JP3999908B2 - Nuclear power plant pumping equipment - Google Patents
[go: Go Back, main page]

JP3999908B2 - Nuclear power plant pumping equipment - Google Patents

Nuclear power plant pumping equipment Download PDF

Info

Publication number
JP3999908B2
JP3999908B2 JP08277199A JP8277199A JP3999908B2 JP 3999908 B2 JP3999908 B2 JP 3999908B2 JP 08277199 A JP08277199 A JP 08277199A JP 8277199 A JP8277199 A JP 8277199A JP 3999908 B2 JP3999908 B2 JP 3999908B2
Authority
JP
Japan
Prior art keywords
pump
floor
maintenance
equipment
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08277199A
Other languages
Japanese (ja)
Other versions
JP2000275388A (en
Inventor
秀男 平井
茂樹 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP08277199A priority Critical patent/JP3999908B2/en
Priority to CNB031584799A priority patent/CN1232989C/en
Priority to CNB2005100726230A priority patent/CN1293572C/en
Priority to CNB00105404XA priority patent/CN1147874C/en
Priority to CNA2006100958707A priority patent/CN1901098A/en
Publication of JP2000275388A publication Critical patent/JP2000275388A/en
Application granted granted Critical
Publication of JP3999908B2 publication Critical patent/JP3999908B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は原子力発電所のポンプ設備およびそのメンテナンス設備に関する。
【0002】
【従来の技術】
図16に基いて従来の原子力発電所におけるポンプ設備について説明する。図16中、符号1は、例えば原子力発電所の建屋躯体、2は機器室、3は縦軸ポンプである。縦軸ポンプ3は、主としてポンプ本体4とポンプケーシング5とからなっており、ポンプサポート6を介して機器室2の天井から吊下げられて設置している。
【0003】
原子力発電所において、建屋躯体1等から吊下げて設置される縦軸ポンプ3は、ポンプ本体4のメンテナンス性と縦軸ポンプ3の配管7に付随する吸込弁および吐出弁8のメンテナンス性を特別な配管ルートを伴わずに確保するために階高が高い機器室2に設置されることになる。
【0004】
また、縦軸ポンプ3のメンテナンスを行う場合、ポンプ本体4を鉛直下向きにしてポンプ本体4内に組込まれているモータ、ロータ、インペラ等を引抜くことで行う。吸込口および吐出口はポンプ上部に設けられていることから、特別な要求がない限り吸込,吐出の配管7,吸込弁および吐出弁8は縦軸ポンプ3の上方つまり、縦軸ポンプ3が設置される機器室2の上方に設置される。
【0005】
この場合、ポンプ本体4と吸込弁および吐出弁8双方のメンテナンス性を確保するためには機器室2の上方に作業員10が前記各々の弁8にアクセス可能な高さLが必要であり、また同時に縦軸ポンプ3をメンテナンスする際の作業員10がメンテナンスエリアとして使用可能なスペースおよび高さLが必要である。
【0006】
従って、機器室2内の階高としては作業員10のアクセス高さL(通常1.8 m程度以上必要)の2倍と架台9の厚さが最低限必要となり、機器室2の高さの低減を阻害していた。また、縦軸ポンプ3の設置作業においても縦軸ポンプ3を縦方向に吊上げ、据付ける作業となっている。
【0007】
さらに、縦軸ポンプ3が放射性流体を移送するものであれば、それらのメンテナンス作業時においては作業員が放射線被ばくすることになるが、作業員10のアクセス高さLを低減することは作業性の悪化および作業の遅延を伴い、さらに被ばくの増加につながることになる。
【0008】
ここで、図17の手順aからhに基づき、従来の吊下げ式縦軸ポンプ3のメンテナンス方法を説明する。
a.ポンプケーシング5内およびモータ内の流体を抜き、洗浄後、モータ冷却用の配管等の分解に支障のある付帯設備12等を取外す。b.インペラ13,ロータ14を含んだモータユニット15を鉛直下方に引抜くため、ポンプケーシング5に付随する吊フックを介してチェンブロック等の揚重機16によりモータユニット15を支持する。
【0009】
c.モータユニット15とポンプケーシング5を機械的に接合している部分を取外す(ナット17等)。d.縦軸ポンプ3の下方に用意した移動台車11にモータユニット15を揚重機16を使い、吊下ろす。e.モータユニット15から上方へインペラ13,ロータ14を引抜くため、縦軸ポンプ3の真下の位置からモノレール18,吊フック等の設置されている揚重機16の使用できる位置であるポンプメンテナンスエリアに台車11によりモータユニット15を移動する。
【0010】
f.モータユニット15の分解作業のため、モータユニット15を台車11からモータユニット支持架台19に移設する。g.人力あるいは揚重機16により、インペラ13をロータ14から鉛直上方に引抜く。h.次に、揚重機16によりモータケーシング20からロータ14を鉛直上方に引抜く。i.モータリアカバー21も取外す。j.分解した各種部品の点検・洗浄等の後、組立ては一連の作業の逆を行う。
【0011】
以上のように縦軸ポンプ3のメンテナンス作業を実施するが、モータユニット15の分解には、床からリアカバー21の取外し高さA、モータケーシング20の高さB、ロータ14の引抜き高さC、揚重機16の必要高さDが必要となる。
【0012】
【発明が解決しようとする課題】
縦軸ポンプ3を設置する場合、ポンプ本体4が鉛直方向に長いこと、縦軸ポンプ3のメンテナンスはポンプケーシング5からのモータ,インペラ等を含むモータユニット15を鉛直方向に引抜き分解するための高さを必要とすること、および縦軸ポンプ3とこのポンプ3に付随する弁8のメンテナンススペースのために高さ方向の寸法が必要であることにより、縦軸ポンプ3の配置は十分な有効階高がある部分に限定される。
【0013】
また、縦軸ポンプ3の設置に際しては高所作業ともなり、手間と時間を要するだけでなく、縦軸ポンプ3のモータ,インペラ等を分解する場合には、それらを含むモータユニット15を鉛直方向にポンプケーシング5から引抜いてからレイダウンエリアまで運搬し、この後揚重機16等を用いてインペラ13,ロータ14の引抜き分解を行う。したがって、作業に手間を要するとともに、特に放射性流体を移送するポンプであれば作業員の放射線被ばくが課題となる。
【0014】
原子力発電所のプラント設備のコスト削減には建屋寸法の縮小,建設合理化が望まれ、プラントの保守作業には作業員の作業効率化,放射線被ばく低減が望まれ、縦軸ポンプ3の設置および配管、弁類等の配置施工、ポンプメンテナンス時には作業量低減および被ばく量低減が望まれるところであり、これらの要望を満足させることが課題となっている。
【0015】
本発明は、上記課題を解決するためになされたもので、吊下げ支持式縦軸ポンプを設置する建屋の階高の低減、施工性の向上、ポンプメンテナンス時の作業の省力化および放射線被ばく低減、さらにはメンテナンス機器数を合理的に配置することを目的とした原子力発電所のポンプ設備およびそのメンテナンス設備を提供することにある。
【0016】
請求項1の発明は、縦軸ポンプを設置する機器室の下階にメンテナンス室を設け、前記縦軸ポンプを天井から吊下げ設置し、前記機器室内の前記縦軸ポンプの下方に位置する床にハッチを設けてなることを特徴とする。
【0017】
請求項2の発明は、前記天井は、前記縦軸ポンプのポンプ本体、ポンプに付随する機器類及びその他の機器類を予め打込型枠に取付けて一体構造物とし、この一体構造物を建設現場の所定位置に直接吊込んで前記機器室の天井とすることを特徴とする。
【0018】
請求項3の発明は、縦軸ポンプを設置する機器室の下階にメンテナンス室を設け、前記縦軸ポンプのポンプケーシング部分を前記機器室内の床に支持固定し、前記縦軸ポンプの配管側を前記機器室内に配置し、前記ポンプ本体側を前記メンテナンス室内に配置してなることを特徴とする。
【0019】
請求項4の発明は、前記床は、前記縦軸ポンプのポンプ本体、ポンプに付随する機器及びその他の機器類を予め打込型枠に取付けて床ブロック構造物とし、この床ブロック構造物を建設現場の所定位置に直接吊込んで前記機器室の床とすることを特徴とする。
【0028】
上記構成の本発明に係る縦軸ポンプ設備においては、縦軸ポンプを設置する機器室またはポンプ室内の寸法、容積を縮小することができる。また、放射性流体を移送する縦軸ポンプの場合にはメンテナンス作業時の放射線被ばく低減により作業安全性を確保できるとともに労務費を低減することができる。
【0029】
さらに、機器類の先行取付、大型モジュール工法を採用することによる工期短縮、被ばく低減装置の共用化することにより遮へい用ラビリンスの削除が可能となりコスト低減および平面寸法低減化を図ることができる。
【0030】
一方、ポンプメンテナンス設備においては、縦軸ポンプに付随するモータおよびインペラ等を引抜き、これを移動するための台車に架構回転機構、台車固定機構、遠隔操作機能などを付設することでポンプメンテナンス作業時の安全性を確保でき、台車の位置決めが簡素化し、ポンプメンテナンスの作業量の低減およびこれによる作業員の放射線被ばく低減を図ることができる。
【0031】
【発明の実施の形態】
図1により本発明に係る縦軸ポンプ設備の第1の実施の形態を説明する。
なお、図1中、図16と同一部分には同一符号を付して重複する部分の説明は省略する。本実施の形態は建屋躯体23に従来例より階高が低い機器室24を設け、この機器室24内に縦軸ポンプ3を天井から吊下げて設置し、前記機器室24に隣接して設けた隣接室25内に配管7と吸込弁および吐出弁(以下、弁と記す)8を配置したことにある。
【0032】
すなわち、図1において縦軸ポンプ3が設置される機器室24に隣接する隣接室25に縦軸ポンプ3に付随する配管7と弁8を配置し、縦軸ポンプ3と弁8を並列に配置する。これによりポンプ側エリアでは機器室24内上方の弁のメンテナンスは弁がないことより必要がなく、ポンプメンテナンス用の必要高さのみで機器室24内の階高を決定することができる。
【0033】
弁エリアについては弁メンテナンス用架台9のレベルをポンプメンテナンス必要高さと関係なく弁8の位置のみを考慮することにより設定可能となり、鉛直方向の配置自由度が向上し機器室24の階高を低減することを可能とする。
【0034】
また、階高が低減し、吊下げ式支持型縦軸ポンプ3の支持構造物(以下、ポンプサポート6という)の長さが短くなることによりポンプサポート6にかかるモーメントも低減し耐震性の向上を図ることができる。
【0035】
壁によって縦軸ポンプ3と弁8が区分されるとき、経済性の観点から、ポンプエリア側に配置される配管7は最短となるように設定されるが、これはすなわち機器室24内の配管長は弁を同一室内に配置とした場合よりも短くなり縦軸ポンプ3が放射性流体を移送する場合において、機器室24内の放射線線源が少なくなることを意味する。従って、ポンプメンテナンス時の作業員の放射線被ばく低減が可能となる。
【0036】
次に図2により発明の第2の実施の形態を説明する。本実施の形態は図2に示したように階高が低い機器室24内に縦軸ポンプ3を天井から吊下げ設置し、機器室24の上階に設けた階上室26に縦軸ポンプ3に付随する配管7と弁8を配置したことにある。
【0037】
本発明によれば、縦軸ポンプ3が設置されている機器室24の上階の部屋に縦軸ポンプ3に付随する弁8を配置し、縦軸ポンプ3と弁8を上下に区分する。これにより前記実施の形態と同様にポンプメンテナンス用の必要高さのみで機器室24内の階高を決定することができる。
【0038】
また、弁エリアについては弁8を床レベル付近に配置可能となり、弁8のメンテナンスには作業員10のアクセス高さ程度あれば十分であり、弁設置の階上室26の高さ設定の自由度が向上し機器室24の階高の低減を可能とする。さらに、前記と同様に耐震性の向上、および放射性流体を扱う場合にはポンプメンテナンス時の作業員の被ばく低減が可能となる。
【0039】
次に図3により発明の第3の実施の形態を説明する。本実施の形態は階高が高い機器室2内に縦軸ポンプ3を天井から吊下げ設置し、機器室2内の縦軸ポンプ3の下方に位置する床にハッチ28を設け、縦軸ポンプ3が設置されている機器室2の下階の部屋にメンテナンス室29を設けたことにある。
【0040】
ここで図17の従来のメンテナンス手順d,eにおいてはポンプケーシング5からモータユニット15を引抜くためにはモータユニット15をポンプケーシングボルト22から下方に吊下ろす必要があり、これによりポンプ据付け位置から床までの最小高さが決められていた。
【0041】
しかしながら、本実施の形態によればポンプ3の下の床27にハッチ28を設けることにより、ポンプ下部にハッチ28を取扱えるハッチ28の厚さの高さが有れば、ポンプ設置エリアの階高によらず下階のメンテナンス室29へモータユニット15を引抜き,移送可能とすることが可能となりポンプ設置エリアの階高低減が図れる。また、メンテナンスは下階の放射性流体を含む配管のないエリアで行うことが可能となり、メンテナンス時の被ばく低減が可能となる。
【0042】
次に図4により発明の第4の実施の形態を説明する。本実施の形態は縦軸ポンプ3の下階にメンテナンス室29を設け、縦軸ポンプ3のポンプケーシング5の部分を床27の躯体から鋼材の支持部材30を介して直接支持固定したことにある。
【0043】
本実施の形態によれば、縦軸ポンプ3を重心位置付近で支持することが可能となり、図16に見られるようにポンプケーシング5の上方にポンプサポート6を設置するよりもモーメントの低減を図ることができるので、耐震性の向上に寄与するものとなる。
【0044】
また、縦軸ポンプ3が放射性流体を扱う場合、その放射性流体はポンプケーシング5から下方すなわち、床27のスラブ下端レベルから下方を通流しない。これはポンプケーシング5から下方はモータ部となっていることによる。
【0045】
したがって、通常のポンプ運転時においても縦軸ポンプ3のメンテナンス時においてもモータ側エリアは放射線線源がポンプケーシング5部分に限定されるため、このエリア内での作業員の被ばく低減が可能となる。
【0046】
次に図5により発明の第5の実施の形態を説明する。本実施の形態は図5に示したように建屋躯体31内に縦方向仕切壁32と横方向仕切壁33により右側ポンプ室34と左側ポンプ室35に区画する。右側ポンプ室34に右側ポンプ3aを配置し、左側ポンプ室35に左側ポンプ3bを配置する。
【0047】
横方向仕切壁33の前面にカーテンレール36を布設し、カーテンレール36に遮へい用カーテン37を取付ける。建屋躯体31に出入口38を設け、出入口38側とカーテンレール36との間をメンテナンスエリア39とする。
【0048】
すなわち、本実施の形態では遮へい用カーテン37を隣接する2つの放射性流体を移送するポンプ室34,35で共用する。通常、原子力発電所の放射性流体を扱うポンプは、冗長性を考慮して同じ用途のものを2台以上設置する。
【0049】
従って、このようなポンプ3a,3bのメンテナンス時には、複数台のポンプ3a,3bのうち、常に少なくとも1台は運転を続けていることがある。また、発電所建物の経済性の観点から同じ用途のポンプ3a,3bについてはメンテナンスエリア39を図5中の網掛け部に示すように共用して建屋平面積を削減することがある。
【0050】
この場合、図中左側ポンプ3bのメンテナンス時には、メンテナンスエリア39にいる作業員は右側ポンプ室34の入口前で右側ポンプ3aからの放射線による被ばくを受ける。右側ポンプ3aが運転中である場合には作業員への被ばく量が増すこととなる。
【0051】
これに対して本実施の形態では遮へい性能を有する材質の遮へい用カーテン37をメンテナンスエリア39を共用した2つのポンプ室34,35の入口前にカーテンレール36を介して共有し、右側のポンプ3aのメンテナンス時にはメンテナンスエリア39の作業員に対する左側のポンプ3bからの放射線による被ばくを低減し、またメンテナンスエリア39のポンプ室34,35前の部分を作業域として有効に利用することができる。
【0052】
に図6(a)により発明の第6の実施の形態を説明する。本実施の形態は図6(a)に示したように建屋躯体31内に出入口38およびメンテナンスエリア39を有するポンプ室40を設け、このポンプ室40内に縦軸ポンプ3を設置し、この縦軸ポンプ3は縦軸ポンプ3の前面の横方向にスライドする機構を有する遮へい扉41を設置したことにある。なお、図6(b)は従来のポンプ設備の配置であってポンプ室入口から放射線線源である縦軸ポンプ3,配管7および弁8が直視できないようにラビリンス壁42を設けてラビリンス通路43を形成し迷路としている。
【0053】
本実施の形態ではスライドする機構を有する遮へい扉41を設置することにより、縦軸ポンプ3をメンテナンス時にメンテナンスエリア39へ引出す時以外は放射線線源である縦軸ポンプ3,配管7,弁8に対して遮へい扉41を閉め、直視しないようにすることができる。
【0054】
そして、ポンプメンテナンス時も従来に比べて配管7,弁8を直視しないエリアでの作業となるため作業員の被ばく低減が図れる。また、従来の遮へい用のラビリンス壁42が不要となり、ラビリンス通路43を削除することによってポンプ室40内のスペース縮小が可能となる。
【0055】
次に図7により発明の第7の実施の形態を説明する。本実施の形態は図7に示したように打込型枠44にポンプサポート6,配管サポート45およびダクトサポート46を固定し、ポンプサポート6にポンプケーシング5を取付け、配管サポート45に配管7を取付け、ダクトサポート46にダクト47を取付けてなるものをポンプ室の天井としたことにある。
【0056】
すなわち、ポンプ(図示せず)およびポンプの一部であるポンプケーシング5、ポンプサポート6、架台(図示せず)、ポンプの吸込,吐出配管7および弁(図示せず)、ダクト47、ケーブルトレイ(図示せず)、躯体埋設機器類(図示せず)、その他機器類を予め打込型枠44に取付け、それを一体構造物としたものである。
【0057】
本実施の形態によれば、建設現場の所定位置に打込型枠44のついた一体構造物を吊り具48を介して大型揚重機(図示せず)にて吊込んでポンプ室の天井とするものである。これによる作用は一体構造物を吊込み後、打込型枠44の上面に鉄筋(図示せず)を施工してコンクリートの打設により床を構築する。
【0058】
また、打込型枠44の下面はそのまま天井となり、配管7およびダクト47等の機器の接続を行うことで容易に建屋の天井(床)が構築される。従って、大幅な現地作業の低減と工期短縮を図ることができる。さらに、吊下げ式支持のポンプの設置は建屋を構築後のポンプ室内での狭いエリアでの据付作業でなく、一体構造物の構築時の工場あるいは建屋外の作業性の良い工事スペースで実施することが可能となり作業の効率化を図ることができる。
【0059】
次に図8により発明の第8の実施の形態を説明する。本実施の形態は図8に示したように縦軸ポンプ3のポンプケーシング5およびポンプサポート6および縦軸ポンプ3に付随する機器類のみならず、ケーブルトレイ49等の他の機器類を打込型枠44、打設コンクリートの重量を保持する補強材50、その他鋼材等を利用し床の単位とした大ブロック(床ブロック)51を構成している。また、床の打込型枠44の上面には床埋設の配管7等の機器と床下端の鉄筋(図示せず)を設置する。
【0060】
本実施の形態によれば、建設現場の所定位置に大ブロック51を天秤52と吊り具48を介して大型揚重機(図示せず)にて直接吊込むものである。これによる作用は大ブロック51を吊込み後、打込型枠44の上面に上端鉄筋(図示せず)を施工し、コンクリートを打設することにより容易に床が構築される。
【0061】
また、下面はそのまま天井となるが、この下面の補強材50により打込型枠44の設定と支保工(図示せず)の設置作業および撤去作業が不要となり、建設工程と工期短縮が図れる。さらに前記と同様に吊下げ式支持の縦軸ポンプ3の据付作業の効率化を図ることができる。
【0062】
に図9(a),(b)により発明の第9の実施の形態を説明する。図9(a)は本実施の形態においてポンプメンテナンス時のポンプケーシング5内部の遮へい用補助機器を示す図で、遮へい性能を有する平板をポンプケーシング5内の遮へい蓋53として用い、これを縦軸ポンプ3近傍の位置から縦軸ポンプ3の回転軸中心へ平面方向に移動可能とするヒンジ54と、これに取付く蓋53の上下方向の移動,支持をボールネジ(図示せず)によって可能とするボールネジ付き支持台55により支持することにより構成される。また、この支持台55はそのヒンジ54を介して壁と機械的に接合している。
【0063】
つぎに、本実施の形態のポンプケーシング5の遮へい蓋53を使用したポンプメンテナンス時の遮へい方法について図9,図17を用いて説明する。
図17のメンテナンス手順d,eに示す状態、つまりモータユニット15をポンプケーシング5から取外した後、ヒンジ54により遮へい蓋53およびボールネジ付き支持台55をポンプケーシング5の軸中心位置に移動する。図9(b)に示すように遮へい蓋53に設定しているボルト挿入用孔57とケーシングに付いたポンプケーシングボルト56の位置が一致するように調整する。このとき、遮へい蓋53は鉛直軸に対して支持台55上で回転可能である。
【0064】
次に、ボールネジを動作させるハンドル(図示せず)によりボールネジの作動により鉛直上下方向の遮へい蓋53をその重量を支持して遮へい蓋53のボルト挿入用孔57にボルト56を通しながらポンプケーシング5本体に装着する。この後、ポンプケーシングのナット58を利用して遮へい蓋53をポンプケーシング5に固定する。
【0065】
この遮へい蓋53の装着によりポンプケーシング5内側の放射化された部分からの放射線を遮へいすることが可能となり、この近傍でメンテナンス作業を実施する作業員の被ばく低減が可能となる。また、遮へい蓋53の設置作業は上方向への作業であって作業員の身長以上での作業の可能性もあり、遮へい蓋53の重量の支持作業の負担があるが、ボールネジの操作により遮へい蓋53の位置を容易に調整可能となり作業の軽減が図れる。
【0066】
に図10,図11(a),図12および図17により発明の第10の実施の形態を説明する。本実施の形態は図10に示したように台車61の上部に架構59を支持くさび62により取付け、架構59にケーシング固定用孔63を有するモータユニット固定部材64を設けてポンプ設備のメンテナンス機器を構成したことにある。
【0067】
本実施の形態はポンプメンテナンス時の図17に示したモータユニット15を取扱うメンテナンス機器にある。すなわち、縦軸ポンプ3のポンプケーシング5から分離したモータユニット15を固定支持する架構59に固定したモータユニット15を架構59と共に鉛直面内で回転可能とする回転軸と回転軸の受け架台を兼ねる車輪60付きの台車61の回転位置を固定する支持くさび62,架構59に設けたケーシング固定用孔63を有するモータユニット固定部材64とからなっている。
【0068】
つぎに本実施の形態のメンテナンス機器を使用したポンプメンテナンス方法について図10,11,15,17を用いて説明する。
図17のメンテナンス手順d,eに示す状態、つまりモータユニット15をポンプケーシング5から取外した後、台車61(図17では符号11)にモータユニット15を吊下ろす。
【0069】
次に、図15に示す手順fのようにモータユニット15が搭載された台車61を上方から揚重機16が使用できるエリアへ移動する。この移動中、架構59は台車61に支持くさび62により固定し、モータユニット15は架構59に設定されたケーシング固定用孔63とポンプケーシング5に設定されたネジ孔66にボルトを通して架構59に固定する(図10の概念図、図11(a)の立面図参照)。
【0070】
手順gでは揚重機16の使用可能範囲において、台車61を輪留め65により固定する。揚重機16によりポンプモータ下方を支持しながら架構59を台車61に固定している支持くさび62をはずし、ポンプモータ下方を持ち上げてポンプモータ回転軸を水平となる位置とする。支持くさび62をこの状態で固定できる位置へ差込み、固定する。この後、インペラ13を人力あるいは揚重機16によってロータ14から水平方向に引抜く。
【0071】
手順hでは、揚重機16によりモータケーシング20からロータ14を水平方向に引抜く。その他モータリアカバー21等も分解し、各種部品の点検,洗浄等の後、組立ては一連の作業の逆を行う。
【0072】
以上のようなメンテナンス作業となるが、本作業ではモータユニット15の分解には、従来の技術のように床からのリアカバー21の取外し高さA、モータケーシング20の高さB、ロータ14の引抜き高さCの鉛直方向高さは不要となり、メンテナンスエリアの必要階高が低減可能となる(図17参照)。
【0073】
また、インペラ13,ロータ14およびリアカバー21等の分解取り扱い高さは作業員の身長の範囲内の高さとなるため、従来の方法に比べ高所作業の低減および作業の効率化とともに作業台の削減が図れる。
【0074】
に図11(a),(b)により発明の第11の実施の形態を説明する。本実施の形態は前記第10の実施の形態において、図11(a),(b)に示したように台車61の下部に図11(b)に示した構造の台車固定機構67を設けたことにある。
【0075】
台車固定機構67はハンドル68と、このハンドル68により回転するボールネジ69と、このボールネジ69の下端部に取付けられる固定台70と、この固定台70の下面に設けられたベース板71と、ハンドル68の近傍に設けられた軸受72および固定台71に取付けたヒンジアーム73とからなっている。
【0076】
この台車固定機構67はハンドル68を回転することによりボールネジ69の動作によって台車61の重量を固定支持することが可能となる。メンテナンス設備において、台車61を固定する輪留め65の削除が可能となり、ポンプメンテナンス時の作業安定性が確保される。
【0077】
また、建屋の床に排水等のために勾配がついている場合には、台車61の傾きを本機構67によって解消し、ポンプ部品の引抜き分解作業を精度良く実施することができる。
【0078】
に図12(a),(b)により発明の第12の実施の形態を説明する。本実施の形態はポンプ室40内に台車61を走行して案内するための滑車74に取付け、この滑車74にロープ75を引っ掛けて台車61を走行させることにある。すなわち、図12(a)に示したようにポンプ室40の躯体31の壁面に滑車74を取付け、滑車74およびロープ75を利用し、モータユニット15の運搬台車61の移動を遠隔で操作することを可能とする。このメンテナンス設備を使用したポンプメンテナンス方法について図12を用いて説明する。縦軸ポンプ3のメンテナンス時にはモータユニット15をポンプ室40以外のメンテナンスエリアへ運ぶ場合がある。
【0079】
これは、縦軸ポンプ3が放射性流体を取扱っている場合、ポンプ室40内の配管7,弁8等は放射化されるか、または放射性流体を内包した状態で放射線の線源となってポンプ室40内の作業員の被ばくの原因となるためである。
【0080】
また、このようなことから、ポンプ室40の出入口38では被ばくを受けないようなラビリンス壁42が設置される。縦軸ポンプ3をメンテナンスエリアへ運ぶ場合もまた、運搬時の作業員の被ばく防止が必要である。
【0081】
本実施例では、(a)に示すように台車61を遮へい壁出入口38の部分よりポンプ室40の奥方向へ壁に台車61のストッパー(図示せず)等が接触するまで人力にて直進させる。この後、(b)に示すように台車61に装着したロープ75を張り、滑車74を介してロープ75を人力あるいは機械的駆動機構により操作し、台車61をポンプ設置位置へ誘導する。この際、作業員はラビリンス壁42の反ポンプ側で監視操作を行う。
【0082】
次に、縦軸ポンプ3の分解を行い、モータユニット15を台車61に載せた後にロープ75の操作により逆の手順によりモータユニット15をポンプ室40から搬出する。これらの操作により台車61によるモータユニット15の運搬の際に放射線線源に作業員が接近することが回避される。これによりポンプメンテナンス作業時の放射線被ばくの低減を図ることができ、また台車61のポンプ下への位置決めが滑車74での誘導により正確に行うことができる。
【0083】
なお、本実施の形態では図示していないが、台車61にモータユニット15の自動昇降機構、モータユニット15とポンプケーシング5の接合ボルトの自動着脱装置等を付設することにより、一層の作業員の被ばく低減を図ることもできる。
【0084】
また、ポンプ室40内においては放射性流体等の収集のため、床に勾配が付いている場合もあるが、台車61の傾斜による不安定を解消するため、台車61の車輪60に高さ調整機構を設置して、ロープ75による操作前に高さ調整を可能としてもよい。
【0085】
に図13(a),(b)により発明の第13の実施の形態を説明する。本実施の形態は第12の実施の形態において、ポンプ室40の床面にガイドレール76を敷設し、このガイドレール76に沿って台車61が走行するためのガイドレール取合機構77を台車61に設けたことにある。
【0086】
本実施の形態によれば、車輪60付き台車61がガイドレール取合機構77によりガイドレール76に沿って走行可能となり、ポンプ設置位置への台車61の誘導の位置の精度が増し、位置ずれ調整等による作業員の被ばくが低減できる。
【0087】
に図14(a),(b)により発明の第14の実施の形態を説明する。本実施の形態は第12の実施の形態において、ポンプ室40の床面にレール78を敷設し、このレール78を走行するためのレール取合機構79を台車61に設けたことにある。すなわち、ポンプ室40の床に敷設されたレール78上を走行可能となるモータユニット15の運搬台車61にレール取合機構79を付設している。
【0088】
本実施の形態によれば、台車61がレール78に沿って走行可能となり、縦軸ポンプ3の設置位置への台車61の誘導の位置の精度が増し、位置ずれ調整等による作業員の被ばくが低減できる。また、台車61を人力にて縦軸ポンプ3の設置エリアに誘導する作業が削減されるため、運搬作業の効率化と作業員の被ばく低減を図ることができる。
【0089】
メンテナンス機器の実施の形態によれば、建屋体積縮小化、ポンプメンテナンス時の被ばく低減および作業の省力化、施工性向上などが可能となる。建屋体積縮小化によるコストの大幅な低減を図ることができ、また、ポンプメンテナンス時の被ばくおよび低減作業の省力化による労務費の削減、安全性の向上が図れるとともに、施工性向上による工期短縮などを図ることができる。
【0090】
【発明の効果】
本発明に係る原子力発電所のポンプ設備の発明によれば、ポンプ本体と弁および配管の配置を区分することによって建屋の寸法と容積の縮小化を図ることができる。また、縦軸ポンプを設置する機器室またはポンプ室内の階高を最小限かつ放射性流体配管配置室内寸法を最短とし、メンテナンス作業時の放射線被ばくの低減および作業の省力化などによるコスト低減も図ることができる。
【0091】
一方、メンテナンス設備の発明によれば、縦軸ポンプの鉛直下方向への分解点検時において、縦軸ポンプまたはそれらの部品を搭載する台車の移動を遠隔操作することにより作業員の作業低減、放射線被ばくの低減、安全性等々合わせて行うことができる。
【図面の簡単な説明】
【図1】本発明に係るポンプ設備の第1の実施の形態を一部概略的に示す縦断面図。
【図2】本発明に係るポンプ設備の第2の実施の形態を一部概略的に示す縦断面図。
【図3】本発明に係るポンプ設備の第3の実施の形態を一部概略的に示す縦断面図。
【図4】本発明に係るポンプ設備の第4の実施の形態を一部概略的に示す縦断面図。
【図5】本発明に係るポンプ設備の第5の実施の形態を一部概略的に示す縦断面図。
【図6】(a)は本発明に係るポンプ設備の第6の実施の形態を一部概略的に示す平面図、(b)は(a)と対比した従来例を示す平面図。
【図7】本発明に係るポンプ設備の第7の実施の形態を一部概略的に説明するための斜視図。
【図8】本発明に係るポンプ設備の第8の実施の形態を一部概略的に説明するための斜視図。
【図9】(a)は本発明に係るポンプ設備の第9の実施の形態を一部概略的に示す平面図、(b)は(a)における遮へい蓋をポンプケーシングに取付ける状態を示す斜視図。
【図10】本発明に係るポンプメンテナンス設備の実施の形態における第1の例を示す斜視図。
【図11】(a)は本発明に係るポンプメンテナンス設備の実施の形態における第2の例を示すための一部断面で示す立面図、(b)は(a)における台車固定機構を拡大して示す立面図。
【図12】(a)は本発明に係るポンプメンテナンス設備の実施の形態における第3の例を示す平面図、(b)は(a)の状態からの台車移動状態を示す平面図。
【図13】本発明に係るポンプメンテナンス設備の実施の形態における第4の例を示す平面図、(b)は(a)における要部を拡大して示す平面図。
【図14】(a)は本発明に係るポンプメンテナンス設備の実施の形態における第5の例を示す平面図、(b)は(a)における要部を拡大して示す平面図。
【図15】本発明に係るポンプメンテナンス設備を用いたメンテナンス手順を説明するための立面図。
【図16】従来の原子力発電所のポンプ設備の室内配置を示す断面図。
【図17】従来の縦軸ポンプのメンテナンス手順を説明するための立面図。
【符号の説明】
1…建屋躯体、2…階高が高い機器室、3…縦軸ポンプ、4…ポンプ本体、5…ポンプケーシング、6…ポンプサポート、7…配管、8…吸込弁および吐出弁、9…架台、10…作業員、11…台車、12…付帯設備、13…インペラ、14…ロータ、15…モータユニット、16…揚重機、17…ナット、18…モノレール、19…モータユニット支持架台、20…モータケーシング、21…リアカバー、22…ポンプケーシングボルト、23…建屋躯体、24…階高が低い機器室、25…隣接室、26…階上室、27…床、28…ハッチ、29…メンテナンス室、30…支持部材、31…建屋躯体、32…たて方向仕切壁、33…よこ方向仕切壁、34…右側ポンプ室、35…左側ポンプ室、36…カーテンレール、37…遮へい用カーテン、38…出入口、39…メンテナンスエリア、40…ポンプ室、41…遮へい扉、42…ラビリンス壁、43…ラビリンス通路、44…打込型枠、45…配管サポート、46…ダクトサポート、47…ダクト、48…吊り具、49…ケーブルトレイ、50…補強材、51…大ブロック(床ブロック)、52…天秤、53…遮へい蓋、54…ヒンジ、55…支持台、56…ボルト、57…ボルト挿入用孔、58…ナット、59…架構、60…車輪、61…台車、62…支持くさび、63…ケーシング固定用孔、64…モータユニット固定部材、65…輪留め、66…ネジ孔、67…台車固定機構、68…ハンドル、69…ボールネジ、70…固定台、71…ベース板、72…軸受、73…ヒンジアーム、74…滑車、75…ロープ、76…ガイドレール、77…ガイドレール取合機構、78…レール、79…レール取合機構。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pump facility and a maintenance facility for a nuclear power plant.
[0002]
[Prior art]
A conventional pump facility in a nuclear power plant will be described with reference to FIG. In FIG. 16, reference numeral 1 is, for example, a building housing of a nuclear power plant, 2 is an equipment room, and 3 is a vertical axis pump. The vertical pump 3 mainly includes a pump body 4 and a pump casing 5, and is suspended from the ceiling of the equipment room 2 via a pump support 6.
[0003]
In the nuclear power plant, the vertical axis pump 3 suspended from the building housing 1 etc. has special maintenance characteristics of the pump body 4 and maintenance characteristics of the suction valve and the discharge valve 8 associated with the piping 7 of the vertical axis pump 3. In order to secure without a complicated piping route, it will be installed in the equipment room 2 with a high floor.
[0004]
In addition, when the maintenance of the vertical axis pump 3 is performed, the pump main body 4 is directed vertically downward, and the motor, rotor, impeller and the like incorporated in the pump main body 4 are pulled out. Since the suction port and the discharge port are provided in the upper part of the pump, the suction and discharge pipes 7, the suction valve and the discharge valve 8 are located above the vertical pump 3, that is, the vertical pump 3 is installed unless there is a special request. It is installed above the equipment room 2 to be operated.
[0005]
In this case, in order to ensure the maintainability of both the pump body 4 and the suction valve and the discharge valve 8, a height L is required above the equipment chamber 2 so that the worker 10 can access each of the valves 8. At the same time, it is necessary to have a space and a height L that can be used as a maintenance area by the operator 10 when maintaining the vertical axis pump 3.
[0006]
Therefore, the floor height in the equipment room 2 is required to be twice the access height L (usually about 1.8 m or more) of the worker 10 and the thickness of the mount 9 at a minimum, and the height of the equipment room 2 is reduced. Was inhibiting. Further, in the installation work of the vertical pump 3, the vertical pump 3 is lifted in the vertical direction and installed.
[0007]
Furthermore, if the vertical axis pump 3 transports the radioactive fluid, the worker is exposed to radiation during the maintenance work. However, reducing the access height L of the worker 10 can improve the workability. This will lead to an increase in exposure with worsening of work and delay of work.
[0008]
Here, based on the procedures a to h in FIG. 17, a conventional maintenance method for the suspended vertical pump 3 will be described.
a. The fluid in the pump casing 5 and the motor is drained, and after cleaning, the incidental equipment 12 and the like that hinder disassembly of the motor cooling pipes and the like are removed. b. In order to pull out the motor unit 15 including the impeller 13 and the rotor 14 vertically downward, the motor unit 15 is supported by a lifting machine 16 such as a chain block through a hanging hook attached to the pump casing 5.
[0009]
c. Remove the part where the motor unit 15 and the pump casing 5 are mechanically joined (nut 17 etc.). d. A motor unit 15 is suspended from a moving carriage 11 prepared below the vertical pump 3 using a lifting machine 16. e. In order to pull out the impeller 13 and the rotor 14 upward from the motor unit 15, the carriage is moved from the position directly below the vertical axis pump 3 to the pump maintenance area where the monorail 18, the lifting hook 16 and the like where the hanging hook is installed can be used. 11 moves the motor unit 15.
[0010]
f. In order to disassemble the motor unit 15, the motor unit 15 is transferred from the carriage 11 to the motor unit support base 19. g. The impeller 13 is pulled out vertically from the rotor 14 by human power or a lifting machine 16. h. Next, the rotor 14 is pulled out vertically from the motor casing 20 by the lifting machine 16. i. Also remove the motor rear cover 21. j. After inspecting and cleaning the disassembled parts, the assembly is performed in the reverse order of the series of operations.
[0011]
As described above, the maintenance work of the vertical axis pump 3 is performed. The motor unit 15 is disassembled by removing the rear cover 21 from the floor A, the height B of the motor casing 20, the pulling height C of the rotor 14, The required height D of the lifting machine 16 is required.
[0012]
[Problems to be solved by the invention]
When the vertical axis pump 3 is installed, the pump body 4 is long in the vertical direction, and the maintenance of the vertical axis pump 3 is a height for pulling out and disassembling the motor unit 15 including the motor, impeller and the like from the pump casing 5 in the vertical direction. And the vertical dimension of the vertical pump 3 is sufficient for the maintenance space of the vertical axis pump 3 and the valve 8 associated with the vertical axis pump 3. Limited to the high part.
[0013]
Moreover, when installing the vertical axis pump 3, it is a work at a high place, which requires labor and time. When disassembling the motor, impeller, etc. of the vertical axis pump 3, the motor unit 15 including them is installed in the vertical direction. Then, the pump casing 5 is pulled out and then transported to the laydown area. Thereafter, the impeller 13 and the rotor 14 are pulled out and disassembled using the lifting machine 16 and the like. Therefore, work is troublesome, and in particular, the radiation exposure of workers becomes a problem in the case of a pump for transferring a radioactive fluid.
[0014]
To reduce the cost of plant facilities at nuclear power plants, reduction of building dimensions and rationalization of construction are desired. For plant maintenance work, improvement of worker efficiency and reduction of radiation exposure are desired. Installation of vertical axis pump 3 and piping In addition, it is desired to reduce the amount of work and the amount of exposure at the time of arrangement and construction of valves and pump maintenance, and satisfying these demands is a problem.
[0015]
The present invention has been made to solve the above-mentioned problems, and it is possible to reduce the floor height of the building where the suspension support type vertical axis pump is installed, to improve workability, to save labor during pump maintenance, and to reduce radiation exposure. Furthermore, another object of the present invention is to provide a nuclear power plant pump facility and its maintenance facility for the purpose of rationally arranging the number of maintenance devices.
[0016]
The invention of claim 1 A maintenance room is provided on the lower floor of the equipment room where the vertical axis pump is installed, the vertical axis pump is suspended from the ceiling, and a hatch is provided on the floor located below the vertical axis pump in the equipment room. It is characterized by that.
[0017]
The invention of claim 2 The ceiling has a pump body of the vertical axis pump, devices attached to the pump, and other devices attached in advance to a driving form to form an integrated structure, and the integrated structure is directly suspended at a predetermined position on the construction site. To the ceiling of the equipment room It is characterized by that.
[0018]
The invention of claim 3 A maintenance room is provided on the lower floor of the equipment room where the vertical axis pump is installed, the pump casing part of the vertical axis pump is supported and fixed to the floor in the equipment room, and the piping side of the vertical axis pump is arranged in the equipment room. The pump body side is arranged in the maintenance chamber It is characterized by that.
[0019]
The invention of claim 4 The floor has a floor block structure in which a pump body of the vertical axis pump, equipment associated with the pump and other equipment are previously attached to a driving form, and the floor block structure is directly placed at a predetermined position on the construction site. Suspend to make the floor of the equipment room It is characterized by that.
[0028]
In the vertical axis pump facility according to the present invention having the above-described configuration, the size and volume of the equipment room or the pump room in which the vertical axis pump is installed can be reduced. Further, in the case of a vertical pump for transferring a radioactive fluid, work safety can be ensured and labor costs can be reduced by reducing radiation exposure during maintenance work.
[0029]
In addition, it is possible to shorten the work period by adopting the prior installation of equipment, adopting a large module construction method, and to delete the shielding labyrinth by sharing the exposure reducing device, thereby reducing the cost and the planar dimensions.
[0030]
On the other hand, in the pump maintenance facility, the motor and impeller associated with the vertical axis pump are pulled out, and a frame rotating mechanism, a cart fixing mechanism, a remote control function, etc. are attached to the cart for moving the pump. Safety can be ensured, positioning of the carriage can be simplified, the amount of pump maintenance work can be reduced, and the radiation exposure of workers can be reduced.
[0031]
DETAILED DESCRIPTION OF THE INVENTION
A first embodiment of a longitudinal pump facility according to the present invention will be described with reference to FIG.
In FIG. 1, the same parts as those in FIG. In the present embodiment, an equipment room 24 having a floor height lower than that of the conventional example is provided in the building housing 23, and the vertical pump 3 is suspended from the ceiling in the equipment room 24 and provided adjacent to the equipment room 24. In other words, the pipe 7, the suction valve, and the discharge valve (hereinafter referred to as a valve) 8 are disposed in the adjacent chamber 25.
[0032]
That is, in FIG. 1, a pipe 7 and a valve 8 associated with the vertical pump 3 are arranged in an adjacent chamber 25 adjacent to the equipment room 24 where the vertical pump 3 is installed, and the vertical pump 3 and the valve 8 are arranged in parallel. To do. Thereby, in the pump side area, maintenance of the valve in the upper part of the equipment room 24 is not necessary because there is no valve, and the floor height in the equipment room 24 can be determined only by the required height for pump maintenance.
[0033]
For the valve area, the level of the valve maintenance stand 9 can be set by considering only the position of the valve 8 regardless of the required height of the pump maintenance, improving the vertical freedom of arrangement and reducing the floor height of the equipment room 24. It is possible to do.
[0034]
In addition, the floor height is reduced, and the length of the support structure (hereinafter referred to as pump support 6) of the suspension support type vertical axis pump 3 is shortened, so that the moment applied to the pump support 6 is reduced and the earthquake resistance is improved. Can be achieved.
[0035]
When the vertical axis pump 3 and the valve 8 are separated by the wall, the piping 7 arranged on the pump area side is set to be the shortest from the viewpoint of economy, that is, this is the piping in the equipment room 24. The length is shorter than when the valves are arranged in the same chamber, and means that the radiation source in the device chamber 24 is reduced when the vertical pump 3 transfers the radioactive fluid. Therefore, it is possible to reduce the radiation exposure of workers during pump maintenance.
[0036]
Next, according to FIG. Book A second embodiment of the invention will be described. In this embodiment, as shown in FIG. 2, the vertical pump 3 is suspended from the ceiling in the equipment room 24 having a low floor height, and the vertical pump is installed in the upper room 26 provided on the upper floor of the equipment room 24. 3 is that a pipe 7 and a valve 8 associated with the valve 3 are arranged.
[0037]
According to the present invention, the valve 8 associated with the vertical pump 3 is arranged in the upper floor room of the equipment room 24 where the vertical pump 3 is installed, and the vertical pump 3 and the valve 8 are divided vertically. As a result, the floor height in the equipment room 24 can be determined only by the required height for pump maintenance, as in the above embodiment.
[0038]
In the valve area, the valve 8 can be arranged near the floor level. For the maintenance of the valve 8, the access height of the operator 10 is sufficient, and the height of the upper chamber 26 where the valve is installed can be freely set. The degree of improvement improves the floor height of the equipment room 24. Further, as in the case described above, improvement of earthquake resistance and reduction of exposure of workers during pump maintenance can be achieved when a radioactive fluid is handled.
[0039]
Next, according to FIG. Book A third embodiment of the invention will be described. In the present embodiment, the vertical pump 3 is suspended from the ceiling in the equipment room 2 where the floor height is high, the hatch 28 is provided on the floor located below the vertical pump 3 in the equipment room 2, and the vertical pump The maintenance room 29 is provided in the room on the lower floor of the equipment room 2 in which 3 is installed.
[0040]
Here, in the conventional maintenance procedures d and e of FIG. 17, in order to pull out the motor unit 15 from the pump casing 5, it is necessary to suspend the motor unit 15 downward from the pump casing bolt 22, and thus from the pump installation position. The minimum height to the floor was determined.
[0041]
However, according to the present embodiment, by providing the hatch 28 on the floor 27 under the pump 3, if the hatch 28 is thick enough to handle the hatch 28 at the bottom of the pump, the floor of the pump installation area The motor unit 15 can be pulled out and transferred to the maintenance room 29 on the lower floor regardless of the height, and the floor height of the pump installation area can be reduced. In addition, maintenance can be performed in an area where there is no piping containing radioactive fluid on the lower floor, and exposure during maintenance can be reduced.
[0042]
Next, according to FIG. Book A fourth embodiment of the invention will be described. In the present embodiment, a maintenance chamber 29 is provided on the lower floor of the vertical pump 3, and the pump casing 5 portion of the vertical pump 3 is directly supported and fixed from the housing of the floor 27 via a steel support member 30. .
[0043]
According to the present embodiment, the vertical axis pump 3 can be supported near the position of the center of gravity, and the moment can be reduced as compared with the case where the pump support 6 is installed above the pump casing 5 as shown in FIG. Can contribute to the improvement of earthquake resistance.
[0044]
Further, when the vertical axis pump 3 handles the radioactive fluid, the radioactive fluid does not flow downward from the pump casing 5, that is, downward from the slab lower end level of the floor 27. This is because the motor casing is below the pump casing 5.
[0045]
Therefore, since the radiation source is limited to the pump casing 5 portion in the motor side area both during normal pump operation and during maintenance of the vertical pump 3, it is possible to reduce the exposure of workers in this area. .
[0046]
Next, according to FIG. Book A fifth embodiment of the invention will be described. In the present embodiment, as shown in FIG. 5, a right side pump chamber 34 and a left side pump chamber 35 are partitioned in a building housing 31 by a vertical partition wall 32 and a horizontal partition wall 33. The right pump 3 a is disposed in the right pump chamber 34, and the left pump 3 b is disposed in the left pump chamber 35.
[0047]
A curtain rail 36 is laid on the front surface of the lateral partition wall 33, and a shielding curtain 37 is attached to the curtain rail 36. An entrance / exit 38 is provided in the building housing 31, and a maintenance area 39 is defined between the entrance / exit 38 side and the curtain rail 36.
[0048]
That is, in the present embodiment, the shielding curtain 37 is shared by the pump chambers 34 and 35 for transferring two adjacent radioactive fluids. Normally, two or more pumps that handle radioactive fluid in nuclear power plants are installed for the same purpose in consideration of redundancy.
[0049]
Therefore, at the time of maintenance of such pumps 3a and 3b, at least one of the plurality of pumps 3a and 3b may always be in operation. Further, from the viewpoint of economic efficiency of the power plant building, the maintenance area 39 may be shared for the pumps 3a and 3b having the same application as shown by the shaded portion in FIG.
[0050]
In this case, during maintenance of the left pump 3b in the figure, workers in the maintenance area 39 are exposed to radiation from the right pump 3a in front of the entrance of the right pump chamber 34. When the right pump 3a is in operation, the amount of exposure to workers increases.
[0051]
On the other hand, in the present embodiment, a shielding curtain 37 made of a material having shielding performance is shared through the curtain rail 36 in front of the entrances of the two pump chambers 34, 35 sharing the maintenance area 39, and the right pump 3a. At the time of maintenance, exposure of workers in the maintenance area 39 due to radiation from the left pump 3b can be reduced, and the portions of the maintenance area 39 in front of the pump chambers 34 and 35 can be used effectively as work areas.
[0052]
Next According to Fig. 6 (a) Book A sixth embodiment of the invention will be described. In the present embodiment, as shown in FIG. 6A, a pump chamber 40 having an entrance 38 and a maintenance area 39 is provided in a building housing 31, and a vertical pump 3 is installed in the pump chamber 40. The axial pump 3 is that a shielding door 41 having a mechanism that slides in the lateral direction of the front surface of the vertical pump 3 is installed. FIG. 6B shows the arrangement of a conventional pump facility, and a labyrinth wall 43 is provided by providing a labyrinth wall 42 so that the vertical axis pump 3, the pipe 7 and the valve 8, which are radiation sources, cannot be directly viewed from the pump chamber entrance. Forming a maze.
[0053]
In the present embodiment, by installing a shielding door 41 having a sliding mechanism, the vertical axis pump 3, which is a radiation source, the piping 7, and the valve 8 except when the vertical axis pump 3 is pulled out to the maintenance area 39 during maintenance. On the other hand, the shielding door 41 can be closed so as not to look directly.
[0054]
In addition, since the work is performed in an area where the pipe 7 and the valve 8 are not directly viewed during the pump maintenance, the exposure of workers can be reduced. Further, the conventional labyrinth wall 42 for shielding is not required, and the space inside the pump chamber 40 can be reduced by eliminating the labyrinth passage 43.
[0055]
Next, according to FIG. Book A seventh embodiment of the invention will be described. In this embodiment, as shown in FIG. 7, the pump support 6, the pipe support 45 and the duct support 46 are fixed to the driving form 44, the pump casing 5 is attached to the pump support 6, and the pipe 7 is attached to the pipe support 45. The installation is such that a duct 47 is attached to a duct support 46 as a ceiling of the pump chamber.
[0056]
That is, a pump (not shown) and a pump casing 5 which is a part of the pump, a pump support 6, a mount (not shown), a pump suction, a discharge pipe 7 and a valve (not shown), a duct 47, a cable tray (Not shown), a case-embedded device (not shown), and other devices are previously attached to the driving form 44, which is an integrated structure.
[0057]
According to the present embodiment, an integral structure with a driving form 44 at a predetermined position on the construction site is hung by a large lifting machine (not shown) via a lifting device 48 and the ceiling of the pump chamber. To do. The action by this is to hang a monolithic structure, construct a reinforcing bar (not shown) on the upper surface of the placing form 44 and construct a floor by placing concrete.
[0058]
In addition, the lower surface of the placement form 44 becomes a ceiling as it is, and the ceiling (floor) of the building is easily constructed by connecting equipment such as the pipe 7 and the duct 47. Therefore, it is possible to greatly reduce the work on site and shorten the construction period. In addition, the installation of the suspension support pump is not carried out in a narrow area in the pump room after the building is built, but in a work space with good workability at the factory or outside of the building when building an integrated structure. This makes it possible to improve work efficiency.
[0059]
Next, according to FIG. Book An eighth embodiment of the invention will be described. In the present embodiment, as shown in FIG. 8, not only the pump casing 5 and the pump support 6 of the vertical pump 3 and the devices associated with the vertical pump 3 but also other devices such as the cable tray 49 are driven. A large block (floor block) 51 is formed as a floor unit using a formwork 44, a reinforcing member 50 for holding the weight of the cast concrete, and other steel materials. In addition, equipment such as a floor buried pipe 7 and a reinforcing bar (not shown) at the lower end of the floor are installed on the upper surface of the floor placement form 44.
[0060]
According to the present embodiment, the large block 51 is directly suspended by a large lifting machine (not shown) via the balance 52 and the lifting tool 48 at a predetermined position on the construction site. As a result of this, after the large block 51 is suspended, an upper end reinforcing bar (not shown) is constructed on the upper surface of the placing mold 44, and concrete is placed, so that a floor is easily constructed.
[0061]
In addition, although the lower surface becomes the ceiling as it is, the setting material 44 and the installation work and the removal work of the support work (not shown) are unnecessary by the reinforcing material 50 on the lower surface, and the construction process and the work period can be shortened. Further, as described above, it is possible to improve the efficiency of the installation work of the vertical support pump 3 of the suspension type support.
[0062]
Next Figure 9 (a) and (b) Book A ninth embodiment of the invention will be described. FIG. 9A is a diagram showing a shielding auxiliary device inside the pump casing 5 at the time of pump maintenance in the present embodiment. A flat plate having shielding performance is used as the shielding lid 53 in the pump casing 5, and this is used as the vertical axis. A hinge 54 capable of moving in a plane direction from the position near the pump 3 to the rotation axis center of the vertical pump 3 and a vertical movement and support of a lid 53 attached to the hinge 54 are made possible by a ball screw (not shown). It is configured by being supported by a support base 55 with ball screws. The support base 55 is mechanically joined to the wall via the hinge 54.
[0063]
Next, the shielding method at the time of pump maintenance using the shielding lid 53 of the pump casing 5 of the present embodiment will be described with reference to FIGS.
The state shown in the maintenance procedures d and e of FIG. 17, that is, after the motor unit 15 is removed from the pump casing 5, the shielding lid 53 and the support base 55 with the ball screw are moved to the axial center position of the pump casing 5 by the hinge 54. As shown in FIG. 9B, the bolt insertion hole 57 set in the shielding lid 53 is adjusted so that the position of the pump casing bolt 56 attached to the casing coincides. At this time, the shielding lid 53 is rotatable on the support base 55 with respect to the vertical axis.
[0064]
Next, the pump casing 5 is operated while supporting the weight of the vertical vertical shielding cover 53 by the operation of the ball screw by a handle (not shown) for operating the ball screw and passing the bolt 56 through the bolt insertion hole 57 of the shielding lid 53. Attach to the body. Thereafter, the shielding lid 53 is fixed to the pump casing 5 using the nut 58 of the pump casing.
[0065]
By mounting the shielding lid 53, it is possible to shield radiation from the activated portion inside the pump casing 5, and it is possible to reduce exposure of workers performing maintenance work in the vicinity thereof. In addition, the installation work of the shielding lid 53 is an upward work, and there is a possibility of work exceeding the height of the worker, and there is a burden of supporting the weight of the shielding lid 53, but the shielding work is performed by operating the ball screw. The position of the lid 53 can be easily adjusted, and the work can be reduced.
[0066]
Next Figure 10, Figure 11 (a), Figure 12 and Figure 17 Book A tenth embodiment of the invention will be described. In the present embodiment, as shown in FIG. 10, a frame 59 is attached to the upper portion of a carriage 61 by a supporting wedge 62, and a motor unit fixing member 64 having a casing fixing hole 63 is provided in the frame 59 to provide maintenance equipment for pump equipment. It is in the configuration.
[0067]
This embodiment is in a maintenance device that handles the motor unit 15 shown in FIG. 17 during pump maintenance. That is, the motor unit 15 fixed to the frame 59 for fixing and supporting the motor unit 15 separated from the pump casing 5 of the vertical axis pump 3 also serves as a rotating shaft and a receiving shaft for the rotating shaft that can rotate in the vertical plane together with the frame 59. A support wedge 62 for fixing the rotational position of a carriage 61 with wheels 60, and a motor unit fixing member 64 having a casing fixing hole 63 provided in the frame 59.
[0068]
Next, a pump maintenance method using the maintenance device of the present embodiment will be described with reference to FIGS.
The state shown in the maintenance procedures d and e of FIG. 17, that is, after the motor unit 15 is removed from the pump casing 5, the motor unit 15 is suspended from the carriage 61 (reference numeral 11 in FIG. 17).
[0069]
Next, as shown in step f shown in FIG. 15, the carriage 61 on which the motor unit 15 is mounted is moved from above to an area where the lifting machine 16 can be used. During this movement, the frame 59 is fixed to the carriage 61 by the supporting wedge 62, and the motor unit 15 is fixed to the frame 59 through bolts in the casing fixing hole 63 set in the frame 59 and the screw hole 66 set in the pump casing 5. (Refer to the conceptual diagram of FIG. 10 and the elevation view of FIG. 11A).
[0070]
In step g, the carriage 61 is fixed by the ring stopper 65 within the usable range of the lifting machine 16. The supporting wedge 62 that fixes the frame 59 to the carriage 61 is removed while supporting the pump motor lower part by the lifting machine 16, and the pump motor lower part is lifted to make the pump motor rotating shaft horizontal. The support wedge 62 is inserted and fixed to a position where it can be fixed in this state. Thereafter, the impeller 13 is pulled out from the rotor 14 by human power or a lifting machine 16 in the horizontal direction.
[0071]
In step h, the rotor 14 is pulled out from the motor casing 20 in the horizontal direction by the lifting machine 16. In addition, the motor rear cover 21 and the like are also disassembled, and after inspection and cleaning of various parts, assembly is performed in the reverse order of the series of operations.
[0072]
Although the maintenance work is as described above, in this work, the motor unit 15 can be disassembled by removing the rear cover 21 from the floor A, the height B of the motor casing 20, and the rotor 14 being pulled out as in the prior art. The height C in the vertical direction is unnecessary, and the required floor height of the maintenance area can be reduced (see FIG. 17).
[0073]
Also, since the disassembly handling height of the impeller 13, rotor 14 and rear cover 21 is within the range of the height of the worker, the work height and work efficiency are reduced and the work table is reduced compared to the conventional method. Can be planned.
[0074]
Next Figure 11 (a) and (b) Book An eleventh embodiment of the invention will be described. In this embodiment, in the tenth embodiment, as shown in FIGS. 11A and 11B, a carriage fixing mechanism 67 having the structure shown in FIG. There is.
[0075]
The carriage fixing mechanism 67 includes a handle 68, a ball screw 69 rotated by the handle 68, a fixing base 70 attached to a lower end portion of the ball screw 69, a base plate 71 provided on the lower surface of the fixing base 70, and a handle 68 And a hinge arm 73 attached to a fixed base 71.
[0076]
The cart fixing mechanism 67 can fix and support the weight of the cart 61 by the operation of the ball screw 69 by rotating the handle 68. In the maintenance facility, it is possible to delete the ring stopper 65 that fixes the carriage 61, and work stability during pump maintenance is ensured.
[0077]
Further, when the floor of the building is inclined due to drainage or the like, the tilt of the carriage 61 can be eliminated by the mechanism 67, and the pump parts can be pulled out and disassembled with high accuracy.
[0078]
Next Figure 12 (a) and (b) Book A twelfth embodiment of the invention will be described. In this embodiment, the carriage 61 is attached to a pulley 74 for running and guiding the carriage 61 in the pump chamber 40, and the carriage 61 is caused to run by hooking a rope 75 on the pulley 74. That is, as shown in FIG. 12A, a pulley 74 is attached to the wall surface of the casing 31 of the pump chamber 40, and the movement of the transport carriage 61 of the motor unit 15 is remotely controlled using the pulley 74 and the rope 75. Is possible. A pump maintenance method using this maintenance facility will be described with reference to FIG. When the vertical axis pump 3 is maintained, the motor unit 15 may be transported to a maintenance area other than the pump chamber 40.
[0079]
This is because when the vertical axis pump 3 handles a radioactive fluid, the pipe 7, the valve 8 and the like in the pump chamber 40 are activated or become a radiation source in a state containing the radioactive fluid. This is because it may cause exposure of workers in the chamber 40.
[0080]
In addition, for this reason, a labyrinth wall 42 that is not exposed at the entrance 38 of the pump chamber 40 is installed. When the vertical axis pump 3 is transported to the maintenance area, it is necessary to prevent exposure of workers during transportation.
[0081]
In this embodiment, the carriage 61 is moved straight by human power until the stopper (not shown) of the carriage 61 comes into contact with the wall in the depth direction of the pump chamber 40 from the portion of the wall entrance / exit 38 as shown in FIG. . Thereafter, as shown in (b), the rope 75 attached to the carriage 61 is stretched, and the rope 75 is operated by a manual force or a mechanical drive mechanism via the pulley 74 to guide the carriage 61 to the pump installation position. At this time, the worker performs a monitoring operation on the opposite side of the labyrinth wall 42 to the pump.
[0082]
Next, the vertical axis pump 3 is disassembled, and after the motor unit 15 is placed on the carriage 61, the motor unit 15 is carried out of the pump chamber 40 in the reverse procedure by operating the rope 75. These operations prevent the worker from approaching the radiation source when the carriage 61 carries the motor unit 15. As a result, radiation exposure during pump maintenance work can be reduced, and positioning of the carriage 61 under the pump can be accurately performed by guidance with the pulley 74.
[0083]
Although not shown in the present embodiment, an automatic lifting mechanism for the motor unit 15, an automatic attachment / detachment device for the joint bolt between the motor unit 15 and the pump casing 5, etc. are attached to the carriage 61. It is also possible to reduce exposure.
[0084]
In addition, in the pump chamber 40, the floor may have a gradient to collect radioactive fluid, etc., but in order to eliminate instability due to the inclination of the carriage 61, a height adjustment mechanism is provided on the wheel 60 of the carriage 61. May be installed so that the height can be adjusted before operation with the rope 75.
[0085]
Next Figure 13 (a) and (b) Book A thirteenth embodiment of the invention will be described. This embodiment is the same as the twelfth embodiment in that a guide rail 76 is laid on the floor surface of the pump chamber 40, and a guide rail coupling mechanism 77 for the carriage 61 to travel along the guide rail 76 is used as the carriage 61. It is in that.
[0086]
According to the present embodiment, the carriage 61 with wheels 60 can travel along the guide rail 76 by the guide rail coupling mechanism 77, the accuracy of the position of the carriage 61 to the pump installation position is increased, and the positional deviation is adjusted. The exposure of workers due to such factors can be reduced.
[0087]
Next Figure 14 (a) and (b) Book A fourteenth embodiment of the invention will be described. In this twelfth embodiment, a rail 78 is laid on the floor surface of the pump chamber 40 in the twelfth embodiment, and a rail coupling mechanism 79 for running the rail 78 is provided in the carriage 61. That is, the rail coupling mechanism 79 is attached to the transport carriage 61 of the motor unit 15 that can run on the rail 78 laid on the floor of the pump chamber 40.
[0088]
According to the present embodiment, the carriage 61 can travel along the rail 78, the accuracy of the position of the guidance of the carriage 61 to the installation position of the vertical axis pump 3 is increased, and the exposure of the worker due to misalignment adjustment or the like is increased. Can be reduced. In addition, since the work for guiding the carriage 61 to the installation area of the vertical pump 3 by human power is reduced, it is possible to improve the efficiency of transportation work and reduce the exposure of workers.
[0089]
According to the embodiment of the maintenance device, it is possible to reduce the building volume, reduce exposure during pump maintenance, save work, improve workability, and the like. Costs can be significantly reduced by reducing the volume of the building. In addition, exposure during pump maintenance and labor costs can be reduced by saving labor for reduction work, safety can be improved, and work time can be shortened by improving workability. Can be achieved.
[0090]
【The invention's effect】
According to the invention of the pump facility of the nuclear power plant according to the present invention, the size and volume of the building can be reduced by dividing the arrangement of the pump main body, the valve and the piping. In addition, the floor height of the equipment room or pump room where the vertical axis pump is installed should be minimized and the dimensions of the radioactive fluid piping layout should be minimized to reduce costs by reducing radiation exposure during maintenance work and saving labor. Can do.
[0091]
On the other hand, according to the invention of the maintenance facility, at the time of overhaul inspection of the vertical axis pump in the vertical downward direction, the operation of the vertical axis pump or the carriage carrying these parts is remotely controlled to reduce the work of the worker, It can be done in combination with reduction of exposure, safety, etc.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view schematically showing a part of a first embodiment of a pump facility according to the present invention.
FIG. 2 is a longitudinal sectional view schematically showing a part of a second embodiment of the pump equipment according to the present invention.
FIG. 3 is a longitudinal sectional view schematically showing a part of a third embodiment of pump equipment according to the present invention.
FIG. 4 is a longitudinal sectional view schematically showing a part of a fourth embodiment of the pump equipment according to the present invention.
FIG. 5 is a longitudinal sectional view schematically showing a part of a fifth embodiment of pump equipment according to the present invention.
6A is a plan view schematically showing a part of a sixth embodiment of the pump equipment according to the present invention, and FIG. 6B is a plan view showing a conventional example compared with FIG.
FIG. 7 is a perspective view for schematically explaining in part a seventh embodiment of pump equipment according to the present invention;
FIG. 8 is a perspective view for schematically explaining a part of an eighth embodiment of the pump equipment according to the present invention.
9A is a plan view schematically showing a part of a ninth embodiment of the pump equipment according to the present invention, and FIG. 9B is a perspective view showing a state in which the shielding lid in FIG. Figure.
FIG. 10 is a perspective view showing a first example of the embodiment of the pump maintenance facility according to the present invention.
FIG. 11A is an elevational view showing a partial cross section for illustrating a second example of the embodiment of the pump maintenance facility according to the present invention, and FIG. 11B is an enlarged view of the carriage fixing mechanism in FIG. Elevation view shown.
12A is a plan view showing a third example of the embodiment of the pump maintenance facility according to the present invention, and FIG. 12B is a plan view showing a moving state of the carriage from the state of FIG.
FIG. 13 is a plan view showing a fourth example in the embodiment of the pump maintenance facility according to the present invention, and (b) is an enlarged plan view showing the main part in (a).
14A is a plan view showing a fifth example of the embodiment of the pump maintenance facility according to the present invention, and FIG. 14B is a plan view showing an enlarged main part in FIG. 14A.
FIG. 15 is an elevation view for explaining a maintenance procedure using the pump maintenance facility according to the present invention.
FIG. 16 is a cross-sectional view showing the indoor arrangement of a pump facility of a conventional nuclear power plant.
FIG. 17 is an elevation view for explaining a maintenance procedure of a conventional vertical axis pump.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Building housing, 2 ... Equipment room with high floor height, 3 ... Vertical axis pump, 4 ... Pump main body, 5 ... Pump casing, 6 ... Pump support, 7 ... Piping, 8 ... Suction valve and discharge valve, 9 ... Stand , 10 ... Worker, 11 ... Dolly, 12 ... Auxiliary equipment, 13 ... Impeller, 14 ... Rotor, 15 ... Motor unit, 16 ... Lifting machine, 17 ... Nut, 18 ... Monorail, 19 ... Motor unit support base, 20 ... Motor casing, 21 ... Rear cover, 22 ... Pump casing bolt, 23 ... Building housing, 24 ... Lower floor equipment room, 25 ... Adjacent room, 26 ... Upstairs room, 27 ... Floor, 28 ... Hatch, 29 ... Maintenance room , 30: Support member, 31 ... Building housing, 32 ... Vertical partition wall, 33 ... Horizontal partition wall, 34 ... Right pump chamber, 35 ... Left pump chamber, 36 ... Curtain rail, 37 ... Shielding curtain, 38 ... Entrance, 39 ... Maintenance area, 40 ... Pump room, 41 ... Shield door, 42 ... Rabi Wall, 43 ... labyrinth passage, 44 ... driving form, 45 ... piping support, 46 ... duct support, 47 ... duct, 48 ... suspension, 49 ... cable tray, 50 ... reinforcement, 51 ... large block (floor Block), 52 ... balance, 53 ... shielding lid, 54 ... hinge, 55 ... support base, 56 ... bolt, 57 ... bolt insertion hole, 58 ... nut, 59 ... frame, 60 ... wheel, 61 ... bogie, 62 ... Supporting wedge, 63 ... Case fixing hole, 64 ... Motor unit fixing member, 65 ... Ring stop, 66 ... Screw hole, 67 ... Dolly fixing mechanism, 68 ... Handle, 69 ... Ball screw, 70 ... Fixing base, 71 ... Base plate , 72 ... bearing, 73 ... hinge arm, 74 ... pulley, 75 ... rope, 76 ... guide rail, 77 ... guide rail coupling mechanism, 78 ... rail, 79 ... rail coupling mechanism.

Claims (4)

縦軸ポンプを設置する機器室の下階にメンテナンス室を設け、前記縦軸ポンプを天井から吊下げ設置し、前記機器室内の前記縦軸ポンプの下方に位置する床にハッチを設けてなることを特徴とする原子力発電所のポンプ設備。 Maintenance chamber provided in the lower floor of an equipment room for installing the vertical shaft pump, said longitudinal axis pump lowered installed suspended from the ceiling, comprising setting only a hatch in the floor located below the longitudinal axis pump of the equipment chamber This is a pumping facility for nuclear power plants. 前記天井は、前記縦軸ポンプのポンプ本体、ポンプに付随する機器類及びその他の機器類を予め打込型枠に取付けて一体構造物とし、この一体構造物を建設現場の所定位置に直接吊込んで前記機器室の天井とすることを特徴とする請求項1記載の原子力発電所のポンプ設備。 The ceiling has a pump body of the vertical axis pump, devices attached to the pump, and other devices attached in advance to a driving form to form an integrated structure, and the integrated structure is directly suspended at a predetermined position on the construction site. 2. The nuclear power plant pumping facility according to claim 1 , wherein the pumping facility is a ceiling of the equipment room . 縦軸ポンプを設置する機器室の下階にメンテナンス室を設け、前記縦軸ポンプのポンプケーシング部分を前記機器室内の床に支持固定し、前記縦軸ポンプの配管側を前記機器室内に配置し、前記ポンプ本体側を前記メンテナンス室内に配置してなることを特徴とする原子力発電所のポンプ設備。Maintenance chamber provided ordinate pump equipment chamber beneath floor you installation, the pump casing portion of the longitudinal axis pump supported and fixed to the floor of the equipment room, the piping side of the longitudinal axis pump into the equipment chamber arrangement, and pumping equipment for nuclear power plants, characterized by comprising place the said pump body to the maintenance room. 前記床は、前記縦軸ポンプのポンプ本体、ポンプに付随する機器及びその他の機器類を予め打込型枠に取付けて床ブロック構造物とし、この床ブロック構造物を建設現場の所定位置に直接吊込んで前記機器室の床とすることを特徴とする請求項3記載の原子力発電所のポンプ設備。The floor has a floor block structure in which a pump body of the vertical axis pump, equipment associated with the pump and other equipment are previously attached to a driving form, and the floor block structure is directly placed at a predetermined position on the construction site. 4. The pumping facility for a nuclear power plant according to claim 3, wherein the pumping facility is used as a floor of the equipment room .
JP08277199A 1999-03-26 1999-03-26 Nuclear power plant pumping equipment Expired - Fee Related JP3999908B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP08277199A JP3999908B2 (en) 1999-03-26 1999-03-26 Nuclear power plant pumping equipment
CNB031584799A CN1232989C (en) 1999-03-26 2000-03-27 Pump equipment and its maintenance equipment in nuclear power plants
CNB2005100726230A CN1293572C (en) 1999-03-26 2000-03-27 Pumping equipment in nuclear power plants
CNB00105404XA CN1147874C (en) 1999-03-26 2000-03-27 Pump device for nuclear power plants
CNA2006100958707A CN1901098A (en) 1999-03-26 2000-03-27 Pump equipment of reactor power station and its maintenance equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08277199A JP3999908B2 (en) 1999-03-26 1999-03-26 Nuclear power plant pumping equipment

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2007162526A Division JP2007232746A (en) 2007-06-20 2007-06-20 Nuclear power plant pump facilities and maintenance facilities

Publications (2)

Publication Number Publication Date
JP2000275388A JP2000275388A (en) 2000-10-06
JP3999908B2 true JP3999908B2 (en) 2007-10-31

Family

ID=13783708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08277199A Expired - Fee Related JP3999908B2 (en) 1999-03-26 1999-03-26 Nuclear power plant pumping equipment

Country Status (2)

Country Link
JP (1) JP3999908B2 (en)
CN (4) CN1147874C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102081977A (en) * 2009-11-27 2011-06-01 上海核工程研究设计院 Turning repair frame for plug-in part of primary coolant pump in reactor
JP2015112612A (en) * 2013-12-10 2015-06-22 村田機械株式会社 Plate material-processing device
JP6873826B2 (en) * 2017-05-31 2021-05-19 株式会社東芝 Particle beam medical equipment
CN107342111A (en) * 2017-08-25 2017-11-10 上海核工程研究设计院有限公司 A kind of double crane common rail method for arranging of PWR nuclear power plant fuel factory building
CN107628532B (en) * 2017-10-16 2023-12-22 通裕重工股份有限公司 Crane with hot chamber
CN109969949A (en) * 2017-12-27 2019-07-05 核动力运行研究所 Nuclear main pump maintenance rail car

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5307386A (en) * 1992-06-24 1994-04-26 Westinghouse Electric Corp. Apparatus and method for servicing an elongated suspended pump motor in an electric power plant with limited access
DE19611703C2 (en) * 1996-03-25 1998-04-09 Siemens Ag Method and device for securing the removal of residual heat from a reactor of a nuclear power plant
JPH1123786A (en) * 1997-07-02 1999-01-29 Toshiba Corp Water level adjusting device for vertical centrifugal pump of nuclear power plant

Also Published As

Publication number Publication date
CN1901098A (en) 2007-01-24
CN1691210A (en) 2005-11-02
CN1268752A (en) 2000-10-04
CN1495803A (en) 2004-05-12
CN1147874C (en) 2004-04-28
CN1232989C (en) 2005-12-21
JP2000275388A (en) 2000-10-06
CN1293572C (en) 2007-01-03

Similar Documents

Publication Publication Date Title
CN102583130B (en) A kind of elevator shaft wall using combined shaft frame to assemble
JP3999908B2 (en) Nuclear power plant pumping equipment
JP2007232746A (en) Nuclear power plant pump facilities and maintenance facilities
JP3095749B1 (en) Turbine building structure and intake duct
JPH1172591A (en) Regular inspection work equipment for nuclear power plants
JP3405537B2 (en) Pneumatic caisson
KR20020070325A (en) Pulling room
JP7244119B2 (en) Floor slab installation method
JP2003268779A (en) Pneumatic caisson and excavation in pneumatic caisson, management and recovery of excavator
JPH0886037A (en) Plant building, construction method of the building, and structure used for the construction
US20070283634A1 (en) Lifting Cradle
WO2022235024A1 (en) Wire saw apparatus for excavator
JP4127940B2 (en) Method for carrying in / out of feed water heater in condenser and carrying in / out device for feed water heater in condenser
CN114251516A (en) Comprehensive support and hanger system and construction method thereof
CN113734998A (en) Fan lifting equipment for pumped storage power station
JP3325387B2 (en) Lid attachment / detachment device for pipe cooler
KR101865792B1 (en) Building structure constructed by the prefabrication method and temporary structure for the prefabrication method and constructing process by the prefabrication method
JP2003293792A (en) Gas turbine intake filter equipment
CN216072803U (en) Fan lifting equipment for pumped storage power station
JP2003184321A (en) Apparatus and method for dismantling tower-like structures
JP3576399B2 (en) Inspection method and inspection device for fuel control valve for gas turbine
CN120946102A (en) Installation method for cement curing line equipment in nuclear chemical industry
JPS6243088Y2 (en)
KR20240017638A (en) Interlayer lifting machine that carries formwork from a building
JPS6243989Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040611

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070424

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070807

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070810

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110817

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees