JP4007366B2 - Filling method for underground cavity and filling pipe for filling underground cavity - Google Patents
[go: Go Back, main page]

JP4007366B2 - Filling method for underground cavity and filling pipe for filling underground cavity - Google Patents

Filling method for underground cavity and filling pipe for filling underground cavity Download PDF

Info

Publication number
JP4007366B2
JP4007366B2 JP2004372464A JP2004372464A JP4007366B2 JP 4007366 B2 JP4007366 B2 JP 4007366B2 JP 2004372464 A JP2004372464 A JP 2004372464A JP 2004372464 A JP2004372464 A JP 2004372464A JP 4007366 B2 JP4007366 B2 JP 4007366B2
Authority
JP
Japan
Prior art keywords
filling
underground cavity
pipe
filler
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004372464A
Other languages
Japanese (ja)
Other versions
JP2006177073A (en
Inventor
乾郎 杉浦
伸幸 石合
哲夫 中西
圭介 岩城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP2004372464A priority Critical patent/JP4007366B2/en
Publication of JP2006177073A publication Critical patent/JP2006177073A/en
Application granted granted Critical
Publication of JP4007366B2 publication Critical patent/JP4007366B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

本発明は、地下空洞の充填工法およびこの充填工法に用いる充填管に関する。   The present invention relates to a filling method for underground cavities and a filling pipe used for the filling method.

亜炭坑,炭坑,採石場等の廃坑、防空壕、水路トンネル等の、供用期間を終え老朽化した人工空洞、あるいは、溶岩トンネル、石灰洞等の自然空洞等各種の地下空洞は、地震による崩落または自然に生ずる崩落により地表面を陥没させたり、地表構造物を沈下させる等の災害の原因となることがある。
そこで、従来より地下空洞の崩落を防ぐために、この地下空洞に充填材を充填する、各種の地下空洞の充填工法が行われている。
Various underground cavities such as abandoned mines such as lignite mines, coal mines, quarries, etc., air defense tunnels, waterway tunnels, etc. May cause disasters such as sinking the ground surface or sinking surface structures.
Therefore, in order to prevent the collapse of the underground cavity, various underground cavity filling methods for filling the underground cavity with a filler have been performed.

たとえば、特開2002-81054号公報(特許文献1)に開示されている工法は、それ以前の工法によると、地下空洞内の充填が必要とされる充填対象領域から、その外にまで充填材が流出してしまい、充填材の無駄が生じ不経済であったこと等の問題を解決しようとするもので、まず、上記充填対象領域の端部(外周部)に、注入管を通じて低流動性の充填材を注入し、これにより地下空洞断面を閉鎖する端部壁体を形成することによって上記充填対象領域を閉鎖空間とし、その後、閉鎖された充填対象領域に高流動性の中詰充填材を中詰め充填することによって、上記充填対象領域にのみ限定的に充填材を充填するようにしたものである。
このような限定充填工法は、特に、地下水路のような長細い形状の地下空洞の充填に採用することにより、充填対象領域外に流出し無駄となる充填材を大幅に減らすとともに工期を短縮できる経済的な工法である。
For example, according to the construction method disclosed in Japanese Unexamined Patent Publication No. 2002-81054 (Patent Document 1), according to the previous construction method, the filling material extends from the filling target area where filling in the underground cavity is required to the outside. Outflow, wasted the waste of the filler, was uneconomical, etc. First, low fluidity through the injection pipe at the end (outer periphery) of the filling target area The filling target region is made a closed space by forming an end wall body that closes the cross section of the underground cavity, and then the highly packed medium filling filler is filled in the closed filling target region. The filling material is limitedly filled only in the region to be filled by filling the inside of the material.
Such a limited filling method can be used to fill long and narrow underground cavities such as underground waterways, greatly reducing the amount of wasted material that flows out of the filling target area and shortening the construction period. This is an economical method.

しかし、同公報に開示された工法においては、注入管として、通常の中空直管が用いられ、充填材は該注入管の下端開口から吐出されるものと認められるが、図12に示すように、そのような通常の管1による注入では、下方に吐出される充填材2は地下空洞内で水平方向に均等に広がってしまい、仮に、充填材落下速度を抑制するトレミー方式により注入したとしても、この充填材2の水平方向の広がりを抑えることは難しい。
実際には、端部壁体3が形成されるとき、上記充填材2は、15〜25%程度の緩い勾配の円錐状を呈しながら地下空洞内に充填され、地下空洞の横断面を天端まで完全に閉鎖する端部壁体3を形成するまでには多量の充填材2の注入が必要となってしまう。
たとえば、幅2m,高さ1.5mの横断面を有する長細い地下空洞に、勾配約20%で充填される充填材2を充填する場合、その横断面を完全に閉鎖する端部壁体3は、該地下空洞の軸方向に伸びた形状になってしまうので、これを形成するのには約30m3もの注入が必要となってしまう。
上記のように、通常の管を注入管として用いるこの工法は、必要となる端部充填材の量が多く、材料コストを引き上げるために不経済で、また、多量の注入を行うために工期が長くなり効率が悪いという問題があった。
However, in the construction method disclosed in the publication, a normal hollow straight pipe is used as the injection pipe, and it is recognized that the filler is discharged from the lower end opening of the injection pipe, as shown in FIG. In such normal injection by the pipe 1, the filler 2 discharged downward spreads evenly in the horizontal direction in the underground cavity, and even if it is injected by the Tremy method that suppresses the filler falling speed, It is difficult to suppress the spread of the filler 2 in the horizontal direction.
Actually, when the end wall body 3 is formed, the filler 2 is filled into the underground cavity while exhibiting a conical shape with a gentle gradient of about 15 to 25%, and the cross section of the underground cavity is It is necessary to inject a large amount of the filler 2 until the end wall 3 that is completely closed is formed.
For example, when a long and narrow underground cavity having a cross section with a width of 2 m and a height of 1.5 m is filled with the filler 2 filled with a gradient of about 20%, the end wall 3 that completely closes the cross section is as follows. Since the underground cavity has a shape extending in the axial direction, about 30 m3 of injection is required to form the underground cavity.
As described above, this construction method using a normal pipe as an injection pipe requires a large amount of end filler, which is uneconomical for raising the material cost, and requires a construction period for carrying out a large quantity of injection. There was a problem that it was long and inefficient.

一方、通常の中空直管の代わりに、特開平7-286319号公報(特許文献2)や特開平10-266185号公報(特許文献3)に記載されたような、注入管の外側に、スリットを有するラバーパイプあるいは被覆膜を備え、岩盤中の特定の方向にグラウト脈を注入形成できるようにした注入装置を用いて、端部充填材の吐出方向を地下空洞の幅方向すなわち該地下空洞の軸方向に直交する方向に向けて端部壁体を形成するようにすれば、必要となる充填材の量を節減することも可能ではある。   On the other hand, instead of a normal hollow straight tube, a slit is formed outside the injection tube as described in JP-A-7-286319 (Patent Document 2) and JP-A-10-266185 (Patent Document 3). The end filler is discharged in the width direction of the underground cavity, i.e., the underground cavity by using an injection device provided with a rubber pipe or a coating film having If the end wall body is formed in a direction orthogonal to the axial direction, the amount of filler required can be reduced.

しかしながら、これらの文献に記載された注入装置は、岩盤中に鉛直グラウト脈を形成するための特殊な構造を有するものであり、これを地下空洞充填工法に単に転用することは、コストが必要以上に高くなってしまうから適当でない。
特開2002-81054号公報 特開平7-286319号公報 特開平10-266185号公報
However, the injection devices described in these documents have a special structure for forming vertical grouting veins in the rock, and it is more costly to simply convert this to the underground cavity filling method. It is not appropriate because it becomes too high.
JP 2002-81054 A Japanese Patent Laid-Open No. 7-286319 Japanese Patent Laid-Open No. 10-266185

そこで、本発明は、単純な構成でコストを抑えることのできる充填管を提供するとともに、この充填管を用いることにより充填材の使用量を削減することができる、従来よりも効率的で経済的な地下空洞充填工法を提供することを課題とする。   Therefore, the present invention provides a filling tube that can be reduced in cost with a simple configuration, and can reduce the amount of filler used by using this filling tube, which is more efficient and economical than the conventional one. It is an object to provide a simple underground cavity filling method.

請求項1記載の本発明は、下端を閉塞した管の側面に、複数の吐出孔32……を、その軸方向に沿って並べ、かつ、下側のものを大きく上側のものを小さく開口させた内管34と、この内管34の外側に軸方向にスライド自在にして嵌合させた外管35とからなることを特徴とする地下空洞充填用の充填管である。In the first aspect of the present invention, a plurality of discharge holes 32... Are arranged along the axial direction on the side surface of the pipe whose lower end is closed, and the lower one is opened larger and the upper one opened smaller. A filling tube for filling an underground cavity, comprising an inner tube 34 and an outer tube 35 slidably fitted to the outside of the inner tube 34 in the axial direction.

請求項2記載の本発明、上記吐出孔32……の上方延長位置にその開口方向を示すマーキングを施していることを特徴とする請求項1記載の地下空洞充填用の充填管である。The filling pipe for filling an underground cavity according to claim 1, wherein a marking indicating the opening direction is provided at an upper extension position of the discharge hole 32.

請求項3記載の本発明は、(1)地上から地下空洞33の充填対象領域に達するボーリング孔36を削孔し、(2)そのボーリング孔36に、請求項1または2記載の地下空洞充填用の充填管を、その下端が地下空洞33の底面近傍に達する位置まで挿入するとともに、該充填管の内管34を適宜回転させて吐出孔32……を地下空洞33の横断方向に向け、(3)上記充填管の外管35を上方にスライドさせることにより内管34の吐出孔32……を下方のものから順に開放しながら、該充填管の上端側から端部充填材37を圧送することによって、開放状態になっている上記吐出孔32……から端部充填材37を吐出させて、上記地下空洞33の横断面を閉塞する端部壁体38を形成することを特徴とする地下空洞充填工法である。According to the third aspect of the present invention, (1) the boring hole 36 reaching the filling target region of the underground cavity 33 from the ground is drilled, and (2) the underground cavity filling according to the first or second aspect is performed in the borehole 36. And inserting the filling pipe to the position where the lower end thereof reaches the vicinity of the bottom surface of the underground cavity 33, and appropriately rotating the inner pipe 34 of the filling pipe so that the discharge holes 32. (3) While the outer pipe 35 of the filling pipe is slid upward, the end filling material 37 is pumped from the upper end side of the filling pipe while opening the discharge holes 32. By doing so, the end filler 37 is discharged from the discharge holes 32 in an open state to form an end wall 38 that closes the transverse section of the underground cavity 33. It is an underground cavity filling method.

請求項4記載の本発明地下空洞充填工法は、上記外管35のスライドを、内管34の上記開放状態の吐出孔32……が既に吐出した端部充填材の中に埋没した状態となるようにしつつ、端部充填材の嵩が増すのに合わせて行うことを特徴とする請求項3記載の地下空洞充填工法である。In the underground cavity filling method of the present invention according to claim 4, the slide of the outer pipe 35 is buried in the end filling material in which the discharge holes 32. The underground cavity filling method according to claim 3, wherein the filling is performed in accordance with an increase in the bulk of the end filler.

請求項5記載の本発明地下空洞充填工法は、上記外管35のスライドを、該外管35に取り付けたワイヤー等を操作して行うことを特徴とする請求項3または4記載の地下空洞充填工法である。The underground cavity filling method of the present invention according to claim 5 is characterized in that the sliding of the outer pipe 35 is performed by operating a wire or the like attached to the outer pipe 35. It is a construction method.

本発明地下空洞充填用の充填管は、外管を上方にスライドさせることにより開放した内管の吐出孔から端部充填材を吐出させることができる。また、内管を回転させることにより端部充填材の吐出方向の制御が可能であり、地下空洞の端部閉塞に好都合なものであるとともに、簡単な構造のものであるから安価に製作できる。The filling tube for filling the underground cavity of the present invention can discharge the end filler from the discharge hole of the opened inner tube by sliding the outer tube upward. Further, the discharge direction of the end filler can be controlled by rotating the inner pipe, which is convenient for closing the end of the underground cavity and can be manufactured at a low cost because it has a simple structure.

本発明地下空洞充填工法は、端部充填材の使用量を減らすことによる材料コストの低減を図り経済的に、しかも短い工期で効率的に施工できる。The underground cavity filling method of the present invention can reduce the material cost by reducing the amount of the end filler used, and can be constructed economically and efficiently in a short construction period.

下端を閉塞した管の側面に、複数の吐出孔32……を、その軸方向に沿って並べ、かつ、下側のものを大きく上側のものを小さく開口させた内管34と、この内管34の外側に軸方向にスライド自在にして嵌合させた外管35とからなる地下空洞充填用の充填管。An inner tube 34 in which a plurality of discharge holes 32... Are arranged in the axial direction on the side surface of the tube whose lower end is closed, and the lower one is opened large and the upper one is opened small. A filling pipe for filling an underground cavity, comprising an outer pipe 35 slidably fitted in the axial direction on the outside of 34.

(1)地上から地下空洞33の充填対象領域に達するボーリング孔36を削孔し、(2)そのボーリング孔36に、上記地下空洞充填用の充填管を、その下端が地下空洞33の底面近傍に達する位置まで挿入するとともに、該充填管の内管34を適宜回転させて吐出孔32……を地下空洞33の横断方向に向け、(3)上記充填管の外管35を上方にスライドさせることにより内管34の吐出孔32……を下方のものから順に開放しながら、該充填管の上端側から端部充填材37を圧送することによって、開放状態になっている上記吐出孔32……から端部充填材37を吐出させて、上記地下空洞33の横断面を閉塞する端部壁体38を形成することを特徴とする地下空洞充填工法。(1) Drilling a boring hole 36 reaching the filling target area of the underground cavity 33 from the ground. (2) Filling the bore hole 36 with the above-mentioned filling pipe for filling the underground cavity, and its lower end near the bottom surface of the underground cavity 33. And the inner pipe 34 of the filling pipe is appropriately rotated to direct the discharge hole 32... In the transverse direction of the underground cavity 33, and (3) the outer pipe 35 of the filling pipe is slid upward. As a result, the discharge holes 32... Of the inner pipe 34 are opened in order from the lower one, while the end filling material 37 is pumped from the upper end side of the filling pipe to open the discharge holes 32. An end portion filling material 37 is discharged from the end portion to form an end portion wall body 38 that closes the transverse cross section of the underground cavity 33.

まず地下空洞充填工法の一実施例について、図1〜4を参照しながら詳しく説明する。
この地下空洞充填工法は、地下空洞11の、所望の充填対象領域にのみ限定的に充填材を充填するため、すなわち、該領域の外に流出させないように充填材を充填するために、上記充填対象領域の端部に予め端部充填材12を注入充填し、これにより形成した端部壁体13によって上記充填対象領域を閉鎖するとともに、その後、閉鎖された充填対象領域に中詰充填材を注入充填するようにした、いわゆる限定充填工法であって、特に、地下水路のような長細い形状の地下空洞内の、所要の充填対象領域に充填材を注入充填する場合に好適なものである。
本実施例では、長細い形状の地下空洞11の内部に地下水が充満している場合を想定して説明する。
First, an embodiment of the underground cavity filling method will be described in detail with reference to FIGS.
In this underground cavity filling method, the above filling is performed in order to fill the filler only in a desired filling target region of the underground cavity 11, that is, to fill the filler so as not to flow out of the region. End filling material 12 is injected and filled in the end portion of the target region in advance, and the filling target region is closed by the end wall body 13 formed thereby, and then the filling material is filled in the closed filling target region. This is a so-called limited filling method that is used for filling and filling, and is particularly suitable for filling and filling a required filling target area in a long and narrow underground cavity such as a groundwater channel. .
In the present embodiment, description will be made assuming a case where ground water is filled in the long and narrow underground cavity 11.

14は、所要長さの管の下端を閉塞するとともに、その下端近傍の側面の互いに対向する位置に縦長スリット状の1対の吐出孔15,15を開設してなる地下空洞充填用の充填管である(図3)。上記各吐出孔15,15の上方延長位置には、その吐出孔15,15の開口方向を示すためのマーキング(図示しない)が施されている。   14 is a filling pipe for filling an underground cavity, which closes the lower end of a pipe having a required length and has a pair of vertically-slit discharge holes 15 and 15 at opposite positions on the side surfaces in the vicinity of the lower end. (FIG. 3). Marking (not shown) for indicating the opening direction of the discharge holes 15, 15 is provided at the upper extended positions of the discharge holes 15, 15.

この充填管14は、この地下空洞充填工法において地下空洞内の充填対象領域の端部に上記端部充填材12を注入充填して端部壁体13を形成するのに用いられるもので、その上端より圧送送給される端部充填材12を上記吐出孔15,15から側方に吐出させることができるようになっている。
なお、上記吐出孔15,15の開口面積は、圧送ポンプ(図示しない)の圧送圧力と管径との関係等から適宜決定される。
The filling tube 14 is intended to be used to form the end wall 13 by injecting filling the end filler 12 in the end portion of the filling region of interest in an underground cavity in the underground cavity filling method, the The end filler 12 that is pumped and fed from the upper end can be discharged sideways from the discharge holes 15 and 15.
The opening areas of the discharge holes 15 and 15 are appropriately determined from the relationship between the pumping pressure of a pumping pump (not shown) and the pipe diameter.

本実施例の地下空洞充填工法は、上記充填管14を用いて以下のようにして行われる。   The underground cavity filling method of the present embodiment is performed as follows using the filling pipe 14.

(1) まず、地上より地下空洞11の充填対象領域の端部の位置まで、上記充填管14を挿入するためのボーリング孔16を削孔する。   (1) First, the boring hole 16 for inserting the filling pipe 14 is drilled from the ground to the position of the end of the filling target region of the underground cavity 11.

(2) 続いて、上記充填管14を上記ボーリング孔16に挿入し、その下端が地下空洞11の底面近傍に達するように設置する。このとき、上記充填管14の吐出孔15,15の開口方向を示すマーキングを確認するとともに適宜該充填管14を回転させて、吐出孔15,15を、地下空洞11の横断方向(長手方向に直交する方向)に向け、その両壁面に対向させる。   (2) Subsequently, the filling tube 14 is inserted into the boring hole 16 and installed so that the lower end thereof reaches the vicinity of the bottom surface of the underground cavity 11. At this time, the marking indicating the opening direction of the discharge holes 15 and 15 of the filling pipe 14 is confirmed and the filling pipe 14 is appropriately rotated so that the discharge holes 15 and 15 are moved in the transverse direction (longitudinal direction) of the underground cavity 11. (To the direction perpendicular to each other), facing the both wall surfaces.

(3) そして、圧送ポンプ(図示しない)により上記充填管14の上端側から、端部充填材12を圧送し、これを上記吐出孔15,15から対向する上記両壁面に向けて吐出させることにより、地下空洞内に注入する。この注入の過程においては、上記圧送ポンプ側の圧送圧力や充填量等をモニタリングしておく。   (3) Then, the end filler 12 is pumped from the upper end side of the filling pipe 14 by a pumping pump (not shown) and discharged from the discharge holes 15, 15 toward the opposing wall surfaces. Inject into the underground cavity. In the process of this injection, the pumping pressure and the filling amount on the pumping pump side are monitored.

この注入は、地下空洞内に充満している地下水の水質をできるだけ悪化させないために、また、端部充填材の水中分離をできる限り防ぐために、充填管14の上記吐出孔15,15が、既にそこから吐出した端部充填材12の中に埋没した状態となり、吐出する端部充填材12が直接地下水に触れないように、端部充填材12の嵩が増すのに合わせて充填管14を段階的に上方へスライドさせながら行う(図1,2)。
そのスライドの時期およびスライド量は、モニタリングしている上記圧送ポンプ側の圧送圧力,充填量等から定める。
In order to prevent the water quality of the groundwater filled in the underground cavity from being deteriorated as much as possible and to prevent separation of the end filling material in water as much as possible, the injection holes 15 and 15 of the filling pipe 14 have already been injected. The filling tube 14 is inserted in accordance with the increase in the bulk of the end filler 12 so that the end filler 12 discharged from the end 12 is buried in the outlet filler 12 and does not directly touch the groundwater. It is performed while sliding upward in stages (FIGS. 1 and 2).
The slide timing and slide amount are determined from the pumping pressure and the filling amount on the pumping pump side being monitored.

端部充填材12は、充填管14の吐出孔15,15から地下空洞11の横断方向、すなわち両壁面の方向へ吐出されるので、地下空洞11の長手方向の勾配を急峻にし、横断方向の勾配を緩やかにした山形をなした状態で注入充填され嵩を増してゆく(図1,2)。   Since the end filler 12 is discharged from the discharge holes 15 and 15 of the filling pipe 14 in the transverse direction of the underground cavity 11, that is, in the direction of both wall surfaces, the gradient in the longitudinal direction of the underground cavity 11 is made steep. It fills and fills up in the form of a mountain with a gentle gradient (FIGS. 1 and 2).

(4) 充填管14のスライドにより、吐出孔15,15が地下空洞11の天端近傍に達したら最終充填に入る。
そして、圧送ポンプ側でモニタされる圧送圧力の上昇により、地下空洞11の横断面を完全に閉鎖する端部壁体13が形成されたことを確認して注入充填を終了する。
(4) When the discharge holes 15 and 15 reach the vicinity of the top end of the underground cavity 11 by the sliding of the filling pipe 14, the final filling is started.
Then, it is confirmed that the end wall body 13 that completely closes the transverse section of the underground cavity 11 is formed by the increase in the pumping pressure monitored on the pumping pump side, and the filling is finished.

本工法ではこのように、充填管14を用いて端部充填材12を地下空洞11の壁面の方向へ吐出させているので、従来に比べて少ない充填量で地下空洞横断面を閉鎖する端部壁体13を形成することができる。
具体的には、端部壁体13を、地下空洞の長手方向の勾配を100%程度の急勾配にし、横断方向の勾配を10%程度にして形成することができるので、たとえば、幅2m、高さ1.5mの横断面を有する地下空洞11の場合、約6m3の端部充填材12で足りることになる。
In the present construction method, the end filler 12 is discharged in the direction of the wall surface of the underground cavity 11 using the filling pipe 14 in this way, so that the end portion that closes the underground cavity cross section with a smaller filling amount than in the conventional method. The wall body 13 can be formed.
Specifically, the end wall 13 can be formed with a steep slope of about 100% in the longitudinal direction of the underground cavity and a slope of about 10% in the transverse direction. In the case of the underground cavity 11 having a cross section with a height of 1.5 m, an end filler 12 of about 6 m3 is sufficient.

(5) 上記と同様の手順で充填対象領域の他端部にも端部壁体26を形成して該充填対象領域を閉鎖したのち、充填対象領域内へと削孔したボーリング削孔(図示しない)を通じて中詰充填材を注入充填することにより、地下空洞の充填が完了する。   (5) A boring hole (shown in the figure) is formed by forming an end wall body 26 at the other end of the filling target region in the same procedure as described above and closing the filling target region. The filling of the underground cavity is completed by injecting and filling the filling material.

上記の通り、本工法によれば、端部壁体13を急勾配にして形成できるから、端部充填材12の使用量を減らすことによりコスト低減を図れ、また、工期の短縮をも図ることができる。また、上記充填管14は、簡単な構造で安価に製作できるとともに、施工時に地下空洞内に固定されず、使用後には回収することができるため再利用や転用が可能である。   As described above, according to the present construction method, the end wall 13 can be formed with a steep slope. Therefore, the cost can be reduced by reducing the amount of the end filler 12 used, and the construction period can be shortened. Can do. Further, the filling tube 14 can be manufactured with a simple structure at low cost, and is not fixed in the underground cavity at the time of construction, and can be recovered after use, and thus can be reused or diverted.

図4(a)〜(e)に示したものは、吐出孔の数,配置および形状を変更した充填管の例である。すなわち、上記充填管14は、下端近傍の側面の互いに対向する位置に1対の縦長スリット状の吐出孔15,15を開設してあるが、その吐出孔は丸孔状のものとしてもよく(同図(a))、また、端部充填材12を一方向に吐出させれば足りる場合には、一側面に1つのみ開口させてもよい(同図(b),(c))。さらに、横長スリット状の吐出孔にするとか、スリット状の吐出孔と丸孔状の吐出孔とを組み合わせるなどしてもよい。
その他、地下空洞の形状等により、端部充填材12を3方向以上に吐出させるのが好ましい場合には、3つ以上の吐出孔を設けるようにしてもよい(同図(d),(e)には4方向に吐出孔を設けたものを示した。)。
4 (a) to 4 (e) are examples of a filling tube in which the number, arrangement, and shape of the discharge holes are changed. In other words, the filling tube 14 has a pair of vertically-slit discharge holes 15 and 15 formed at opposite positions on the side surfaces near the lower end, but the discharge holes may be round holes ( (A)), and if it is sufficient to discharge the end filler 12 in one direction, only one opening may be provided on one side (FIGS. (B) and (c)). Further, the discharge hole may be a horizontally long discharge hole, or a combination of a slit discharge hole and a round discharge hole may be used.
In addition, when it is preferable to discharge the end filler 12 in three or more directions due to the shape of the underground cavity or the like, three or more discharge holes may be provided ((d), (e ) Shows one provided with discharge holes in four directions.)

上記丸孔状の吐出孔とスリット状の吐出孔とは、前者のほうが吐出速度が大きくなる傾向にあるが、その吐出孔の形状等の決定は、端部充填材12の可塑性や流動性等のフレッシュ性状を勘案して行うことができる。
たとえば、流動性が低く自立性の高い端部充填材12を用いる場合には丸孔状の吐出孔を有する充填管を用いて端部充填材を急速に吐出させることにより、急勾配な山形をなした端部壁体13を短時間で形成することができる。
一方、材料分離抵抗性の比較的低い端部充填材12を充填する場合には、水中での材料分離をできる限り低減するため、吐出速度の小さいスリット状の吐出孔を有する充填管を用いるのがよい。
The above-mentioned round hole-shaped discharge holes and slit-shaped discharge holes tend to have a higher discharge speed in the former, but the shape and the like of the discharge holes are determined by the plasticity and fluidity of the end filler 12. This can be done in consideration of the fresh properties of
For example, when the end filler 12 having low fluidity and high self-supporting property is used, the end filler is rapidly discharged using a filling pipe having a round hole-like discharge hole, thereby forming a steep mountain shape. The made end wall 13 can be formed in a short time.
On the other hand, when filling the end filler 12 having a relatively low material separation resistance, a filling tube having slit-like discharge holes with a low discharge speed is used in order to reduce material separation in water as much as possible. Is good.

なお、本実施例では、地下空洞内に地下水が充満している場合を想定して説明したが、本工法は、地下水が無い地下空洞においても勿論施工することができる。   In addition, although the present Example demonstrated and demonstrated the case where underground water was filled in the underground cavity, of course, this construction method can also be constructed also in an underground cavity without underground water.

次に、地下空洞充填工法の他の実施例について、図5〜8を参照しながら詳しく説明する。
本実施例の工法は、実施例1の場合と同じく地下水路のような長細い形状の地下空洞ではあるが、その内部に地下水がなく、端部充填材の水中での分離を考慮する必要がない場合を想定している。
ただし、水中分離抵抗性の高い端部充填材を使用する場合等には、地下水が充満している地下空洞においても施工できるものである。
Next, another embodiment of the underground cavity filling method will be described in detail with reference to FIGS.
Although the construction method of this embodiment is a long and narrow underground cavity like the underground water channel as in the case of Example 1, there is no underground water in the interior, and it is necessary to consider separation of the end filler in water. It assumes no case.
However, when using an end filling material with high resistance to separation in water, it can be constructed even in underground cavities filled with groundwater.

21は、下端を閉塞した所要長さの管の互いに対向する側面に、それぞれ複数の縦長スリット状の吐出孔22……を、下端近傍から少なくとも地下空洞23の高さに相当する位置までその軸方向に並べた状態にして開設した地下空洞充填用の充填管である(図7)。 上記吐出孔22……の開口面積の合計は、該充填管21内を圧送される端部充填材の圧力が過剰に高くならないよう、該充填管21の断面積に比べて大きくなるようにしておくのが好ましい。
また、上記各吐出孔22……の上方延長位置には、その吐出孔……の開口方向を示すためのマーキング(図示しない)が施されている。
21 is provided with a plurality of longitudinally slit-like discharge holes 22... On the side surfaces facing each other of a pipe having a required length with the lower end closed, from the vicinity of the lower end to a position corresponding to at least the height of the underground cavity 23. It is a filling tube for filling an underground cavity opened in a state aligned in a direction (FIG. 7). The total opening area of the discharge holes 22... Is larger than the cross-sectional area of the filling tube 21 so that the pressure of the end filling material pumped through the filling tube 21 does not become excessively high. It is preferable to leave.
Further, markings (not shown) for indicating the opening direction of the discharge holes are provided at the upper extended positions of the discharge holes 22.

本実施例の地下空洞充填工法は、上記充填管21を用いて以下のようにして行われる。 (1) まず、地上より地下空洞23の充填対象領域の端部の位置まで、上記充填管21を挿入するためのボーリング孔24を削孔する。   The underground cavity filling method of the present embodiment is performed as follows using the filling pipe 21. (1) First, the boring hole 24 for inserting the filling pipe 21 is drilled from the ground to the position of the end of the filling target area of the underground cavity 23.

(2) 続いて、上記充填管21を上記ボーリング孔24に、その下端が地下空洞23の底面近傍に達するまで挿入するとともに、該充填管21を、吐出孔22……の開口方向を示すマーキングを確認して適宜回転させて、該吐出孔22……を、地下空洞23の横断方向に向けその両壁面に対向させた状態で固定する。   (2) Subsequently, the filling tube 21 is inserted into the boring hole 24 until its lower end reaches the vicinity of the bottom surface of the underground cavity 23, and the filling tube 21 is marked to indicate the opening direction of the discharge holes 22 ... The discharge holes 22... Are fixed in a state facing the both wall surfaces in the transverse direction of the underground cavity 23.

(3) そして、圧送ポンプにより上記充填管21の上端側から、所要の端部充填材25を圧送し、これを上記吐出孔22……から吐出させ、地下空洞23内に注入する。
圧送ポンプ側では、この注入の過程を通じて圧送圧力,充填量等をモニタリングする。
(3) Then, the required end filling material 25 is pumped from the upper end side of the filling pipe 21 by a pumping pump, discharged from the discharge holes 22, and injected into the underground cavity 23.
On the pumping pump side, the pumping pressure, the filling amount, etc. are monitored through this injection process.

充填管21内を圧送される端部充填材25は、上方から下方までの全ての吐出孔22……から、地下空洞23の両壁面の方向、すなわち横断方向へ吐出されるので、地下空洞23の長手方向の勾配を急峻にし、横断方向の勾配を緩やかにした山形をなす(図5,6)。 また、上方の吐出孔22……から吐出した端部充填材25の一部は充填管21の外面を伝って下方に流動するので、端部充填材25は全体として下方ほど膨れた状態で充填管21の周囲に充満してゆく。   The end filler 25 that is pumped through the filling pipe 21 is discharged from all the discharge holes 22... From the upper side to the lower side in the direction of both wall surfaces of the underground cavity 23, that is, the transverse direction. The slope in the longitudinal direction is steep and the slope in the transverse direction is gradual (FIGS. 5 and 6). Further, a part of the end filling material 25 discharged from the upper discharge holes 22... Flows downward along the outer surface of the filling tube 21, so that the end filling material 25 is filled in a state where it swells downward as a whole. The circumference of the tube 21 is filled.

端部充填材25が吐出されるのにしたがい、下方の吐出孔22……は充填管21を伝って上方から下方に流動してくる端部充填材25に覆われて閉塞され、吐出の抵抗が次第に大きくなるので、これに伴い、該下方の吐出孔22……からの吐出量および吐出速度が小さくなり、上方の吐出孔22……からの吐出量および吐出速度が大きくなるように推移する。
そして、最終的には、最上部の吐出孔22……からのみの吐出となり、この吐出孔22……からの吐出量および吐出速度はさらに大きくなる。したがって、この最上部の吐出孔22……からの吐出は、より方向精度良く地下空洞の壁面方向に行われる。
As the end filling material 25 is discharged, the lower discharge holes 22 are covered and closed by the end filling material 25 that flows downward from the upper direction through the filling tube 21 and discharge resistance. Therefore, the discharge amount and the discharge speed from the lower discharge hole 22... Decrease, and the discharge amount and the discharge speed from the upper discharge hole 22. .
Eventually, the discharge is made only from the uppermost discharge hole 22..., And the discharge amount and discharge speed from the discharge hole 22. Therefore, the discharge from the uppermost discharge hole 22... Is performed in the direction of the wall surface of the underground cavity with higher directional accuracy.

(4) この注入充填は、圧送ポンプ側でモニタされる圧送圧力の上昇により、地下空洞23の横断面を完全に閉鎖する端部壁体26が形成されたことを確認して終了する。   (4) This injection filling is completed after confirming that the end wall 26 that completely closes the transverse section of the underground cavity 23 is formed by the increase of the pumping pressure monitored on the pumping pump side.

(5) 上記と同様の手順で充填対象領域の他端部にも端部壁体26を形成して充填該対象領域を閉鎖したのち、充填対象領域内に削孔したボーリング削孔(図示しない)を通じて中詰充填材を注入充填することにより、地下空洞の充填が完了する。   (5) After the end wall 26 is formed at the other end of the filling target region in the same procedure as described above to close the filling target region, a boring hole (not shown) is drilled in the filling target region. The filling of the underground cavity is completed by injecting and filling the filling material.

本実施例の工法においても、実施例1の工法と同様に端部充填材25を地下空洞23の壁面の方向へ吐出させていることにより、従来に比べて少ない充填量で地下空洞横断面を閉鎖する端部壁体26を形成することができる。   Also in the construction method of the present embodiment, the end filler 25 is discharged in the direction of the wall surface of the underground cavity 23 in the same manner as in the construction method of the first embodiment, so that the cross-section of the underground cavity can be reduced with a smaller filling amount than conventional. A closed end wall 26 can be formed.

また、この工法では、実施例1の工法と異なり充填管21をスライドさせて引き上げないので、充填の過程における充填管21の振動・振れ等による端部充填材25(端部壁体26)の崩れを抑制できる。したがって、最小限の端部充填材25によって端部壁体26が形成できる。
なお、上記充填管21は、上記のようにして形成される端部壁体26内に埋設され、端部壁体26の固定作用を有することになるものである。
Further, in this construction method, unlike the construction method of the first embodiment, the filling pipe 21 is not slid and pulled up, so that the end filler 25 (end wall body 26) is caused by vibration and vibration of the filling pipe 21 in the filling process. Collapse can be suppressed. Therefore, the end wall body 26 can be formed with the minimum end filler 25.
The filling tube 21 is embedded in the end wall body 26 formed as described above, and has a function of fixing the end wall body 26.

なお、図7には、すべて同じ形状で開口面積を同じくする上記吐出孔22……を設けた充填管を示したが、上方の吐出孔22……から吐出される充填材の量が下方の吐出孔22……から吐出される量よりも多すぎるような場合には、該吐出孔22……の開口面積を、下方のものを大きく、上方のものを小さくするのが好ましい。
すなわち、端部充填材25は、圧力損失の小さい上方の吐出孔22……からより多く、下方の吐出孔22……からはそれよりも少なく吐出しようとするが、下方の吐出孔22……を大きく、上方の吐出孔22……を小さく開口させることによって上下の吐出孔22……からの吐出量のバランスを調整することができる。
このように下方の吐出孔22……を大きく開口させることによって、全ての吐出孔22……の合計開口面積を大きくすれば、圧送ポンプの圧送圧力を下げることが可能になる。また、最終的に端部充填材25を吐出させる最上部の吐出孔22……からの吐出速度がより大きくなるので、その吐出の方向精度をより高めることにも寄与する。
FIG. 7 shows a filling tube provided with the discharge holes 22... Having the same shape and the same opening area. However, the amount of filler discharged from the upper discharge holes 22. In the case where the amount discharged from the discharge holes 22... Is too large, it is preferable to make the opening area of the discharge holes 22.
That is, the end filling material 25 tends to discharge more from the upper discharge holes 22... With a small pressure loss and less from the lower discharge holes 22. The balance of the discharge amount from the upper and lower discharge holes 22... Can be adjusted by increasing the upper discharge holes 22.
If the total opening area of all the discharge holes 22 is increased by opening the lower discharge holes 22 in this way, the pumping pressure of the pump can be lowered. Further, since the discharge speed from the uppermost discharge hole 22... For finally discharging the end filler 25 becomes higher, it contributes to further improving the discharge direction accuracy.

図8(a)〜(e)に示したものは、吐出孔の数,配置および形状を変更した充填管の例である。すなわち、上記充填管21は、側面の互いに対向する位置に縦長スリット状の吐出孔22……を開設してあるが、その吐出孔は丸孔状のものとしてもよく(同図(a))、また、端部充填材12を一方向に吐出させれば足りる場合には、一側面にのみ開口させてもよい(同図(b),(c))。さらに、横長スリット状の吐出孔にするとか、スリット状の吐出孔
と丸孔状の吐出孔とを組み合わせるなどしてもよい。
その他、地下空洞の形状等により、端部充填材12を3方向以上に吐出させるのが好ましい場合には、3方向以上に吐出孔を設けるようにしてもよい(同図(d),(e))。
8 (a) to 8 (e) are examples of the filling tube in which the number, arrangement, and shape of the discharge holes are changed. That is, the filling pipe 21 has the vertically slit-like discharge holes 22... Formed at the positions of the side surfaces facing each other, but the discharge holes may be round holes ((a) in the figure). In addition, if it is sufficient to discharge the end filler 12 in one direction, the end filler 12 may be opened only on one side surface ((b) and (c) in the figure). Further, the discharge hole may be a horizontally long discharge hole, or a combination of a slit discharge hole and a round discharge hole may be used.
In addition, when it is preferable to discharge the end filler 12 in three or more directions due to the shape of the underground cavity or the like, discharge holes may be provided in three or more directions (see FIGS. )).

最後に、地下空洞充填工法のさらに他の実施例について、図9〜11を参照しながら詳しく説明する。
充填しようとする地下空洞の横断面幅が広い場合には、上記充填管21を用いる実施例2の工法を採用すると、その充填管21から壁面までの距離が大きいために、吐出される端部充填材が幅方向に十分拡がって壁面に到達する前に、上方から流下してくる端部充填材により下方の吐出孔22……が閉塞され、端部充填材は上方の吐出孔22……からのみ吐出するようになってしまう。
このような状態で所要の時間充填を続けると、下方の吐出孔22……の閉塞による圧送ポンプ側の圧送圧力の上昇状態が必要以上に続いてしまい、特に、地下水が充満している地下空洞に充填をしようとすれば、上方の吐出孔22……から吐出する端部充填材の落下高さが高い分だけ該端部充填材の水中での材料分離が懸念されることにもなる。
Finally, still another embodiment of the underground cavity filling method will be described in detail with reference to FIGS.
When the cross-sectional width of the underground cavity to be filled is wide, if the construction method of Example 2 using the filling pipe 21 is adopted, the distance from the filling pipe 21 to the wall surface is large. Before the filler sufficiently expands in the width direction and reaches the wall surface, the lower discharge hole 22... Is closed by the end filler flowing down from above, and the end filler becomes the upper discharge hole 22. It will come to discharge only from.
If filling is continued for a required time in such a state, an increase in the pumping pressure on the pumping pump side due to the blockage of the lower discharge holes 22... Continues more than necessary, and in particular, the underground cavity filled with groundwater. If it is going to be filled, there will be a concern about the material separation of the end filler in water by the amount of the falling height of the end filler discharged from the upper discharge holes 22.

以下に説明する本実施例の地下空洞充填工法は、上記のように横断面幅が広い地下空洞において、さらには、地下水が充満した地下空洞において施工するのに適しているものである。   The underground cavity filling method of the present embodiment described below is suitable for construction in an underground cavity having a wide transverse cross section as described above, and further in an underground cavity filled with groundwater.

31は、実施例2において説明した充填管21と同様の、すなわち、下端を閉塞した所要長さの管の互いに対向する側面に、それぞれ複数の縦長スリット状の吐出孔32……を、下端近傍から少なくとも地下空洞33の高さに相当する位置までその軸方向に並べた状態で開設した内管34と、この内管34の外側に、軸方向にスライド自在にして嵌合させた中空筒状の外管35とからなる、地下空洞充填用の充填管である(図9)。 31 is the same as the filling tube 21 described in the second embodiment, that is, a plurality of longitudinally slit-like discharge holes 32... To a position corresponding to at least the height of the underground cavity 33 and arranged in the axial direction thereof, and a hollow cylindrical shape fitted to the outside of the inner pipe 34 so as to be slidable in the axial direction. This is a filling tube for filling an underground cavity , consisting of the outer tube 35 (FIG. 9).

上記外管35は、ワイヤー操作等により上記内管34に対して上下にスライドできるようになっており、これによって上記吐出孔32……を閉塞しまたは開放することができる。 この外管35は比較的軽量なものであるため、そのスライドの操作は容易に行えるようになっているが、そのスライドをさらに円滑にし、内管34のとも上がりを防止するために、内管34と外管35との間にグリス等の潤滑剤を充填しておくようにするのが好ましい。   The outer tube 35 can be slid up and down with respect to the inner tube 34 by a wire operation or the like, whereby the discharge holes 32... Can be closed or opened. Since the outer tube 35 is relatively lightweight, the slide can be easily operated. In order to make the slide smoother and prevent the inner tube 34 from rising, It is preferable that a lubricant such as grease is filled between the outer pipe 35 and the outer pipe 35.

また、この充填管31の内管34の上記吐出孔32……の上方延長位置には、上位吐出孔32……の開口方向を示すマーキング(図示しない)を施してある。   Further, markings (not shown) indicating the opening direction of the upper discharge holes 32... Are provided on the upper extension positions of the discharge holes 32.

本実施例の地下空洞充填工法は、上記充填管31を用いて以下のようにして行われる。   The underground cavity filling method of the present embodiment is performed using the filling pipe 31 as follows.

(1) まず、地上より地下空洞33の充填対象領域の端部の位置まで、上記充填管31を挿入するためのボーリング孔36を削孔する。   (1) First, the boring hole 36 for inserting the filling pipe 31 is drilled from the ground to the position of the end of the filling target region of the underground cavity 33.

(2) 続いて、上記充填管31を上記ボーリング孔36に挿入し、その下端が地下空洞33の底面近傍に達するように設置し、内管34を固定する。このとき、吐出孔32……の開口方向を示すマーキングを確認して適宜内管34を回転させ、該吐出孔32……を、地下空洞33の横断方向に向け、その両壁面に対向させておく。
また、上記外管35は、内管34とともに地下空洞33の底面近傍に達するところまで下ろして上記内管34の吐出孔32……を閉塞した状態としておくとともに、地上からワイヤー等の操作(図示しない)によって上方にスライドさせることができるようにしておく。
(2) Subsequently, the filling tube 31 is inserted into the boring hole 36 and installed so that the lower end thereof reaches the vicinity of the bottom surface of the underground cavity 33, and the inner tube 34 is fixed. At this time, after confirming the marking indicating the opening direction of the discharge holes 32..., The inner pipe 34 is appropriately rotated so that the discharge holes 32. deep.
The outer pipe 35 is lowered to the vicinity of the bottom surface of the underground cavity 33 together with the inner pipe 34 so as to block the discharge holes 32... Do not) to be able to slide upward.

(3) そして、上記ワイヤー等を操作して外管35を1スライド分だけ上昇させて、内管34の最下方の吐出孔32……を開放する。ここで、1スライドの量は、たとえば、外管35を上昇させることにより開放されることとなる吐出孔32……の面積が、内管34の断面積と同程度になるように定めることができる。   (3) Then, the wire etc. is operated to raise the outer tube 35 by one slide, and the lowermost discharge hole 32... Of the inner tube 34 is opened. Here, the amount of one slide can be determined so that, for example, the area of the discharge hole 32.. it can.

(4) 続いて、圧送ポンプにより上記充填管31の上端側から、所要の端部充填材37を圧送することにより、開放状態になっている最下方の吐出孔32……を通じて端部充填材37を吐出させて地下空洞33に注入する。この注入は、圧送ポンプの圧送圧力や充填量をモニタリングしながら行う。   (4) Subsequently, the end filler is pumped through the lowermost discharge hole 32... Which is opened by pumping the required end filler 37 from the upper end side of the filling pipe 31 by the pump. 37 is discharged and injected into the underground cavity 33. This injection is performed while monitoring the pumping pressure and filling amount of the pump.

その注入は、下方の吐出孔32……が上方の吐出孔32……から吐出され下方に流動してくる端部充填材37により早期に閉塞されてしまうのを防ぐために、また、地下空洞内に地下水が充満している場合には、その地下水の水質をできるだけ悪化させず、しかも端部充填材37の水中分離をできる限り防ぐために、内管34の上記開放状態の吐出孔32……が、既に吐出した端部充填材37の中に埋没した状態となるように、端部充填材37の嵩が増すのに合わせて外管35を段階的に上方へスライドさせながら行う(図11)。 1スライドの量および各スライドの時間間隔は、圧送ポンプの圧送圧力,充填量等より定める。   The injection is performed in order to prevent the lower discharge holes 32... From being blocked early by the end filling material 37 discharged from the upper discharge holes 32. In order to prevent the water quality of the groundwater from being deteriorated as much as possible and to prevent the end filler 37 from being separated in water as much as possible, the open discharge holes 32. Then, the outer tube 35 is slid upward in a stepwise manner as the bulk of the end filler 37 increases so as to be buried in the discharged end filler 37 (FIG. 11). . The amount of one slide and the time interval of each slide are determined from the pumping pressure of the pump and the filling amount.

端部充填材37は、充填管31の吐出孔32……から地下空洞33の横断方向、すなわち両壁面の方向へ吐出されるので、地下空洞33の長手方向の勾配を急峻にし、横断方向の勾配を緩やかにした山形をなした状態で充填されてゆく(図10,11)。   Since the end filler 37 is discharged from the discharge hole 32 of the filling pipe 31 in the transverse direction of the underground cavity 33, that is, in the direction of both wall surfaces, the gradient in the longitudinal direction of the underground cavity 33 is steep, It is filled in a mountain shape with a gentle slope (Figs. 10 and 11).

(5) 注入と並行して繰り返し行う外管35のスライドにより、該外管35の下端が地下空洞11の天端より高くなる位置まで来たら、最終充填に入る。
最終充填では、圧送圧力の上昇により、地下空洞33の横断面を完全に閉鎖する端部壁体38が形成されたことを確認して充填を終了する。
(5) When the outer tube 35 slides repeatedly in parallel with the injection and reaches the position where the lower end of the outer tube 35 is higher than the top end of the underground cavity 11, final filling is started.
In the final filling, it is confirmed that the end wall 38 that completely closes the cross section of the underground cavity 33 is formed by the increase of the pumping pressure, and the filling is finished.

本実施例でも、上記実施例1および2と同様に、端部充填材37を地下空洞33の壁面の方向へ吐出させていることにより、従来に比べて少ない充填量で地下空洞33横断面を閉鎖する端部壁体38を形成することができる。   Also in this embodiment, the end filler 37 is discharged in the direction of the wall surface of the underground cavity 33 in the same manner as in the first and second embodiments, so that the cross section of the underground cavity 33 can be reduced with a smaller filling amount than before. A closing end wall 38 can be formed.

(6) 上記と同様の手順で充填対象領域の他端部にも端部壁体38を形成して充填対象領域を閉鎖したのち、充填対象領域内に削孔したボーリング削孔(図示しない)を通じて中詰充填材を注入充填することにより、地下空洞の充填が完了する。   (6) A boring hole (not shown) drilled in the filling target area after forming the end wall 38 at the other end of the filling target area and closing the filling target area in the same procedure as above. The filling of the underground cavity is completed by pouring and filling the filling material through.

このように本実施例の工法では、外管35を上方へスライドさせながら端部充填材37の充填を行うので、下方の吐出孔32……の早期閉塞を防ぐことができ、したがって、幅広の地下空洞への充填が効率的に行えるものである。   Thus, in the construction method of the present embodiment, the end filler 37 is filled while sliding the outer tube 35 upward, so that the early closing of the lower discharge holes 32... Can be prevented. It can efficiently fill underground cavities.

また、地下水が充満している地下空洞への充填であっても、端部充填材37を既に吐出された端部充填材37の中へ吐出させるようにしているので、材料分離を防ぐとともに地下水の汚濁を防止することができる。
なお、たとえば地下水が充満していない地下空洞での充填、すなわち気中での充填の場合等には、材料分離のおそれがないので、外管35のスライド方法(スライドさせる時期およびスライド量)は適宜変更可能である。
Further, even when filling an underground cavity filled with groundwater, the end filler 37 is discharged into the already discharged end filler 37, so that material separation is prevented and the groundwater is discharged. Can be prevented.
For example, in the case of filling in an underground cavity that is not filled with groundwater, that is, filling in the air, there is no risk of material separation, so the sliding method (sliding time and sliding amount) of the outer tube 35 is It can be changed as appropriate.

なお、内管34の吐出孔の数,配置および形状を変更できることは、上記実施例1および2と同様である。   It is to be noted that the number, arrangement, and shape of the discharge holes of the inner pipe 34 can be changed as in the first and second embodiments.

地下空洞充填工法の実施例1により、地下空洞に充填材を充填する様子を示した(a)側面図および(b)平面図である。 It is the (a) side view and (b) top view which showed a mode that the underground cavity was filled with the filler by Example 1 of an underground cavity filling method . 同上の拡大横断面図である。It is an expanded horizontal sectional view same as the above. 本実施例において用いられる充填管を示した斜視図である。It is the perspective view which showed the filling pipe | tube used in a present Example. (a)〜(e)は、本実施例において用いることができる他の充填管の例を示した斜視図である。(a)-(e) is the perspective view which showed the example of the other filling pipe | tube which can be used in a present Example. 地下空洞充填工法の実施例2により、地下空洞に充填材を充填する様子を示した(a)側面図およびその(b)平面図である。 It is the (a) side view and the (b) top view which showed a mode that the underground cavity was filled with the filler by Example 2 of an underground cavity filling method . 同上の拡大横断面図である。It is an expanded horizontal sectional view same as the above. 本実施例において用いられる充填管を示した斜視図である。It is the perspective view which showed the filling pipe | tube used in a present Example. (a)〜(e)は、本実施例において用いることができる他の充填管の例を示した斜視図である。(a)-(e) is the perspective view which showed the example of the other filling pipe | tube which can be used in a present Example. 地下空洞充填工法の実施例3において用いられる充填管の、外管をスライドさせる様子を示した斜視図である。It is the perspective view which showed a mode that the outer tube | pipe of the filling tube used in Example 3 of an underground cavity filling method was slid. 上記充填管を用いて地下空洞に充填材を充填する様子を示した(a)側面図およびその(b)平面図である。It is (a) side view and (b) top view which showed a mode that the underground cavity was filled with a filler using the said filling pipe. 同上の拡大横断面図である。It is an expanded horizontal sectional view same as the above. 従来の地下空洞充填工法により充填材を充填する様子を示した(a)側面図およびその(b)横断面図である。It is (a) side view and the (b) cross-sectional view which showed a mode that the filler was filled by the conventional underground cavity filling method.

符号の説明Explanation of symbols

11,23,33 地下空洞
12,25,37 端部充填材
13,26,38 端部壁体
14,21,31 吐出管
15,22,32 吐出孔
16,24,36 削孔
34 内管
35 外管
11, 23, 33 Underground cavities 12, 25, 37 End fillers 13, 26, 38 End wall bodies 14, 21, 31 Discharge pipes 15, 22, 32 Discharge holes 16, 24, 36 Drill holes 34 Inner pipe 35 Outer pipe

Claims (5)

下端を閉塞した管の側面に、複数の吐出孔を、その軸方向に沿って並べ、かつ、下側のものを大きく上側のものを小さく開口させた内管と、この内管の外側に軸方向にスライド自在にして嵌合させた外管とからなることを特徴とする地下空洞充填用の充填管。A plurality of discharge holes are arranged along the axial direction on the side surface of the pipe whose lower end is closed, and an inner pipe in which the lower one is opened larger and the upper one is opened smaller, and the outer pipe is arranged outside the inner pipe. A filling tube for filling an underground cavity characterized by comprising an outer tube that is slidable in a direction and fitted. 上記吐出孔の上方延長位置にその開口方向を示すマーキングを施していることを特徴とする請求項1記載の地下空洞充填用の充填管。2. The filling pipe for filling an underground cavity according to claim 1, wherein a marking indicating the opening direction is provided at an upper extension position of the discharge hole. (1)地上から地下空洞の充填対象領域に達するボーリング孔を削孔し、(1) Drill a boring hole that reaches the filling target area of the underground cavity from the ground,
(2)そのボーリング孔に、請求項1または2記載の地下空洞充填用の充填管を、その下端が地下空洞の底面近傍に達する位置まで挿入するとともに、該充填管の内管を適宜回転させて吐出孔を地下空洞の横断方向に向け、(2) Insert the filling pipe for filling the underground cavity into the borehole to the position where the lower end reaches the vicinity of the bottom of the underground cavity, and rotate the inner pipe of the filling pipe appropriately. Direct the discharge hole in the transverse direction of the underground cavity,
(3)上記充填管の外管を上方にスライドさせることにより内管の吐出孔を下方のものから順に開放しながら、該充填管の上端側から端部充填材を圧送することによって、開放状態になっている上記吐出孔から端部充填材を吐出させて、上記地下空洞の横断面を閉塞する端部壁体を形成することを特徴とする地下空洞充填工法。(3) While opening the discharge hole of the inner pipe in order from the lower one by sliding the outer pipe of the filling pipe upward, the end filling material is pumped from the upper end side of the filling pipe to open the state. An underground cavity filling method characterized by forming an edge wall body that closes a transverse section of the underground cavity by discharging an edge filler from the ejection hole.
上記外管のスライドを、内管の上記開放状態の吐出孔が既に吐出した端部充填材の中に埋没した状態となるようにしつつ、端部充填材の嵩が増すのに合わせて行うことを特徴とする請求項3記載の地下空洞充填工法。Slide the outer tube in accordance with the increase in the bulk of the end filler while keeping the open discharge hole of the inner tube buried in the end filler already discharged. The underground cavity filling method according to claim 3. 上記外管のスライドを、該外管に取り付けたワイヤー等を操作して行うことを特徴とする請求項3または4記載の地下空洞充填工法。5. The underground cavity filling method according to claim 3, wherein the sliding of the outer pipe is performed by operating a wire or the like attached to the outer pipe.
JP2004372464A 2004-12-24 2004-12-24 Filling method for underground cavity and filling pipe for filling underground cavity Expired - Fee Related JP4007366B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004372464A JP4007366B2 (en) 2004-12-24 2004-12-24 Filling method for underground cavity and filling pipe for filling underground cavity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004372464A JP4007366B2 (en) 2004-12-24 2004-12-24 Filling method for underground cavity and filling pipe for filling underground cavity

Publications (2)

Publication Number Publication Date
JP2006177073A JP2006177073A (en) 2006-07-06
JP4007366B2 true JP4007366B2 (en) 2007-11-14

Family

ID=36731428

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004372464A Expired - Fee Related JP4007366B2 (en) 2004-12-24 2004-12-24 Filling method for underground cavity and filling pipe for filling underground cavity

Country Status (1)

Country Link
JP (1) JP4007366B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6054334B2 (en) * 2014-05-16 2016-12-27 株式会社アライ Retaining method of retaining wall
CN104453995A (en) * 2014-11-28 2015-03-25 冀中能源峰峰集团有限公司 Gob waste-rock-based packing material strip filling method
CN113202552B (en) * 2021-05-28 2023-08-11 鞍钢集团矿业有限公司 A Treatment Method for Underground Empty Area Combining Filling and Artificial Pillars
JP2022184361A (en) * 2021-06-01 2022-12-13 株式会社イノアック住環境 Method for repairing hollow floor slab and hollow floor slab
CN114483173B (en) * 2022-01-18 2023-03-14 安徽理工大学 A controllable hysteresis subsidence grouting method for overlying rock separation layer
CN114808990A (en) * 2022-03-21 2022-07-29 中交第四航务工程局有限公司 High-pressure pre-filling karst cave pile foundation construction method
JP2024011885A (en) * 2022-07-15 2024-01-25 五洋建設株式会社 Structure of tremie pipe for charging soil and rock waste and method of constructing the structure
CN116357385B (en) * 2023-05-30 2023-07-25 山西汾河焦煤股份有限公司回坡底煤矿 Automatic filling equipment for small coal mine goaf
CN117286901A (en) * 2023-11-13 2023-12-26 坝道工程医院(平舆) A method for controlling and reinforcing water surges in foundation pits in karst areas

Also Published As

Publication number Publication date
JP2006177073A (en) 2006-07-06

Similar Documents

Publication Publication Date Title
US7854572B2 (en) Piling machine with high-pressure jet spiral bit and its piling method
US10301904B2 (en) Method for isolation of a permeable zone in a subterranean well
RU2390623C2 (en) Single-trip downhole device equipped with means of minimising sand ingress
JP4007366B2 (en) Filling method for underground cavity and filling pipe for filling underground cavity
MX2007007284A (en) A method and a device for sealing a void incompletely filled with a cast material.
CN103362461B (en) Long-spiral drilling machine and drill bit thereof
KR20100086254A (en) Simultaneous method using a simultaneous-injecting apparatus comprising packer and u-shape pipe
US8887807B2 (en) Apparatus and methods for deploying cementing plugs
CN102472086B (en) current limiter
KR20190122135A (en) Simultaneous injection device using straight punching steel pipe and construction method thereof
CN111677448A (en) Drilling Technology for Variable Diameter Casing in Unstable Formation
CN203488115U (en) Long spiral drilling machine and drill bit
JP6521311B2 (en) Chemical solution injection method under pressurized water
KR100691727B1 (en) Ground hardener injection device and soft ground strengthening method using the device
US10914135B2 (en) Attachments for mitigating set cement downhole
KR101904279B1 (en) Down the hole hammer operating by mud for drilling ground
US10352115B2 (en) Preventing fluid loss
KR100811289B1 (en) Ground Improvement Method and Ground Improvement Equipment
KR20040101102A (en) Grouting apparatus having a adapting type packer
RU2007147527A (en) METHOD FOR DRILLING STRONG BREEDS WITH CORE HYDRAULIC TRANSPORT AND DRILLING APPARATUS FOR ITS IMPLEMENTATION
KR100756524B1 (en) Ground Improvement Method and Ground Improvement Equipment
KR100685007B1 (en) Ground hardener injection device and soft ground strengthening method using the device
JP3821440B2 (en) Filling material filling method
RU163420U1 (en) DRILLING STAW
KR100811287B1 (en) Ground Improvement Method and Ground Improvement Equipment

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070724

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070820

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100907

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4007366

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100907

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110907

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120907

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130907

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130907

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140907

Year of fee payment: 7

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees