Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4067189B2 - Friction welding equipment - Google Patents
[go: Go Back, main page]

JP4067189B2 - Friction welding equipment - Google Patents

Friction welding equipment Download PDF

Info

Publication number
JP4067189B2
JP4067189B2 JP21601798A JP21601798A JP4067189B2 JP 4067189 B2 JP4067189 B2 JP 4067189B2 JP 21601798 A JP21601798 A JP 21601798A JP 21601798 A JP21601798 A JP 21601798A JP 4067189 B2 JP4067189 B2 JP 4067189B2
Authority
JP
Japan
Prior art keywords
friction welding
welding apparatus
spindle box
equipment base
linear guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP21601798A
Other languages
Japanese (ja)
Other versions
JP2000042761A (en
Inventor
広一 川浦
修 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Izumi Machine Mfg Co Ltd
Original Assignee
Toyota Industries Corp
Izumi Machine Mfg Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Industries Corp, Izumi Machine Mfg Co Ltd filed Critical Toyota Industries Corp
Priority to JP21601798A priority Critical patent/JP4067189B2/en
Priority to TW088112616A priority patent/TW416883B/en
Priority to KR1019990030989A priority patent/KR100359398B1/en
Priority to CNB991105443A priority patent/CN1137799C/en
Publication of JP2000042761A publication Critical patent/JP2000042761A/en
Application granted granted Critical
Publication of JP4067189B2 publication Critical patent/JP4067189B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/12Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding
    • B23K20/122Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding using a non-consumable tool, e.g. friction stir welding
    • B23K20/1245Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding using a non-consumable tool, e.g. friction stir welding characterised by the apparatus
    • B23K20/1255Tools therefor, e.g. characterised by the shape of the probe

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Replacement Of Web Rolls (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は摩擦圧接方法によりワーク同士を溶着するための摩擦圧接装置に関するものである。
【0002】
【従来の技術】
従来より、ワーク同士を接合する手法として、摩擦圧接方法がよく知られている。それは、接合しようとするワークを接触させ、加圧しつつ接触面に相対運動を起こさせ、発生する摩擦熱で接合面付近を加熱して圧接する方法である。この摩擦圧接方法は、異種金属間の圧接ができることと、材料や電気の消費が少ないことと、生産性及び接合精度の面で優れていることなどの特徴がある。現在では多量生産用の溶接法として特に棒材や管材などの素材に広く適用されている。
【0003】
図5〜図7は、3個のワークW11,W12,W13を接合する従来の摩擦圧接装置を示す。図5において、摩擦圧接装置の設備ベース30の上面30aを作業面とし、その上面30aには、第1及び第2リニアガイド34,40が長手方向(Y方向)に延設されている。第1主軸ユニット31が第1リニアガイド34に、第2主軸ユニット32が第2リニアガイド40にそれぞれ設置され、両主軸ユニット31,32はそれぞれリニアガイド34,40に沿って移動可能になっている。
【0004】
第1及び第2主軸ユニット31,32には、主軸31a,32aが回転可能に設けられている。主軸31a,32aは主軸箱31b,32b内に配置されたギア31c,32cを介して回転用サーボモータ31d,32dと駆動連結されている。主軸31a,32aの先端にはチャック31e,32eが取り付けられており、それぞれワークW12,W13を固定する。
【0005】
第1及び第2主軸ユニット31,32の下面には、設備ベース30内に突出するアーム35,39が設けられている。そのアーム35,39にはスライド用サーボモータ36,41により駆動される圧接送りシャフトとしてのボールネジ37,38が螺合されている。そして、ボールネジ37,38を正逆回転させると、第1及び第2主軸ユニット31,32は、ボールネジ37,38とアーム35,39との間に発生する推進力によりY方向に移動する。
【0006】
第1及び第2主軸ユニット31,32の間には、ワークW11を挟持する固定クランプ42と移動クランプ43が配置されている。固定クランプ42はその脚部42aが設備ベース30の上面30aに固定されている。固定クランプ42は、図7に示すように、上部に一対の挟持アーム部42b,42cを備えている。挟持アーム部42b,42cは、前記脚部42aに対してY方向と直交する方向(前後方向)に移動しワークW11を挟持固定する。
【0007】
移動クランプ43はその脚部43aが前記第2リニアガイド40に設置されている。移動クランプ43の脚部43aは、第2リニアガイド40に沿ってY方向に移動し所定の位置で固定されている。移動クランプ43は、図7に示すように、上部に一対の挟持アーム部43b,43cを備えている。挟持アーム部43b,43cは、前記脚部43aに対してY方向と直交する方向(前後方向)に移動しワークW11を挟持固定する。
【0008】
そして、固定クランプ42と移動クランプ43にて、挟持固定されたワークW11の中心軸線L0は、第1及び第2主軸ユニット31,32の主軸31a,32aに設けたチャック31e,32eに固定されたワークW12,W13の中心軸線(主軸31a,32aの中心軸線)と一致するようになっている。
【0009】
上記のように構成された摩擦圧接装置により例えば3つのワークW11,W12,W13の摩擦圧接を行うときにおいて、図5及び図7に示すように、まず、中間ワークW11を、前記両リニアガイド34,40間の所定位置に固設された固定クランプ42と前記第2リニアガイド40の上に移動可能に配設された移動クランプ43に固定し、中間ワークW11の両側のワークW12,W13をそれぞれ前記主軸31a,32aのチャック31e,32eに固定する。それぞれ前記回転用サーボモータ31d,32dにより主軸31a,32aが回転駆動されることによって、ワークW12,W13は所定回転数にて回転される。
【0010】
そして、前記スライド用サーボモータ36,41によりボールネジ37,38が所定回転方向にて回転駆動されると、第1及び第2主軸ユニット31,32は、それぞれアーム35,39を介してともにワークW11に向かってY方向に平行移動される。そして、回転されるワークW12,W13を、両端から回転しないワークW11に接触させると、ワークW11とワークW12の接合部及びワークW11とワークW13の接合部に摩擦熱が発生し、該摩擦熱で前記3つのワークW11,W12,W13の接合部が軟化される。所望の状態に軟化を進行させてから、ワークW12,W13の回転を停止させつつさらにアプセット圧力を加えると、3つのワークW11,W12,W13の接合部は互いにめり込むようにして一体化し、溶着される。
【0011】
上記の摩擦圧接工程において、第1主軸ユニット31(第2主軸ユニット32)の移動及びアプセット圧力は、すべて前記ボールネジ37(ボールネジ38)の回転駆動によって行われ、つまり、ボールネジ37(ボールネジ38)の回転運動が当該ボールネジ37(ボールネジ38)と螺合された前記アーム35(アーム39)の直線運動に変わることによって実現されている。従って、摩擦圧接作業中において、ボールネジ37(ボールネジ38)とアーム35(アーム39)は、第1主軸ユニット31(第2主軸ユニット32)の移動により頻繁に作動されるとともに、アプセット圧力の加えにより大きな負荷が付加されるようになっている。その結果、ボールネジ37(ボールネジ38)とアーム35(アーム39)特にボールネジ37(ボールネジ38)は、常に点検及び保全する必要がある。
【0012】
【発明が解決しようとする課題】
ところで、図7に示すように、固定クランプ42の挟持アーム部42b,42c及び移動クランプ43の挟持アーム部43b,43cは、設備ベース30の上面30aに対して前後方向に配設されている。そして、図6及び図7に示すように、固定クランプ42及び移動クランプ43の前側の挟持アーム部42b,43bは、設備ベース30の前側面より外方に突出している。固定クランプ42及び移動クランプ43の後側の挟持アーム部42c,43cは、設備ベース30の後側面より外方に突出している。
【0013】
このワークW11の中心軸線L0から前側及び後側の挟持アーム部42b,43b,42c,43cの側端部までの距離をL1とすると、この距離L1は固定クランプ42の挟持アーム部42b,42c及び移動クランプ43の挟持アーム部43b,43cの構造上必要な距離であってそれ以上短くすることはできない。
【0014】
従って、設備ベース30から前方に張り出す挟持アーム部42b,43bによって、作業者はそれ以上近づくことができない。その結果、ワークW11を固定クランプ42及び移動クランプ43に装着したり取り外す作業は非常に面倒で作業性に問題があった。
【0015】
また、第1及び第2主軸ユニット31,32を移動させるボールネジ37,38や同ボールネジ37,38に螺合したアーム35,39は、設備ベース30内に配置されていることから、外から直接に点検及び保全作業することができない。そのため、点検及び保全作業を行うたびに、設備ベース30の上面30aに設置された前記主軸箱31b,32bを取り外さなければならなかった。その結果、ボールネジ37,38やアーム35,アーム39の点検及び保全作業は非常に手間がかかり作業性に問題があった。
【0016】
本発明の第1の目的は、ワークの装着したり取り外す作業の作業性の向上を図ることのできる摩擦圧接装置を提供することにある。
本発明の第2の目的は、前記第1の目的に加え点検及び保全作業の作業性の向上を図ることのできる摩擦圧接装置を提供することにある。
【0017】
【課題を解決するための手段】
上記問題点を解決するために、請求項1に記載の発明は、少なくとも二つ以上のワーク間を摩擦圧接にて接合する摩擦圧接装置において、前記ワークを摩擦圧接接合させるための圧接機構は、設備ベースの前側面に設けられ、前記前側面は、摩擦圧接装置の載置面に対して垂直に形成され、該圧接機構は、一対の挟持アームを有するクランプを備え、前記一対の挟持アームは、前記設備ベースの前記前側面と対向するように前記設備ベースを見た場合の該設備ベースに対する縦横を基準とした縦状態に配置され、縦状態に配置された前記一対の挟持アーム部が前記ワークに向かって互いに移動することでワークが挟持固定されることを要旨とする。
【0018】
請求項2に記載の発明は、請求項1に記載の摩擦圧接装置において、前記圧接機構は、前記設備ベースの前側面に沿って横方向に移動可能な主軸箱を備え、前記主軸箱の駆動機構は前記設備ベースの内部に配置され、前記設備ベースの裏側は、前記主軸箱の前記駆動機構に向かって開口されていることを要旨とする。
【0019】
請求項3に記載の発明は、請求項2に記載の摩擦圧接装置において、前記設備ベースの前側面に横方向にリニアガイド部材を延設し、そのリニアガイド部材に前記主軸箱を設置したことを要旨とする。
【0020】
請求項4に記載の発明は、請求項2に記載の摩擦圧接装置において、前記設備ベースの前側面に横方向に且つ上下平行に一対のリニアガイドレールを延設し、その上下一対のリニアガイドレールに前記主軸箱を設置したことを要旨とする。
【0021】
請求項5に記載の発明は、請求項2に記載の摩擦圧接装置において、前記主軸箱は第1主軸箱及び第2主軸箱を備え、前記設備ベースの前側面に横方向に且つ上下平行に一対のリニアガイドレールを延設し、その上下一対のリニアガイドレールに前記第1主軸箱及び第2主軸箱を設置したことを要旨とする。
請求項6に記載の発明は、請求項2〜5のいずれか一項に記載の摩擦圧接装置において、前記駆動機構は、前記主軸箱に突出形成されたアーム及び該アームに螺合されるボールネジを備えていることを要旨とする。
【0022】
(作用)
請求項1に記載の発明によれば、クランプの一対の挟持アームを縦状態に配置したので、挟持アームの張り出し部分は上下方向に張り出す。その結果、ワークから作業者までの距離は、従来技術の装置の対応する距離に比べ、大幅に低減することができる。つまり、操作者はさらにワークに近づくことができる。その結果、摩擦圧接装置の作業性の向上を図ることができる。
【0023】
請求項2〜6に記載の発明によれば、請求項1の作用に加えて、従来技術の装置に比べ、圧接機構を取り外さずに、設備ベースの裏側から開口された部分を介して主軸箱の駆動機構に対するメテンナンスを行うことができる。その結果、摩擦圧接装置の点検及び保全作業を容易にすることができる。
【0024】
とくに、請求項3及び4に記載の発明によれば、ワークから作業者までの距離は、従来技術の装置の対応する距離に比べ、大幅に低減することができるとともに、主軸箱などを取り外さずに、主軸箱の反対側,即ち設備ベースの裏側から開口された部分を介して主軸箱の駆動機構に対するメテンナンスを行うことができる。その結果、摩擦圧接装置の作業性の向上を図ることができるとともに、摩擦圧接装置の点検及び保全作業を容易にすることができる。
【0025】
とくに、請求項5に記載の発明によれば、ワークから作業者までの距離は、従来技術の装置の対応する距離に比べ、大幅に低減することができるとともに、第1及び第2主軸箱などを取り外さずに、第1及び第2主軸箱の反対側,即ち設備ベースの裏側から開口された部分を介して第1及び第2主軸箱の駆動機構に対するメテンナンスを行うことができる。その結果、摩擦圧接装置の作業性の向上を図ることができるとともに、摩擦圧接装置の点検及び保全作業を容易にすることができる。
【0026】
【発明の実施の形態】
以下、本発明を具体化した一の実施形態を図1〜図4に従って説明する。
図1〜図4に示すように、本実施形態の摩擦圧接装置10の設備ベース11は、4つの支承部11aと、その4つの支承部11aの片側(図2において右側)上部に形成されたベース部11bとから構成されている。本実施形態では、ベース部11bの前側面11rを垂直面とし、その前側面11rを作業面としている。
【0027】
図3は設備ベース11の正面図である。図3に示すように、前記ベース部11bの前側面11rの両側には、後述するメンテナンスの必要な部位であるボールネジ18,20に向かって開口するように水平方向の長方形状の第1,第2貫通孔11c,11dがそれぞれ設けられている。両貫通孔11c,11dの上下方向の間隔は同一高さに形成している。また、両貫通孔11c,11dの横方向の間隔は第1貫通孔11cより第2貫通孔11dを長くしている。第1,第2貫通孔11c,11dの間には、ベース部11bの裏側面11eから長方形状の凹部11fが設けられている。凹部11fの上下方向の間隔は前記両貫通孔11c,11dの上下方向の間隔と同じ高さに形成している。
【0028】
そして、第1,第2貫通孔11c,11d及び凹部11fを設けることによって、ベース部11b内には、互いに平行する4つの壁部11g,11h,11j,11kが形成される。各壁部11g〜11kには、中心軸線を一致する貫通孔11m,11n,11o,11pがそれぞれ設けられている。
【0029】
また、図1〜図4に示すように、前記ベース部11bの前側面11rには、前記第1貫通孔11cの上下両側に位置するように互いに平行する2本の軌道からなるリニアガイド部材としての第1リニアガイドレール12が横方向に延設して設けられている。
【0030】
同様に、前記ベース部11bの前側面11rには、前記第2貫通孔11c及び凹部11fの上下両側に位置するように互いに平行する2本の軌道からなるリニアガイド部材としての第2リニアガイドレール13が横方向に延設して設けられている。第1及び第2リニアガイドレール12,13は、上下一対の第1リニアガイドレール12の間隔と、上下一対の第2リニアガイドレール13の間隔が一致するとともに、その間隔の中間位置を通過する中間線が共に一致するように設置されている。また、第1及び第2リニアガイドレール12,13は、前記中間線と前記貫通孔11m,11n,11o,11pの中心軸線とを通過する面が水平面となるように設置されている。
【0031】
さらに、図1に示すように、前記ベース部11bの前側面11rには、両リニアガイドレール12,13間の所定位置に圧接機構を構成する固定クランプ14が固着されている。固定クランプ14はその脚部14aが前側面11rに固定されている。固定クランプ14は、一対の挟持アーム部14b,14cを備えている。上側の挟持アーム部14bと下側の挟持アーム部14cは、設備ベース11の前側面11rに対して長手方向(Y方向)と直交する方向(上下方向)に並設されている。そして、挟持アーム部14b,14cは、Y方向と直交する方向(上下方向)に移動しワークW3を挟持固定する。
【0032】
第2リニアガイドレール13には、移動クランプ17が設置されていて、その移動クランプの脚部17aが第2リニアガイドレール13に沿ってY方向に移動し所定の位置で固定される。移動クランプ17は、一対の挟持アーム部17b,17cを備えている。
【0033】
上側の挟持アーム部17bと下側の挟持アーム部17cは、設備ベース11の前側面11rに対してY方向と直交する上下方向に並設されている。そして、挟持アーム部17b,17cは、Y方向と直交する上下方向に移動しワークW3を挟持固定する。
【0034】
図1及び図4に示すように、第1リニアガイドレール12の上には、圧接機構を構成する第1主軸ユニット15の第1主軸箱15aが移動可能に設置されている。
【0035】
第1主軸ユニット15には、主軸15bが回動可能に設けられている。主軸15bは、前記第1主軸箱15a内に配置されたギア15cを介して第1主軸箱15a上に固着された回転用サーボモータ15dと駆動連結されている。主軸15bの先端にはワークW1を挟持固定するチャック15eが取り付けられている。そして、チャック15eに挟持固定されたワークW1は、その中心軸線が前記固定及び移動クランプ14,17に挟持固定されるワークW3の中心軸線L0と一致するようになっている。
【0036】
また、図4に示すように、前記第1主軸箱15aの後側面15fには、アーム15gが突出形成されている。第1主軸箱15aが横から移動可能に第1リニアガイドレール12の上に設置されたとき、前記アーム15gは、前記設備ベース11の第1貫通孔11c内に内在されるようになっている。
【0037】
アーム15gの先端には、貫通孔15hが設けられている。前記貫通孔15hは、前記貫通孔11m,11nに回転可能に支持されているボールネジ18が螺合されている。従って、ボールネジ18を回転させれば、アーム15g(第1主軸箱15a)はボールネジ18(第1リニアガイドレール12)に沿って直線運動する。
【0038】
前記ボールネジ18の基端は、前記ベース部11bの左側面に固設されたサーボモータ19の回転軸と駆動連結されている。
第2リニアガイドレール13の上には、圧接機構を構成する第2主軸ユニット16の第2主軸箱16aが移動可能に設置されている。第2主軸ユニット16には、主軸16bが回動可能に設けられている。主軸16bは、前記第2主軸箱16a内に配置されたギア16cを介して第2主軸箱16a上に固着された回転用サーボモータ16dと駆動連結されている。主軸16bの先端にはワークW2を挟持固定するチャック16eが取り付けられている。そして、チャック16eに挟持固定されたワークW2は、その中心軸線が前記固定及び移動クランプ14,17に挟持固定されるワークW3の中心軸線L0と一致するようになっている。
【0039】
また、前記第2主軸箱16aの後側面16fには、アーム16gが突出形成されている。第2主軸箱16aが移動可能に第2リニアガイドレール13の上に設置されたとき、前記アーム16gは、前記設備ベース11の第2貫通孔11d内に内在されるようになっている。
【0040】
アーム16gの先端には、貫通孔16hが設けられている。前記貫通孔16hは、前記貫通孔11m,11nに回転可能に支持されているボールネジ20が螺合されている。従って、ボールネジ20を回転させれば、アーム16g(第2主軸箱16a)はボールネジ20(第2リニアガイドレール13)に沿って直線運動する。
【0041】
前記ボールネジ20の基端は、前記ベース部11bの右側面に固設されたサーボモータ21の回転軸と駆動連結されている。
次に、上記のように構成された摩擦圧接装置10の動作について簡単に説明する。
【0042】
この摩擦圧接装置10は、同時に3つのワークを一体に摩擦圧接させることができる。この摩擦圧接装置10により例えば3つのワークW1,W2,W3の摩擦圧接を行うときにおいて、まず、図1及び図4に示すように、中間のワークW3を前記固定クランプ14及び移動クランプ17に挟持固定させる。この場合、ワークW3の長さによって、移動クランプ17の位置を、移動クランプ17を前記第2リニアガイドレール13上で移動させることにより調整する。つまり、ワークW3の一端を固定クランプ14に挟持固定してから、ワークW3の他端の挟持位置を位置調整して移動クランプ17に挟持固定する。また、ワークW1を前記第1主軸ユニット15のチャック15eに挟持固定させ、ワークW2を前記第2主軸ユニット16のチャック16eに挟持固定させる。
【0043】
そして、ワークW1は、前記主軸15bが回転用サーボモータ15dにより回転駆動されることによって、所定回転数にて回転される。
また、第1主軸ユニット15は、前記ボールネジ18がスライド用サーボモータ19により所定回転方向にて回転駆動されることによって、アーム15gとともにワークW3に向かって主軸15bの中心軸線方向(Y方向)に平行移動される。そして、回転されるワークW1を、回転しないワークW3に接触させると、両ワークW1,W3の接合部に摩擦熱が発生し、該摩擦熱で前記両ワークW1,W3の接合部が軟化される。所望の状態に軟化を進行させてから、ワークW1の回転を停止させつつさらにアプセット圧力を加えると、両ワークW1,W3の接合部は互いにめり込むようにして一体化し、溶着される。
【0044】
一方、それと同時に、ワークW2は、前記主軸16bが回転用サーボモータ16dにより回転駆動されることによって、所定回転数にて回転される。
また、第2主軸ユニット16は、前記ボールネジ20がスライド用サーボモータ21により所定回転方向にて回転駆動されることによって、アーム16gとともにワークW3に向かって主軸16bの中心軸線方向(Y方向)に平行移動される。そして、回転されるワークW2を、回転しないワークW3に接触させると、両ワークW2,W3の接合部に摩擦熱が発生し、該摩擦熱で前記両ワークW2,W3の接合部が軟化される。所望の状態に軟化を進行させてから、ワークW2の回転を停止させつつさらにアプセット圧力を加えると、両ワークW2,W3の接合部は互いにめり込むようにして一体化し、溶着される。そうすると、ワークW1,W2,W3は一体に接合される。
【0045】
次に、上記のように構成された本実施形態の摩擦圧接装置10の特徴について説明する。
(1)本実施形態では、第1主軸ユニット15の第1主軸箱15aは、設備ベース11のベース部11bの前側面11rに設けられた第1リニアガイドレール12の上に移動可能に設置され、第2主軸ユニット16の第2主軸箱16aは、設備ベース11のベース部11bの前側面11rに設けられた第2リニアガイドレール13の上に移動可能に設置されている。つまり、第1及び第2主軸箱15a,16aの摺動部は、設備ベース11の前面に配置されている。つまり、圧接機構を構成する第1及び第2主軸箱15a,16aは、縦状態となるように配置されている。
【0046】
また、本実施形態では、固定クランプ14は設備ベース11のベース部11bの前側面11rに固定され、移動クランプ17は設備ベース11のベース部11bの前側面11rに設けられた第2リニアガイドレール13の上に移動可能に設置されている。そして、図4に示すように、両クランプ14,17のワーク挟持アーム部14b,14c,17b,17cは各々上下方向に配置されている。つまり、圧接機構を構成する固定クランプ14及び移動クランプ17は、縦状態となるように配置されている。
【0047】
従って、図4に示すように、ワークW1〜W3から作業者までの距離を意味する第1,第2主軸ユニット15,16と固定クランプ14及び移動クランプ17の中心軸線L0から操作者側の装置端面までの距離Lは、固定及び移動クランプ14,17の張り出し部が上下方向に張り出し、前方に張り出さないので、図7に示す従来技術の装置の対応する距離L1に比べ、大幅に低減することができる。つまり、操作者はワークW1〜W3に近づくことができる。その結果、操作者はワークW1〜W3を第1,第2主軸ユニット15,16及びクランプ14,17に装着する又は取り外す作業を容易に行うことができる。即ち、摩擦圧接装置10の作業性の向上を図ることができる。
【0048】
(2)本実施形態では、第1主軸ユニット15の第1主軸箱15aは、設備ベース11のベース部11bの前側面11rに設けられた第1リニアガイドレール12の上に移動可能に設置され、第2主軸ユニット16の第2主軸箱16aは、設備ベース11のベース部11bの前側面11rに設けられた第2リニアガイドレール13の上に移動可能に設置されている。第1主軸箱15aのアーム15gと螺合した第1主軸ユニット15を移動駆動させるボールネジ18は、ベース部11bの貫通孔11m,11n間に配置されている。第2主軸箱16aのアーム16gと螺合した第2主軸ユニット16を移動駆動させるボールネジ20は、ベース部11bの貫通孔11o,11p間に配置されている。
【0049】
また、図3に示すように、前記ベース部11bの前側面11rの両側には、水平方向の長方形状の第1,第2貫通孔11c,11dがそれぞれ設けられている。
【0050】
従って、ボールネジ18,20を点検及び保全作業をする場合、第1及び第2主軸箱15a,16aを取り外さずに、第1及び第2主軸箱15a,16aの反対側、即ち設備ベース11の裏側から貫通孔11c及び貫通孔11dを介して点検及び保全作業を行うことができる。その結果、摩擦圧接装置10の点検及び保全作業を容易に行うことができる。
【0051】
なお、本発明の実施形態は以下のように変更してもよい。
○上記実施形態に記載したような、それ以外の具体的な圧接機構であるクランプ構造、回転構造、主軸駆動構造、スライド構造及び制御方式、(単頭、両頭の)ワーク形式等々は一切限定されず、あらゆる構造の摩擦圧接装置に適用可能である。例えば、第1,第2主軸ユニット15,16の主軸15b,16bを回転駆動するサーボモータ15d,16dを通常のモータにして実施してもよい。また、第1,第2主軸ユニット15,16の第1,第2主軸箱15a,16aを水平移動に駆動するボールネジ18,20とサーボモータ19,21を、油圧シリンダ駆動機構にして実施してもよい。この場合、上記実施形態と同様な効果を得ることができる。
【0052】
○上記実施形態に記載したような、設備ベースの裏側の開口形状、開口数、開口構造は、保全性が得られれば全く限定されない。例えば、第1,第2貫通孔11c,11d間に設けられた凹部11fを省略して、または第1,第2貫通孔11c,11dと凹部11fとを連通させて1つの貫通孔にして実施してもよい。さらに、貫通孔を3つ以上に設けてもよい。第1,第2貫通孔11c,11dの代わりに、例えば板材間に支柱を設けて実施してもよい。要は、メンテナンスの必要な部位が外部から容易に作業できるような、外部と連続した空間を有していればよい。
【0053】
○また、ベース部11bに設けられた第1,第2貫通孔11c,11d及び凹部11fの縦断面形状は、長方形状に限定されなく、円状、楕円状或いは長方形以外の多角形状にしてもよい。
【0054】
○さらに、第1,第2貫通孔11c,11dと凹部11fを省略して実施してもよい。この場合、摩擦圧接装置の保全性は従来と変わらないが、作業性向上の効果を得ることができる。
【0055】
○上記実施形態では、第1,第2主軸ユニット15,16を同時に作動(同期)させるように実施したが、第1,第2主軸ユニット15,16を別々に作動させるように実施してもよい。この場合、上記実施形態と同様な効果を得ることができる。
【0056】
○上記実施形態では、アーム15g,16gは、それぞれ第1及び第2主軸箱15a,16aの後側面15f,16fから突出形成されて実施したが、アーム15g,16gを別部材として、それぞれ第1及び第2主軸箱15a,16aの後側面15f,16fに固着させるように実施してもよい。この場合、上記実施形態と同様な効果を得ることができる。
【0057】
○また、図4に示すように、第1,第2貫通孔11c,11dの装置裏側開口部には、それぞれ2点鎖線で示す第1,第2防塵カバー11s,11tを開閉可能に設けて実施してもよい。この場合、上記実施形態と同様な効果を得ることができる。
【0058】
○第1,第2主軸ユニット15,16のうちいずれか1を省略して、つまり1つの主軸ユニット15(又は主軸ユニット16)から構成される摩擦圧接装置に具体化して実施してもよい。この場合、上記実施形態と同様な効果を得ることができる。
【0059】
○固定クランプ14及び移動クランプ17のうちいずれか1を省略して実施してもよい。
○第1,第2リニアガイドレール12,13は、それぞれ1本の軌道からなってもよい。また、リニアガイド部材をガイドレール以外例えばV字溝にて実施してもよい。
【0060】
○上記実施形態において圧接機構を配置する「縦状態」とは、完全に垂直に限定されるのではなく、垂直から(設備ベース)前後方向に傾斜する場合も含まれる。しかも、圧接機構の傾斜角度を、任意に調節する機構を設けてもよい。
【0061】
【発明の効果】
以上詳述したように、請求項1に記載の発明によれば、摩擦圧接装置の作業性の向上を図ることができる。
【0062】
請求項2〜に記載の発明によれば、摩擦圧接装置の点検及び保全を容易にすることができるとともに、作業性の向上を図ることができる。
【図面の簡単な説明】
【図1】本実施形態の摩擦圧接装置の正面図である。
【図2】同じく摩擦圧接装置の図1における右側面図である。
【図3】同じく摩擦圧接装置の設備ベースの正面図である。
【図4】同じく摩擦圧接装置の平面図である。
【図5】従来技術の摩擦圧接装置の正面図である。
【図6】従来技術の摩擦圧接装置の図5における左側面図である。
【図7】従来技術の摩擦圧接装置の平面図である。
【符号の説明】
10…摩擦圧接装置、11…設備ベース、12,13…リニアガイド部材としてのリニアガイドレール、14…圧接機構を構成する固定クランプ、14b,14c,17b,17c…ワーク挟持アーム部、15a,16a…圧接機構を構成する第1及び第2主軸箱、15g,16g…アーム、17…圧接機構を構成する移動クランプ、18,20…ボールネジ、19,21…サーボモータ、W1〜W3…ワーク。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a friction welding apparatus for welding workpieces by a friction welding method.
[0002]
[Prior art]
Conventionally, a friction welding method is well known as a technique for joining workpieces. In this method, the workpieces to be joined are brought into contact with each other, a relative movement is caused on the contact surface while applying pressure, and the vicinity of the joining surface is heated and pressed by the generated frictional heat. This friction welding method has features such as being capable of pressure welding between dissimilar metals, low consumption of materials and electricity, and excellent productivity and joining accuracy. Currently, it is widely applied to materials such as rods and pipes as a welding method for mass production.
[0003]
5 to 7 show a conventional friction welding apparatus for joining three workpieces W11, W12, and W13. In FIG. 5, an upper surface 30a of the equipment base 30 of the friction welding apparatus is used as a work surface, and first and second linear guides 34 and 40 are extended in the longitudinal direction (Y direction) on the upper surface 30a. The first spindle unit 31 is installed in the first linear guide 34, and the second spindle unit 32 is installed in the second linear guide 40. Both spindle units 31, 32 are movable along the linear guides 34, 40, respectively. Yes.
[0004]
The first and second spindle units 31, 32 are provided with spindles 31a, 32a so as to be rotatable. The main shafts 31a and 32a are drivably coupled to rotation servomotors 31d and 32d via gears 31c and 32c disposed in the main shaft boxes 31b and 32b. Chuckes 31e and 32e are attached to the tips of the main shafts 31a and 32a, respectively, and fix the workpieces W12 and W13, respectively.
[0005]
Arms 35 and 39 projecting into the equipment base 30 are provided on the lower surfaces of the first and second spindle units 31 and 32. Ball screws 37 and 38 as press contact feed shafts driven by slide servomotors 36 and 41 are screwed onto the arms 35 and 39, respectively. When the ball screws 37 and 38 are rotated forward and backward, the first and second spindle units 31 and 32 are moved in the Y direction by a propulsive force generated between the ball screws 37 and 38 and the arms 35 and 39.
[0006]
Between the first and second spindle units 31 and 32, a fixed clamp 42 and a moving clamp 43 that sandwich the workpiece W11 are arranged. The leg 42 a of the fixed clamp 42 is fixed to the upper surface 30 a of the equipment base 30. As shown in FIG. 7, the fixed clamp 42 includes a pair of sandwiching arm portions 42 b and 42 c at the top. The clamping arm portions 42b and 42c move in a direction (front-rear direction) perpendicular to the Y direction with respect to the leg portion 42a to clamp and fix the workpiece W11.
[0007]
The leg 43a of the moving clamp 43 is installed on the second linear guide 40. The leg 43a of the moving clamp 43 moves in the Y direction along the second linear guide 40 and is fixed at a predetermined position. As shown in FIG. 7, the moving clamp 43 includes a pair of sandwiching arm portions 43b and 43c at the top. The clamping arm portions 43b and 43c move in a direction (front-rear direction) perpendicular to the Y direction with respect to the leg portion 43a to clamp and fix the workpiece W11.
[0008]
The center axis L0 of the workpiece W11 clamped and fixed by the fixed clamp 42 and the moving clamp 43 is fixed to chucks 31e and 32e provided on the main shafts 31a and 32a of the first and second main spindle units 31 and 32. It is configured to coincide with the central axis of the workpieces W12 and W13 (the central axis of the main shafts 31a and 32a).
[0009]
When, for example, the three workpieces W11, W12, and W13 are subjected to friction welding by the friction welding apparatus configured as described above, as shown in FIGS. 5 and 7, first, the intermediate workpiece W11 is moved to the both linear guides 34. , 40 is fixed to a fixed clamp 42 fixed at a predetermined position and a movable clamp 43 movably disposed on the second linear guide 40, and the workpieces W12, W13 on both sides of the intermediate workpiece W11 are respectively fixed. The main shafts 31a and 32a are fixed to chucks 31e and 32e. The spindles 31a and 32a are rotationally driven by the rotation servomotors 31d and 32d, respectively, so that the workpieces W12 and W13 are rotated at a predetermined rotational speed.
[0010]
When the ball screws 37 and 38 are rotationally driven in the predetermined rotational direction by the slide servomotors 36 and 41, the first and second spindle units 31 and 32 are both moved to the workpiece W11 via the arms 35 and 39, respectively. Toward the Y direction. When the rotated workpieces W12 and W13 are brought into contact with the workpiece W11 that does not rotate from both ends, frictional heat is generated at the joint between the workpiece W11 and the workpiece W12 and between the workpiece W11 and the workpiece W13. The joint portion of the three workpieces W11, W12, W13 is softened. When softening is advanced to a desired state and then the upset pressure is further applied while stopping the rotation of the workpieces W12 and W13, the joints of the three workpieces W11, W12 and W13 are integrated and welded together. The
[0011]
In the above-described friction welding process, the movement and upset pressure of the first spindle unit 31 (second spindle unit 32) are all performed by rotational driving of the ball screw 37 (ball screw 38), that is, the ball screw 37 (ball screw 38). The rotational movement is realized by changing to the linear movement of the arm 35 (arm 39) screwed with the ball screw 37 (ball screw 38). Accordingly, during the friction welding operation, the ball screw 37 (ball screw 38) and the arm 35 (arm 39) are frequently operated by the movement of the first main spindle unit 31 (second main spindle unit 32), and by applying the upset pressure. A large load is added. As a result, the ball screw 37 (ball screw 38) and the arm 35 (arm 39), especially the ball screw 37 (ball screw 38), must always be inspected and maintained.
[0012]
[Problems to be solved by the invention]
By the way, as shown in FIG. 7, the holding arm portions 42 b and 42 c of the fixed clamp 42 and the holding arm portions 43 b and 43 c of the moving clamp 43 are disposed in the front-rear direction with respect to the upper surface 30 a of the equipment base 30. As shown in FIGS. 6 and 7, the holding arm portions 42 b and 43 b on the front side of the fixed clamp 42 and the moving clamp 43 protrude outward from the front side surface of the equipment base 30. The holding arm portions 42 c and 43 c on the rear side of the fixed clamp 42 and the moving clamp 43 protrude outward from the rear side surface of the equipment base 30.
[0013]
When the distance from the center axis L0 of the workpiece W11 to the side end portions of the front and rear holding arm portions 42b, 43b, 42c, 43c is L1, this distance L1 is the holding arm portions 42b, 42c of the fixed clamp 42 and The distance is necessary for the structure of the holding arm portions 43b and 43c of the moving clamp 43, and cannot be further shortened.
[0014]
Therefore, the operator cannot approach any more by the sandwiching arm portions 42b and 43b projecting forward from the equipment base 30. As a result, the work of attaching and removing the workpiece W11 to and from the fixed clamp 42 and the moving clamp 43 is very troublesome and has a problem in workability.
[0015]
Further, since the ball screws 37 and 38 for moving the first and second spindle units 31 and 32 and the arms 35 and 39 screwed to the ball screws 37 and 38 are disposed in the equipment base 30, they are directly applied from the outside. The inspection and maintenance work cannot be performed. For this reason, each time the inspection and maintenance work is performed, the spindle boxes 31b and 32b installed on the upper surface 30a of the equipment base 30 have to be removed. As a result, the inspection and maintenance work of the ball screws 37 and 38, the arm 35, and the arm 39 is very troublesome and there is a problem in workability.
[0016]
SUMMARY OF THE INVENTION A first object of the present invention is to provide a friction welding apparatus capable of improving workability of work for mounting and removing a workpiece.
A second object of the present invention is to provide a friction welding apparatus capable of improving workability of inspection and maintenance work in addition to the first object.
[0017]
[Means for Solving the Problems]
  In order to solve the above problems, the invention according to claim 1 is a friction welding apparatus for joining at least two workpieces by friction welding, and a pressure welding mechanism for joining the workpieces by friction welding, On the front side of the equipment baseProvided, the front side surface is formed perpendicular to the mounting surface of the friction welding apparatus,The pressure contact mechanism has a pair of clamping armsPartA pair of clamping arms.PartIs the equipment baseThe equipment base to face the front side ofIt is arranged in a vertical state with respect to the vertical and horizontal directions relative to the equipment base when viewed.The workpiece is clamped and fixed by moving the pair of clamping arms arranged in the vertical state toward the workpiece.This is the gist.
[0018]
  The invention according to claim 2 is the friction welding apparatus according to claim 1, wherein the pressure welding mechanism is used.Comprises a spindle box movable laterally along the front side of the equipment base, and the drive mechanism of the spindle box is disposed inside the equipment base,Back side of equipment basesurfaceSaidThe drive mechanism of the spindle boxThe gist is that it is open toward.
[0019]
  According to a third aspect of the present invention, in the friction welding apparatus according to the second aspect, a linear guide member is extended laterally on the front side surface of the equipment base, and the linear guide member isSaidSpindle box installedPlaceThis is the summary.
[0020]
  According to a fourth aspect of the present invention, there is provided the friction welding apparatus according to the second aspect, wherein a pair of linear guide rails are provided on the front side surface of the equipment base so as to extend laterally and vertically in parallel, and the pair of upper and lower linear guides. On the railSaidSpindle box installedPlaceThis is the summary.
[0021]
  The invention according to claim 5 is the friction welding apparatus according to claim 2,The spindle box includes a first spindle box and a second spindle box,A pair of linear guide rails are extended laterally and vertically in parallel on the front side of the equipment base,SaidFirstSpindle boxAnd a second spindle boxPlaceThis is the summary.
According to a sixth aspect of the present invention, in the friction welding apparatus according to any one of the second to fifth aspects, the drive mechanism includes an arm projecting from the spindle box and a ball screw screwed into the arm. The main point is that
[0022]
  (Function)
  According to the invention of claim 1,A pair of clamping armsIs placed vertically, soClamping armThe overhanging part of the hangs up and down. As a result, the distance from the workpiece to the operator can be greatly reduced compared to the corresponding distance of the prior art device. That is, the operator can further approach the work. As a result, the workability of the friction welding apparatus can be improved.
[0023]
  Claim 2~ 6According to the invention described in claim 1, in addition to the operation of the first aspect, the rear side of the equipment base can be used without removing the pressure contact mechanism as compared with the prior art device.surfaceThrough the part opened fromSpindle box drive mechanismCan be metenance. As a result, inspection and maintenance work of the friction welding apparatus can be facilitated.
[0024]
  In particular,According to the inventions of claims 3 and 4, the distance from the workpiece to the operator can be significantly reduced compared with the corresponding distance of the prior art device, and without removing the spindle box or the like, The opposite side of the main box, that is, the back side of the equipment basesurfaceThrough the part opened fromSpindle box drive mechanismCan be metenance. As a result, the workability of the friction welding apparatus can be improved, and the inspection and maintenance work of the friction welding apparatus can be facilitated.
[0025]
  In particular,According to the fifth aspect of the present invention, the distance from the workpiece to the operator can be greatly reduced as compared with the corresponding distance of the prior art apparatus, and the first and second main spindle boxes are removed. Without the other side of the first and second spindle box, that is, the back side of the equipment basesurfaceThrough the part opened fromDrive mechanism for first and second spindle boxesCan be metenance. As a result, the workability of the friction welding apparatus can be improved, and the inspection and maintenance work of the friction welding apparatus can be facilitated.
[0026]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, one embodiment of the present invention will be described with reference to FIGS.
As shown in FIGS. 1-4, the equipment base 11 of the friction welding apparatus 10 of this embodiment was formed in the upper part of the four support parts 11a and the one side (right side in FIG. 2) of the four support parts 11a. It is comprised from the base part 11b. In the present embodiment, the front side surface 11r of the base portion 11b is a vertical surface, and the front side surface 11r is a work surface.
[0027]
FIG. 3 is a front view of the equipment base 11. As shown in FIG. 3, the first rectangular rectangular first and the second rectangular holes are formed on both sides of the front side surface 11r of the base portion 11b so as to open toward ball screws 18 and 20, which are parts requiring maintenance, which will be described later. Two through holes 11c and 11d are provided, respectively. The distance between the through holes 11c and 11d in the vertical direction is the same height. In addition, the distance between the through holes 11c and 11d in the lateral direction makes the second through hole 11d longer than the first through hole 11c. Between the 1st, 2nd through-holes 11c and 11d, the rectangular-shaped recessed part 11f is provided from the back side surface 11e of the base part 11b. The interval in the vertical direction of the recess 11f is formed at the same height as the vertical interval between the through holes 11c and 11d.
[0028]
And by providing the 1st, 2nd through-holes 11c and 11d and the recessed part 11f, four wall part 11g, 11h, 11j, 11k mutually parallel is formed in the base part 11b. Each of the walls 11g to 11k is provided with through holes 11m, 11n, 11o, and 11p that coincide with the central axis.
[0029]
As shown in FIGS. 1 to 4, the front side surface 11 r of the base portion 11 b is a linear guide member composed of two tracks that are parallel to each other so as to be positioned on both upper and lower sides of the first through hole 11 c. The first linear guide rail 12 extends in the lateral direction.
[0030]
Similarly, on the front side surface 11r of the base portion 11b, a second linear guide rail as a linear guide member comprising two tracks parallel to each other so as to be positioned on both the upper and lower sides of the second through hole 11c and the concave portion 11f. 13 is provided extending in the lateral direction. The first and second linear guide rails 12 and 13 have an interval between the pair of upper and lower first linear guide rails 12 and an interval between the pair of upper and lower second linear guide rails 13 and pass through an intermediate position of the interval. It is installed so that the intermediate lines coincide with each other. Further, the first and second linear guide rails 12 and 13 are installed such that surfaces passing through the intermediate line and the central axes of the through holes 11m, 11n, 11o, and 11p are horizontal surfaces.
[0031]
Further, as shown in FIG. 1, a fixed clamp 14 constituting a pressure contact mechanism is fixed to a predetermined position between the linear guide rails 12 and 13 on the front side surface 11r of the base portion 11b. The leg 14a of the fixed clamp 14 is fixed to the front side surface 11r. The fixed clamp 14 includes a pair of clamping arm portions 14b and 14c. The upper clamping arm portion 14 b and the lower clamping arm portion 14 c are arranged in parallel in the direction (vertical direction) perpendicular to the longitudinal direction (Y direction) with respect to the front side surface 11 r of the equipment base 11. The clamping arm portions 14b and 14c move in a direction (vertical direction) perpendicular to the Y direction to clamp and fix the workpiece W3.
[0032]
A moving clamp 17 is installed on the second linear guide rail 13, and a leg portion 17a of the moving clamp moves in the Y direction along the second linear guide rail 13 and is fixed at a predetermined position. The moving clamp 17 includes a pair of clamping arm portions 17b and 17c.
[0033]
The upper holding arm portion 17 b and the lower holding arm portion 17 c are arranged in parallel in the vertical direction perpendicular to the Y direction with respect to the front side surface 11 r of the equipment base 11. The clamping arm portions 17b and 17c move in the vertical direction perpendicular to the Y direction to clamp and fix the workpiece W3.
[0034]
As shown in FIG.1 and FIG.4, on the 1st linear guide rail 12, the 1st spindle box 15a of the 1st spindle unit 15 which comprises a press-contact mechanism is installed so that a movement is possible.
[0035]
The first spindle unit 15 is provided with a spindle 15b so as to be rotatable. The main shaft 15b is drivingly connected to a rotation servo motor 15d fixed on the first main shaft box 15a via a gear 15c disposed in the first main shaft box 15a. A chuck 15e that clamps and fixes the workpiece W1 is attached to the tip of the main shaft 15b. The center axis of the workpiece W1 clamped and fixed on the chuck 15e is made to coincide with the center axis L0 of the workpiece W3 clamped and fixed on the fixed and moving clamps 14 and 17.
[0036]
Further, as shown in FIG. 4, an arm 15g is formed to project from the rear side surface 15f of the first main spindle box 15a. When the first spindle box 15a is installed on the first linear guide rail 12 so as to be movable from the side, the arm 15g is embedded in the first through hole 11c of the equipment base 11. .
[0037]
A through hole 15h is provided at the tip of the arm 15g. The through hole 15h is screwed with a ball screw 18 rotatably supported by the through holes 11m and 11n. Therefore, if the ball screw 18 is rotated, the arm 15g (first spindle box 15a) moves linearly along the ball screw 18 (first linear guide rail 12).
[0038]
The base end of the ball screw 18 is drivably coupled to a rotating shaft of a servo motor 19 fixed to the left side surface of the base portion 11b.
On the 2nd linear guide rail 13, the 2nd main spindle box 16a of the 2nd main spindle unit 16 which comprises a press-contact mechanism is installed so that a movement is possible. The second spindle unit 16 is provided with a spindle 16b that can rotate. The main shaft 16b is drivingly connected to a rotating servo motor 16d fixed on the second main shaft box 16a via a gear 16c disposed in the second main shaft box 16a. A chuck 16e that clamps and fixes the workpiece W2 is attached to the tip of the main shaft 16b. The center axis of the workpiece W2 clamped and fixed to the chuck 16e is made to coincide with the center axis L0 of the workpiece W3 clamped and fixed to the fixed and moving clamps 14 and 17.
[0039]
Further, an arm 16g is formed to project from the rear side surface 16f of the second main spindle box 16a. When the second main spindle box 16a is movably installed on the second linear guide rail 13, the arm 16g is housed in the second through hole 11d of the equipment base 11.
[0040]
A through hole 16h is provided at the tip of the arm 16g. The through hole 16h is screwed with a ball screw 20 rotatably supported by the through holes 11m and 11n. Therefore, if the ball screw 20 is rotated, the arm 16g (second spindle box 16a) moves linearly along the ball screw 20 (second linear guide rail 13).
[0041]
The base end of the ball screw 20 is drivably coupled to a rotating shaft of a servo motor 21 fixed to the right side surface of the base portion 11b.
Next, the operation of the friction welding apparatus 10 configured as described above will be briefly described.
[0042]
The friction welding apparatus 10 can simultaneously friction weld the three workpieces at the same time. When, for example, three workpieces W1, W2, and W3 are friction-welded by the friction welding apparatus 10, first, an intermediate workpiece W3 is sandwiched between the fixed clamp 14 and the movable clamp 17 as shown in FIGS. Fix it. In this case, the position of the moving clamp 17 is adjusted by moving the moving clamp 17 on the second linear guide rail 13 according to the length of the workpiece W3. That is, one end of the workpiece W3 is clamped and fixed to the fixed clamp 14, and then the clamp position of the other end of the workpiece W3 is adjusted to be clamped and fixed to the moving clamp 17. Further, the workpiece W1 is clamped and fixed to the chuck 15e of the first spindle unit 15, and the workpiece W2 is clamped and fixed to the chuck 16e of the second spindle unit 16.
[0043]
Then, the workpiece W1 is rotated at a predetermined number of rotations when the main shaft 15b is rotationally driven by a rotation servomotor 15d.
The first spindle unit 15 is driven in the central axis direction (Y direction) of the spindle 15b toward the workpiece W3 together with the arm 15g when the ball screw 18 is rotationally driven in a predetermined rotation direction by the slide servo motor 19. Translated. When the rotated workpiece W1 is brought into contact with the non-rotating workpiece W3, frictional heat is generated at the joint between the two workpieces W1 and W3, and the joint between the two workpieces W1 and W3 is softened by the frictional heat. . When the softening is advanced to a desired state and then the upset pressure is further applied while the rotation of the workpiece W1 is stopped, the joint portions of the workpieces W1 and W3 are integrated and welded so as to be sunk together.
[0044]
Meanwhile, at the same time, the workpiece W2 is rotated at a predetermined rotational speed by the main shaft 16b being rotationally driven by the rotation servomotor 16d.
Further, the second spindle unit 16 is driven in the central axis direction (Y direction) of the spindle 16b toward the workpiece W3 together with the arm 16g when the ball screw 20 is rotationally driven by the slide servomotor 21 in a predetermined rotation direction. Translated. When the rotated workpiece W2 is brought into contact with the non-rotating workpiece W3, frictional heat is generated at the joint between the two workpieces W2 and W3, and the joint between the two workpieces W2 and W3 is softened by the frictional heat. . When the softening is advanced to a desired state and then the upset pressure is further applied while stopping the rotation of the workpiece W2, the joint portions of both the workpieces W2 and W3 are integrated and welded together. Then, the workpieces W1, W2, and W3 are joined together.
[0045]
Next, features of the friction welding apparatus 10 of the present embodiment configured as described above will be described.
(1) In the present embodiment, the first spindle box 15a of the first spindle unit 15 is movably installed on the first linear guide rail 12 provided on the front side surface 11r of the base portion 11b of the equipment base 11. The second spindle box 16a of the second spindle unit 16 is movably installed on the second linear guide rail 13 provided on the front side surface 11r of the base portion 11b of the equipment base 11. That is, the sliding parts of the first and second main spindle boxes 15 a and 16 a are arranged on the front surface of the equipment base 11. That is, the first and second main spindle boxes 15a and 16a constituting the pressure contact mechanism are arranged in a vertical state.
[0046]
In the present embodiment, the fixed clamp 14 is fixed to the front side surface 11r of the base portion 11b of the equipment base 11, and the moving clamp 17 is a second linear guide rail provided on the front side surface 11r of the base portion 11b of the equipment base 11. 13 is movably installed. And as shown in FIG. 4, the work clamping arm part 14b, 14c, 17b, 17c of both the clamps 14 and 17 is each arrange | positioned at the up-down direction. That is, the fixed clamp 14 and the movable clamp 17 that constitute the press contact mechanism are arranged in a vertical state.
[0047]
Therefore, as shown in FIG. 4, the first and second spindle units 15 and 16, which mean the distance from the workpieces W1 to W3 to the operator, the fixed clamp 14 and the central axis L0 of the moving clamp 17, the device on the operator side. The distance L to the end face is greatly reduced compared to the corresponding distance L1 of the prior art device shown in FIG. 7 because the overhangs of the fixed and moving clamps 14, 17 overhang and do not overhang forward. be able to. That is, the operator can approach the workpieces W1 to W3. As a result, the operator can easily perform the work of mounting or removing the workpieces W1 to W3 on the first and second spindle units 15, 16 and the clamps 14, 17. That is, the workability of the friction welding apparatus 10 can be improved.
[0048]
(2) In the present embodiment, the first spindle box 15a of the first spindle unit 15 is movably installed on the first linear guide rail 12 provided on the front side surface 11r of the base portion 11b of the equipment base 11. The second spindle box 16a of the second spindle unit 16 is movably installed on the second linear guide rail 13 provided on the front side surface 11r of the base portion 11b of the equipment base 11. A ball screw 18 for moving and driving the first spindle unit 15 screwed with the arm 15g of the first spindle box 15a is disposed between the through holes 11m and 11n of the base portion 11b. The ball screw 20 for moving and driving the second spindle unit 16 screwed with the arm 16g of the second spindle box 16a is disposed between the through holes 11o and 11p of the base portion 11b.
[0049]
Moreover, as shown in FIG. 3, horizontal rectangular first and second through holes 11c and 11d are respectively provided on both sides of the front side surface 11r of the base portion 11b.
[0050]
Therefore, when the ball screws 18 and 20 are inspected and maintained, the first and second spindle boxes 15a and 16a are not removed, but the opposite side of the first and second spindle boxes 15a and 16a, that is, the back side of the equipment base 11. The inspection and maintenance work can be performed through the through hole 11c and the through hole 11d. As a result, the inspection and maintenance work of the friction welding apparatus 10 can be easily performed.
[0051]
In addition, you may change embodiment of this invention as follows.
○ Clamp structure, rotation structure, main shaft drive structure, slide structure and control system, work type (single head, double head), etc., which are other specific pressure contact mechanisms as described in the above embodiment, are not limited at all. It can be applied to friction welding devices of any structure. For example, the servo motors 15d and 16d that rotationally drive the spindles 15b and 16b of the first and second spindle units 15 and 16 may be implemented as normal motors. Further, the ball screws 18 and 20 and the servo motors 19 and 21 for driving the first and second spindle boxes 15a and 16a of the first and second spindle units 15 and 16 to move horizontally are used as hydraulic cylinder driving mechanisms. Also good. In this case, the same effect as the above embodiment can be obtained.
[0052]
The opening shape, the numerical aperture, and the opening structure on the back side of the equipment base as described in the above embodiment are not limited at all as long as maintainability is obtained. For example, the concave portion 11f provided between the first and second through holes 11c and 11d is omitted, or the first and second through holes 11c and 11d and the concave portion 11f are connected to form one through hole. May be. Further, three or more through holes may be provided. Instead of the first and second through holes 11c and 11d, for example, a support may be provided between the plate members. In short, it is only necessary to have a space that is continuous with the outside so that a portion requiring maintenance can be easily operated from the outside.
[0053]
In addition, the longitudinal cross-sectional shape of the first and second through holes 11c, 11d and the recess 11f provided in the base portion 11b is not limited to a rectangular shape, but may be a circle, an ellipse, or a polygon other than a rectangle. Good.
[0054]
In addition, the first and second through holes 11c and 11d and the recess 11f may be omitted. In this case, although the maintainability of the friction welding apparatus is not different from the conventional one, an effect of improving workability can be obtained.
[0055]
In the above embodiment, the first and second spindle units 15 and 16 are operated (synchronized) at the same time. However, the first and second spindle units 15 and 16 may be operated separately. Good. In this case, the same effect as the above embodiment can be obtained.
[0056]
In the above embodiment, the arms 15g and 16g are formed so as to protrude from the rear side surfaces 15f and 16f of the first and second spindle boxes 15a and 16a, respectively. However, the arms 15g and 16g are first members, respectively. Further, the second main spindle boxes 15a and 16a may be fixed to the rear side surfaces 15f and 16f. In this case, the same effect as the above embodiment can be obtained.
[0057]
As shown in FIG. 4, first and second dustproof covers 11 s and 11 t indicated by two-dot chain lines are provided in the apparatus rear side openings of the first and second through holes 11 c and 11 d so as to be openable and closable. You may implement. In this case, the same effect as the above embodiment can be obtained.
[0058]
One of the first and second spindle units 15 and 16 may be omitted, that is, a friction welding apparatus constituted by one spindle unit 15 (or spindle unit 16) may be embodied. In this case, the same effect as the above embodiment can be obtained.
[0059]
One of the fixed clamp 14 and the movable clamp 17 may be omitted.
The first and second linear guide rails 12 and 13 may each consist of one track. Further, the linear guide member may be implemented by a V-shaped groove other than the guide rail, for example.
[0060]
In the above-described embodiment, the “vertical state” in which the pressure contact mechanism is arranged is not limited to being completely vertical, but includes a case in which the pressure mechanism is inclined in the front-rear direction (equipment base). In addition, a mechanism for arbitrarily adjusting the tilt angle of the pressure contact mechanism may be provided.
[0061]
【The invention's effect】
As described above in detail, according to the first aspect of the invention, the workability of the friction welding apparatus can be improved.
[0062]
  Claim 26According to the invention described in (2), inspection and maintenance of the friction welding apparatus can be facilitated, and workability can be improved.
[Brief description of the drawings]
FIG. 1 is a front view of a friction welding apparatus according to an embodiment.
FIG. 2 is a right side view of the friction welding apparatus in FIG. 1;
FIG. 3 is a front view of the equipment base of the friction welding apparatus.
FIG. 4 is a plan view of the friction welding apparatus.
FIG. 5 is a front view of a conventional friction welding apparatus.
6 is a left side view of the prior art friction welding apparatus in FIG. 5;
FIG. 7 is a plan view of a conventional friction welding apparatus.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 ... Friction pressure welding apparatus, 11 ... Equipment base, 12, 13 ... Linear guide rail as a linear guide member, 14 ... Fixed clamp which comprises pressure welding mechanism, 14b, 14c, 17b, 17c ... Work clamping arm part, 15a, 16a ... 1st and 2nd spindle box which comprises a press-contact mechanism, 15g, 16g ... Arm, 17 ... Moving clamp which comprises a press-contact mechanism, 18, 20 ... Ball screw, 19, 21 ... Servo motor, W1-W3 ... Workpiece.

Claims (6)

少なくとも二つ以上のワーク間を摩擦圧接にて接合する摩擦圧接装置において、
前記ワークを摩擦圧接接合させるための圧接機構は、設備ベースの前側面に設けられ、前記前側面は、摩擦圧接装置の載置面に対して垂直に形成され、該圧接機構は、一対の挟持アームを有するクランプを備え、前記一対の挟持アームは、前記設備ベースの前記前側面と対向するように前記設備ベースを見た場合の該設備ベースに対する縦横を基準とした縦状態に配置され、縦状態に配置された前記一対の挟持アーム部が前記ワークに向かって互いに移動することでワークが挟持固定されることを特徴とする摩擦圧接装置。
In a friction welding apparatus that joins at least two workpieces by friction welding,
A pressure-contact mechanism for friction-welding the workpiece is provided on the front side surface of the equipment base, and the front side surface is formed perpendicular to the mounting surface of the friction pressure-welding device. A clamp having an arm portion, and the pair of sandwiching arm portions are arranged in a vertical state with respect to the equipment base when viewed from the equipment base so as to face the front side surface of the equipment base. The workpiece is clamped and fixed by moving the pair of clamping arms arranged in a vertical state relative to each other, toward the workpiece .
請求項1に記載の摩擦圧接装置において、
前記圧接機構は、前記設備ベースの前側面に沿って横方向に移動可能な主軸箱を備え、前記主軸箱の駆動機構は前記設備ベースの内部に配置され、前記設備ベースの裏側は、前記主軸箱の前記駆動機構に向かって開口されていることを特徴とする摩擦圧接装置。
In the friction welding apparatus according to claim 1,
The pressure contact mechanism includes a spindle box that is movable in a lateral direction along a front side surface of the equipment base, a driving mechanism of the spindle box is disposed inside the equipment base, and a back side surface of the equipment base is A friction welding apparatus , wherein the spindle box is opened toward the drive mechanism .
請求項2に記載の摩擦圧接装置において、
前記設備ベースの前側面に横方向にリニアガイド部材を延設し、そのリニアガイド部材に前記主軸箱を設置したことを特徴とする摩擦圧接装置。
In the friction welding apparatus according to claim 2,
Friction welding apparatus, characterized in that said linear guide member and extending laterally facility based front surface, and established the said spindle box in the linear guide member.
請求項2に記載の摩擦圧接装置において、
前記設備ベースの前側面に横方向に且つ上下平行に一対のリニアガイドレールを延設し、その上下一対のリニアガイドレールに前記主軸箱を設置したことを特徴とする摩擦圧接装置。
In the friction welding apparatus according to claim 2,
Friction welding apparatus characterized by the front side of the equipment base so laterally and vertically parallel to extend the pair of linear guide rails, and established the said spindle box in the upper and lower pair of linear guide rails.
請求項2に記載の摩擦圧接装置において、
前記主軸箱は第1主軸箱及び第2主軸箱を備え、前記設備ベースの前側面に横方向に且つ上下平行に一対のリニアガイドレールを延設し、その上下一対のリニアガイドレールに前記第1主軸箱及び第2主軸箱を設置したことを特徴とする摩擦圧接装置。
In the friction welding apparatus according to claim 2,
The spindle box comprises a first spindle box and the second spindle box, and then extends vertically parallel to the pair of linear guide rails laterally front side of the equipment base, the first on the upper and lower pair of linear guide rails friction welding apparatus being characterized in that established the first spindle box and the second spindle box.
請求項2〜5のいずれか一項に記載の摩擦圧接装置において、  In the friction welding apparatus according to any one of claims 2 to 5,
前記駆動機構は、前記主軸箱に突出形成されたアーム及び該アームに螺合されるボールネジを備えていることを特徴とする摩擦圧接装置。  The drive mechanism includes an arm projecting from the spindle box and a ball screw screwed to the arm.
JP21601798A 1998-07-30 1998-07-30 Friction welding equipment Expired - Lifetime JP4067189B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP21601798A JP4067189B2 (en) 1998-07-30 1998-07-30 Friction welding equipment
TW088112616A TW416883B (en) 1998-07-30 1999-07-26 Frictional pressing device
KR1019990030989A KR100359398B1 (en) 1998-07-30 1999-07-29 Friction welding apparatus
CNB991105443A CN1137799C (en) 1998-07-30 1999-07-29 Friction pressure welding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21601798A JP4067189B2 (en) 1998-07-30 1998-07-30 Friction welding equipment

Publications (2)

Publication Number Publication Date
JP2000042761A JP2000042761A (en) 2000-02-15
JP4067189B2 true JP4067189B2 (en) 2008-03-26

Family

ID=16682005

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21601798A Expired - Lifetime JP4067189B2 (en) 1998-07-30 1998-07-30 Friction welding equipment

Country Status (4)

Country Link
JP (1) JP4067189B2 (en)
KR (1) KR100359398B1 (en)
CN (1) CN1137799C (en)
TW (1) TW416883B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100809643B1 (en) 2006-10-27 2008-03-07 정운규 Friction Welding Device
JP5060984B2 (en) * 2008-02-07 2012-10-31 株式会社豊田自動織機 Friction welding equipment
KR101084576B1 (en) * 2009-05-14 2011-11-17 고정세 Isophase friction welding method and apparatus
KR101004312B1 (en) 2010-04-27 2010-12-28 이병애 Automatic friction welding device for vehicle power transmission shaft
US10265809B2 (en) * 2013-05-13 2019-04-23 Dana Automotive Systems Group, Llc Method of joining workpieces using a sliding part coupling portion
KR102083110B1 (en) * 2019-01-07 2020-02-28 김성택 Straight wear welding machine for welding of dissimilar materials
KR102810279B1 (en) * 2022-10-25 2025-05-26 주식회사 동성테크 Clamp unit for friction welding equipment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3237037B2 (en) * 1993-06-17 2001-12-10 株式会社日立製作所 Friction welding device
JP3491661B2 (en) * 1996-08-22 2004-01-26 トヨタ自動車株式会社 Friction welding method

Also Published As

Publication number Publication date
CN1137799C (en) 2004-02-11
KR20000012058A (en) 2000-02-25
CN1247786A (en) 2000-03-22
JP2000042761A (en) 2000-02-15
KR100359398B1 (en) 2002-10-31
TW416883B (en) 2001-01-01

Similar Documents

Publication Publication Date Title
KR101067864B1 (en) Gantry Friction Stir Welding Machine
JPS60152387A (en) Multi-point welding apparatus
KR20170143270A (en) Vertical type welding apparatus for 3D pipe circle welding of car
JP4067189B2 (en) Friction welding equipment
JP4090588B2 (en) Friction welding method and friction welding apparatus
CN115255751A (en) Solar aluminum frame welding processing device for photovoltaic module
JP7720701B2 (en) Friction stir welding apparatus and friction stir welding method
JP3661923B2 (en) Mash seam welding equipment
JP3675513B2 (en) Welding method and welding equipment
KR100596730B1 (en) Sheet centering device in Taylor welded blank system
JPH01316112A (en) Two-axis control for v-shaped groove working machine
CN118768817A (en) A pipe and pipe fitting internal expansion and external clamp assembly and robot welding integrated machine
JP3984723B2 (en) Clamp device and friction welding device
CN212398476U (en) Double-station friction stir welding equipment with upper machine head and lower machine head
KR100259881B1 (en) The 2-dimensional flexible fixing device for butt laser welding
JPH01310831A (en) Table feed device for gear machining device
JP6540794B2 (en) Friction stir welding machine
JP3402930B2 (en) Automatic seam welding line copying machine
CN223070744U (en) Pipe fitting internal expansion and external clamping assembly and robot welding integrated machine
CN110883473A (en) Circular seam welder
CN223947027U (en) Five laser cladding automatic weld machines
CN220825578U (en) Laser welding machine
JPS62173154A (en) Transfer device
JPH0353822Y2 (en)
KR100329371B1 (en) Chucking means of large structure welding device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070620

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070626

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070824

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071016

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080108

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110118

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110118

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120118

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120118

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130118

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140118

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term