Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4022008B2 - Coke oven inspection and repair equipment and coke oven repair method - Google Patents
[go: Go Back, main page]

JP4022008B2 - Coke oven inspection and repair equipment and coke oven repair method - Google Patents

Coke oven inspection and repair equipment and coke oven repair method Download PDF

Info

Publication number
JP4022008B2
JP4022008B2 JP31020398A JP31020398A JP4022008B2 JP 4022008 B2 JP4022008 B2 JP 4022008B2 JP 31020398 A JP31020398 A JP 31020398A JP 31020398 A JP31020398 A JP 31020398A JP 4022008 B2 JP4022008 B2 JP 4022008B2
Authority
JP
Japan
Prior art keywords
repair
coke oven
lance
combustion chamber
camera
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31020398A
Other languages
Japanese (ja)
Other versions
JP2000136386A (en
Inventor
盛明 鶴田
裕二 石原口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP31020398A priority Critical patent/JP4022008B2/en
Publication of JP2000136386A publication Critical patent/JP2000136386A/en
Application granted granted Critical
Publication of JP4022008B2 publication Critical patent/JP4022008B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Coke Industry (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、コークス炉の燃焼室におけるレンガの損傷状態を観察すると共に補修することができるコークス炉点検・補修設備及びコークス炉の補修方法に関する。
【0002】
【従来の技術】
コークス炉は複数の燃焼室と炭化室を仕切り壁を介して交互に配列することによって構成されるが、仕切り壁は、石炭の装入から乾留工程における急激な温度変化を受けると共に、窯出しに際しては、機械的押し出しによるコークスとの摩擦により機械的衝撃並びに大気の流入による温度変化を受け、これらにより、仕切り壁に目地切れや欠損が生じ、ガスの漏出が発生することになる。そこで、コークス炉の炉命延長を図る上で、仕切り壁の補修はかかせないものとなっている。
【0003】
そこで、本出願人等は、先に、特開平5−311173号公報において、観察装置と溶射又は吹き付け補修可能な補修ノズルを先部に取付けた単一の水冷筒状機体を、コークス炉燃焼室点検口を通して燃焼室内に挿入可能な構成を有するコークス炉点検・補修設備を提示した。
このコークス炉点検・補修設備を用いたコークス炉点検・補修方法について簡単に説明すると、まず、水冷筒状機体を鉛直状態のままコークス炉燃焼室点検口より挿入し、上下動、旋回動により観察装置を用いて仕切り壁損傷位置を探索する。補修位置が確定したところで、補修ノズルを用いて溶射又は吹き付け補修を行い、亀裂等を塞ぐ。補修完了後、観察装置で補修状態を確認した後、水冷筒状機体を炉外に取り出す。
このようなコークス炉点検・補修設備を用いることによって、コークス炉点検・補修作業を効率的に行うことができる。
【0004】
【発明が解決しようとする課題】
しかし、上記したコークス炉点検・補修設備は、未だ、以下の解決すべき課題を有している。
即ち、観察装置と補修ノズルは共に単一の長尺筒体からなるので、筒の直径が大きくなり、フリュー孔からの挿入が困難となり、旋回時に筒やフリュー孔の損傷を招く。また、水冷筒状機体の先部に取付けられているため、補修ノズルによる溶射又は吹き付け補修時に、相当量の粉塵が燃焼室内に発生した際、粉塵が観察装置であるファイバースコープの先端や小型TVカメラ等の表面に付着し、実質的にその後の監視が不可能となる。また、観察装置のカメラ表面に付着する粉塵除去作業を補修作業ごとにしなくてはならず、補修時間の短縮化を十分に図ることができなかった。
【0005】
本発明は、このような事情に鑑みなされたものであり、被補修個所を明確に確認しながら補修材を被補修個所に付着することができ、補修時間の短縮化を図ることができると共に生産性も向上することができるコークス炉点検・補修設備及びコークス炉の補修方法を提供することを目的とする。
【0006】
【課題を解決するための手段】
前記目的に沿う第1の発明に係るコークス炉点検・補修設備は、燃焼室と炭化室を仕切り壁を介して交互に配置したコークス炉の天井壁上に長手方向に走行可能に配設された縦行台車と、縦行台車上に搭載され縦行台車の走行方向と直交する炉幅方向に走行可能な横行台車と、横行台車上に搭載され、先部にCCDカメラが取り付けられ、コークス炉の天井壁に設けたフリュー孔を通して燃焼室内に昇降自在に挿入されると共に軸線回りに旋回可能なカメラランスを有する観察装置と、横行台車上に観察装置と並列状態に搭載され、コークス炉の天井壁に設けたフリュー孔を通して燃焼室内にカメラランスと独立して別々に昇降自在に挿入されると共に軸線回りに旋回可能な補修ランスを有する補修装置と、CCDカメラの撮像により被補修個所及び損傷状態を記憶する制御装置とを具備し、しかも制御装置からの被補修個所の位置情報及び損傷状態の情報に基づいて補修ランスが補修を行い、コークス炉を燃焼室側から点検・補修する設備であって、更に、横行台車上には、カメラランスと補修ランスを一体的に傾倒させる傾倒装置が載置され、縦行台車は走行駆動源を具備する石炭装入車に連結されている。
【0007】
上記した構成において、まず、観察装置のカメラランスを燃焼室内にフリュー孔を通して挿入し、仕切り壁に生じた亀裂等の被補修個所を発見し、その位置情報を信号線を通して炉外の制御装置に送信し記憶させる。この時点で燃焼室内には粉塵が発生していないので、観察装置は正確に被補修個所及び損傷状態(レンガからの火炎の発生、亀裂の大きさ等)を確認することができる。その後、カメラランスを燃焼室から炉外に取り出し、縦行台車と横行台車を駆動して、補修ランスを燃焼室のフリュー孔に整合させると共に、このフリュー孔を通して燃焼室内に挿入し、上記した位置情報に基づいて補修ランスを所定の位置に保持した後、被補修個所に向けて溶射材や吹き付け材を噴射することによって、被補修個所における亀裂や目地切れを塞ぐ。その後、補修ランスを炉外に取り出し、上記した補修作業を他の燃焼室についても行うことによって、コークス炉全体の点検・補修作業を完了する。
このように、観察装置のカメラランスと補修装置の補修ランスを別々に燃焼室内に挿入することができ、粉塵が発生していない状態の燃焼室にカメラランスを挿入して被補修個所を確実に確認した後、補修ランスを燃焼室に挿入して補修材を被補修個所に付着することができる。
観察装置のカメラランスと補修装置の補修ランスは横行台車上で傾倒装置によって傾動可能に構成することができるので、コークス炉の天井壁の上方に位置する建屋構造体等の各種障害物を効果的に避けながら観察装置と補修ランスを長手方向や炉幅方向に移動しながら、コークス炉の点検・補修作業を行うことができる。
縦行台車は、コークス炉の天井壁上に長手方向に走行可能に配設されている石炭装入車に連結して石炭装入車の走行駆動源を利用して縦行台車を走行させることができるので、縦行台車へ専用の走行駆動源を装備させる必要がなくなる。
【0008】
ここで、上記した本発明に係るコークス炉点検・補修設備は、以下の構成とすることもできる。
【0009】
コークス炉の天井壁に沿って長手方向に補修材供給配管を配設し、補修材供給配管に間隔を開けて複数の中継端子を取付け、補修装置を、任意の長手方向移動位置において、中継端子を用いて補修材供給配管に着脱自在に連結することもできる。従って、補修装置に補修材供給用ケーブルベア等の大がかりな附帯設備を取付けることが不要となる。
【0010】
前記目的に沿う第2の発明に係るコークス炉の補修方法は、第1の発明に係るコークス炉点検・補修設備を使用する補修方法であって、燃焼室と炭化室を仕切り壁を介して交互に配置したコークス炉の天井壁上を長手方向に走行する縦行台車に搭載され、炉幅方向に走行する横行台車に、昇降及び軸線回りに旋回自在に載置したカメラランスと補修ランスにより仕切り壁の補修を行うにあたり、コークス炉の炉幅方向のフリュー孔の中央部に相当する燃焼室をカメラランスによって観察し、被補修個所の位置情報及び損傷状態の情報を制御装置に記憶し、位置情報及び損傷状態の情報に基づいて補修ランスにより被補修個所の補修を行い、コークス炉の炉幅方向のフリュー孔の両端部に相当する燃焼室を、別の観察装置と補修装置により炭化室側から補修して燃焼室と炭化室の通気を遮断する。
このようにすることによって、燃焼室と炭化室側を導通する亀裂やレンガ目地の開きを無くすことができ、黒煙の発生等を防止することができる。
【0011】
【発明の実施の形態】
続いて、添付した図面を参照しつつ、本発明を具体化した実施の形態につき説明し、本発明の理解に供する。
図1〜図11を参照して、本発明の一実施の形態に係るコークス炉点検・補修設備Aを説明する。
【0012】
まず、図1を参照して、本発明の一実施の形態に係るコークス炉点検・補修設備Aのコークス炉10との関係におけるレイアウトについて説明する。
図示するように、長手方向に伸延する矩形箱状のコークス炉10の天井壁14の上方には石炭を貯蔵した炭槽51が配設されており、かつ、天井壁14上には、炭槽51から切り出した石炭を後述するコークス炉10内の各炭化室12(図3参照)内に装入するための石炭装入車の一例である主石炭装入車18aと予備石炭装入車18が長手方向に移動自在に載置されている。また、コークス炉10の一側側壁に沿って、押出機50が走行可能に配設されており、その他側側壁に沿ってガイド車52が走行可能に配設されている。そして、本発明に係るコークス炉点検・補修設備Aは、同様に、コークス炉10の天井壁14に、長手方向に走行自在に配設されている。
【0013】
次に、上記した全体構成を有するコークス炉10及び本発明の一実施の形態に係るコークス炉点検・補修設備Aの各部の構成について、図1〜図11を参照して説明する。
図3、図6〜図9に示すように、長手方向に伸延する矩形箱状のコークス炉10内には、複数の短手方向(炉幅方向、以下同様)に伸延する仕切り壁の一例である第1の仕切り壁11によって、横長の空間からなる炭化室12と燃焼室形成用横長空間が交互に形成されている。そして、燃焼室形成用横長空間内には、この空間を複数の仕切り壁の一例である第2の仕切り壁11aによって仕切ることによって複数の燃焼室13が形成されることになる。
これらの炭化室12と燃焼室13からなるコークス炉10の上部は長手方向に伸延する広幅の天井壁14によって覆われており、天井壁14には、図6に示すように、炭化室12に連通する石炭装入開口12aと、燃焼室13と連通するフリュー孔15が設けられている。なお、これらの石炭装入開口12aとフリュー孔15は、コークス炉10による乾留作業時はそれぞれ蓋によって閉じられている。
【0014】
図1〜図4に示すように、コークス炉10の天井壁14上には第1の走行レール16が敷設されており、第1の走行レール16上には縦行台車17が長手方向(縦長方向)に走行可能に載置されている。また、第1の走行レール16上には、上述したように、主石炭装入車18aと予備石炭装入車18が同様に長手方向に走行可能に載置されている。そして、縦行台車17は予備石炭装入車18に連結杆19によって連結されている。
上記した構成によって、予備石炭装入車18に搭載されている走行駆動源を駆動することによって、予備石炭装入車18と共に縦行台車17を長手方向に移動することができる。
【0015】
縦行台車17上には、図2〜図5に示すように、複数の支柱20aを用いて矩形架台20が固定状態に載置されており、矩形架台20上には、第1の走行レール16と直交する方向(短手方向)に伸延する第2の走行レール21が敷設されている。そして、第2の走行レール21上には、横行台車22が縦行台車17と直交する方向(炉幅方向)に走行可能に載置されている。ここで、横行台車22は走行駆動源を具備する自走式台車から構成されている。
横行台車22上には、傾倒装置23aによって傾倒される傾倒台23を介して、横長方向に平行間隔を開けて観察装置24と補修装置の一例である溶射装置25が並列状態に搭載されている。
【0016】
観察装置24は、実質的に、図2〜図7に示すように、コークス炉10の天井壁14に設けたフリュー孔15を通して燃焼室13内に挿入されるカメラランス26と、カメラランス26の先部に取付けられるCCDカメラ27と、カメラランス26を昇降するカメラランス昇降機構28と、カメラランス26を軸線回りに360°回転するカメラランス旋回機構29を具備する。また、図10に示すように、観察装置24は、カメラランス26の先部にパージ用エアを供給するためのエアコンプレッサ30と、CCDカメラ27に接続される高解像度VTRからなるモニター31と、カメラコントローラ32と、制御装置としてのパソコン33と、カメラランス26を冷却するための冷却水を供給する冷却水供給装置34を具備する。なお、冷却水供給装置34は、後述する溶射装置25の溶射ランス35の冷却にも用いられるものである。
【0017】
溶射装置25は、図2、図4〜図7に示すように、コークス炉10の天井壁14に設けたフリュー孔15を通して燃焼室13内に挿入される補修ランスの一例である溶射ランス35と、溶射ランス35の先部に取付けられる溶射ノズル36と、溶射ランス35を昇降する溶射ランス昇降機構37と、溶射ランス35を軸線回りに360°回転する補修ランス旋回機構の一例である溶射ランス旋回機構38を具備する。また、図11に示すように、溶射装置25は、酸素とLPGの混合量や混合比を制御するガス制御装置39と、溶射材料となる粉体を供給する粉体供給装置40と、溶射ランス35内に滞留する酸素やLPGをパージする窒素ガスを供給する窒素ガス(N2 ) 発生装置41等を具備する。
【0018】
上記した構成によって、カメラランス昇降機構28を駆動することによって、カメラランス26をCCDカメラ27と共に、コークス炉10の天井壁14に設けたフリュー孔15を挿通して燃焼室13内に挿入することができる。一方、溶射ランス昇降機構37を駆動することによって、溶射ランス35を溶射ノズル36と共に、コークス炉10の天井壁14に設けたフリュー孔15を挿通して燃焼室13内に挿入することができる。
このように、本実施の形態では、それぞれ観察装置24と溶射装置25の要部を構成するカメラランス26と溶射ランス35をそれぞれ独立して燃焼室13内に挿入することができる。従って、溶射ランス35による溶射作業において発生する粉塵等をカメラランス26は全く受けることがないので、仕切り壁11、11aへの亀裂の発生等を容易かつ正確に確認することができる。また、その確認した情報に基づいて溶射装置25の駆動を制御することができる。
【0019】
また、図2及び図11に示すように、コークス炉10の天井壁14に沿って、長手方向に前記したガス制御装置39に酸素とLPGを供給するための補修材供給配管の一例である酸素供給配管42とLPG供給配管43が配設されている。そして、これらの酸素供給配管42とLPG供給配管43は、コークス炉10の天井壁14に沿って長手方向に間隔を開けて配設した複数の第1の中継端子44に接続されている。一方、第1の中継端子44は、ガス制御装置39から導出したガス制御側酸素配管45とガス制御側LPG配管46の端部に接続された第2の中継端子47にフレキシブル配管48、49を介して自在に接続されることになる。
【0020】
上記した構成において、縦行台車17の長手方向の移動に連動して移動する溶射装置25に最も近い第1の中継端子44にガス制御側酸素配管45とガス制御側LPG配管46の第2の中継端子47を接続して、酸素やLPGを溶射装置25に供給することができ、ケーブルベア等の大がかりな設備を不要とすることができる。
また、図示の実施の形態におけるコークス炉点検・補修設備Aのその他の構成について説明すると、図1及び図2に示すように、コークス炉10の長手方向側壁に平行に押出機走行レール50aが敷設されており、押出機走行レール50aには押出機50が長手方向に走行可能に載置されている。押出機50は、押出機走行レール50a上に載置される走行フレーム50bと、走行フレーム50b上に搭載され、先部に押出板50cを具備する進退杆50dを具備する。
図2に示すように、床面上には、LGPボンベ、酸素ボンベ、窒素ボンベ等からなる供給装置57が設置されている。
図10及び図11に示すように、観察装置24のカメラコントローラ32及び溶射装置25のガス制御装置39への電源は、予備石炭装入車18の電源コンセント53、54に、給電線55、56を接続することによって行われる。
【0021】
次に、上記した構成を有するコークス炉点検・補修設備Aを用いたコークス炉10の点検作業について説明する。
まず、観察装置24と溶射装置25を搭載した縦行台車17を予備石炭装入車18で牽引して、コークス炉10の天井壁14上を長手方向に移動すると共に、観察装置24と溶射装置25を横行台車22を短手方向に移動して、点検・補修しようとする燃焼室13のフリュー孔15上に位置決めする。
図5〜図7に示すように、観察装置24のカメラランス昇降機構28を駆動してカメラランス26を燃焼室13内にフリュー孔15を通して挿入すると共にカメラランス旋回機構29を駆動してカメラランス26を旋回して、図8及び図9に示すように、第1及び/又は第2の仕切り壁11、11aに生じた目開きa、目地割れb、c、d、欠落e等の被補修個所を発見する。この際、冷却水供給装置34によってカメラランス26を冷却しながら、カメラランス26の先部に取付けたCCDカメラ27の撮像をモニター31で目視確認し、その位置と画像記録を行う。なお、CCDカメラ27もエアコンプレッサ30でエア冷却を行うようにしている。
この時点で燃焼室13内には粉塵が発生していないので、観察装置24は正確に被補修個所及び損傷状態(レンガからの火炎の発生、亀裂の大きさ等)を確認することができる。
【0022】
カメラランス26を燃焼室13から炉外に取り出した後、若しくは、後日に、縦行台車17と横行台車22を駆動して、溶射ランス35を燃焼室13のフリュー孔15に整合させると共に、上記した画像記録情報に基づいて、溶射ランス昇降機構37を駆動してこのフリュー孔15を通して燃焼室13内に挿入すると共に、溶射ランス旋回機構38を駆動して溶射ランス35を旋回し、溶射ノズル36を所定の位置に保持した後、被補修個所に向けて溶射材や吹き付け材を所定の角度、深さで噴射することによって、目開きa、目地割れb、c、d、欠落e等を塞ぐ。この際、冷却水供給装置34によって溶射ランス35を冷却すると共に、補修終了後は窒素ガス発生装置41を駆動して補修装置内に滞留するLPGや酸素をパージする。
その後、溶射ランス35を炉外に取り出し、上記した要領で、補修作業を他の燃焼室13についても行うことによって、コークス炉10全体の点検・補修作業を完了する。
このように、観察装置24のカメラランス26と溶射装置25の溶射ランス35を別々に燃焼室13内に挿入することによって、被補修個所を確実に確認しながら補修材を被補修個所に付着することができる。
【0023】
本実施の形態では、観察装置24のカメラランス26と溶射装置25の溶射ランス35を傾倒装置23aによって一体的に傾倒することができるので、コークス炉10の天井壁14の上方に位置する建屋構造体等の各種障害物を効果的に避けながら観察装置24と溶射装置25を縦行台車17と共に移動でき、コークス炉10の点検・補修作業をこの面からも円滑に行うことができる。
縦行台車17は、コークス炉10の天井壁14上に長手方向に移動可能に配設されている予備石炭装入車18に連結しているので、予備石炭装入車18の走行駆動源を利用して縦行台車17を走行させることができ、縦行台車17へ専用の走行駆動源を装備させる必要がなくなり、コークス炉点検・補修設備Aの設備費の低減化を図ることができる。
カメラランス26と溶射ランス35を、それぞれ軸線回りに360°旋回することができるので、燃焼室13の一側の第1の仕切り壁11の壁面のみならず、他側の第1の仕切り壁11の壁面上の被補修個所、及び、その左、右側に位置する第2の仕切り壁11aの壁面上の被補修個所も効果的に点検・補修することができる。
【0024】
また、上記したコークス炉点検・補修方法において、図12に示すように、コークス炉10の天井壁14にはそれぞれ燃焼室13に対応する多数のフリュー孔15が長手方向及びそれと直交する短手方向に格子状に設けられている。この場合、中央部の縦列に属するフリュー孔15及び燃焼室13については、上記したコークス炉点検・補修設備Aを用いて効果的に、燃焼室13の点検・補修を行うことができるが、短手方向の両端部を形成する3縦列のフリュー孔15については、横行台車22が近接できないので、これらのフリュー孔15に対応する燃焼室13の点検・補修は困難となる。
【0025】
この場合、これらの短手方向の両端部を形成する3縦列のフリュー孔15を除いて、他の縦列のフリュー孔15と対応する燃焼室13を、上記したコークス炉点検・補修設備Aを用いて点検・補修すると共に、3縦列のフリュー孔15と対応する燃焼室13に隣接する炭化室12に、コークス炉10の横側方から別途観察装置と補修装置を進入して、炭化室12の内面に補修材を付着し、燃焼室13と炭化室12とを連通する亀裂を塞ぐことができる。
このように、コークス炉点検・補修設備Aを用いて殆どの燃焼室13を効率的に点検、補修すると共に、コークス炉点検・補修設備Aを用いることが困難な燃焼室13は、燃焼室13に隣接する炭化室12に、コークス炉10の横側方から観察装置や補修装置を進入して炭化室12の内面に補修材を付着し、燃焼室13と炭化室12を連通する亀裂を塞ぐことによって、同様に効率的に点検、補修することができる。
【0026】
【実施例】
幅方向(炉幅方向、以下同様)のフリュー孔15の中央部に相当する20個をカメラランス26により観察して仕切り壁11、11aの表面に火炎の発生の有無を調査し、その位置を記録した。そして、カメラランス26を上昇してフリュー孔15から取り出した後、補修ランスである溶射ランス35を下降して仕切り壁11、11aの火炎の発生の部位に合わせてから耐火物を溶射して補修した。
更に、幅方向の各端部のフリュー孔15である6個(片側3個)は、炭化室12の両側からカメラを挿入して亀裂やレンガ目地の開きの有無を観察して、燃焼室13に通じた亀裂やレンガ目地の開きの部位に耐火物の吹き付け補修を行った。その結果、燃焼室13と炭化室12を導通する亀裂やレンガ目地の開きを無くすことができ、燃焼室13と炭化室12の通気を遮断して、黒煙の発生等を防止することができた。
【0027】
以上、本発明を、一実施の形態及び一実施例を参照して説明してきたが、本発明は何ら上記した実施の形態や実施例に記載の構成に限定されるものではなく、特許請求の範囲に記載されている事項の範囲内で考えられるその他の実施の形態や実施例や変形例も含むものである。
例えば、上記した実施の形態では、補修装置として溶射装置25を用いたが、吹き付け材を吹き付ける形態の吹付装置を用いることもできる。
また、溶射ランス35とカメラランス26は平行間隔を開けて垂直方向に伸延するが、その間の間隔は、フリュー孔15間の間隔と等しい、又は、同間隔の整数倍とするのが望ましい。このようにすることによって、後述するコークス炉点検・補修方法において、カメラランス26と溶射ランス35をそれぞれ別の燃焼室13に同時に挿入でき、一方の燃焼室13内で点検作業を行うと同時に、他方の燃焼室13で補修作業を行うことができ、コークス炉点検・補修作業をさらに短時間で行うことができる。
【0028】
【発明の効果】
請求項1及び2記載のコークス炉点検・補修設備においては、観察装置のカメラランスと補修装置の補修ランスを別々に燃焼室内に挿入することができ、粉塵が発生していない状態の燃焼室にカメラランスを挿入して被補修個所を確実に確認した後、補修ランスを燃焼室に挿入して補修材を被補修個所に溶射や吹き付けによって付着することができる。従って、迅速かつ容易に被補修個所を補修して、コークス炉の炉命延長を短時間で確実に図ることができると共に生産性も向上することができる。
【0029】
また、観察装置と補修装置を傾動することによって、コークス炉の天井壁の上方に位置する建屋構造体等の各種障害物を効果的に避けながらコークス炉点検・補修設備をカメラランス及び補修ランスを長手方向や炉幅方向に移動して、コークス炉の点検・補修作業を行うことができるので、この面からも、迅速かつ容易に被補修個所を補修して、コークス炉の炉命延長を短時間で確実に図ることができる。
【0030】
更に、縦行台車を予備石炭装入車によって牽引、走行させることができるので、縦行台車は専用の走行駆動源を持つ必要がなくな、コークス炉点検・補修設備の設備費の低減化を図ることができる。
【0031】
請求項記載のコークス炉点検・補修設備においては、補修装置を、任意の移動位置において、中継端子を用いて補修材供給配管に着脱自在に連結することができるので、補修装置へ酸素やLPG等の補修材を供給する際にケーブルベア等の大がかりな附帯設備を不要とすることができ、この面からもコークス炉点検・補修設備の設備費の低減化を図ることができる。
【0033】
請求項記載のコークス炉の補修方法においては、コークス炉の幅方向のフリュー孔の中央部に相当する燃焼室をカメラランスによって観察すると共に補修ランスにより補修を行い、幅方向の端部のフリュー孔に相当する燃焼室を炭化室側から補修して燃焼室と炭化室の通気を遮断するようにしたので、燃焼室と炭化室側を導通する亀裂やレンガ目地の開きを無くすことができ、黒煙の発生等を防止することができる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係るコークス炉点検・補修設備のレイアウトを示す説明図である。
【図2】本発明の一実施の形態に係るコークス炉点検・補修設備の全体斜視図である。
【図3】同要部側面図である。
【図4】同要部平面図である。
【図5】同要部正面図である。
【図6】コークス炉の内部構成を示す横断面図である。
【図7】図6のI−I線による断面図である。
【図8】図6の要部拡大説明図である。
【図9】図7の要部拡大説明図である。
【図10】本発明の一実施の形態に係るコークス炉点検・補修設備の観察装置の冷却構造及び制御ブロック図である。
【図11】本発明の一実施の形態に係るコークス炉点検・補修設備の補修装置の補修材供給・冷却構造及び制御ブロック図である。
【図12】本発明の一実施の形態に係るコークス炉の補修方法の説明図である。
【符号の説明】
A コークス炉点検・補修設備 10 コークス炉
11 第1の仕切り壁 11a 第2の仕切り壁
12 炭化室 12a 石炭装入開口
13 燃焼室 14 天井壁
15 フリュー孔 16 第1の走行レール
17 縦行台車 18 予備石炭装入車
18a 主石炭装入車 19 連結杆
20 矩形架台 20a 支柱
21 第2の走行レール 22 横行台車
23 傾倒台 23a 傾倒装置
24 観察装置 25 溶射装置
26 カメラランス 27 CCDカメラ
28 カメラランス昇降機構 29 カメラランス旋回機構
30 エアコンプレッサ 31 モニター
32 カメラコントローラ 33 パソコン
34 冷却水供給装置 35 溶射ランス
36 溶射ノズル 37 溶射ランス昇降機構
38 溶射ランス旋回機構 39 ガス制御装置
40 粉体供給装置 41 窒素ガス発生装置
42 酸素供給配管 43 LPG供給配管
44 第1の中継端子 45 ガス制御側酸素配管
46 ガス制御側LPG配管 47 第2の中継端子
48 フレキシブル配管 49 フレキシブル配管
50 押出機 50a 押出機走行レール
50b 走行フレーム 50c 押出板
50d 進退杆 51 炭槽
52 ガイド車 53 電源コンセント
54 電源コンセント 55 給電線
56 給電線 57 供給装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a coke oven inspection / repair facility and a coke oven repair method capable of observing and repairing a damaged state of a brick in a combustion chamber of a coke oven.
[0002]
[Prior art]
A coke oven is configured by alternately arranging a plurality of combustion chambers and carbonization chambers through partition walls. The partition walls are subjected to a rapid temperature change in the dry distillation process from the charging of coal, Are subjected to mechanical impacts due to friction with the coke due to mechanical extrusion and temperature changes due to the inflow of air, which cause joint breakage and chipping in the partition wall and gas leakage. Therefore, in order to extend the life of the coke oven, repair of the partition wall is indispensable.
[0003]
In view of this, the present applicants previously disclosed a single water-cooled tubular body in which an observation device and a repair nozzle that can be sprayed or repaired by spraying are attached to a front part in a coke oven combustion chamber in JP-A-5-31173. A coke oven inspection / repair facility that can be inserted into the combustion chamber through the inspection port was presented.
The coke oven inspection / repair method using this coke oven inspection / repair facility will be briefly explained. First, the water-cooled tubular body is inserted in the coke oven combustion chamber inspection port in the vertical state, and observed by vertical movement and swivel movement. The partition wall damage position is searched using the apparatus. When the repair position is determined, thermal spraying or spray repair is performed using a repair nozzle to close cracks and the like. After the repair is completed, the repaired state is confirmed with an observation device, and then the water-cooled tubular body is taken out of the furnace.
By using such a coke oven inspection / repair facility, the coke oven inspection / repair work can be efficiently performed.
[0004]
[Problems to be solved by the invention]
However, the above-described coke oven inspection / repair facilities still have the following problems to be solved.
That is, since both the observation device and the repair nozzle are made of a single long cylindrical body, the diameter of the cylinder becomes large, making it difficult to insert from the flue hole, and incurring damage to the cylinder and the flue hole. In addition, because it is attached to the tip of the water-cooled tubular body, when a considerable amount of dust is generated in the combustion chamber during spraying or repairing with a repair nozzle, the tip of the fiberscope that is the observation device or a small TV It adheres to the surface of a camera or the like, and the subsequent monitoring becomes virtually impossible. In addition, it is necessary to remove dust adhering to the camera surface of the observation apparatus for each repair work, and the repair time cannot be sufficiently shortened.
[0005]
The present invention has been made in view of such circumstances, and it is possible to attach a repair material to a repaired part while clearly checking the repaired part, thereby reducing the repair time and producing the repaired part. The purpose is to provide a coke oven inspection / repair facility and a coke oven repair method capable of improving the performance.
[0006]
[Means for Solving the Problems]
The coke oven inspection / repair facility according to the first invention in accordance with the above object is disposed to be able to travel in the longitudinal direction on the ceiling wall of the coke oven in which the combustion chamber and the carbonization chamber are alternately arranged via the partition wall. A longitudinal carriage, a transverse carriage mounted on the longitudinal carriage and capable of traveling in the furnace width direction perpendicular to the traveling direction of the longitudinal carriage, and mounted on the transverse carriage with a CCD camera attached to the front, a coke oven Into the combustion chamber through the flue hole in the ceiling wallFreely move up and downAn observation device having a camera lance that can be inserted and swiveled around an axis, and mounted in parallel with the observation device on a traversing carriage, is independent of the camera lance in the combustion chamber through a flew hole provided in the ceiling wall of the coke oven. SeparatelyFreely move up and downA repair device having a repair lance that is inserted and pivotable about an axis, and a control device that stores a repair location and a damage state by imaging of a CCD cameraIn addition, the repair lance repairs based on the position information and damage status information of the repaired part from the control device,It is a facility that inspects and repairs the coke oven from the combustion chamber side. Further, a tilting device that tilts the camera lance and the repair lance integrally is placed on the traversing cart, and the traversing cart serves as a travel drive source. It is connected to a coal charging vehicle.
[0007]
In the configuration described above, first, the camera lance of the observation device is inserted into the combustion chamber through the flue hole, the repaired part such as a crack generated in the partition wall is found, and the position information is transmitted to the control device outside the furnace through the signal line. Send and memorize. Since dust is not generated in the combustion chamber at this time, the observation apparatus can accurately confirm the repaired part and the damaged state (generation of a flame from a brick, the size of a crack, etc.). Thereafter, the camera lance is taken out of the furnace from the combustion chamber, the longitudinal carriage and the transverse carriage are driven, and the repair lance is aligned with the flue hole of the combustion chamber, and is inserted into the combustion chamber through the flue hole, and the position described above. After holding the repair lance at a predetermined position based on the information, the sprayed material or the spray material is sprayed toward the repaired portion, thereby closing the crack or the joint breakage at the repaired portion. Thereafter, the repair lance is taken out of the furnace, and the above repair work is performed on the other combustion chambers to complete the inspection and repair work for the entire coke oven.
In this way, the camera lance of the observation device and the repair lance of the repair device can be inserted separately into the combustion chamber, and the camera lance is inserted into the combustion chamber in a state where dust is not generated to ensure the repaired part After confirmation, the repair lance can be inserted into the combustion chamber and the repair material can adhere to the repair site.
The camera lance of the observation device and the repair lance of the repair device can be configured to be tiltable by a tilting device on the traversing carriage, so that various obstacles such as building structures located above the ceiling wall of the coke oven are effective. It is possible to inspect and repair the coke oven while moving the observation device and the repair lance in the longitudinal direction and the furnace width direction while avoiding them.
A longitudinal carriage is connected to a coal charging vehicle disposed on the ceiling wall of the coke oven so as to be able to travel in the longitudinal direction, and the longitudinal carriage is caused to travel using a traveling drive source of the coal charging vehicle. This eliminates the need to equip a longitudinal carriage with a dedicated travel drive source.
[0008]
Here, the above-described coke oven inspection / repair facility according to the present invention may be configured as follows.
[0009]
A repair material supply pipe is arranged in the longitudinal direction along the ceiling wall of the coke oven, a plurality of relay terminals are attached to the repair material supply pipe at intervals, and the repair device is connected to the relay terminal at any longitudinal movement position. Can be detachably connected to the repair material supply pipe. Therefore, it is not necessary to attach a large incidental facility such as a cable bear for supplying a repair material to the repair device.
[0010]
A coke oven repair method according to the second invention that meets the above-mentioned object is as follows:A repair method using the coke oven inspection / repair facility according to the first invention,It is mounted on a longitudinal carriage that runs in the longitudinal direction on the ceiling wall of a coke oven in which combustion chambers and carbonization chambers are alternately arranged via partition walls, and is moved up and down on a transverse carriage that runs in the furnace width direction.Around the axisWhen repairing a partition wall with a camera lance and a repair lance placed so as to rotate freely, the combustion chamber corresponding to the center of the flue hole in the coke oven furnace width direction is observed with a camera lance, and the location information of the repaired locationAnd damage status informationIs stored in the control device and the position informationAnd damage status informationBased on the above, the repaired part is repaired with a repair lance, and the combustion chambers corresponding to both ends of the flue hole in the furnace width direction of the coke oven are formed., With another observation device and repair deviceRepair from the carbonization chamber side,Shut off the ventilation of the combustion chamber and carbonization chamber.
By doing in this way, the crack which conducts a combustion chamber and the carbonization chamber side, and the opening of a brick joint can be eliminated, and generation | occurrence | production of black smoke etc. can be prevented.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the accompanying drawings for understanding of the present invention.
A coke oven inspection / repair facility A according to an embodiment of the present invention will be described with reference to FIGS.
[0012]
First, the layout in relation to the coke oven 10 of the coke oven inspection / repair facility A according to one embodiment of the present invention will be described with reference to FIG.
As shown in the figure, a coal tank 51 storing coal is disposed above the ceiling wall 14 of the rectangular box-shaped coke oven 10 extending in the longitudinal direction, and the coal tank is disposed on the ceiling wall 14. The main coal charging vehicle 18a and the preliminary coal charging vehicle 18 are examples of a coal charging vehicle for charging the coal cut out from 51 into each carbonization chamber 12 (see FIG. 3) in the coke oven 10 described later. Is mounted so as to be movable in the longitudinal direction. Moreover, the extruder 50 is arrange | positioned along the one side wall of the coke oven 10, and the guide wheel 52 is arrange | positioned along the other side wall so that driving | running | working is possible. The coke oven inspection / repair facility A according to the present invention is similarly disposed on the ceiling wall 14 of the coke oven 10 so as to be able to run in the longitudinal direction.
[0013]
Next, the configuration of each part of the coke oven 10 having the above-described overall configuration and the coke oven inspection / repair facility A according to one embodiment of the present invention will be described with reference to FIGS.
As shown in FIGS. 3 and 6 to 9, a rectangular box-shaped coke oven 10 extending in the longitudinal direction has a plurality of short directions.(Furnace width direction, the same applies below)The first partition wall 11, which is an example of a partition wall extending in a straight line, alternately forms a carbonization chamber 12 composed of a horizontally long space and a horizontally long space for forming a combustion chamber. A plurality of combustion chambers 13 are formed in the combustion chamber forming horizontally long space by partitioning this space with a second partition wall 11a which is an example of a plurality of partition walls.
The upper portion of the coke oven 10 composed of the carbonization chamber 12 and the combustion chamber 13 is covered with a wide ceiling wall 14 extending in the longitudinal direction, and the ceiling wall 14 includes a carbonization chamber 12 as shown in FIG. A coal charging opening 12 a that communicates with the combustion chamber 13 and a flue hole 15 that communicates with the combustion chamber 13 are provided. The coal charging opening 12a and the flue hole 15 are each closed by a lid during the carbonization operation in the coke oven 10.
[0014]
As shown in FIGS. 1 to 4, a first traveling rail 16 is laid on the ceiling wall 14 of the coke oven 10, and a longitudinal carriage 17 is disposed on the first traveling rail 16 in the longitudinal direction (vertically long). In the direction). Further, as described above, the main coal charging vehicle 18a and the preliminary coal charging vehicle 18 are similarly mounted on the first traveling rail 16 so as to be able to travel in the longitudinal direction. The longitudinal carriage 17 is connected to a spare coal charging car 18 by a connecting rod 19.
With the above-described configuration, the longitudinal carriage 17 can be moved in the longitudinal direction together with the preliminary coal charging vehicle 18 by driving the traveling drive source mounted on the preliminary coal charging vehicle 18.
[0015]
As shown in FIGS. 2 to 5, a rectangular frame 20 is mounted on the longitudinal carriage 17 in a fixed state using a plurality of support columns 20 a, and the first traveling rail is mounted on the rectangular frame 20. A second traveling rail 21 extending in a direction (short direction) perpendicular to 16 is laid. On the second traveling rail 21, a traversing carriage 22 is placed so as to be able to travel in a direction orthogonal to the longitudinal carriage 17 (furnace width direction). Here, the traversing cart 22 is composed of a self-propelled cart having a travel drive source.
On the traverse carriage 22, an observation device 24 and a thermal spraying device 25, which is an example of a repair device, are mounted in parallel with a parallel interval in the horizontal direction via a tilting table 23 tilted by a tilting device 23 a. .
[0016]
2 to 7, the observation device 24 includes a camera lance 26 inserted into the combustion chamber 13 through a flew hole 15 provided in the ceiling wall 14 of the coke oven 10, and the camera lance 26. A CCD camera 27 attached to the front part, a camera lance elevating mechanism 28 for elevating the camera lance 26, and a camera lance turning mechanism 29 for rotating the camera lance 26 360 ° around the axis are provided. As shown in FIG. 10, the observation device 24 includes an air compressor 30 for supplying purge air to the front portion of the camera lance 26, a monitor 31 composed of a high resolution VTR connected to the CCD camera 27, A camera controller 32, a personal computer 33 as a control device, and a cooling water supply device 34 for supplying cooling water for cooling the camera lance 26 are provided. The cooling water supply device 34 is also used for cooling a thermal spray lance 35 of the thermal spray device 25 described later.
[0017]
As shown in FIGS. 2 and 4 to 7, the thermal spray device 25 includes a thermal spray lance 35 that is an example of a repair lance that is inserted into the combustion chamber 13 through a flue hole 15 provided in the ceiling wall 14 of the coke oven 10. The spray lance swivel is an example of a spray lance swivel mechanism that rotates the spray lance 35 around the axis 360 degrees, and a spray lance lift mechanism 37 that lifts and lowers the spray lance 35. A mechanism 38 is provided. As shown in FIG. 11, the thermal spraying device 25 includes a gas control device 39 that controls the mixing amount and mixing ratio of oxygen and LPG, a powder supply device 40 that supplies powder serving as a thermal spray material, and a thermal spray lance. 35, a nitrogen gas (N2) generator 41 for supplying oxygen gas or nitrogen gas for purging LPG is provided.
[0018]
By driving the camera lance raising / lowering mechanism 28 with the above-described configuration, the camera lance 26 is inserted into the combustion chamber 13 through the flue hole 15 provided in the ceiling wall 14 of the coke oven 10 together with the CCD camera 27. Can do. On the other hand, by driving the spray lance elevating mechanism 37, the spray lance 35 and the spray nozzle 36 can be inserted into the combustion chamber 13 through the flew hole 15 provided in the ceiling wall 14 of the coke oven 10.
As described above, in the present embodiment, the camera lance 26 and the thermal spray lance 35 constituting the main parts of the observation device 24 and the thermal spray device 25 can be inserted into the combustion chamber 13 independently. Accordingly, since the camera lance 26 does not receive any dust or the like generated in the thermal spraying operation by the thermal spray lance 35, it is possible to easily and accurately confirm the occurrence of cracks in the partition walls 11 and 11a. Moreover, the drive of the thermal spray apparatus 25 can be controlled based on the confirmed information.
[0019]
2 and 11, oxygen as an example of a repair material supply pipe for supplying oxygen and LPG to the gas control device 39 in the longitudinal direction along the ceiling wall 14 of the coke oven 10 is provided. A supply pipe 42 and an LPG supply pipe 43 are provided. These oxygen supply pipes 42 and LPG supply pipes 43 are connected to a plurality of first relay terminals 44 arranged at intervals in the longitudinal direction along the ceiling wall 14 of the coke oven 10. On the other hand, the first relay terminal 44 has flexible pipes 48 and 49 connected to the second relay terminal 47 connected to the ends of the gas control side oxygen pipe 45 and the gas control side LPG pipe 46 derived from the gas control device 39. It will be freely connected through.
[0020]
In the configuration described above, the second relay terminal 44 closest to the thermal spraying device 25 moving in conjunction with the longitudinal movement of the longitudinal carriage 17 is connected to the second of the gas control side oxygen pipe 45 and the gas control side LPG pipe 46. By connecting the relay terminal 47, oxygen and LPG can be supplied to the thermal spraying device 25, and a large facility such as a cable bear can be dispensed with.
Further, the other configuration of the coke oven inspection / repair facility A in the illustrated embodiment will be described. As shown in FIGS. 1 and 2, an extruder running rail 50 a is laid in parallel to the longitudinal side wall of the coke oven 10. The extruder 50 is mounted on the extruder travel rail 50a so as to be able to travel in the longitudinal direction. The extruder 50 includes a traveling frame 50b mounted on the extruder traveling rail 50a, and an advancing / retracting rod 50d mounted on the traveling frame 50b and including an extrusion plate 50c at the tip.
As shown in FIG. 2, a supply device 57 composed of an LGP cylinder, an oxygen cylinder, a nitrogen cylinder, or the like is installed on the floor surface.
As shown in FIGS. 10 and 11, the power supply to the camera controller 32 of the observation device 24 and the gas control device 39 of the thermal spraying device 25 is connected to power outlets 53 and 54 of the preliminary coal charging vehicle 18, and feed lines 55 and 56. Is done by connecting.
[0021]
Next, an inspection operation of the coke oven 10 using the coke oven inspection / repair facility A having the above-described configuration will be described.
First, the longitudinal carriage 17 on which the observation device 24 and the thermal spraying device 25 are mounted is pulled by the preliminary coal charging vehicle 18 and moved on the ceiling wall 14 of the coke oven 10 in the longitudinal direction, and the observation device 24 and the thermal spraying device are moved. 25, the traverse carriage 22 is moved in the short direction and positioned on the flue hole 15 of the combustion chamber 13 to be inspected / repaired.
As shown in FIGS. 5 to 7, the camera lance lifting mechanism 28 of the observation device 24 is driven to insert the camera lance 26 into the combustion chamber 13 through the flue hole 15 and the camera lance turning mechanism 29 is driven to drive the camera lance. 26, as shown in FIGS. 8 and 9, repairs are made to the openings a, joint cracks b, c, d, missing e, etc. generated in the first and / or second partition walls 11, 11a. Discover a spot. At this time, while the camera lance 26 is cooled by the cooling water supply device 34, the image of the CCD camera 27 attached to the front portion of the camera lance 26 is visually confirmed on the monitor 31, and the position and the image are recorded. The CCD camera 27 is also cooled by the air compressor 30.
Since dust is not generated in the combustion chamber 13 at this time, the observation device 24 can accurately confirm the repaired part and the damaged state (generation of a flame from a brick, the size of a crack, etc.).
[0022]
After the camera lance 26 is taken out of the furnace from the combustion chamber 13 or at a later date, the longitudinal carriage 17 and the transverse carriage 22 are driven to align the thermal spray lance 35 with the flue hole 15 of the combustion chamber 13. On the basis of the recorded image information, the spray lance lifting mechanism 37 is driven and inserted into the combustion chamber 13 through the flue hole 15, and the spray lance turning mechanism 38 is driven to turn the spray lance 35, and the spray nozzle 36. Is held at a predetermined position, and then sprayed with a sprayed material or spraying material at a predetermined angle and depth toward the repaired site, thereby closing the opening a, joint cracks b, c, d, missing e, etc. . At this time, the thermal spray lance 35 is cooled by the cooling water supply device 34, and after the repair is completed, the nitrogen gas generator 41 is driven to purge LPG and oxygen remaining in the repair device.
Thereafter, the thermal spray lance 35 is taken out of the furnace, and the repair work is performed on the other combustion chambers 13 as described above, thereby completing the inspection and repair work for the entire coke oven 10.
In this way, by inserting the camera lance 26 of the observation device 24 and the thermal spray lance 35 of the thermal spray device 25 into the combustion chamber 13 separately, the repair material adheres to the repair site while confirming the repair location. be able to.
[0023]
In the present embodiment, the camera lance 26 of the observation device 24 and the thermal spray lance 35 of the thermal spray device 25 can be integrally tilted by the tilting device 23a, so that the building structure is located above the ceiling wall 14 of the coke oven 10. The observation device 24 and the thermal spraying device 25 can be moved together with the longitudinal carriage 17 while effectively avoiding various obstacles such as the body, and the inspection and repair work of the coke oven 10 can be smoothly performed from this aspect.
Since the longitudinal carriage 17 is connected to a preliminary coal charging vehicle 18 that is disposed on the ceiling wall 14 of the coke oven 10 so as to be movable in the longitudinal direction, a traveling drive source of the preliminary coal charging vehicle 18 is used. It is possible to travel the longitudinal carriage 17 by using it, and it becomes unnecessary to equip the longitudinal carriage 17 with a dedicated traveling drive source, so that the equipment cost of the coke oven inspection / repair facility A can be reduced.
Since the camera lance 26 and the thermal spray lance 35 can each be rotated 360 ° around the axis, not only the wall surface of the first partition wall 11 on one side of the combustion chamber 13 but also the first partition wall 11 on the other side. It is also possible to effectively inspect and repair the repaired parts on the wall surface and the repaired parts on the wall surface of the second partition wall 11a located on the left and right sides thereof.
[0024]
Further, in the above-described coke oven inspection / repair method, as shown in FIG. 12, a plurality of flew holes 15 corresponding to the combustion chambers 13 are respectively formed in the ceiling wall 14 of the coke oven 10 in the longitudinal direction and in the short direction perpendicular thereto. Are provided in a grid pattern. In this case, the flue holes 15 and the combustion chambers 13 belonging to the central column can be effectively inspected / repaired with the above-described coke oven inspection / repair facility A, but the short With respect to the three columns of flew holes 15 forming both ends in the hand direction, the traversing carriage 22 cannot approach, so that it is difficult to inspect and repair the combustion chambers 13 corresponding to these flew holes 15.
[0025]
In this case, the above-described coke oven inspection / repair facility A is used for the combustion chambers 13 corresponding to the other flew holes 15 except for the three flew holes 15 that form both ends in the short direction. In addition, an observation device and a repair device are separately entered from the lateral side of the coke oven 10 into the carbonization chamber 12 adjacent to the combustion chamber 13 corresponding to the three columns of the flew holes 15. A repair material is attached to the inner surface, and the cracks that connect the combustion chamber 13 and the carbonization chamber 12 can be closed.
As described above, most of the combustion chambers 13 are efficiently inspected and repaired using the coke oven inspection / repair facility A, and the combustion chamber 13 in which it is difficult to use the coke oven inspection / repair facility A is the combustion chamber 13. An observation device or a repair device enters the carbonization chamber 12 adjacent to the coke oven 10 from the side of the coke oven 10 and adheres a repair material to the inner surface of the carbonization chamber 12, thereby closing a crack that connects the combustion chamber 13 and the carbonization chamber 12. As a result, the inspection and repair can be performed efficiently in the same manner.
[0026]
【Example】
Width direction(Furnace width direction, the same applies below)Twenty pieces corresponding to the central part of the flue holes 15 were observed with a camera lance 26 to investigate the presence or absence of flame on the surfaces of the partition walls 11 and 11a, and the positions thereof were recorded. Then, after the camera lance 26 is raised and taken out from the flew hole 15, the spraying lance 35, which is a repair lance, is lowered to match the flame generating part of the partition walls 11 and 11a, and then the refractory is sprayed and repaired. did.
Further, six (three on one side) of the flew holes 15 at each end in the width direction are inserted into the carbonization chamber 12 by observing the presence or absence of cracks and brick joints, and the combustion chamber 13. The refractory was sprayed and repaired to the cracks and brick joints that led to. As a result, it is possible to eliminate cracks and open brick joints between the combustion chamber 13 and the carbonization chamber 12, and block the ventilation of the combustion chamber 13 and the carbonization chamber 12 to prevent the generation of black smoke. It was.
[0027]
Although the present invention has been described with reference to one embodiment and one example, the present invention is not limited to the configurations described in the above-described embodiment and examples, and claims Other embodiments, examples, and modifications that can be considered within the scope of matters described in the scope are also included.
For example, in the above-described embodiment, the thermal spraying device 25 is used as the repair device, but a spraying device in a form of spraying a spraying material can also be used.
The thermal spray lance 35 and the camera lance 26 extend in the vertical direction with a parallel interval, and the interval between them is preferably equal to the interval between the flew holes 15 or an integral multiple of the interval. By doing in this way, in the coke oven inspection / repair method described later, the camera lance 26 and the thermal spray lance 35 can be simultaneously inserted into separate combustion chambers 13, and at the same time the inspection work is performed in one combustion chamber 13, Repair work can be performed in the other combustion chamber 13, and the coke oven inspection and repair work can be performed in a shorter time.
[0028]
【The invention's effect】
Claim1 and 2In the described coke oven inspection and repair facility, the camera lance of the observation device and the repair lance of the repair device can be inserted separately into the combustion chamber, and the camera lance is inserted into the combustion chamber where dust is not generated. After confirming the repaired part securely, the repair lance can be inserted into the combustion chamber and the repair material can be applied to the repaired part by spraying or spraying. Therefore, the repaired portion can be repaired quickly and easily, and the life of the coke oven can be reliably extended in a short time, and the productivity can be improved.
[0029]
Observation equipmentBy tilting the repair device, the camera lance and repair lance can be installed in the longitudinal direction while effectively avoiding various obstacles such as building structures located above the ceiling wall of the coke oven.Furnace widthThe inspection and repair work of the coke oven can be performed by moving in the direction. From this aspect as well, the repaired part can be repaired quickly and easily, and the life of the coke oven can be extended in a short time. be able to.
[0030]
Furthermore, a longitudinal carriageCan be towed and driven by a preliminary coal charging vehicle, so that the longitudinal carriage need not have a dedicated driving source.RIn addition, it is possible to reduce the cost of the coke oven inspection and repair equipment.
[0031]
Claim2In the described coke oven inspection / repair facility, the repair device can be detachably connected to the repair material supply pipe using a relay terminal at an arbitrary movement position, so that repairs such as oxygen and LPG can be made to the repair device. It is possible to eliminate the need for a large incidental facility such as a cable bear when supplying the material, and from this aspect, the cost of the coke oven inspection / repair facility can be reduced.
[0033]
Claim3In the described coke oven repair method, the coke ovenFurnaceThe combustion chamber corresponding to the center of the flue hole in the width direction is observed with a camera lance and repaired with a repair lance.FurnaceThe combustion chamber corresponding to the flue hole at the end in the width direction was repaired from the carbonization chamber side to block the ventilation between the combustion chamber and the carbonization chamber. The opening can be eliminated and the generation of black smoke can be prevented.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a layout of a coke oven inspection / repair facility according to an embodiment of the present invention.
FIG. 2 is an overall perspective view of a coke oven inspection / repair facility according to an embodiment of the present invention.
FIG. 3 is a side view of the main part.
FIG. 4 is a plan view of the main part.
FIG. 5 is a front view of the main part.
FIG. 6 is a cross-sectional view showing the internal configuration of the coke oven.
7 is a cross-sectional view taken along the line II of FIG.
FIG. 8 is an enlarged explanatory view of a main part of FIG. 6;
9 is an enlarged explanatory view of a main part of FIG.
FIG. 10 is a cooling structure and control block diagram of an observation apparatus for a coke oven inspection / repair facility according to an embodiment of the present invention.
FIG. 11 is a repair material supply / cooling structure and control block diagram of a repair device for a coke oven inspection / repair facility according to an embodiment of the present invention.
FIG. 12 is an explanatory diagram of a coke oven repair method according to an embodiment of the present invention.
[Explanation of symbols]
A Coke Oven Inspection / Repair Equipment 10 Coke Oven
11 1st partition wall 11a 2nd partition wall
12 Carbonization chamber 12a Coal charging opening
13 Combustion chamber 14 Ceiling wall
15 Flue hole 16 First traveling rail
17 Longitudinal cart 18 Preliminary coal loading
18a Main coal loading vehicle 19
20 Rectangular stand 20a Prop
21 Second traveling rail 22 Traversing cart
23 tilting table 23a tilting device
24 Observation device 25 Thermal spraying device
26 Camera lance 27 CCD camera
28 Camera lance lifting mechanism 29 Camera lance turning mechanism
30 Air compressor 31 Monitor
32 Camera controller 33 Personal computer
34 Cooling water supply device 35 Thermal spray lance
36 Thermal spray nozzle 37 Thermal spray lance lifting mechanism
38 Thermal spray lance turning mechanism 39 Gas control device
40 Powder supply device 41 Nitrogen gas generator
42 Oxygen supply piping 43 LPG supply piping
44 First relay terminal 45 Gas control side oxygen piping
46 Gas control side LPG piping 47 Second relay terminal
48 Flexible piping 49 Flexible piping
50 Extruder 50a Extruder travel rail
50b Traveling frame 50c Extruded plate
50d advance and retreat 51 coal tank
52 Guide car 53 Power outlet
54 Power outlet 55 Power supply line
56 Feeder 57 Feeder

Claims (3)

燃焼室と炭化室を仕切り壁を介して交互に配置したコークス炉の天井壁上に長手方向に走行可能に配設された縦行台車と、
前記縦行台車上に搭載され前記縦行台車の走行方向と直交する炉幅方向に走行可能な横行台車と、
前記横行台車上に搭載され、先部にCCDカメラが取り付けられ、前記コークス炉の天井壁に設けたフリュー孔を通して前記燃焼室内に昇降自在に挿入されると共に軸線回りに旋回可能なカメラランスを有する観察装置と、
前記横行台車上に前記観察装置と並列状態に搭載され、前記コークス炉の天井壁に設けたフリュー孔を通して前記燃焼室内に前記カメラランスと独立して別々に昇降自在に挿入されると共に軸線回りに旋回可能な補修ランスを有する補修装置と、
前記CCDカメラの撮像により被補修個所及び損傷状態を記憶する制御装置とを具備し、しかも前記制御装置からの前記被補修個所の位置情報及び前記損傷状態の情報に基づいて前記補修ランスが補修を行い、前記コークス炉を前記燃焼室側から点検・補修する設備であって、更に、
前記横行台車上には、前記カメラランスと前記補修ランスを一体的に傾倒させる傾倒装置が載置され、前記縦行台車は走行駆動源を具備する石炭装入車に連結されているコークス炉点検・補修設備。
A longitudinal carriage disposed on the ceiling wall of a coke oven in which combustion chambers and carbonization chambers are alternately arranged via partition walls so as to be able to travel in the longitudinal direction;
A transverse carriage mounted on the longitudinal carriage and capable of traveling in a furnace width direction perpendicular to the traveling direction of the longitudinal carriage;
A camera lance mounted on the traverse carriage, having a CCD camera attached to the tip , inserted into the combustion chamber through a flew hole provided in the ceiling wall of the coke oven, and capable of swiveling around an axis. An observation device;
It is mounted in parallel with the observation device on the traversing carriage, and is inserted into the combustion chamber independently of the camera lance through a flue hole provided in the ceiling wall of the coke oven, and can be raised and lowered separately. A repair device having a pivotable repair lance;
And a control device for storing the repaired part and the damage state by imaging of the CCD camera , and the repair lance repairs based on the position information of the repaired part and the damage state information from the control device. performed, the coke oven be inspected and repaired to equipment from the combustion chamber side, further,
A tilting device for tilting the camera lance and the repair lance integrally is mounted on the traversing cart, and the traversing cart is connected to a coal charging vehicle having a traveling drive source.・ Repair equipment.
請求項1記載のコークス炉点検・補修設備において、前記コークス炉の天井壁に沿って長手方向に補修材供給配管が配設され、該補修材供給配管に間隔を開けて複数の中継端子が取付けられ、前記補修装置は、任意の長手方向移動位置において、前記中継端子を用いて前記補修材供給配管に着脱自在に連結されるコークス炉点検・補修設備。  2. The coke oven inspection / repair facility according to claim 1, wherein a repair material supply pipe is disposed in a longitudinal direction along a ceiling wall of the coke oven, and a plurality of relay terminals are attached to the repair material supply pipe at intervals. The repair device is a coke oven inspection / repair facility that is detachably connected to the repair material supply pipe using the relay terminal at any longitudinal movement position. 請求項1又は請求項2に記載のコークス炉点検・補修設備を使用するコークス炉の補修方法であって、
前記縦行台車に搭載され、炉幅方向に走行する前記横行台車に、昇降及び軸線回りに旋回自在に載置した前記カメラランスと前記補修ランスにより前記仕切り壁の補修を行うにあたり、前記コークス炉の炉幅方向の前記フリュー孔の中央部に相当する燃焼室を前記カメラランスによって観察し、被補修個所の位置情報及び損傷状態の情報を前記制御装置に記憶し、前記位置情報及び前記損傷状態の情報に基づいて前記補修ランスにより前記被補修個所の補修を行い、前記コークス炉の炉幅方向の前記フリュー孔の両端部に相当する燃焼室を、別の観察装置と補修装置により前記炭化室側から補修して前記燃焼室と前記炭化室の通気を遮断することを特徴とするコークス炉の補修方法。
A method for repairing a coke oven using the coke oven inspection / repair facility according to claim 1 or 2,
When the partition wall is repaired by the camera lance and the repair lance that are mounted on the longitudinal carriage and traveled in the furnace width direction so as to be movable up and down and pivoted about an axis , the coke oven the flue combustion chamber corresponding to the center of the hole was observed by the camera lance, stores information of the position information and the damage state of the repair locations to the controller, the position information and the damaged state of the furnace width direction Based on the information of the above, the repaired portion is repaired by the repair lance, and the combustion chamber corresponding to both ends of the flue hole in the furnace width direction of the coke oven is separated from the carbonization chamber by another observation device and a repair device. A method for repairing a coke oven , comprising repairing from the side to block ventilation of the combustion chamber and the carbonization chamber.
JP31020398A 1998-10-30 1998-10-30 Coke oven inspection and repair equipment and coke oven repair method Expired - Fee Related JP4022008B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31020398A JP4022008B2 (en) 1998-10-30 1998-10-30 Coke oven inspection and repair equipment and coke oven repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31020398A JP4022008B2 (en) 1998-10-30 1998-10-30 Coke oven inspection and repair equipment and coke oven repair method

Publications (2)

Publication Number Publication Date
JP2000136386A JP2000136386A (en) 2000-05-16
JP4022008B2 true JP4022008B2 (en) 2007-12-12

Family

ID=18002434

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31020398A Expired - Fee Related JP4022008B2 (en) 1998-10-30 1998-10-30 Coke oven inspection and repair equipment and coke oven repair method

Country Status (1)

Country Link
JP (1) JP4022008B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002226862A (en) * 2001-02-07 2002-08-14 Nittetsu Yahata Eng Kk Observation repair method of combustion chamber of coke oven
JP4718027B2 (en) * 2001-03-26 2011-07-06 ニッテツ八幡エンジニアリング株式会社 Observation and repair equipment for coke oven combustion chamber
US7547377B2 (en) 2005-02-28 2009-06-16 Kansai Coke And Chemicals Co., Ltd., The Coke oven repairing apparatus
JP6773147B2 (en) * 2018-03-29 2020-10-21 Jfeスチール株式会社 Mobile equipment for furnace construction work, and furnace construction method and equipment for furnace construction work using it.
CN114131619B (en) * 2022-01-07 2023-09-22 江苏科技大学 A dynamic re-spraying control system and method for a spraying robot and a breakpoint recovery control system and method

Also Published As

Publication number Publication date
JP2000136386A (en) 2000-05-16

Similar Documents

Publication Publication Date Title
KR100312905B1 (en) Cork Furnace Repair Method and Device
JP4808210B2 (en) Coke oven repair equipment
US8298347B2 (en) Method and apparatus for cleaning a substantially vertical surface
JPH0214954B2 (en)
JP4022008B2 (en) Coke oven inspection and repair equipment and coke oven repair method
JPH0517277B2 (en)
JP2889101B2 (en) Repair method and apparatus for coke oven wall
JP2819229B2 (en) Repair method of coke oven wall
WO2025179800A1 (en) Coke oven sidewall thermal repair robot system with high imaging precision, and construction method
JP2819228B2 (en) Furnace wall repair equipment for coke ovens
JP4718027B2 (en) Observation and repair equipment for coke oven combustion chamber
JPH039955B2 (en)
CN104148775A (en) Welding robot
CN203956300U (en) Welding robot
JP2002038159A (en) Observation and repair equipment for coke oven combustion chamber
JP4291943B2 (en) Coke oven observation and repair equipment
JP3156901B2 (en) Method and apparatus for repairing the furnace wall below the coal mouth of the coke oven
JP4454175B2 (en) Heat insulation device for coke oven repair
JP3689487B2 (en) Coke oven spraying repair device and repair method
JP4102225B2 (en) Coke oven diagnostic repair method and diagnostic repair device
JPH0299589A (en) Coke oven thermal spray repair equipment
JP2003049170A (en) Apparatus and method for removing and burning carbon adhering to furnace top space
JPH05311173A (en) Coke oven furnace wall repair device
JPH0745666B2 (en) Coke oven furnace wall repair method
KR101009021B1 (en) Dispersion Plate Cleaning Device for Fluidized Bed Reduction Furnace

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040615

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050517

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070403

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070918

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070928

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101005

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111005

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111005

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121005

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131005

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131005

Year of fee payment: 6

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131005

Year of fee payment: 6

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees