JP4009967B2 - Block boundary construction method such as walkway - Google Patents
[go: Go Back, main page]

JP4009967B2 - Block boundary construction method such as walkway - Google Patents

Block boundary construction method such as walkway Download PDF

Info

Publication number
JP4009967B2
JP4009967B2 JP2004330379A JP2004330379A JP4009967B2 JP 4009967 B2 JP4009967 B2 JP 4009967B2 JP 2004330379 A JP2004330379 A JP 2004330379A JP 2004330379 A JP2004330379 A JP 2004330379A JP 4009967 B2 JP4009967 B2 JP 4009967B2
Authority
JP
Japan
Prior art keywords
block
boundary
boundary block
straight
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004330379A
Other languages
Japanese (ja)
Other versions
JP2006138163A (en
Inventor
芳浩 城本
友之 安達
純子 木村
Original Assignee
有限会社 城本工業所
山陽コンクリート工業株式会社
純子 木村
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社 城本工業所, 山陽コンクリート工業株式会社, 純子 木村 filed Critical 有限会社 城本工業所
Priority to JP2004330379A priority Critical patent/JP4009967B2/en
Publication of JP2006138163A publication Critical patent/JP2006138163A/en
Application granted granted Critical
Publication of JP4009967B2 publication Critical patent/JP4009967B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Road Paving Machines (AREA)

Description

本発明は、歩車と車道との間などに境界ブロックを一線状に配置して形成されるブロック境界の施工方法に関する。   The present invention relates to a method for constructing a block boundary formed by arranging boundary blocks in a line between a pedestrian carriage and a roadway.

歩道と車道との間には、自動車などが歩道に自由に進入するのを阻止するために、コンクリート製の境界ブロックの多数を一線状に配置して、高さ10〜35cm程度で長さ凡そ60cm〜240cm程度のブロック境界を形成することが行われている。   Between the sidewalk and the roadway, in order to prevent automobiles from freely entering the sidewalk, a large number of concrete boundary blocks are arranged in a line, with a height of about 10 to 35 cm and a length of about A block boundary of about 60 cm to 240 cm is formed.

上記境界ブロックはその寸法が大きいものになると、その重量も相応に大きくなるのであり、1つの境界ブロックが100kgを超えるものも少なくなく、重いものは400kgにも及ぶものとなるのであり、このように重い境界ブロックを使用したブロック境界を施工する場合、境界ブロックを1つづつクレーンなどで吊り移動させて一線状に配置するのであり、この際、通常、境界ブロックの前後端のそれぞれに少なくとも1人の作業者が付いてその向きを変更させたり、上下姿勢を反転させるようにしている。
技術水準を示す公知資料としては特許文献1に示すようなものがある。
When the size of the boundary block increases, the weight of the boundary block increases correspondingly. There are many cases where one boundary block exceeds 100 kg, and a heavy block reaches 400 kg. When constructing a block boundary using heavy boundary blocks, the boundary blocks are suspended and moved one by one with a crane or the like, and at this time, at least one is usually placed on each of the front and rear ends of the boundary block. A human worker is attached to change the direction of the operator or to reverse the vertical posture.
As publicly known data indicating the technical level, there is one as shown in Patent Document 1.

特開2002−332608号公報JP 2002-332608 A

比較的重い境界ブロックを使用してブロック境界を施工する場合には、既述のように1つの境界ブロックの前後各側に1人又は複数人の作業者が付いて作業するため人件費が嵩むという問題があるのであり、本発明はこの問題を解消させることを目的とするものである。   When building a block boundary using a relatively heavy boundary block, as described above, one or more workers are attached to the front and rear sides of one boundary block, which increases labor costs. The present invention aims to solve this problem.

上記目的を達成するため、本発明に係るブロック境界の施工方法は、請求項1に記載したように、前後方向へ長い直状の定断面形状体となされ且つ前後各端面で凡そ重心個所となる付近に前後向きの直状孔を形成された境界ブロックと、前記直状孔のそれぞれに挿入される特定長さの直状棒部材と、前記直状孔のそれぞれに挿入された状態の直状棒部材の外方張出部に同時に掛け止められる一対のフック部材を具備し且つこれらフック部材を特定間隔に保持するフック支持部材を具備し且つ前記フック部材や前記フック支持部材に吊り力を付与するための吊り力付与部を具備した境界ブロック用吊り具とを作成しておき、2つの直状棒部材を境界ブロックの前後各端面の直状孔にその一端部が外方へ張り出した状態に挿入し、次に前記2つの直状棒部材のそれぞれの前記一端部に一対のフック部材を掛け止めた状態となし、次に吊り力付与部に吊り力を付与して該境界ブロックを境界施工位置に移動するという処理を繰り返すことにより、多数の境界ブロックをその前後方向の一線状に配設するのであり、この配設において既配設の境界ブロックに他の境界ブロックを境界ブロック用吊り具によるその吊り移動により隣接させるとき、前記他の境界ブロックの前記既設ブロック側の直状孔に挿入された直状棒部材の前記一端部を前記既設ブロックの前記他の境界ブロック側の直状孔に挿入させるように実施することを特徴とするものである。 In order to achieve the above object, according to the block boundary construction method of the present invention, as described in claim 1, a straight constant cross-sectional shape that is long in the front-rear direction is formed, and the center of gravity is located at each of the front and rear end faces. A boundary block in which a straight hole facing forward and backward is formed in the vicinity, a straight bar member having a specific length inserted into each of the straight holes, and a straight shape in a state of being inserted into each of the straight holes It has a pair of hook members that are hooked simultaneously on the outwardly projecting portions of the bar members, and has a hook support member that holds these hook members at a specific interval, and applies a suspension force to the hook member and the hook support member A boundary block suspension provided with a suspension force imparting portion for carrying out, and a state where one end of the two straight bar members projects outwardly into a straight hole on each of the front and rear end faces of the boundary block And then the two A state in which a pair of hook members are hooked on each of the one end portions of each of the rod-shaped rod members, and then the suspension block is applied to the suspension force application portion and the boundary block is moved to the boundary construction position. Thus, a large number of boundary blocks are arranged in a line in the front-rear direction, and in this arrangement, when other boundary blocks are adjacent to the existing boundary block by its suspension movement by the boundary block lifting tool, The first end of the straight bar member inserted in the straight hole on the existing block side of the other boundary block is inserted into the straight hole on the other boundary block side of the existing block. It is a feature.

この発明はさらに次のように具体化するのであって、即ち、請求項2に記載したように、フック部材の厚さ寸法を、10mm〜20mmの範囲内の大きさに作成し、既配設の境界ブロックに他の境界ブロックを境界ブロック用吊り具によるその吊り移動により隣接させるとき、既配設の境界ブロックの前後方向一端とこれに隣接される他の境界ブロックの前後方向一端との隙間寸法を、前記フック部材の厚さ寸法よりも大ならしめておき、前記他の境界ブロックが配設された後に前記境界ブロック用吊り具を降下させ続いてそのフック部材を左右方向へ移動させることにより、該他の境界ブロックの前後方向各端面の直状孔に挿入されている各直状棒部材から前記境界ブロック用吊り具のフック部材を既配設の境界ブロック及び該他の境界ブロックを変位させることなく外すように実施するのである。 The present invention is further embodied as follows. That is, as described in claim 2, the thickness dimension of the hook member is made to a size within the range of 10 mm to 20 mm, and is already installed. When another boundary block is adjacent to the boundary block by the suspension movement of the boundary block lifting tool, the gap between one end in the front-rear direction of the existing boundary block and one end in the front-rear direction of another boundary block adjacent thereto The dimension is made larger than the thickness dimension of the hook member, and after the other boundary block is disposed, the boundary block suspension is lowered and then the hook member is moved in the left-right direction. The hook member of the boundary block suspension is connected to the existing boundary block and the other boundary block from the straight bar members inserted in the straight holes on the end faces in the front-rear direction of the other boundary block. It is to implement to disengage without displacing the click.

上記した本発明によれば次のような効果が得られる。
即ち、請求項1記載の発明によれば、境界ブロックに1人の作業者が付くことにより、たとえ400kgに及ぶような重さの境界ブロックであっても、境界ブロック用吊り具による吊り状態の下で、その境界ブロックの前後方向端面を他の境界ブロックの前後方向端面に近接した位置に移動させることができ且つ、必要に応じて上下を反転させることができ且つ、このように移動され反転された境界ブロック(前者ブロック)の一側の端面の直状孔に挿入された直状棒部材の外方張出部を、既に大地側の平面上に定置されている境界ブロック(後者ブロック)の一側の端面の直状孔に挿入させて前者ブロックを後者ブロックに対し特定間隔を置いて前者ブロックの前後方向の正確な一線状に定置させることができるようになるのであり、ブロック境界を少ない人件費で構築することが可能となる。
このようなブロック境界の構築にさいして、1つの境界ブロックの一側の端面を他の境界ブロックの一側の端面に近接させて定置させた後に、これら境界ブロックを変位させることなく、境界ブロック用吊り具を、これの掛け止められた境界ブロックの前後端面の直状部材の外方張出部から簡便に取り外すことができるのである。
さらには一線状に配設された境界ブロックの隣接したもの同士の間でそれぞれのブロックの直状孔間に橋渡し状に挿入された直状棒部材が、前後方向で隣接したこれら境界ブロックの間に充填されたモルタルやアスファルトなどの中に埋め込まれた状態となるものである。
According to the above-described present invention, the following effects can be obtained.
In other words, according to the first aspect of the present invention, a single worker is attached to the boundary block . Below, the front / rear end face of the boundary block can be moved to a position close to the front / rear end face of another boundary block , and the top / bottom can be reversed as necessary. Boundary block (the latter block) in which the outward projecting portion of the straight bar member inserted into the straight hole on the one end face of the boundary block (the former block) is already placed on the ground plane and than it is possible to stationary one side of the end face of the former block is inserted into the straight hole before and after the former block at a specific spacing with respect to the latter block direction of precise clear distinction shape, Bro It is possible to construct a clause boundary with less labor costs.
In constructing such a block boundary, after placing one end face of one boundary block close to one end face of another boundary block, the boundary blocks are not displaced, and the boundary blocks are not displaced. The lifting device can be easily removed from the outward projecting portion of the straight member on the front and rear end faces of the boundary block on which the hook is suspended.
Furthermore, a straight bar member inserted in a bridging manner between the adjacent straight holes of each block between adjacent ones of the boundary blocks arranged in a straight line is between these adjacent boundary blocks in the front-rear direction. It will be in a state where it is embedded in mortar or asphalt filled in.

請求項2記載の発明によれば、請求項1記載の発明の効果が得られるほかに次のような効果が得られるのであって、即ち、境界ブロックを一線上に配置する際、各境界ブロックを境界ブロック用吊り具を使用し、吊り下ろしながらこれの前後方向一側の直状孔に挿入されている直状棒部材を、既に配置されている境界ブロックに近接させつつこれの直状孔内に挿入することにより、現に吊り下ろされた境界ブロックを正確に位置決めできてこのブロックと既に配置されている境界ブロックとの対向した端面間の隙間を10mm〜20mmの範囲内の大きさとなすことができる。 According to the invention described in claim 2, in addition to the effect of the invention described in claim 1, the following effect can be obtained. That is, when the boundary blocks are arranged on one line, each boundary block is obtained. the using hanger for boundary block, a straight rod member being inserted into straight hole in the longitudinal direction on one side of which while down hanging, which the straight while already in proximity to the boundary block located By inserting into the hole , the currently suspended boundary block can be accurately positioned, and the gap between the opposing end faces of this block and the already disposed boundary block has a size within the range of 10 mm to 20 mm. Can be made.

以下、図面を参照して本発明の実施の形態について説明する。
図1は本発明に係るブロック境界の材料である境界ブロックなどを示す斜視図、図2は前記境界ブロックなどを成形するための型枠を示す斜視図、図3は前記境界ブロックを吊り上げるための境界ブロック用吊り具を示す図、図4は前記境界ブロック用吊り具の使用例を示す図、図5は前記ブロック境界を示す斜視図である。
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a perspective view showing a boundary block which is a block boundary material according to the present invention, FIG. 2 is a perspective view showing a mold for forming the boundary block, etc., and FIG. 3 is a view for lifting the boundary block. FIG. 4 is a view showing a boundary block suspension, FIG. 4 is a view showing an example of use of the boundary block suspension, and FIG. 5 is a perspective view showing the block boundary.

本発明に係るブロック境界の施工方法を実施するには、先ず、図1に示すような境界ブロック1を必要数だけ作成する。
該境界ブロック1は、コンクリート(モルタルを含む)を材料としたもので、前後方向f1へ長くなされ且つ、前後方向f1へ直状となされ、且つ長さ方向の任意位置の断面形状を同一となされた定断面形状体となされ且つ、前後各端面の凡そ重心個所となる付近に前後向きの直状孔1a、1bを形成されたものとなさている。
To implement the block boundary construction method according to the present invention, first, a necessary number of boundary blocks 1 as shown in FIG. 1 are created.
The boundary block 1 is made of concrete (including mortar), is elongated in the front-rear direction f1, is straight in the front-rear direction f1, and has the same cross-sectional shape at any position in the length direction. The front and rear straight holes 1a and 1b are formed in the vicinity of the center of gravity of the front and rear end faces.

さらに詳細には、前後方向f1の長さは凡そ60cm〜240cm程度となされるが、これは作業の能率化の観点から次第に長くなされる傾向にある。また左右方向で切断したときの断面形状は一般には概ね台形となされるが、これに限定するものではない。直状孔1a、1bの大きさは境界ブロック1の重量に関連して決定されるもので、例えば直径を凡そ15mm〜20mm程度となされ、深さを凡そ70mm程度となされる。   More specifically, the length in the front-rear direction f1 is about 60 cm to 240 cm, but this tends to be gradually increased from the viewpoint of improving work efficiency. The cross-sectional shape when cut in the left-right direction is generally a trapezoid, but is not limited to this. The size of the straight holes 1a and 1b is determined in relation to the weight of the boundary block 1. For example, the diameter is about 15 mm to 20 mm, and the depth is about 70 mm.

該境界ブロック1の作成には、図2に示すような型枠2が使用される。
該型枠2は本体部3と前後の端面部4a、4bとからなっている。本体部3は鋼板を屈曲することにより複数条(図示例では2条)の直状溝部3aを左右方向へ並列させた状態に形成されており、各溝部3aは左右側面a1と下面a2とからなっており、該溝部3aを左右方向に切断したときの断面形状が前後方向f1の任意位置で同一形状の倒立台形となる定断面形状となされている。端面部4a、4bは本体部3の前後の端面に分離可能に密接された方形板体となされていて各溝部3aの前後の端面の凡そ重心個所となる付近のそれぞれに前後向きの棒部材5が張出状に固定されている。
For creating the boundary block 1, a form 2 as shown in FIG. 2 is used.
The mold 2 is composed of a main body 3 and front and rear end surfaces 4a and 4b. The main body 3 is formed in a state in which a plurality of (two in the illustrated example) straight grooves 3a are juxtaposed in the left-right direction by bending a steel plate, and each groove 3a is formed from the left and right side surfaces a1 and the lower surface a2. The cross-sectional shape when the groove 3a is cut in the left-right direction is a constant cross-sectional shape that is an inverted trapezoid having the same shape at an arbitrary position in the front-rear direction f1. The end surface portions 4a and 4b are formed as rectangular plates that are separably attached to the front and rear end surfaces of the main body portion 3, and the rod members 5 facing front and rear are located in the vicinity of the center of gravity of the front and rear end surfaces of each groove portion 3a. Is fixed in an overhang shape.

境界ブロック1の作成に際しては、上記型枠2の各溝部3aの内方にコンクリートを充填するのであり、このように充填されたコンクリートが充分に固化したとき、本体部3から前後の端面部4a、4bを揺動させ或いは前後方向f1へ変位させることにより分離させる。これにより、本体部3は自身の弾性で各溝部3a内で固化したコンクリートブロックの側面から離れるように弾性変形し、また該コンクリートブロックの前後端面から棒部材5が抜き出されるものとなり、棒部材5が抜き出された後のコンクリートブロックの前後端面個所に前記直状孔1a、1bが形成され、上記境界ブロック1が形成される。   When the boundary block 1 is created, concrete is filled in the groove portions 3a of the mold 2 and when the filled concrete is sufficiently solidified, the front and rear end face portions 4a are separated from the main body portion 3. 4b is separated by swinging or displacing it in the front-rear direction f1. As a result, the main body 3 is elastically deformed so as to be separated from the side surface of the concrete block solidified in each groove 3a by its own elasticity, and the bar member 5 is extracted from the front and rear end surfaces of the concrete block. The said straight hole 1a, 1b is formed in the front-and-rear end surface location of the concrete block after 5 is extracted, and the said boundary block 1 is formed.

一方では、図3に示すように、上記境界ブロック1を移動させるための境界ブロック用吊り具6を作成する。
該吊り具6は次のようなものとなされているのであって、即ち、前後向きのフック支持部材7を形成し、これの前後端部に一対のフック部材8a、8bを少なくともこれらの一方のものが前後位置調整可能なように固定するほか、前記フック部材8a、8bや前記フック支持部材7に吊り力を付与するための吊り力付与部9a、9bを形成したものとなされている。
On the other hand, as shown in FIG. 3, the boundary block suspension 6 for moving the boundary block 1 is created.
The hanger 6 is configured as follows, that is, a hook support member 7 facing forward and backward is formed, and a pair of hook members 8a and 8b are provided at the front and rear end portions of at least one of them. In addition to fixing so that the front and rear positions can be adjusted, suspending force application portions 9a and 9b for applying a suspending force to the hook members 8a and 8b and the hook support member 7 are formed.

この際、フック支持部材7は、長さ凡そ280cm程度となされた前後向きの直状管部材からなっており、またフック支持部材7の前後端部に環状部材10a、10bが前後方向f1の摺動変位可能に外挿され、各環状部材10a、10bの周面下部に長さ凡そ50cm程度のフック部材8a、8bが固着されると共に各環状部材10a、10bの周面上部に吊り力付与部9a、9bとしての吊り孔片が形成されている。各環状部材10a、10bはフック支持部材7の各端部において、各環状部材10a、10bの特定直径位置に設けられたピン孔b1と、フック支持部材7の各端部の前後方向f1上の複数位置のそれぞれの個所の特定直径位置に設けられたピン孔b2と、これらピン孔b1、b2に挿通されるピン部材cとを介して、前後方向f1の位置変更調整可能となされている。   At this time, the hook support member 7 is formed of a straight pipe member facing in the front-rear direction having a length of about 280 cm, and the annular members 10a, 10b are slid in the front-rear direction f1 at the front-rear ends of the hook support member 7. The hook members 8a and 8b having a length of about 50 cm are fixed to the lower portions of the circumferential surfaces of the annular members 10a and 10b. The suspension members are suspended at the upper portions of the circumferential surfaces of the annular members 10a and 10b. Suspension hole pieces as 9a and 9b are formed. Each annular member 10a, 10b has a pin hole b1 provided at a specific diameter position of each annular member 10a, 10b at each end of the hook support member 7, and a front-rear direction f1 of each end of the hook support member 7. The position change in the front-rear direction f1 can be adjusted via a pin hole b2 provided at a specific diameter position at each of a plurality of positions and a pin member c inserted through the pin holes b1 and b2.

各フック部材8a、8bは歩車道などに使用される境界ブロック1の前後側の端面1c、1dの形状中心個所の直状孔1a、1bに挿入された一対の直状棒部材11、11(図4参照)の外方張出部11a、11aに同時に掛け止められると共にこのように掛け止められた状態で前後の端面1c、1dに密状に近接した状態になるものとなされている。また各フック部材8a、8bの前記端面1c、1dと対向される部分が平面状となされ厚さを前記境界ブロック1の配置間隔に関連した大きさ(例えば凡そ10mm程度)となされており、さらに各フック部材8a、8bの掛け溝部dはこれの掛け止められた前記外方張出部11aに対し下方へ移動されることにより該外方張出部11aから抜け出る形状となさている。   Each of the hook members 8a, 8b is a pair of straight rod members 11, 11 (inserted in the straight holes 1a, 1b at the center of the shape of the end faces 1c, 1d on the front and rear sides of the boundary block 1 used for a walking road or the like. The outer overhanging portions 11a and 11a of FIG. 4) are hooked at the same time, and in the state of being hooked in this way, the front and rear end faces 1c and 1d are in close proximity to each other. Further, the portions of the hook members 8a, 8b facing the end faces 1c, 1d are planar, and the thickness is set to a size related to the arrangement interval of the boundary blocks 1 (for example, about 10 mm). The hooking groove portion d of each hook member 8a, 8b is shaped to come out of the outer overhanging portion 11a by being moved downward with respect to the outer overhanging portion 11a to which the hook member 8a, 8b is hooked.

上記直状棒部材11は金属材(鋼材など)からなり、既述のように境界ブロック1を吊り上げるときに使用されるほか、一線状に配置された多数の境界ブロック1における隣接したもの同士の位置決めに使用されるもので、本例では凡そ直径15〜20mm程度で全長を凡そ100mm程度となされている。   The straight bar member 11 is made of a metal material (steel material or the like), and is used when lifting the boundary block 1 as described above, and between adjacent ones in a large number of boundary blocks 1 arranged in a line. It is used for positioning. In this example, the diameter is about 15 to 20 mm and the total length is about 100 mm.

次に上記のように作成した境界ブロック1、吊り具6及び直状棒部材11を使用して、図5に示すように歩車道における歩道e1と車道e2とを区分するブロック境界12を施工する場合の作業手順の一例を説明する。
上記型枠2の溝部3a内でコンクリートが固化して本体部3から端面部4a、4bが分離された状態では、各溝部3a内に境界ブロック1が倒立姿勢で存在した状態となり、その前後の各端面1c、1dは開放された状態となるが、該状態の下で、作業者は溝部3a内から境界ブロック1を外方へ取り出し、運搬し、保管場所に段重ねして一時保管する。
Next, using the boundary block 1, the lifting tool 6 and the straight bar member 11 created as described above, a block boundary 12 for separating the sidewalk e1 and the roadway e2 on the walking road is constructed as shown in FIG. An example of the work procedure will be described.
In the state where the concrete is solidified in the groove portion 3a of the mold 2 and the end surface portions 4a, 4b are separated from the main body portion 3, the boundary block 1 is present in an inverted posture in each groove portion 3a. Each end surface 1c, 1d is in an open state. Under this state, the operator takes out the boundary block 1 from the groove 3a, carries it, stacks it in a storage place, and temporarily stores it.

境界ブロック1の保管では、風雨や大気接触による上面の経年劣化を防ぐため、境界ブロック1の保管姿勢を倒立姿勢となすことがあるが、このような保管を行うときは、型枠2から倒立姿勢で吊り上げ分離された境界ブロック1をそのままの姿勢で保管場所に吊り下ろすようにすればよいのであり、また正立姿勢で保管するときは型枠2から倒立姿勢で吊り上げ分離された境界ブロック1の吊上げ状態でこの境界ブロック1を前後の直状棒部材11、11回りへ回転変位させた後、吊り下ろすようにすればよい。   In the storage of the boundary block 1, the storage posture of the boundary block 1 may be an inverted posture in order to prevent aged deterioration of the upper surface due to wind and rain and atmospheric contact. The boundary block 1 lifted and separated in the posture may be suspended in the storage location in the same posture, and when stored in the upright posture, the boundary block 1 lifted and separated from the mold 2 in the inverted posture. After the boundary block 1 is rotationally displaced around the front and rear straight rod members 11 and 11 in the lifting state, the suspension block may be suspended.

ブロック境界12の施工に際しては、上記のように一時保管された境界ブロック1を施工現場まで運搬し、その使用場所の近くに荷下ろしする。
一方、施工現場では、ブロック境界12を構築する位置に境界ブロック1を一線状に配置するための基礎面を形成し、該基礎面にブロック位置決め線を引いておく。
When constructing the block boundary 12, the boundary block 1 temporarily stored as described above is transported to the construction site and unloaded near the place of use.
On the other hand, at the construction site, a foundation surface for arranging the boundary block 1 in a line is formed at a position where the block boundary 12 is constructed, and a block positioning line is drawn on the foundation surface.

そして、施工現場にクレーン車などの吊り手段を用意し、該吊り手段により境界ブロック1を1つづつその配置場所に吊り移動させ、このように移動された境界ブロック1を作業者が順次にブロック位置決め線に合わせるように位置決めしていき、一線状のブロック境界12を形成するのである。   Then, suspension means such as a crane truck is prepared at the construction site, and the boundary blocks 1 are suspended and moved one by one by the suspension means, and the operator sequentially blocks the boundary blocks 1 thus moved. Positioning is performed so as to match the positioning line, and a linear block boundary 12 is formed.

このような一連の作業における境界ブロック1の吊り移動は、次のように行うのであって、即ち、先ず境界ブロック1の各端面1c、1dの直状孔1a、1bに直状棒部材11、11を挿入し、その外方張出部11a、11aを凡そ30mm程度片持ち状に張り出させた状態となし、次に吊り具6の各フック部材8a、8bの掛け溝部d、dを前後の直状棒部材11、11の外方張出部11a、11aに掛け止める。この際、必要に応じ予めピン部材cとピン孔b1、b2を介してフック支持部材7に対する環状部材10a、10bの位置を調整しておき、各フック部材8a、8bがその対応する側の端面1c、1dに近接される状態となす。この後、吊り具6をクレーンなどの吊り手段で吊り上げて移動させる。   The suspension movement of the boundary block 1 in such a series of operations is performed as follows. That is, first, the straight rod member 11 is inserted into the straight holes 1a and 1b of the end faces 1c and 1d of the boundary block 1, respectively. 11 is inserted and the outwardly projecting portions 11a and 11a are cantilevered by about 30 mm. Next, the hooking groove portions d and d of the hook members 8a and 8b of the hanging tool 6 are moved back and forth. The straight bar members 11 and 11 are hooked on the outward projecting portions 11a and 11a. At this time, if necessary, the positions of the annular members 10a and 10b with respect to the hook support member 7 are adjusted in advance via the pin member c and the pin holes b1 and b2, and the end surfaces on the corresponding sides of the hook members 8a and 8b are adjusted. 1c and 1d. Thereafter, the lifting tool 6 is lifted and moved by a lifting means such as a crane.

このような吊り具6による吊り移動作業においては、境界ブロック1に付いている作業者は、吊り具6のフック部材8a、8bを、前後の直状孔1a、1bに挿入された直状棒部材11、11に掛け止めたり直状棒部材11、11から外す処理や、吊り上げられた境界ブロック1を姿勢変更させる処理を行うことで足りるのであり、また吊り上げられた境界ブロック1を上下反転させるときは前後の直状棒部材11、11が境界ブロック1のほぼ重心と通る直線上に位置するため、たとえ境界ブロック1の重量が100kgを超えるようなものであっても、比較的小さい力で行えるのであり、したがって境界ブロック1の吊り移動作業において境界ブロック1に付いて作業すべき作業者の人数は1人で足りるのである。   In such a suspending / moving operation using the suspending tool 6, the operator attached to the boundary block 1 inserts the hook members 8a, 8b of the suspending tool 6 into the front and rear straight holes 1a, 1b. It is sufficient to perform the process of hanging on the members 11 and 11 or removing from the straight rod members 11 and 11 and the process of changing the posture of the suspended boundary block 1, and the suspended boundary block 1 is turned upside down. Sometimes the front and rear straight bar members 11 and 11 are located on a straight line passing through the approximate center of gravity of the boundary block 1, so even if the weight of the boundary block 1 exceeds 100 kg, the force is relatively small. Therefore, the number of workers who should work on the boundary block 1 in the suspension movement work of the boundary block 1 is sufficient.

また吊り具6を使用して境界ブロック1を保管場所に同一向きとなして段積みするとき、前後向きの境界ブロック1、1の端面1c、1d同士は吊り降下するだけで凡そ100mm程度の間隔で配置することができ、また前後向きの境界ブロック1、1の側面同士は吊り降下するだけで殆ど隙間の無い状態に配置することができる。   In addition, when the boundary blocks 1 are stacked in the same direction in the storage place by using the lifting tool 6, the end faces 1c and 1d of the boundary blocks 1 and 1 facing forward and backward are simply suspended and separated by about 100 mm. In addition, the side surfaces of the boundary blocks 1 and 1 facing forward and backward can be arranged in a state with almost no gap just by hanging down.

次に各境界ブロック1を基礎面に引かれたブロック位置決め線に合わせるように位置決めしていくときの手順の一例をさらに詳細に説明する。
ブロック位置決め線の場所にいる1人の作業者は吊り手段により吊り移動された1つの境界ブロック1がブロック位置決め線の近傍に位置したとき、吊り手段の操縦者に吊り降下位置についての指示を与えて、該境界ブロック1をブロック位置決め線のほぼ真上に位置させ、この後、該境界ブロック1を吊り下げ、基礎面から僅かに離れた状態の吊り状態となす。この際、吊り移動された境界ブロック1が倒立姿勢であれば、作業者は手作業でこれを正立姿勢となるように反転させる。
Next, an example of a procedure for positioning each boundary block 1 so as to match the block positioning line drawn on the base surface will be described in more detail.
When one boundary block 1 hung and moved by the suspension means is located in the vicinity of the block positioning line, an operator at the location of the block positioning line gives an instruction on the suspension lowering position to the operator of the suspension means. Thus, the boundary block 1 is positioned almost directly above the block positioning line, and then the boundary block 1 is suspended to a suspended state slightly separated from the foundation surface. At this time, if the suspended boundary block 1 is in the inverted posture, the operator manually reverses the boundary block 1 so as to be in the upright posture.

次に該境界ブロック1を前後方向f1へ変位させることにより、一側の端面1dの直状孔1bに挿入された直状棒部材11の凡そ30mm程度の長さの外方張出部11aを、既にブロック位置決め線に合致されて定置されている境界ブロック1の一側の端面1cの直状孔1aに挿入させ、さらに、吊られている境界ブロック1と既に定置されている境界ブロック1との端面1c、1d間に一側のフック部材8bがほぼ密状に挟み付けられた状態となす。これにより吊られている境界ブロック1の一側は既に定置されている境界ブロック1及び直状棒部材11を介して正確な位置に位置決めされた状態となる。   Next, by displacing the boundary block 1 in the front-rear direction f1, the outward protruding portion 11a having a length of about 30 mm of the straight bar member 11 inserted into the straight hole 1b of the end surface 1d on one side is moved. The boundary block 1 is inserted into the straight hole 1a of the end face 1c on one side of the boundary block 1 that has already been placed in conformity with the block positioning line, and the suspended boundary block 1 and the boundary block 1 that has already been placed The hook member 8b on one side is sandwiched between the end faces 1c and 1d in a substantially dense state. As a result, one side of the suspended boundary block 1 is positioned at an accurate position via the boundary block 1 and the straight bar member 11 that have already been placed.

次に作業者は吊られている境界ブロック1の他側をブロック位置決め線に合わせた状態に保持しておき、吊り手段の操縦者に吊り降下を指示し、吊られている境界ブロック1を基礎面上に定置させる。このとき吊り具6の高さ位置を直状棒部材11の高さよりも充分に降下させるのであり、これにより吊り具6の一対のフック部材8a、8bの掛け溝部d、dは前後の直状棒部材11、11の外方張出部11a、11aからこれら相互の案内作用により殆ど人為力を要することなく外れるのである。   Next, the operator holds the other side of the suspended boundary block 1 in a state where it is aligned with the block positioning line, instructs the operator of the suspension means to drop, and uses the suspended boundary block 1 as a basis. Place on the surface. At this time, the height position of the hanger 6 is sufficiently lowered from the height of the straight bar member 11, so that the hooking grooves d and d of the pair of hook members 8 a and 8 b of the hanger 6 are formed in the front and rear straight shapes. The bar members 11 and 11 can be detached from the outwardly projecting portions 11a and 11a with almost no human force by the mutual guiding action.

次に吊り具6のフック部材8a、8bを端面1c、1dに沿って左右方向へ変位させるなどして境界ブロック1の端面1c、1dと対向した位置から離脱させる。これにより、定置され隣接された2つの境界ブロック1、1の端面1c、1d間には凡そフック部材8bの厚さと略同一の幅(例えば凡そ10mm程度)の隙間gが形成される。次に今、定置された境界ブロック1の開放側の端面1cの直状孔1aに挿入されている直状棒部材11を抜き出す。
以後は次々と定置される各境界ブロック1について同じ作業が繰り返される。
Next, the hook members 8a and 8b of the hanger 6 are disengaged from the positions facing the end surfaces 1c and 1d of the boundary block 1 by displacing the hook members 8a and 8b in the left-right direction along the end surfaces 1c and 1d. As a result, a gap g having a width substantially the same as the thickness of the hook member 8b (for example, about 10 mm) is formed between the end faces 1c and 1d of the two boundary blocks 1 and 1 that are placed adjacent to each other. Next, the straight bar member 11 inserted in the straight hole 1a of the open end face 1c of the boundary block 1 that has been placed is extracted.
Thereafter, the same operation is repeated for each boundary block 1 that is placed one after another.

こうして境界ブロック1はこれに付いている1人の作業者により一線状に配置された状態となされるのであり、この後、隣接した境界ブロック1、1間の隙間にモルタルやアルファルトなどの目地材が充填されて、図5に示すようなブロック境界12が形成される。   In this way, the boundary block 1 is arranged in a line by one operator attached to the boundary block 1, and thereafter, joints such as mortar and alphalt are formed in the gap between the adjacent boundary blocks 1 and 1. The material is filled to form a block boundary 12 as shown in FIG.

上記した施工例では、保管場所での境界ブロック1の移動や、施工現場への境界ブロック1の移動において吊り具6を使用したが、これらの移動は他の適宜な手段で行って差し支えない。   In the construction example described above, the hanging tool 6 is used in the movement of the boundary block 1 at the storage location and the movement of the boundary block 1 to the construction site. However, these movements may be performed by other appropriate means.

また本例では歩道と車道とを区分するブロック境界12の施工について説明したが、これに限定するものではないのであり、例えば、船着き場の縁に形成されるブロック境界12であってもよいし、或いは広場の縁に形成されるブロック境界12であっても差し支えない。   In this example, the construction of the block boundary 12 that separates the sidewalk and the roadway has been described. However, the present invention is not limited to this. For example, the block boundary 12 formed at the edge of the dock may be used. Alternatively, it may be the block boundary 12 formed at the edge of the square.

本発明に係るブロック境界の材料である境界ブロックを示す斜視図である。It is a perspective view which shows the boundary block which is the material of the block boundary which concerns on this invention. 前記境界ブロックを成形するための型枠を示す斜視図である。It is a perspective view which shows the formwork for shape | molding the said boundary block. 前記境界ブロックを吊り上げるための境界ブロック用吊り具を示す図である。It is a figure which shows the suspension tool for boundary blocks for lifting the said boundary block. 前記境界ブロック用吊り具の使用例を示す図である。It is a figure which shows the usage example of the said suspension tool for boundary blocks. 前記ブロック境界を示す斜視図である。It is a perspective view which shows the said block boundary.

符号の説明Explanation of symbols

1 境界ブロック
1a 直状孔
1b 直状孔
1c 端面
1d 端面
6 境界ブロック用吊り具
7 フック支持部材
11 直状棒部材
11a 外方張出部
8a フック部材
8b フック部材
9a 吊り力付与部
9b 吊り力付与部
DESCRIPTION OF SYMBOLS 1 Boundary block 1a Straight hole 1b Straight hole 1c End surface 1d End surface 6 Boundary block lifting tool 7 Hook support member 11 Straight bar member 11a Outward projecting portion 8a Hook member 8b Hook member 9a Suspension force giving portion 9b Lifting force Granting part

Claims (2)

前後方向へ長い直状の定断面形状体となされ且つ前後各端面で凡そ重心個所となる付近に前後向きの直状孔を形成された境界ブロックと、前記直状孔のそれぞれに挿入される特定長さの直状棒部材と、前記直状孔のそれぞれに挿入された状態の直状棒部材の外方張出部に同時に掛け止められる一対のフック部材を具備し且つこれらフック部材を特定間隔に保持するフック支持部材を具備し且つ前記フック部材や前記フック支持部材に吊り力を付与するための吊り力付与部を具備した境界ブロック用吊り具とを作成しておき、2つの直状棒部材を境界ブロックの前後各端面の直状孔にその一端部が外方へ張り出した状態に挿入し、次に前記2つの直状棒部材のそれぞれの前記一端部に一対のフック部材を掛け止めた状態となし、次に吊り力付与部に吊り力を付与して該境界ブロックを境界施工位置に移動するという処理を繰り返すことにより、多数の境界ブロックをその前後方向の一線状に配設するのであり、この配設において既設の境界ブロックに他の境界ブロックを境界ブロック用吊り具によるその吊り移動により隣接させるとき、前記他の境界ブロックの前記既設ブロック側の直状孔に挿入された直状棒部材の前記一端部を前記既設ブロックの前記他の境界ブロック側の直状孔に挿入させるように実施することを特徴とする歩車道などのブロック境界施工方法。 A boundary block that has a straight, constant cross-sectional shape that is long in the front-rear direction and has a straight hole in the front-rear direction in the vicinity of the center of gravity at each front and rear end face, and a specific block that is inserted into each of the straight holes A straight bar member having a length, and a pair of hook members that are simultaneously hooked on the outwardly extending portion of the straight bar member inserted into each of the straight holes, and the hook members are spaced at a specific interval. leave create a hook provided with a supporting member and said hook member and said hook hanging force to the support member comprises a hanging force imparting unit for imparting boundary block for hanging member to retain the two straight rods Insert the member into a straight hole on each of the front and rear end faces of the boundary block with one end projecting outward, and then hook a pair of hook members on the one end of each of the two straight rod members No state, and then applying lifting force A number of boundary blocks are arranged in a line in the front-rear direction by repeating the process of applying a suspension force to the boundary block and moving the boundary block to the boundary construction position. In this arrangement, the existing boundary block When the other boundary block is made adjacent by the suspension movement by the boundary block lifting tool, the one end portion of the straight bar member inserted into the straight hole on the existing block side of the other boundary block is connected to the existing block. A block boundary construction method for a walkway or the like, wherein the block boundary construction method is implemented so as to be inserted into a straight hole on the other boundary block side . フック部材の厚さ寸法を、10mm〜20mmの範囲内の大きさに作成し、既配設の境界ブロックに他の境界ブロックを境界ブロック用吊り具によるその吊り移動により隣接させるとき、既配設の境界ブロックの前後方向一端とこれに隣接される他の境界ブロックの前後方向一端との隙間寸法を、前記フック部材の厚さ寸法よりも大ならしめておき、前記他の境界ブロックが配設された後に前記境界ブロック用吊り具を降下させ続いてそのフック部材を左右方向へ移動させることにより、該他の境界ブロックの前後方向各端面の直状孔に挿入されている各直状棒部材から前記境界ブロック用吊り具のフック部材を既配設の境界ブロック及び該他の境界ブロックを変位させることなく外すように実施することを特徴とする請求項1記載の歩車道などのブロック境界施工方法。 When the hook member is made to have a thickness within a range of 10 mm to 20 mm and another boundary block is adjacent to the existing boundary block by its suspension movement by the boundary block lifting tool, The gap dimension between one end of the boundary block in the front-rear direction and one end of the other boundary block adjacent to the boundary block is made larger than the thickness dimension of the hook member, and the other boundary block is disposed. After the boundary block suspension is lowered and subsequently the hook member is moved in the left-right direction, each straight bar member inserted in the straight hole in each end face in the front-rear direction of the other boundary block step carriageway according to claim 1, which comprises carrying out the hook member of the crane for the boundary block to disengage without displacing the boundary block and said other boundary block of Sundehai set Which block boundary construction method.
JP2004330379A 2004-11-15 2004-11-15 Block boundary construction method such as walkway Expired - Fee Related JP4009967B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004330379A JP4009967B2 (en) 2004-11-15 2004-11-15 Block boundary construction method such as walkway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004330379A JP4009967B2 (en) 2004-11-15 2004-11-15 Block boundary construction method such as walkway

Publications (2)

Publication Number Publication Date
JP2006138163A JP2006138163A (en) 2006-06-01
JP4009967B2 true JP4009967B2 (en) 2007-11-21

Family

ID=36619156

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004330379A Expired - Fee Related JP4009967B2 (en) 2004-11-15 2004-11-15 Block boundary construction method such as walkway

Country Status (1)

Country Link
JP (1) JP4009967B2 (en)

Also Published As

Publication number Publication date
JP2006138163A (en) 2006-06-01

Similar Documents

Publication Publication Date Title
JPH08144514A (en) Form device having scaffold having raising-lowering function, and construction method of concrete wall or the like by using form device having scaffold
CN102677569A (en) Positioning support for dowel bars at concrete pavement joints
JP6442358B2 (en) Block manufacturing method and block manufacturing apparatus
CN103291000B (en) The construction method of tool type reinforcing bar support and suspension floor negative reinforcement thereof
JP4009967B2 (en) Block boundary construction method such as walkway
KR102186470B1 (en) Dowel Bar steel form
CN108792924B (en) Reinforcing steel bar positioning frame
CN212294380U (en) Cast-in-place suspension bracket of new type cantilever light structure
JP4745496B2 (en) Floating formwork support and construction method of water structure
JP6253479B2 (en) Method for constructing concrete structure and formwork used for the method
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same
JP2019019477A (en) Floor slab replacement method and portal crane
KR101978500B1 (en) Slip form apparatus using tower structure and method for forming vertical structure
JP4994153B2 (en) Block construction method
CN213198142U (en) A T beam hydraulic demoulding device
JP2018168599A (en) Installation method of formwork and suspending device for formwork
JP2013023835A (en) Installation device of manhole cover receiving frame
CN209812671U (en) Prefabricated square steel marking die
CN208266905U (en) A kind of simple plate device in rim of a cup basis
JPH01150691A (en) Method of laying slope-face block
CN215925703U (en) Steel truss support mounting tool
CN211006679U (en) Anti uplift soil pressure balancing device for foundation pit
KR200493864Y1 (en) Blocking board
CN209837683U (en) Cast-in-situ stair step combined template
JP3593607B2 (en) Slip form equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061107

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070420

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20070416

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20070423

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20070529

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20070606

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20070606

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070731

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070823

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100914

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100914

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130914

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees