Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4005497B2 - Floor bundle and its usage - Google Patents
[go: Go Back, main page]

JP4005497B2 - Floor bundle and its usage - Google Patents

Floor bundle and its usage Download PDF

Info

Publication number
JP4005497B2
JP4005497B2 JP2002375037A JP2002375037A JP4005497B2 JP 4005497 B2 JP4005497 B2 JP 4005497B2 JP 2002375037 A JP2002375037 A JP 2002375037A JP 2002375037 A JP2002375037 A JP 2002375037A JP 4005497 B2 JP4005497 B2 JP 4005497B2
Authority
JP
Japan
Prior art keywords
bolt
nut
fixing tool
floor
concrete base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002375037A
Other languages
Japanese (ja)
Other versions
JP2004204553A (en
Inventor
孝一 久貝
正勝 町村
金十 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2002375037A priority Critical patent/JP4005497B2/en
Publication of JP2004204553A publication Critical patent/JP2004204553A/en
Application granted granted Critical
Publication of JP4005497B2 publication Critical patent/JP4005497B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、コンクリート基盤上に建築物の床を固定するための床束、さらに詳しくは、ボルトとそのボルトの上部に螺合されるナットを有し、ボルトの下端部をコンクリート基盤に植設し、ボルトの上端部に大引又は根太材(以下、代表的に根太材という。)を前記ナットにより高さを調整された位置に固定する床束及びその使用方法に関する。
【0002】
【従来の技術】
図5及び図6は、本出願人の一人が従来使用してきた床束及びその使用方法を示すものである。すなわち、床束A´は、高さ調整用のボルト101と、そのボルトの下部に螺合される定着板102と、ボルトの上部に螺合される受け材103と、ボルト101の上端部に螺合されるナット104とで構成されている。
これを用いる場合は、図5に示すように、下部に定着板102を螺合したボルト101の下端部を、コンクリート基盤B上に書いた縦線XLと横線YLの交差点に設けた孔105に挿入し、定着板102でボルトの埋め込み深さを調整した後、孔105にモルタル又は接着剤などの結合材106を注入して、ボルトを個々に固定する。
結合材の固化養生を待ち、個々の床束に根太材107を結合する。すなわち、ボルト101の上部に受け材103をその中央に設けてある雌ねじにおいて螺合し、かつ、ボルト101の上端部を根太材107に設けてある下部の孔に貫通し、その根太材に設けてある上部の孔からナット104をボルト101の上端部に螺合して、受け材103とナット104の回転操作により根太材107の傾き及び高さを調整していた。
特許文献1には、上記従来技術と実質的に同様の床束が記載されている。
【0003】
【特許文献1】
特開2000−320056号公報 段落0010, 図2
【0004】
【発明が解決しようとする課題】
上記従来技術による場合は、ボルトを床下地に結合せずに、ボルトに定着板を取付けただけの状態でコンクリート基盤の孔に挿入し、その結合材の固化養生後にボルトに受け材を螺合し、個々のボルトの上端部を根太材に貫通してその根太材を前記受け材に載せ、ボルトの上部にナットを締結して根太材を固定するが、次のような問題がある。
すなわち、第1に、ボルトはそれぞれ個別に立設されるので、ボルトを根太材に沿う直線上に完全に鉛直状態に、しかも、複数本のボルトが共通の垂直面に沿って整列するように立設することは困難である。従って、根太材設置の寸法精度は構造的に上げにくい。第2に、各床束のボルト設置の寸法精度が低いので、ボルトの根太材への貫通及びナット締結時の矯正が容易でない。第3に、ボルトの挿入後に結合材の固化養生を待って、ボルトに対して受け材を螺合する作業と、ボルト上端部を根太材に貫通する作業と、ボルト上端部にナットを締結する作業とを行うので、施工開始から終了までの時間が長くなる。
【0005】
本発明は、上記の点に鑑みてなされたものであり、その第一の課題は、ボルトのコンクリート基盤に対する立設の能率及び寸法精度の向上が可能で、根太材の傾き及び高さ矯正を容易に行うことができ、施工時間の短縮を図ることができる床束を提供することにある。
また、第二の課題は、床下地の設置のための施工時間の大幅な短縮を可能にする床束の使用方法を提供することにある。
【0006】
【課題を解決するための手段】
上記第一の課題を解決するため、本発明は、ボルトとそのボルトの上部に螺合されるナットからなり、前記ボルトの下端部をコンクリート基盤に植設し、前記ボルトの上端部に大引又は根太材を前記ナットにより高さを調整された位置に固定する床束において、(a)倒立カップ状の定着具をその底部に設けた雌ねじ部において前記ボルトの下部に螺合したこと、(b)前記定着具は、下面に開口してモルタル等の結合材を収容する収容空間と、前記収容空間に前記結合材を注入するための孔又は切欠を有することを特徴としている。
上記構成により、定着具を回転して、ボルトのコンクリート基盤の孔に対する挿入深さを調整できる。ボルトの上端部はこれを根太材にナットにより結合し、根太材のボルトに対する高さをナットを介して調整することができる。ボルトの下端部をコンクリート基盤の孔に挿入して、定着具をそのコンクリート基盤の上面に静置することができる。その状態で、ナットのボルトに対する位置を調整して、根太材の高さ及び傾きの矯正ができる。そして、定着具の孔又は切欠からコンクリート基盤の孔及び定着具の収容空間にモルタル等の結合材を注入することができる。結合材の注入で、結合材の固化養生を待たずに施工は終了する。
【0007】
定着具の孔又は切欠は、互いに反対側の位置に設けられていることが望ましい。これにより、一方の孔又は切欠から注入状況を監視しながら、他方の孔又は切欠から結合材を注入することができる。
また、定着具は、上端部から上方に突出するナットが設けられ、そのナットに工具を嵌合して回転可能であることが望ましい。これにより、他のナットと共通の工具を用いて、定着具のボルト長手方向に対する位置調整を容易に行うことができる。
【0008】
上記第二の課題を解決するため、本発明は、(a)ボルトの下部に定着具を螺合し、(b)前記ボルトの上部を大引又は根太材にナットにより仮結合して各床束を床下地に取付け、(c)その床下地をコンクリート基盤上に静置し、前記コンクリート基盤に設けてある孔に前記ボルトの下端部を挿入して、前記定着具を前記コンクリート基盤上面に静置し、(d)前記ナットの操作により前記大引き又は根太材の傾き及び高さ等を矯正して前記ナットを締結し、(e)最後に前記定着具の孔又は切欠から結合材を前記コンクリート基盤の孔及び定着具の収容空間に注入することを特徴としている。
【0009】
【発明の実施の形態】
次に、本発明の実施の形態について、図面を用いて説明する。
図1は根太材の設置に使用されている床束の正面図、図2は図1のX−X線に沿った断面図、図3は定着具のみの縦断面図、図4は床束の下部のみの拡大断面図である。
【0010】
図において、Aは本発明による床束である。床束Aは、高さ調整用のボルト1と、ボルト1の下端部に上下移動可能に螺合されている定着具2と、ボルト1の上端部付近に螺合される一対のナット3,4とから構成されている。
【0011】
定着具2は、図3に示すように、倒立カップ状に形成され、下方に開口する収容空間5を有するとともに、その底部の中央に孔6が設けられ、さらにその底部の上面に上方に突出するナット7をその雌ねじ8の中心を孔6の中心に合致させた状態で接合されている。好ましくは、定着具2の下端部の鍔部に定着具のコンクリート基盤Bに対する摩擦抵抗を高めるため、ゴム製の滑り止めカバー9が嵌着されている。
【0012】
定着具2には、また、その肩部の互いに反対側となる位置において、収容空間5に連通する孔10が設けられていて、後述するように、この孔から収容空間5にモルタル又はモルタル及び接着剤などの、コンクリート基盤Bとの結合性に優れた結合材を注入することができるようになっている。孔10は、これに代えて切欠であっても良い。
【0013】
上記の構成を有する床束Aを用いて、図1に示すように、建築物の床下地Cをコンクリート基盤B上に固定する場合の施工方法を説明する。
図1において、12は、床下地Cを構成する根太材であり、図2に示すように、長尺角筒状に形成されている。そして、根太材12の上壁13と下壁14には、床束を結合する位置において、上下方向に貫通する孔13h,14hが設けられている。上壁13の孔13hは、ナット4を上方から根太材12の中に挿通することができる大きさに形成されている。
【0014】
まず、ボルト1の下端部を定着具2のナット7の雌ねじ8にねじ込み、そのナット7に工具を嵌合して回すことにより、ボルト1の下端部を適当な長さに渡って定着具2から突出させる。すなわち、ボルト1のコンクリート基盤の孔に対する埋設深さを設定する。
次に、そのボルト1の上部に一つ目のナット3を螺合し、工具を用いて定着具2からの距離が、根太材のコンクリート基盤Bからの設置高さとほぼ等しくなる位置まで、ナット3を移動する。続いて、ナット3の上側においてボルト1にワッシャ11を装着した後、そのボルト1の先端を根太材12の下壁14の孔14hから上方に挿通するとともに、その根太材12の上壁13の孔13hからもう一つのナット4を根太材12の中に挿入して、ボルト1の上端部に緩やかに螺合して、床束Aを根太材12に取付ける。
【0015】
床下地Cを構成するすべての根太材12には、その長手方向に隔てられた複数箇所に、上述と同様にして、複数個の床束Aが取付けられる。平行に配置されている根太材12は、図示されていない連結材により連結されて、枠状又は目字状に組立てられていることが多い。
【0016】
そして、床束Aを取付けられた床下地Cは、コンクリート基盤B上に置かれ、図4に示すように、コンクリート基盤上面に書かれた縦線と横線の交差点においてコンクリート基盤Bに設けられた孔15に、各床束のボルト1の下端部を挿入して、定着具2をコンクリート基盤上面に静置する。この状態で、各床束におけるコンクリート基盤Bの上面は、完全な水平面を形成しているとは限らないので、ある床束における定着具はコンクリート基盤上面から浮上する場合もある。そこで、工具を用いて定着具2及び/又はナット3を所要方向に回し、定着具2をコンクリート基盤Bの上面に接地させ、かつ、すべての根太材12が共通の水平面上に存在するように、根太材の高さ及び傾きを矯正する。そして、最後にナット4を強く締めてボルト1を根太材12にロックする。
【0017】
床束Aの定着具2及びナット3,4によりすべての根太材12の高さが調整されたならば、各床束の定着具2の一方の孔10から定着具の収容空間5に結合材Dを注入する。すなわち、例えば、モルタルを注入し、又はモルタルの注入後に接着剤を注入する。他方の孔10から定着具の中を見ながら注入することができるので、結合材の注入量が定着具2の収容空間5の容積に対して過不足を生じないようにすることが可能である。従って、定着具2をコンクリート基盤Bに確実に固定することができる。
【0018】
床下地Cの固定後は、床束Aは、下端部が定着具2を介してコンクリート基盤Bに埋設され、上端部がナット3,4を介して根太材12に結合されているので、床下地がコンクリート基盤に対して上下振動して、いわゆる床鳴りをすることが有効に防止される。
【0019】
定着具2に滑り止めカバー9が取付けられている場合は、ボルト1のコンクリート基盤B上面に対する横滑りが確実に防止され、硬化したモルタル等の結合材Dがボルトから受ける応力により破断される恐れも排除される。
【0020】
図1の16は、根太材12の上面に載置して固定されたデッキ材である。
図示の例は、ボルト1の上端部が根太材12の上面から突出しない態様で根太材に結合されているので、ナット3,4が下壁14を締め付けているが、床の種類によっては、ボルト1が根太材の上面から突出する態様で根太材に結合される場合もあり、その場合は、上側のナット4は根太材の上壁13の上面に当接される。
さらに、定着具Aの孔10の数及び位置はとくに限定されず、孔は一つだけ設けても、結合材の適正な注入は可能であるが、図示の例のように、孔10が互いに反対側に設けてあると、一方から監視しながら他方の孔より適量の結合材を迅速的確に注入できる利点がある。
【0021】
【発明の効果】
上述のように、請求項1の発明によれば、床束を予め床下地に取付け、その床下地をコンクリート基盤上に静置して、各床束のボルトの下端部をコンクリート基盤の孔に挿入した状態で、定着具及び/又はナットのボルトに対する高さを調整して、根太材の高さ及び傾きを容易に矯正することができ、その後に定着具の中に結合材を容易に注入することができる。従って、床束の床下地に対する取付作業、高さ調整作業、結合材注入作業を簡単迅速に行うことができ、さらに、施工は、結合材の養生期間に影響されないので、施工時間の短縮が可能である。
【0022】
請求項3の発明によれば、床束をコンクリート基盤に立設した後、その床束に根太材を結合するのではなく、床束を予め床下地に取付け、その床下地をコンクリート基盤上に静置し、そのコンクリート基盤に設けてある孔にボルトの下端部を挿入して、定着具をコンクリート基盤上面に静置し、定着具及び/又はナットの操作により根太材の傾き及び高さ等を矯正してナットを締結し、最後に定着具の孔から結合材を前記コンクリート基盤の孔及び定着具の収容空間に注入するように床束を用いるので、床下地の施工能率が格段に向上する。
【図面の簡単な説明】
【図1】根太材の設置に使用されている床束の正面図。
【図2】図1のX−X線に沿った断面図。
【図3】定着具のみの縦断面図。
【図4】床束の下部のみの拡大断面図。
【図5】本出願人の一人が従来使用してきた床束の構成要素の一部及び床束の使用方法を示す斜視図。
【図6】同じくその床束の使用状態を示す断面図。
【符号の説明】
A 床束
1 ボルト
2 定着具
3,4 ナット
5 収容空間
7 4ナット
10 孔
B コンクリート基盤
15 孔
D 結合材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a floor bundle for fixing a building floor on a concrete base, more specifically, a bolt and a nut screwed onto the top of the bolt, and the lower end of the bolt is planted on the concrete base. In addition, the present invention relates to a floor bundle for fixing a large draw or joist (hereinafter, typically referred to as joist) to a position whose height is adjusted by the nut, and a method of using the same.
[0002]
[Prior art]
FIGS. 5 and 6 show a floor bundle that has been conventionally used by one of the applicants and a method for using the same. That is, the floor bundle A ′ includes a bolt 101 for height adjustment, a fixing plate 102 screwed to the lower part of the bolt, a receiving member 103 screwed to the upper part of the bolt, and an upper end part of the bolt 101. It is comprised with the nut 104 screwed together.
When this is used, as shown in FIG. 5, the lower end portion of the bolt 101 with the fixing plate 102 screwed to the lower portion is provided in the hole 105 provided at the intersection of the vertical line XL and the horizontal line YL written on the concrete base B. After inserting and adjusting the embedding depth of the bolt with the fixing plate 102, a bonding material 106 such as a mortar or an adhesive is injected into the hole 105 to fix the bolt individually.
Waiting for the solidification curing of the binding material, the joists 107 are bonded to the individual floor bundles. That is, the receiving member 103 is screwed onto the upper portion of the bolt 101 by a female screw provided in the center thereof, and the upper end portion of the bolt 101 is passed through the lower hole provided in the joist member 107 to be provided in the joist member. The nut 104 is screwed into the upper end of the bolt 101 from the upper hole, and the inclination and height of the joist member 107 are adjusted by rotating the receiving member 103 and the nut 104.
Patent Document 1 describes a floor bundle that is substantially the same as the above prior art.
[0003]
[Patent Document 1]
JP 2000-320056 A paragraph 0010, FIG.
[0004]
[Problems to be solved by the invention]
In the case of the above prior art, the bolt is not connected to the floor base, but is inserted into the hole of the concrete base with the fixing plate attached to the bolt, and the receiving material is screwed to the bolt after the curing of the binding material. Then, the upper ends of the individual bolts are passed through the joists, and the joists are placed on the receiving member, and the nuts are fastened to the upper parts of the bolts to fix the joists. However, there are the following problems.
That is, firstly, since the bolts are erected individually, the bolts are completely vertical on a straight line along the joist and so that a plurality of bolts are aligned along a common vertical plane. It is difficult to stand upright. Therefore, the dimensional accuracy of the joist installation is difficult to increase structurally. Secondly, since the dimensional accuracy of the bolt installation of each floor bundle is low, the penetration of the bolt into the joist and the correction at the time of fastening the nut are not easy. Thirdly, after the bolt is inserted, after waiting for the solidification curing of the binding material, the operation of screwing the receiving material to the bolt, the operation of penetrating the bolt upper end portion into the joist material, and the fastening of the nut to the bolt upper end portion Since the work is performed, the time from the start to the end of construction becomes longer.
[0005]
The present invention has been made in view of the above points, and the first problem is that it is possible to improve the efficiency and dimensional accuracy of the bolt standing on the concrete base, and to correct the inclination and height of the joist. An object of the present invention is to provide a floor bundle that can be easily performed and can shorten the construction time.
The second problem is to provide a method of using a floor bundle that enables a significant reduction in the construction time for installing the floor foundation.
[0006]
[Means for Solving the Problems]
In order to solve the first problem, the present invention comprises a bolt and a nut that is screwed onto the upper part of the bolt. The lower end of the bolt is planted on a concrete base, and the upper end of the bolt is overdrawn. Alternatively, in a floor bundle for fixing a joist to a position whose height is adjusted by the nut, (a) an inverted cup-shaped fixing tool is screwed into a lower portion of the bolt at an internal thread portion provided at the bottom thereof; b) The fixing tool is characterized in that it has an accommodation space that opens on the lower surface and accommodates a binding material such as mortar, and a hole or notch for injecting the binding material into the accommodation space.
With the above configuration, the fixing tool can be rotated to adjust the insertion depth of the bolt into the hole of the concrete base. The upper end of the bolt can be coupled to the joist with a nut, and the height of the joist can be adjusted via the nut. The lower end portion of the bolt can be inserted into the hole of the concrete base, and the fixing tool can be placed on the top surface of the concrete base. In this state, the height and inclination of the joist can be corrected by adjusting the position of the nut relative to the bolt. Then, a binder such as mortar can be injected from the hole or notch of the fixing tool into the hole of the concrete base and the accommodation space of the fixing tool. By injecting the binder, the construction is completed without waiting for the solidification curing of the binder.
[0007]
It is desirable that the holes or notches of the fixing tool are provided at positions opposite to each other. Thereby, it is possible to inject the binding material from the other hole or notch while monitoring the injection state from one hole or notch.
Further, it is desirable that the fixing tool is provided with a nut protruding upward from the upper end portion, and can be rotated by fitting a tool to the nut. Thereby, the position adjustment with respect to the volt | bolt longitudinal direction of a fixing tool can be easily performed using a tool common with another nut.
[0008]
In order to solve the second problem, the present invention includes: (a) a fixing tool is screwed to a lower part of a bolt; and (b) an upper part of the bolt is temporarily connected to a large pull or a joist with a nut. The bundle is attached to the floor base, (c) the floor base is left on the concrete base, the lower end of the bolt is inserted into the hole provided in the concrete base, and the fixing tool is placed on the top of the concrete base. (D) Correct the inclination and height of the large pull or joist by operating the nut and fasten the nut. (E) Finally, remove the binder from the hole or notch of the fixing tool. It is characterized in that it is injected into the hole of the concrete base and the accommodation space of the fixing tool.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings.
1 is a front view of a floor bundle used for installing joists, FIG. 2 is a sectional view taken along line XX in FIG. 1, FIG. 3 is a longitudinal sectional view of only a fixing tool, and FIG. 4 is a floor bundle. It is an expanded sectional view of only the lower part.
[0010]
In the figure, A is a floor bundle according to the present invention. The floor bundle A includes a height adjusting bolt 1, a fixing device 2 screwed to the lower end portion of the bolt 1 so as to be vertically movable, and a pair of nuts 3 screwed to the vicinity of the upper end portion of the bolt 1. 4.
[0011]
As shown in FIG. 3, the fixing device 2 is formed in an inverted cup shape, has an accommodation space 5 that opens downward, has a hole 6 in the center of its bottom, and further projects upward on the upper surface of its bottom. The nut 7 is joined with the center of the female screw 8 aligned with the center of the hole 6. Preferably, a rubber anti-slip cover 9 is fitted to the flange at the lower end of the fixing tool 2 in order to increase the frictional resistance of the fixing tool against the concrete base B.
[0012]
The fixing device 2 is also provided with a hole 10 communicating with the accommodation space 5 at a position on the opposite side of the shoulder portion. As will be described later, mortar or mortar and It is possible to inject a bonding material having excellent bonding properties with the concrete base B, such as an adhesive. Instead of this, the hole 10 may be a notch.
[0013]
The construction method in the case of fixing the floor foundation C of a building on the concrete base B as shown in FIG. 1 using the floor bundle A having the above configuration will be described.
In FIG. 1, reference numeral 12 denotes a joist material constituting the floor base C, and is formed in a long rectangular tube shape as shown in FIG. 2. The upper wall 13 and the lower wall 14 of the joist 12 are provided with holes 13h and 14h penetrating in the vertical direction at positions where the floor bundles are joined. The hole 13h in the upper wall 13 is formed in a size that allows the nut 4 to be inserted into the joist 12 from above.
[0014]
First, the lower end portion of the bolt 1 is screwed into the female screw 8 of the nut 7 of the fixing device 2, and a tool is fitted into the nut 7 and turned to turn the lower end portion of the bolt 1 over an appropriate length. Protrude from. That is, the embedding depth with respect to the hole of the concrete base | substrate of the volt | bolt 1 is set.
Next, the first nut 3 is screwed onto the upper part of the bolt 1, and the nut is used to reach a position where the distance from the fixing tool 2 is substantially equal to the installation height from the concrete base B of the joists using a tool. Move 3. Subsequently, after attaching the washer 11 to the bolt 1 on the upper side of the nut 3, the tip of the bolt 1 is inserted upward from the hole 14 h of the lower wall 14 of the joist 12 and the upper wall 13 of the joist 12 is formed. Another nut 4 is inserted into the joist member 12 through the hole 13 h and is gently screwed into the upper end of the bolt 1 to attach the floor bundle A to the joist member 12.
[0015]
A plurality of floor bundles A are attached to all the joists 12 constituting the floor foundation C at a plurality of locations separated in the longitudinal direction in the same manner as described above. In many cases, the joist members 12 arranged in parallel are connected to each other by a connecting member (not shown) and assembled into a frame shape or a square shape.
[0016]
Then, the floor base C to which the floor bundle A is attached is placed on the concrete base B, and is provided on the concrete base B at the intersection of the vertical and horizontal lines written on the top surface of the concrete base as shown in FIG. The lower end portion of the bolt 1 of each floor bundle is inserted into the hole 15, and the fixing tool 2 is placed on the concrete base upper surface. In this state, since the upper surface of the concrete base B in each floor bundle does not necessarily form a complete horizontal plane, the fixing tool in a certain floor bundle may float from the upper surface of the concrete base. Therefore, the fixing tool 2 and / or the nut 3 is turned in a required direction by using a tool so that the fixing tool 2 is grounded to the upper surface of the concrete base B, and all the joists 12 are on a common horizontal plane. Correct the height and inclination of joists. Finally, the nut 4 is firmly tightened to lock the bolt 1 to the joist 12.
[0017]
When the height of all the joists 12 is adjusted by the fixing tool 2 and the nuts 3 and 4 of the floor bundle A, the binder is connected from the one hole 10 of the fixing tool 2 of each floor bundle to the accommodation space 5 of the fixing tool. D is injected. That is, for example, mortar is injected, or adhesive is injected after mortar injection. Since the injection can be performed while looking into the fixing tool from the other hole 10, it is possible to prevent the amount of injection of the binding material from being excessive or insufficient with respect to the volume of the accommodation space 5 of the fixing tool 2. . Therefore, the fixing tool 2 can be securely fixed to the concrete base B.
[0018]
After fixing the floor foundation C, the floor bundle A has a lower end embedded in the concrete base B via the fixing tool 2 and an upper end connected to the joist 12 via nuts 3 and 4. It is effectively prevented that the ground vibrates up and down with respect to the concrete base and makes a so-called floor noise.
[0019]
When the anti-slip cover 9 is attached to the fixing device 2, the side slip of the bolt 1 with respect to the upper surface of the concrete base B is surely prevented, and the hardened mortar or other bonding material D may be broken by the stress received from the bolt. Eliminated.
[0020]
Reference numeral 16 in FIG. 1 denotes a deck member that is placed and fixed on the upper surface of the joist member 12.
In the illustrated example, since the upper end of the bolt 1 is coupled to the joist in a manner that does not protrude from the upper surface of the joist 12, the nuts 3 and 4 tighten the lower wall 14, but depending on the type of floor, In some cases, the bolt 1 is coupled to the joist in a manner that protrudes from the upper surface of the joist. In this case, the upper nut 4 is brought into contact with the upper surface of the upper wall 13 of the joist.
Further, the number and position of the holes 10 of the fixing device A are not particularly limited, and even if only one hole is provided, it is possible to properly inject the binding material. When provided on the opposite side, there is an advantage that an appropriate amount of the bonding material can be quickly and accurately injected from the other hole while monitoring from one side.
[0021]
【The invention's effect】
As described above, according to the invention of claim 1, the floor bundle is previously attached to the floor foundation, the floor foundation is left on the concrete base, and the lower end portion of the bolt of each floor bundle is made into the hole of the concrete base. In the inserted state, the height and inclination of the joist can be easily corrected by adjusting the height of the fixing tool and / or nut relative to the bolt, and then the binder is easily injected into the fixing tool. can do. Therefore, it is possible to easily and quickly perform the work of attaching the floor bundle to the floor base, adjusting the height, and injecting the binder, and the construction is not affected by the curing period of the binder, so that the construction time can be shortened. It is.
[0022]
According to the invention of claim 3, after the floor bundle is erected on the concrete base, the floor bundle is not attached to the floor bundle but is attached to the floor base in advance, and the floor base is placed on the concrete base. Let stand, insert the lower end of the bolt into the hole provided in the concrete base, leave the fixing tool on the top of the concrete base, and operate the fixing tool and / or nut to tilt and height the joist Since the floor bundle is used so that the binder is injected into the hole of the concrete base and the fixing space from the hole of the fixing tool and finally the nut is tightened, the floor base construction efficiency is greatly improved. To do.
[Brief description of the drawings]
FIG. 1 is a front view of a floor bundle used for installing joists.
FIG. 2 is a cross-sectional view taken along line XX in FIG.
FIG. 3 is a longitudinal sectional view of only a fixing tool.
FIG. 4 is an enlarged sectional view of only the lower part of the floor bundle.
FIG. 5 is a perspective view showing some of the components of the floor bundle that have been conventionally used by one of the applicants and a method of using the floor bundle.
FIG. 6 is a cross-sectional view showing the usage state of the floor bundle.
[Explanation of symbols]
A Floor bundle 1 Bolt 2 Fixing tool 3, 4 Nut 5 Housing space 7 4 Nut 10 Hole B Concrete base 15 Hole D Bonding material

Claims (4)

ボルトとそのボルトの上部に螺合されるナットとを有し、前記ボルトの下端部をコンクリート基盤に植設し、前記ボルトの上端部に大引又は根太材を前記ナットにより高さを調整された位置に固定する床束において、
倒立カップ状の定着具をその底部に設けた雌ねじ部において前記ボルトの下部に螺合したこと、
前記定着具は、下面に開口してモルタル等の結合材を収容する収容空間と、その収容空間に前記結合材を注入するための孔又は切欠を有すること、
を特徴とする床束。
A bolt and a nut that is screwed onto the top of the bolt; the bottom end of the bolt is planted on a concrete base; In the floor bundle fixed in the
The inverted cup-shaped fixing tool is screwed to the lower part of the bolt at the female thread portion provided at the bottom thereof,
The fixing device has an accommodation space that opens on the lower surface and accommodates a binding material such as mortar, and a hole or a notch for injecting the binding material into the accommodation space;
A floor bundle characterized by.
定着具の孔又は切欠は、互いに反対側の位置に設けられていることを特徴とする請求項1に記載された床束。The floor bundle according to claim 1, wherein the holes or notches of the fixing tool are provided at positions opposite to each other. 定着具は、その底部から上方に突出するナットが設けられ、そのナットに工具を嵌合して回転可能であることを特徴とする請求項1又は2に記載された床束。3. The floor bundle according to claim 1, wherein the fixing tool is provided with a nut protruding upward from a bottom portion thereof, and can be rotated by fitting a tool to the nut. ボルトの下部に定着具を螺合するとともに、前記ボルトの上部を大引又は根太材にナットにより仮結合して各床束を床下地に取付け、その床下地をコンクリート基盤上に静置し、前記コンクリート基盤に設けてある孔に前記ボルトの下端部を挿入して、前記定着具を前記コンクリート基盤上面に静置し、前記ナットの操作により前記大引き又は根太材の傾き及び高さ等を矯正して前記ナットを締結し、最後に前記定着具の孔又は切欠から結合材を前記コンクリート基盤の孔及び定着具の収容空間に注入することを特徴とする請求項1,2又は3記載の床束を使用する方法。While screwing the fixing tool to the lower part of the bolt, temporarily attaching the upper part of the bolt to the foreboard or joist with a nut and attaching each floor bundle to the floor base, the floor base is left on the concrete base, The lower end of the bolt is inserted into a hole provided in the concrete base, the fixing tool is allowed to stand on the top surface of the concrete base, and the inclination or height of the large pull or joist is adjusted by operating the nut. 4. The nut according to claim 1, 2 or 3, wherein the nut is straightened and the nut is fastened, and finally a binding material is injected from the hole or notch of the fixing tool into the hole of the concrete base and the accommodation space of the fixing tool. How to use a floor bundle.
JP2002375037A 2002-12-25 2002-12-25 Floor bundle and its usage Expired - Fee Related JP4005497B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002375037A JP4005497B2 (en) 2002-12-25 2002-12-25 Floor bundle and its usage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002375037A JP4005497B2 (en) 2002-12-25 2002-12-25 Floor bundle and its usage

Publications (2)

Publication Number Publication Date
JP2004204553A JP2004204553A (en) 2004-07-22
JP4005497B2 true JP4005497B2 (en) 2007-11-07

Family

ID=32812890

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002375037A Expired - Fee Related JP4005497B2 (en) 2002-12-25 2002-12-25 Floor bundle and its usage

Country Status (1)

Country Link
JP (1) JP4005497B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397199A (en) * 2019-07-31 2019-11-01 安徽鼎峰钢结构科技有限公司 A kind of H profile steel beam form bracing structure

Also Published As

Publication number Publication date
JP2004204553A (en) 2004-07-22

Similar Documents

Publication Publication Date Title
US2772560A (en) Pick-up device for pre-cast concrete slabs
JP2981213B1 (en) Foundation piles and building structure
KR20120132660A (en) Pile cap structure
JP4005497B2 (en) Floor bundle and its usage
JP2928745B2 (en) Installation structure of directly connected pillows and installation method of directly connected pillows
KR200414119Y1 (en) Mounting structure of fence post
JP3740232B2 (en) Anchor bolt mounting bracket
JP2002194746A (en) Installation method of anchor bolt
KR100763886B1 (en) Curtain wall fixture
JP2008291438A (en) Anchor frame
JP3032104B2 (en) Fixing method of pillar lower end
JPH0733690B2 (en) Anchor frame and its fixing jig
JP3762897B2 (en) Anchor bolt support device in exposed fixed column base method
JPH0514061B2 (en)
JPH11200511A (en) Column leg fitting and wooden through column fixing method using the same
JP2000160682A (en) Pillar fixing bracket
JPH0410282Y2 (en)
JP2000110175A (en) Individual footing for mat foundation
KR200418142Y1 (en) Curtain wall fixture
JPH0643238Y2 (en) Slope stabilizer
JPH0849306A (en) Anchorage device of anchor bolt
JPH0524296B2 (en)
JP2005036646A (en) Foundation structure for steel frame column
JPH0731943U (en) Holding device for anchor bolts for foundation when placing concrete foundation
JPH09158640A (en) Gatepost and installing method of gatepost

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050831

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070821

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070823

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100831

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees