JP4037124B2 - Tunnel structure and tunnel construction method - Google Patents
Tunnel structure and tunnel construction method Download PDFInfo
- Publication number
- JP4037124B2 JP4037124B2 JP2002043350A JP2002043350A JP4037124B2 JP 4037124 B2 JP4037124 B2 JP 4037124B2 JP 2002043350 A JP2002043350 A JP 2002043350A JP 2002043350 A JP2002043350 A JP 2002043350A JP 4037124 B2 JP4037124 B2 JP 4037124B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- shotcrete
- fault
- inner pipe
- lining concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、トンネル構造およびトンネルの構築方法に関するものである。
【0002】
【従来の技術】
従来、地震時に局所的な大変形が予測される断層部や破砕帯などの区間では、トンネルを設置する際、補強を行う。図8は、従来のトンネル109の軸方向の断面図である。図8に示すように、トンネル109を設置する地山101に断層103が存在する場合、ロックボルトの増し打ちや長尺化、鋼製支保工のサイズアップ、吹付けコンクリート105の厚層化、覆工コンクリート107への鉄筋コンクリートや鋼繊維補強コンクリート適用等の方法で補強を図る。
【0003】
【発明が解決しようとする課題】
しかしながら、従来の補強は、トンネル構造の剛性を高めて変形に対抗するものであり、地震時における断層のずれのように変形を強制的に生じさせるような動きには対抗できない。例えば、図8の断層103に沿って矢印Fの方向に大規模なすべりが生じると、吹付けコンクリート105及び覆工コンクリート107の両者に数mmから数10mmのひび割れが発生し、局所的な破壊、コンクリート片の剥落等が起こり、トンネル109の構造全体の破壊に至ることも少なくない。
【0004】
図9は断層103に矢印Fの方向のずれが生じた後のトンネル109の軸方向の断面図である。図9に示すように、断層103の変形が大きく、吹付けコンクリート105及び覆工コンクリート107の両者が破壊してトンネル109の構造全体が破壊した場合、破砕された岩や砂礫111がトンネル109の内部に流入する。また、断層103は滞水層になっていることも多く、大量の湧水113が同時に発生することも多い。
【0005】
ひび割れによる漏水やコンクリート片の剥落は、道路トンネルなどでは走行障害や通行止め、水路トンネルなどではライフラインの機能損失といったような大きな被害に結びつく。トンネル109の構造全体が破壊した場合には、落下したコンクリート、破砕された地山や砂礫111、あるいは破壊に伴い発生した湧水113などが、鉄道・道路トンネルでは交通機能の麻痺、水路トンネルなどではライフラインの機能停止といったような大災害を引き起こし、人的被害が甚大になる恐れがある。
【0006】
なお、特願2001−191742のように、高靭性繊維補強モルタル(以下、高靭性FRCとする)を用いたトンネル覆工構造が提案されているが、該特許はトンネルの防水を主目的、コンクリートの剥落防止を副次的な効果としており、大変形部におけるトンネル構造の破壊を防止するためのものではない。
【0007】
本発明は、このような問題に鑑みてなされたもので、その目的とするところは、地山が大変形を起こしても致命的な被害にならないようなトンネル構造およびトンネルの構築方法を提供することにある。
【0008】
【課題を解決するための手段】
前述した目的を達成するために第1の発明は、吹付けコンクリートと、前記吹付けコンクリートの内側に、空間を介して設けられた内管と、を具備し、前記内管の周囲に、抑え枠とダンパが設けられることを特徴とするトンネル構造である。
【0013】
第1の発明のトンネル構造は、断層のある区間で使用される。内管には、例えば、可とう性のある管材料や、比較的剛な鋼管、ヒューム管等を使用する。必要に応じて、吹付けコンクリートの内側に覆工コンクリートを設ける。内管と吹付けコンクリートとの間、または、内管と覆工コンクリートとの間には、内管の姿勢を保持するための抑え枠と、地震による内管の振動を低減するためのダンパを設ける。吹付けコンクリートと内管との間、または、覆工コンクリートと内管との間の空間には、液体や気体等の緩衝材を充填してもよい。
【0014】
第1の発明では、地山の掘削面に吹付けコンクリートを設置し、吹付けコンクリートの内側に、空間を介して内管を設ける。吹付けコンクリートと内管との間に空間を設けるので、断層のずれで吹付けコンクリートが破壊した場合でも、内管はほとんど損傷しない。
【0017】
第2の発明は、地山の掘削面に吹付けコンクリートを設置する工程(a)と、前記吹付けコンクリートの内側に、空間を介して内管を設置する工程(b)と、を具備し、前記工程(b)の前に、前記内管の設置予定位置と前記吹付けコンクリートとの間に、抑え枠とダンパを設けることを特徴とするトンネル構築方法である。
【0018】
第2の発明は、第1の発明のトンネル構造を構築する方法である。第2の発明では、地山の掘削面に吹付けコンクリートを吹付けて設置する。次に、吹付けコンクリートの内側に、空間を介して内管を設置する。覆工コンクリートを設置する必要がある場合には、吹付けコンクリートを設置した後、吹付けコンクリートの内側に覆工コンクリートを設置し、覆工コンクリートの内側に、空間を介して内管を設置する。
【0019】
内管には、例えば、可撓性のある管材料や、比較的剛な鋼管、ヒューム管等を使用する。内管を設置する前に、内管設置予定位置と吹付けコンクリートまたは覆工コンクリートとの間に抑え枠とダンパを設ける。また、内管を設置した後に、内管と吹付けコンクリートまたは覆工コンクリートとの間の空間内に液体や気体等の緩衝材を充填してもよい。
【0020】
【発明の実施の形態】
以下、図面に基づいて、本発明の第1の実施の形態について詳細に説明する。図1は、トンネル3の断面図である。図1の(a)はトンネル3の軸方向の断面図、図1の(b)は図1の(a)のX−Xによる断面図を示す。
【0021】
図1の(a)に示すように、地山1にトンネル3を形成する際、断層5の存在しない通常区間16では、掘削したトンネル3の壁面に吹付けコンクリート7を吹付け、吹付けコンクリート7の内側に覆工コンクリート9を設置する。
【0022】
断層5の存在する拡幅範囲17では、汎用機械によりトンネル3の断面を拡幅する。地山1の素掘りが困難な場合は、先受け工法や事前の地盤改良注入などを利用する。掘削に伴い、トンネル3の壁面や切羽に高靭性FRC吹付けコンクリート11を吹付けて設置する。なお、必要に応じて、鋼製支保工やロックボルト(図示せず)を設置しておく。
【0023】
次に、セントルなどの移動式型枠や組立て式型枠など(図示せず)を使用して、図1の(a)、図1の(b)に示すように、高靭性FRC吹付けコンクリート11の内側にせん断変形低減層13を形成し、せん断変形低減層13の内側に高靭性FRC覆工コンクリート15を打設する。
【0024】
せん断変形低減層13には、例えば、トンネルの裏込め注入に使用される一般的な裏込め注入材等、周囲の地山1よりも剛性の低い材料を使用すればよく、高強度の材料を使用する必要はない。せん断変形低減層13として、高靭性FRC吹付けコンクリート11と同様に、高靭性FRCを用いてもよい。
【0025】
図2は、断層5に矢印Aの方向のずれが生じた後のトンネル3の軸方向の断面図である。トンネル覆工部材は、通常、圧縮材として設計されるので、曲げ変形に対しては非常に弱いが、高靭性FRC覆工コンクリート15、高靭性FRC吹付けコンクリート11を使用することにより、図2に示すように、通常の無筋コンクリートや鋼繊維補強コンクリートを使用する場合に比べて、非常に大きな曲げ変形に耐えることができる。また、高靭性FRC材料はひび割れ分散性を有しているため、高靭性FRC覆工コンクリート15には貫通ひび割れが生じず、せん断変形低減層13からトンネル3の内部への漏水を阻止することができる。トンネル3が水路トンネルであれば、トンネル3内部から地山1への漏水を防止できる。
【0026】
図3は、図2の断層5とトンネル3の境界部分を示す図である。図3の(a)は、断層5とトンネル3の境界部分の拡大図、図3の(b)、(c)は、それぞれ、図3の(a)の範囲B、範囲Cのせん断変形低減層13の一部分を示す図である。
【0027】
図3の(b)、(c)に示すように、断層5のずれの前後で、せん断変形低減層13の最も外側の範囲B(地山1に近い部分)では部材19が部材21に変形し、最も内側の範囲C(トンネル3に近い部分)では部材23が部材25に変形する。
【0028】
せん断変形低減層13は、断層5の急激なずれ(不連続面)が高靭性FRC覆工コンクリート15に直接影響を及ぼさないようにするための緩衝層である。せん断変形低減層13の厚さを増し、せん断幅を大きく取ることで、せん断変形低減層13と高靭性FRC覆工コンクリート15の接触面でのせん断ひずみをより小さくできる。
【0029】
せん断変形低減層13を大変形の緩衝層として設置することにより、断層5に急激なずれが生じても、せん断変形低減層13と高靭性FRC覆工コンクリート15の接触面でのずれは、なだらかで連続性のあるものとなり、曲げに強い高靭性FRC材料の特長を最大限に生かすことができる。断層5のずれにより、せん断変形低減層13にひび割れが生じても、せん断変形低減層13と高靭性FRC覆工コンクリート15との接触面のずれが断層5のずれよりもなだらかになり、比較的連続性を持ったものであれば、せん断変形低減層13は機能を果たしているといえる。
【0030】
このように、第1の実施の形態では、断層部、破砕帯部など、地震時に大変形を生じるような地点にトンネルを施工する際、緩衝層、すなわち、せん断変形低減層13を設けることで、緩衝層が大変形を低減する。また、高靭性FRC覆工コンクリート15が高靭性とひび割れ分散性を発揮することで、トンネル3の機能停止を回避し、機能損失の程度を軽減することができる。トンネル3の被害が小さくなると恒久措置への取り掛かりが早まり、早期の復旧が可能となる。
【0031】
なお、第1の実施の形態では、トンネル3の断面拡幅後に高靭性FRC吹付けコンクリート11を吹付け、その内側にせん断変形低減層13を充填して設置したが、地盤条件により、トンネル3の断面拡幅を行わずに、拡幅深さに相当する部分を事前注入などにより改良し、せん断変形低減層13を設置してもよい。また、拡幅範囲17の吹付けコンクリートとして高靭性FRC吹付けコンクリート11を用いたが、材料は高靭性FRCに限らない。断面拡幅時に拡幅区間17の地山1が安定している場合には、吹付けコンクリートは必ずしも必要でない。
【0032】
また、地山1と高靭性FRC吹付けコンクリート11の間、高靭性FRC吹付けコンクリート11とせん断変形低減層13の間、せん断変形低減層13と高靭性FRC覆工コンクリート15の間に、防水シートやセメント結晶増殖材等により、防水工(図示せず)を設置してもよい。防水工によってこれらの隣接する2層を分離することで、高靭性FRC覆工コンクリート15が拘束されて断層5の大変形の影響を受けるのを防ぐことができる。
【0033】
次に、第2の実施の形態について説明する。図4は、トンネル3の断面図である。図4の(a)はトンネル3の軸方向の断面図、図4の(b)は図4の(a)のY−Yによる断面図を示す。
【0034】
図4の(a)に示すように、地山1にトンネル3を形成する際、断層5の存在しない通常区間16では、掘削したトンネル3の壁面に吹付けコンクリート23を吹付け、吹付けコンクリート23の内側に覆工コンクリート25を設置する。
【0035】
断層5の存在する拡幅範囲17では、汎用機械によりトンネル3の断面の拡幅を行う。地山1の素掘りが困難な場合は、先受け工法や事前の地山改良注入などを利用して拡幅する。掘削に伴い、トンネル3の壁面や切羽に吹付けコンクリート23を吹付けて設置する。なお、必要に応じて、鋼製支保工やロックボルト(図示せず)を設置しておく。そして、吹付けコンクリート23の内側に覆工コンクリート25を設置する。
【0036】
次に、拡幅範囲17の覆工コンクリート25の内側に、複数の抑え枠33とダンパ39を設置する。図4の(b)に示すように、抑え枠33は、方形の枠状の本体35と、本体35の下部に固定された足37とで構成される。
【0037】
抑え枠33とダンパ39を設置した後、通常区間16の端部の覆工コンクリート25の内側に沿って型枠27を配置する。そして、抑え枠33の中に可とう性管材31を通し、型枠27を用いて、拡幅区間17に可とう性管材31を配置する。但し、可とう性管材31の軸方向の長さは拡幅区間17より長く、両端部は通常区間16に達するものとする。
【0038】
抑え枠33は、可とう性管材31の姿勢を保持し、設計荷重に対抗し、ダンパ39を設置するために使用される。ダンパ39は、抑え枠33の本体35と覆工コンクリート25との間に設置され、地震時に地山1から可とう性管材31へ伝わる振動を低減し、共振などを避けるために設置される。
【0039】
次に、必要に応じて、覆工コンクリート25と可とう性管材31との間に緩衝材47を充填する。緩衝材47は振動を軽減するためのものであり、例えば、液体や気体を使用する。さらに、内管固定用材料29を可とう性管材31の両端部の周囲に充填する。内管固定用材料29には、例えば、吹付けコンクリートを使用する。トンネル3が水路トンネルなどであって、内管固定用材料29に防水性がない場合は、内管固定用材料29の表面に防水材料を塗布することで防水性を達成する方法などが考えられる
【0040】
図5は、断層5に矢印Dの方向のずれが生じた後のトンネル3の軸方向の断面図である。断層5が存在する区間において、トンネル3の覆工コンクリート25と可とう性管材31との間に空間を設け、必要に応じて緩衝材47を充填することで、断層5の大きなずれは、直接には可とう性管材31に伝わらない。可とう性管材31の両端部と、トンネル3の内空の変状に応じて、可とう性管材31が余裕を持って再配置される。
【0041】
次に、第3の実施の形態について説明する。図6は、トンネル3の断面図である。図6の(a)はトンネル3の軸方向の断面図、図6の(b)は図6の(a)のZ−Zによる断面図を示す。第3の実施の形態では、覆工コンクリート25の内側に設置する内管として、第2の実施の形態の可とう性管材31の代わりに、比較的剛な管材である鋼管43を使用する。鋼管43の他に、ヒューム管等を用いても良い。
【0042】
第3の実施の形態では、第2の実施の形態と同様にして、通常区間16および拡幅範囲17のトンネル3の壁面に吹付けコンクリート23を吹付け、吹付けコンクリート23の内側に覆工コンクリート25を設置する。
【0043】
さらに、拡幅範囲17の覆工コンクリート25の内側に、複数の抑え枠33とダンパ39を設置した後、鋼管43を抑え枠33の中に通し、型枠等(図示せず)を用いて拡幅区間17に鋼管43を配置する。但し、鋼管43の軸方向の長さは拡幅区間17より長く、両端部は通常区間16に達するものとする。また、必要に応じて、覆工コンクリート25と鋼管43との間に、液体、気体等の緩衝材47を充填する。
【0044】
抑え枠33は、鋼管43の姿勢を保持し、設計荷重に対抗し、ダンパ39を設置するために使用される。ダンパ39は、抑え枠33の本体35と覆工コンクリート25との間に設置され、地震時に地山1から鋼管43へ伝わる振動を低減し、共振などを避けるために設置される。
【0045】
次に、内管固定用材料45を鋼管43の両端部の周囲に固定する。トンネル3が水路トンネル等であり、鋼管43の端部の止水が必要な場合には、内管固定用材料45として、例えば、テールシール構造等の形式の止水構造を使用する。その他の場合には、内管固定用材料29と同様に、防水性の固定用材料を鋼管43の端部の外周に充填してもよい。
【0046】
図7は、断層5が矢印Eの方向に動いた後のトンネル3の軸方向の断面図である。断層5が存在する区間において、トンネル3の覆工コンクリート25と鋼管43との間に空間を設け、必要に応じて緩衝材47を充填することで、断層5の大きなずれは、直接には鋼管43に伝わらない。鋼管43の両端部と、トンネル3の内空の変状に応じて、鋼管43が余裕を持って再配置される。
【0047】
トンネル3の内空の変形により、鋼管43が回転して鋼管43の両端部と覆工コンクリート5との間に開きが生じる場合でも、内管固定用材料45としてテールシール構造等の形式の止水構造を用いることで、止水性能を向上できる。
【0048】
このように、第2、第3の実施の形態では、断層部、破砕帯部など、地震時に大変形を生じるような地点にトンネルを施工する際、トンネル3の覆工コンクリート25と内管、すなわち可とう性管材料31や鋼管43、ヒューム管との間に空間を設ける。空間には、必要に応じて、緩衝材47を充填する。
【0049】
この空間または緩衝材47が地震時の断層5のずれを吸収するため、断層5に大きなずれが生じて拡幅範囲17前後で局所的に覆工コンクリート25等のトンネル構造が破壊しても、図5、図7に示すように、内管に損傷はほとんどなく、砂礫41等は内管の外側に保持される。よって、トンネル3が水路トンネルであれば機能を保持でき、道路・鉄道トンネルであれば被害を最小限に食い止めることができる。トンネル3の被害が小さくなると恒久措置への取り掛かりが早まり、早期の復旧が可能となる。
【0050】
なお、第2、第3の実施の形態では、拡幅範囲17でトンネル3の断面を拡幅したが、内管の断面がトンネル3の断面より非常に小さくて良い場合は、拡幅する必要はない。拡幅区間17や拡幅高18は、あらかじめ断層5のずれ変位量を評価し、内管に使用する可とう性管材料31や鋼管43、ヒューム管等が変形を受けても、内管材がその変形により破損せず、許容応力の範囲内のひずみに収まるように決定する。
【0051】
また、拡幅範囲17の覆工コンクリート25は、必ずしも必要ではない。覆工コンクリート25を設置しない場合は、吹付けコンクリート23と内管(可とう性管材料31や鋼管43、ヒューム管等)との間に抑え枠33、ダンパ39を設置する。また、必要に応じて、吹付けコンクリート23と内管との間に緩衝材47を充填する。
【0052】
さらに、図4の(b)、図6の(b)では、可とう性管材料31や鋼管43の断面を円形としたが、設計荷重に対抗できる限りにおいては、内管の断面は円形である必要はない。また、内管材は単一である必要はなく、複数の管の集合体としてもよい。
【0053】
【発明の効果】
以上、詳細に説明したように本発明によれば、地山が大変形を起こしても致命的な被害にならないようなトンネル構造およびトンネルの構築方法を提供できる。
【図面の簡単な説明】
【図1】トンネル3の断面図
【図2】断層5に矢印Aの方向のずれが生じた後のトンネル3の軸方向の断面図
【図3】図2の断層5とトンネル3の境界部分を示す図
【図4】トンネル3の断面図
【図5】断層5に矢印Dの方向のずれが生じた後のトンネル3の軸方向の断面図
【図6】トンネル3の断面図
【図7】断層5に矢印Eの方向のずれが生じた後のトンネル3の軸方向の断面図
【図8】従来のトンネル109の軸方向の断面図
【図9】断層103に矢印Fの方向のずれが生じた後のトンネル109の軸方向の断面図
【符号の説明】
1………地山
3………トンネル
5………断層
7、23………吹付けコンクリート
9、25………覆工コンクリート
11………高靭性FRC吹付けコンクリート
13………せん断変形低減層
15………高靭性FRC覆工コンクリート
31………可とう性管材
33………抑え枠
39………ダンパ
43………鋼管[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel structure and a tunnel construction method.
[0002]
[Prior art]
Conventionally, in a section such as a fault zone or a fracture zone where local large deformation is predicted during an earthquake, reinforcement is performed when a tunnel is installed. FIG. 8 is a sectional view of the
[0003]
[Problems to be solved by the invention]
However, the conventional reinforcement increases the rigidity of the tunnel structure and resists deformation, and cannot cope with the movement that forcibly causes deformation such as fault displacement during an earthquake. For example, if a large-scale slip occurs in the direction of arrow F along the
[0004]
FIG. 9 is a sectional view in the axial direction of the
[0005]
Water leakage and cracking of concrete pieces due to cracks can lead to major damage such as road obstructions and road closures, and loss of lifeline functions in waterway tunnels. When the entire structure of the
[0006]
In addition, as in Japanese Patent Application No. 2001-191742, a tunnel lining structure using a high-toughness fiber-reinforced mortar (hereinafter referred to as high-toughness FRC) has been proposed. As a secondary effect, the prevention of the peeling of the tunnel is not intended to prevent the tunnel structure from being destroyed at the large deformation portion.
[0007]
The present invention has been made in view of such problems, and an object of the present invention is to provide a tunnel structure and a tunnel construction method that do not cause fatal damage even if a natural mountain undergoes a large deformation. There is.
[0008]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, the first invention comprises a shotcrete and an inner pipe provided inside the shotcrete via a space, and is restrained around the inner pipe. The tunnel structure is characterized in that a frame and a damper are provided.
[0013]
The tunnel structure of the first invention is used in a section having a fault. For the inner pipe, for example, a flexible pipe material, a relatively rigid steel pipe, a fume pipe, or the like is used. If necessary, lining concrete is provided inside shotcrete. Between the inner pipe and shotcrete, or between the inner pipe and lining concrete, there is a holding frame to maintain the attitude of the inner pipe and a damper to reduce the vibration of the inner pipe due to an earthquake. Provide. A space between the shotcrete and the inner pipe or between the lining concrete and the inner pipe may be filled with a buffer material such as liquid or gas.
[0014]
In 1st invention, shotcrete is installed in the excavation surface of a natural ground, and an inner pipe is provided through the space inside shotcrete. Since a space is provided between the shotcrete and the inner pipe, even if the shotcrete breaks due to a fault, the inner pipe is hardly damaged.
[0017]
2nd invention comprises the process (a) which installs shotcrete on the excavation surface of a natural ground, and the process (b) which installs an inner pipe through the space inside the shotcrete. The tunnel construction method is characterized in that, before the step (b), a restraining frame and a damper are provided between the planned installation position of the inner pipe and the shotcrete.
[0018]
The second invention is a method for constructing the tunnel structure of the first invention. In 2nd invention, spray concrete is sprayed and installed in the excavation surface of a natural ground. Next, an inner pipe is installed through the space inside the shotcrete. When it is necessary to install lining concrete, after installing shotcrete, install the lining concrete inside the shotcrete and install the inner pipe through the space inside the lining concrete. .
[0019]
For the inner pipe, for example, a flexible pipe material, a relatively rigid steel pipe, a fume pipe, or the like is used. Before installing the inner pipe, install a restraining frame and a damper between the planned position of the inner pipe and the shotcrete or lining concrete. In addition, after the inner pipe is installed, a buffer material such as liquid or gas may be filled in the space between the inner pipe and the shotcrete or lining concrete.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a cross-sectional view of the
[0021]
As shown in FIG. 1A, when forming the
[0022]
In the widening
[0023]
Next, using a movable formwork such as a centle or an assembly formwork (not shown), as shown in FIGS. 1 (a) and 1 (b), a high toughness FRC shotcrete A shear
[0024]
For the shear
[0025]
FIG. 2 is a cross-sectional view of the
[0026]
FIG. 3 is a diagram showing a boundary portion between the
[0027]
As shown in FIGS. 3B and 3C, before and after the displacement of the
[0028]
The shear
[0029]
By installing the shear
[0030]
Thus, in the first embodiment, when a tunnel is constructed at a point where a large deformation occurs during an earthquake, such as a fault portion or a fractured zone portion, a buffer layer, that is, a shear
[0031]
In the first embodiment, after the cross section of the
[0032]
Moreover, between the
[0033]
Next, a second embodiment will be described. FIG. 4 is a cross-sectional view of the
[0034]
As shown in FIG. 4 (a), when forming the
[0035]
In the widening
[0036]
Next, a plurality of holding
[0037]
After the holding
[0038]
The restraining
[0039]
Next, a
FIG. 5 is a sectional view in the axial direction of the
[0041]
Next, a third embodiment will be described. FIG. 6 is a cross-sectional view of the
[0042]
In the third embodiment, as in the second embodiment, the
[0043]
Further, after installing a plurality of restraining frames 33 and
[0044]
The holding
[0045]
Next, the inner
[0046]
FIG. 7 is a sectional view in the axial direction of the
[0047]
Even when the
[0048]
Thus, in the second and third embodiments, when constructing a tunnel at a point where a large deformation occurs during an earthquake, such as a fault part, a crushing zone part, the lining
[0049]
Since this space or the
[0050]
In the second and third embodiments, the cross section of the
[0051]
Moreover, the lining
[0052]
Further, in FIGS. 4B and 6B, the cross sections of the
[0053]
【The invention's effect】
As described above in detail, according to the present invention, it is possible to provide a tunnel structure and a tunnel construction method that do not cause fatal damage even if a natural ground undergoes a large deformation.
[Brief description of the drawings]
1 is a cross-sectional view of a
1 .........
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002043350A JP4037124B2 (en) | 2002-02-20 | 2002-02-20 | Tunnel structure and tunnel construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002043350A JP4037124B2 (en) | 2002-02-20 | 2002-02-20 | Tunnel structure and tunnel construction method |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2007132371A Division JP2007205163A (en) | 2007-05-18 | 2007-05-18 | Tunnel structure and tunnel construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003239691A JP2003239691A (en) | 2003-08-27 |
| JP4037124B2 true JP4037124B2 (en) | 2008-01-23 |
Family
ID=27783173
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002043350A Expired - Fee Related JP4037124B2 (en) | 2002-02-20 | 2002-02-20 | Tunnel structure and tunnel construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4037124B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010203211A (en) * | 2009-03-06 | 2010-09-16 | Taisei Corp | Underground structure and method for constructing the same |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5035772B2 (en) * | 2007-06-25 | 2012-09-26 | 国立大学法人横浜国立大学 | Multi-shell structural material and its uniaxial compression test method |
| JP5342687B2 (en) * | 2012-10-12 | 2013-11-13 | 大成建設株式会社 | Underground structures that cross the active fault zone |
| CN104863615B (en) * | 2015-06-16 | 2017-03-08 | 西南交通大学 | Anti-seismic structure of tunnel across large active fault zone |
| CN108547633A (en) * | 2018-06-22 | 2018-09-18 | 西南交通大学 | It is a kind of to cross over active fault anti-seismic structure and its construction method |
| CN110374628B (en) * | 2019-08-02 | 2024-05-31 | 西南交通大学 | Double-layer anti-fault structure of tunnel penetrating through creeping fault and construction method |
| CN110359954B (en) * | 2019-08-02 | 2024-05-24 | 西南交通大学 | Anti-fault structure for particle filling layer of tunnel penetrating through creeping fault and construction method of anti-fault structure |
| JP2022148691A (en) * | 2021-03-24 | 2022-10-06 | 株式会社フジタ | Tunnel displacement control structure |
| CN115326582B (en) * | 2022-08-09 | 2025-03-18 | 中国水利水电科学研究院 | A test device and test method for simulating the stress of support and lining under large deformation and fault dislocation of soft rock |
-
2002
- 2002-02-20 JP JP2002043350A patent/JP4037124B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2010203211A (en) * | 2009-03-06 | 2010-09-16 | Taisei Corp | Underground structure and method for constructing the same |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003239691A (en) | 2003-08-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2007205163A (en) | Tunnel structure and tunnel construction method | |
| Power et al. | Seismic vulnerability of tunnels and underground structures revisited | |
| JP4281010B2 (en) | Tunnel structure | |
| JP4037124B2 (en) | Tunnel structure and tunnel construction method | |
| JP6127193B1 (en) | Construction method of large section underground structure | |
| JP3330341B2 (en) | Tunnel structure passing through a fault | |
| JP6062098B1 (en) | Construction method of large section underground structure | |
| JP6493736B2 (en) | Tunnel segment diameter reducing device, tunnel lining structure, and freeze expansion countermeasure method | |
| JP4183470B2 (en) | Underground structure and its construction method | |
| JP4640674B2 (en) | Tunnel excavation method | |
| JP2000303797A (en) | Shoring joint and shoring structure using it | |
| KR100844104B1 (en) | Central support unit of adjacent parallel tunnel | |
| JP3793955B2 (en) | Multiple support construction method | |
| JP6257814B1 (en) | Construction method of large section underground structure | |
| JP4958036B2 (en) | Tunnel support structure | |
| CN112065432A (en) | A tunnel structure passing through the fractured zone of an active fault and its construction method | |
| CN111878123A (en) | Tunnel primary support construction method capable of adapting to high ground stress and rock burst | |
| CN109611116A (en) | A segment lining structure suitable for large deformation of surrounding rock and its construction method | |
| JP5177492B2 (en) | Temporary structures that can be removed and methods for removing temporary structures | |
| JP5416435B2 (en) | Underground structure and construction method of underground structure | |
| CN223330580U (en) | High-intensity area cross-movable fault tunnel shock-resistant structure | |
| CN221896597U (en) | Primary lining system utilizing waste pile foundation and effectively reducing ground subsidence | |
| JP3499005B2 (en) | Tail seal structure and shield method | |
| JPH09268878A (en) | Tunnel excavation method | |
| CN120889592A (en) | A composite support structure for tunnels traversing strike-slip faults and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040909 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060908 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060919 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061113 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20070320 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070518 |
|
| A911 | Transfer of reconsideration by examiner before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20070524 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070724 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070921 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20071030 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20071031 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4037124 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101109 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101109 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131109 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |