JP3975438B2 - Inclined repair method for dirt concrete building - Google Patents
Inclined repair method for dirt concrete building Download PDFInfo
- Publication number
- JP3975438B2 JP3975438B2 JP2002318383A JP2002318383A JP3975438B2 JP 3975438 B2 JP3975438 B2 JP 3975438B2 JP 2002318383 A JP2002318383 A JP 2002318383A JP 2002318383 A JP2002318383 A JP 2002318383A JP 3975438 B2 JP3975438 B2 JP 3975438B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- soil
- building
- foundation
- repair method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、補修時における建物の耐震安全性を確保しながら、土工事のコスト、工期を削減できる土間コンクリート建物の傾斜補修工法に関する。
【0002】
【従来の技術】
不同沈下等によって地盤に傾斜が生じることで不陸が発生した場合には、建物の傾きや高さ等を補修するために建物とその基礎との間に油圧ジャッキを介在装備させて空間を形成し、この空間に入り込んだ人間によって基礎の上面を平坦に均すことで不陸を補修していたが、本補修工法は、油圧ジャッキの取付に治具を要して大規模の工事になりながら、補修効果に信憑性を欠く問題点も指摘されていたことから、これらの問題点を改善する下記の工法も提案されていた。
【0003】
【特許文献】
特公平4−5105号公報(第2頁、第3欄第40行〜第4欄第17行、第1図)
【0004】
特に、一階の床が土間コンクリートの建物では、土聞コンクリートの補強や盛替えを行うのが一般的であるが、土間コンクリートの解体工事における騒音、産業廃棄物の発生、さらには建物に対する耐震安全性の確立等の問題が発生し、わずかな傾斜を補正するのにも、土工事における工期やコストの面で無視できない課題として問題視されていた。
【0005】
即ち、従来における土間コンクリート建物の傾斜補修は、アンダーピニング、ジャッキアップ等で傾斜補正を行う等いずれの工法においても、既存の土間コンクリートを盛り替えしながら維持するものであり、図4の概要図に示すような各種工法での施工においても、建物の基礎に対してジャッキを設置すると同時に既存の土間コンクリートの下を全面的に掘削していた。
【0006】
図4(a)に示す例は、建物の基礎1に対してジャッキ2を設置することで、建物の傾斜を補正するように基礎1のジャッキアップをすると同時に、鉄骨梁10等で土間コンクリート4を掘削した後の床下3から補強する傾斜の補正工法である。
【0007】
従って、既存の土間コンクリート4の下は、大量の土壌を掘削して撤去すると共に、建物の傾斜補正が行われた後には、図示していないが、地盤に対する土壌の埋め戻しが行われていた。
【0008】
又、図4(b)の例は、既存の土間コンクリートを構造スラブ11に盛り替えた後に、建物の傾斜を補正するように基礎2のジャッキアップをすることで傾斜補正を行っている傾斜の補正工法であるが、上記の例と同様に、傾斜補正の前における既存土間コンクリートの下にある土壌の掘削撤去と傾斜補正後における図示していない土壌の埋め戻しが行われていた。
【0009】
さらに、図4(c)の例は、既存の土聞コンクリートを全てに亘って一旦取り壊すものであり、基礎1のジャッキアップをすることで傾斜補正を行った後に、土壌の埋め戻し12と土間コンクリート13の新設を行う傾斜の補正工法である。
【0010】
従って、本工法では、既存土間コンクリートの取り壊しと大量土壌の掘削撤去を必須にし、建物の傾斜補正が行われた後には、地盤に対する土壌の埋め戻しと新規土間コンクリートの施工を要していた。
【0011】
以上のように、従来の傾斜補修工法は、土間コンクリートの土工事におけるコストの高騰と工期の長期化、土間の解体工事における騒音、産業廃棄物の発生及び工事期間中における建物の耐震安全性の確立対策等が発生しており、その改善が求められていた。
【0012】
【発明が解決しようとする課題】
本発明は、上記の実態に鑑みてその改善を図るために提案するものであり、既存土間コンクリートの下を掘削することや既存土間コンクリートの盛替えを行わないことによって、従来からの問題点であった土工事のコスト、工期の削減と工事期間中における建物の耐震安全性確保及び土間解体工事の騒音、産業廃棄物の発生を防止できる土間コンクリート建物の傾斜補修工法の提供を目的にしている。
【0013】
【課題を解決するための手段】
本発明による土間コンクリート建物の傾斜補修工法は、傾斜を生じた土間コンクリート建物の基礎をジャッキアップすることで不陸に対応する土間コンクリート建物の傾斜補修工法において、ジャッキを設置する掘削部分の土間コンクリートは撤去して、他の土間コンクリートは基礎梁と縁切りし、しかる後に基礎を不陸分だけジャッキアップして既存土間コンクリートの上に床上げ土間コンクリートを打設することを特徴としている。
【0014】
【発明の実施の形態】
本発明による土間コンクリート建物の傾斜補修工法は、ジャッキを設置する掘削部分の土間コンクリートのみを撤去して、他の土間コンクリートは、基礎梁との間を縁切りして置き、しかる後に基礎を不陸分だけジャッキアップして、既存土間コンクリートの上に床上げ土間コンクリートを打設しているものであり、土工事のコストと工期の削減を図り、工事期間中における建物の耐震安全性を確保しながら、土間解体工事における騒音、産業廃棄物の発生を抑制している。
【0015】
以下に、本発明による土間コンクリート建物の傾斜補修工法に関する実施の形態を図面に基づいて詳細に説明するが、理解を容易にするために、従来と同様の部位については、同一の符号で表示している。
【0016】
図1は、本実施の形態における前処理の工程を示しており、土間コンクリート建物の立断面図(a)と立断面図(a)の(b)−(b)矢視した基礎梁の断面図(b)を表示している。
【0017】
本実施の形態では、立断面図(a)に図示するように、工事に必要な最小域の掘削溝5が、既存土間コンクリート4の床下3に掘削されており、この掘削溝5の底面には、傾斜状態にある基礎1を支えてジャッキ2を配置している。
【0018】
この際の既存土間コンクリート4は、工事に必要な最小域の掘削溝5に該当する範囲において掘削、撤去されており、他の区域にあっては、断面図(b)が図示するように基礎梁6との間に縁切り7が行われるのみで、その掘削、撤去は回避されている。
【0019】
又、図2は、本実施の形態における傾斜修正の工程を示しており、土間コンクリート建物の立断面図(a)と立断面図(a)の(b)−(b)矢視した基礎梁と土間コンクリートの断面図(b)を表示している。
【0020】
本工程では、最初に掘削溝5の底面に配置されているジャッキ2によって傾斜状態にある基礎1をジャッキアップすることで、立断面図(a)に図示するように、基礎梁6を水平状態に修正するものであるが、基礎梁6は、既存土間コンクリート4と縁切りされていることで、断面図(b)に見られるように、大部分の既存土間コンクリート4をそのままの状態に残しながらその傾斜状態を修正して、正規の位置に容易に水平化することができる。
【0021】
次いでの工程は、掘削溝5に、撤去された既存土間コンクリート4の床下3に相当する位置まで埋め戻し8を行うものであり、新規の土間コンクリートを施工するための前処理を完了している。
【0022】
さらに、図3は、本実施の形態における最終施工の工程を示しており、土間コンクリート建物の立断面図(a)と立断面図(a)の(b)−(b)矢視した基礎梁を含む床上げ土間コンクリートの断面図(b)を表示している。
【0023】
最終工程は、床上げ土間コンクリート9を不陸が解消された正規の土間コンクリートとして最終的に施工されるものであり、立断面図(a)に図示するように、掘削溝5に埋め戻し8された土壌面と既存土間コンクリート4の上に、基礎梁6と同一面までコンクリートの打ち増しを行うことによって最終的な土間コンクリートを完成している。
【0024】
従って、床上げ土間コンクリート9は、傾斜を修正して不陸を解消した状態にあり、断面図(b)に見られるように、基礎梁6と同一面まで新規の土間コンクリートとして打設されている。
【0025】
以上のように、本発明による土間コンクリート建物の傾斜補修工法は、実施の形態で説明したように、ジャッキを設置する掘削部分の土間コンクリートは撤去して、他の土間コンクリートは基礎梁と縁切りし、しかる後に基礎を不陸分だけジャッキアップして既存土間コンクリートの上に床上げ土間コンクリートを打設することを特徴としているので、土工事のコスト、工期の削減と工事期間中における建物の耐震安全性確保及び土間解体工事の騒音、産業廃棄物の発生が防止されている。
【0026】
以上、本発明による土間コンクリート建物の傾斜補修工法を、上記実施の形態に基づいて詳細に説明したが、本発明は、これらの実施の形態に何ら限定されるものでなく、発明の主旨を逸脱しない範囲において各種の変更が可能であることは当然のことである。
【0027】
【発明の効果】
本発明による土間コンクリート建物の傾斜補修工法は、傾斜を生じた土間コンクリート建物の基礎をジャッキアップすることで不陸に対応する土間コンクリート建物の傾斜補修工法において、ジャッキを設置する掘削部分の土間コンクリートは撤去して、他の土間コンクリートは基礎梁と縁切りし、しかる後に基礎を不陸分だけジャッキアップして既存土間コンクリートの上に床上げ土間コンクリートを打設することを特徴としているので、以下の効果を発揮している。
【0028】
▲1▼ 床下の掘削が最小限になるので、土工事の工期・コストを削減できる。
▲2▼ 基礎は、工事中も土の中にあるので、建物の耐震安全性が確保される。
▲3▼ 既存土間コンクリートの取壊しを解消して、土間解体工事における騒音、産業廃棄物の発生を抑制できる。
【図面の簡単な説明】
【 図1】本発明による土間コンクリート建物の傾斜補修工法の前処理工程図
【 図2】本発明による土間コンクリート建物の傾斜補修工法の傾斜補修工程図
【 図3】本発明による土間コンクリート建物の傾斜補修工法の最終工程図
【 図4】従来の土間コンクリート建物の傾斜補修図
【符号の説明】
1 基礎、 2 ジャッキ、 3 既存土間コンクリートの床下、
4 既存土間コンクリート、 5 掘削溝、 6 基礎梁、 7 縁切り、
8 埋め戻し、 9 床上土間コンクリート、 10 鉄骨梁、
11 構造スラブ、 12 埋め戻し、 13 土間コンクリート、[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a slope repair method for an earthen concrete building that can reduce the cost and time of earth work while ensuring seismic safety of the building at the time of repair.
[0002]
[Prior art]
If unevenness occurs due to incline in the ground due to uneven subsidence, etc., a space is formed by installing a hydraulic jack between the building and its foundation to repair the inclination and height of the building. However, humans who entered this space repaired the unevenness by leveling the upper surface of the foundation flat, but this repair method requires a jig to install the hydraulic jack and is a large-scale work. However, since problems that lacked credibility in the repair effect were pointed out, the following methods for improving these problems were also proposed.
[0003]
[Patent Literature]
Japanese Examined Patent Publication No. 4-5105 (
[0004]
In particular, in buildings with ground floor concrete on the first floor, it is common to reinforce or refill clay soil concrete, but noise, industrial waste generation, and earthquake resistance to the building are also observed. Problems such as establishment of safety occurred, and correction of slight inclinations was regarded as a problem that could not be ignored in terms of construction period and cost in earthwork.
[0005]
In other words, the conventional slope repair of the soil concrete building is to maintain the existing soil concrete while replacing it with any method such as underpinning, jacking up, etc. In various construction methods as shown in Fig. 1, jacks were installed on the foundation of the building, and at the same time, the existing underground concrete was excavated completely.
[0006]
In the example shown in FIG. 4A, the
[0007]
Therefore, under the existing soil concrete 4, a large amount of soil was excavated and removed, and after the inclination of the building was corrected, the soil was backfilled to the ground although not shown in the figure. .
[0008]
Moreover, the example of FIG.4 (b) is the inclination of which inclination correction is performed by jacking up the
[0009]
Furthermore, the example of FIG.4 (c) is what demolishes existing soil concrete once, and after performing inclination correction | amendment by jacking up the
[0010]
Therefore, in this construction method, it was essential to demolish existing soil concrete and excavate and remove a large amount of soil, and after the inclination of the building was corrected, it was necessary to backfill the soil and construct new soil concrete.
[0011]
As described above, the conventional slope repair method increases the cost and lengthening the construction period of soil-concrete earthwork, generates noise during demolition work between the soil, generation of industrial waste, and seismic safety of the building during the construction period. Establishing measures have occurred, and improvements were required.
[0012]
[Problems to be solved by the invention]
The present invention is proposed in order to improve the above in view of the above-mentioned actual situation. By excavating under the existing soil concrete or not refilling the existing soil concrete, it is a conventional problem. The purpose of this project is to provide a slope repair method for dirt concrete buildings that can reduce the cost of earthwork, reduce the work period, ensure seismic safety of the building during the work period, and prevent noise from soil demolition work and industrial waste. .
[0013]
[Means for Solving the Problems]
According to the present invention, the slope repair method for the soil-concrete building is the soil-concrete of the excavation part where the jack is installed in the slope repair method for the soil-concrete building corresponding to the unevenness by jacking up the foundation of the slope-concrete concrete building. Is removed, and the other interstitial concrete is cut off from the foundation beam, and then the foundation is jacked up by the amount of unevenness, and the raised concrete is placed on the existing interstitial concrete.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
According to the present invention, the slope repair method for dirt concrete buildings removes only the dirt concrete in the excavation part where the jack is installed, and puts other dirt concrete between the foundation beams, and then the foundation is not landed. Jacking up as much as possible and placing floor-to-floor concrete on top of existing soil-concrete, reducing earthwork costs and construction time, while ensuring earthquake-resistant safety of the building during the construction period , Suppresses noise and industrial waste generated during soil dismantling work.
[0015]
In the following, an embodiment relating to a slope repair method for a concrete concrete building according to the present invention will be described in detail with reference to the drawings. ing.
[0016]
FIG. 1 shows a pretreatment process in the present embodiment, and is a sectional view of a foundation beam as viewed from arrows (a) and (b)-(b) of the sectional view (a) of a concrete concrete building. The figure (b) is displayed.
[0017]
In the present embodiment, as shown in the elevation sectional view (a), the
[0018]
In this case, the existing soil concrete 4 has been excavated and removed in a range corresponding to the
[0019]
Moreover, FIG. 2 has shown the process of the inclination correction in this Embodiment, and the foundation beam which looked at (b)-(b) arrow of (b)-(b) of an elevational sectional view (a) and an elevational sectional view (a) of a soil concrete building And a cross-sectional view (b) of soil concrete.
[0020]
In this step, the
[0021]
In the next step, the
[0022]
Furthermore, FIG. 3 has shown the process of the final construction in this Embodiment, and the basic beam which looked at (b)-(b) of (b)-(b) of the elevational sectional view (a) and the elevational sectional view (a) of the soil concrete building The cross-sectional view (b) of the floor-raised soil concrete including is displayed.
[0023]
In the final step, the floor-raised soil concrete 9 is finally constructed as regular soil-free concrete in which unevenness has been eliminated, and as shown in the elevational sectional view (a), it is backfilled 8 in the
[0024]
Accordingly, the floor-raised soil concrete 9 is in a state in which the slope is corrected and the unevenness is eliminated, and as seen in the cross-sectional view (b), it is placed as a new soil concrete up to the same plane as the
[0025]
As described above, according to the slope repair method for a dirt concrete building according to the present invention, as explained in the embodiment, the dirt concrete in the excavation part where the jack is installed is removed, and the other dirt concrete is cut off from the foundation beam. After that, it is characterized by jacking up the foundation by the amount of unevenness and placing floor concrete on top of the existing concrete, thus reducing the cost of construction work, reducing the construction period, and seismic safety of the building during the construction period Generation of noise and industrial waste are prevented.
[0026]
As mentioned above, although the slope repair method of the concrete concrete building by this invention was demonstrated in detail based on the said embodiment, this invention is not limited to these embodiment at all, and deviates from the main point of invention. It goes without saying that various changes can be made without departing from the scope.
[0027]
【The invention's effect】
According to the present invention, the slope repair method for the soil-concrete building is the soil-concrete of the excavation part where the jack is installed in the slope repair method for the soil-concrete building corresponding to the unevenness by jacking up the foundation of the slope-concrete concrete building. Is removed, and other interstitial concrete is cut off from the foundation beam, and then the foundation is jacked up by the unevenness and the floor is raised on the existing interstitial concrete. It is effective.
[0028]
(1) Since excavation under the floor is minimized, the construction period and cost of earthwork can be reduced.
(2) Since the foundation is still in the soil during construction, seismic safety of the building is ensured.
(3) It is possible to eliminate the demolition of existing soil concrete and suppress the generation of noise and industrial waste during the soil demolition work.
[Brief description of the drawings]
[Fig. 1] Pre-treatment process diagram of slope repair method for dirt concrete building according to the present invention [Fig. 2] Slope repair process diagram of slope repair method of dirt concrete building according to the present invention [Fig. 3] Slope of dirt concrete building according to the present invention Final process diagram of repair method [Fig.4] Inclined repair diagram of conventional soil concrete building [Explanation of symbols]
1 foundation, 2 jacks, 3 under existing concrete floor,
4 Existing soil concrete, 5 Excavation groove, 6 Foundation beam, 7 Edge cutting,
8 Backfill, 9 Concrete on floor, 10 Steel beam,
11 structural slabs, 12 backfilling, 13 earthen concrete,
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002318383A JP3975438B2 (en) | 2002-10-31 | 2002-10-31 | Inclined repair method for dirt concrete building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002318383A JP3975438B2 (en) | 2002-10-31 | 2002-10-31 | Inclined repair method for dirt concrete building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004150193A JP2004150193A (en) | 2004-05-27 |
| JP3975438B2 true JP3975438B2 (en) | 2007-09-12 |
Family
ID=32461527
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002318383A Expired - Fee Related JP3975438B2 (en) | 2002-10-31 | 2002-10-31 | Inclined repair method for dirt concrete building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3975438B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008156930A (en) * | 2006-12-25 | 2008-07-10 | Takenaka Komuten Co Ltd | Base-isolating and repairing method for existing building having earthen floor |
| KR101140787B1 (en) | 2008-12-17 | 2012-05-03 | 주식회사 바우 컨설탄트 | Bridge post foundation construction method |
| CN115030559B (en) * | 2022-05-24 | 2023-07-21 | 四川农业大学 | A method for dismantling cast-in-place concrete beams, slabs and columns of existing buildings |
-
2002
- 2002-10-31 JP JP2002318383A patent/JP3975438B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004150193A (en) | 2004-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20220098817A1 (en) | Method for constructing structure | |
| KR20120093547A (en) | Top-down construction method of basement | |
| KR102522619B1 (en) | Upward basement structure demolition method | |
| CN113818460A (en) | Cofferdam construction method based on high-standard environmental protection requirement | |
| JP2007182741A (en) | Differentially settled foundation correcting and reinforcing method by underpinning | |
| JP5698405B1 (en) | Ground improvement solid foundation method | |
| KR20090050042A (en) | Installation method of earth wall temporary installation by connecting thumb pile with guide plate and wide sheet pile | |
| CN101509258B (en) | Method for precontrolling subsidence slant of sinking well | |
| JP3975438B2 (en) | Inclined repair method for dirt concrete building | |
| JP5465086B2 (en) | Construction method of underground structure | |
| JP3516391B2 (en) | Ground excavation method | |
| KR20240020470A (en) | Top-down and bottom-up parallel decommissioning of existing building | |
| JP2017197950A (en) | Insert pile retaining wall | |
| JP4111445B2 (en) | Basic settlement settlement method using sandbag | |
| JP2977805B1 (en) | Straightening method and straightening device for buildings with uneven settlement | |
| JP2016037847A (en) | Liquefaction countermeasure structure for ground improvement solid foundation and correction method for occurrence of uneven settlement due to liquefaction | |
| JP6710999B2 (en) | Temporary receiving method for existing structures | |
| JP6052541B2 (en) | Seismic isolation method for existing buildings | |
| JP2019173453A (en) | Construction method of building | |
| JP3879085B2 (en) | Uneven settlement settlement method | |
| KR101025399B1 (en) | Underground structures using line backfill and construction method | |
| JP2005180015A (en) | Method of improving unevenly settled foundation and structure for improving unevenly settled foundation | |
| CN222413052U (en) | Pipe jacking starting well foundation pit support structure | |
| KR20050019379A (en) | storey spacing support ssoldier pile soil retaining wall | |
| AU2016102394A4 (en) | A method of constructing a column, a subterranean structure, and a structure made from the method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20040712 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050125 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070314 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070522 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070607 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100629 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130629 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |