JP4034076B2 - Floor laying method and floor repair method - Google Patents
Floor laying method and floor repair method Download PDFInfo
- Publication number
- JP4034076B2 JP4034076B2 JP2002016472A JP2002016472A JP4034076B2 JP 4034076 B2 JP4034076 B2 JP 4034076B2 JP 2002016472 A JP2002016472 A JP 2002016472A JP 2002016472 A JP2002016472 A JP 2002016472A JP 4034076 B2 JP4034076 B2 JP 4034076B2
- Authority
- JP
- Japan
- Prior art keywords
- floor
- flooring
- fixing
- fixed
- concave
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 31
- 239000000463 material Substances 0.000 claims description 167
- 238000009408 flooring Methods 0.000 claims description 159
- 238000005452 bending Methods 0.000 claims description 3
- 230000013011 mating Effects 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 3
- 229920005989 resin Polymers 0.000 claims description 2
- 239000011347 resin Substances 0.000 claims description 2
- 238000005034 decoration Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 239000002699 waste material Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 229920003002 synthetic resin Polymers 0.000 description 2
- 239000000057 synthetic resin Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 1
- 229920005549 butyl rubber Polymers 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000006748 scratching Methods 0.000 description 1
- 230000002393 scratching effect Effects 0.000 description 1
Images
Landscapes
- Floor Finish (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、住宅等に設けられている床材を貼り替えるのに好適な床構造及び床の補修方法に関する。
【0002】
【従来の技術】
従来の床構造は、例えば図13に示すように、床下地板1の上に床材としてのフローリング材2が複数敷設されている。フローリング材2の各々は、一側面に凸条部2aが形成されると共に、他側面に凹条部2bが形成された構造を有している。従って、フローリング材2の敷設時には、一方のフローリング材2の凸条部2aに、これと隣り合うフローリング材2の他側面の凹条部2bが嵌合した後、そのフローリング材2の一側面の凸条部2aに、これと隣り合うフローリング材2の凹条部2bを嵌合させ、これを順次行うことによって互いに連結される構成となっている。このようなフローリング材2は、床下地板1に接着剤3、或いは両面テープ若しくは釘等によって固定されている。符号4は、根太である。
【0003】
【発明が解決しようとする課題】
このように、従来の床構造においては、フローリング材2を敷設する場合、それぞれのフローリング材2が順次連結されることによって互いに固定されると共に、床下地板1に対しても固定される構成であるので、例えば、一枚のフローリング材2に傷等が付いたとき、その傷の付いているフローリング材2のみを抜き取ることが困難であった。
即ち、フローリング材2は、それと両側で隣り合っているフローリング材2と嵌合しているので、傷の付いているフローリング材2だけを、互いに隣り合っている双方のフローリング材2から取り外そうとすると、隣接しているフローリング材2を破損させてしまうおそれがあり、そのため、所望のフローリング材2だけを取り外すことができないばかりでなく、新たに敷設しようとしているフローリング材2のみをその位置に敷設することができない結果、全てのフローリング材2を交換せざるを得ず、廃材処理が大がかりとなって環境問題が生ずるという問題があった。
【0004】
この発明は、このような事情を考慮してなされたもので、その目的は、所望のフローリング材のみを交換して床の補修を簡単に行うことができ、廃材処理が小規模で済む床構造及び床の補修方法を提供することにある。
【0005】
【課題を解決するための手段】
上記目的を達成するために、この発明は以下の手段を提案している。
請求項1に係る発明は、両側面に凹条部、上面に飾り溝を有する床材を、床下地の上に敷設する床の敷設方法であって、床下地に、予め、床材を互いに隣接した状態で固定する固定部品を複数配列しておき、床材を、前記飾り溝で折り曲げた状態から床材が平らになるようにのばしながら、床材の両側面の凹条部をそれぞれの固定部品と嵌合して、床材を互いに隣接して連結すると共に床下地に対して固定することを特徴とする。
【0007】
請求項2に係る発明は、請求項1記載の床の敷設方法において、複数の固定部品の各々は、一方の床材の前記凹条部と嵌合する第1凸条部と、他方の床材の前記凹条部と嵌合する第2凸条部と、床下地に固定される固定部とが、金属板を折曲形成して形成される固定部材で構成されていることを特徴とする。
【0008】
この発明に係る床の敷設方法によれば、固定部品が床材の一側面の凹条部と嵌合する第1凸条部と、その床材と隣接する床材の他側面の凹条部と嵌合する第2凸条部とをそれぞれ有すると共に、床下地に固定される固定部を有するので、固定部品を床下地に固定しているとき、固定部品の第1,第2凸条部と一方の床材の凹条部,他方の床材の凹条部に嵌合すると、双方の床材を互いに隣接して連結することができる。
【0009】
請求項3に係る発明は、請求項1記載の床の敷設方法において、複数の固定部品の各々は、一方の床材の前記凹条部と嵌合する第1凸条部、及び他方の床材の前記凹条部と嵌合する第2凸条部をそれぞれ有すると共に、床下地に固定される固定部を有する樹脂などで形成された固定部材と、床下地に取り付けられると共に前記固定部材の固定部を係止する引き掛け具とを備えてなる構成とされていることを特徴とする。
【0010】
この発明に係る床の敷設方法によれば、固定部品が固定部材と引き掛け具とを備えてなる構成とされており、引き掛け具が固定部材の固定部を係止するので、固定部材と嵌合している床材を床下地に対して確実に固定することができる。
【0011】
請求項4に係る発明は、請求項3記載の床の敷設方法において、前記引き掛け具は、床下地を構成する床下地板と根太とのいずれか一方の上面に形成された取付溝に埋設され、かつ前記固定部材の固定部が挿入されたとき、固定部を係止する係止溝を有することを特徴とする。
【0012】
この発明に係る床の敷設方法によれば、床下地に埋設された取付溝に固定部材の固定部が挿入されたとき、引き掛け具が係止溝によって固定部を係止するので、床下地に固定部材を確実に固定させておくことができる。
【0013】
請求項5に係る発明は、請求項4記載の床の敷設方法において、前記取付溝は、奥部から開口部に至るに従い幅を次第に狭めて形成されたテーパ状をなし、前記引き掛け具は、前記取付溝と対応する形状をなしていることを特徴とする。
【0014】
この発明に係る床の敷設方法によれば、引き掛け具が床下地の取付溝から離脱することがないので、引き掛け具としての信頼性が得られる。
【0015】
請求項6に係る発明は、 床下地上に敷設されると共に両側面に凹条部、上面に飾り溝を有する複数の床材のうち、所望の床材を選択的に取り外して新規の床材を敷設する床の補修方法であって、床下地に、予め、隣り合う床材を固定する固定部品を複数配列しておき、その固定部品が一方の床材の一側面の凹条部と他方の床材の他側面の凹条部と嵌合して、双方の床材が互いに隣接して連結されると共に、床下地に対して固定された状態にあるとき、交換すべき床材と、その両側面の凹条部と嵌合しているそれぞれの固定部品との嵌合を解除して、交換すべき床材を床下地から取り外した後、新規の床材を、前記飾り溝で折り曲げた状態から床材が平らになるようにのばしながら、床材の両側面の凹条部をそれぞれの固定部品と嵌合して、新規の床材を既存の床材間に連結すると共に床下地に対して固定することを特徴とする。
【0016】
この発明に係る床の補修方法によれば、固定部品が一方の床材の一側面と他方の床材の他側面と嵌合して、双方の床材が互いに隣接して連結されると共に床材に対して固定された状態にあるとき、交換すべき床材と、その両側面と嵌合しているそれぞれの固定部品との嵌合を解除して、交換すべき床材を床下地から取り外した後、新規の床材の両側面をそれぞれの固定部品と嵌合して、新規の床材を既存の床材間に連結すると共に床下地に対して固定するので、所望の床材のみを確実に交換することができる。
【0017】
【発明の実施の形態】
以下、図面を参照し、この発明の実施の形態について説明する。図1から図3は、この発明の第1の実施の形態に係る床構造を示す図であり、図4から図8は、この発明の第2の実施の形態に係る床構造を示す図である。
【0018】
図1から図3に示す第1の実施の形態である床構造5は、支持脚6の上に配置された床下地材7の上にフローリング材8が敷設され、このフローリング材8が複数の固定部品9により固定された構造となっている。固定部品9は、図3(a)、(b)に示すように、金属板を折曲して形成したものであって、その上部に形成されている第1凸条部9a,第2凸条部9bと、下部に形成されている固定部9cとを備えた構成とされている。そして、床下地材7に固定部品9の固定部9cが接着剤、両面テープ、または、釘等によって固定されている。
フローリング材8の一側面には凹条部8aが形成され、同他側面には凹条部8bが形成されている。そして、固定部品9の凸条部9a、9bがそれぞれ凹条部8a、8bに嵌合することによってフローリング材8が床下地材7に固定された構造となっている。
【0019】
図4に示す第2の実施の形態である床構造10は、大引き11の上に配置された根太12上に床下地板13が敷設されると共に、床下地板13の上に床板としてのフローリング材14が敷設されている。フローリング材14は、その上面中央部に飾り溝140を有し、両側面に凹条部14a,14bを有する。これらフローリング材14の各々は、後述する固定部品(符示せず)によって互いに隣接して連結されると共に、床下地板13に固定されている。
【0020】
固定部品は、固定部材20と引き掛け具26とを備えた構成とされている。その固定部材20は、図4〜図6のように、合成樹脂によって全体的にT字状をなしている。即ち、固定部材20は、図6に明示するように、上部の両側に互いに隣り合うフローリング材14方向に延在する第1凸条部21,第2凸条部22を有している。
【0021】
第1の凸条部21及び第2の凸条部22は、双方が固定部材20の上部に設けられた平板部23を構成してあって、フローリング材14の一側面の凹条部14aと他方のフローリング材14の他側面の凹条部14bとそれぞれ嵌合することにより、互いに隣り合う両フローリング材14,14を共に隣接させて連結するようになっている。
【0022】
そのため、フローリング材14の各々には、一側面の途中位置に図4のように凹条部14aが長さ方向に形成されると共に、他側面の途中位置にその凹条部14aと対称形状をなす凹条部14bが長さ方向に形成されていて、第1,第2凸条部21,22を嵌入し得る大きさをなしている。この実施形態では、第1,第2凸条部21,22は、凹条部14a,14bに対し上下方向でガタつくことがなくかつ容易に嵌入できるよう先端が円弧状をなしている。
【0023】
また、固定部材20の下部には、中央から垂下する脚体24を介して固定部25が設けられている。固定部25は、図6に示す広幅部分25aとその下部に次第に幅が狭くなるようにテーパ状に形成された狭幅部分25bとからなる逆台形の形状が複数連設された形状をなしており、フローリング材14の敷設に際し、固定部材20の固定部25が床下地板13に挿入されて固定されるようになっている(図5、図6参照)。
【0024】
一方、床下地板13には、固定部品の引き掛け具26が取り付けられている。引き掛け具26は、図6のように、床下地板13の上面に設けられた取付溝130に嵌合されることにより、床下地板13の長さ方向に沿って取り付けられている。取付溝130は、床下地板13の上面において、隣り合うフローリング材14,14間と対応する位置に凹んで形成されている。
【0025】
この引き掛け具26は、上部を開口して取付溝130と対応する略コ字状に形成された合成樹脂からなっており、内部に固定部材20の固定部25が挿入されたとき、弾性力で拡開して固定部25の挿入を許容すると共に、弾性復元して固定部25を係止する係止溝27を有している。係止溝27は、引き掛け具26の内部の両側に固定部25の広幅部分25a及び狭幅部分25bと略対応する形状をなしており、固定部25が挿入されただけで固定部材20を固定できるようになっている。
【0026】
また、引き掛け具26と床下地板13とは、以下の関係となっている。即ち、床下地板13に設けられた取付溝130は、上端の開口部131が下方の奥部132から次第に幅を狭めた蟻溝形状に形成されている。そして、固定部25の引き抜き力が引き掛け具26に作用しても、引き掛け具26が取付溝130から離脱することがないようになっている。
【0027】
従って、この床構造10は、固定部材20及び引き掛け具26を備えた固定部品により、床下地板13上に一方のフローリング材14と他方のフローリング材14とが互いに隣接配置して連結されると共に、連結されたフローリング材14,14の付き合わせ位置において、床下地板13に密接した状態で固定されるようになっている。なお、大引き11と根太12と床下地板13とで床下地が構成される。
【0028】
上述した第1の実施の形態(図1から図3に示す形態)と第2の実施の形態(図4から図8に示す形態)とは、フローリング材の敷設工法が略同様である。従って、フローリング材の敷設工法について、以下第2の実施の形態を例にとって説明する。
まず、フローリング材14の敷設に際しては、根太12の上面に取付溝130を有する床下地板13を取り付ける。その際、床下地板13には取付溝130に引き掛け具26が予め取り付けられることによって引き掛け具26を埋設しておく。
【0029】
次いで、敷設すべきフローリング材14の列に応じた数の固定部材20を用意し、その固定部材20の固定部25を床下地板13の引き掛け具26にそれぞれ挿入して、固定部25を引き掛け具26内の係止溝27に係止する。これにより、床下地板13上に固定部材20が図5及び図6のように起立して複数配列される。その後、床下地板13上にフローリング材14を順次敷設することとなる。なお、以下は、図7を用いて説明するが、図7においては便宜上、左側の列のフローリング材14を「第1フローリング材14A」、それと右側に順次隣り合う列のフローリング材14を「第2フローリング材14B」,「第3フローリング材14C」という。
【0030】
即ち、図7において、床下地板13の上に、例えば左側の第1フローリング材14Aを乗せ、その第1フローリング材14Aの一側面に設けられている凹条部14aを固定部材20の第1凸条部21と嵌合させることにより、第1フローリング材14Aを床下地板13に固定する。
【0031】
このようにして第1フローリング材14Aが固定された後、それと隣り合う位置に第2フローリング材14Bを用意し、第2フローリング材14Bの他側面に設けられている凹条部14bを固定部材20の第2凸条部22と嵌合させると共に、そのフローリング材14Bの一側面に設けられている凹条部14aを、隣の列の固定部材20の第1凸条部21と嵌合させる。
これにより、固定部材20を挟んで左右に位置する第1フローリング材14Aと第2フローリング材14Bとが、互いに隣接配置して連結されると共に、その隣接配置された状態で床下地板13に対して固定される。
【0032】
その後、隣の列の固定部材20の第2凸条部22に第3フローリング材14Cの凹条部14aが嵌合されることにより第2フローリング材14Bと第3フローリング材14Cが連結され、以下、同様にして繰り返されることにより、床下地板13上に全てのフローリング材14が敷設されることとなる。
【0033】
このようにして床構造10が構成され、かつ使用された場合、フローリング材14のいずれかに傷等が付くことによってフローリング材14を交換することがある。
その場合、例えば、図8のように、第2フローリング材14Bに傷が付いていてこれを交換するには、まず、第2フローリング材14Bの中央に設けられている飾り溝140を中心として、第2フローリング材14Bがくの字状になるように持ち上げられて第2フローリング材14Bの幅を徐々に狭めると、第2フローリング材14Bの他側面に設けられている凹条部14bと、固定部材20の第2凸条部22との嵌合が解除されると共に、その第2フローリング材14Bの一側面の凹条部14aと固定部材20の第1凸条部21との嵌合も解除されることにより、第2フローリング材14Bを取り外すことができる。
【0034】
この場合、第2フローリング材14Bは、両側に配列されている固定部材20,20によって固定されているので、浮かした状態でくの字状に折り曲げられるだけで双方の固定部材20,20との嵌合が解除されることにより、第1,第3フローリング材14A,14C及び床下地板13から容易に外される。
【0035】
その後、新規のフローリング材14を用意し、そのフローリング材14の他側面の凹条部14bを固定部材20の第2凸条部22に押し付けて嵌合し、またフローリング材14が平らになるようにのばしながら、かつフローリング材14の一側面の凹条部14aを固定部材20の第1凸条部21に押し付けて嵌合することによりフローリング材14を両固定部材20,20間に入れ、これによって新規のフローリング材14のみが床下地板2上に敷設されることとなる。
【0036】
その結果、固定部品によってフローリング材14が互いに隣接して連結されると共に床下地板13に固定されているので、交換すべきフローリング材14を固定部材20から取り外すだけで、隣接する他のフローリング材を何等損傷させることなく、所望のフローリング材14のみを確実に取り外すことができるばかりでなく、取り外した位置に新規のフローリング材14のみを容易に敷設することができる。
【0037】
これにより、床の補修を簡単に行うことができ、補修コストを安価にすることもできるので、従来のように一カ所のフローリング材を取り外すのに全てのフローリング材を取り外すことが不要になり、大がかりな工事となるのを回避することができると共に、廃材が多量に生じるのを防ぐことができる。
【0038】
しかも、フローリング材14の取り外し及び敷設に際しては、固定部材20及び引き掛け具26を何等取り換える必要もなく、固定部材20と引き掛け具26の双方をそのまま利用できるので、これによっても廃材量を少なくすることができると共に、補修コストのいっそうの低減化を図ることもできる。
【0039】
また、この実施形態の床構造10においては、固定部品の固定部材20及び引き掛け具26により、隣接する一方のフローリング材14と他方のフローリング材14とそれぞれ嵌合して双方のフローリング材14,14を隣接配置して連結すると共に、その連結状態のままで床下地板13に固定するので、上述したように、所望のフローリング材14のみを容易に交換することができ、床の補修を簡単にかつ安価に行うことができる。
【0040】
また、固定部材20の上部にはフローリング材14の一側面の凹条部14aと嵌合する第1凸条部21と、そのフローリング材14と隣接するフローリング材14の他側面の凹条部14bと嵌合する第2凸条部22とをそれぞれ有すると共に、その下部に、床下地板13に固定される固定部25を有して形成されているので、フローリング材14を床下地板13上で確実に隣接配置させることができる。
【0041】
更に、床下地板13に引き掛け具26が固定され、この引き掛け具26に固定部材20の固定部25を引き掛けるので、固定部材20と嵌合しているフローリング材14を床下地板13に対して確実に固定することができる。しかも、引き掛け具26は、床下地板13の上面に埋設された取付溝130に固定部材20の固定部25が挿入されたとき、係止溝27によって固定部25を係止するので、床下地板13に固定部材20を確実に固定させておくことができる。
【0042】
それに加え、取付溝130が奥部132から開口部131に至るに従い幅を次第に狭めて形成されたテーパ状をなす一方、引き掛け具26が、取付溝130と対応する形状をなしているので、引き掛け具26が取付溝130から離脱することがなく、引き掛け具26としての信頼性が得られる。
【0043】
なお、以上の実施形態においては、フローリング材14の中央に、公知の飾り溝140が設けられているので、その飾り溝140を利用してくの字状に折り曲げてからフローリング材14を交換するようにした例を示したが、万一、取り外そうとしているフローリング材14に飾り溝140がない場合には、カッター等で飾り溝を設けることでフローリング材14を取り外すことができる。
【0044】
また、これまでの実施形態においては、新築住宅の床構造に適用した例を示したが、以下は、床を改修(リフォーム)する場合について述べる。
図9及び図10は、この発明の第3の実施の形態に係る床構造を玄関ホールに適用した場合を示している。
即ち、この場合は、根太12の上に既存のフローリング材が直接敷設されている玄関に適用したものであって、この実施形態では、まず、既存のフローリング材を取り外した後、図9に示すように、支持脚30を設置すると共に、その支持脚30の上に新規の根太12Aが設置される。支持脚30は、台座31を垂直軸周りに回転することによって高さが調整され、その台座31の上に新規の根太12Aが設置される。この新規の根太12Aの高さは、既存の根太12より高くなっている。そして、支持脚30には例えばブチルゴム33等を介して既存の根太12と隣接させておき、既存の根太12に沿い図10のように新規の根太12Aが設けられることにより、いわゆる、きわ根太沿わし工法が採用されている。
【0045】
その場合、新規の根太12Aの上面には、その長さ方向と直交するように取付溝130が設けられ、それぞれの根太12Aの取付溝130間に引き掛け具26が介装される。このようにして新規の根太12A間に引き掛け具26が介装された後、その引き掛け具26に固定部材20を介してフローリング材14が敷設される。
つまり、根太12A上の引き掛け具26に固定部材20が固定され、その固定部材20によってフローリング材14を根太12A上に固定することにより、フローリング材14が敷設され、これによって、根太12A上にフローリング材14が敷設された床構造が構成される。従って、引き掛け具26は、床下地としての根太12Aに直に取り付けられている。
【0046】
この実施形態においても、フローリング材14に傷等が付いてこれを交換するには、そのフローリング材14を前述と同様にして取り外し、かつ新規のフローリング材14と交換すればよいので、基本的には前述した実施形態と同様の作用効果が得られる。
【0047】
また、この実施形態によれば、引き掛け具26が新規の根太12Aに直に取り付けられることによって埋設されるので、床下地板13を用いない床構造に適用することもできる。
【0048】
図11は、この発明の第4の実施の形態に係る床構造を示している。
この実施形態は、和室を洋室にリフォームする場合に適用したものであって、まず、敷設に際しては、荒板40から畳(図示せず)が全て取り除かれた後、その荒板40の所定位置に支持具用孔41がそれぞれ穿設され、それらの支持具用孔41に支持具42を挿通させる。支持具42は、台座43が垂直軸周りに回転することによって高さが調整され、台座43が荒板40より若干高めに調整される。
【0049】
そして、支持具42の台座43上に床下地板13が配置されると共に、その床下地板13上にフローリング材14が敷設される。この場合、床下地板13に設けられている取付溝130には引き掛け具26が取り付けられると共に、その引き掛け具26に前述した実施形態と同様にして固定部材20が固定され、固定部材20の第1,第2凸条部21,22とフローリング材14とが嵌合することにより、床下地板13上にフローリング材14が敷設される。
【0050】
このように、床下地板13に引き掛け具26を埋設すると共に、その引き掛け具26に固定された固定部材20によって、フローリング材14を床下地板13上に固定することができるので、和室から洋室にリフォームする場合にも容易に適用することができる。しかも、リフォームされたフローリング材14に万一傷等が付いて交換する場合には、前述した実施形態と同様に交換できるので、傷等の付いたフローリング材のみを簡単にかつ確実に交換することができる。
【0051】
また、和室の荒板40を挿通する支持具42を利用して床下地板13,フローリング材14を敷設すると、荒板40をそのまま残すこととなるので、廃材としては畳だけであるので、廃材が多量に排出されるのを防ぐことができ、廃材を可及的に少なくすることができる。
【0052】
なお、これまで説明した図示実施形態においては、固定部材20を引き掛け具26に固定するため、固定部材20の固定部25が図6のように逆台形状に複数連設して形成されると共に、それに対応するよう引き掛け具26の係止溝27が形成された例を示したが、固定部25及び係止溝27としては他の形状であってもよい。
【0053】
例えば、固定部材20の固定部25として、図12(a)に示すように山形形状の突起25cが形成される一方、引き掛け具26の係止溝27もその形状に対応する山形形状に形成してもよい。或いは、図12(b)に示すように、固定部25として両側の非対称位置に設けられた非対称歯25d,25eを有して形成される一方、係止溝27としてそれぞれの非対称歯25d,25eを係止し得るよう形状に形成してもよく、要は、固定部材20の固定部25と引き掛け具26の係止溝27との形状に拘わることなく、固定部25を係止溝27に差し込んだとき、係止溝27が固定部25を固定し得る形状であればよい。
【0054】
【発明の効果】
以上説明したように、請求項1に係る発明によれば、固定部品により、一方の床材と他方の床材とそれぞれ嵌合して双方の床材を互いに隣接して連結すると共に床材に対して固定するように構成したので、所望の床材を固定部品から取り外すだけで、その床材を、連結されている両側の床材から分離させることができ、所望のフローリング材のみを容易に交換することができ、廃材処理が小規模で済むとういう効果が得られる。
【0055】
請求項2に係る発明によれば、固定部品の第1,第2凸条部と一方の床材の凹条部,他方の床材の凹条部とが嵌合すると、双方の床材を互いに隣接して連結することができる効果が得られる。
【0056】
請求項3に係る発明によれば、引き掛け具が固定部材の固定部を係止するので、固定部材と嵌合している床材を床下地に対して確実に固定することができる効果が得られる。
【0057】
請求項4に係る発明によれば、床下地に埋設された取付溝に固定部材の固定部が挿入されたとき、引き掛け具が係止溝によって固定部を係止するので、床下地に固定部材を確実に固定させておくことができる効果が得られる。
【0058】
請求項5に係る発明によれば、引き掛け具が床下地の取付溝から離脱することがなので、引き掛け具としての信頼性が得られる。
【0059】
請求項6に係る発明によれば、固定部品によって双方の床材が互いに隣接して連結されると共に床材に対して固定された状態にあるとき、交換すべき床材を床下地から取り外した後、新規の床材の両側面をそれぞれの固定部品と嵌合して、新規の床材を既存の床材間に連結すると共に床下地に対して固定するように構成したので、所望の床材のみを確実に交換することができ、補修方法として実用上大なる効果が得られる。
【図面の簡単な説明】
【図1】 この発明の第1の実施の形態に係る床構造を示す縦断面図である。
【図2】 同じく床構造を示す平面図である。
【図3】 (a)は固定部品を示す正面図、(b)は固定部品を示す側面図である。
【図4】 この発明の第2の実施の形態に係る床構造を示す縦断面図である。
【図5】 同じく床構造におけるフローリング材を敷設する前の状態であって、床下地板に固定部材が固定された状態を示す平面図である。
【図6】 床構造に用いられる固定部品を示す要部の拡大図である。
【図7】 この発明の一実施の形態に係る床構造の施工方法を示す説明図である。
【図8】 床構造における床の一部の補修方法を示す説明図である
【図9】 この発明の第3の実施の形態に係る床構造を玄関ホールの改修に適用した縦断面図である。
【図10】 図9の床構造において、フローリング材を敷設前の状態であって、新規の根太に固定部材が固定された状態を示す平面図である。
【図11】 この発明の第4の実施の形態に係る床構造を和室から洋室に改修する場合に適用した縦断面図である。
【図12】 (a)は固定部品の固定部材と引き掛け具との他の例を示す拡大図、(b)は固定部品の固定部材と引き掛け具との更に他の例を示す拡大図である。
【図13】 従来の床構造を示す縦断面図である。
【符号の説明】
5、10 床構造
9 固定部品
7、13 床下地板
8、14、14A〜14C フローリング材(床材)
11 大引き
12,12A 根太
130 取付溝
131 取付溝の開口部
132 取付溝の奥部
20 固定部材
21 第1凸条部、
22 第2凸条部
24 脚体
25 固定部
26 引き掛け具
27 係止溝[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a floor structure suitable for replacing a floor material provided in a house or the like and a floor repair method.
[0002]
[Prior art]
In the conventional floor structure, for example, as shown in FIG. 13, a plurality of
[0003]
[Problems to be solved by the invention]
As described above, in the conventional floor structure, when the
That is, since the
[0004]
The present invention has been made in consideration of such circumstances, and its purpose is to replace only the desired flooring material and to easily repair the floor, and to reduce the waste material processing on a small scale. And providing a floor repair method.
[0005]
[Means for Solving the Problems]
In order to achieve the above object, the present invention proposes the following means.
The invention according to
[0007]
The invention according to
[0008]
Floor according to the present invention Laying method According to the above, the first protruding portion that fits the recessed portion on one side surface of the flooring and the second protruding portion that fits the recessed portion on the other side surface of the flooring adjacent to the flooring. And the fixing part fixed to the floor base, when the fixing part is fixed to the floor base, the first and second protrusions of the fixing part and the concave part of one floor material And the other floor material can be connected to each other adjacent to each other.
[0009]
The invention according to
[0010]
Floor according to the present invention Laying method According to the present invention, the fixed part includes a fixing member and a hooking tool, and the hooking tool locks the fixing portion of the fixing member. It can be securely fixed to the floor base.
[0011]
The invention according to claim 4 is the floor according to
[0012]
Floor according to the present invention Laying method According to the present invention, when the fixing portion of the fixing member is inserted into the mounting groove embedded in the floor base, the hooking tool locks the fixing portion by the locking groove, so that the fixing member is securely fixed to the floor base. I can keep it.
[0013]
The invention according to claim 5 is the floor according to claim 4. Laying method The mounting groove has a tapered shape formed with a width that gradually narrows from the back to the opening, and the hooking tool has a shape corresponding to the mounting groove. .
[0014]
Floor according to the present invention Laying method According to the above, since the hook is not detached from the mounting groove on the floor base, the reliability as the hook is obtained.
[0015]
The invention which concerns on
[0016]
According to the floor repairing method of the present invention, the fixed part is fitted to one side surface of one floor material and the other side surface of the other floor material, and both floor materials are connected adjacent to each other and the floor When the floor material to be replaced is released from the floor base, release the mating between the floor material to be replaced and the respective fixed parts that are fitted on both sides of the floor material. After removal, both sides of the new flooring are fitted with the respective fixed parts, and the new flooring is connected between the existing flooring and fixed to the floor base, so only the desired flooring Can be reliably replaced.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 are diagrams showing a floor structure according to a first embodiment of the present invention, and FIGS. 4 to 8 are diagrams showing a floor structure according to a second embodiment of the present invention. is there.
[0018]
In the floor structure 5 according to the first embodiment shown in FIGS. 1 to 3, a flooring material 8 is laid on a floor base material 7 disposed on a
A
[0019]
The
[0020]
The fixing component is configured to include a fixing
[0021]
Both the
[0022]
Therefore, each of the
[0023]
In addition, a fixing
[0024]
On the other hand, a
[0025]
The hooking
[0026]
The
[0027]
Accordingly, the
[0028]
The above-described first embodiment (the form shown in FIGS. 1 to 3) and the second embodiment (the form shown in FIGS. 4 to 8) are substantially the same in the flooring material laying method. Therefore, the flooring material laying method will be described below by taking the second embodiment as an example.
First, when laying the
[0029]
Next, the number of fixing
[0030]
That is, in FIG. 7, for example, the left
[0031]
After the
Accordingly, the
[0032]
Then, the
[0033]
When the
In that case, for example, as shown in FIG. 8, in order to replace the
[0034]
In this case, since the
[0035]
After that, a
[0036]
As a result, the
[0037]
As a result, the floor can be easily repaired and the repair cost can be reduced, so that it is not necessary to remove all the flooring materials to remove one flooring material as in the past, In addition to avoiding large-scale construction, it is possible to prevent a large amount of waste material from being generated.
[0038]
Moreover, when removing and laying the
[0039]
Further, in the
[0040]
Further, on the upper portion of the fixing
[0041]
Further, the
[0042]
In addition, while the
[0043]
In the above embodiment, since a known
[0044]
Moreover, although the example applied to the floor structure of a newly built house was shown in the embodiments so far, the case where the floor is renovated (reformed) will be described below.
9 and 10 show a case where the floor structure according to the third embodiment of the present invention is applied to the entrance hall.
That is, in this case, the present invention is applied to the entrance where the existing flooring material is directly laid on the
[0045]
In that case, a mounting
In other words, the fixing
[0046]
Also in this embodiment, in order to replace the
[0047]
Moreover, according to this embodiment, since the hooking
[0048]
FIG. 11 shows a floor structure according to a fourth embodiment of the present invention.
This embodiment is applied to a case where a Japanese-style room is remodeled into a Western-style room. First, when laying, after all tatami mats (not shown) are removed from the
[0049]
Then, the
[0050]
In this manner, the hooking
[0051]
Further, when the
[0052]
In the illustrated embodiment described so far, in order to fix the fixing
[0053]
For example, as shown in FIG. 12A, a chevron-shaped
[0054]
【The invention's effect】
As described above, according to the first aspect of the present invention, the fixed parts are used to fit one floor material and the other floor material to connect both floor materials adjacent to each other and to the floor material. Since it is configured to be fixed to the floor, it is possible to separate the flooring from the floors on both sides by simply removing the desired flooring from the fixed part, and easily only the desired flooring It can be exchanged, and the effect that the waste material processing is small is obtained.
[0055]
According to the invention which concerns on
[0056]
According to the invention which concerns on
[0057]
According to the fourth aspect of the present invention, when the fixing portion of the fixing member is inserted into the mounting groove embedded in the floor base, the hooking tool locks the fixing portion by the locking groove, so that the fixing portion is fixed to the floor base. The effect that the member can be securely fixed is obtained.
[0058]
According to the invention which concerns on Claim 5, since a hooking tool can detach | leave from the attachment groove | channel of a floor base, the reliability as a hooking tool is acquired.
[0059]
According to the invention which concerns on
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view showing a floor structure according to a first embodiment of the present invention.
FIG. 2 is a plan view showing the floor structure.
3A is a front view showing a fixed component, and FIG. 3B is a side view showing the fixed component.
FIG. 4 is a longitudinal sectional view showing a floor structure according to a second embodiment of the present invention.
FIG. 5 is a plan view showing a state in which a fixing member is fixed to the floor base plate before the flooring material is laid in the floor structure.
FIG. 6 is an enlarged view of a main part showing a fixing part used in the floor structure.
FIG. 7 is an explanatory diagram showing a floor structure construction method according to an embodiment of the present invention.
FIG. 8 is an explanatory diagram showing a method of repairing a part of the floor in the floor structure.
FIG. 9 is a longitudinal sectional view in which a floor structure according to a third embodiment of the present invention is applied to repair of an entrance hall.
10 is a plan view showing a state in which a flooring material is not laid and a fixing member is fixed to a new joist in the floor structure of FIG. 9;
FIG. 11 is a longitudinal sectional view applied when a floor structure according to a fourth embodiment of the present invention is refurbished from a Japanese-style room to a Western-style room.
12A is an enlarged view showing another example of the fixing member and the hooking tool of the fixing part, and FIG. 12B is an enlarged view showing still another example of the fixing member and the hooking tool of the fixing part. It is.
FIG. 13 is a longitudinal sectional view showing a conventional floor structure.
[Explanation of symbols]
5, 10 Floor structure
9 Fixed parts
7, 13 Floor base plate
8, 14, 14A-14C Flooring material (floor material)
11 large discount
12, 12A joist
130 Mounting groove
131 Mounting groove opening
132 Back of mounting groove
20 Fixing member
21 first ridge,
22 Second ridge
24 Legs
25 Fixed part
26 Hook
27 Locking groove
Claims (6)
床下地に、予め、床材を互いに隣接した状態で固定する固定部品を複数配列しておき、
床材を、前記飾り溝で折り曲げた状態から床材が平らになるようにのばしながら、床材の両側面の凹条部をそれぞれの固定部品と嵌合して、床材を互いに隣接して連結すると共に床下地に対して固定することを特徴とする床の敷設方法。Concave portions on both sides, the floor member having a groove decoration on the upper surface, a laying method of a floor laying on the subfloor,
A plurality of fixing parts for fixing the flooring in a state adjacent to each other in advance are arranged on the floor base ,
While extending the flooring so that the flooring is flattened from the state where the flooring is bent in the decorative groove, fit the concave strips on both sides of the flooring with the respective fixed parts, and place the flooring adjacent to each other. A floor laying method characterized by being connected and fixed to a floor base.
複数の固定部品の各々は、一方の床材の前記凹条部と嵌合する第1凸条部と、他方の床材の前記凹条部と嵌合する第2凸条部と、床下地に固定される固定部とが、金属板を折曲形成して形成される固定部材で構成されていることを特徴とする床の敷設方法。In the floor laying method according to claim 1,
Each of the plurality of fixed parts includes a first ridge that fits with the concave ridge of one floor, a second ridge that fits with the concave of the other floor, and a floor base The floor laying method characterized in that the fixing portion fixed to the base plate is composed of a fixing member formed by bending a metal plate.
複数の固定部品の各々は、一方の床材の前記凹条部と嵌合する第1凸条部、及び他方の床材の前記凹条部と嵌合する第2凸条部をそれぞれ有すると共に、床下地に固定される固定部を有する樹脂などで形成された固定部材と、床下地に取り付けられると共に前記固定部材の固定部を係止する引き掛け具とを備えてなる構成とされていることを特徴とする床の敷設方法。In the floor laying method according to claim 1,
Each of the plurality of fixed parts has a first ridge portion that fits with the concave portion of one floor material, and a second convex portion that fits with the concave portion of the other floor material. And a fixing member formed of resin or the like having a fixing portion fixed to the floor base, and a hook that is attached to the floor base and engages the fixing portion of the fixing member. A method of laying a floor characterized by that.
前記引き掛け具は、床下地を構成する床下地板と根太とのいずれか一方の上面に形成された取付溝に埋設され、かつ前記固定部材の固定部が挿入されたとき、固定部を係止する係止溝を有することを特徴とする床の敷設方法。In the floor laying method according to claim 3,
The hook is embedded in a mounting groove formed on the upper surface of one of the floor base plate and joists constituting the floor base, and locks the fixing portion when the fixing portion of the fixing member is inserted. A floor laying method characterized by having a locking groove.
前記取付溝は、奥部から開口部に至るに従い幅を次第に狭めて形成されたテーパ状をなし、前記引き掛け具は、前記取付溝と対応する形状をなしていることを特徴とする床の敷設方法。In the floor laying method according to claim 4,
The mounting groove has a tapered shape formed by gradually narrowing the width from the back to the opening, and the hooking tool has a shape corresponding to the mounting groove . Laying method .
床下地に、予め、隣り合う床材を固定する固定部品を複数配列しておき、
その固定部品が一方の床材の一側面の凹条部と他方の床材の他側面の凹条部と嵌合して、双方の床材が互いに隣接して連結されると共に、床下地に対して固定された状態にあるとき、
交換すべき床材と、その両側面の凹条部と嵌合しているそれぞれの固定部品との嵌合を解除して、交換すべき床材を床下地から取り外した後、
新規の床材を、前記飾り溝で折り曲げた状態から床材が平らになるようにのばしながら、床材の両側面の凹条部をそれぞれの固定部品と嵌合して、新規の床材を既存の床材間に連結すると共に床下地に対して固定することを特徴とする床の補修方法。It is a floor repair method in which a desired flooring is selectively removed and a new flooring is laid out from a plurality of flooring materials that are laid on the floor foundation and have concave grooves on both sides and a decorative groove on the upper surface. And
Arrange a plurality of fixed parts to fix the adjacent floor material in advance on the floor base,
The fixed part fits into the concave strip on one side of one floor and the concave strip on the other side of the other floor so that both floors are connected adjacent to each other and When in a fixed state
After releasing the mating between the floor material to be exchanged and the respective fixed parts fitted to the concave portions on both sides, the floor material to be exchanged is removed from the floor base,
While extending the new flooring so that the flooring is flattened from the state where it is bent in the decorative groove, the concave parts on both sides of the flooring are fitted with the respective fixing parts, and the new flooring is A method of repairing a floor, characterized in that it is connected between existing floor materials and fixed to the floor base.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002016472A JP4034076B2 (en) | 2002-01-25 | 2002-01-25 | Floor laying method and floor repair method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002016472A JP4034076B2 (en) | 2002-01-25 | 2002-01-25 | Floor laying method and floor repair method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003213902A JP2003213902A (en) | 2003-07-30 |
| JP4034076B2 true JP4034076B2 (en) | 2008-01-16 |
Family
ID=27652527
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002016472A Expired - Fee Related JP4034076B2 (en) | 2002-01-25 | 2002-01-25 | Floor laying method and floor repair method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4034076B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4578561B1 (en) * | 2009-10-15 | 2010-11-10 | Wpcコーポレーション株式会社 | Floor board fixture |
-
2002
- 2002-01-25 JP JP2002016472A patent/JP4034076B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003213902A (en) | 2003-07-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5091516B2 (en) | Long plate material fixing structure, long plate material fixture, and long plate material | |
| US20080034697A1 (en) | Rail-type fixing apparatus for installing panels | |
| CN105940165A (en) | Structural member clad decorative part, method of manufacturing and using the structural member clad decorative part | |
| US20140026513A1 (en) | Panel connection system | |
| AU2004270889A1 (en) | Floor | |
| KR101251700B1 (en) | Coupling system of deck-materials for using channel clip | |
| KR200436274Y1 (en) | Formwork fixture with excellent workability | |
| KR100814075B1 (en) | Deck assembly and deck construction method using the same. | |
| JP4034076B2 (en) | Floor laying method and floor repair method | |
| JP7329315B2 (en) | Ceiling material installation method | |
| JP5361366B2 (en) | Entrance fence fixing structure | |
| KR20050102995A (en) | A floor assembly for connecting means | |
| JP2009091761A (en) | Structural plate and surface structure using the same | |
| JP4226138B2 (en) | Renovated floor | |
| US5893255A (en) | Method for locating a wall form assembly on a floor of a concrete structure, and implements for use in said locating method | |
| JP2004036278A (en) | Planking connector | |
| KR20180048114A (en) | Deck repair bracket | |
| JP2002242358A (en) | Ceiling construction method and field material used for it | |
| KR100513152B1 (en) | The sepaties | |
| CN209413211U (en) | Lock splicing board | |
| CN216840371U (en) | Floor lock catch assembly | |
| JP2006233705A (en) | Screwed floorboard and floor structure using the same floorboard | |
| JP4417804B2 (en) | Building material fixing bracket | |
| CN100497867C (en) | Combined lock floor joist | |
| JP2011047229A (en) | Fixing fitting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050106 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070215 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070306 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070423 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20071016 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20071024 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101102 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4034076 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111102 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121102 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131102 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |