JP3971283B2 - Tunnel excavator for shaft and its retreating method - Google Patents
Tunnel excavator for shaft and its retreating method Download PDFInfo
- Publication number
- JP3971283B2 JP3971283B2 JP2002283654A JP2002283654A JP3971283B2 JP 3971283 B2 JP3971283 B2 JP 3971283B2 JP 2002283654 A JP2002283654 A JP 2002283654A JP 2002283654 A JP2002283654 A JP 2002283654A JP 3971283 B2 JP3971283 B2 JP 3971283B2
- Authority
- JP
- Japan
- Prior art keywords
- gripper
- deck
- excavator
- jack
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、全断面切下がり立坑を掘削する立坑用トンネル掘削機およびその後退方法に関するものである。
【0002】
【従来の技術】
一般に、立坑の掘削方法としては、ケーソンとクラムシェルバケットを用いる所謂ケーソン工法が知られている。この工法は、立坑の坑壁としてケーソンを使用し、クラムシェルバケットによりケーソンの刃口の下方まで地山を掘削した後、ケーソンを降下させていく方法である。また、前記クラムシェルバケットの代わりにケーソンの刃口の下方を油圧ショベルのバックホウもしくは掘削用カッタで掘削するようにしたものも知られている。
【0003】
なお、本願発明に関連する先行技術として、特許文献1および特許文献2に開示されるものがある。ここで、特許文献1に開示されたトンネル掘削機は、斜坑を掘削するのに使用されるトンネル掘削機に関わるもので、掘削機本体の後方に二本のビームを介して後続台車を連結したものにおいて、曲進掘進時においても掘削機本体に対して後続台車をスムーズに追従させるために、二本のビームの一端部と掘削機本体もしくは後続台車との間に油圧ジャッキを介在させるように構成したものである。また、特許文献2に開示されたトンネル掘削機は、小型で簡素な構造の水平坑用トンネル掘削機を提供することを目的とするもので、坑壁に圧着自在なシューを有するサポート手段をメインビームの外周に複数取り付けて、掘進時には、これらサポート手段のシューを坑壁に圧着することにより地山に反力をとって推進するとともに、盛り替え時には、サポート手段を第一サポート手段と第二サポート手段とに分け、これら2つのサポート手段を交互に盛り替えるように構成したものである。
【0004】
【特許文献1】
特開平8−291697号公報
【特許文献2】
特開2001−241294号公報
【0005】
【発明が解決しようとする課題】
しかしながら、立坑を掘削するのに用いられている従来のケーソン工法では、掘削作業の作業能率が悪いために、特に大深度の立坑掘削には不向きであるという問題点がある。この問題点を解決するために、前記特許文献1もしくは特許文献2に開示されたようなトンネル掘削機を立坑掘削に用いることも考えられるが、これらのトンネル掘削機においては、掘削機本体の後方にそのトンネル掘削機を駆動するための電気機器や油圧機器、更には排土、支保、覆工のための関連設備を搭載した後続台車(後続設備)が配されていて、この後続設備が掘削機本体の推進に追従する構造となっているために、このトンネル掘削機を単に立坑用に転用しただけでは前記後続設備の自重が全て掘削機本体にかかることになって、水平坑もしくは斜坑と同様のスムーズな掘削作業が行えないという問題点がある。
【0006】
また、前記従来のトンネル掘削機を立坑掘削に用いた場合には、カッタ交換もしくは何らかの切羽作業のために掘削機本体を上昇させる必要が生じた際に、この掘削機本体を坑壁に対して支持するメイングリッパに前記後続設備の重量も支持させる必要があり、グリッパ推力および滑落防止に対して不利になるという問題点がある。
【0007】
本発明は、このような問題点を解消するためになされたもので、水平坑もしくは斜坑と同様の施工を行うことのできる立坑用トンネル掘削機を提供し、併せて掘削機本体に後続設備の自重をかけずに後退させることのできる立坑用トンネル掘削機の後退方法を提供することを目的とするものである。
【0008】
【課題を解決するための手段および作用・効果】
前記目的を達成するために、第1発明による立坑用トンネル掘削機は、
(a)地山を掘削するカッタヘッドと、坑壁に押し付けてその坑壁から反力を取る本体保持用グリッパとを有する掘削機本体および
(b)この掘削機本体の上方に配される階層構造の後続デッキを備え、
前記後続デッキに、その後続デッキを坑壁に対して保持する後続デッキ保持用グリッパを設けることを特徴とするものである。
【0009】
本発明によれば、掘削機本体の上方に階層構造の後続デッキが配されてその後続デッキの自重が掘削機本体にて支持され、掘削機本体は本体保持用グリッパを坑壁に押し付けることでその坑壁から反力を取りつつカッタヘッドの回転により立坑掘削が行われる。こうして、水平坑もしくは斜坑を掘削するトンネル掘削機と同様に立坑の掘削を行うことができる。また、階層構造の後続デッキが設けられているので、この後続デッキの各階層に、トンネル掘削機を駆動するための電気機器、油圧機器を始めとする各種関連設備を搭載して、この後続デッキを掘削機本体の推進に追従させることができる。また、前記後続デッキには、その後続デッキを坑壁に対して保持する後続デッキ保持用グリッパが設けられているので、何らかの切羽作業のためにトンネル掘削機を後退(上昇)させる場合であっても、後続デッキ保持用グリッパにて掘削機本体とは独立に後続デッキの自重を保持して後退させることができ、掘削機本体に後続デッキの自重がかかることがない。したがって、掘削機本体を坑壁に対して保持する本体保持用グリッパの負荷を軽減することができ、滑落に対してより安全に掘削機本体を後退させることが可能となる。
【0010】
前記第1発明において、前記掘削機本体と前記後続デッキとは、この後続デッキのレベルを調整するために周方向の複数位置に配されるレベル調整ジャッキにより相互に連結されているのが好ましい(第2発明)。このようなレベル調整ジャッキを設けることで、掘削機本体の上方に搭載される後続デッキをそのレベル調整ジャッキを介して支持することができる。したがって、掘削機本体が方向制御のために傾いた場合にも、前記レベル調整ジャッキの調整により後続デッキを常に水平に維持することができ、坑壁と干渉するのを防止することができる。
【0011】
ここで、前記レベル調整ジャッキは、互いに隣接するジャッキ同士が略ハ字状に配されたラチス式ジャッキであり得る(第3発明)。こうすることで、掘削機本体が掘削トルク反力により推進方向を軸心にしてローリングする場合にも、ラチスジャッキの伸縮量を調整することにより、掘削機本体のローリングが後続デッキに及ぶのを防ぐことができる。
【0012】
前記各発明において、前記本体保持用グリッパは、坑壁に押し付けられるシューと、一端部が前記カッタヘッドを支持するメインビームに枢着されるとともに他端部が前記シューに枢着されるサポートジャッキと、このサポートジャッキに交差するように配され、一端部が前記メインビームに枢着されるとともに他端部が前記シューに枢着されるスラストジャッキとを備えて構成されるのが好ましい(第4発明)。このような構成の本体保持用グリッパを用いれば、トンネル掘削機の機長を大幅に短くすることができて、トンネル掘削機を小型で簡素な構造にすることができる。
【0013】
また、前記第1発明〜第4発明において、前記本体保持用グリッパは、互いに対向位置にある一対の第1グリッパ部と、互いに対向位置にある一対の第2グリッパ部とよりなるものとするのが好ましい(第5発明)。さらに、前記第1発明〜第5発明において、前記後続デッキ保持用グリッパは、弾性体よりなるリング状のチューブ内に注入された液体の圧力によって前記チューブを膨張させて坑壁に押し付ける液圧膨張式のグリッパであるのが良い(第6発明)。このような液圧膨張式のグリッパを用いると、省スペースの構成で、坑壁全体に均等に押し付け力を伝達することができるとともに、坑壁を乱さない低面圧で保持できる。
【0014】
次に、第7発明による立坑用トンネル掘削機の後退方法は、前記第2発明〜第6発明のいずれかの発明による立坑用トンネル掘削機を後退させる方法であって、
(a)前記本体保持用グリッパにより前記掘削機本体を坑壁に保持した状態で、前記後続デッキ保持用グリッパを収縮させる第1工程、
(b)前記レベル調整ジャッキを伸張させて前記後続デッキを後退させた後、前記後続デッキ保持用グリッパにより前記後続デッキを坑壁に保持する第2工程および
(c)前記後続デッキを坑壁に保持した状態で、前記本体保持用グリッパを坑壁から離し、かつ前記レベル調整ジャッキを収縮させながら前記掘削機本体を後退させる第3工程
を備えることを特徴とするものである。
【0015】
本発明によれば、カッタ交換等何らかの切羽作業のためにトンネル掘削機を後退(上昇)させる場合であっても、後続デッキ保持用グリッパにて後続デッキの自重を保持してレベル調整ジャッキを収縮させることにより掘削機本体を後退させ、また本体保持用グリッパにて掘削機本体の自重を保持してレベル調整ジャッキを伸張させることにより後続デッキを後退させることができる。したがって、掘削機本体を坑壁に対して保持する本体保持用グリッパの負荷を軽減することができ、滑落に対してより安全に掘削機本体を後退させることができる。
【0016】
また、第8発明による立坑用トンネル掘削機の後退方法は、前記第5発明による立坑用トンネル掘削機を後退させる方法であって、
(a)前記本体保持用グリッパにより前記掘削機本体を坑壁に保持した状態で、前記後続デッキ保持用グリッパを収縮させる第1工程、
(b)前記レベル調整ジャッキを伸張させて前記後続デッキを後退させた後、前記後続デッキ保持用グリッパにより前記後続デッキを坑壁に保持する第2工程および
(c)前記後続デッキを坑壁に保持した状態で、前記本体保持用グリッパを坑壁から離し、かつ前記レベル調整ジャッキを収縮させながら前記掘削機本体を後退させる第3工程
を備え、
前記第3工程の前記掘削機本体の後退は、前記第1グリッパ部を坑壁に押し付けた状態で前記第2グリッパ部を後方へ移動させることによって行う後退と、前記第2グリッパ部を坑壁に押し付けた状態で前記第1グリッパ部を後方へ移動させることによって行う後退とを交互に行うことによって行われることを特徴とするものである。
本発明によれば、トンネル掘削機の後退作業の時間を短縮することができる。なお、第1グリッパ部と第2グリッパ部を同時に用いて掘削機本体を後退させることも可能であるが、この場合においても、グリッパの盛替えの際には第1グリッパ部か第2グリッパ部のいずれかを常に坑壁に押し付けて掘削機本体の重量を支えるべきである。これは、掘削機本体の重量は、保持能力のより高い掘削機本体のグリッパで支える方が、後続デッキ保持用グリッパで支えるよりも安全であるという理由による。
【0017】
【発明の実施の形態】
次に、本発明による立坑用トンネル掘削機およびその後退方法の具体的な実施の形態について、図面を参照しつつ説明する。
【0018】
図1には、本発明の第1の実施形態に係る立坑用トンネル掘削機の縦断面図が示され、図2には、図1のA−A断面図が示されている。また、図3には、図1のB−B断面図(a)およびC−C断面図(b)がそれぞれ示されている。
【0019】
本実施形態の立坑用トンネル掘削機1は、前部(下部)にカッタヘッド2を有する掘削機本体3と、この掘削機本体3の後方(上方)に配される後続デッキ4とを備えて構成されている。前記掘削機本体3は、トンネル軸線に沿うように設けられる角筒状のメインビーム5を備えるとともに、このメインビーム5の前部にカッタヘッドサポート6が固着されてなり、このカッタヘッドサポート6に前記カッタヘッド2が回転自在に取り付けられて構成されている。前記カッタヘッドサポート6にはカッタヘッド駆動モータ7が装着され、このカッタヘッド駆動モータ7の駆動によって前記カッタヘッド2が回転駆動されて切羽を掘削するようにされている。なお、掘削された土砂は図示されない空気輸送手段等の搬送手段によって地上(上方)へ向けて搬送される。
【0020】
前記メインビーム5の外周部には、このメインビーム5を挟んで互いに対向位置にある一対のサイドサポート兼グリッパ(以下、「第1グリッパ部」という。)8と、この第1グリッパ部8に対して90°位相をずらせた位置に、やはりメインビーム5を挟んで互いに対向位置にある一対のサイドサポート兼グリッパ(以下、「第2グリッパ部」という。)9とが装着され、これら第1グリッパ部8および第2グリッパ部9によって本体保持用グリッパ10が構成されている。
【0021】
前記第1グリッパ部8は、坑壁に押し付けられる湾曲板状のシュー11と、一端部が前記メインビーム5に枢着されるとともに他端部が前記シュー11に枢着される互いに平行配置の4本のサポートジャッキ12と、このサポートジャッキ12に交差するように配され、一端部が前記メインビーム5に枢着されるとともに他端部が前記シュー11に枢着される正面視でハ字状配置の2本のスラストジャッキ13とを備えて構成されている。ここで、前記サポートジャッキ12は、シリンダ側の端部が前記メインビーム5の前部の左右それぞれと、後部の左右それぞれに枢着されるとともに、ロッド側の端部がそのシリンダ側の端部に対して後方(上方)に位置するように配置されて前記シュー11の後部に枢着されている。これに対して、前記スラストジャッキ13は、正面視で前記サポートジャッキ12の外側に位置してシリンダ側の端部が前記メインビーム5の後部の左右それぞれに枢着されるとともに、ロッド側の端部がそのシリンダ側の端部に対して前方(下方)に位置するように配置されて前記シュー11の前部に枢着されている。
【0022】
一方、前記第2グリッパ部9は、坑壁に押し付けられる湾曲板状のシュー14と、一端部が前記メインビーム5に枢着されるとともに他端部が前記シュー14に枢着される互いに平行配置の4本のサポートジャッキ15と、このサポートジャッキ15に交差するように配され、一端部が前記メインビーム5に枢着されるとともに他端部が前記シュー14に枢着される正面視でハ字状配置の2本のスラストジャッキ16とを備えて構成されている。ここで、前記サポートジャッキ15は、シリンダ側の端部が前記メインビーム5の前部の左右それぞれと、後部の左右それぞれに枢着されるとともに、ロッド側の端部がそのシリンダ側の端部に対して後方(上方)に位置するように配置されて前記シュー14の後部に枢着されている。これに対して、前記スラストジャッキ16は、正面視で前記サポートジャッキ15の外側に位置してシリンダ側の端部が前記メインビーム5の後部の左右それぞれに枢着されるとともに、ロッド側の端部がそのシリンダ側の端部に対して前方(下方)に位置するように配置されて前記シュー14の前部に枢着されている。
【0023】
また、前記メインビーム5の後端部(上端部)には水平配置のデッキ板17が固着されている。そして、このデッキ板17の上方には、前記後続デッキ4のレベルを調整するための油圧ジャッキ(以下、「レベル調整ジャッキ」という。)18を介して前記後続デッキ4が支持されている。ここで、このレベル調整ジャッキ18は、図3(b)に示されるように周方向に等間隔で配される4本の油圧ジャッキよりなり、各油圧ジャッキが個別に伸縮制御できるようにされていて、掘削機本体3の方向制御時においても後続デッキ4を水平に保つことができるようにされている。なお、図1、図3中、符号19にて示されるのはロックボルト穴穿孔装置である。
【0024】
前記後続デッキ4は、デッキ板4aとそのデッキ板4a上に立設される複数本の支柱4bとよりなる第1デッキ20、第2デッキ21、第3デッキ22、第4デッキ23、第5デッキ24、第6デッキ25等が階層構造に積み重ねられて構成され、各デッキに、トンネル掘削機1を駆動するための電気機器や油圧機器、更には排土、支保、覆工のための関連設備等が搭載されてなるものである。図示の例では、第1デッキ20、第2デッキ21および第3デッキ22が資機材置場とされるとともに、第3デッキ22に後述する後続デッキ保持用グリッパ31のための水タンク26および水ポンプ27が、第4デッキ23および第5デッキ24にオイルタンク28,29等が、第6デッキ25に高圧トランス30がそれぞれ搭載されている。
【0025】
前記第1デッキ20のデッキ板4a上には後続デッキ保持用グリッパ31が装着されている。この後続デッキ保持用グリッパ31は、弾性体(例えばゴム)よりなるリング状のチューブ31a内に水等の液体を注入し、この液体の圧力によってチューブ31aを膨張させて坑壁に押し付け、それによって後続デッキ4の自重を保持するように構成されたものである。このような液圧膨張式のグリッパを用いると、省スペースの構成で、坑壁全体に均等に押し付け力を伝達することができるとともに、坑壁を乱さない低面圧で保持できるという利点がある。
【0026】
次に、前述の構成よりなるトンネル掘削機1による掘削作業について説明する。
【0027】
掘削時には、後続デッキ保持用グリッパ31を収縮させた状態で、第1グリッパ部8の各サポートジャッキ12を伸張させてシュー11を坑壁に押し付けるとともに、第2グリッパ部9の各サポートジャッキ15を伸張させてシュー14を坑壁に押し付けて、メインビーム5を坑壁に対して保持する。
【0028】
この状態において、第1グリッパ部8のスラストジャッキ13と、第2グリッパ部9のスラストジャッキ16とを一斉に収縮させると、メインビーム5が前方へ移動して推進力が発生し、メインビーム5の前方に装着されたカッタヘッド2により切羽の掘削が行われる。なお、スラストジャッキ13,16の収縮時にサポートジャッキ12,15は、シュー11,14による坑壁への押し付け力を保持したままそれらスラストジャッキ13,16の収縮に合わせて伸張するように制御される。
【0029】
次いで、スラストジャッキ13,16が最大ストローク位置まで収縮されると、まず、第2グリッパ部9のサポートジャッキ15を収縮させてシュー14を坑壁から離し、この状態でその第2グリッパ部9のスラストジャッキ16を伸張させてシュー14を前方へ移動させる。続いて、この第2グリッパ部9のサポートジャッキ15を再び伸張させてシュー14を坑壁に押し付けてメインビーム5を坑壁に対して保持する。
【0030】
次いで、今度は、第1グリッパ部8のサポートジャッキ12を収縮させてシュー11を坑壁から離し、この状態でその第1グリッパ部8のスラストジャッキ13を伸張させてシュー11を前方へ移動させる。続いて、この第1グリッパ部8のサポートジャッキ12を再び伸張させてシュー11を坑壁に押し付けて盛り替えが終了する。このようにして順次掘削作業が進められていく。
【0031】
本実施形態のトンネル掘削機1を方向制御する際には、第1グリッパ部8のサポートジャッキ12およびスラストジャッキ13、第2グリッパ部9のサポートジャッキ15およびスラストジャッキ16のそれぞれの伸張量を調整することで、図4に示されるようにカッタヘッド2およびカッタヘッドサポート6を坑壁に対して所定角度傾斜させるようにされる。このとき、掘削機本体3の揺動によって後続デッキ4が振れることのないように、レベル調整ジャッキ18を制御して後続デッキ4が常に水平を保持するようにされる。このようにすることで、掘削機本体3が方向制御のために傾いた場合にも、後続デッキ4の上段部が坑壁と干渉するのを防ぐことができ、これによって後方作業に及ぼす影響を未然に防ぐことができる。
【0032】
次に、例えばカッタヘッド2に装着されているカッタを交換する場合のように、何らかの切羽作業のためにトンネル掘削機1を後退(上昇)させる必要が生じた場合のその後退手順について、図5〜図9を参照しつつ説明する。
【0033】
まず、図5に示されているように、後続デッキ保持用グリッパ31を収縮させ(矢印PB)、第1グリッパ部8の各サポートジャッキ12を伸張させてシュー11を坑壁に押し付ける(矢印QA)とともに、第2グリッパ部9の各サポートジャッキ15を伸張させてシュー14を坑壁に押し付けて(矢印RA)、メインビーム5を坑壁に対して保持した掘削停止状態から、掘削機本体3の後退を開始する。
【0034】
この後退に際しては、図6に示されているように、レベル調整ジャッキ18を伸張させて後続デッキ4を1ストロークp分後退させ(矢印S)、この後退後に後続デッキ保持用グリッパ31を伸張させてそのチューブ(シュー)31aを坑壁に押し付けて(矢印PA)、後続デッキ4を坑壁に固定する。
【0035】
次いで、図7に示されているように、後続デッキ4を坑壁に固定した状態で、レベル調整ジャッキ18を収縮させながら掘削機本体3を1ストロークp分後退させる(矢印T)。この掘削機本体3の後退は、本体保持用グリッパ10のうちのいずれかのグリッパ部(本実施形態では第2グリッパ部9)を使用して行われる。すなわち、第1グリッパ部8の各サポートジャッキ12を伸張させてシュー11を坑壁に押し付けたまま、第2グリッパ部9のサポートジャッキ15を収縮させてシュー14を坑壁から離し(矢印RB)、この状態でその第2グリッパ部9のスラストジャッキ16を収縮させてシュー14を後方へ移動させる。続いて、この第2グリッパ部9のサポートジャッキ15を再び伸張させてシュー14を坑壁に押し付けてメインビーム5を坑壁に対して保持する。
【0036】
こうして、図8に示されているように、第1グリッパ部8の各サポートジャッキ12が伸張される(矢印QA)とともに、第2グリッパ部9の各サポートジャッキ15が伸張されて(矢印RA)、掘削機本体3が4基のグリッパにより坑壁に保持された状態となる。この後、後続デッキ保持用グリッパ31を収縮させ(矢印PB)、レベル調整ジャッキ18を伸張させて後続デッキ4を1ストロークp分後退させる(矢印S)。
【0037】
次いで、図9に示されているように、後続デッキ保持用グリッパ31を伸張させてそのチューブ(シュー)31aを坑壁に押し付け(矢印PA)、後続デッキ4を坑壁に固定する。そして、レベル調整ジャッキ18を収縮させながら掘削機本体3を1ストロークp分後退させる(矢印T)。この後退は、第2グリッパ部9の各サポートジャッキ15を伸張させてシュー14を坑壁に押し付けたまま、第1グリッパ部8のサポートジャッキ12を収縮させてシュー11を坑壁から離し(矢印QB)、この状態でその第1グリッパ部8のスラストジャッキ13を収縮させてシュー11を後方へ移動させることにより行う。続いて、この第1グリッパ部8のサポートジャッキ12を再び伸張させてシュー11を坑壁に押し付けてメインビーム5を坑壁に対して保持する。
【0038】
このように、本実施形態によれば、掘削機本体3を後退させるときには、本体保持用グリッパ10のうちの第1グリッパ部8もしくは第2グリッパ部9のいずれかによって掘削機本体3が坑壁に保持されているので、後続デッキ保持用グリッパ31に掘削機本体3の自重が加わることがない。また、掘削機本体3にも後続デッキ4の自重が加わることがないので、本体保持用グリッパ10の負荷が軽減され、滑落に対してより安全に後退することが可能となる。
【0039】
また、本実施形態のトンネル掘削機1によれば、掘削機本体3がフロントサポートおよびリアサポート等を有していない簡易型の構造となっているので、トンネル掘削機の機長を大幅に短くすることができて、トンネル掘削機を小型で簡素な構造にすることができるという利点がある。
【0040】
本実施形態においては、トンネル掘削機1の後退時に、本体保持用グリッパ10のうちの第1グリッパ部8と第2グリッパ部9とを交互に作動させるようにしたものを説明したが、これら第1グリッパ部8と第2グリッパ部9とを同時に作動させるようにすることもできる。
【0041】
図10には、本発明の第2の実施形態に係る立坑用トンネル掘削機の縦断面図が示されている。
【0042】
本実施形態の立坑用トンネル掘削機1Aにおいては、後続デッキ4Aに、第1の実施形態における後続デッキ保持用グリッパ31を有していない。これ以外の構成については第1の実施形態と同様である。したがって、第1の実施形態と共通する部分には図に同一符号を付すに留めてその詳細な説明を省略することとする。
【0043】
本実施形態においては、後続デッキ保持用グリッパ31が設けられていないので、トンネル掘削機1Aの後退時に本体保持用グリッパ10により掘削機本体3および後続デッキ4の両者の自重を支持することになるので、第1の実施形態のものに比べて本体保持用グリッパ10に加わる負荷は大きくなる。
【0044】
図11には、本発明の第3の実施形態に係る立坑用トンネル掘削機の縦断面図が示されている。
【0045】
本実施形態の立坑用トンネル掘削機1Bにおいては、掘削機本体3Bの胴部が、カッタシールド40とテレスコピックシールド41とグリッパシールド42とに分割され、カッタシールド40に対してグリッパシールド42が図示されないスラストジャッキを介して前後摺動可能に設けられている。そして、カッタシールド40にはフロントサポート43が、グリッパシールド42にはメイングリッパ44がそれぞれ設けられている。これ以外の構成については第1の実施形態と同様である。したがって、第1の実施形態と共通する部分には図に同一符号を付すに留めてその詳細な説明を省略することとする。
【0046】
本実施形態の立坑用トンネル掘削機1Bによれば、メイングリッパ44を伸張させてグリッパシールド42を坑壁に固定した状態で、スラストジャッキを伸張させることによりカッタヘッド2にて切羽が掘削される。また、スラストジャッキが最大ストロークに達すると、メイングリッパ44を収縮させるとともに、フロントサポート43を伸張させてカッタシールド40を坑壁に固定し、この状態でスラストジャッキを収縮させることにより盛り替えが行われる。
【0047】
本実施形態の掘削機本体3Bの構造によれば、掘削機本体3Bの胴部が第1の実施形態のものに比べて長くなるものの、第1の実施形態と同様の作用効果を得ることができる。
【0048】
図12には、本発明の第4の実施形態に係る立坑用トンネル掘削機の縦断面図(a)およびそのD−D断面図(b)が示されている。
【0049】
本実施形態の立坑用トンネル掘削機1Cにおいては、掘削機本体3および後続デッキ4はいずれも第1の実施形態と同様構造であるが、これら掘削機本体3と後続デッキ4とを連結するレベル調整ジャッキ18Aが、互いに隣接するジャッキ同士が略ハ字状に配されたラチス式ジャッキで構成されたものである。なお、本実施形態において、このレベル調整ジャッキ18Aは6本設けられている。これ以外の構成については第1の実施形態と同様である。したがって、第1の実施形態と共通する部分には図に同一符号を付すに留めてその詳細な説明を省略することとする。
【0050】
本実施形態の立坑用トンネル掘削機1Cによれば、レベル調整ジャッキ本来の機能のほか、掘削機本体3が掘削トルク反力により推進方向を軸心にしてローリングする場合にも、ラチス式のレベル調整ジャッキ18Aの伸縮量を調整することにより、掘削機本体3のローリングが後続デッキ4に及ぶのを防ぐことができる。なお、ローリングした掘削機本体3のローリング修正は、レベル調整ジャッキ18Aではなく、ラチス状に配置されたスラストジャッキ13,16により行うが、後続デッキ保持用グリッパによる保持能力に充分な余裕があれば、ラチス式のレベル調整ジャッキ18Aで行うことも可能である。
【図面の簡単な説明】
【図1】図1は、本発明の第1の実施形態に係る立坑用トンネル掘削機の縦断面図である。
【図2】図2は、図1のA−A断面図である。
【図3】図3は、図1のB−B断面図(a)およびC−C断面図(b)である。
【図4】図4は、方向制御時の後続デッキの位置を示す図である。
【図5】図5は、後退手順説明図(1)である。
【図6】図6は、後退手順説明図(2)である。
【図7】図7は、後退手順説明図(3)である。
【図8】図8は、後退手順説明図(4)である。
【図9】図9は、後退手順説明図(5)である。
【図10】図10は、本発明の第2の実施形態に係る立坑用トンネル掘削機の縦断面図である。
【図11】図11は、本発明の第3の実施形態に係る立坑用トンネル掘削機の縦断面図である。
【図12】図12は、本発明の第4の実施形態に係る立坑用トンネル掘削機の縦断面図(a)およびそのD−D断面図(b)である。
【符号の説明】
1,1A,1B,1C 立坑用トンネル掘削機
2 カッタヘッド
3,3B 掘削機本体
4,4A 後続デッキ
5 メインビーム
8 第1グリッパ部
9 第2グリッパ部
10 本体保持用グリッパ
11,14 シュー
12,15 サポートジャッキ
13,16 スラストジャッキ
18,18A レベル調整ジャッキ
31 後続デッキ保持用グリッパ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a shaft tunnel excavator for excavating a shaft with a section cut down and a method for retreating the tunnel excavator.
[0002]
[Prior art]
Generally, a so-called caisson method using a caisson and a clamshell bucket is known as a shaft excavation method. In this method, a caisson is used as the wall of a vertical shaft, and a caisson is lowered after excavating a natural ground below the edge of the caisson with a clamshell bucket. In addition, there is also known one in which the caisson blade edge is excavated by a backhoe of a hydraulic excavator or an excavating cutter instead of the clamshell bucket.
[0003]
In addition, there exist some which are disclosed by
[0004]
[Patent Document 1]
JP-A-8-291697
[Patent Document 2]
JP 2001-241294 A
[0005]
[Problems to be solved by the invention]
However, the conventional caisson method used for excavating a shaft has a problem that it is not suitable for excavation of a deep shaft due to poor work efficiency of excavation work. In order to solve this problem, it is conceivable to use a tunnel excavator as disclosed in
[0006]
In addition, when the conventional tunnel excavator is used for shaft excavation, when the excavator body needs to be raised for exchanging cutters or for some face work, the excavator body is attached to the pit wall. The supporting main gripper must also support the weight of the subsequent equipment, which is disadvantageous for gripper thrust and slipping prevention.
[0007]
The present invention has been made to solve such problems, and provides a tunnel excavator for shafts that can be constructed in the same manner as a horizontal shaft or a tilt shaft. It is an object of the present invention to provide a method for retreating a shaft tunnel excavator that can be retreated without applying its own weight.
[0008]
[Means for solving the problems and actions / effects]
In order to achieve the above object, a shaft tunnel excavator according to the first invention comprises:
(A) an excavator main body having a cutter head for excavating natural ground, and a main body holding gripper that presses against a pit wall and takes a reaction force from the pit wall;
(B) A succeeding deck having a hierarchical structure disposed above the excavator body,
The succeeding deck is provided with a gripper for retaining the succeeding deck for retaining the succeeding deck against the pit wall.It is characterized by this.
[0009]
According to the present invention, the subsequent deck having a hierarchical structure is arranged above the excavator body, and the weight of the subsequent deck is supported by the excavator body, and the excavator body presses the gripper for holding the main body against the pit wall. Shaft excavation is performed by rotating the cutter head while taking reaction force from the wall. Thus, the shaft can be excavated in the same manner as a tunnel excavator for excavating a horizontal or inclined shaft. In addition, since there is a subsequent deck with a hierarchical structure, each subsequent deck is equipped with various related equipment such as electrical equipment and hydraulic equipment for driving the tunnel excavator. Can follow the propulsion of the excavator body.Further, since the succeeding deck is provided with a succeeding deck retaining gripper for retaining the succeeding deck with respect to the pit wall, it is a case where the tunnel excavator is moved backward (ascended) for some face work. However, the succeeding deck holding gripper can hold and retract the own weight of the succeeding deck independently from the excavator body, and the succeeding deck does not receive the own weight. Therefore, it is possible to reduce the load of the main body holding gripper that holds the excavator main body against the pit wall, and the excavator main body can be retreated more safely against sliding.
[0010]
In the first invention, the excavator body and the subsequent deck are preferably connected to each other by level adjusting jacks arranged at a plurality of circumferential positions in order to adjust the level of the subsequent deck ( Second invention). By providing such a level adjustment jack, the subsequent deck mounted above the excavator body can be supported via the level adjustment jack. Therefore, even when the excavator body is tilted for direction control, the subsequent deck can always be kept horizontal by adjusting the level adjusting jack, and can be prevented from interfering with the pit wall.
[0011]
Here, the level adjustment jack may be a lattice type jack in which adjacent jacks are arranged in a substantially C shape (third invention). In this way, even when the excavator body rolls with the excavating torque reaction force centered on the propulsion direction, the excavator body rolling can reach the subsequent deck by adjusting the expansion and contraction amount of the lattice jack. Can be prevented.
[0012]
In each of the above inventions, the main body holding gripper includes a shoe pressed against the well wall, and a support jack whose one end is pivotally attached to the main beam supporting the cutter head and the other end is pivotally attached to the shoe. And a thrust jack that is arranged so as to intersect with the support jack and has one end pivotally attached to the main beam and the other end pivotally attached to the shoe (first). 4 invention). When the main body holding gripper having such a configuration is used, the length of the tunnel excavator can be greatly shortened, and the tunnel excavator can be made small and simple.
[0013]
The first1In invention-4th invention,It is preferable that the main body holding gripper includes a pair of first gripper portions at positions facing each other and a pair of second gripper portions at positions facing each other (fifth invention). Furthermore, in the first to fifth inventions, the subsequent deck holding gripper is a hydraulic expansion device that expands the tube by the pressure of the liquid injected into the ring-shaped tube made of an elastic body and presses the tube against the well wall. A gripper of the formula is preferable (sixth invention). When such a hydraulic expansion gripper is used, a pressing force can be transmitted evenly to the entire well wall with a space-saving configuration, and a low surface pressure that does not disturb the well wall can be maintained.
[0014]
Next, the receding method of the shaft tunnel excavator according to the seventh invention is the above-mentioned2A method for retreating a shaft tunnel excavator according to any of the inventions to 6th invention,
(A) a first step of shrinking the subsequent deck holding gripper in a state where the excavator main body is held on a pit wall by the main body holding gripper;
(B) a second step of holding the subsequent deck on the pit wall by the subsequent deck holding gripper after the level adjusting jack is extended to retract the subsequent deck;
(C) A third step of moving the excavator main body backward while separating the main body holding gripper from the pit wall and contracting the level adjustment jack in a state where the subsequent deck is held on the pit wall.
It is characterized by providing.
[0015]
According to the present invention, even when the tunnel excavator is moved backward (raised) for some face work such as cutter replacement, the leveling jack is contracted while the weight of the subsequent deck is held by the gripper for holding the subsequent deck. Thus, the excavator body can be moved backward, and the subsequent deck can be moved backward by extending the level adjustment jack while holding the weight of the excavator body with the gripper for holding the main body. Therefore, the load of the main body holding gripper for holding the excavator main body against the pit wall can be reduced, and the excavator main body can be retreated more safely against sliding.
[0016]
The shaft tunnel excavator retreating method according to the eighth invention is the same as that according to the fifth invention.A method of retreating a shaft tunnel excavator,
(A) a first step of shrinking the subsequent deck holding gripper in a state where the excavator main body is held on a pit wall by the main body holding gripper;
(B) a second step of holding the subsequent deck on the pit wall by the subsequent deck holding gripper after the level adjusting jack is extended to retract the subsequent deck;
(C) A third step of moving the excavator main body backward while separating the main body holding gripper from the pit wall and contracting the level adjustment jack in a state where the subsequent deck is held on the pit wall.
With
The retraction of the excavator body in the third step is performed by the first gripper portion.This is done by moving the second gripper portion backward while pressing against the pit wall.Retraction and the second gripper partIs performed by moving the first gripper portion rearward in a state where it is pressed against the pit wallRetreat andTheAlternating rowsBy lineBe calledIt is characterized by this.
According to the present invention,It is possible to reduce the time for the tunnel excavator to move backward. It is also possible to retract the excavator body using the first gripper part and the second gripper part at the same time, but in this case as well, the first gripper part or the second gripper part can be used when replacing the gripper. One of these should always be pressed against the pit wall to support the weight of the excavator body. This is because the weight of the excavator main body is safer to support with the gripper of the excavator main body having a higher holding capacity than to be supported with the gripper for holding the subsequent deck.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Next, specific embodiments of a shaft tunnel excavator and its retreating method according to the present invention will be described with reference to the drawings.
[0018]
FIG. 1 is a longitudinal sectional view of a vertical tunnel excavator according to the first embodiment of the present invention, and FIG. 2 is a sectional view taken along line AA of FIG. Further, FIG. 3 shows a BB sectional view (a) and a CC sectional view (b) of FIG.
[0019]
A vertical
[0020]
On the outer periphery of the
[0021]
The
[0022]
On the other hand, the
[0023]
A horizontally arranged
[0024]
The succeeding
[0025]
A succeeding
[0026]
Next, excavation work by the
[0027]
At the time of excavation, with the subsequent
[0028]
In this state, when the
[0029]
Next, when the thrust jacks 13 and 16 are contracted to the maximum stroke position, first, the
[0030]
Next, this time, the
[0031]
When the direction of the
[0032]
Next, a procedure for retreating when the
[0033]
First, as shown in FIG. 5, the subsequent
[0034]
In this backward movement, as shown in FIG. 6, the
[0035]
Next, as shown in FIG. 7, the
[0036]
Thus, as shown in FIG. 8, each
[0037]
Next, as shown in FIG. 9, the trailing
[0038]
Thus, according to the present embodiment, when the excavator
[0039]
Moreover, according to the
[0040]
In the present embodiment, when the
[0041]
FIG. 10 is a longitudinal sectional view of a vertical tunnel excavator according to the second embodiment of the present invention.
[0042]
In the
[0043]
In the present embodiment, since the
[0044]
FIG. 11 shows a longitudinal sectional view of a vertical tunnel excavator according to the third embodiment of the present invention.
[0045]
In the
[0046]
According to the
[0047]
According to the structure of the
[0048]
FIG. 12 shows a longitudinal sectional view (a) and a DD sectional view (b) of a vertical tunnel excavator according to the fourth embodiment of the present invention.
[0049]
In the vertical
[0050]
According to the
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view of a shaft tunnel excavator according to a first embodiment of the present invention.
FIG. 2 is a cross-sectional view taken along the line AA in FIG.
3 is a cross-sectional view taken along the line BB in FIG. 1 (a) and a cross-sectional view taken along the line CC in FIG. 3 (b).
FIG. 4 is a diagram illustrating a position of a subsequent deck at the time of direction control.
FIG. 5 is an explanatory diagram (1) of a backward movement procedure;
FIG. 6 is an explanatory diagram (2) of a backward movement procedure.
FIG. 7 is an explanatory diagram (3) of a backward movement procedure;
FIG. 8 is an explanatory diagram (4) of the reverse procedure.
FIG. 9 is an explanatory diagram (5) of a backward movement procedure;
FIG. 10 is a longitudinal sectional view of a shaft tunnel excavator according to a second embodiment of the present invention.
FIG. 11 is a longitudinal sectional view of a shaft tunnel excavator according to a third embodiment of the present invention.
FIG. 12 is a longitudinal sectional view (a) and a DD sectional view (b) of a vertical tunnel excavator according to a fourth embodiment of the present invention.
[Explanation of symbols]
1,1A, 1B, 1C Tunnel excavator for shaft
2 Cutter head
3,3B excavator body
4,4A Subsequent deck
5 Main beam
8 First gripper
9 Second gripper
10 Gripper for holding the body
11,14 shoe
12,15 Support jack
13,16 Thrust jack
18,18A Level adjustment jack
31 Gripper for holding the subsequent deck
Claims (8)
(b)この掘削機本体の上方に配される階層構造の後続デッキを備え、
前記後続デッキに、その後続デッキを坑壁に対して保持する後続デッキ保持用グリッパを設けることを特徴とする立坑用トンネル掘削機。(A) an excavator body having a cutter head for excavating a natural ground, and a main body holding gripper that presses against the pit wall and takes a reaction force from the pit wall; and (b) a hierarchy disposed above the excavator body. With a subsequent deck of structure,
A tunnel excavator for shafts, wherein the succeeding deck is provided with a gripper for retaining the succeeding deck with respect to the well wall.
(a)前記本体保持用グリッパにより前記掘削機本体を坑壁に保持した状態で、前記後続デッキ保持用グリッパを収縮させる第1工程、
(b)前記レベル調整ジャッキを伸張させて前記後続デッキを後退させた後、前記後続デッキ保持用グリッパにより前記後続デッキを坑壁に保持する第2工程および
(c)前記後続デッキを坑壁に保持した状態で、前記本体保持用グリッパを坑壁から離し、かつ前記レベル調整ジャッキを収縮させながら前記掘削機本体を後退させる第3工程
を備えることを特徴とする立坑用トンネル掘削機の後退方法。A method for retreating a shaft tunnel excavator according to any one of claims 2 to 6,
(A) a first step of shrinking the subsequent deck holding gripper in a state where the excavator main body is held on a pit wall by the main body holding gripper;
(B) a second step of extending the level adjusting jack to retract the succeeding deck and then retaining the succeeding deck on the well wall by the succeeding deck holding gripper; and (c) the succeeding deck on the well wall. A retracting method for a tunnel excavator for shafts, comprising a third step of moving the excavator main body backward while separating the main body holding gripper from the well wall and contracting the level adjustment jack in a held state. .
(a)前記本体保持用グリッパにより前記掘削機本体を坑壁に保持した状態で、前記後続デッキ保持用グリッパを収縮させる第1工程、
(b)前記レベル調整ジャッキを伸張させて前記後続デッキを後退させた後、前記後続デッキ保持用グリッパにより前記後続デッキを坑壁に保持する第2工程および
(c)前記後続デッキを坑壁に保持した状態で、前記本体保持用グリッパを坑壁から離し、かつ前記レベル調整ジャッキを収縮させながら前記掘削機本体を後退させる第3工程
を備え、
前記第3工程の前記掘削機本体の後退は、前記第1グリッパ部を坑壁に押し付けた状態で前記第2グリッパ部を後方へ移動させることによって行う後退と、前記第2グリッパ部を坑壁に押し付けた状態で前記第1グリッパ部を後方へ移動させることによって行う後退とを交互に行うことによって行われることを特徴とする立坑用トンネル掘削機の後退方法。A method for retreating a shaft tunnel excavator according to claim 5,
(A) a first step of shrinking the subsequent deck holding gripper in a state where the excavator main body is held on a pit wall by the main body holding gripper;
(B) a second step of extending the level adjusting jack to retract the succeeding deck and then retaining the succeeding deck on the well wall by the succeeding deck holding gripper; and (c) the succeeding deck on the well wall. A third step of moving the excavator body backward while releasing the main body holding gripper from the pit wall and contracting the level adjustment jack in a held state;
The retreat of the excavator body in the third step is performed by moving the second gripper portion backward while the first gripper portion is pressed against the well wall, and the second gripper portion is moved to the well wall. A method for retreating a tunnel excavator for shafts, wherein the retreat is performed by alternately performing retreat performed by moving the first gripper portion backward while being pressed against the shaft.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002283654A JP3971283B2 (en) | 2002-09-27 | 2002-09-27 | Tunnel excavator for shaft and its retreating method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002283654A JP3971283B2 (en) | 2002-09-27 | 2002-09-27 | Tunnel excavator for shaft and its retreating method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004116218A JP2004116218A (en) | 2004-04-15 |
| JP3971283B2 true JP3971283B2 (en) | 2007-09-05 |
Family
ID=32277459
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002283654A Expired - Fee Related JP3971283B2 (en) | 2002-09-27 | 2002-09-27 | Tunnel excavator for shaft and its retreating method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3971283B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102013212098B4 (en) * | 2013-06-25 | 2015-11-26 | Herrenknecht Aktiengesellschaft | Device for sinking a shaft and method for sinking a shaft |
| RU2547851C1 (en) * | 2014-03-12 | 2015-04-10 | Ибрагим Магомедович Паланкоев | Method of cyclic sinking of vertical mine shafts and device for its implementation |
-
2002
- 2002-09-27 JP JP2002283654A patent/JP3971283B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004116218A (en) | 2004-04-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DK2423390T3 (en) | Turning module for use in producing an underwater foundation for a building | |
| CN112727456B (en) | Be used for unsteady roof to dig anchor all-in-one can push away anchor and bore platform | |
| CN112682035B (en) | But anchor drill platform formula unstable roof of pushing away is with tunneling anchor all-in-one | |
| JP3483225B2 (en) | Tunnel excavator | |
| JP7413119B2 (en) | tunnel drilling equipment | |
| CN113574246B (en) | System and method for simultaneous excavation and segment assembly of a TBM using a propulsion housing | |
| CN115094885A (en) | Construction device and construction method for inclined support for foundation pit | |
| JP3971283B2 (en) | Tunnel excavator for shaft and its retreating method | |
| JP5115613B2 (en) | Segment shape holding device and segment shape holding method using the shape holding device | |
| JP2611896B2 (en) | Tunnel excavator | |
| JPH0642285A (en) | Reaming tunnel machine | |
| US3920277A (en) | Tunnel boring machine roll correction | |
| JPH06185285A (en) | Diametrally expanding shield drilling machine | |
| US4501517A (en) | Self propelled trench shield | |
| JP3215091B2 (en) | Segment shape holding device | |
| JP3428280B2 (en) | Hydraulic slope drilling vehicle | |
| JP3181271B2 (en) | All casing excavator | |
| JP4342900B2 (en) | Tunnel excavator | |
| JP4640079B2 (en) | Segment shape holding device and segment shape holding method using the shape holding device | |
| CN111287239A (en) | A device and method for silt cleaning in Heihe River | |
| JP2003172100A (en) | Support assembling device, its method and tunnel excavator | |
| JP7333138B2 (en) | Rolling correction method for shield excavator, rolling correction device for shield excavator, and shield excavation method using the same | |
| JPH11117343A (en) | Excavating method and excavator for construction machine | |
| JP2002227588A (en) | Pipe and jacking machine and shield tunneling method by use of the same | |
| CN120777022A (en) | Digging and splicing integrated connection channel construction system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040817 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060814 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060822 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061017 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070313 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070320 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070605 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070607 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3971283 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110615 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120615 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120615 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130615 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |