staircase fixed to the inner wall of the tower. Furthermore, the de-energizing means can be composed of plates protruding in a staggered arrangement on the opposing tower inner walls.
[0009]
The discharge facility of the present invention includes a fresh water reducing tower having any one of the above structures, a weir provided upstream of the river for taking fresh water, a communication passage communicating the fresh water reducing tower and the intake portion of the weir. And a fresh water supply amount adjusting means for adjusting the supply amount of fresh water introduced to the fresh water reduction tower, provided near the fresh water reduction tower in the communication passage.
[0010]
In the above-mentioned discharge facility, the fresh water supply amount adjusting means can be constituted by a water tank for storing fresh water taken from the intake portion of the weir and an adjustment gate for adjusting the discharge amount of the fresh water stored in the water tank. .
[0011]
According to the fresh water reducing tower of the present invention, when fresh water is introduced from the upper part of the fresh water reducing tower, the introduced fresh water flows through the tower toward the fresh water outlet using the height difference of the tower, After the momentum is attenuated by the de-energizing means, it is sent into the intake tower from the fresh water lead-out path. Thereby, clean water can be safely introduced into the water intake tower without being affected by the water level in the water intake tower, and can be mixed with muddy water stored therein.
[0012]
According to the discharge facility of the present invention, the fresh water sent through the long-distance communication passage from the weir provided upstream of the river is temporarily stored in the water tank of the fresh water supply amount adjustment means. There is no need to consider it, so the degree of freedom in designing the communication path can be increased.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail based on the embodiments shown in the drawings.
[0014]
FIG. 1 shows the configuration of a discharge facility to which the fresh water decontamination tower according to the present invention is applied.
[0015]
In the figure, a dam body 2 of a dam lake 1 is provided with a water intake tower 3 for taking surface water from the lake water, and a cylindrical fresh water reducing tower 4 is erected in parallel with the water intake tower 3. Has been. The intake tower 3 always takes and discharges the surface water of the dam lake 1 and discharges muddy water at the time of flooding.
[0016]
An upstream intake weir 6 is provided upstream of the river 5 flowing into the dam lake 1, and fresh water taken from the upstream intake weir 6 is introduced into the fresh water reducing tower 4 through the communication path 7. It has become. In addition, a relay water tank 8 is provided in the communication path 7, and a water control valve 9 is provided in the communication path 7 a between the relay water tank 8 and the fresh water reducing tower 4.
[0017]
Next, the structure of the fresh water reducing tower 4 will be described in detail with reference to FIG. FIG. 2 (a) shows a front view of the fresh water reducing tower 4, and FIG. 2 (b) shows a side view thereof.
[0018]
In FIG. 2, the fresh water reducing tower 4 is configured to reduce the turbidity by mixing fresh water taken from the upstream intake weir 6 with the muddy water when, for example, water is taken from the dam lake 1 after the flood. Yes.
[0019]
The fresh water reducing tower 4 is composed of a steel cylinder tower installed in the vicinity of the intake tower 3, and an end of the communication passage 7 a is connected to the upper part of the tower to form a fresh water introduction path 10. . On the other hand, the lower part of the tower is provided with a fresh water lead-out path 11 for sending fresh water introduced into the fresh water reducing tower 4 to the water storage part 3a at the lower part of the water tower 3.
[0020]
In the fresh water reducing tower 4, a column 12 is provided in the column axis direction of the tower (in the present embodiment, in the vertical direction), and a spiral staircase 13 for reducing pressure is provided spirally with the column 12 as a central axis. It has been. The struts 12 and the spiraling spiral staircase 13 can be regarded as a biasing means. Further, the outer peripheral side of the decelerating spiral staircase 13 is fixed to the inner wall of the tower, and each step of the decelerating spiral staircase 13 is performed so that the fresh water surely flows on the decelerating spiral staircase 13 and descends spirally. Are connected by vertical plates.
[0021]
A manhole 4a is provided at the top of the fresh water reducing tower 4. When the fresh water reducing tower 4 is inspected, the operator can open the manhole 4a and get down onto the reducing spiral staircase 13. It is like that.
[0022]
In addition, an upper portion of the fresh water reducing tower 4 is provided with a supply / exhaust pipe 4b configured as a downward elbow. The air supply / exhaust pipe 4b is for communicating the inside of the fresh water reducing tower 4 with the atmosphere. In order to exhaust immediately after the water introduction, the air is taken along by the water flow and the inside of the fresh water reducing tower 4 is decompressed. In the case of an air supply, the air is supplied into the tower.
[0023]
In the intake tower 3, multistage movable gates 3a, 3b, 3c are arranged, and the screen 3e from the surface of the lake water according to the fluctuating water level of the dam lake 1, specifically, the highest water level WL1 to the lowest water level WL2. The water is taken in through. And the muddy water which overflowed the said gate and was taken in in the intake tower 3 is stored by the water storage part 3a.
[0024]
On the other hand, the fresh water introduced from the upper part of the fresh water reducing tower 4 has potential energy and tries to descend from the fresh water introduction path 10 toward the fresh water lead-out path 11. Since a number of staircase shapes act as resistance to the flow when flowing through the water, the momentum of the flow of fresh water is attenuated, and the reduced fresh water reaches the fresh water outlet pipe 11.
[0025]
The fresh water reduced in this way is supplied into the intake tower 3 via the fresh water outlet pipe 11 and mixed with the muddy water stored in the storage part 3a. The discharged water whose turbidity has been reduced by mixing fresh water is discharged from the discharge pipe 14. In the figure, reference numeral 15 denotes a dam housing, and 15a denotes a dam shaft.
[0026]
FIG. 3 is an AA arrow view of FIG. 1, and shows the arrangement of the fresh water reducing tower 4 and the intake tower 3.
[0027]
In the figure, the fresh water introduced from the fresh water introduction pipe 7 is introduced into the upper part of the fresh water reducing tower 4 which is separated from the dam shaft 15 a by a predetermined distance via the water control valve 9. The water control valve 9 is for closing the fresh water introduction pipe 7 when the maintenance inspection of the fresh water reducing tower 4 is performed.
[0028]
In the fresh water reducing tower 4, fresh water flows in a spiral shape and falls along the peripheral wall of the tower and the spiraling staircase 13 attached to the peripheral wall.
[0029]
FIG. 4 is a view taken along the line B-B in FIG. 1, and shows the arrangement of the fresh water outlet pipe 11 of the fresh water reducing tower 4 and the water storage section 3 a of the intake tower 3.
[0030]
In the figure, a fresh water outlet pipe 11 provided at the lower part of the fresh water reducing tower 4 constitutes an elbow and communicates with a water storage part 3 a formed at the lower part of the intake tower 3. Is supported by a support member 16 attached to the outer wall of the intake tower 3.
[0031]
FIG. 5 shows another embodiment of the fresh water reducing tower according to the present invention. A fresh water reducing tower 10 shown in the figure is made of a concrete cylinder, and a returning stairs 11 for reducing energy is formed therein. In this configuration, the fresh water introduced from the duct-shaped fresh water passage 12 serving as the fresh water introduction path descends into a zigzag while flowing along the de-energizing return stairs 11, and flows over the de-energizing return stairs 11. Since many staircase shapes act as resistance to flow, the momentum of fresh water is attenuated. The reduced fresh water reaches a fresh water outlet (not shown) provided at the lower part of the fresh water reducing tower 10 and is sent out to the intake tower 3.
[0032]
FIG. 6 shows still another embodiment of the fresh water reducing tower according to the present invention. The fresh water reducing tower 20 shown in the figure is made of a concrete cylinder, and a large number of reducing plates 21, 22, 23, 24. Weirs 21a, 22a, 23a, 24a,... Bent upwardly are formed at the tips of the respective force reducing plates.
[0033]
In this configuration, the fresh water introduced from the duct-shaped fresh water passage 30 serving as the fresh water introduction path overflows the weir 21a of the uppermost derating plate 21 and falls onto the next depressing plate 22, and the weir After overflowing 22a, it falls onto the next-stage depressing plate 23, and descends while repeating this operation. Since a large number of depressing plates act as resistance, the momentum of the descending fresh water is attenuated, and the depressurized fresh water reaches a fresh water lead-out path (not shown) provided at the lower portion of the fresh water reducing tower 20, It is sent to the intake tower 3.
[0034]
In the discharge facility of the present invention, it is preferable to provide the relay water tank 8 near the fresh water depressing tower 4 in the communication path 7. That is, the distance from the upstream intake weir 6 to the dam body 2 may reach several kilometers, and if the communication passage 7 is not provided with any flow rate adjusting means, the flow velocity in the pipe changes depending on the shape and gradient of the communication passage 7. As a result, there arises a problem that it becomes difficult to design the pipe line up to the Shimizu de-energization tower 4.
[0035]
Therefore, in this embodiment, the relay water tank 8 is provided in the middle of the communication path 7 so as to adjust the pressure of fresh water taken from the upstream intake weir 6.
[0036]
7A and 7B are a plan view and a front view showing the configuration of the relay water tank 8, respectively.
[0037]
The relay water tank 8 is made of a concrete box or the like, and a height difference is provided between the communication path 7 upstream from the relay water tank 8 and the communication path 7 a downstream from the relay water tank 8.
[0038]
The wall 8a to which the downstream communication path 7a is connected is provided with an adjustment gate 40 that moves up and down, so that the amount of fresh water stored in the relay water tank 8 can be adjusted. Further, a water intake pipe 41 is provided on the side wall 8b of the relay water tank 8 so that water can be taken in as necessary. In addition, 8c is an upper cover.
[0039]
If the relay water tank 8 having the above-described configuration is provided in the middle of the communication passage 7 and the fresh water whose flow rate is adjusted is introduced into the fresh water depressing tower 4, the long distance communication from the weir provided upstream of the river is possible. Since the fresh water sent through the passage 7 is once stored in the water tank, it is not necessary to consider the pressure fluctuation of the communication passage 7, and therefore the degree of freedom in designing the communication passage 7 can be increased.
[0040]
Further, since the upstream intake weir 6 is usually provided in a steep place considerably upstream of the river, even if the upstream intake weir 6 is provided with a flow rate adjusting means, daily management becomes extremely difficult. On the other hand, if the relay water tank 8 is provided in the communication path 7 near the fresh water reducing tower 4, daily management becomes extremely easy.
[0041]
In the above-described embodiment, the fresh water reduction tower is separately installed in parallel with the water tower so that it can be applied to an existing dam. It is also possible to incorporate a fresh water derating tower having a configuration in advance.
[0042]
Further, in the present invention, the deenergizing means is constituted by a spiral staircase, a turn-up staircase, etc. for convenience in maintenance in the above embodiment, but is not limited thereto, and fresh water is directly dropped from the upper part of the water tower. As long as it can be de-energized without any restriction, the de-energizing means having any shape can be used.
[0043]
【The invention's effect】
As is clear from the above description, according to the fresh water reducing tower of the present invention, the fresh water attenuated by the reducing means is introduced into the intake tower, so that it is not affected by the water level in the intake tower. Fresh water can be introduced into the intake tower in a safe state and mixed with, for example, muddy water stored therein.
[0044]
According to the discharge facility of the present invention, the fresh water sent through the long-distance communication passage from the weir provided upstream of the river is temporarily stored in the water tank of the fresh water supply amount adjusting means. Therefore, there is an advantage that the degree of freedom of design of the pipe is increased when the communication path is provided at a long distance from the upstream side of the river.
[Brief description of the drawings]
FIG. 1 is a plan view showing a discharge facility to which a fresh water reducing tower of the present invention is applied.
FIGS. 2A and 2B are explanatory views showing a configuration of a fresh water reducing tower according to the present invention, in which FIG. 2A is a front view and FIG. 2B is a side view;
FIG. 3 is a view taken along arrow AA in FIG. 2;
4 is a BB arrow view of FIG. 2;
FIG. 5 is a perspective view showing a main part of another embodiment of the fresh water reducing tower according to the present invention.
FIG. 6 is a perspective view showing a main part of still another embodiment of a fresh water reducing tower according to the present invention.
7A and 7B are explanatory views showing a configuration of a relay water tank in the discharge facility of the present invention, wherein FIG. 7A is a plan view and FIG. 7B is a front view.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Dam lake 2 Dam main body 3 Intake tower 4 Fresh water reduction tower 5 River 6 Upstream intake weir 7 Communication path 8 Relay tank 9 Water control valve 10 Fresh water introduction path 11 Fresh water outlet path 13 Reduction spiral helix 14 Drain pipe

Claims (6)

取水塔によって表層取水された水に対して外部から清水を混合する清水減勢塔であって、
該清水減勢塔が、塔上部に外部から清水を導入する清水導入路を有し、塔下部にその導入された清水を前記取水塔下部に送り出す清水導出路を有し、前記塔内に、前記清水導入路から導入された清水を高低差を利用して前記清水導出路に導きつつ減勢させる減勢手段を形成してなることを特徴とする清水減勢塔。
A fresh water reduction tower that mixes fresh water from the outside with water taken from the surface by the intake tower,
The fresh water reducing tower has a fresh water introduction path for introducing fresh water from the outside to the upper part of the tower, and a fresh water outlet path for sending the introduced fresh water to the lower part of the intake tower at the lower part of the tower. A fresh water depressing tower, comprising: a depressurizing unit configured to depressurize the fresh water introduced from the fresh water introduction path while guiding the fresh water to the fresh water lead-out path using a height difference.
前記清水減勢塔が筒体からなり、前記減勢手段が、塔内周壁に螺旋状に固定された螺旋階段から構成される請求項1記載の清水減勢塔。The fresh water reducing tower according to claim 1, wherein the fresh water reducing tower comprises a cylindrical body, and the reducing means comprises a spiral staircase fixed to the inner wall of the tower in a spiral shape. 前記清水減勢塔が筒体からなり、前記減勢手段が、塔内壁に固定された折返し階段から構成される請求項1記載の清水減勢塔。2. The fresh water reducing tower according to claim 1, wherein the fresh water reducing tower is formed of a cylindrical body, and the reducing means is constituted by a folded staircase fixed to the inner wall of the tower. 前記清水減勢塔が筒体からなり、前記減勢手段が、対向する塔内壁に千鳥配置で突出されたプレートから構成される請求項1記載の清水減勢塔。2. The fresh water reducing tower according to claim 1, wherein the fresh water reducing tower is formed of a cylindrical body, and the reducing means is constituted by a plate protruding in a staggered arrangement on the opposing inner wall of the tower. 請求項1〜4のいずれかに記載の清水減勢塔と、清水を取水するために河川上流に設けられる堰と、前記清水減勢塔と前記堰の取水部とを連通する連通路と、該連通路における前記清水減勢塔寄りに設けられ、前記清水減勢塔に導入する清水の供給量を調節する清水供給量調節手段と、を備えてなることを特徴とする放流設備。A fresh water reducing tower according to any one of claims 1 to 4, a weir provided upstream of a river for taking fresh water, a communication passage communicating the fresh water reducing tower and a water intake of the weir, Discharge equipment comprising: fresh water supply amount adjusting means for adjusting the supply amount of fresh water to be introduced into the fresh water reduction tower, provided near the fresh water reduction tower in the communication passage. 前記清水供給量調節手段が、前記堰の取水部から取水された清水を貯留する水槽と、その水槽内に貯留された清水の放出量を調節する調節ゲートとから構成される請求項5記載の放流設備。The said fresh water supply amount adjustment means is comprised from the water tank which stores the fresh water taken from the water intake part of the said weir, and the adjustment gate which adjusts the discharge amount of the fresh water stored in the water tank. Discharge equipment.
JP35339498A 1998-12-11 1998-12-11 Shimizu reduction tower and discharge facility using the same Expired - Lifetime JP3955403B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35339498A JP3955403B2 (en) 1998-12-11 1998-12-11 Shimizu reduction tower and discharge facility using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35339498A JP3955403B2 (en) 1998-12-11 1998-12-11 Shimizu reduction tower and discharge facility using the same

Publications (2)

Publication Number Publication Date
JP2000178943A JP2000178943A (en) 2000-06-27
JP3955403B2 true JP3955403B2 (en) 2007-08-08

Family

ID=18430551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35339498A Expired - Lifetime JP3955403B2 (en) 1998-12-11 1998-12-11 Shimizu reduction tower and discharge facility using the same

Country Status (1)

Country Link
JP (1) JP3955403B2 (en)

Also Published As

Publication number Publication date
JP2000178943A (en) 2000-06-27

Similar Documents

Publication Publication Date Title
EP2251072B1 (en) Separator and separation method
US6638424B2 (en) Stormwater treatment apparatus
US10710907B2 (en) Hydrodynamic separators, assemblies and methods for storm water treatment
US8591148B2 (en) Multi-rate flow control system for a detention pond
TW201511819A (en) A scrubber tower of a flue gas purification device
JP2018051461A (en) Transfer device
JP4719261B2 (en) Separation device
KR100938411B1 (en) Float inhaler
SA08290468B1 (en) Exhaust Gas Desulfurizer
JP3955403B2 (en) Shimizu reduction tower and discharge facility using the same
JPH11262755A (en) Apparatus for purifying filled liquid by floating
US20100284746A1 (en) Flow control system for a detention pond
CN102482872B (en) Gravity-fed basin
JP5149485B2 (en) Dust removal device
JP2004510073A (en) Weir section, sewer pipe structure provided with such a weir section, and methods of manufacturing them
KR102476064B1 (en) Apparatus for reducing nonpoint pollution
JP2004353197A (en) Discharge or water intake device by automatic control without power supply
KR101915653B1 (en) Oil-water separator
JP5663209B2 (en) Pollutant trapping structure and pollutant trapping facility
CN115478603A (en) a scum baffle
KR102259725B1 (en) Vortex and screen complex type apparatus for reducing non-point pollution
KR101997488B1 (en) Apparatus for separation of waste oil
CA2757363C (en) Multi-rate flow control system for a detention pond
JP4420758B2 (en) Oil / water separation tank
KR20190074507A (en) Apparatus for separation of waste oil

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051007

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070424

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070502

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120511

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120511

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140511

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term