JP4024742B2 - Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method - Google Patents

Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method Download PDF

Info

Publication number
JP4024742B2
JP4024742B2 JP2003360489A JP2003360489A JP4024742B2 JP 4024742 B2 JP4024742 B2 JP 4024742B2 JP 2003360489 A JP2003360489 A JP 2003360489A JP 2003360489 A JP2003360489 A JP 2003360489A JP 4024742 B2 JP4024742 B2 JP 4024742B2
Authority
JP
Japan
Prior art keywords
filling
amount
switching position
holding pressure
molten resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003360489A
Other languages
Japanese (ja)
Other versions
JP2005125511A (en
Inventor
健二 杉田
Original Assignee
株式会社名機製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社名機製作所 filed Critical 株式会社名機製作所
Priority to JP2003360489A priority Critical patent/JP4024742B2/en
Publication of JP2005125511A publication Critical patent/JP2005125511A/en
Application granted granted Critical
Publication of JP4024742B2 publication Critical patent/JP4024742B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Injection Moulding Of Plastics Or The Like (AREA)

Description

本発明は、射出成形機の保圧切換位置の演算方法、および前記演算方法を実行させるための演算プログラムを記録したコンピュータ読み取り可能な記録媒体に関するものである。そして特には、保圧切換位置の初期設定に用いられる設定値を、少ない入力項目によって演算可能とした射出成形機の保圧切換位置の演算方法、および前記演算方法を実行させるための演算プログラムを記録したコンピュータ読み取り可能な記録媒体に関するものである。   The present invention relates to a method for calculating a holding pressure switching position of an injection molding machine, and a computer-readable recording medium on which a calculation program for executing the calculation method is recorded. And in particular, a calculation method for a holding pressure switching position of an injection molding machine that can calculate a set value used for initial setting of the holding pressure switching position with a small number of input items, and a calculation program for executing the calculation method. The present invention relates to a recorded computer-readable recording medium.

射出成形機の射出条件の設定は、樹脂の種類、金型の形状、キャビティの容積等の様々な要因が考慮されて決定される。そして前記射出条件の設定の際には、キャビティ内への樹脂の過充填によるバリの発生や金型の破損を避けるために、保圧切換位置等の数値は、安全を見越した値を入力して所謂ショートショットの成形品を成形し、それを完全な成形品に近づけていくことにより保圧切換位置等の射出条件の設定の調整が行なわれていた。しかし前記保圧切換位置等の射出条件の設定方法は、熟練した作業者の経験に頼るところが大きく、作業時間とテスト用樹脂のロスについても問題となっていた。   The injection conditions of the injection molding machine are determined in consideration of various factors such as the type of resin, the shape of the mold, and the volume of the cavity. When setting the injection conditions, in order to avoid burrs due to overfilling of the resin in the cavity and damage to the mold, enter values that allow for safety, such as the holding pressure switching position. Thus, by adjusting a so-called short shot molded product and bringing it close to a complete molded product, the setting of injection conditions such as the holding pressure switching position has been adjusted. However, the method for setting the injection conditions such as the holding pressure switching position largely depends on the experience of a skilled worker, and the working time and the loss of the test resin are also problematic.

上記の問題を解決し、簡単な入力で型開閉、射出、可塑化の初期運転条件が自動設定でき、オペレータの入力操作が容易になるものとして、特許文献1に記載されたものが知られている。特許文献1によれば、型閉開始位置、突出前進位置、型厚、樹脂名、成形品肉厚、成形品重量の初期入力項目を入力することにより、射出成形機の初期運転条件を設定することが記載されている。ところが特許文献1においては、計量完了位置LS8については、計算式が開示されているが、保圧切換位置LS6については(0019)に経験値を設定するとの記載があり、(図4)にLS6=βと記載されるのみで、具体的な計算式の開示がされていない。   As described in Patent Document 1, it is known that the above-mentioned problems can be solved, initial operation conditions of mold opening / closing, injection, and plasticization can be automatically set by simple input, and the operator's input operation becomes easy. Yes. According to Patent Document 1, initial operating conditions of an injection molding machine are set by inputting initial input items of a mold closing start position, a protruding forward position, a mold thickness, a resin name, a molded product thickness, and a molded product weight. It is described. However, Patent Document 1 discloses a calculation formula for the measurement completion position LS8, but there is a description that an experience value is set in (0019) for the holding pressure switching position LS6, and LS6 is shown in (FIG. 4). = Β is only described, and no specific calculation formula is disclosed.

一方射出条件として計量値、最小クッション量、V−P切換位置(保圧切換位置)、速度指令値を設定するものとして、特許文献2に記載されたものが知られている。ところが特許文献2においては、V−P切換位置については、(0036)や(図5)に計算式が開示されており、そこでは所定係数r[例えば5%]を掛けると記載があるものの、根拠等が記載されていない。そして(0036)の計算式のようにrを一律に5%としてV−P切換位置を計算しても、使用される樹脂によって溶融状態から固化した際の容積変化率に相違があるため、適切なV−P切換位置を算出することができない場合があった。   On the other hand, what is described in Patent Document 2 is known as an injection condition for setting a measured value, a minimum cushion amount, a VP switching position (holding pressure switching position), and a speed command value. However, in Patent Document 2, the calculation formula is disclosed in (0036) and (FIG. 5) for the VP switching position, and there is a description that it is multiplied by a predetermined coefficient r [for example, 5%]. The grounds are not described. Even if the VP switching position is calculated by uniformly setting r to 5% as in the calculation formula of (0036), there is a difference in the volume change rate when solidified from the molten state by the resin used. In some cases, it was not possible to calculate the correct VP switching position.

特開平6−114907号公報(要約、0008、0019、図4)JP-A-6-114907 (Abstract, 0008, 0019, FIG. 4) 特開平7−232356号公報(請求項1、0032、0036、図5)JP-A-7-232356 (Claims 1, 0032, 0036, FIG. 5)

上記のように、射出成形機の保圧切換位置の初期設定値については、理論的な演算方法が開示されておらず、成形当初から演算によりキャビティ容積に対してほぼ充填された程度の成形品を成形することはできなかった。そこで本発明では少ない入力項目により、保圧切換位置をほぼ正確に演算することができ、前記保圧切換位置を初期設定値とすることにより、成形当初からキャビティ容積に対してほぼ充填された程度の成形品を成形することができる射出成形機の保圧切換位置の演算方法、および前記演算方法を実行させるための演算プログラムを記録したコンピュータ読み取り可能な記録媒体を提供することを目的とする。   As described above, the theoretical calculation method is not disclosed for the initial setting value of the holding pressure switching position of the injection molding machine, and the molded product is almost filled with respect to the cavity volume by calculation from the beginning of molding. Could not be molded. Accordingly, in the present invention, the holding pressure switching position can be calculated almost accurately with a small number of input items, and by setting the holding pressure switching position as an initial set value, the degree of filling with respect to the cavity volume from the beginning of the molding. It is an object of the present invention to provide a calculation method of a holding pressure switching position of an injection molding machine capable of molding the molded product, and a computer-readable recording medium recording a calculation program for executing the calculation method.

本発明の請求項1に記載の射出成形機の射出工程における充填工程から保圧工程への切換位置である保圧切換位置の演算方法は、充填工程においてキャビティ容積に対して溶融樹脂が充填される仮想充填量を演算して、その仮想充填量における溶融樹脂の収縮量を演算し、収縮量を充填工程における補充充填量とし、その仮想充填量と補充充填量とを加えて充填工程における溶融樹脂の総充填量を演算し、総充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程における充填ストロークを演算し、計量ストロークから充填ストロークを減算して保圧切換位置を演算することを特徴とする。 According to a first aspect of the present invention, there is provided a method for calculating a holding pressure switching position, which is a switching position from a filling process to a pressure holding process in an injection process of an injection molding machine, in which molten resin is filled into a cavity volume in the filling process. that calculates the virtual loading, calculates the amount of shrinkage of the molten resin in the virtual loading, the amount of shrinkage as a replenishing loading in the filling process, molten in the filling process by adding and a replenishment loading the virtual loading Calculate the total filling amount of resin, calculate the filling stroke in the filling process by dividing the total filling amount by either the screw pressing area or the heated cylinder cross-sectional area, and subtract the filling stroke from the metering stroke to switch the holding pressure. The position is calculated.

本発明の請求項2に記載の射出成形機の保圧切換位置の演算方法は、請求項1において、仮想充填量については、キャビティ容積に対して所定のキャビティ充填係数を乗算して演算され、補充充填量については、仮想充填量に対して所定の固化係数を乗算して樹脂固化量を演算し、樹脂固化量に樹脂が溶融状態から固化した際の容積変化率を乗算して求められることを特徴とする。   The method for calculating the holding pressure switching position of the injection molding machine according to claim 2 of the present invention is the calculation method according to claim 1, wherein the virtual filling amount is calculated by multiplying the cavity volume by a predetermined cavity filling coefficient, The replenishment filling amount is obtained by multiplying the virtual filling amount by a predetermined solidification coefficient to calculate the resin solidification amount, and multiplying the resin solidification amount by the volume change rate when the resin is solidified from the molten state. It is characterized by.

本発明の請求項3に記載の射出成形機の保圧切換位置の演算方法は、請求項1において、射出成形機の射出工程における充填工程から保圧工程への切換位置である保圧切換位置の演算方法において、スクリュ径に対して所定のクッション係数を乗算してスクリュ前進限度位置からクッション位置までのクッション距離を演算し、成形品重量を樹脂の固体時の比重で除算した固体時容積に樹脂が溶融状態から固化した際の容積変化率を乗算するか或いは成形品重量を溶融樹脂の溶融時の比重で除算して、充填工程と保圧工程を加えた分の溶融樹脂の総射出量を演算し、総射出量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程と保圧工程を加えた分の総射出ストロークを演算し、クッション距離と総射出ストロークを加算して計量ストロークを演算し、請求項1で演算した総充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程における充填ストロークを演算し、計量ストロークから充填ストロークを減算することにより保圧切換位置を演算することを特徴とする。   The method for calculating the holding pressure switching position of the injection molding machine according to claim 3 of the present invention is the holding pressure switching position which is the switching position from the filling process to the holding pressure process in the injection process of the injection molding machine. In this calculation method, the cushion distance from the screw advance limit position to the cushion position is calculated by multiplying the screw diameter by the predetermined cushion coefficient, and the molded product weight is divided by the specific gravity of the resin solid. Multiply the volume change rate when the resin is solidified from the molten state, or divide the weight of the molded product by the specific gravity at the time of melting of the molten resin, and add the filling process and pressure holding process, and the total injection amount of the molten resin The total injection stroke is calculated by dividing the total injection amount by either the screw pressing area or the heating cylinder cross-sectional area, and adding the filling process and pressure holding process. The metering stroke is calculated by adding the mark and the total filling amount calculated in claim 1 is divided by either the screw pressing area or the heating cylinder cross-sectional area to calculate the filling stroke in the filling process. The holding pressure switching position is calculated by subtracting the stroke.

本発明の請求項4に記載の射出成形機の保圧切換位置の演算方法は、スクリュ径に対して所定のクッション係数を乗算してスクリュ前進限度位置からクッション位置までのクッション距離を演算し、充填工程においてキャビティ容積に対して溶融樹脂が充填される仮想充填量を演算し、仮想充填量に所定の非固化係数を乗算して仮想充填量における充填工程終了時までの溶融樹脂の非固化量を演算し、溶融樹脂の非固化量における溶融樹脂の収縮量を演算し、キャビティ容積から仮想充填量を減算して非充填容積を演算し、溶融樹脂の非固化量における収縮量と非充填容積を加算して保圧工程における充填量を演算し、保圧工程における充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより保圧ストロークを演算し、保圧ストロークとクッション距離を加算することにより保圧切換位置を演算することを特徴とする。 According to a fourth aspect of the present invention, the pressure holding switching position calculation method for the injection molding machine calculates a cushion distance from the screw advance limit position to the cushion position by multiplying the screw diameter by a predetermined cushion coefficient, Calculates the virtual filling amount by which the molten resin is filled with respect to the cavity volume in the filling process, multiplies the virtual filling amount by a predetermined non-solidification coefficient, and the non-solidified amount of the molten resin until the end of the filling step in the virtual filling amount To calculate the shrinkage amount of the molten resin in the non-solidified amount of the molten resin, subtract the virtual filling amount from the cavity volume to calculate the non-filling volume, and the shrinkage amount and non-filling volume in the non-solidified amount of the molten resin Is added to calculate the filling amount in the pressure-holding process, and the pressure-holding stroke is calculated by dividing the filling amount in the pressure-holding process by either the screw pressing area or the heating cylinder cross-sectional area. Characterized by calculating the hold pressure switching position by adding the holding pressure stroke and cushion distance.

本発明の請求項5に記載の射出成形機の保圧切換位置の演算方法は、請求項2において、所定のキャビティ充填係数は、0.95ないし1.00であり、所定の固化係数が0.25ないし0.35であることを特徴とする。 According to a fifth aspect of the present invention, there is provided the method for calculating the holding pressure switching position of the injection molding machine according to the second aspect, wherein the predetermined cavity filling factor is 0.95 to 1.00, and the predetermined solidification factor is 0. .25 to 0.35 .

本発明の請求項6に記載のコンピュータ読み取り可能な記録媒体は、前記請求項1ないし5のいずれか1項の演算方法を実行させるための演算プログラムを記録したものであることを特徴とする。   According to a sixth aspect of the present invention, there is provided a computer-readable recording medium on which an arithmetic program for executing the arithmetic method according to any one of the first to fifth aspects is recorded.

本発明の射出成形機の保圧切換位置の演算方法は、充填工程においてキャビティ容積に対して溶融樹脂が略充填される仮想充填量を演算して、仮想充填量における溶融樹脂の収縮量を演算し、収縮量を充填工程における補充充填量とし、仮想充填量と前記補充充填量とを加えて充填工程における溶融樹脂の総充填量を演算し、スクリュ押圧面積または加熱筒断面積のいずれかと総充填量とを用いて保圧切換位置を演算するようにしたので、少ない入力項目により、保圧切換位置をほぼ正確に演算することができ、保圧切換位置を初期設定値とすることにより、成形当初からキャビティ容積に対してほぼ充填された程度の成形品を成形することはできるので、誰でも容易に保圧切換位置の初期設定ができるとともに、保圧切換位置の設定完了までの時間とテスト用樹脂の節約につながる。   The calculation method of the holding pressure switching position of the injection molding machine according to the present invention calculates a virtual filling amount in which the molten resin is substantially filled with respect to the cavity volume in the filling step, and calculates a shrinkage amount of the molten resin in the virtual filling amount. The shrinkage amount is used as the replenishment filling amount in the filling step, the virtual filling amount and the replenishing filling amount are added to calculate the total filling amount of the molten resin in the filling step, and the total amount of either the screw pressing area or the heating cylinder cross-sectional area is calculated. Since the holding pressure switching position is calculated using the filling amount, the holding pressure switching position can be calculated almost accurately with a small number of input items. By setting the holding pressure switching position as an initial set value, Since it is possible to mold a molded product that is almost filled with the cavity volume from the beginning of molding, anyone can easily set the holding pressure switching position and complete the setting of the holding pressure switching position. Leading to savings in time and the test resin.

本発明の実施形態について図1ないし図3を参照して説明する。図1は、本発明を実施する射出成形機の射出位置についての説明図であってスクリュが計量位置にある状態を示す図である。図2は、本発明を実施する射出成形機の射出位置についての説明図であってスクリュが保圧切換位置にある状態を示す図である。図3は、本発明の保圧切換位置の演算方法に用いる入力画面を示す図である。   An embodiment of the present invention will be described with reference to FIGS. FIG. 1 is an explanatory view of an injection position of an injection molding machine for carrying out the present invention, and shows a state where a screw is in a metering position. FIG. 2 is an explanatory view of the injection position of the injection molding machine for carrying out the present invention and is a view showing a state in which the screw is at the holding pressure switching position. FIG. 3 is a diagram showing an input screen used in the method for calculating the holding pressure switching position according to the present invention.

図1により、本発明に使用される射出成形機1の構成を説明する。射出成形機1は、射出装置2と図示しない可動盤および固定盤にそれぞれ取付けられた成形金型3からなっている。射出装置2は、図示しないヒータにより温度制御される加熱筒4が設けられ、前記加熱筒内4aには逆流防止弁5が先端に取付けられたスクリュ6が、図示しない計量用および射出用のサーボモータからなるスクリュ駆動手段により回転および前後進自在に取り付けられている。そして前記サーボモータにはそれぞれエンコーダが取付けられ、前記サーボモータの回転数から、計量工程のスクリュ回転数、計量位置Iqや保圧切換位置Iq等のスクリュ6の位置、および充填工程における射出速度等が検出可能となっている。また射出装置2には射出圧力を検出するロードセルまたは加熱筒内樹脂センサが取付けられている。なおスクリュ駆動手段については油圧を使用したものでもよく、その場合の圧力センサは油圧センサであってもよい。 The configuration of an injection molding machine 1 used in the present invention will be described with reference to FIG. The injection molding machine 1 includes an injection device 2 and molding dies 3 attached to a movable platen and a fixed platen (not shown). The injection device 2 is provided with a heating cylinder 4 whose temperature is controlled by a heater (not shown), and a screw 6 with a backflow prevention valve 5 attached to the tip is provided in the heating cylinder 4a. It is attached so that it can be rotated and moved forward and backward by a screw driving means comprising a motor. An encoder is attached to each of the servo motors. From the rotation speed of the servo motor, the screw rotation speed in the measuring process, the position of the screw 6 such as the measuring position Iq 1 and the holding pressure switching position Iq 2 , and the injection in the filling process. Speed etc. can be detected. The injection device 2 is provided with a load cell for detecting the injection pressure or a heating in-cylinder resin sensor. The screw driving means may use hydraulic pressure, and the pressure sensor in that case may be a hydraulic pressure sensor.

また加熱筒4の先端には前記加熱筒内4aから樹脂通路7aが連通されたノズル7が取付けられ、前記ノズル7の先端部7bは成形金型3の固定金型8のスプルブッシュ8aに当接可能に設けられている。成形金型3は固定金型8と可動金型9が型合わせされることにより、キャビティ10が形成される。そしてキャビティ10は前記射出装置2のノズル7に連通可能となっている。なお後述する本発明における演算プログラムによる演算の説明におけるキャビティ10の概念は、ランナ部やスプル部等の余剰部を形成する部分を含んでいる。また成形金型3は図示しない温調手段が取付けられ、キャビティ10内に射出された溶融樹脂が冷却・固化されるようになっている。   Further, a nozzle 7 having a resin passage 7 a communicating with the inside of the heating cylinder 4 a is attached to the tip of the heating cylinder 4, and the tip 7 b of the nozzle 7 contacts the sprue bush 8 a of the fixed mold 8 of the molding die 3. It is provided so that it can touch. In the molding die 3, a cavity 10 is formed by matching the fixed die 8 and the movable die 9. The cavity 10 can communicate with the nozzle 7 of the injection device 2. Note that the concept of the cavity 10 in the description of the calculation by the calculation program according to the present invention, which will be described later, includes a part that forms a surplus part such as a runner part or a sprue part. The molding die 3 is provided with a temperature control means (not shown) so that the molten resin injected into the cavity 10 is cooled and solidified.

そして上記射出成形機1の計量工程においては、ホッパ11から投入された樹脂ペレットは、加熱筒内4aにおいてスクリュ6が回転されることにより溶融され、溶融された樹脂は、所定の背圧が加えられたスクリュ6を後退させ、加熱筒内4aの前方部分に貯留される。そしてスクリュ6が所定の計量位置Iqまで後退すると、スクリュ6の回転は停止され、計量工程が終了する。またノズル7を成形金型3のスプルブッシュ8aから後退させる場合には、計量工程終了後に、スクリュ位置を僅かに後退させるサックバック工程が行なわれることもある。いずれにせよ、次の射出工程においては、成形品が取出された後に再型締された成形金型3のスプルブッシュ8aに対して、ノズル7が当接された状態で、スクリュ6を前進させ、成形金型3のキャビティ10内に溶融樹脂を射出する射出工程が行なわれる。 In the measuring step of the injection molding machine 1, the resin pellets fed from the hopper 11 are melted by rotating the screw 6 in the heating cylinder 4a, and the melted resin is subjected to a predetermined back pressure. The screw 6 is retracted and stored in the front portion of the heating cylinder 4a. When the screw 6 is moved backward to a predetermined measuring position Iq 1, rotation of the screw 6 is stopped, the metering step is completed. Further, when the nozzle 7 is retracted from the sprue bush 8a of the molding die 3, a suck back process for slightly retracting the screw position may be performed after the completion of the measuring process. In any case, in the next injection step, the screw 6 is advanced in a state where the nozzle 7 is in contact with the sprue bush 8a of the molding die 3 which is re-clamped after the molded product is taken out. An injection process for injecting molten resin into the cavity 10 of the molding die 3 is performed.

射出工程は充填工程と保圧工程からなっており、その切換位置が保圧切換位置Iqである。まず充填工程では、キャビティ10内に溶融樹脂が完全に充填される直前までスクリュ6を速度制御により前進させ、キャビティ10内に溶融樹脂の充填を行なう。その際に、図2に示されるように、冷却された成形金型3のキャビティ形成面に触れた溶融樹脂については固化してスキン層M1が形成され、キャビティ10の中心層M2についてはまだ溶融状態にある。そしてキャビティ10内に溶融樹脂が略充填完了すると充填工程が終了され、保圧切換位置Iqにおいて、スクリュ6の制御が圧力制御に切換えられ、保圧工程が開始される。そして以後保圧工程では、射出装置2のスクリュ6によりキャビティ10内の樹脂に所定の圧力が掛けられて、冷却による溶融樹脂の収縮量分が補われる。そしてスクリュ6が前進完了するクッション位置Iqcは、保圧工程においてキャビティ10内に圧力を及ぼすことができるように、スクリュ前進限度位置Iqからクッション位置Iqcまでのクッション距離S1を残した位置となるように設定されている。 Injection process is composed of the filling process and pressure holding process, the switching position is hold pressure switching position Iq 2. First, in the filling step, the screw 6 is advanced by speed control until immediately before the cavity 10 is completely filled with the molten resin, and the cavity 10 is filled with the molten resin. At that time, as shown in FIG. 2, the molten resin that has touched the cavity forming surface of the cooled molding die 3 is solidified to form a skin layer M1, and the center layer M2 of the cavity 10 is still molten. Is in a state. When the molten resin is almost completely filled into the cavity 10, the filling process is terminated, and at the holding pressure switching position Iq 2 , the control of the screw 6 is switched to the pressure control, and the pressure holding process is started. Then, in the pressure holding process, a predetermined pressure is applied to the resin in the cavity 10 by the screw 6 of the injection device 2 to compensate for the shrinkage of the molten resin due to cooling. The screw 6 is advanced completed cushion position Iqc, as can exert pressure to the cavity 10 within the dwelling step, a position leaving the cushion distance S1 from the screw forward limit position Iq 0 to cushion position Iqc Is set to

なお保圧切換位置Iqと成形の関係については、充填工程の射出速度および射出圧力、保圧工程の設定圧力、および成形品の肉厚等にもよるが、充填工程から保圧工程への切換えを早くする(図2においてスクリュ6が右側寄りの位置にあるときに切換える)と、キャビティ10内に溶融樹脂を射出充填する際の射出速度および射出圧力が伴なわず、ゲートから遠い部分まで完全に樹脂が充填されなくなる場合が多い。また充填工程から保圧工程への切換えを遅くする(図2においてスクリュ6が左側寄りの位置にあるときに切換える)と、キャビティ10内の溶融樹脂が極めて高い圧力となり、成形金型3のパーティング面3aからバリが発生する所謂オーバーパックを引き起こしやすい。よって保圧切換位置Iqは、適切な位置に設定する必要がある。しかし従来の保圧切換位置Iqの設定は、熟練した作業者の経験に頼るところが大きく、作業時間とテスト用樹脂のロスが問題となっていた。 Note the relationship molding hold pressure switching position Iq 2 is injection speed and injection pressure of the filling process, the set pressure of the pressure holding process, and depending on the molded article thickness such as from the filling process to the pressure-holding step If the switching is accelerated (switching is performed when the screw 6 is located at the right side in FIG. 2), the injection speed and the injection pressure when the molten resin is injected and filled into the cavity 10 are not accompanied, and the portion far from the gate is reached. In many cases, the resin is not completely filled. Further, if the switching from the filling process to the pressure holding process is delayed (switching is performed when the screw 6 is located on the left side in FIG. 2), the molten resin in the cavity 10 becomes extremely high pressure, and the party of the molding die 3 is increased. It is easy to cause a so-called overpack in which burrs are generated from the sealing surface 3a. Therefore hold pressure switching position Iq 2 needs to be set in position. But of the conventional pressure-holding switch position Iq 2 set has a large place to rely on skilled worker's experience, loss of work time and the test for the resin has been a problem.

次に上記の問題を解決するための、射出成形機1における射出時における計量位置Iq、保圧切換位置Iq、およびクッション位置Iqcの各位置の初期設定位置を、容易に演算する演算プログラム、および前記演算プログラムを記録したコンピュータ読み取り可能な記録媒体を搭載したコンピュータについて説明する。なお本実施形態において演算プログラムは、市販のパーソナルコンピュータで使用される市販の計算ソフトにより作成され、保圧切換位置Iq等の初期設定位置についての演算結果は、前記パーソナルコンピュータの画面に表示される。そして作業者が前記画面を見て、射出成形機1の設定画面に初期設定位置の入力を行なう。しかし本発明の演算プログラムは、射出成形機1の制御装置に搭載された専用プログラムからなり、前記専用プログラムの演算結果に基づき、射出成形機1が制御されるものであってもよい。なお演算プログラムは、前記パーソナルコンピュータや制御装置の、ハードディスクに記録されたものの他、フレキシブルディスク、光ディスク等の記録媒体に記録されたものでもよい。 Next, a calculation program for easily calculating the initial setting positions of the measurement position Iq 1 , the holding pressure switching position Iq 2 , and the cushion position Iqc at the time of injection in the injection molding machine 1 for solving the above problem. A computer equipped with a computer-readable recording medium on which the arithmetic program is recorded will be described. In the present embodiment, the calculation program is created by commercially available calculation software used in a commercially available personal computer, and the calculation result for the initial setting position such as the holding pressure switching position Iq 2 is displayed on the screen of the personal computer. The Then, the operator views the screen and inputs an initial setting position on the setting screen of the injection molding machine 1. However, the calculation program of the present invention may be a dedicated program installed in the control device of the injection molding machine 1, and the injection molding machine 1 may be controlled based on the calculation result of the dedicated program. Note that the arithmetic program may be recorded on a recording medium such as a flexible disk or an optical disk in addition to those recorded on the hard disk of the personal computer or the control device.

次に本実施形態の演算プログラムによる射出成形機1の保圧切換位置Iqの演算方法について説明する。本実施形態の演算プログラムは、図3に示される「計量位置・保圧切換位置・クッション位置計算シート」の画面から入力値を入力するようになっている。本実施形態において必須の入力項目は、「スクリュ径(mm)」、「樹脂の種類」、「成形品重量(g)またはキャビティ容積(cc)」のみである。スクリュ径(mm)については、後述する溶融樹脂の総充填量(容積)等からスクリュ押圧面積を除算して充填時の充填ストローク等を算出する際に使用され、数値を半角入力するようになっている。なお演算プログラムを特定の機種のみに使用する場合は、スクリュ径(mm)は予め固定値を登録し、スクリュ径(mm)の入力を省略するようにしてもよい。 Then calculation method of hold pressure switching position Iq 2 of the injection molding machine 1 by the calculation program of the present embodiment will be described. The calculation program of the present embodiment is configured to input an input value from the screen of “Measuring position / holding pressure switching position / cushion position calculation sheet” shown in FIG. In the present embodiment, the only required input items are “screw diameter (mm)”, “resin type”, “molded product weight (g) or cavity volume (cc)”. The screw diameter (mm) is used when calculating the filling stroke at the time of filling by dividing the screw pressing area from the total filling amount (volume) of the molten resin, which will be described later, and numerical values are entered. ing. When the arithmetic program is used only for a specific model, a fixed value may be registered in advance for the screw diameter (mm), and the input of the screw diameter (mm) may be omitted.

「樹脂の種類」については、右側の▽釦をクリックすると、PP、PC、ABSといった各樹脂の一覧が表示され、その中で使用する樹脂を選択入力する。本実施形態では樹脂の種類を入力すると、予め入力されていた樹脂の種類に対応する加熱筒温度が自動的に読み出される。 そして所定の背圧がかけられた状態における前記加熱筒温度での樹脂の溶融時の比重γと、固体時の比重γfが本発明の演算のために読み出されるようになっている。なお樹脂の種類については、分子量や充填材等により更に細分化してもよい。また比重等については手入力により数値を修正可能としてもよく、溶融時の比重γは、樹脂の種類ごとに一の固定値を用いてもよい。   With respect to “type of resin”, when the ▽ button on the right side is clicked, a list of resins such as PP, PC, and ABS is displayed, and a resin to be used is selected and input. In this embodiment, when the resin type is input, the heating cylinder temperature corresponding to the previously input resin type is automatically read out. Then, the specific gravity γ when the resin is melted at the heating cylinder temperature and the specific gravity γf at the time of solid are read out for the calculation of the present invention in a state where a predetermined back pressure is applied. In addition, about the kind of resin, you may subdivide further according to molecular weight, a filler, etc. The numerical value of the specific gravity and the like may be corrected manually, and the specific gravity γ at the time of melting may be a fixed value for each type of resin.

成形品重量(g)またはキャビティ容積(cc)については、右側の▽釦を入力していずれかに切換可能である。よって既に成形品が存在するか、又は設計図面から成形品の重量が判明している場合は「成形品重量(g)」を選択入力する。また成形金型3の設計図面等からキャビティ10の容積が判明している場合は、「キャビティ容積(cc)」を設定入力する。そして図3に示されるように「成形品重量(g)」を選択した場合は、その次段の左側の説明欄が、「成形品1個の重量(g)」、「成形品取り数」、「スプルおよびランナの重量(g)」、「合計重量(g)」と表示される。そこで前記「成形品1個の重量(g)」、「成形品取り数」、「スプルおよびランナの重量(g)」の右側の入力欄に、それぞれ数字を半角入力すると、次段の「合計重量(g)」欄の右側の数値表示欄に、一成形における合計重量(g)が演算、表示される。またキャビティ容積(cc)を選択した場合は、その次段の左側の説明欄が、「成形品1個の容積(cc)」、「成形品取り数」、および「スプルおよびランナの容積(cc)」と表示され、前記重量(g)の場合と同様に、数値を入力することにより、一成形における合計容積(cc)を演算、表示することができる。よって本発明における成形品重量(g)またはキャビティ容積(cc)は、成形品1個当たりの重量または容積に成形品の取り数を乗算し、スプルおよびランナー等の余剰部の重量または容積を加算した合計重量(g)や合計容積(cc)が演算に用いられる。なお合計重量(g)または合計容量(cc)については、手入力により入力するようにしてもよい。   The molded product weight (g) or cavity volume (cc) can be switched to either by inputting the right ▽ button. Therefore, if a molded product already exists or if the weight of the molded product is known from the design drawing, the “molded product weight (g)” is selected and input. If the volume of the cavity 10 is known from the design drawing of the molding die 3, etc., “cavity volume (cc)” is set and inputted. Then, as shown in FIG. 3, when “molded product weight (g)” is selected, the description column on the left side of the next stage shows “weight of one molded product (g)”, “number of molded products taken”. , “Weight of sprue and runner (g)”, “total weight (g)”. Therefore, if you enter a single-byte number in the right-hand side of the “weight of one molded product (g)”, “number of molded products”, and “weight of sprue and runner (g)”, The total weight (g) in one molding is calculated and displayed in the numerical value display column on the right side of the “weight (g)” column. In addition, when the cavity volume (cc) is selected, the description column on the left side of the next stage includes “volume of one molded article (cc)”, “number of molded articles”, and “volume of sprue and runner (cc ) ”, And the total volume (cc) in one molding can be calculated and displayed by inputting a numerical value as in the case of the weight (g). Therefore, the weight (g) or cavity volume (cc) of the molded product in the present invention is obtained by multiplying the weight or volume per molded product by the number of molded products, and adding the weight or volume of surplus parts such as sprues and runners. The total weight (g) and the total volume (cc) are used for the calculation. The total weight (g) or the total capacity (cc) may be input manually.

次の演算プログラムによる演算式について説明する。まずクッション位置Iqc(=クッション距離S1):(mm)は次式により演算される。

Figure 0004024742
An arithmetic expression by the following arithmetic program will be described. First, the cushion position Iqc (= cushion distance S1): (mm) is calculated by the following equation.
Figure 0004024742

クッション位置Iqcについては、スクリュ径dに所定のクッション係数c(0.10ないし0.20)を乗算して求められ、過剰な樹脂の滞留が発生しない最適の位置が演算される。なお本実施形態では所定のクッション係数cは、スクリュ6がスクリュ前進限度位置Iqにあってクッション量がまったくない状態の位置を0として、0.15に設定されている。なお所定のクッション係数cについては、樹脂の種類、温度、射出圧力、および射出速度等が変更されることに応じて、前記の範囲で係数値の変更が可能である。 The cushion position Iqc is obtained by multiplying the screw diameter d by a predetermined cushion coefficient c (0.10 to 0.20), and an optimal position where excessive resin stagnation does not occur is calculated. In the present embodiment, the predetermined cushion coefficient c is set to 0.15, where 0 is a position where the screw 6 is at the screw advance limit position Iq 0 and there is no cushion amount. For the predetermined cushion coefficient c, the coefficient value can be changed within the above range in accordance with changes in the type of resin, temperature, injection pressure, injection speed, and the like.

次に計量位置Iq(=計量ストロークS2):(mm)は次式により演算される。

Figure 0004024742
Next, the measurement position Iq 1 (= measurement stroke S2): (mm) is calculated by the following equation.
Figure 0004024742

計量位置Iqについては、上記のように、まず成形品重量Wa(g)を、樹脂の溶融時の比重γで除算し、充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vを求める。そして前記充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vを、スクリュ押圧面積(π÷4×d)で除算して総射出ストロークS3(計量位置Iqからクッション位置Iqcまでの射出ストローク)(mm)が演算される。この際に充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vに10を乗算しているのは、充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vの単位がccであるのに対し、求められる計量位置Iqの単位がmmであるため、充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vの単位をmmにするためである。そして前記総射出ストロークS3(mm)に対して、上記で求めたクッション距離S1(mm)を加算し、計量位置Iq(=計量ストロークS2)(mm)を求める。なお、充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vについては、成形品重量Wa(g)を樹脂の固体時の比重γfで除算して固体時比重を求め、それに樹脂が溶融状態から固化した際の容積変化率Vtを乗算して求めてもよい。 For the weighing position Iq 1 , as described above, first, the molded product weight Wa (g) is divided by the specific gravity γ when the resin is melted, and the total injection amount of the molten resin is the sum of the filling step and the pressure holding step. determine the V 1. Then, the total injection amount V 1 of the molten resin corresponding to the addition of the filling step and the pressure holding step is divided by the screw pressing area (π ÷ 4 × d 2 ) to obtain the total injection stroke S3 (from the measurement position Iq 1 to the cushion position). The injection stroke (mm) up to Iqc is calculated. At this time, the total injection amount V 1 of the molten resin added to the filling step and the holding step is multiplied by 10 3 because the total injection amount of the molten resin added to the filling step and the holding step is added. The unit of V 1 is cc, whereas the unit of the required measurement position Iq 1 is mm. Therefore, the unit of the total injection amount V 1 of the molten resin obtained by adding the filling step and the pressure holding step is mm 3. It is to make it. Then, the cushion distance S1 (mm) obtained above is added to the total injection stroke S3 (mm) to obtain the measurement position Iq 1 (= measurement stroke S2) (mm). Note that the total injection amount V 1 of the minute of the molten resin was added filling process and pressure holding process are moldings weight Wa (g) of was divided by the specific gravity γf during resin solid sought solid upon gravity, it You may obtain | require by multiplying the volume change rate Vt at the time of resin solidifying from a molten state.

次に保圧切換位置Iq:(mm)は次式により演算される。

Figure 0004024742
Next, the holding pressure switching position Iq 2 : (mm) is calculated by the following equation.
Figure 0004024742

上記において、所定のキャビティ充填係数Cは、充填工程においてキャビティ容積Vfに対して溶融樹脂が略充填される仮想充填量(C×Vf)を演算するための係数値であり、0.95ないし1.00の係数値が望ましい。本実施形態では所定のキャビティ充填係数Cは、0.97に設定されている。また所定の固化係数Cは、前記溶融樹脂の仮想充填量(C×Vf)がキャビティ10内に略充填された際に既に固化した樹脂固化量を演算するための係数であり、0.25ないし0.35の係数値が望ましい。本実施形態では、所定の固化係数Cは0.30に設定されている。なお本発明において、前記所定のキャビティ充填係数C、および所定の固化係数Cについては、樹脂の種類、射出圧力、射出速度、成形金型の形状、冷却温度等が変更されることに応じて、前記した数値の範囲で設定が変更可能となっている。また前記所定のキャビティ充填係数C、および前記所定の固化係数Cについては、多くのテストデータから知見した係数であって、実際にこれから行なう充填工程における溶融樹脂の充填や固化が、必ずしも前記係数内に収まっているという訳ではない。 In the above, the predetermined cavity filling coefficient C 1 is a coefficient value for calculating a virtual filling amount (C 1 × Vf) in which the molten resin is substantially filled with respect to the cavity volume Vf in the filling step, and is 0.95. A coefficient value between 1.00 and 1.00 is desirable. In this embodiment the predetermined cavity filling coefficient C 1 is set to 0.97. The predetermined solidification coefficient C 2 are coefficients for virtual filling amount of the molten resin (C 1 × Vf) is computed the resin solidified quantity which has already been solidified upon being substantially filled into the cavity 10, 0. A coefficient value between 25 and 0.35 is desirable. In the present embodiment, the predetermined hardening coefficient C 2 is set to 0.30. In the present invention, the predetermined cavity filling factor C 1 and the predetermined solidification factor C 2 are changed according to changes in resin type, injection pressure, injection speed, molding die shape, cooling temperature, and the like. Thus, the setting can be changed within the above numerical range. Further, the predetermined cavity filling coefficient C 1 and the predetermined solidification coefficient C 2 are coefficients found from a lot of test data, and the filling and solidification of the molten resin in the filling process to be actually performed are not necessarily described above. It is not necessarily within the coefficient.

そして本発明では、まずキャビティ容積Vfに対して所定のキャビティ充填係数Cを乗算して、充填工程における溶融樹脂の仮想充填量(C×Vf)を演算する。次に上記の充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vからキャビティ容積Vfを減算して、総射出量に対する溶融樹脂の収縮量(V−Vf)を求め、前記総射出量に対する溶融樹脂の収縮量(V−Vf)に、前記所定のキャビティ充填係数Cと所定の固化係数Cとをそれぞれ乗算して溶融樹脂の仮想充填量(C×Vf)における溶融樹脂の収縮量(C×C×Vs)を演算する。前記溶融樹脂の収縮量(C×C×Vs)は、充填工程において樹脂収縮のため、その容積分だけ更にキャビティ10内に溶融樹脂を追加して充填を要する容積であって、前記溶融樹脂の収縮量(C×C×Vs)が溶融樹脂の補充充填量に相当する。次に前記溶融樹脂の仮想充填量(C×Vf)と溶融樹脂の補充充填量(=C×C×Vs)を加算して、充填工程における溶融樹脂の総充填量(C×Vf+C×C×Vs)を演算する。 In the present invention, first, the cavity volume Vf is multiplied by a predetermined cavity filling coefficient C 1 to calculate the virtual filling amount (C 1 × Vf) of the molten resin in the filling step. Then by subtracting the cavity volume Vf from the total injection amount V 1 of the minute of the molten resin by adding the filling process and pressure holding process, shrinkage of the molten resin to the total injection amount (V 1 -Vf) determined, The molten resin shrinkage amount (V 1 −Vf) with respect to the total injection amount is multiplied by the predetermined cavity filling coefficient C 1 and the predetermined solidification coefficient C 2 , respectively, to obtain a virtual filling amount (C 1 × Vf) of the molten resin. ) To calculate the shrinkage amount (C 1 × C 2 × Vs) of the molten resin. The amount of shrinkage of the molten resin (C 1 × C 2 × Vs) is a volume that needs to be filled by adding molten resin further into the cavity 10 by the volume due to the resin shrinkage in the filling step, and the melting The shrinkage amount of the resin (C 1 × C 2 × Vs) corresponds to the replenishment filling amount of the molten resin. Then the by adding the virtual filling amount of the molten resin (C 1 × Vf) and replenishing filling amount of the molten resin (= C 1 × C 2 × Vs), the total filling amount of the molten resin in the filling step (C 1 × Vf + C 1 × C 2 × Vs) is calculated.

なおこの充填工程における溶融樹脂の総充填量(C×Vf+C×C×Vs)の演算においては、溶融樹脂の仮想充填量(C×Vf)と溶融樹脂の補充充填量(=C×C×Vs)を区別して計算をしているが、実際の充填工程においては、溶融樹脂の仮想充填量(C×Vf)分の溶融樹脂の収縮による容積減少と、前記溶融樹脂の補充充填量(=C×C×Vs)分の樹脂の補充は同時に並行して行なわれるので区別はない。 In the calculation of the total molten resin filling amount (C 1 × Vf + C 1 × C 2 × Vs) in this filling step, the molten resin virtual filling amount (C 1 × Vf) and the molten resin replenishing filling amount (= C 1 × C 2 × Vs) is calculated separately, but in the actual filling step, the volume reduction due to the shrinkage of the molten resin by the virtual filling amount (C 1 × Vf) of the molten resin, and the molten resin Since the replenishment of the resin for the replenishment filling amount (= C 1 × C 2 × Vs) is simultaneously performed in parallel, there is no distinction.

また本実施形態では、所定のキャビティ充填係数Cを0.97として演算を行なっているが、前記所定のキャビティ充填係数C=1のときは、溶融樹脂の仮想充填量(C×Vf)の演算は行なわれず、キャビティ容積Vfがそのまま後の演算に用いられるのは言うまでもない。更に本実施形態では、前記のようにして溶融樹脂の仮想充填量(C×Vf)における溶融樹脂の収縮量(C×C×Vs)を演算しているが、前記仮想充填量(C×Vf)に、所定の固化係数Cを乗算して樹脂固化量を演算し、前記樹脂固化量に、更に樹脂の種類ごとに予め入力された固化した際の容積変化率Vtを乗算して、溶融樹脂の補充充填量(=C×C×Vs)を算出してもよい。更にまた各樹脂ごとの溶融状態から固化した際の容積変化率Vt(または溶融時の比重γと固化時の比重γf)と、キャビティ10内における樹脂固化比率の両方を勘案した一の係数を予め設定し、前記一の係数を前記仮想充填量(C×Vf)に乗算することにより、前記溶融樹脂の収縮量(=溶融樹脂の補充充填量)を算出してもよい。 In this embodiment, the calculation is performed by setting the predetermined cavity filling factor C 1 to 0.97. However, when the predetermined cavity filling factor C 1 = 1, the virtual resin filling amount (C 1 × Vf) Needless to say, the cavity volume Vf is used as it is in subsequent calculations. Further, in the present embodiment, the shrinkage amount (C 1 × C 2 × Vs) of the molten resin in the virtual filling amount (C 1 × Vf) of the molten resin is calculated as described above. C 1 × Vf) is multiplied by a predetermined solidification coefficient C 2 to calculate the resin solidification amount, and the resin solidification amount is further multiplied by the volume change rate Vt when solidified in advance for each type of resin. Then, the replenishment filling amount (= C 1 × C 2 × Vs) of the molten resin may be calculated. Furthermore, a coefficient that takes into account both the volume change rate Vt (or the specific gravity γf at the time of melting and the specific gravity γf at the time of solidification) when the resin is solidified from the molten state and the resin solidification ratio in the cavity 10 is determined in advance. The shrinkage amount of the molten resin (= the replenishment filling amount of the molten resin) may be calculated by setting and multiplying the virtual filling amount (C 1 × Vf) by the one coefficient.

そして前記充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vから前記充填工程における溶融樹脂の総充填量(C×Vf+C×C×Vs)を減算した数値が、保圧切換後にキャビティ10に充填される溶融樹脂量となる。 The value obtained by subtracting the total filling amount of the molten resin (C 1 × Vf + C 1 × C 2 × Vs) in the filling process from the total injection amount V 1 of the minute of the molten resin was added the filling process and pressure holding process are, It becomes the amount of molten resin filled in the cavity 10 after the holding pressure is switched.

充填工程における溶融樹脂の総充填量(C×Vf+C×C×Vs)が演算されたら、その値をスクリュ押圧面積(π÷4×d)または前記スクリュ押圧面積(π÷4×d)に近似する加熱筒断面積のいずれかで除算することにより充填工程における充填ストローク(計量位置Iqから保圧切換位置Iqまでの充填ストローク)S4が演算される。そして前記により充填ストロークS4が演算されたら、前記で演算された計量位置Iq(=計量ストロークS2)から、充填ストロークS4を減算することにより、保圧切換位置Iqを算出する。 When the total filling amount (C 1 × Vf + C 1 × C 2 × Vs) of the molten resin in the filling step is calculated, the value is calculated as the screw pressing area (π ÷ 4 × d 2 ) or the screw pressing area (π ÷ 4 ×). d 2) filling stroke in the filling process by dividing by either heating cylinder cross-sectional area that approximates (filling stroke from the metering position Iq 1 to hold pressure switching position Iq 2) S4 is calculated. And if the filling stroke S4 are calculated by the, from said computed metering position Iq 1 (= metering stroke S2) at by subtracting the filling stroke S4, calculates a hold pressure switching position Iq 2.

演算プログラムの上記演算式により、計量位置Iq、保圧切換位置Iq、クッション位置Iqcの初期設定値が演算され、パーソナルコンピュータの画面に表示されたら、作業者は、その値を射出成形機1の設定画面から入力する。そして射出成形機1の射出装置2から成形金型3内のキャビティ10に溶融樹脂を射出してテスト成形を行なう。演算プログラムによって演算された初期設定用の保圧切換位置Iqは、安全を見越して、僅かに過少充填気味になるようにしてあるので、テスト成形では、成形品にヒケやウエルドライン等が残る場合が多い。しかしテスト成形による成形品を見て設定値を僅かに修正することにより、容易に完全な成形品が得られる。 When the initial setting values of the measurement position Iq 1 , the holding pressure switching position Iq 2 , and the cushion position Iqc are calculated and displayed on the screen of the personal computer by the above calculation formula of the calculation program, the operator inputs the values into the injection molding machine Input from 1 setting screen. Then, the molten resin is injected from the injection device 2 of the injection molding machine 1 into the cavity 10 in the molding die 3 to perform test molding. The initial setting holding pressure switching position Iq 2 calculated by the calculation program is slightly underfilled in anticipation of safety. Therefore, in test molding, sink marks, weld lines, etc. remain in the molded product. There are many cases. However, a complete molded product can be easily obtained by slightly correcting the set value by looking at the molded product by test molding.

なお本実施形態の演算プログラムでは、樹脂の種類を設定することにより、樹脂の種類に対応する溶融時の比重γと固体時の比重γfを読み出して保圧切換位置Iqの演算に使用しているが、他に下記の(1)ないし(3)のいずれかの値から演算するようにしてもよい。
(1)樹脂の溶融時の比重γおよび固体時の比重γfいずれか一方の比重と、前記樹脂が溶融状態から固化した際の容積変化率Vtと成形品重量(g)
(2)樹脂の溶融時の比重γおよび固体時の比重γfとキャビティ容積(cc)
(3)樹脂が溶融状態から固化した際の容積変化率Vtとキャビティ容積(cc)
In the calculation program of this embodiment, by setting the type of resin, the specific gravity γ at the time of melting and the specific gravity γf at the time of solid corresponding to the type of resin are read out and used to calculate the holding pressure switching position Iq 2. However, it may be calculated from any one of the following values (1) to (3).
(1) Specific gravity γ at the time of melting of the resin and specific gravity γf at the time of solid, the volume change rate Vt when the resin is solidified from the molten state, and the weight of the molded product (g)
(2) Specific gravity γ when the resin is melted, specific gravity γf when the resin is solid, and cavity volume (cc)
(3) Volume change rate Vt and cavity volume (cc) when the resin is solidified from the molten state

また保圧切換位置Iq:(mm)の演算は次のように行なってもよい。

Figure 0004024742
前記の数式によれば、充填工程と保圧工程を加えた分の溶融樹脂の総射出量Vから、充填工程における溶融樹脂の総充填量(C×Vf+C×C×Vs)を減算して、保圧切換後にキャビティ10に補充される溶融樹脂量{V−(C×Vf+C×C×Vs)}を求める。そしてそれをスクリュ押圧面積(π÷4×d)で除算して、保圧ストロークS5を求める。次にそれにクッション位置Iqcを加算して保圧切換位置Iqを求める。この演算方法は、上記の実施形態の数式と手順こそ相違するものの、スクリュ押圧面積(π÷4×d)と前記総充填量(C×Vf+C×C×Vs)を用いるという技術思想については同じである。 The calculation of the holding pressure switching position Iq 2 : (mm) may be performed as follows.
Figure 0004024742
According to the above formula, the total amount of molten resin injected in the filling step (C 1 × Vf + C 1 × C 2 × Vs) is calculated from the total injection amount V 1 of the molten resin added to the filling step and the pressure holding step. By subtracting, the amount of molten resin {V 1 − (C 1 × Vf + C 1 × C 2 × Vs)} to be replenished in the cavity 10 after switching the holding pressure is obtained. Then, it is divided by the screw pressing area (π ÷ 4 × d 2 ) to obtain the pressure holding stroke S5. Then it adds the cushion position Iqc Request hold pressure switching position Iq 2. This calculation method uses a screw pressing area (π ÷ 4 × d 2 ) and the total filling amount (C 1 × Vf + C 1 × C 2 × Vs) although the procedure is different from the formula of the above embodiment. The idea is the same.

本発明は、上記に説明した最初に充填工程における溶融樹脂の総充填量を求めた上で保圧切換位置を求める演算方法以外に、直接保圧工程における充填量を求めた上で保圧切換位置を求める演算方法によっても可能である。以下の演算方法は、請求項4に対応する。直接保圧工程における充填量を求めた上で保圧切換位置を求める演算方法の数式は、 In addition to the calculation method for obtaining the holding pressure switching position after obtaining the total filling amount of the molten resin in the filling step as described above, the present invention switches the holding pressure after obtaining the filling amount in the direct holding step. It is also possible by a calculation method for obtaining the position. The following calculation method corresponds to claim 4 . The formula of the calculation method for obtaining the holding pressure switching position after obtaining the filling amount in the direct holding process is as follows:

充填工程においてキャビティ容積に対して溶融樹脂が略充填される仮想充填量(C×Vf)を演算し、その仮想充填量(C×Vf)に所定の非固化係数(1−C)を乗算して充填工程終了時までの溶融樹脂の非固化量(C×Vf×(1−C))をまず演算する。なお所定の非固化係数(1−C)は、上記の所定の固化係数が0.25ないし0.35であるので、0.65ないし0.75である。次に溶融樹脂の非固化量(C×Vf×(1−C))に容積変化率Vtを乗算して、充填工程後の保圧工程における溶融樹脂の収縮量(C×Vf×(1−C)×Vt)を演算する。 A virtual filling amount (C 1 × Vf) in which the molten resin is substantially filled with respect to the cavity volume in the filling step is calculated, and a predetermined non-solidification coefficient (1-C 2 ) is calculated as the virtual filling amount (C 1 × Vf). First, a non-solidified amount of the molten resin (C 1 × Vf × (1−C 2 )) until the end of the filling process is calculated. The predetermined non-solidification coefficient (1-C 2 ) is 0.65 to 0.75 because the predetermined solidification coefficient is 0.25 to 0.35. Next, the unsolidified amount of the molten resin (C 1 × Vf × (1−C 2 )) is multiplied by the volume change rate Vt, and the shrinkage amount (C 1 × Vf ×) of the molten resin in the pressure-holding step after the filling step. (1-C 2 ) × Vt) is calculated.

そして前記仮想充填量(C×Vf)は、キャビティ容積Vfに対して、まだ非充填容積(Vf−C×Vf)があるからその分を演算する。そして前記非充填容積(Vf−C×Vf)と前記保圧工程における溶融樹脂の収縮量(C×Vf×(1−C)×Vt)とを加算して保圧工程における充填量{(C×Vf×(1−C)×Vt)+(Vf−C×Vf)}を演算する。そしてそれに10を乗算して単位mmにし、スクリュ押圧面積(π÷4×d)または加熱筒断面積のいずれかで除算して保圧ストロークS5を演算する。そして前記保圧ストロークS5とクッション距離S1を加算することにより保圧切換位置Iqを演算する。 The virtual filling amount (C 1 × Vf) is calculated with respect to the cavity volume Vf because there is still an unfilled volume (Vf−C 1 × Vf). The unfilled volume (Vf−C 1 × Vf) and the shrinkage amount (C 1 × Vf × (1−C 2 ) × Vt) of the molten resin in the pressure-holding step are added to fill the amount in the pressure-holding step. calculates the {(C 1 × Vf × ( 1-C 2) × Vt) + (Vf-C 1 × Vf)}. Then, the pressure holding stroke S5 is calculated by multiplying it by 10 3 to obtain a unit mm 3 and dividing by either the screw pressing area (π ÷ 4 × d 2 ) or the heating cylinder cross-sectional area. And calculating a hold pressure switching position Iq 2 by adding the pressure holding stroke S5 and the cushion distance S1.

なお数式4、数式5は、本発明の変形例の例示に過ぎないものであって、それ以外にも同一または近似した演算結果を得るために、演算式の前後の入れ替え、乗算と除算の入れ替え、または加算と減算の入れ替え、比重と容積変化率の入れ替え、固化率と非固化率、および入力項目の変更等を行なったものも本発明に含まれる。   In addition, Formula 4 and Formula 5 are only examples of modifications of the present invention, and other than that, in order to obtain the same or approximated calculation results, switching before and after the calculation formula, switching between multiplication and division Alternatively, the present invention includes those in which addition and subtraction are interchanged, specific gravity and volume change rate are interchanged, solidification rate and non-solidification rate, and input item are changed.

なお本実施形態では、一のスクリュ6により、計量工程と充填工程が行なわれるインラインスクリュタイプの射出成形機1について記載したが、計量工程をスクリュにより行ない、充填工程はプランジャにより行なう射出装置を持ったプリプラ式射出成形機についても適用可能である。更には、計量工程の後に、サックバック工程を行なう場合にも適用可能である。本来サックバック工程を行なう場合は、計量ストロークS2にサックバックストロークを加えたものが充填開始位置となるが、本発明の演算式は、計量ストロークS2を基準として充填ストロークS4等の演算を行ない、保圧切換位置Iqを演算する。またサックバック工程を行なう場合について、上記とは別に、更に別の係数を用いた演算式により行なってもよい。 In this embodiment, the inline screw type injection molding machine 1 in which the metering process and the filling process are performed by one screw 6 is described. However, the metering process is performed by a screw, and the filling process has an injection device that is performed by a plunger. The present invention can also be applied to a pre-plastic injection molding machine. Furthermore, the present invention can also be applied to a case where a suck back process is performed after the weighing process. Originally, when the suck back process is performed, the sum of the measuring stroke S2 and the suck back stroke is the filling start position. However, the calculation formula of the present invention calculates the filling stroke S4 and the like based on the measuring stroke S2, calculating a hold pressure switching position Iq 2. Further, in the case of performing the suck-back process, it may be performed by an arithmetic expression using another coefficient separately from the above.

また本発明については、一々列挙はしないが、上記した実施形態のものに限定されず、当業者が本発明の趣旨を踏まえて変更を加えたものについても、適用されることは言うまでもない。   The present invention is not enumerated one by one, but is not limited to the above-described embodiment, and it goes without saying that the present invention can be applied to those modified by a person skilled in the art based on the gist of the present invention.

本発明を実施する射出成形機の射出位置についての説明図であってスクリュが計量位置にある状態を示す図である。It is explanatory drawing about the injection position of the injection molding machine which implements this invention, Comprising: It is a figure which shows the state which has a screw in a measurement position. 本発明を実施する射出成形機の射出位置についての説明図であってスクリュが保圧切換位置にある状態を示す図である。It is explanatory drawing about the injection position of the injection molding machine which implements this invention, Comprising: It is a figure which shows the state which has a screw in a holding pressure switching position. 本発明の保圧切換位置の演算方法に用いる入力画面を示す図である。It is a figure which shows the input screen used for the calculation method of the holding pressure switching position of this invention.

符号の説明Explanation of symbols

1 射出成形機
2 射出装置
3 成形金型
3a パーティング面
4 加熱筒
4a 加熱筒内
5 逆流防止弁
6 スクリュ
7 ノズル
7a 樹脂通路
7b 先端部
8 固定金型
8a スプルブッシュ
9 可動金型
10 キャビティ
Iq スクリュ前進限度位置
Iq 計量位置
Iq 保圧切換位置
Iqc クッション位置
M1 スキン層
M2 中心層
S1 クッション距離
S2 計量ストローク
S3 総射出ストローク(計量位置からクッション位置までの射出ストローク)
S4 充填ストローク(計量位置から保圧切換位置までの充填ストローク)
S5 保圧ストローク
DESCRIPTION OF SYMBOLS 1 Injection molding machine 2 Injection apparatus 3 Molding die 3a Parting surface 4 Heating cylinder 4a Inside heating cylinder 5 Backflow prevention valve 6 Screw 7 Nozzle 7a Resin passage 7b Tip 8 Fixed mold 8a Sprue bush 9 Movable mold 10 Cavity Iq 0 Screw advance limit position Iq 1 Measurement position Iq 2 Holding pressure switching position Iqc Cushion position M1 Skin layer M2 Center layer S1 Cushion distance S2 Measurement stroke S3 Total injection stroke (injection stroke from the measurement position to the cushion position)
S4 Filling stroke (filling stroke from weighing position to holding pressure switching position)
S5 Holding pressure stroke

Claims (6)

射出成形機の射出工程における充填工程から保圧工程への切換位置である保圧切換位置の演算方法において、
充填工程においてキャビティ容積に対して溶融樹脂が充填される仮想充填量を演算し、
前記仮想充填量における溶融樹脂の収縮量を演算し、
前記収縮量を充填工程における補充充填量とし、
前記仮想充填量と前記補充充填量とを加えて充填工程における溶融樹脂の総充填量を演算し、
前記総充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程における充填ストロークを演算し、計量ストロークから充填ストロークを減算して保圧切換位置を演算することを特徴とする射出成形機の保圧切換位置の演算方法。
In the calculation method of the holding pressure switching position, which is the switching position from the filling process to the holding pressure process in the injection process of the injection molding machine,
Calculate the virtual filling amount that is filled with the molten resin to the cavity volume in the filling process,
Calculate the shrinkage amount of the molten resin in the virtual filling amount,
The amount of shrinkage is the replenishment filling amount in the filling step,
Calculate the total filling amount of the molten resin in the filling step by adding the virtual filling amount and the replenishment filling amount,
The filling stroke in the filling process is calculated by dividing the total filling amount by either the screw pressing area or the heating cylinder cross-sectional area, and the holding pressure switching position is calculated by subtracting the filling stroke from the measuring stroke. Of calculating the holding pressure switching position of an injection molding machine.
前記仮想充填量は、キャビティ容積に対して所定のキャビティ充填係数を乗算して演算され、
前記補充充填量は、前記仮想充填量に対して所定の固化係数を乗算して樹脂固化量を演算し、前記樹脂固化量に樹脂が溶融状態から固化した際の容積変化率を乗算して求められる請求項1に記載の射出成形機の保圧切換位置の演算方法。
The virtual filling amount is calculated by multiplying the cavity volume by a predetermined cavity filling factor,
The replenishment filling amount is obtained by multiplying the virtual filling amount by a predetermined solidification coefficient to calculate a resin solidification amount, and multiplying the resin solidification amount by a volume change rate when the resin is solidified from a molten state. The calculation method of the holding pressure switching position of the injection molding machine according to claim 1.
射出成形機の射出工程における充填工程から保圧工程への切換位置である保圧切換位置の演算方法において、
スクリュ径に対して所定のクッション係数を乗算してスクリュ前進限度位置からクッション位置までのクッション距離を演算し、
成形品重量を樹脂の固体時の比重で除算した固体時容積に樹脂が溶融状態から固化した際の容積変化率を乗算するか或いは成形品重量を溶融樹脂の溶融時の比重で除算して、充填工程と保圧工程を加えた分の溶融樹脂の総射出量を演算し、
前記総射出量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程と保圧工程を加えた分の総射出ストロークを演算し、
前記クッション距離と前記総射出ストロークを加算して計量ストロークを演算し、
請求項1で演算した総充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより充填工程における充填ストロークを演算し、
前記計量ストロークから前記充填ストロークを減算することにより保圧切換位置を演算する請求項1に記載の射出成形機の保圧切換位置の演算方法。
In the calculation method of the holding pressure switching position, which is the switching position from the filling process to the holding pressure process in the injection process of the injection molding machine,
Multiply the screw diameter by a predetermined cushion coefficient to calculate the cushion distance from the screw advance limit position to the cushion position,
Multiply the molded product weight by the specific gravity at the time of solidification of the resin and multiply the solid volume by the volume change rate when the resin solidifies from the molten state, or divide the molded product weight by the specific gravity at the time of melting of the molten resin, Calculate the total injection amount of the molten resin for the filling process and pressure holding process,
By dividing the total injection amount by either the screw pressing area or the heating cylinder cross-sectional area, the total injection stroke is calculated by adding the filling step and the pressure holding step,
Calculate the measuring stroke by adding the cushion distance and the total injection stroke,
The filling stroke in the filling process is calculated by dividing the total filling amount calculated in claim 1 by either the screw pressing area or the heating cylinder cross-sectional area,
The calculation method of the holding pressure switching position of the injection molding machine according to claim 1, wherein the holding pressure switching position is calculated by subtracting the filling stroke from the metering stroke.
射出成形機の射出工程における充填工程から保圧工程への切換位置である保圧切換位置の演算方法において、
スクリュ径に対して所定のクッション係数を乗算してスクリュ前進限度位置からクッション位置までのクッション距離を演算し、
充填工程においてキャビティ容積に対して溶融樹脂が充填される仮想充填量を演算し、
前記仮想充填量に所定の非固化係数を乗算して前記仮想充填量における充填工程終了時までの溶融樹脂の非固化量を演算し、
前記溶融樹脂の非固化量における溶融樹脂の収縮量を演算し、
前記キャビティ容積から前記仮想充填量を減算して非充填容積を演算し、
前記溶融樹脂の非固化量における収縮量と前記非充填容積を加算して保圧工程における充填量を演算し、
前記保圧工程における充填量をスクリュ押圧面積または加熱筒断面積のいずれかで除算することにより保圧ストロークを演算し、
前記保圧ストロークとクッション距離を加算することにより保圧切換位置を演算することを特徴とする射出成形機の保圧切換位置の演算方法。
In the calculation method of the holding pressure switching position, which is the switching position from the filling process to the holding pressure process in the injection process of the injection molding machine,
Multiply the screw diameter by a predetermined cushion coefficient to calculate the cushion distance from the screw advance limit position to the cushion position,
Calculate the virtual filling amount that is filled with the molten resin to the cavity volume in the filling process,
Multiplying the virtual filling amount by a predetermined non-solidification coefficient to calculate the non-solidification amount of the molten resin up to the end of the filling step in the virtual filling amount,
Calculate the amount of shrinkage of the molten resin in the non-solidified amount of the molten resin,
Subtract the virtual filling amount from the cavity volume to calculate the unfilled volume,
The amount of shrinkage in the non-solidified amount of the molten resin and the unfilled volume are added to calculate the amount of filling in the pressure holding step,
The pressure holding stroke is calculated by dividing the filling amount in the pressure holding step by either the screw pressing area or the heating cylinder cross-sectional area,
A method for calculating a holding pressure switching position of an injection molding machine, wherein the holding pressure switching position is calculated by adding the holding pressure stroke and the cushion distance.
前記所定のキャビティ充填係数は、0.95ないし1.00であり、
前記所定の固化係数が0.25ないし0.35である請求項2に記載の射出成形機の保圧切換位置の演算方法。
The predetermined cavity filling factor is 0.95 to 1.00;
The method for calculating a holding pressure switching position of an injection molding machine according to claim 2 , wherein the predetermined solidification coefficient is 0.25 to 0.35 .
前記請求項1ないし5のいずれか1項の演算方法を実行させるための演算プログラムを記録したコンピュータ読み取り可能な記録媒体。 A computer-readable recording medium recording an arithmetic program for executing the arithmetic method according to any one of claims 1 to 5.
JP2003360489A 2003-10-21 2003-10-21 Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method Expired - Fee Related JP4024742B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003360489A JP4024742B2 (en) 2003-10-21 2003-10-21 Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003360489A JP4024742B2 (en) 2003-10-21 2003-10-21 Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method

Publications (2)

Publication Number Publication Date
JP2005125511A JP2005125511A (en) 2005-05-19
JP4024742B2 true JP4024742B2 (en) 2007-12-19

Family

ID=34640788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003360489A Expired - Fee Related JP4024742B2 (en) 2003-10-21 2003-10-21 Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method

Country Status (1)

Country Link
JP (1) JP4024742B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102366126B1 (en) * 2021-11-19 2022-02-23 (주)우수아이 Computing apparatus of calculating molding conditions for injection molding
CN115958764A (en) * 2022-11-14 2023-04-14 珠海格力智能装备有限公司 Injection molding multi-stage forming method

Also Published As

Publication number Publication date
JP2005125511A (en) 2005-05-19

Similar Documents

Publication Publication Date Title
JP4459467B2 (en) Electric injection molding machine and injection speed / injection pressure control method of electric injection molding machine
JP2770131B2 (en) Injection molding method and injection molding machine
JPWO1997015432A1 (en) Injection method for pre-plasticizing injection molding machines
JP5351307B1 (en) Pressure control device for injection molding machine
JP4024742B2 (en) Calculation method of holding pressure switching position of injection molding machine and computer-readable recording medium recording a calculation program for executing the calculation method
CN102962971B (en) The set supporting device of injection (mo(u)lding) machine and injection (mo(u)lding) machine
CN113573868A (en) Injection molding method and injection molding machine
CN121175170A (en) Plasticizing control method and device for injection molding machine
JP4385008B2 (en) Injection control method for injection molding machine
JP3798236B2 (en) Method for estimating plasticizing time of test run in injection molding machine and injection molding machine
JP5531814B2 (en) Injection molding method
JP2627047B2 (en) Injection molding machine molding condition setting method
JPH08290448A (en) Injection control method of injection molding machine
WO2022244221A1 (en) Injection molding device
JP3930467B2 (en) Injection molding control method
JP3232550B2 (en) Control method of mold clamping pressure in injection compression molding
JP3293415B2 (en) How to set the optimal filling resin amount for injection compression molding
CN111186105A (en) Injection molding machine and its control method
JP2012187787A (en) Method of supporting adjustment of molding condition and injection molding machine
JPS6246615A (en) Injection molding and device thereof
JPH0788910A (en) Injection molding method
JP4248504B2 (en) Injection control method and injection apparatus for injection molding machine
JPH08318553A (en) Injection compression molding method
JP2640714B2 (en) Injection molding method
JP2025080460A (en) Injection molding machine and method for detecting mold internal pressure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050831

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070514

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070529

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070705

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070821

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070823

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071003

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101012

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111012

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111012

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121012

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131012

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees