JP3977608B2 - Waste heat recovery control device - Google Patents
Waste heat recovery control device Download PDFInfo
- Publication number
- JP3977608B2 JP3977608B2 JP2001118206A JP2001118206A JP3977608B2 JP 3977608 B2 JP3977608 B2 JP 3977608B2 JP 2001118206 A JP2001118206 A JP 2001118206A JP 2001118206 A JP2001118206 A JP 2001118206A JP 3977608 B2 JP3977608 B2 JP 3977608B2
- Authority
- JP
- Japan
- Prior art keywords
- heat
- heating
- medium
- heat medium
- hot water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、発電機を駆動するエンジン等の駆動源を熱源とし、その排熱を回収して利用する排熱回収制御装置に関する。
【0002】
【従来の技術】
従来、エンジンで発電機を駆動して発電するとともに、その駆動源であるエンジンの排熱を回収して利用する排熱回収制御装置が知られている。排熱の回収は、エンジンのウォータージャケット部に冷却水や排熱回収水としての熱媒を流し、その熱媒を通じて行われる。そして、熱媒の吸熱を蓄積し、又は、その熱を給湯等に利用するものである。
【0003】
【発明が解決しようとする課題】
ところで、従来の排熱利用システムでは、貯湯タンクに貯湯される湯の温度検知より駆動源であるエンジンの運転制御が行われているが、予め蓄熱量又は運転時間を設定する単純な制御を用いており、運転形態によってはエンジンの耐久性を低下させたり、放熱損失が大きくなる等、ランニングコストが高くなるという欠点があった。
【0004】
そこで、本発明は、熱源の耐久性を向上させるとともに、蓄熱の有効利用を図り、ランニングコストを低減させた排熱回収制御装置を提供することを課題とする。
【0005】
【課題を解決するための手段】
本発明の排熱回収制御装置は、熱を放出する熱源(エンジン2)と、この熱源に第1の熱媒(4)を循環させる第1の熱媒循環手段(排熱回収路6、循環ポンプ16)と、この第1の熱媒循環手段によって前記熱源に循環させ、前記熱源からの排熱を吸収させた前記第1の熱媒が持つ熱を第2の熱媒(温水32)に吸収させる第1の熱交換器(24)と、この第1の熱交換器で得た前記第2の熱媒を溜める蓄熱手段(貯湯タンク34)と、この蓄熱手段に溜められている前記第2の熱媒を前記第1の熱交換器に循環させる第2の熱媒循環手段(循環路36)と、暖房端末(室内放熱器102、浴室暖房乾燥機104)に循環させる第3の熱媒(温水98)を前記第1の熱媒で加熱する第2の熱交換器(26)と、前記第1の熱媒循環手段に形成され、前記熱源を跨がって前記第1の熱媒を循環させる第1のバイパス路(12)と、この第1のバイパス路とは別に前記第1の熱媒循環手段に形成され、前記熱源に循環させる前記第1の熱媒の循環路を短縮する第2のバイパス路(28)と、前記熱源の起動運転又は暖機運転時には、前記第2のバイパス路を通して前記第1の熱媒を前記第1の熱媒循環手段に循環させ、前記熱源の運転を停止している場合の前記暖房端末側の暖房要求時には、前記蓄熱手段の前記第2の熱媒が持つ熱を前記第1の熱交換器を通して吸収させた第1の熱媒を前記第1のバイパス路を通して前記第1の熱媒循環手段に循環させ、第1の熱媒の熱量を前記第2の熱交換器を通して吸収させた前記第3の熱媒を前記暖房端末に循環させる制御手段(制御部124)とを備えたことを特徴とする。
【0006】
即ち、第1の熱媒は、エンジン等の熱源を冷却する冷却媒体であり、温水や不凍液等を用いることができ、第1の熱媒循環手段を通じて熱源に循環させる。第2の熱媒は、第1の熱媒が持つ熱を吸収する媒体であって、温水等が用いられ、第2の熱媒循環手段に循環させる。また、第3の熱媒には、暖房端末に循環させる温水等が用いられる。熱源の起動運転又は暖機運転時には、第1の熱媒が第1の熱媒循環手段の短縮された循環路を通じて熱源に循環させる。
【0007】
通常、熱源の排熱を吸収した第1の熱媒により、第1の熱交換器を通して第2の熱媒が加熱され、蓄熱手段に蓄熱が行われるとともに、第2の熱交換器を通して第3の熱媒が加熱され、この第3の熱媒を暖房端末に循環させることにより暖房が行われる。
【0008】
そこで、熱源の運転停止時、蓄熱手段から第2の熱媒を第1の熱交換器に流し、第2の熱媒が持つ熱を第1の熱媒に吸収させ、この第1の熱媒が持つ熱量を第2の熱交換器を通して第3の熱媒に吸収させ、この第3の熱媒を暖房端末に循環させることにより、蓄熱手段の蓄熱を暖房に利用するものである。この場合、第1の熱媒は、第2の熱媒と第3の熱媒との間の熱伝達の担い手である。
【0009】
本発明の排熱回収制御装置において、前記蓄熱手段は、下層部側に加熱前の前記第2の熱媒、上層部側に加熱した前記第2の熱媒を溜める貯湯タンクであることを特徴とする。即ち、温水の積層沸き上げを行っている。
【0010】
本発明の排熱回収制御装置において、前記暖房端末に前記3の熱媒を循環させる暖房回路(暖房用循環路100)と、この暖房回路に設けられて前記第3の熱媒を循環させるポンプ(循環ポンプ108)と、前記熱源の運転停止時、前記蓄熱手段の前記第2の熱媒が持つ熱を前記第1の熱交換器を通して前記第1の熱媒に吸収させ、この第1の熱媒の熱量を前記第2の熱交換器を通して吸収させた前記第3の熱媒を前記ポンプにより前記暖房回路に循環させる制御手段とを備えたことを特徴とする。即ち、蓄熱手段の蓄熱を第1の熱媒を通して暖房回路側に循環する第3の熱媒の加熱に用いるので、暖房回路の凍結防止等が可能となる。
【0011】
本発明の排熱回収制御装置において、前記ポンプは、直流モータで駆動されることを特徴とする。即ち、直流モータで駆動されるポンプは、消費電力が低く、小流量から大流量まで幅の広い流量制御が可能である。
【0012】
本発明の排熱回収制御装置において、前記第1のバイパス路は、前記制御手段で制御される弁(三方弁14)を介して前記第1の熱媒循環手段に接続されていることを特徴とする。即ち、熱源に跨がって形成されたバイパス路を通して第1の熱媒を循環させるので、熱源側での放熱損失を防止できる。
【0013】
本発明の排熱回収制御装置において、前記熱源に発電機を回転させる駆動源を用いたことを特徴とする。即ち、発電機を駆動する駆動源は、例えば、エンジンで構成されており、相当な排熱があり、有効な熱源となるものである。
【0014】
【発明の実施の形態】
以下、本発明の実施の形態を図面に示した実施例を参照して説明する。
【0015】
図1及び図2は、本発明の排熱回収制御装置の実施例を示し、図1は排熱回収制御装置のエンジン及び貯湯タンク等の排熱回収系統、図2は排熱回収制御装置の暖房端末等の蓄熱利用系統等、図3は図1の排熱回収制御装置の拡大部分を示している。
【0016】
この排熱回収制御装置では、熱を放出する熱源には図示しない発電機を駆動する駆動源としてのエンジン2が用いられ、このエンジン2には排熱回収用の流体としてエンジン冷却水ないし排熱回収水としての第1の熱媒4を循環させ、この熱媒4にエンジン2の排熱を回収させる第1の熱媒循環手段として排熱回収路6が形成されている。この排熱回収路6のエンジン2の入口側及び出口側にはそれぞれ温度検出手段としてサーミスタ等からなる温度センサ8、10が設置されているとともに、バイパス路12が三方弁14を介して形成されている。また、排熱回収路6には、熱媒4を強制循環させるための循環ポンプ16、熱媒4を排熱回収路6に供給する循環タンク18、熱媒4を発電出力によって加熱する電気ヒータ20、流量センサ22、第1及び第2の熱交換器24、26等が設けられるとともに、前記バイパス路12とは別に、暖機時の循環路を短縮化するためのバイパス路28が三方弁30を介して形成されている。循環ポンプ16は直流モータ17によって駆動される。
【0017】
熱交換器24は熱媒4を熱源とする第2の熱媒である温水32の加熱手段であって、蓄熱手段である貯湯タンク34の加熱すべき水を循環させる第2の熱媒循環手段としての循環路36に設けられている。この循環路36は、貯湯タンク34の底面側と天井側とを結ぶ閉回路を構成しており、バイパス路38、40が設けられているとともに、これらバイパス路38、40との流路切換手段として三方弁42、44、熱交換器24、流量センサ43、循環ポンプ45、温度センサ49等が設けられている。即ち、循環ポンプ45は直流モータ47によって駆動され、熱交換器24で加熱された温水32が積層沸き上げが行われる貯湯タンク34の上層部側に供給される。貯湯タンク34には、温水32の供給や取出しによる階層蓄熱の乱調防止手段として第1の緩衝板46が設置されている。
【0018】
貯湯タンク34の底面側には、給水路48が設けられるとともに、排水栓50が設けられ、給水管52から上水Wが貯湯タンク34の底面側に給水される。給水管52には、減圧弁54及び流量センサ56が設けられているとともに、ミキシングバルブ58を介して給湯管60が接続されている。また、貯湯タンク34には、給水による階層蓄熱の乱調防止手段として第2の緩衝板62が設置されている。貯湯タンク34の側面部には積層沸き上げされる水の温度を検出する温度検出手段として複数の温度センサ641、642・・・・650が一定の間隔で設置されている。この実施例では、10個の温度センサ641、642・・・・650が設置されているが、計測ゾーンに応じてこれより少なく又は多く設置してもよい。
【0019】
また、貯湯タンク34の天井側には温水取出路66が設けられ、この温水取出路66の一端は、過圧逃し弁68及び負圧弁70を介して外気に開放されており、その他端側には、給湯バックアップ用の第3の熱交換器72、出湯温検出用の温度センサ74等が設けられている。熱交換器72は、バーナ76による燃料ガスの燃焼熱を熱源とする。この熱交換器72の出口側の給湯管60には、前記ミキシングバルブ58、流量センサ78、水比例弁80、混合温検出用の温度センサ82等が設けられている。
【0020】
また、給湯管60から出湯される温水HWは、追焚用循環路84側に供給されて浴槽86に注湯可能である。追焚用循環路84側には、三方弁88、循環ポンプ90、水位センサ92、温度センサ94、第4の熱交換器96等が設けられている。
【0021】
排熱回収路6に設けられた熱交換器26は、熱媒4を熱源とする暖房用熱媒、第3の熱媒である温水98の加熱手段であって、暖房回路としての暖房用循環路100に設けられている。この暖房用循環路100は、室内放熱器102や浴室暖房乾燥機104等の暖房端末に温水98を循環させる手段であって、温水98を溜めて膨張沸騰を抑制する手段としての温水タンク106、循環ポンプ108、流量センサ110、熱交換器96、112、暖房端末側に熱動弁113、115等が設けられている。温水タンク106には、給水管114が接続されるとともに、給水を調整するためのバルブ116が設けられている。レベルセンサ118は、温水タンク106に適正量の温水98を溜めるためのレベル制御に用いられる。熱交換器112は、バーナ120による燃料ガスの燃焼熱を熱源とし、浴槽86内の温水122の追焚の他、暖房用熱源としての温水98のバックアップ加熱に用いられる。また、熱交換器96では、温水タンク106側から供給される温水98が持つ熱を追焚用循環路84側の加熱に用いられる。
【0022】
この排熱回収制御装置において、図3に三方弁14、30、42、44の切換方向A、B、C又はDが示されており、例えば、暖機運転時、三方弁14はC−A方向、三方弁30はC−A方向に切り換られ、このとき、温水32の自然対流防止のため、三方弁42はD−A方向、三方弁44はD−C(閉止)方向に切り換えられる。
【0023】
そして、この排熱回収制御手段としてコンピュータ等で構成された制御部124が設置されており、この制御部124は、演算手段としてのCPU、記憶手段としてのROM、RAM、駆動出力や検出出力の入出力手段としてI/O等を備えているとともに、給湯積算手段として給湯積算出力カウンタ125を備えている。この制御部124で実行される制御は、暖房端末の運転状態に応じて直流モータ17、47の回転制御及び循環ポンプ16、45の回転制御、三方弁42、44の開閉制御等である。このような制御を行うため、制御部124には、凍結予防用の温度センサ127、温度センサ8、10、流量センサ22等、各種センサ等から検出出力が制御入力として加えられ、この制御部124から得られる制御出力が直流モータ17、47や三方弁42、44等、各種の制御機器のアクチュエータに加えられる。また、制御部124には、アラーム等の表示を行う表示手段として表示器126が設けられ、この表示器126は文字表示器、音声発生器等で構成できる。温度センサ127は、暖房用温水器129内や屋外に設置される。なお、この実施例では、ディジタル制御を行うため、コンピュータ等を用いた制御部124を例に取って説明しているが、アナログ処理を行う制御回路を用いてもよい。
【0024】
次に、排熱回収制御を図4に示すメインルーチンを参照して説明する。
【0025】
電源が投入されると、ステップS1では、三方弁14、30、42、44等の各種弁を初期位置制御(図6)を実行した後、ステップS2に移行する。ステップS2では、常時起動プログラムが実行される。この常時起動プログラムでは、エンジン異常停止制御(図7)、エンジン運転許可制御(図8)、エンジン停止制御(図9)、エンジン強制停止制御(図10)、暖房命令制御(図11)、給湯積算出力カウンタ125の制御(図12)、弁異常チェック制御(図13)、温度センサ異常チェック制御(図14)等が行われる。また、ステップS3では、暖房命令が制御部124に付与された(ON)か否かが判定され、暖房命令がない場合にはステップS4に移行し、エンジン運転が許可されたか否かを判定する。即ち、ステップS4では、季節に応じて設定される運転許可時間内であるか否かが確認される。
【0026】
ステップS4でエンジン運転が許可された場合には、ステップS5に移行し、要求蓄熱量が所定蓄熱量以上か否かを判定する。即ち、ステップS5では、例えば、
【0027】
(給湯負荷×1.2−積算出力−タンク蓄熱量)>1000kcal・・・(1)
であるか否かを判定し、予想される給湯需要から貯湯タンク34の蓄熱量を引いた値が所定蓄熱量以上である場合にエンジン2を運転可能とする。この場合、係数1.2は給湯負荷に余裕を持たせるための数値の一例であり、この数値に限定されるものではない。
【0028】
ここで、ステップS5における演算に用いる「給湯負荷」は、各季節毎に予め給湯予想負荷を決定するものである。
【0029】
【表1】
【0030】
即ち、「給湯負荷」は、その時点の季節及び時刻における次回の給湯予想量であるから、例えば、7月X日、18:00にCGS運転を開始する場合、給湯負荷は6000kcalで計算し、また、2月Y日、5:00にCGS運転を開始する場合、給湯負荷は2000kcalで計算する。
【0031】
また、「積算出力」は、制御部124に内蔵されている給湯積算出力カウンタ125を用いて求められる給湯及び注湯に使用された出力の合計である。即ち、給湯需要があると思われる時間帯で、バックアップと蓄熱利用を含めた全ての出力を求め、そのデータをエンジン運転時間にフィードバックする。
【0032】
また、貯湯タンク34のタンク蓄熱量の計算は、例えば、タンク容量を200リットルとし、図5に示すように、貯湯タンク34の各ゾーン1〜7は同容量であり、1ゾーン当たりの温水量は約28.6リットルとなる。ここで、水温を冬期で5℃、春秋期で15℃、夏期で25℃と定義すると、各ゾーンの熱量Q(kcal)は、
【0033】
Q=28.6×{(上側検出温度+下側検出温度)/2−水温}・・・(2)
となり、タンク蓄熱量Qmは全ゾーン1〜7の合計である。但し、一つの条件として{(上側検出温度+下側検出温度)/2−水温}<10℃の場合には、そのゾーンは零とする。例えば、冬期、温度センサ641の検出温度が75℃、温度センサ643の検出温度が70℃のとき、ゾーン1の熱量Q1 は、
【0034】
Q1 =28.6×{(75+70)/2−5}=1930.5(kcal)・・・(3)
となる。なお、温度センサ641〜650の中、温度センサ642、649は蓄熱量Qmの計算には使用しない。
【0035】
そして、ステップS5で前記要求蓄熱量が1000kcal以上であると判定されたとき、又はステップS3で暖房命令が発せられているとき、ステップS6に移行し、貯湯タンク34の最下部側の温度センサ650の検出温度が所定温度、例えば、40℃以上か否かを判定し、所定温度以下の場合、ステップS7に移行する。ステップS7では、前回のエンジン2の停止から所定時間、例えば、60分以上経過したか否かが判定され、所定時間以下の場合には、エンジン保護のためエンジン2の起動を禁止する。即ち、貯湯タンク34の最下部側の湯温が低温であることを確認し、エンジン2のオーバーヒートを防止している。そして、所定時間が経過している場合には、ステップS8に移行し、エンジン2の起動を行うとともに、暖機運転を行う。この暖機運転では、三方弁30を切り換えてバイパス路28を介して排熱回収路6を狭小化し、熱媒温度の急激な立上りを行う。
【0036】
そして、この暖機運転の後、ステップS9に移行し、エンジン2の入口側の熱媒4の温度が所定温度、例えば、65℃になるように制御する。この一定温度制御は、温度センサ8、10の検出温度を監視しながら、直流モータ17の回転数を増減させ、循環ポンプ16で圧送される熱媒4の流量を加減することにより行われる。
【0037】
次に、図6は、図4のステップS1の三方弁14、30、42、44等の弁初期位置設定のサブルーチンを示している。即ち、このサブルーチンがスタートすると、ステップS101で、三方弁42はD−A方向、三方弁44はD−C(閉止)方向、三方弁30はC−A方向、三方弁14はC−A方向に切り換えられる。この結果、常時起動プログラムの実行が準備される。
【0038】
次に、図7は、図4のメインルーチンのステップS2のサブルーチンであるエンジン異常停止制御を示している。即ち、このサブルーチンがスタートすると、ステップS201では、エンジン2の運転状態が「運転」であるか否かが判定され、運転状態にあるときはステップS202に移行し、所定時間として例えば、10秒経過の後、ステップS203に移行し、ガス弁が閉(OFF)であるか否かが判定され、閉でない場合にはステップS201に戻り、閉止している場合にはステップS204に移行し、エンジン停止を行った後、ステップS205に移行し、表示器126にエンジン異常停止を行った旨の表示としてアラーム表示を行う。
【0039】
また、ステップS201で、エンジン2が運転状態でない場合には、ステップS206に移行し、所定時間として例えば、10秒経過の後、ステップS207に移行し、ガス弁が開(ON)であるか否かが判定され、開でない場合にはステップS201に戻り、開の場合にはステップS208に移行し、エンジン停止を行った後、ステップS209に移行し、表示器126に「エンジン停止せず」とのアラーム表示を行う。
【0040】
次に、図8は、図4のメインルーチンのステップS2のサブルーチンであるエンジン運転許可制御を示している。即ち、このサブルーチンがスタートすると、ステップS211では、エンジン運転が許可時間であるか否かが判定され、運転許可時間にある場合にはステップS212に移行し、エンジン運転許可指示として「許可」を出力し、また、エンジン運転許可時間でない場合にはステップS213に移行し、エンジン運転許可を禁止する指示として「禁止」を出力する。
【0041】
次に、図9は、図4のメインルーチンのステップS2のサブルーチンであるエンジン停止制御を示している。即ち、このサブルーチンがスタートすると、ステップS215では、エンジン2の電源をOFFにした後、ステップS216に移行し、弁初期位置制御(図6)を実行した後、ステップS217に移行し、エンジン2の運転状態を停止状態にする。
【0042】
次に、図10は、図4のメインルーチンのステップS2のサブルーチンであるエンジン強制停止制御を示している。即ち、このサブルーチンがスタートすると、ステップS221では、強制停止入力手段として例えば、Escキーが押されたか否かが判定され、このEscキーが押されたとき、ステップS222に移行し、エンジン停止制御(図9)を実行し、制御を終了する。
【0043】
次に、図11は、図4のメインルーチンのステップS2のサブルーチンである暖房運転命令制御を示している。即ち、このサブルーチンがスタートすると、ステップS225では、暖房装置側の暖房命令手段として端末スイッチがON又は双方向通信の暖房命令がONしたか否かが判定され、暖房命令が指示されたとき、ステップS226に移行し、暖房命令を「ON」とし、制御手段であるバックアップインテリ基板のEコン端子を「ON」とする。また、ステップS227では、暖房装置側の暖房命令手段として端末スイッチのOFFと、双方向通信の暖房命令のOFFとが成立しているか否かが判定され、暖房停止命令が指示されたとき、ステップS228に移行し、暖房命令を「OFF」とし、制御手段であるバックアップインテリ基板のEコン端子を「OFF」とする。
【0044】
次に、図12は、図4のメインルーチンのステップS2のサブルーチンである給湯積算出力カウンタ125の制御を示している。即ち、このサブルーチンがスタートすると、ステップS231では、エンジン運転が「許可」であるか否かが判定され、許可の場合にはステップS232に移行し、カウンタリセットを行う。即ち、給湯積算出力カウンタ125に格納されている熱量Qcを0kcalとした後、ステップS233に移行し、水温を決定する。即ち、冬期では5℃、春秋期では15℃、夏期では25℃を設定した後、ステップS234に移行し、混合温サーミスタである温度センサ82の湯温測定を行う。
【0045】
そして、ステップS235では、給湯量を検出する流量センサ78が所定流量として例えば、1リットルカウントしたか否かを判定し、1リットルカウントを行った場合、ステップS236に移行する。ステップS236では、1リットル当たりの熱量計算として給湯積算出力熱量Qcを演算する。即ち、この給湯積算出力熱量Qc(kcal)は、
【0046】
Qc=(湯温−水温)×1(kcal) ・・・(4)
で算出される。
【0047】
そして、ステップS237に移行し、エンジン運転許可が「禁止」されているか否かが判定され、エンジン運転が禁止されている場合にはステップS231に復帰し、エンジン運転が禁止されていない場合にはステップS234に移行し、ステップS234〜ステップS236の処理を実行する。
【0048】
次に、図13は、図4のメインルーチンのステップS2のサブルーチンである弁異常チェック制御を示している。即ち、このサブルーチンがスタートすると、ステップS241では、弁出力と切換状態を表すリミットが一致しているか否かが判定され、一致していない場合にはステップS242で所定時間として例えば、30秒経過の後、ステップS243に移行し、表示器126に三方弁14、30、42、44等が異常である旨をアラームによって告知する。また、ステップS241で弁出力とリミットが一致している場合には、ステップS244に移行し、正常である旨出力し、表示器126にそれを表示する。
【0049】
次に、図14は、図4のメインルーチンのステップS2のサブルーチンである温度センサ異常チェック制御を示している。即ち、このサブルーチンがスタートすると、ステップS251では、接続線等に断線又は短絡の異常が生じているか否かが判定され、異常が生じている場合にはステップS252に移行し、表示器126に温度センサ8、10等が異常である旨をアラームによって告知する。また、ステップS251で異常が生じていない場合には、ステップS253に移行し、正常である旨出力し、表示器126にそれを表示する。
【0050】
次に、図15は、貯湯タンク34の残熱を利用した暖房制御を示している。
【0051】
この暖房制御はメインルーチンに対して割込み制御によって実行され、この制御がスタートすると、ステップS11では、暖房要求があるか否かを判定し、暖房要求がない場合には、図4に示すメインルーチンに復帰し、暖房要求がある場合にはステップS12に移行する。ステップS12では、エンジン2が運転中であるか否かが判定され、エンジン2が運転中である場合には、通常の暖房シーケンスに移行する。また、エンジン2が運転中でない場合には、ステップS13に移行し、貯湯タンク34の残熱が所定熱量、例えば、2000kcalを超えているか否かが判定され、所定熱量以下の場合には通常の暖房シーケンスに移行し、所定熱量を超えている場合には、ステップS14に移行する。ステップS14では、貯湯タンク34の温度センサ641の検出温度が所定温度を超えているか否か、例えば、65℃を超えているか否かが判定され、超えていない場合には通常の暖房シーケンスに移行し、所定温度を超えている場合には、ステップS15に移行する。
【0052】
ステップS15では、三方弁14、42、44の切換え、循環ポンプ16、45の運転、暖房側の循環ポンプ108の運転、室内放熱器102、浴室暖房乾燥機104等の暖房端末側の熱動弁113、115を開とする。このような処理の後、ステップS16では、貯湯タンク34の温度センサ641の検出温度が所定温度、例えば、60℃を超えているか否かを判定し、超えていない場合には通常の暖房シーケンスに移行し、所定温度を超えている場合には、ステップS17に移行する。
【0053】
そして、ステップS17では暖房要求があるか否かが判定され、暖房要求がない場合には図4のメインルーチンに復帰し、暖房要求がある場合にはステップS16に戻り、ステップS16の処理を行う。即ち、貯湯タンク34の残熱量が所定熱量を超えている場合、即ち、温度センサ641の検出温度が所定温度、例えば、60℃を超えている間、暖房要求があることを条件に貯湯タンク34の温水32の熱を用いた加熱によって暖房端末への温水供給を行う。
【0054】
次に、図16は、暖房凍結予防動作制御を示している。
【0055】
この暖房凍結予防動作は、メインルーチンに対して割込み制御によって実行され、この制御がスタートすると、ステップS21では温度センサ127が凍結が予想される所定温度以下であるか否か、例えば、6℃以下であるか否かを判定し、所定温度以下でない場合にはステップS22に移行し、正常動作を続行し、所定温度以下である場合には、ステップS23に移行する。ステップS23では、暖房用の循環ポンプ108を運転するとともに、暖房用循環路100の熱動弁113、115を開とした後、ステップS24に移行する。
【0056】
ステップS24では排熱回収運転中であるか否かが判定され、運転中である場合にはステップS25に移行し、凍結予防用の温度センサ127の検出温度が所定温度以上であるか否か、例えば、10℃以上であるか否かを判定し、所定温度以上でない場合にはステップS24に戻り、所定温度以上である場合にはステップS26に移行し、所定時間として例えば、16分だけ待機する。即ち、所定時間後、ステップS27に移行し、循環ポンプ108を停止させ、熱動弁113、115を閉止し、凍結予防動作を終了する。即ち、排熱回収運転中は、排熱回収によって得られる熱量を凍結予防に利用する。
【0057】
また、ステップS24で排熱回収運転中でない場合にはステップS28に移行し、貯湯タンク34に凍結予防に必要な蓄熱量があるか否かが判定され、必要な蓄熱量がある場合には、ステップS29に移行し、貯湯タンク34内の温水32を利用するための制御として、三方弁14、42、44を切り換え、循環ポンプ16及び循環ポンプ45を運転状態に切り換え、ステップS30に移行する。
【0058】
ステップS30では、温度センサ127の検出温度が所定温度以上か否か、例えば、15℃以上か否かを判定し、所定温度以上である場合にはステップS31に移行し、所定時間として例えば、16分だけ待機する。即ち、所定時間後、ステップS32に移行し、暖房用の循環ポンプ108、循環ポンプ16、45を停止するとともに、熱動弁113、115を閉止し、凍結予防動作を終了する。即ち、排熱回収運転中でない場合には、貯湯タンク34に凍結防止に必要な蓄熱量が存在しているとき、その熱量を凍結予防に利用する。
【0059】
しかし、ステップS28で貯湯タンク34に必要な蓄熱量が存在していない場合には、凍結防止のために必要な熱量を確保する必要がある。そこで、ステップS33では、バックアップ燃焼としてバーナ120を燃焼させ、ステップS34に移行し、温度センサ127の検出温度が所定温度以上か否か、例えば、20℃以上か否かを判定する。所定温度以上でない場合には、ステップS28に戻り、所定温度以上である場合にはステップS35に移行し、バックアップ燃焼としてのバーナ120の燃焼を停止し、ステップS36に移行して所定時間として例えば、16分だけ待機する。即ち、所定時間後、ステップS37に移行し、暖房用の循環ポンプ108を停止するとともに、熱動弁113、115を閉止し、凍結予防動作を終了する。即ち、排熱回収運転中でない場合であって、貯湯タンク34に凍結防止に必要な蓄熱量が存在していないときには、バーナ120を燃焼させてその熱量を凍結予防に利用するものである。
【0060】
このように、暖房要求があった場合には、エンジン2を運転して暖房を行うが、貯湯タンク34内に必要な蓄熱量がある場合は、エンジン2を運転することなく、即ち、エンジン2を停止状態に維持し、貯湯タンク34内の蓄熱を第2の熱媒である温水32の熱を加熱源として、熱交換器24を通して熱媒4を加熱する。この熱媒4をエンジン冷却回路である排熱回収路6を通じて熱交換器26に循環させ、第3の熱媒である温水98を加熱することにより暖房運転を行う。即ち、貯湯タンク34の蓄熱を暖房に利用する。同様に、暖房用循環路100及び暖房用温水器129の凍結防止の熱源に利用することができる。
【0061】
このような処理を具体的に説明すると、室内放熱器102又は浴室暖房乾燥機104等の暖房端末側より暖房要求があると、熱交換器24の入出側の三方弁42、44の方向を変え、循環ポンプ45を動作させ、貯湯タンク34の上部側から高温の温水32を取り出し、熱交換器24を通して貯湯タンク34の下部側に流す。
【0062】
同時に、三方弁14の方向を変え、循環ポンプ16を運転し、エンジン2側に熱媒4が循環しないように、エンジン2側の排熱回収路6をバイパス路12で短絡状態にして、熱媒4を熱交換器26側に循環させる。この結果、熱媒4は、貯湯タンク34から流出した第2の熱媒である温水32の熱を熱交換器24を通して吸収する。
【0063】
そして、温水32から熱を吸収した熱媒4が熱交換器26に循環し、温水98が熱媒4から熱を吸収する。この温水98が各暖房端末に循環し、暖房が行われる。この場合、貯湯タンク34側の蓄熱量が低下し、暖房負荷が大きくなると、熱量が不足するので、暖房バックアップのため、バーナ120の燃焼を行うバックアップ制御を行う。
【0064】
また、暖房回路の凍結防止として、貯湯タンク34に蓄熱がある場合には、暖房バックアップを燃焼させることなく、貯湯タンク34の温水32→熱媒4→温水98への熱伝達により、貯湯タンク34の蓄熱を無駄なく消費して暖房回路及び暖房用温水器129の凍結防止を図ることができる。この場合も、貯湯タンク34の蓄熱量が低下したときには、暖房バックアップの燃焼に切り換える。
【0065】
このような貯湯タンク34の蓄熱量を効率よく利用することで、エンジン2の運転による排熱の有効利用を図ることができる。
【0066】
【発明の効果】
以上説明したように、本発明によれば、次の効果が得られる。
a 熱源の排熱を吸収させた第1の熱媒から第2の熱媒に熱伝達を行い、蓄熱手段に第2の熱媒を以て蓄熱を行い、熱源の停止時、蓄熱手段の蓄熱を第1の熱媒を通じて第3の熱媒を加熱し、暖房に利用するので、適当な蓄熱量がある場合に暖房や凍結防止のために過剰な熱源の運転を回避でき、エンジン等の熱源の耐久性を高め、ランニングコストの低減とともに、蓄熱の有効利用を図ることができる。
b 積層沸き上げを行う蓄熱手段を用いたので、蓄熱の有効利用を図ることができる。
c 蓄熱手段の蓄熱を暖房回路の凍結防止に利用でき、エンジン等の熱源の耐久性を高め、ランニングコストの低減とともに、蓄熱の有効利用を図ることができる。
d 直流ポンプを用いることで、低消費電力で幅の広い流量制御を実現することができる。
e 熱源に跨がるバイパス路を第1の熱媒循環手段に形成し、第2の熱媒の熱を暖房に使用するとき、バイパス路を通して第1の熱媒を循環させるので、熱源の放熱損失を抑制でき、暖房時の蓄熱の利用効率を高めることができる。
【図面の簡単な説明】
【図1】本発明の排熱回収制御装置の実施例を示す図である。
【図2】本発明の排熱回収制御装置の実施例を示す図である。
【図3】図1の排熱回収制御装置の一部を拡大して示した図である。
【図4】本発明の排熱回収制御のメインルーチンを示すフローチャートである。
【図5】貯湯タンクの蓄熱形態を示す図である。
【図6】メインルーチンにおける弁初期位置の設定処理に関するサブルーチンを示すフローチャートである。
【図7】メインルーチンにおけるエンジン異常停止処理に関するサブルーチンを示すフローチャートである。
【図8】メインルーチンにおけるエンジン運転許可処理に関するサブルーチンを示すフローチャートである。
【図9】メインルーチンにおけるエンジン停止処理に関するサブルーチンを示すフローチャートである。
【図10】メインルーチンにおけるエンジン強制停止処理に関するサブルーチンを示すフローチャートである。
【図11】メインルーチンにおける暖房命令処理に関するサブルーチンを示すフローチャートである。
【図12】メインルーチンにおける給湯積算出力カウンタ処理に関するサブルーチンを示すフローチャートである。
【図13】メインルーチンにおける弁異常チェック処理に関するサブルーチンを示すフローチャートである。
【図14】メインルーチンにおける温度センサ異常チェック処理に関するサブルーチンを示すフローチャートである。
【図15】貯湯タンク残熱を利用した暖房制御を示すフローチャートである。
【図16】暖房凍結予防動作制御を示すフローチャートである。
【符号の説明】
2 エンジン(熱源)
4 第1の熱媒
6 排熱回収路(第1の熱媒循環手段)
12 バイパス路
16 循環ポンプ(第1の熱媒循環手段)
24 第1の熱交換器
26 第2の熱交換器
32 温水(第2の熱媒)
34 貯湯タンク(蓄熱手段)
36 循環路(第2の熱媒循環手段)
98 温水(第3の熱媒)
100 暖房用循環路(暖房回路)
102 室内放熱器(暖房端末)
104 浴室暖房乾燥機(暖房端末)
108 循環ポンプ
124 制御部(制御手段)[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an exhaust heat recovery control device that uses a drive source such as an engine driving a generator as a heat source and recovers and uses the exhaust heat.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, there is known an exhaust heat recovery control device that generates electric power by driving a generator with an engine and recovers and uses exhaust heat of an engine that is a driving source. The exhaust heat is recovered through a cooling medium and a heat medium as exhaust heat recovery water flowing through the water jacket portion of the engine and through the heat medium. Then, the heat absorption of the heat medium is accumulated, or the heat is used for hot water supply or the like.
[0003]
[Problems to be solved by the invention]
By the way, in the conventional exhaust heat utilization system, the operation control of the engine which is a drive source is performed based on the temperature detection of the hot water stored in the hot water storage tank, but a simple control for setting the heat storage amount or the operation time in advance is used. However, depending on the driving mode, there is a drawback that the running cost becomes high, such as decreasing the durability of the engine and increasing the heat dissipation loss.
[0004]
Then, this invention makes it a subject to provide the exhaust-heat-recovery control apparatus which aimed at the effective use of heat storage and reduced the running cost while improving the durability of a heat source.
[0005]
[Means for Solving the Problems]
The exhaust heat recovery control device of the present invention includes a heat source (engine 2) that releases heat, and first heat medium circulation means (exhaust
[0006]
That is, the first heat medium is a cooling medium for cooling a heat source such as an engine, and hot water, antifreeze liquid, or the like can be used, and is circulated to the heat source through the first heat medium circulation means. The second heat medium is a medium that absorbs the heat of the first heat medium, and warm water or the like is used and is circulated to the second heat medium circulation means. Moreover, the 3rd heat medium uses the warm water etc. which are circulated to a heating terminal. During start-up operation or warm-up operation of the heat source, the first heat medium is circulated to the heat source through the shortened circulation path of the first heat medium circulation means.
[0007]
Usually, the second heat medium is heated through the first heat exchanger by the first heat medium that has absorbed the exhaust heat of the heat source, and heat is stored in the heat storage means, and the third heat medium is passed through the second heat exchanger. The heating medium is heated, and heating is performed by circulating the third heating medium to the heating terminal.
[0008]
Therefore, when the operation of the heat source is stopped, the second heat medium is caused to flow from the heat storage means to the first heat exchanger so that the heat of the second heat medium is absorbed by the first heat medium, and the first heat medium. The amount of heat of the heat is absorbed by the third heat medium through the second heat exchanger, and the third heat medium is circulated to the heating terminal, whereby the heat stored in the heat storage means is used for heating. In this case, the first heat medium is a bearer of heat transfer between the second heat medium and the third heat medium.
[0009]
In the exhaust heat recovery control device of the present invention, the heat storage means is a hot water storage tank that stores the second heat medium before heating on the lower layer side and the second heat medium heated on the upper layer side. And In other words, stacked boiling of warm water is performed.
[0010]
In the exhaust heat recovery control apparatus of the present invention, a heating circuit (heating circulation path 100) that circulates the third heat medium in the heating terminal, and a pump that is provided in the heating circuit and circulates the third heat medium. (Circulation pump 108) and when the operation of the heat source is stopped, the heat of the second heat medium of the heat storage means is absorbed by the first heat medium through the first heat exchanger. Control means for circulating the third heat medium that has absorbed the heat quantity of the heat medium through the second heat exchanger to the heating circuit by the pump. That is, since the heat storage of the heat storage means is used to heat the third heat medium that circulates to the heating circuit side through the first heat medium, the heating circuit can be prevented from freezing.
[0011]
In the exhaust heat recovery control apparatus of the present invention, the pump is driven by a DC motor. That is, a pump driven by a direct current motor has low power consumption and can control a wide flow rate from a small flow rate to a large flow rate.
[0012]
In the exhaust heat recovery control apparatus of the present invention, the first bypass passage is connected to the first heat medium circulating means via a valve (three-way valve 14) controlled by the control means. And That is, since the first heat medium is circulated through the bypass path formed across the heat source, heat dissipation loss on the heat source side can be prevented.
[0013]
In the exhaust heat recovery control apparatus of the present invention, a drive source that rotates a generator is used as the heat source. That is, the drive source for driving the generator is composed of, for example, an engine, has a considerable amount of exhaust heat, and becomes an effective heat source.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to examples shown in the drawings.
[0015]
1 and 2 show an embodiment of the exhaust heat recovery control device of the present invention, FIG. 1 shows an exhaust heat recovery system such as an engine and a hot water storage tank of the exhaust heat recovery control device, and FIG. 2 shows an exhaust heat recovery control device. FIG. 3 shows an enlarged portion of the exhaust heat recovery control device of FIG. 1, such as a heat storage utilization system such as a heating terminal.
[0016]
In this exhaust heat recovery control device, an
[0017]
The
[0018]
A
[0019]
Further, a hot
[0020]
Moreover, the hot water HW discharged from the hot
[0021]
The
[0022]
In this exhaust heat recovery control device, the switching direction A, B, C or D of the three-
[0023]
A
[0024]
Next, the exhaust heat recovery control will be described with reference to the main routine shown in FIG.
[0025]
When the power is turned on, in step S1, various positions such as the three-
[0026]
When engine operation is permitted in step S4, the process proceeds to step S5, and it is determined whether the required heat storage amount is equal to or greater than a predetermined heat storage amount. That is, in step S5, for example,
[0027]
(Hot-water supply load × 1.2−integrated output−tank heat storage amount)> 1000 kcal (1)
If the value obtained by subtracting the heat storage amount of the hot
[0028]
Here, the “hot water supply load” used for the calculation in step S5 is to determine the expected hot water supply load for each season in advance.
[0029]
[Table 1]
[0030]
That is, the “hot water supply load” is an estimated amount of hot water supply in the next season and time, so for example, when starting CGS operation at 18:00 on July X, the hot water supply load is calculated at 6000 kcal, In addition, when the CGS operation is started at 5:00 on February Y, the hot water supply load is calculated at 2000 kcal.
[0031]
The “integrated output” is the total of the outputs used for hot water supply and pouring obtained using the hot water supply
[0032]
Moreover, the calculation of the tank heat storage amount of the hot
[0033]
Q = 28.6 × {(upper detection temperature + lower detection temperature) / 2−water temperature} (2)
Thus, the tank heat storage amount Qm is the sum of all
[0034]
Q 1 = 28.6 × {(75 + 70) / 2−5} = 1930.5 (kcal) (3)
It becomes. Of the
[0035]
And when it determines with the said required heat storage amount being 1000 kcal or more by step S5, or when the heating command is issued by step S3, it transfers to step S6 and the
[0036]
Then, after this warm-up operation, the process proceeds to step S9, and the temperature of the
[0037]
Next, FIG. 6 shows a subroutine for setting initial valve positions of the three-
[0038]
Next, FIG. 7 shows engine abnormal stop control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, in step S201, it is determined whether or not the operating state of the
[0039]
If it is determined in step S201 that the
[0040]
Next, FIG. 8 shows engine operation permission control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, it is determined in step S211 whether or not the engine operation is permitted time. If it is in the operation permitted time, the process proceeds to step S212 and "permitted" is output as an engine operation permission instruction. On the other hand, if it is not the engine operation permission time, the process proceeds to step S213, and “prohibited” is output as an instruction to prohibit engine operation permission.
[0041]
Next, FIG. 9 shows engine stop control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine starts, in step S215, the power of the
[0042]
Next, FIG. 10 shows engine forced stop control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, in step S221, for example, it is determined whether or not the Esc key is pressed as the forced stop input means. When this Esc key is pressed, the process proceeds to step S222, and engine stop control ( 9) is executed, and the control is terminated.
[0043]
Next, FIG. 11 shows heating operation command control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, in step S225, it is determined whether or not the terminal switch is turned on as a heating command means on the heating device side or a heating command for two-way communication is turned on. The process proceeds to S226, where the heating command is set to “ON”, and the E-con terminal of the backup intelligent board that is the control means is set to “ON”. Further, in step S227, it is determined whether or not the terminal switch OFF and the two-way communication heating command OFF are established as the heating command means on the heating device side. When the heating stop command is instructed, The process proceeds to S228, where the heating command is set to “OFF”, and the E-con terminal of the backup intelligent board as the control means is set to “OFF”.
[0044]
Next, FIG. 12 shows control of the hot water supply
[0045]
In step S235, the flow rate sensor 78 that detects the amount of hot water supply determines whether, for example, 1 liter is counted as a predetermined flow rate. If 1 liter is counted, the process proceeds to step S236. In step S236, the hot water supply integrated output heat quantity Qc is calculated as the heat quantity calculation per liter. That is, this hot water supply integrated output heat quantity Qc (kcal) is
[0046]
Qc = (hot water temperature-water temperature) × 1 (kcal) (4)
Is calculated by
[0047]
Then, the process proceeds to step S237, where it is determined whether or not the engine operation permission is “prohibited”. When the engine operation is prohibited, the process returns to step S231, and when the engine operation is not prohibited. The process proceeds to step S234, and the processes of step S234 to step S236 are executed.
[0048]
Next, FIG. 13 shows valve abnormality check control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, in step S241, it is determined whether or not the valve output and the limit indicating the switching state coincide with each other. If they do not coincide, for example, 30 seconds have passed as a predetermined time in step S242. Thereafter, the process proceeds to step S243, and the
[0049]
Next, FIG. 14 shows temperature sensor abnormality check control which is a subroutine of step S2 of the main routine of FIG. That is, when this subroutine is started, in step S251, it is determined whether a disconnection or short circuit abnormality has occurred in the connection line or the like. If an abnormality has occurred, the process proceeds to step S252, and the
[0050]
Next, FIG. 15 shows the heating control using the residual heat of the hot
[0051]
This heating control is executed by interrupt control for the main routine. When this control is started, it is determined in step S11 whether or not there is a heating request. If there is no heating request, the main routine shown in FIG. If there is a heating request, the process proceeds to step S12. In step S12, it is determined whether or not the
[0052]
In step S15, switching of the three-
[0053]
In step S17, it is determined whether or not there is a heating request. If there is no heating request, the process returns to the main routine of FIG. 4, and if there is a heating request, the process returns to step S16 to perform the process of step S16. . That is, when the residual heat amount of the hot
[0054]
Next, FIG. 16 shows the heating freeze prevention operation control.
[0055]
This heating / freezing prevention operation is executed by interrupt control for the main routine, and when this control is started, in step S21, whether or not the
[0056]
In step S24, it is determined whether or not the exhaust heat recovery operation is being performed. If the operation is being performed, the process proceeds to step S25, whether or not the temperature detected by the
[0057]
If the exhaust heat recovery operation is not being performed in step S24, the process proceeds to step S28, where it is determined whether or not the hot
[0058]
In step S30, it is determined whether or not the temperature detected by the
[0059]
However, if the heat storage amount necessary for the hot
[0060]
As described above, when there is a heating request, the
[0061]
Specifically, when such a process is requested from the heating terminal side such as the
[0062]
At the same time, the direction of the three-
[0063]
Then, the
[0064]
Further, in order to prevent freezing of the heating circuit, when there is heat storage in the hot
[0065]
By efficiently using the amount of heat stored in the hot
[0066]
【The invention's effect】
As described above, according to the present invention, the following effects can be obtained.
a Heat transfer from the first heat medium that has absorbed the exhaust heat of the heat source to the second heat medium, heat storage using the second heat medium to the heat storage means, and when the heat source is stopped, Since the third heat medium is heated through the heat medium of 1 and used for heating, operation of an excessive heat source can be avoided to prevent heating and freezing when there is an appropriate amount of heat storage, and durability of the heat source such as the engine The efficiency can be improved, the running cost can be reduced, and the effective use of heat storage can be achieved.
b Since the heat storage means for carrying out stacking and boiling is used, effective use of the heat storage can be achieved.
c The heat storage of the heat storage means can be used to prevent the freezing of the heating circuit, the durability of the heat source such as the engine can be improved, the running cost can be reduced, and the heat storage can be used effectively.
d By using the direct current pump, wide flow control with low power consumption can be realized.
e When a bypass path over the heat source is formed in the first heat medium circulation means and the heat of the second heat medium is used for heating, the first heat medium is circulated through the bypass path. Loss can be suppressed and the utilization efficiency of the heat storage at the time of heating can be improved.
[Brief description of the drawings]
FIG. 1 is a diagram showing an embodiment of an exhaust heat recovery control apparatus of the present invention.
FIG. 2 is a diagram showing an embodiment of the exhaust heat recovery control apparatus of the present invention.
FIG. 3 is an enlarged view of a part of the exhaust heat recovery control device of FIG. 1;
FIG. 4 is a flowchart showing a main routine of exhaust heat recovery control of the present invention.
FIG. 5 is a diagram showing a heat storage form of a hot water storage tank.
FIG. 6 is a flowchart showing a subroutine related to a valve initial position setting process in the main routine.
FIG. 7 is a flowchart showing a subroutine related to engine abnormal stop processing in the main routine.
FIG. 8 is a flowchart showing a subroutine related to engine operation permission processing in the main routine.
FIG. 9 is a flowchart showing a subroutine related to engine stop processing in the main routine.
FIG. 10 is a flowchart showing a subroutine related to engine forced stop processing in the main routine.
FIG. 11 is a flowchart showing a subroutine related to a heating command process in the main routine.
FIG. 12 is a flowchart showing a subroutine related to hot water supply integrated output counter processing in the main routine.
FIG. 13 is a flowchart showing a subroutine related to valve abnormality check processing in the main routine.
FIG. 14 is a flowchart showing a subroutine related to temperature sensor abnormality check processing in the main routine.
FIG. 15 is a flowchart showing heating control using hot water storage tank residual heat.
FIG. 16 is a flowchart showing heating freeze prevention operation control.
[Explanation of symbols]
2 Engine (heat source)
4
12
24
34 Hot water storage tank (heat storage means)
36 Circulation path (second heat medium circulation means)
98 Hot water (third heat medium)
100 Heating circuit (heating circuit)
102 Indoor radiator (heating terminal)
104 Bathroom heating dryer (heating terminal)
108 Circulating
Claims (6)
この熱源に第1の熱媒を循環させる第1の熱媒循環手段と、
この第1の熱媒循環手段によって前記熱源に循環させ、前記熱源からの排熱を吸収させた前記第1の熱媒が持つ熱を第2の熱媒に吸収させる第1の熱交換器と、
この第1の熱交換器で得た前記第2の熱媒を溜める蓄熱手段と、
この蓄熱手段に溜められている前記第2の熱媒を前記第1の熱交換器に循環させる第2の熱媒循環手段と、
暖房端末に循環させる第3の熱媒を前記第1の熱媒で加熱する第2の熱交換器と、
前記第1の熱媒循環手段に形成され、前記熱源を跨がって前記第1の熱媒を循環させる第1のバイパス路と、
この第1のバイパス路とは別に前記第1の熱媒循環手段に形成され、前記熱源に循環させる前記第1の熱媒の循環路を短縮する第2のバイパス路と、
前記熱源の起動運転又は暖機運転時には、前記第2のバイパス路を通して前記第1の熱媒を前記第1の熱媒循環手段に循環させ、前記熱源の運転を停止している場合の前記暖房端末側の暖房要求時には、前記蓄熱手段の前記第2の熱媒が持つ熱を前記第1の熱交換器を通して吸収させた第1の熱媒を前記第1のバイパス路を通して前記第1の熱媒循環手段に循環させ、第1の熱媒の熱量を前記第2の熱交換器を通して吸収させた前記第3の熱媒を前記暖房端末に循環させる制御手段と、
を備えることを特徴とする排熱回収制御装置。A heat source that releases heat,
A first heat medium circulating means for circulating the first heat medium to the heat source;
A first heat exchanger that circulates to the heat source by the first heat medium circulating means and absorbs the heat of the first heat medium that has absorbed exhaust heat from the heat source to the second heat medium; ,
Heat storage means for storing the second heat medium obtained by the first heat exchanger;
Second heat medium circulating means for circulating the second heat medium stored in the heat storage means to the first heat exchanger;
A second heat exchanger for heating a third heat medium to be circulated to the heating terminal with the first heat medium;
A first bypass path formed in the first heat medium circulating means and circulating the first heat medium across the heat source;
A second bypass path that is formed in the first heat medium circulation means separately from the first bypass path and shortens the circulation path of the first heat medium to be circulated to the heat source,
During the start-up operation or warm-up operation of the heat source, the heating in the case where the first heat medium is circulated to the first heat medium circulation means through the second bypass path and the operation of the heat source is stopped. At the time of the heating request on the terminal side, the first heat medium in which the heat of the second heat medium of the heat storage means is absorbed through the first heat exchanger passes through the first bypass path and the first heat medium. Control means for circulating to the heating terminal the third heat medium which is circulated through the medium circulation means and has absorbed the amount of heat of the first heat medium through the second heat exchanger;
An exhaust heat recovery control device comprising:
この暖房回路に設けられて前記第3の熱媒を循環させるポンプと、
前記熱源の運転停止時、前記蓄熱手段の前記第2の熱媒が持つ熱を前記第1の熱交換器を通して前記第1の熱媒に吸収させ、この第1の熱媒の熱量を前記第2の熱交換器を通して吸収させた前記第3の熱媒を前記ポンプにより前記暖房回路に循環させる制御手段と、
を備えたことを特徴とする請求項1記載の排熱回収制御装置。A heating circuit for circulating the heating medium of 3 in the heating terminal;
A pump provided in the heating circuit for circulating the third heat medium;
When the operation of the heat source is stopped, the heat of the second heat medium of the heat storage means is absorbed by the first heat medium through the first heat exchanger, and the amount of heat of the first heat medium is Control means for circulating the third heat medium absorbed through the heat exchanger of 2 to the heating circuit by the pump;
The exhaust heat recovery control device according to claim 1, comprising:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001118206A JP3977608B2 (en) | 2001-04-17 | 2001-04-17 | Waste heat recovery control device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001118206A JP3977608B2 (en) | 2001-04-17 | 2001-04-17 | Waste heat recovery control device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002318008A JP2002318008A (en) | 2002-10-31 |
| JP3977608B2 true JP3977608B2 (en) | 2007-09-19 |
Family
ID=18968634
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001118206A Expired - Lifetime JP3977608B2 (en) | 2001-04-17 | 2001-04-17 | Waste heat recovery control device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3977608B2 (en) |
-
2001
- 2001-04-17 JP JP2001118206A patent/JP3977608B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002318008A (en) | 2002-10-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3977606B2 (en) | Waste heat recovery control method and apparatus | |
| JP2003222396A (en) | Heat pump water heater | |
| JP3848142B2 (en) | Heat exchange heat storage control method and heat exchange heat storage device | |
| JP3977608B2 (en) | Waste heat recovery control device | |
| JP3977605B2 (en) | Waste heat recovery system | |
| JP7599822B2 (en) | Fuel Cell Device | |
| JP3977607B2 (en) | Waste heat recovery control device | |
| JP4327170B2 (en) | Hot water storage hot water supply system | |
| JP4363612B2 (en) | Path temperature measuring method and exhaust heat recovery device | |
| JP3848129B2 (en) | Heat exchange device and heat exchange treatment method | |
| JP4077419B2 (en) | Cogeneration system | |
| JP4833707B2 (en) | Waste heat recovery device | |
| JPH06100366B2 (en) | Freezing prevention device in hot water supply equipment | |
| JP3961144B2 (en) | Water heater with other functions | |
| JP3034423B2 (en) | Electric water heater | |
| JP3898407B2 (en) | Condensation prevention control device for hot water circulating boiler | |
| JP2004170025A (en) | Electric water heater | |
| JP2004340399A (en) | Snow melting and heating system using hot-water storage type water heater as heat source | |
| JP6920839B2 (en) | Hot water supply system | |
| JP4423440B2 (en) | Heat recovery system | |
| JP3908609B2 (en) | Hot water storage hot water heater | |
| JP2002181385A (en) | Hot-water supplier | |
| JP2004263910A (en) | Hot water storage device and its heating operation control method | |
| JP2002295848A (en) | Anti-freezing device for heating system | |
| JP3920161B2 (en) | Hot water storage hot water heater |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060117 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070208 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070220 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070423 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20070612 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20070621 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100629 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 3977608 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110629 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120629 Year of fee payment: 5 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120629 Year of fee payment: 5 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130629 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140629 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |